OH&S at Holcim

Mr. Uwe Barkmann

Holcim Deutschland

Page 2: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

2

© Holcim Group Support Ltd 2009

Content

Our vision and our results

Our strategy: Shrink the hazard pyramid

Page 3: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

3

© Holcim Group Support Ltd 2009

We have a clear, attractive and ambitious Vision

Zero Harm to People

How far are we from realizing our vision?

Page 4: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

4

© Holcim Group Support Ltd 2009

Lost Time Injury Frequency Rate reduction along target path during the 2009

8

7.1

4.1

2.32.31.9

2.7

5.2

3.9

2.6

8

7.1

5.6

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

2004 2005 2006 2007 2008 HY12009

2009

Group actual * Group ORM Target

* For own and subcontracted employees

Target: LTIFR < 2*

“LTIFR of 2004 reduced by > 30 % per year (2006 – 09) until <2”

LTIFR = number of lost time injuries / total number of hours worked x 1.000.000

Page 5: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

5

© Holcim Group Support Ltd 2009

Content

Our vision and our results

Our strategy: Shrink the hazard pyramid

Page 6: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

6

© Holcim Group Support Ltd 2009

To shrink the Holcim Hazard Pyramid we must eliminate unsafe acts and unsafe conditions (2009 results)

????? Hazards - Unsafe acts &

- Unsafe conditions

???? Near-Misses or First Aid

??? Medical Treatment Injuries

~900 Lost Time Injuries

28 Fatal

Page 7: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

7

© Holcim Group Support Ltd 2009

OccupationalRehabilitation Procurement Management

of Changes

Information& Reporting

IncidentInvestigation &

Corrective Action

DesignSafety

Induction& Training

Safe Working Procedures

Audit and System

Improvement

IndustrialHygiene &Monitoring

Employee Communication& Consultation

RolesResponsibilities

andAccountabilities

Hazardous WorkActivities

Legal Obligations

HazardIdentification

and RiskAssessment

ManagementCommitment& Planning

Planned Inspections

Inspection& Testing

Health & Wellness

IssuesImplementation<25% complete

Implementation25 - 85% complete

FullyImplemented

>85%

Legend

Shrinking the pyramid requires structure: let us implement and live our OH&S Management System

Page 8: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

8

© Holcim Group Support Ltd 2009

Directives accelerate the shrinking of the pyramid

Fatality Prevention Elements

Contractor Safety Management

Occupational Health and Safety for AFR

Elimination of Asbestos in the Workplace

Page 9: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

9

© Holcim Group Support Ltd 2009

Fatality Prevention Elements (FPEs)

Approved and distributed in 2007#1. Working at Heights #2. Isolation and Lock-out#3. Vehicle and Traffic Safety#4. Electrical Safety#5. Machine Guarding#6. Confined Space Entry#7. Hot Work#8. Digging and Excavation#9. Lifting and Supporting Loads

Approved and distributed in 2008

#10. Working near Water

#11. Railway Safety

To be distributed in mid 2010

#12. Quarry & Stockpiles

#13. Working in Hot Zones

Replaced: Hazardous Substances/AFR by (already distributed) AFR Directive

Thorough implementation of each FPE requires time, people and resources

Focus in 2009 to fully implement in each OpCo the most critical three FPEs

OpCos can prioritze implementation of the rest based upon their injury history

Page 10: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

10

© Holcim Group Support Ltd 2009

Contractor Safety Management

An updated version of the Directive “Contractor Safety Management” was put in place and distributed to all OpCos.

The update focuses much more on the execution phase of contractor work and the related Holcim supervision.

Learnings from incidents must also be communicated to contractors.

Page 11: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

11

© Holcim Group Support Ltd 2009

OH&S for Alternative Fuels & Raw (AFR) Materials

OH&S together with CIE worked out a comprehensive Directive concerning safety and occupational health for AFR. This Directive was approved by the EXCO and sent to all OpCos.

The implementation uses the “Train the Trainer” approach.

All OpCos using AFR must be externally certified by 2010

Page 12: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

12

© Holcim Group Support Ltd 2009

Eliminating Asbestos from the workplace

Updated Asbestos Directive include monitoring exposure of asbestos minerals from natural sources.

