ONGOING PROJECTS Sr. No Project Title Contract Number Start Date Completion Date Work Progress Client Name Contract Type Prime or Sub Contract Location (Country & City) 1 Long form contract of onshore maintain potential projects for SA-4 zone from Saudi Aramco. 6600042388 9-Jul-18 8-Jul-2025 SAUDI ARAMCO LFC PRIME All Southern Area of KSA 2 LUMP SUM PROCURE BUILD CONTRACT FOR AL-MUAJJIZ TERMINAL YANBU PROJECT 6600034241 2-Dec-14 31-Oct-17 99% SAUDI ARAMCO LSPB PRIME YANBU, KSA 3 PROCUREMENT AND CONSTRUCTION OF SALES GAS DELIVERY SYSTEM FOR PP-13 POWER PLANT 4400007444 16-Jan-16 31-Mar-18 87% SAUDI ELECTRIC COMPANY PC PRIME RIYADH, KSA 4 LONG FORM CONTRACT OF EAST-WEST PIPELINE- RECONDITIONING WORK 6600034586 1-Feb-15 31-Jan-20 30% SAUDI ARAMCO LFC PRIME AREA I, II 5 CONSTRUCTION OF OIL, WATER & GAS WELLS & PIPELINE OF MAINTAIN POTENTIAL PROJECTS WITH DIFFERENT PO’S AT ALL OVER KINGDOM OF SAUDI ARABIA VARIOUS PO’S 01-Oct-16 31-Dec-18 90% SAUDI ARAMCO MFC SUB CONTRACT ALL AREAS OF KSA

Upload: others

Post on 03-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ONGOING PROJECTS - mail.mbtc.com.sa

ONGOING PROJECTS

Sr. No

Project Title

Contract Number

Start Date

Completion Date

Work Progress

Client Name

Contract Type

Prime or Sub Contract

Location (Country &

City)

1

Long form contract of onshore maintain potential projects for

SA-4 zone from Saudi Aramco.

6600042388

9-Jul-18

8-Jul-2025

SAUDI ARAMCO

LFC

PRIME

All Southern Area of

KSA

2

LUMP SUM PROCURE BUILD CONTRACT FOR AL-MU’AJJIZ

TERMINAL YANBU PROJECT

6600034241

2-Dec-14

31-Oct-17

99%

SAUDI ARAMCO

LSPB

PRIME

YANBU,

KSA

3

PROCUREMENT AND CONSTRUCTION OF SALES GAS

DELIVERY SYSTEM FOR PP-13 POWER PLANT

4400007444

16-Jan-16

31-Mar-18

87%

SAUDI ELECTRIC COMPANY

PC

PRIME

RIYADH,

KSA

4

LONG FORM CONTRACT OF EAST-WEST PIPELINE-

RECONDITIONING WORK

6600034586

1-Feb-15

31-Jan-20

30%

SAUDI ARAMCO

LFC

PRIME

AREA I, II

5

CONSTRUCTION OF OIL, WATER & GAS WELLS & PIPELINE OF

MAINTAIN POTENTIAL PROJECTS WITH DIFFERENT PO’S AT

ALL OVER KINGDOM OF SAUDI ARABIA

VARIOUS

PO’S

01-Oct-16

31-Dec-18

90%

SAUDI ARAMCO

MFC

SUB

CONTRACT

ALL AREAS

OF KSA

Page 2: ONGOING PROJECTS - mail.mbtc.com.sa

MAJOR PROJECTS COMPLETED BY MBTC

S.NO

PROJECT TITLE

CLIENT NAME

CONTRACT NO

AWARD DATE

COMPLETION

DATE

STATUS

(COMPLETED ONGOING)

LSTK/ LSPB/ OTHER

PRIIME OR

SUB- CONTRACT

LOCATION

(COUNTRY & CITY)

1

PROCUREMENT AND CONSTRUCTION OF

EXPANSION OF FUEL AND FEEDSTOCK PIPELINE

STAGE 2, JUBAIL 2

ROYAL

COMMISSION

204-C51

25-Jul-12

30-Jun-17

COMPLETED

PC

PRIME

JUBAIL,

KSA

2

PROCUREMENT AND CONSTRUCTION OF SALES

GAS DELIVERY SYSTEM FOR SAUDI ELECTRICITY

COMPANY PP-12 AT DHURMA

SAUDI

ELECTRICITY

COMPANY

4400005273

25-Jun-14

31-Dec-16

COMPLETED

PC

PRIME

RIYADH,

KSA

3

CONSTRUCTION OF OIL, WATER AND GAS WELLS &

PIPELINE OF MAINTAIN POTENTIAL PROJECTS WITH

DIFFERENT POS (Year 2006 – 2016) AT ALL OVER

KINGDOM OF SAUDI ARABIA

SAUDI ARAMCO

VARIOUS POS

2007 - 2017

COMPLETED

MFC

PRIME

ALL AREAS

OF KSA

4

LONG FORM CONTRACT OF RECONDITIONING

WORKS AT EAST WEST PIPELINE PROJECT

SAUDI ARAMCO

6600017230

7-Nov-06

6 May-2011

COMPLETED

LFC

PRIME

AREA I, II,II

& IV

Page 3: ONGOING PROJECTS - mail.mbtc.com.sa

5

LONG FORM CONTRACT OF PIPELINE COATING

REHABILITATION LINE AT PUMP STATIONS

(PS-2 TO PS-3)

