ohio department of transportation official bid tabulation ......2012/01/12 · firestone, co 80504...
TRANSCRIPT
Project No. 110628
PID 81595
LAW-SR-93-0.00
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 10/30/2015
Award Amount: $81,266,742.05
Contract Awarded To: BRAYMAN CONSTRUCTION CORPORATION
Letting Date: 1/12/2012
Engineer's Estimate: $76,830,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BRAYMAN CONSTRUCTION CORPORATION
1000 JOHN ROEBLING WAY
SAXONBURG, PA 16056
Bidder 1
Bid $81,266,742.05
TRUMBULL-AMERICAN BRIDGE - JV
225 NORHT SHORE DR
PITTSBURGH, PA 15212-
Bidder 2
Bid $96,566,183.08
WALSH CONSTRUCTION COMPANY
1260 EAST SUMMIT STREET
CROWN POINT, IN 46307
Bidder 3
Bid $98,800,000.00
OBAYASHI/RUHLIN - JV
577 AIRPORT BLVD SUITE 600
BULRLINGAME, CA 94010-
Bidder 4
Bid $99,388,276.92
C J MAHAN CONSTRUCTION COMPANY LLC
3400 SOUTHWEST BLVD
GROVE CITY, OH 43123
Franklin
Bidder 5
Bid $103,150,834.09
FLATIRON CONSTRUCTORS INC
10188 E 1-25 FRONTAGE RD
FIRESTONE, CO 80504
Bidder 6
Bid $107,200,428.57
KOKOSING CONSTRUCTION COMPANY INC
886 MC KINLEY AVE
COLUMBUS, OH 43222
Franklin
Bidder 7
Bid $109,964,119.92
TRAYLOR BROS INC
835 NORTH CONGRESS AVE
EVANSVILLE, IN 47715-
Bidder 8
Bid $116,357,642.95
110628 - Page 1
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $150,000.00$150,000.00
2 $400,000.00$400,000.00
3 $400,000.00$400,000.00
4 $320,000.00$320,000.00
5 $1,415,000.00$1,415,000.00
6 $300,000.00$300,000.00
7 $80,000.00$80,000.00
8 $198,000.00$198,000.00
Ref #2 202E11300 PORTIONS OF STRUCTURE REMOVED, (6 CY)
Awd $3,600.00$600.00
2 $10,060.68$1,676.78
3 $6,000.00$1,000.00
4 $1,020.00$170.00
5 $3,000.00$500.00
6 $3,840.00$640.00
7 $1,500.00$250.00
8 $3,180.00$530.00
Ref #3 202E23000 PAVEMENT REMOVED, (5191 SY)
Awd $51,910.00$10.00
2 $66,392.89$12.79
3 $36,285.09$6.99
4 $42,047.10$8.10
5 $41,528.00$8.00
6 $72,674.00$14.00
7 $31,146.00$6.00
8 $44,123.50$8.50
Ref #4 202E23010 PAVEMENT REMOVED, ASPHALT, (10500 SY)
Awd $94,500.00$9.00
2 $51,975.00$4.95
3 $52,500.00$5.00
4 $56,700.00$5.40
5 $52,500.00$5.00
6 $88,200.00$8.40
7 $31,500.00$3.00
8 $55,650.00$5.30
Ref #5 202E24000 BRICK BASE REMOVED, (1613 SY)
Awd $14,517.00$9.00
2 $12,081.37$7.49
3 $3,742.16$2.32
4 $9,597.35$5.95
5 $8,871.50$5.50
6 $8,065.00$5.00
7 $6,452.00$4.00
8 $9,355.40$5.80
Ref #6 202E30000 WALK REMOVED, (18980 SF)
Awd $56,940.00$3.00
2 $98,316.40$5.18
3 $5,124.60$0.27
4 $44,603.00$2.35
5 $43,654.00$2.30