Directive focuses on :

defining measures to minimize the health risk related to asbestos containing materials (ACM), if any in Group Companies;

ensuring that each Group Company has and updates an Asbestos Register;

managing of asbestos containing materials viaproper monitoring and auditing;

banning future purchase of ACM;

and removal of damaged ACM with approved specialized contractors

Page 13: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

13

© Holcim Group Support Ltd 2009

Enhance Skills and Competencies

Training various levels in essential OH&S tools

Auditing and continuously improving the system as well as proactive improvement by correcting unsafe acts (during Safety Observations)

Projects addressing safety in high risk areas

Keeping momentum via good communication

“Passion for Safety” must be strengthened

Drive Accountability

Set the Culture

Manage Performance

Mobilize People

Make OH&S a Condition of Success

Commitment (no compromise on OH&S): Policy and Principles

Cardinal Rules

Goals and KPIs

Reinforce Leadership & Establish Structures

OH&S responsibility with Line Management (organizational accountability)

Corporate OH&S supports common needs

Local committees (OpCo & Site based)

OH&S Network leverages best practices and fosters communication

Monitoring and Recognizing

Analysis of performance and consequent actions

Consequence management and zero tolerance (career, recognitions, disciplinary actions)

Page 14: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

14

© Holcim Group Support Ltd 2009

Setting the culture - 5 Cardinal Rules

Cardinal Rules to be applied without compromise and zero tolerance as of 1.1.2007

1. Do not override or interfere with any safety provision nor allow anyone else and to override or interfere with them

2. Personal Protective Equipment (PPE) rules applicable to a given task must be adhered to at all times.

3. Isolation and Lock Out Procedures must always be followed.

4. No person may work if under the influence of alcohol or drugs.

5. All injuries & incidents must be reported.

Drive Accountability

Set the Culture

Manage Performance

Mobilize People

Page 15: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

15

© Holcim Group Support Ltd 2009

Mobilize People: Training Programs and Projects

Joint Projects with Syndicates

Pocket guides (Cement, AGG, RMX, AFR)

Poster campaigns

Toolbox talks

Employee cards

Delegate OH&S Training (DOT)

Reduction of RCS in the workplace

Training programs for Supervisors

Incident investigations

Hazard Identification

Safety Observation

Contractor Management

Training Programs for Management

Safety Observations

Safety Leadership

Drive Accountability

Set the Culture

Manage Performance

Mobilize People

Page 16: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

16

© Holcim Group Support Ltd 2009

Joint Projects - Overview of the DOT

Goal

To provide safety leadership training to the delegates

Give safety awareness training

Provide a common OH&S vision

Concept

Use of case studies to reinforce understanding of the Holcim Cardinal rules

To actively involve all participants in the process

Methodology

Use of role play with case studies

Use of observers to provide feedback

Use of feedback to reinforce learning

Page 17: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

17

© Holcim Group Support Ltd 2009

Posters, Tool box talks and employee cards

Five sets of communication and training materials have been prepared to reinforce the launch of the AGG and RMX pocket guides

Topics include:

Holcim OH&S methodology

Working at heights on Large Mobile equipment

Mobile equipment and human interaction

Vehicle stability especially during RMX and AGG transport

Avoiding engulfment during excavations

Page 18: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

18

© Holcim Group Support Ltd 2009

Reduction of RCS in workplace

Page 19: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

19

© Holcim Group Support Ltd 2009

Job Observations a Proactive Tool

HAZARD

(Risk Controls)

Injuryor

Illness

(Incident/event ) (Consequence )

(Proactive)

Proactive by observing work practices and conditions to act

before they become accidents

(Reactive)

Reactive by conducting investigations into accidents

Safety Observations are good means to be proactive and show we care

Page 20: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

20

© Holcim Group Support Ltd 2009

Undertaking the Change

The penguin does not have sufficient equipment nor a method to fly . “Try Harder” without the right processes will not work

We Must have the correct equipment, environment

We Must define Safe work methods

We Must have the proper training

We Must have the interpersonal skills to convince people to change.

Page 21: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

21

© Holcim Group Support Ltd 2009

Improving Performance – Our Approach

OH&S Policy & Objectives

Zero Harm To People

Frame Work

Action Plan

People & Organization

Page 22: OH&S at Holcim - HOLCIM Occupational Safety... · Approved and distributed in 2007 #1. Working at Heights #2. Isolation and Lock-out #3. Vehicle and Traffic Safety #4. Electrical

22

© Holcim Group Support Ltd 2009

Holcim OH&S House

You are the cement!cement!