SAUDI ARAMCO

RW/P/C/010

2-Jun-11

2-Jun-14

COMPLETED

LFC

PRIME

JUBAIL

6

LONG FORM CONTRACT OF WATER DELIVERY AT

EAST WEST PIPELINE RECONDITIONING PROJECT

SAUDI ARAMCO

6600010999

1-Jun-04

31-May-17

COMPLETED

LFC

PRIME

AREA I, II,II

& IV

Page 4: ONGOING PROJECTS - mail.mbtc.com.sa

MBTC PROJECT DIARY

S.No

Client

Project Type

Project Title Purchase Order

Number

Start

Date

Completion

Date

Location

1

ARAMCO

Gas Pipeline

TIE-IN SDGM-1071 GAS W ELL TO SDGM-726

21735

1-Oct-16

10-Jan-17

SDGM-KSA

2

ARAMCO

Gas Pipeline

TIE-IN SDGM-1048 GAS W ELL TO SDGM-723

21735

1-Oct-16

15-Jan-17

SDGM-KSA

3

ARAMCO

Oil Pipeline

TIE-IN HW YH-588 OIL W ELLTO HW YH GOSP-4

6510786490

28-Jul-16

31-Oct-16

Hawiyah, KSA

4

ARAMCO

Oil Pipeline

ABQQ-GOSP-2 SW D LINE FROM ABQQ-611 TO 356

6510780539

5-Jun-16

30-Nov-16

Abqaiq KSA

5

ARAMCO

Oil Pipeline

ABQQ-352 TO 356 12" EXTENSION HEADER

6510780470

5-Jun-16

30-Nov-16

Abqaiq KSA

6

ARAMCO

Oil Pipeline

TIE-IN ANDR-3014

6510779337

25-May-16

31-Oct-16

Ainder KSA

7

ARAMCO

Oil Pipeline

TIE-IN ANDR-274 OIL W ELL TO ANDR GOSP-6

6510777677

15-May-16

31-Jul-16

Aindar, KSA

8

ARAMCO

Gas Pipeline

UGW HW YH -1087 TIE-IN TO HWY -942 &HW YH-1073 TO HW YH

6510771805

12-Apr-16

30-Sep-16

Hawiyah, KSA

9

ARAMCO

Oil Pipeline

TIE-IN HW YH-1787

6510765397

25-Feb-16

30-Apr-16

Utmaniyah, KSA

10

ARAMCO

Oil Pipeline

TIE-IN UTMN-1784

6510765997

25-Feb-16

31-May-16

Hawiyah, KSA

11

ARAMCO

Oil Pipeline

TIE-IN HW YH-513

6510765996

25-Feb-16

31-May-16

Hawiyah, KSA

12

ARAMCO

Oil Pipeline

TIE-IN UTMN-1786

6510765618

25-Feb-16

30-Apr-16

Utmaniyah, KSA

13

ARAMCO

Oil Pipeline

TIE-IN UTMN-1781

6510766082

25-Feb-16

31-May-16

Utmaniyah, KSA

14

ARAMCO

Oil Pipeline

TIE-IN UTMN-1785

6510766102

25-Feb-16

31-May-16

Utmaniyah, KSA

15

ARAMCO

Oil Pipeline

TIE-IN UTMN -1720

6510765709

25-Feb-16

30-Apr-16

Utmaniyah, KSA

16

ARAMCO

Oil Pipeline

TIE-IN UTMN -1780

6510765698

21-Feb-16

31-Mar-16

Utmaniyah, KSA

17

SEC

W ater Pipeline

SEC QCPP ( W ATER INJECTION TEST) AT PS # 6 RIYADH

6510760757

15-Jan-16

31-Mar-16

Riyadh KSA

18

ARAMCO

Oil Pipeline

TIE-IN HW YH-586

6510756239

24-Dec-15

28-Feb-16

Hawiyah, KSA

Page 5: ONGOING PROJECTS - mail.mbtc.com.sa

19

ARAMCO

Oil Pipeline

TIE-IN HW YH-587

6510756257

24-Dec-15

28-Feb-16

Hawiyah, KSA

20

ARAMCO

Oil Pipeline

TIE-IN UTMN-1782

6510756237

24-Dec-15

28-Feb-16

Utmaniyah, KSA

21

ARAMCO

Oil Pipeline

TIE-IN HW YH -585

6510748317

31-Oct-15

28-Feb-16

Hawiyah, KSA

22

ARAMCO

Oil Pipeline

8" UTMN -44, 554 and 409 TSTL REPLACEMENT OF

6510749566

5-Nov-15

31-Mar-16

Utmaniyah, KSA

23

ARAMCO

Oil Pipeline

TIE-IN HW YH -599

6510749249

31-Oct-15

31-Dec-15

Hawiyah, KSA

24

ARAMCO

Oil Pipeline

CONSTRUCTION OF TIE-IN NYYM-144

6510743488

30-Sep-15

31-Dec-15

