oil wells stimulation

14
Oil Wells Fog Stimulation Treatment INCREASING OIL BARRELS PRODUCTION IN 1 DAY

Upload: gridesa

Post on 28-Jul-2015

50 views

Category:

Business


14 download

TRANSCRIPT

Page 1: Oil wells stimulation

Oil Wells Fog Stimulation Treatment

INCREASING OIL BARRELS PRODUCTION IN 1 DAY

Page 2: Oil wells stimulation

WWW.OILGETTERS.COM

Contents

Value Proposition: Fog Stimulation Treatment

Benefits and applications

Comparison with Conventional Oil Wells Stimulation

Fog Stimulation Process

Our Guarantee

Success stories

About Oil Getters

Request a Proposal

Page 3: Oil wells stimulation

WWW.OILGETTERS.COM

Value Proposition: Fog Stimulation Treatment

Important note: we only inject superheated fog, no way

peroxide is injected into the well and / or tubing that could

affect the chemical nature of the oil, rig or

facilities. Additionally, the fog never changes its state to water.

Therefore, it will not require an extra process to separate oil

from water.

Would you like a 30% oil extraction increase in less than 1 day?

We are on a mission to help upstream companies to improve their oil well extraction efficiency in at least a 30% increase in

their daily production through the implementation of a tailored and patented fog stimulation treatment using hydrogen

peroxide combined with a set of reagents at temperatures ranging from 176 °F to 392 °F

.

Page 4: Oil wells stimulation

WWW.OILGETTERS.COM

Benefits and applications

Cleansing: it removes all paraffins, asphaltenes and other

minerals in oil rigs, discharge lines, pipelines, equipment and

facilities allowing oil to flow freely. This treatment is friendly

to any mechanical problem of the oil well.

Stimulation: Our superheated fog penetrates the reservoir

and it reaches crude oil that was not easy to extract before

because of its density, therefore increasing its production. It

applies to any type of reservoir or soil, regardless of its

geological formation or conditions.

When we stimulate your mechanical or pneumatic oil wells of depth up to 30,000 ft, we will inject our superheated fog

into your pipeline, with the following benefits and applications:

Results guaranteed in less than 24 hours!

Page 5: Oil wells stimulation

WWW.OILGETTERS.COM

Characteristics Fog Stimulation Treatment Conventional Stimulation Treatment

Water Use No / Use of hydrogen peroxide in minimum amounts. Distilled Water / treatment plant /582 BPD = 4 a 5 pipes

per day approx.

Fossil Fuel Use No 60,000 tons of natural gas per day approx.

Chemical Use Yes, the chemical used is environmentally friendly. No

Mobility The entire system weighs less than a ton. The system further comprises boilers and distillers and

also a supply of constant distilled water.

Fog Quality Superheated / Our fog doesn’t lose its properties when

temperature goes below 90 ° C / 194° F

Saturated Dry / It is converted back into water when

temperature goes below 90 °C/ 194° F and the amount of

injected water is considerable.

Operation time 1 to 4 hours maximum. 28 days in stimulation. It has never been used for

cleansing because of its expensive cost.

Production Increase From 30% to 100% regarding production starting point. From 30% to 100% regarding production starting point.

Our Fog Stimulation Treatment is 100% clean technology because it does not generate any greenhouse gas, fossil fuels

or polluting waste, not even water. Let’s review the following comparison chart:

Comparison with Conventional Oil Wells Stimulation

Page 6: Oil wells stimulation

WWW.OILGETTERS.COM

Fog Stimulation Process

Oil Wells Initial Diagnostic Evaluation

Oil Wells Tailored Stimulation

Treatment Design

Oil Wells Stimulation Application

Every oil well has different characteristics: soil, reservoir, rig, pressure and so on.

Therefore, we always need to perform a thorough evaluation of each oil well so that we design a tailored stimulation treatment and application.

All of it, at our own expense!

We get paid if, and

only if we clean your

rig and increase your

oil barrel production

per day!

Initial Questionnaire:

We need to determine the

initial state and conditions

of the oil well: daily

productivity, operating

conditions, and so on.

Based on the conditions of the oil

well, our Oil Engineering Team will

determine the time, frequency,

amount and temperature of Fog

Stimulation to apply in order to

increase production.

At this point, we implement

the tailored treatment for your

oil wells, in a way and as

long as it takes us to

increase production.

Page 7: Oil wells stimulation

WWW.OILGETTERS.COM

Our Guarantee

Our business model is very simple, if we don’t deliver on our promise, we don’t get paid!

Let’s illustrate this with numbers:

Let’s say that your oil well produces 20 barrels per day.

Let’s imagine that once we apply our fog stimulation treatment, it goes up to

30 barrels per day.

Now you will substract your previous production of the final result. We will get

a share of the excess in production.

Production Oil barrels per day

Starting production 20

Stimulated Production 30

Difference (new production) 10

We get a share of this

new production

We provide our oil well fog stimulation treatment using a model of profit sharing based on the

results of stimulation by steam, it is to say, we charge only a percentage of the increase in

production. We assume all the operating costs of the stimulation of each well, including all its

stages: treatment design and implementation.

So, our only way to get paid, is to make you oil well more productive!

Page 8: Oil wells stimulation

WWW.OILGETTERS.COM

Our Fog Stimulation Treatment has been successfully tested in different wells owned by PEMEX and operated by the British

company PETROFAC in Mexico, as well as other oil wells in Midland, Texas.

