Oil & Gas Sectors Projects
Oil
In the field of oil production, Y&V executes projects based on the highest quality and safety standards, designing, building or revamping central processing facilities or main stations, clusters, production gathering systems, flow stations, valve stations, oil treatment (dehydration, desalting and stabilization), oil transportation and storage, pumping, oilfield power generation and distribution, and oil secondary recovery.
Y&V provides solutions for heavy oil upgrading and refining, with the purpose of increasing equipment and process efficiency focused on the use of less-pollutant technologies, one of today’s greater challenges for oil companies.
Process units: atmospheric distillation units, vacuum distillation units, hydrotreating units, burning systems, alkylation, catalytic cracking, delayed coker unit, gas and liquid fractionation.
Auxiliary units: amine regeneration units, sour water treatment units, hydrogen recovery units, sulfur recovery units.
Utilities and offsites: power generation and distribution facilities, wastewater treatment plants, nitrogen system, fuel gas system, plant and instrument air system, storage facilities, water cooling systems, steam and condensate generation units.
Gas
Y&V specializes in developing projects focused on producing and treating natural gas, covering different processes such as dehydration, gas liquid extraction plants, sweetening, separation, compression, valve stations, transportation and storage, liquefied natural gas facilities and regasification.
Oil & Gas Projects
Compressor Plant and Flux Station Mata 8
START DATE: February 2001 COMPLETETION DATE: November 2001
CLIENT: SADE - PEREZ COMPANCread more...
Pigap II Dehydration Plant
START DATE: September 1995 COMPLETETION DATE: September 1996 CLIENT: PDVSA GAS, S.A.read more...
Bajo Grande – Ulé – Amuay Transportation System Expansion
START DATE: April 2006 COMPLETETION DATE: September 2006 CLIENT: PDVSA GAS, S.A.read more...
San Joaquin, IV Train Liquid Extraction Plant
START DATE: April 2007 COMPLETETION DATE: December 2009CLIENT: PDVSA GAS, S.A.read more...
Ethane Plant Refurbishing - San Joaquin Cryogenic Complex
START DATE: November 2008 COMPLETETION DATE: August 2011CLIENT: PDVSA GAS, S.A.read more...
Gas Refurbishing Plant for the Internal Market (PAGMI)
START DATE: October 2010 COMPLETETION DATE: October 2011CLIENT: PDVSA GAS, S.A.read more...
GNL Re-gasification Terminal and Plant
START DATE: January 2012 COMPLETETION DATE: December 2012 CLIENT: Promigas, Vicini, Propagas.read more...
GNL Terminal Feasibility Research, covering the Colombian Caribbean Region Market
START DATE: May 2.011 COMPLETETION DATE: In processCLIENT: PROMIGASread more...
Tomoporo Production Area Development
START DATE: January 2005 COMPLETETION DATE: October 2006CLIENT: PDVSA PETRÓLEO, S.Aread more...
Ultra Low Sulfur Diesel Hydro treatment Projects, Design, Engineering, Procurement and Construction
START DATE: January 2005 COMPLETETION DATE: October 2005 CLIENT: CITGOread more...
HNAY Unit (Package “A”) and Offsite (Packages “B” Y “C”) of the New Hydro treatment of Gasoline Unit
START DATE: April 2006 COMPLETETION DATE: April 2008CLIENT: PDVSA PETRÓLEO, S.A. read more...
Paraguaná Refinery Project Portfolio
START DATE: January 2009 COMPLETETION DATE: January 2011CLIENT: PDVSA PETRÓLEO, S.A.read more...
Projects for the Executive Management New Refinery Improvement and Terminals
START DATE: November 2009 COMPLETETION DATE: November 2012 CLIENT: PDVSA PETRÓLEO, S.A. read more...
LCR TIER II Compliance Project
START DATE: November 2004 COMPLETETION DATE: October 2005CLIENT: CITGO read more...
General Lázaro Cárdenas Integral Re-configuration Project
START DATE: April 2004 COMPLETETION DATE: January 2010CLIENT: PEMEX.read more...
Production and Clusters Main Station
START DATE: December 1998 COMPLETETION DATE: September 2003CLIENT: PETROCEDEÑO (Pdvsa, Total, Statoil) read more...
El Palito Refinery Expansion
START DATE: January 2008 COMPLETETION DATE: May 2012CLIENT: PDVSA PETRÓLEO, S.A.read more...
Project Portfolio for the Paraguaná Refining Center (B Package)
START DATE: April 2004 COMPLETETION DATE: April 2005CLIENT: PDVSA PETRÓLEO, S.A.read more...
Residual Water Treatment Plant
START DATE: May 2001 COMPLETETION DATE: January 2004CLIENT: PDVSA PETRÓLEO, S.A.read more...
Superficial Installations Associated to the Expansion and New clusters in the Perforation Plan for 2
START DATE: November 2007 COMPLETETION DATE: February 2010 CLIENT: PETROCEDEÑO (Pdvsa, Total, Statoil)read more...
Horizon Oil Sands Project / Secondary Upgrading (SUG)
START DATE: November 2006 COMPLETETION DATE: July 2008CLIENT: CNRL (Canadian Natural Resources) read more...
Superficial Production Installation of PETROURICA, Bloque Junín 4
START DATE: February 2012 COMPLETETION DATE: In Construction CLIENT: PETROURICA (Pdvsa CVP, CNPC)read more...
Early Production of New Developments at Carabobo Block Production Processing Plant
START DATE: May 2012 COMPLETETION DATE: In constructionCLIENT: PETROCARABOBO (PDVSA CVP, REPSOL, PETRONAS, ONGC Videsh LTD, Oil India Limited and India Oil Corporation Limited.read more...
Puerto La Cruz Refinery Deep Conversion Project
START DATE: October 2011 COMPLETETION DATE: In ExecutionCLIENT: PDVSA PETRÓLEO, S.A. read more...
Expansion of the Main Production Station (MSUP Project)
START DATE: March 2012 COMPLETETION DATE: In processCLIENT: PETROCEDEÑO (Pdvsa, Total, Statoil) read more...
Riohacha Production Field Reactivation
START DATE: January 2012COMPLETETION DATE: September 2012CLIENT: CHEVRON read more...
Production Facilities and Extra Heavy Crude Improvement in the Orinoco Oil Belt Blocks.
START DATE: June 2009 COMPLETETION DATE: June 2011CLIENT: PDVSA CVP read more...
Operational Project Development in Rubiales and Quifa Fields
START DATE: June 2011COMPLETETION DATE: June 2013CLIENT: PACIFIC RUBIALES ENERGY (PRE) read more...