Nuayyim, KSA

25

ARAMCO

Oil Pipeline

CONSTRUCTION OF TIE-IN NYYM-138

6510743452

29-Sep-15

30-Nov-15

Nuayyim, KSA

26

ARAMCO

Oil Pipeline

TIE-IN HW YH-630

6510744344

21-Sep-15

31-Jan-16

Hawiyah, KSA

27

ARAMCO

Oil Pipeline

TIE-IN UTMN -1712

6510744341

21-Sep-15

31-Jan-16

Utmaniyah, KSA

28

ARAMCO

Oil Pipeline

TIE-IN UTMN -1719

6510744342

21-Sep-15

31-Jan-16

Utmaniyah, KSA

29

ARAMCO

Oil Pipeline

TIE-IN UTMN - 1730

6510744343

21-Sep-15

31-Jan-16

Utmaniyah, KSA

30

ARAMCO Oil & W ater

Pipeline

TIE-IN NYYM -142

6510706528

5-Feb-15

31-Dec-15

Nuayyim, KSA

31

ARAMCO

Gas Pipeline

REMAINING W ORK AT SHAYBAH GOSP 3 TRUNKLINES

6510725482

20-May-15

30-Sep-15

Shaybah KSA

32

ARAMCO

Gas Pipeline

REMAINING W ORK AT SHAYBAH GOSP - 2 TRUNKLINES

6510725979

20-May-15

30-Sep-15

Shaybah KSA

33

ARAMCO Oil & W ater

Pipeline

TIE-IN TO UTMN -1709

6510709014

19-Feb-15

31-May-15

Utmaniyah, KSA

34

ARAMCO Oil & W ater

Pipeline

TIE-IN NYYM -141

6510706527

5-Feb-15

31-May-15

Nuayyim, KSA

35

ARAMCO

Oil Pipeline

TIE-IN UMJF-44

6510662240

31-May-14

31-Jan-15

Umjaf, KSA

36

ARAMCO Oil & W ater

Pipeline

ABMK -2 TRUNKLINE

6510689804

13-Nov-14

31-Jan-15

ABMK- KSA

37

ARAMCO Oil & W ater

Pipeline

TIE-IN NYYM -518

6510676104

21-Aug-14

31-Jan-15

Nuayyim, KSA

38

ARAMCO Oil & W ater

Pipeline

TIE-IN NYYM -140

6510675822

21-Aug-14

31-Jan-15

Nuayyim, KSA

Page 6: ONGOING PROJECTS - mail.mbtc.com.sa

39

ARAMCO

Gas Pipeline

KGW UTMN -1929 TIE-IN TO UTMN-1918

6510666706

17-Jun-14

1-Mar-15

Utmaniyah, KSA

40

ARAMCO

Gas Pipeline

KGW UTMN -1823 TIE-IN TO UTMN SUB R/H "F"

6510666708

17-Jun-14

1-Mar-15

Utmaniyah, KSA

41

ARAMCO

Gas Pipeline

UTMN GOSP - ZV SKID INSTALLATION

6510663830

12-Jun-14

31-Jul-14

Utmaniyah, KSA

42

ARAMCO Oil & W ater

Pipeline

TIE-IN AMBK-2

6510681833

28-Sep-14

31-Dec-15

ABMK- KSA

43

ARAMCO Oil & W ater Pipe

line

TIE-IN NYYM-139 AND 520

6510661213

13-May-14

28-Feb-15

Nuayyim, KSA

44

ARAMCO

Gas Pipeline

UTMN R/H "B" TO UKGM 16" T/L- FINAL PUNCH LIST

6510659472

7-May-14

31-Dec-14

Utmaniyah, KSA

45

ARAMCO

Oil Pipeline

TIE-IN NYYM-137

6510643010

10-Feb-14

31-May-14

Nuayyim, KSA

46

ARAMCO

Gas Pipeline

KGW ANDR-608 TIE-IN TO ANDR R/H 'B'

6510652588

15-Apr-14

31-Dec-14

Aindar, KSA

47

ARAMCO W ater & Oil

Pipeline

REPLACEMENT OF 10" HW TH T/L-G

6510643654

5-Mar-14

31-Dec-14

Hawtah, KSA

48

ARAMCO W ater & Oil

Pipeline

REPLACEMENT OF 12" HW TH - T/L-G

6510643011

27-Feb-14

31-Jul-14

Hawtah, KSA

49

ARAMCO

Gas Pipeline

EXISTING JUBAIL 2 ROYAL COMMISSION METHANE DISTRIBUTION NETW

6510645223

18-Feb-14

30-May-14

Jubail, KSA

50

ARAMCO

Oil Pipeline

TIE-IN NYYM-134 AND 136

6510642992

10-Feb-14

30-Apr-14

Nuayyim, KSA

51

ARAMCO W ater & Oil

Pipeline

REPLACEMENT OF 16" HW TH T/L-H FROM CIV TO 16"X12"

