oh&s at holcim - holcim occupational safety... · approved and distributed in 2007 #1. working...
TRANSCRIPT
© Holcim Group Support Ltd 2009
OH&S at Holcim
Mr. Uwe Barkmann
Holcim Deutschland
2
© Holcim Group Support Ltd 2009
Content
Our vision and our results
Our strategy: Shrink the hazard pyramid
3
© Holcim Group Support Ltd 2009
We have a clear, attractive and ambitious Vision
Zero Harm to People
How far are we from realizing our vision?
4
© Holcim Group Support Ltd 2009
Lost Time Injury Frequency Rate reduction along target path during the 2009
8
7.1
4.1
2.32.31.9
2.7
5.2
3.9
2.6
8
7.1
5.6
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
2004 2005 2006 2007 2008 HY12009
2009
Group actual * Group ORM Target
* For own and subcontracted employees
Target: LTIFR < 2*
“LTIFR of 2004 reduced by > 30 % per year (2006 – 09) until <2”
LTIFR = number of lost time injuries / total number of hours worked x 1.000.000
5
© Holcim Group Support Ltd 2009
Content
Our vision and our results
Our strategy: Shrink the hazard pyramid
6
© Holcim Group Support Ltd 2009
To shrink the Holcim Hazard Pyramid we must eliminate unsafe acts and unsafe conditions (2009 results)
????? Hazards - Unsafe acts &
- Unsafe conditions
???? Near-Misses or First Aid
??? Medical Treatment Injuries
~900 Lost Time Injuries
28 Fatal
7
© Holcim Group Support Ltd 2009
OccupationalRehabilitation Procurement Management
of Changes
Information& Reporting
IncidentInvestigation &
Corrective Action
DesignSafety
Induction& Training
Safe Working Procedures
Audit and System
Improvement
IndustrialHygiene &Monitoring
Employee Communication& Consultation
RolesResponsibilities
andAccountabilities
Hazardous WorkActivities
Legal Obligations
HazardIdentification
and RiskAssessment
ManagementCommitment& Planning
Planned Inspections
Inspection& Testing
Health & Wellness
IssuesImplementation<25% complete
Implementation25 - 85% complete
FullyImplemented
>85%
Legend
Shrinking the pyramid requires structure: let us implement and live our OH&S Management System
8
© Holcim Group Support Ltd 2009
Directives accelerate the shrinking of the pyramid
Fatality Prevention Elements
Contractor Safety Management
Occupational Health and Safety for AFR
Elimination of Asbestos in the Workplace
9
© Holcim Group Support Ltd 2009
Fatality Prevention Elements (FPEs)
Approved and distributed in 2007#1. Working at Heights #2. Isolation and Lock-out#3. Vehicle and Traffic Safety#4. Electrical Safety#5. Machine Guarding#6. Confined Space Entry#7. Hot Work#8. Digging and Excavation#9. Lifting and Supporting Loads
Approved and distributed in 2008
#10. Working near Water
#11. Railway Safety
To be distributed in mid 2010
#12. Quarry & Stockpiles
#13. Working in Hot Zones
Replaced: Hazardous Substances/AFR by (already distributed) AFR Directive
Thorough implementation of each FPE requires time, people and resources
Focus in 2009 to fully implement in each OpCo the most critical three FPEs
OpCos can prioritze implementation of the rest based upon their injury history
10
© Holcim Group Support Ltd 2009
Contractor Safety Management
An updated version of the Directive “Contractor Safety Management” was put in place and distributed to all OpCos.
The update focuses much more on the execution phase of contractor work and the related Holcim supervision.
Learnings from incidents must also be communicated to contractors.
11
© Holcim Group Support Ltd 2009
OH&S for Alternative Fuels & Raw (AFR) Materials
OH&S together with CIE worked out a comprehensive Directive concerning safety and occupational health for AFR. This Directive was approved by the EXCO and sent to all OpCos.
The implementation uses the “Train the Trainer” approach.
All OpCos using AFR must be externally certified by 2010
12
© Holcim Group Support Ltd 2009
Eliminating Asbestos from the workplace
Updated Asbestos Directive include monitoring exposure of asbestos minerals from natural sources.