6 $18,980.00$1.00
7 $28,470.00$1.50
8 $45,552.00$2.40
110628 - Page 2
Ref #7 202E30800 TRAFFIC ISLAND REMOVED, (42 SY)
Awd $1,176.00$28.00
2 $1,717.38$40.89
3 $181.44$4.32
4 $508.20$12.10
5 $504.00$12.00
6 $1,764.00$42.00
7 $840.00$20.00
8 $535.50$12.75
Ref #8 202E30900 PORTION OF TRAFFIC ISLAND REMOVED, (73 SY)
Awd $2,190.00$30.00
2 $3,699.64$50.68
3 $397.12$5.44
4 $1,533.00$21.00
5 $1,460.00$20.00
6 $1,898.00$26.00
7 $1,460.00$20.00
8 $1,551.25$21.25
Ref #9 202E32000 CURB REMOVED, (2737 FT)
Awd $10,948.00$4.00
2 $15,135.61$5.53
3 $6,787.76$2.48
4 $14,095.55$5.15
5 $13,958.70$5.10
6 $5,474.00$2.00
7 $8,211.00$3.00
8 $14,779.80$5.40
Ref #10 202E32500 CURB AND GUTTER REMOVED, (673 FT)
Awd $3,365.00$5.00
2 $3,714.96$5.52
3 $1,951.70$2.90
4 $5,424.38$8.06
5 $5,384.00$8.00
6 $3,028.50$4.50
7 $4,038.00$6.00
8 $5,720.50$8.50
Ref #11 202E32600 GUTTER REMOVED, (108 FT)
Awd $540.00$5.00
2 $603.72$5.59
3 $317.52$2.94
4 $870.48$8.06
5 $864.00$8.00
6 $1,404.00$13.00
7 $756.00$7.00
8 $918.00$8.50
Ref #12 202E35100 PIPE REMOVED, 24" AND UNDER, (646 FT)
Awd $32,300.00$50.00
2 $12,952.30$20.05
3 $12,060.82$18.67
4 $11,208.10$17.35
5 $10,336.00$16.00
6 $16,796.00$26.00
7 $10,013.00$15.50
8 $10,982.00$17.00
110628 - Page 3
Ref #13 202E38000 GUARDRAIL REMOVED, (554 FT)
Awd $1,662.00$3.00
2 $831.00$1.50
3 $2,770.00$5.00
4 $1,678.62$3.03
5 $1,662.00$3.00
6 $1,052.60$1.90
7 $831.00$1.50
8 $1,772.80$3.20
Ref #14 202E58000 MANHOLE REMOVED, (3 EACH)
Awd $4,500.00$1,500.00
2 $2,913.87$971.29
3 $939.03$313.01
4 $906.75$302.25
5 $900.00$300.00
6 $1,980.00$660.00
7 $1,200.00$400.00
8 $960.00$320.00
Ref #15 202E58300 CATCH BASIN OR INLET REMOVED, (14 EACH)
Awd $7,000.00$500.00
2 $10,198.44$728.46
3 $4,382.00$313.00
4 $3,528.00$252.00
5 $3,500.00$250.00
6 $6,300.00$450.00
7 $4,900.00$350.00
8 $3,710.00$265.00
Ref #16 202E58600 CATCH BASIN OR INLET ABANDONED, (1 EACH)
Awd $750.00$750.00
2 $1,912.09$1,912.09
3 $720.42$720.42
4 $121.00$121.00
5 $120.00$120.00
6 $550.00$550.00
7 $350.00$350.00
8 $128.00$128.00
Ref #17 202E67000 REGULATED UNDERGROUND STORAGE TANK REMOVED, (7 EACH)
Awd $84,000.00$12,000.00
2 $21,549.99$3,078.57
3 $21,700.00$3,100.00
4 $42,000.00$6,000.00
5 $39,375.00$5,625.00
6 $44,800.00$6,400.00
7 $43,400.00$6,200.00
8 $175,000.00$25,000.00
Ref #18 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (460 FT)
Awd $16,100.00$35.00
2 $15,718.20$34.17
3 $12,194.60$26.51
4 $9,269.00$20.15
5 $1,380.00$3.00