6510643012

10-Feb-14

31-Jul-14

Hawtah, KSA

52

ARAMCO

Gas Pipeline

KGW UTMN-1921 TIE-IN TO UTMN-1895

6510637583

16-Jan-14

31-Dec-14

Utmaniyah, KSA

53

ARAMCO

Gas Pipeline

JGW UTMN 2009 TIE-IN TO UTMN 1921

6510636461

8-Jan-14

31-Dec-14

Utmaniyah, KSA

54

ARAMCO Oil & W ater Pipe

line

HRDH-319, UTMN-477 REPLACEMENTS, 12" SW D HEADER & SKID FOU

6510618802

2-Oct-13

30-Jun-14

HRDH, KSA

55

ARAMCO W ater & Oil

Pipeline

REPLACEMENT OF 16" HW TH T/L-H FROM FCC TO CIV

6510635647

31-Dec-13

28-Feb-15

Hawtah, KSA

56

ARAMCO

W ater Pipeline

REPLACEMENT OF CORRODED LINES AT HW TH INJECTION HEADER

6510633836

31-Dec-13

30-Jul-14

Hawtah, KSA

57

ARAMCO

Oil Pipeline

REPLACEMENT OF 8" HW TH T/L-G

6510628596

4-Dec-13

31-Dec-14

Hawtah, KSA

58

ARAMCO

Oil Pipeline

PDHMS,E&I AND FENCE AT HRDH AND HW YH W ELLS

6510618803

2-Oct-13

30-Apr-14

Hawiyah, KSA

Page 7: ONGOING PROJECTS - mail.mbtc.com.sa

59

ARAMCO

W ater Pipeline

ABQQ-943 AND 944 FL INSTALLATIONS

6510611580

15-Aug-13

31-Jan-14

Abqaiq, KSA

60

ARAMCO

Reconditioning

PIPELINE REPAIR, RECONDITIONING AND ROW MAINTENANCE AT AREA II & III

6510594971

1-Jun-13

31-May-14 EW PD Area-

II&III, KSA

61

ARAMCO

Reconditioning

PIPELINE REPAIR, RECOND. AND ROW MAINTENACE AT AREA IV

6510594809

18-May-13

17-May-14 EW PD Area-IV,

KSA

62

ARAMCO

Reconditioning

PIPELINE REPAIR, AND RECOND. AT AREA - I

6510594810

18-May-13

17-May-14 EW PD Area-I,

KSA

63

ARAMCO

Oil Pipeline

RTR REPLACEMENTS FOR 03 HZMY AND 02 UMJF

6510585570

20-Mar-13

30-Apr-14 Hazmiyah

Umjaf, KSA

64

ARAMCO Oil & W ater

Pipeline

VARIOUS W ORK IN NYYM-12 AND 708, PDHMS

6510580711

18-Feb-13

31-May-13

Nuayyim, KSA

65

ARAMCO

Gas Pipeline

KGW UTMN 1907 TIE-IN TO UTMN RH 'K' & UTMN 1891 TIE-IN

6510573488

16-Jan-13

31-Dec-13

Utmaniyah, KSA

66

ARAMCO

Oil Pipeline

HYDRO TEST NEW FABRICATED SPOOLS AT HARADH AREA

6510574594

21-Jan-13

10-Jul-13

Haradh, KSA

67

ARAMCO

RE- ASSIGNMENT

6510594410

1-May-13

31-May-13

EW Pipeline

68

ARAMCO

Gas Pipeline

KGW UTMN 1846 TIE-IN TO UTMN RH 'K'

6510568980

12-Dec-12

30-May-13

Utmaniyah, KSA

69

ARAMCO

W ater Pipeline

REPLACE CORRODED W IH "D" AND LATERALS IN 07 HW TH

6510519833

23-Jan-12

31-Dec-12

Hawtah, KSA

70

ARAMCO

Reconditioning

PIPELINE DAYLIGHTING AT YANBU

6510537994

1-Jun-12

31-Mar-13

Yanbu, KSA

71

ARAMCO

Gas Pipeline

KHUFF GAS W ELL UTMN - 1903 TIE-IN TO UTMN-1871 F/L

6510523399

19-Feb-12

31-Dec-12

Utmaniyah, KSA

72

ARAMCO

Gas Pipeline

KHUFF GAS W ELL - FZRN - 28 TIE-IN TO ANDR R/H 'B'