Directive focuses on :
defining measures to minimize the health risk related to asbestos containing materials (ACM), if any in Group Companies;
ensuring that each Group Company has and updates an Asbestos Register;
managing of asbestos containing materials viaproper monitoring and auditing;
banning future purchase of ACM;
and removal of damaged ACM with approved specialized contractors
13
© Holcim Group Support Ltd 2009
Enhance Skills and Competencies
Training various levels in essential OH&S tools
Auditing and continuously improving the system as well as proactive improvement by correcting unsafe acts (during Safety Observations)
Projects addressing safety in high risk areas
Keeping momentum via good communication
“Passion for Safety” must be strengthened
Drive Accountability
Set the Culture
Manage Performance
Mobilize People
Make OH&S a Condition of Success
Commitment (no compromise on OH&S): Policy and Principles
Cardinal Rules
Goals and KPIs
Reinforce Leadership & Establish Structures
OH&S responsibility with Line Management (organizational accountability)
Corporate OH&S supports common needs
Local committees (OpCo & Site based)
OH&S Network leverages best practices and fosters communication
Monitoring and Recognizing
Analysis of performance and consequent actions
Consequence management and zero tolerance (career, recognitions, disciplinary actions)
14
© Holcim Group Support Ltd 2009
Setting the culture - 5 Cardinal Rules
Cardinal Rules to be applied without compromise and zero tolerance as of 1.1.2007
1. Do not override or interfere with any safety provision nor allow anyone else and to override or interfere with them
2. Personal Protective Equipment (PPE) rules applicable to a given task must be adhered to at all times.
3. Isolation and Lock Out Procedures must always be followed.
4. No person may work if under the influence of alcohol or drugs.
5. All injuries & incidents must be reported.
Drive Accountability
Set the Culture
Manage Performance
Mobilize People
15
© Holcim Group Support Ltd 2009
Mobilize People: Training Programs and Projects
Joint Projects with Syndicates
Pocket guides (Cement, AGG, RMX, AFR)
Poster campaigns
Toolbox talks
Employee cards
Delegate OH&S Training (DOT)
Reduction of RCS in the workplace
Training programs for Supervisors
Incident investigations
Hazard Identification
Safety Observation
Contractor Management
Training Programs for Management
Safety Observations
Safety Leadership
Drive Accountability
Set the Culture
Manage Performance
Mobilize People
16
© Holcim Group Support Ltd 2009
Joint Projects - Overview of the DOT
Goal
To provide safety leadership training to the delegates
Give safety awareness training
Provide a common OH&S vision
Concept
Use of case studies to reinforce understanding of the Holcim Cardinal rules
To actively involve all participants in the process
Methodology
Use of role play with case studies
Use of observers to provide feedback
Use of feedback to reinforce learning
17
© Holcim Group Support Ltd 2009
Posters, Tool box talks and employee cards
Five sets of communication and training materials have been prepared to reinforce the launch of the AGG and RMX pocket guides
Topics include:
Holcim OH&S methodology
Working at heights on Large Mobile equipment
Mobile equipment and human interaction
Vehicle stability especially during RMX and AGG transport
Avoiding engulfment during excavations
18
© Holcim Group Support Ltd 2009
Reduction of RCS in workplace
19
© Holcim Group Support Ltd 2009
Job Observations a Proactive Tool
HAZARD
(Risk Controls)
Injuryor
Illness
(Incident/event ) (Consequence )
(Proactive)
Proactive by observing work practices and conditions to act
before they become accidents
(Reactive)
Reactive by conducting investigations into accidents
Safety Observations are good means to be proactive and show we care
20
© Holcim Group Support Ltd 2009
Undertaking the Change
The penguin does not have sufficient equipment nor a method to fly . “Try Harder” without the right processes will not work
We Must have the correct equipment, environment
We Must define Safe work methods
We Must have the proper training
We Must have the interpersonal skills to convince people to change.
21
© Holcim Group Support Ltd 2009
Improving Performance – Our Approach
OH&S Policy & Objectives
Zero Harm To People
Frame Work
Action Plan
People & Organization
22
© Holcim Group Support Ltd 2009
Holcim OH&S House
You are the cement!cement!