6 $7,360.00$16.00
7 $5,750.00$12.50
8 $9,660.00$21.00
110628 - Page 4
Ref #19 202E75000 FENCE REMOVED, (419 FT)
Awd $2,095.00$5.00
2 $1,194.15$2.85
3 $2,095.00$5.00
4 $1,269.57$3.03
5 $1,257.00$3.00
6 $502.80$1.20
7 $1,257.00$3.00
8 $1,319.85$3.15
Ref #20 202E75250 GATE REMOVED, (2 EACH)
Awd $200.00$100.00
2 $284.00$142.00
3 $800.00$400.00
4 $100.80$50.40
5 $100.00$50.00
6 $250.00$125.00
7 $200.00$100.00
8 $106.00$53.00
Ref #21 203E10000 EXCAVATION, (16100 CY)
Awd $209,300.00$13.00
2 $418,600.00$26.00
3 $193,200.00$12.00
4 $167,440.00$10.40
5 $165,830.00$10.30
6 $193,200.00$12.00
7 $338,100.00$21.00
8 $177,100.00$11.00
Ref #22 203E20000 EMBANKMENT, (19414 CY)
Awd $330,038.00$17.00
2 $135,315.58$6.97
3 $155,312.00$8.00
4 $337,803.60$17.40
5 $334,891.50$17.25
6 $145,605.00$7.50
7 $155,312.00$8.00
8 $354,305.50$18.25
Ref #23 203E20001 EMBANKMENT, AS PER PLAN, (5571 CY)
Awd $94,707.00$17.00
2 $35,208.72$6.32
3 $23,621.04$4.24
4 $179,664.75$32.25
5 $178,272.00$32.00
6 $55,710.00$10.00
7 $89,136.00$16.00
8 $189,414.00$34.00
Ref #24 203E65000 SPECIAL - SETTLEMENT PLATFORM, (2 EACH)
Awd $4,000.00$2,000.00
2 $2,585.50$1,292.75
3 $1,124.98$562.49
4 $1,411.00$705.50
5 $1,400.00$700.00
6 $250.00$125.00
7 $1,000.00$500.00
8 $1,480.00$740.00
110628 - Page 5
Ref #25 204E10000 SUBGRADE COMPACTION, (16273 SY)
Awd $235,958.50$14.50
2 $8,787.42$0.54
3 $24,409.50$1.50
4 $21,154.90$1.30
5 $21,154.90$1.30
6 $32,546.00$2.00
7 $32,546.00$2.00
8 $22,782.20$1.40
Ref #26 204E13000 EXCAVATION OF SUBGRADE, (7101 CY)
Awd $102,964.50$14.50
2 $184,626.00$26.00
3 $106,515.00$15.00
4 $128,883.15$18.15
5 $127,818.00$18.00
6 $113,616.00$16.00
7 $149,121.00$21.00
8 $134,919.00$19.00
Ref #27 204E30010 GRANULAR MATERIAL, TYPE B, (7259 CY)
Awd $326,655.00$45.00
2 $343,858.83$47.37
3 $254,065.00$35.00
4 $218,858.85$30.15
5 $217,770.00$30.00
6 $377,468.00$52.00
7 $508,130.00$70.00
8 $232,288.00$32.00
Ref #28 204E45000 PROOF ROLLING, (6 HOUR)
Awd $1,200.00$200.00
2 $1,056.72$176.12
3 $1,081.20$180.20
4 $725.40$120.90
5 $720.00$120.00
6 $2,100.00$350.00
7 $1,080.00$180.00
8 $768.00$128.00
Ref #29 204E50000 GEOTEXTILE FABRIC, (8325 SY)
Awd $16,650.00$2.00
2 $15,817.50$1.90
3 $17,316.00$2.08
4 $21,811.50$2.62
5 $21,645.00$2.60
6 $12,487.50$1.50
7 $12,487.50$1.50
8 $23,310.00$2.80
Ref #30 511E46201 CLASS C CONCRETE, AS PER PLAN, (14.7 CY)
Awd $23,520.00$1,600.00
2 $14,189.18$965.25
3 $8,073.39$549.21
4 $11,613.00$790.00
5 $6,615.00$450.00