6510550158

4-Aug-12

28-Feb-13 Fazran Aindar,

KSA

73

ARAMCO

Gas Pipeline

8" AND 16" JUMP OVER AT SDGM GAS GATHERING MANIFOLD

6510528544

17-Mar-12

30-Nov-12

Shedgum, KSA

74

ARAMCO

W ater Pipeline

REPLACE HW TH CORRODED WATER INJECTION HEADERS

6510545645

1-Jul-12

30-Sep-12

Hawtah, KSA

75

ARAMCO

Reconditioning

PIPELINE REPAIR, RECON. AND ROW MAINTENACE AT AREA II

6510543093

23-Jun-12

31-Dec-12 EW PD Area-II,

KSA

76

ARAMCO W ater & Oil

Pipeline

TIE-IN NYYM-133, HOOK UP NYYM-704 AND 707,NYYM-517

6510519618

29-Apr-12

30-Jul-12

Nuayyim, KSA

77

ARAMCO

W ater Pipeline

REPLACE CORRODED W IH "C"AND LATERALS IN 03 HW TH WELLS

6510523505

15-Feb-12

31-Jul-12

Utmaniyah, KSA

78

ARAMCO

Oil Pipeline

ABQQ-181 AND 330 RTR FLOW LINE REPLACEMENT

6510520873

30-Jan-12

30-Jun-12

Abqaiq, KSA

Page 8: ONGOING PROJECTS - mail.mbtc.com.sa

79

ARAMCO

Gas Pipeline

KHUFF GAS ANDR-603 TIE-IN TO ANDR R/H 'A'

6510542487

24-Jun-12

30-Dec-12

Aindar, KSA

80

ARAMCO

Reconditioning

PIPELINE RECONDITIONING AT EW RB-1

6510530076

17-Jan-12

31-Jan-12

EW Pipeline

81

ARAMCO

Gas Pipeline

KHUFF GAS W ELL ANDR-605 TIE-IN TO ANDR R/H 'A'

6510515892

4-Jan-12

30-Apr-12

Aindar, KSA

82

ARAMCO

Gas Pipeline

KHUFF GAS W ELL - SDGM - 725 TIE-IN TO SDGM R/H 'D'

6510515148

28-Dec-11

31-Dec-12

Shedgum, KSA

83

ARAMCO

Gas Pipeline

KHUFF GAS W ELL UTMN - 2005 TIE-IN TO UTMN- R/H 'K'