Success stories

Some of our stimulated oil wells:

PEMEX > Golpe 122.- Clean simple rig flowing

PEMEX > Santuario 137 and 35T.- Cleaning mechanical pumping rig

PEMEX > Sánchez Magallanes 137, 2018 & 2019

Caprock 001, Midland, Texas

Let’s review some of those success stories

Page 9: Oil wells stimulation

WWW.OILGETTERS.COM

Well Features

Rig Mechanical Pumping

Depth 3114 m

Packer 2836 m

Failure High friction efforts and bad filling superficial pump

Production 125 BPD

Cleanse & Stimulation Results

Set up 2.5 hr, area of opportunity using flexible hoses to connect

Operation 15 min, V=55. m3, P=150 psi, T=120°C / 248°F

RigWax return was observed with production fluids in metal dam, reducing efforts on the UBM load 4000 lb

Production 33% increase in production

RecommendationsTaking information and measuring torque letter to quantify results, optimize BM

General Results Successful

Success Story: PEMEX > Santuario 137

Page 10: Oil wells stimulation

WWW.OILGETTERS.COM

Well Features

Rig Gas lift

Depth 3376 m

Packer 2950 m

Failure Pass in BN valves

Production 90 BPD

Cleanse and Stimulation Results

Set up 2.5 hr, area of opportunity using flexible hoses to connect

Operation 45 min, V=35 m3, P=150 psi, T=110°C

RigOpening and closing of the 7 reducing valves, leaving operating orifice valve in operation, wax return was observed in metallic dam

Production 119 BPD, 30% increase in production

Recommendations Optimize BN network for better operation

General Results Successful

Success Story: PEMEX > Sanchez Magallanes 2019

Page 11: Oil wells stimulation

WWW.OILGETTERS.COM

Well Features

Rig Mechanical pump

Depth 980 m

Pump 720 m

FailurePresence of asphaltenes and heavy hydrocarbons

Production 2 BPD

Cleanse and Stimulation Results

Set up 1 hr

OperationWeek 1 Cleanse: 30 min, V=43 m3, P=100 psi, T=110°C / 230°FWeek 2 Interval Cleanse: 28 min, V=41 m3, P=150 psi, T=110°C / 230°FWeek 3 Stimulation: 48 min, V=60 m3, V=62 m3,, P=150 psi, T=110°C / 230°F

Assessment

Cleanse: the BM loading system effort was lowered and we observed the correction of the BBA filling process. Interval Cleanse: We observed and gathered at the surface level: fracking gel, fracking mud, heavy hydrocarbons and the dynamics of the oil well were increased.Stimulation: we observed a substantial increase of crude oil production

ProductionProduction was increased from 2 BPD to 37 BPD in the first week. Then, on the second week, it went down and got stabilized at 17 BPD for more than 1 month.

RecommendationsRig optimization, assessment to create maintenance cycles to keep good levels of daily production.

General Results Successful

Caprock 001, Midland Texas

Page 12: Oil wells stimulation

WWW.OILGETTERS.COM

We are on a mission to help upstream companies to increase their

oil barrels productivity by offering our state of the art equipment and

solution that will yield at least a 30% increase in less than 1 day.

We are a partnership between the International Business and

Economic Development Consulting Group and Petrolep, with

presence in the United States and Mexico.

Our Partnership has already delivered outstanding results in the

USA and in MEXICO with upstream and downstream operations.

About Oil Getters

Our certifications:

Our Oil and Gas Business Units:

Oil Wells Stimulation Treatment

Non-Destructive Testing: Magnetic Particle (MT), Liquid Penetrant (PT), Radiographic (RT), Ultrasonic (UT), Electromagnetic

(ET), Visual (VT), Acoustic Emission (AE), Guided Wave (GW), Laser Testing Methods (LM), Leak Testing (LT), Magnetic Flux

Leakage (MFL), Thermal / Infrared Testing (IR), Vibration Analysis (VA)

Pipeline repairs and wrapping

Bio-remediation for oil spills

Fracking minerals: silica sand, barite, bentonite and hydrochloric acid

Page 13: Oil wells stimulation

WWW.OILGETTERS.COM

Request a tailored proposal

By now, you already know that:

1. When you work with Oil Getters, you will be able to increase your daily oil barrel production.

2. You can count on our know how, our technology, our team, our experience and our operational investment to increaseyour oil barrel production.

3. We have to deliver on our promise or we don’t get paid!

So, what are you waiting for?

Request your tailored proposal today at

http://www.oilgetters.com

Once you send us your information, we will contact you at our earliest convenience to schedule a conference call so

that we fully understand your needs and expectations. We will then send you a questionnaire to gather specific

information so that our Oil Engineering Team designs the right treatment for your oil wells.

Would you like a 30% oil extraction increase in 1 day?

Page 14: Oil wells stimulation

May you succeed with

your Oil Wells!

F O R M O R E I N F O R M AT I O N W E I N V I T E Y O U T O V I S I T O U R W E B S I T E :

H T T P : / / W W W. O I L G E T T E R S . C O M /

S E N D U S A N E M A I L T O : O I L @ I B E D C O N S U LT I N G . C O M

O R C A L L U S AT O U R U S N U M B E R : + 1 8 3 2 3 0 5 9 2 3 4