6510511285

7-Dec-11

30-Apr-13

Utmaniyah, KSA

84

ARAMCO

Oil Pipeline

TIE-IN ANDR-572 FLOW LINE TO ANDR GOSP-4 W ITH PDHMS

6510504455

18-Nov-11

31-Mar-12

Aindar, KSA

85

ARAMCO

Oil Pipeline

TIE IN NYYM-128 FLOW LINE TO MANIFOLD # 4

6510505364

24-Oct-11

31-Dec-11

Nuayyim, KSA

86

SW CC

Gas Pipeline

REHABILITATION OF POLYETHYLENE COATING OF MAINLINE VALVES

RW /P/C/007

1-Sep-11

4-Jun-12 Dammam -

Riyadh KSA

87

ARAMCO

Oil Pipeline

TIE-IN NYYM-132 FLOW LINE TO NYYM GOSP-1

6510497746

24-Aug-11

31-Dec-11

Nuayyim, KSA

88

ARAMCO

W ater Pipeline

FULL REPLACEMENT OF CORRODED FLOW LINES IN UTMN-309

6510497161

22-Aug-11

31-Mar-12

Utmaniyah, KSA

89

ARAMCO

Oil Pipeline

TIE-IN UTMN-1764 AND UTMN-1757, FENCE,PDHMS AND W ELLS

6510497014

22-Aug-11

31-Mar-12

Utmaniyah, KSA

90

ARAMCO

Gas Pipeline

KGW SDGM 238 TIE-IN TO SDGM 235 & COMM LINE TO SDGM-411

6510488470

16-Aug-11

30-Nov-11

Shedgum, KSA

91

ARAMCO

Oil Pipoeline

TIE-IN UTMN-1755 F/L, E&I,PDHMS & FENCING

6510479438

4-May-11

31-Aug-11

Utmaniyah, KSA

92

SW CC

Reconditioning

REHABILITATION OF HEAT SHRINK SLEEVE COATING OF W ELD JOINT

RW /R/C/400

1-Jul-11

5-Mar-12 Dammam -

Jubail KSA

93

ARAMCO

Civil W orks

INSTALLATION OF PERIMETER FENCE AT RABIYAH LAND

6510492823

18-Jul-11

31-Jul-11

Rabiyah, KSA

94

ARAMCO

Gas Pipeline

TIE-IN KHUFF GAS W ELL UTMN-1892 F/L TO UTMN-1843

6510485937

11-Jun-11

1-Nov-11

Utmaniyah, KSA

95

ARAMCO

Oil Pipeline

INSTALLATION OF FLOW LINE PROTECTION SYSTEM W #324,ADGOSP-6

6510481722

28-May-11

28-Jun-11

Aindar, KSA

96

ARAMCO

Reconditioning

SAND BLASTING TAPE W RAPPING OF A 30" PIPE IN ABU-ALI FLANK-1

6510482168

11-May-11

15-Jun-11

Abu Ali KSA

97

ARAMCO

Oil Pipeline

TIE-IN ABJF-693 LATERAL TO WIH & INSTALLTION OF FENCE

6510475083

17-Apr-11

29-Jun-11

Abu Jifan, KSA

98

ARAMCO W ater & Oil

Pipeline

TIE-IN IN NYYM-515 6" LATERAL TO NYYM MAIN W I HEADER AND REPLACEMENT OF

FOUR NYYM EXISTING MANIFOLDS

6510473530

26-Mar-11

30-Mar-12

Nuayyim, KSA

Page 9: ONGOING PROJECTS - mail.mbtc.com.sa

99

SW CC

Reconditioning

PIPELINE COATING REHABILITATION FOR LINE A & B PS-1 TO PS-2

RW /P/M/007

20-Mar-11

5-Jul-11 Dammam -

Jubail KSA

100

ARAMCO

Oil Pipeline TIE-IN AND TYPE III FENCE FOR UTMN-1752 AND TYPE-III AND V FENCE FOR UTMN-

1750

6510462011

12-Jan-11

30-Jun-11

Utmaniyah, KSA

101

ARAMCO

Reconditioning

RECONDITION W ELLS LANDING BASE @SHEDGUM AREA

6510435740

17-Jul-10

16-Nov-10

Shedgum KSA

102

ARAMCO

W ater Pipeline

TIE IN ABQ-221 TO 12" U/G W IH FROM ABQ - GOSP - 3

6510449363

24-Oct-10

23-Oct-13

Abqaiq, KSA

103

ARAMCO

Reconditioning

ASPHALT PS11 ROAD ACCESS AND MAINT. AREA

6510449139

23-Oct-10

31-Dec-10

EW PL, KSA

104

ARAMCO

W ater Pipeline WATER INJECTION HEADER EXTENSION FOR ABQ-291 AND HOOK-UP CONNECTION

POINTS

6510447558

16-Oct-10

15-Oct-11

Abqaiq, KSA

105

ARAMCO

W ater Pipeline

TIE-IN NYYM-513 AND 514 AND INSTALLATION OF E&I AND SECURITY FENCE

6510441140

16-Aug-10

31-Dec-10

Nuayyim, KSA

106

ARAMCO

Oil Pipeline

TIE-IN ANDR-560 8" U/G F/L TO ANDR GOSP-6, TYPE-III FENCE

6510438683

11-Jul-10

31-Mar-11

Aindar, KSA

107

ARAMCO

Oil Pipeline

TIE-IN ANDR-567 TO ANDR GOSP-4

6510431499

13-Jun-10

30-Dec-10

Aindar, KSA

108

ARAMCO

Oil Pipeline

TIE-IN NYYM-127 TO NYYM TR/L-3 & INSTALLTION OF MPFM,E&I AND SECURITY FENCE

6510421646

11-Apr-10

25-May-11

Nuayyim, KSA

109

ARAMCO

Oil Pipeline

INSTALLATION OF PDHMS FOR 13 ABDH,FDHL,KRSN AND QATIF W ELLS

6510421606

11-Apr-10

28-Feb-12 Qatif/ Abu

Hadriyah

110

ARAMCO

Civil W orks

CONSTRUCTION OF SECURITY FENCE TYPE-III ON 12 W ELLS

6510421638

13-Apr-10

30-Nov-10 Aindar/

Shedgum, KSA

111

ARAMCO

Oil Pipeline

INSTALLATION OF HIPPS SYSTEM (12AE) ON 12 W ELLS IN ANDR & SDGM

6510417404

16-Mar-10

31-Oct-10 Aindar/Shedgum

, KSA

112

ARAMCO

Oil Pipeline

ABQ-539 8" U/G FLOW LINE TO ABQ GOSP-6

6510415165

6-Mar-10

31-Jul-10

Abqaiq, KSA

113

ARAMCO

W ater Pipeline

TIE-IN OF 5 ABQ W ELLS TO W ATER INJECTION PUMPS

6510418500

22-Mar-10

30-Nov-10

Abqaiq, KSA

114

ARAMCO

W ater Pipeline

CONSTRUCTION OF HW TH WATER INJECTION HEADER REPLACEMENT

6510389090

16-Sep-09

1-Mar-10

Hawtah, KSA

115

ARAMCO

Oil Pipeline

ADDITIONAL MATERIAL TO REQUISITION 3000307565 CRPO 6510396435

6510408535

27-Dec-09

31-Dec-10

Manifa KSA

116

ARAMCO

W ater Pipeline

20" RTR TEMPORARY SEA W ATER SUPPLY PIPELINE

6510396435

31-Oct-09

31-Dec-09

Manifa KSA

117

ARAMCO

Gas Pipeline

INSTALLATION OF HW YH REMOTE HEADER/TRUNK LINE "LK" AND COMM

6510392724

10-Oct-09

31-Mar-10

Hawiyah, KSA

118

ARAMCO

Oil Pipeline

TIE-IN QATIF-316 & 317 AND NEW DRILL SITE P-13 DEVELOPEMENT

6510385784

8-Aug-09

31-Jul-10

Qatif, KSA

Page 10: ONGOING PROJECTS - mail.mbtc.com.sa

/

119

ARAMCO

Oil Pipeline INSTALLATION OF PDHMS SURFACE EQUIPMENT FOR W ORK DOW N HOLE DYNAMIC

SENSOR

6510383112

19-Jul-09

8-Sep-09

Aindar, KSA

120

ARAMCO

Oil Pipeline

TIE IN ABQ-538 AND 540 TO ABQ GOSP-6 AND MODIFICATION

6510383038

18-Jul-09

30-Apr-10

Abqaiq, KSA

121

ARAMCO Oil & W ater

Pipeline

ADDITONAL PDHMS AND FENCING

6510369013

19-Apr-09

30-Jun-09

Nuayyim, KSA

122

ARAMCO Oil & W ater

Pipeline

REPLACEMENT CONVERSION AND ADDITION OF NYYM W ELLS

6510366474

5-Apr-09

30-Apr-09

Nuayyim, KSA

123

ARAMCO Oil & W ater

Pipeline

INSTALLATION OF BELOW GROUND FLARE LINES FOR 9 NYYM

6510376404

30-May-09

31-Jul-09

Nuayyim, KSA

124

ARAMCO

Gas Pipeline

TIE-IN SDGM-704 TO SDGM-462B W ELL SITE

6510365041

28-Mar-09

31-Aug-09

Shedgum, KSA

125

ARAMCO Oil & W ater

Pipeline

SMART W ELL CONVERSION VALIDATION HYDOTEST MOV SIGNAL

6510373716

20-May-09

30-Jun-09

Nuayyim, KSA

126

ARAMCO

Oil Pipeline

TIE-IN QATIF-157 OIL FLOW LINE AT W ELLSITE W -36

6510359156

14-Mar-09

16-May-09

Qatif KSA

127

ARAMCO

W ater Pipeline

TIE-IN QATIF -780 6" LATERAL TO 16" W ATER INJECTION HEADER

6510360130

2-Mar-09

31-May-09

Qatif KSA

128

ARAMCO

Oil Pipeline

CONSTRUCTION OF DRAIN LINE FOR 5 NYYM W ELLS

6510371379

2-May-09

30-Jun-09

Nuayyim, KSA

129

ARAMCO

Oil Pipeline

TIE-IN ABQ-531 W ELL 8" U/G FLOW LINE TO ABQ GOSP-6

6510353491

13-Jan-09

30-Jun-09

Abqaiq KSA

130

ARAMCO Oil & W ater

Pipeline

ADDITONAL W ELL PW I MARL ROAD CROSSING LATERAL RE ROUT

6510324759

10-Nov-08

30-Jan-09

Nuayyim, KSA

131

ARAMCO

Oil Pipeline

INSTALLATION OF SSD FENCE FOR UTHM-1383,1668 & 1690

6510323333

2-Jul-08

8-Oct-08

Utmaniyah, KSA

132

ARAMCO

Oil Pipeline

TIE-IN TO SDGM- 563 A/G 8" OIL FLOW LINE TO SDGM GOSP-3 AND INSTTALLATION

6510331197

20-Feb-08

30-Nov-08

Shedgum KSA

133

ARAMCO Oil & W ater

Pipeline

CRPO W ITH 10% RETENTION

6510299795

27-Jan-08

23-Dec-09

Nuayyim, KSA

134

ARAMCO

Oil Pipeline

CRPO FOR LS CONTRACT W ITH 10% RETENTION

6510277292

2-Oct-07

10-Dec-07

Barri KSA

135

ARAMCO

Oil Pipeline

INSTALL PDHMS (SE) & CONTROL DEVICES & E&I @ HRDH-415,443,305 & 506

6510260328

17-Jun-07

11-Dec-07

Haradh KSA

136

ARAMCO

Oil Pipeline

TIE-IN ABQ-493 TO ABQ-GOSP-6 &W ELL HEAD PIPING INSTALLATION

6510258362

4-Jun-07

31-Jul-07

Abqaiq KSA

137

ARAMCO

Oil Pipeline

10" FLOW LINE # 1041 MODIFICATION AT UGOSP-4 AREA

6510253525

6-May-07

1-Nov-07

Utmaniyah, KSA

138

ARAMCO

Oil Pipeline

REMOVECONCRETE SALBS @ HW GOPS-3 & 4

6510257232

30-May-07

16-Jun-07

Utmaniyah, KSA

Page 11: ONGOING PROJECTS - mail.mbtc.com.sa

139

ARAMCO

Oil Pipeline

LINE FILLING @HAW IYAH AND HARAD AREA

6510255167

16-May-07

29-May-07 Hawiyah,Harad

KSA

140

ARAMCO

Oil Pipeline

10" ABANDONED PIPES REMOVAL @ HAW IYAH AREA

6510253462

6-May-07

23-May-07

Hawiyah, KSA

141

ARAMCO

Reconditioning

REMOVE 48" ABANDONED PIPES AT HW GOSP-2 AREA

6510253505

6-May-07

23-May-07

Hawiyah, KSA

142

ARAMCO

Reconditioning

REMOVE ABANDONED 48"PIPES AT HW GOSP-4 AREA

6510253526

6-May-07

23-May-07

Hawiyah, KSA

143

ARAMCO

Oil Pipeline

MODIFY 10" TEST LINE # 15 AT HDGOSP -1 AREA FOR SAFM &FD

6510248506

8-Apr-07

30-Apr-07

Haradh KSA

144

ARAMCO

Oil Pipeline

REMOVE ABANDONED F/L HRDH-18 AT HDGOSP-1 AREA FOR SAFM & FD

6510248507

8-Apr-07

30-Apr-07

Haradh KSA

145

ARAMCO

Oil Pipeline

INSTALL SSV & PIPING MOD @ANDR- 408,438,466,475,501 & 522

6510232234

6-Jan-07

28-Feb-07

Ainder KSA

146

ARAMCO

Reconditioning

RECONDITIONING AND ROW CONTRACT FOR EW PD

6600017230

7-Nov-06

6-Nov-10

EW PL KSA

147

ARAMCO

Oil Pipeline

INSTALL CSD COUPON AT ABQ-497 to 46" U/G PIPELINE

6510226163

26-Nov-06

26-Dec-06

Abqaiq KSA

148

ARAMCO

Oil Pipeline

TIE-IN 8" SDGM-520 FLOW LINE TO SDGM- GOSP-5 & INSTALL PDHMS

6510208099

1-Aug-06

16-Dec-06

Shedgum KSA

149

ARAMCO

Oil Pipeline

TIE-IN 8" UTMN-1628 FLOW LINE TO UTMN- GOSP-12

6510205443

12-Jul-06

23-Sep-06

Utmaniyah, KSA

150

ARAMCO

Oil Pipeline

INSTALL PDHMS (SE) AT ANDR -538 SDGM-586 & 528

6510201056

17-Jun-06

31-Mar-07

Ainder KSA

151

ARAMCO

Oil Pipeline

TIE-IN 8" UTMN-1660 FLOW LINE TO UTMN- GOSP-2

6510197079

24-May-06

31-Jul-06

Utmaniyah, KSA

152

ARAMCO

Oil Pipeline

INSTALL PDHMS (SE) & CONTROL DEVICES AT SDGM-514 OIL

6510196160

18-May-06

28-Jun-06

Shedgum KSA

153

ARAMCO

Oil Pipeline

TIE-IN 8" UTMN-1625 FLOW LINE TO UTMN- GOSP-8

6510191105

20-Apr-06

30-Jun-06

Utmaniyah, KSA

154

ARAMCO

Oil Pipeline

INSTALL PDHMS (SE) & CONTROL DEVICES AT SDGM-503 & 504

6510190865

17-Apr-06

13-Oct-06

Shedgum KSA

155

ARAMCO

Oil Pipeline

INSTALL PDHMS AND SURFACE EQUIPMENT & CONTROL DEVICES W ELL SDGM-487

6510190863

17-Apr-06

15-Jun-06

Shedgum KSA

156

ARAMCO

Oil Pipeline

TIE-IN 8" SDGM-514 FLOW LINE TO SDGM- GOSP-5

6510181158

4-Mar-06

15-Jul-06

Shedgum KSA

157

ARAMCO Oil & W ater

Pipeline

CRPO W ITH 10% RETENTION

6510297524

9-Mar-06

13-Nov-07

Nuayyim, KSA

158

ARAMCO

Oil Pipeline

INSTALL PDHMS AND CONTROL DEVICES AT SDGM-502 &555 OIL PRODUCTION W ELL

6510184327

11-Mar-06

18-Aug-06

Shedgum KSA

Page 12: ONGOING PROJECTS - mail.mbtc.com.sa

159

ARAMCO

Oil Pipeline

INSTALL PDHMS AND CONTROL DEVICES AT SDGM-494 OIL WELL

6510182034

27-Feb-06

21-Jun-06

Shedgum KSA

160

ARAMCO

Oil Pipeline

TIE-IN 8" SDGM-504 FLOW LINE TO SDGM- GOSP-3

6510176380

25-Jan-06

30-Apr-06

Shedgum KSA

161

ARAMCO

Oil Pipeline

INSTALL PDHMS AND CONTROL DEVICES AT ANDR-506 OIL WELL

6510175047

18-Jan-06

7-Mar-06

Ainder KSA

162

ARAMCO

Oil Pipeline

INSTALL PDHMS AND CONTROL DEVICES AT ANDR-530 OIL WELL

65100164186

14-Nov-05

31-Jan-06

Ainder KSA

163

ARAMCO

Oil Pipeline

TIE-IN 8" ANDR-530 FLOW LINE TO ANDR- GOSP-6

6510155387

14-Sep-05

5-Nov-05

Ainder KSA

164

ARAMCO

Oil Pipeline

TIE-IN ANDR-516 FLOW LINE TO ANDR- GOSP-3

6510143868

29-Jun-05

31-Aug-05

Ainder KSA