6 $4,998.00$340.00
7 $11,760.00$800.00
8 $23,520.00$1,600.00
110628 - Page 6
Ref #31 604E38500 MONUMENT ASSEMBLY, (6 EACH)
Awd $4,500.00$750.00
2 $4,092.00$682.00
3 $1,784.76$297.46
4 $8,970.00$1,495.00
5 $5,100.00$850.00
6 $4,740.00$790.00
7 $3,600.00$600.00
8 $2,850.00$475.00
Ref #32 606E13000 GUARDRAIL, TYPE 5, (493.99 FT)
Awd $9,879.80$20.00
2 $7,162.86$14.50
3 $7,162.86$14.50
4 $7,187.55$14.55
5 $7,162.86$14.50
6 $7,903.84$16.00
7 $7,622.27$15.43
8 $7,286.35$14.75
Ref #33 606E26000 ANCHOR ASSEMBLY, TYPE B, (1 EACH)
Awd $1,750.00$1,750.00
2 $1,550.00$1,550.00
3 $1,550.00$1,550.00
4 $1,550.00$1,550.00
5 $1,550.00$1,550.00
6 $1,700.00$1,700.00
7 $1,649.68$1,649.68
8 $1,570.00$1,570.00
Ref #34 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (3 EACH)
Awd $3,750.00$1,250.00
2 $3,450.00$1,150.00
3 $3,450.00$1,150.00
4 $3,450.00$1,150.00
5 $3,450.00$1,150.00
6 $3,750.00$1,250.00
7 $3,671.85$1,223.95
8 $3,510.00$1,170.00
Ref #35 606E98000 GUARDRAIL, MISC.:KENTUCKY GUARDRAIL - STEEL W BEAM, (525 FT)
Awd $26,250.00$50.00
2 $8,662.50$16.50
3 $8,662.50$16.50
4 $8,662.50$16.50
5 $8,662.50$16.50
6 $9,450.00$18.00
7 $9,219.00$17.56
8 $8,793.75$16.75
Ref #36 606E98100 GUARDRAIL, MISC.:KENTUCKY GUARDRAIL CONNECTOR TO B, (1 EACH)
Awd $1,500.00$1,500.00
2 $2,500.00$2,500.00
3 $2,500.00$2,500.00
4 $2,500.00$2,500.00
5 $2,500.00$2,500.00
6 $2,800.00$2,800.00
7 $2,660.77$2,660.77
8 $2,540.00$2,540.00
110628 - Page 7
Ref #37 607E20001 FENCE, TYPE CL, AS PER PLAN, 8', (140 FT)
Awd $4,200.00$30.00
2 $4,900.00$35.00
3 $4,900.00$35.00
4 $4,900.00$35.00
5 $4,900.00$35.00
6 $5,600.00$40.00
7 $5,189.80$37.07
8 $5,040.00$36.00
Ref #38 607E50901 GATE, TYPE CL, AS PER PLAN, 8', (2 EACH)
Awd $3,500.00$1,750.00
2 $3,000.00$1,500.00
3 $3,000.00$1,500.00
4 $3,000.00$1,500.00
5 $3,000.00$1,500.00
6 $3,400.00$1,700.00
7 $3,177.86$1,588.93
8 $3,000.00$1,500.00
Ref #39 608E10000 4" CONCRETE WALK, (18433 SF)
Awd $110,598.00$6.00
2 $77,418.60$4.20
3 $73,732.00$4.00
4 $165,897.00$9.00
5 $110,598.00$6.00
6 $110,598.00$6.00
7 $110,598.00$6.00
8 $103,224.80$5.60
Ref #40 608E52020 CURB RAMP, TYPE A2, (85 SF)
Awd $6,375.00$75.00
2 $803.25$9.45
3 $811.75$9.55
4 $2,210.00$26.00
5 $2,125.00$25.00
6 $1,275.00$15.00
7 $1,700.00$20.00
8 $1,190.00$14.00
Ref #41 608E52120 CURB RAMP, TYPE A2, (3 EACH)
Awd $4,500.00$1,500.00
2 $1,260.00$420.00
3 $1,272.72$424.24
4 $3,375.00$1,125.00
5 $900.00$300.00
6 $1,860.00$620.00
7 $1,350.00$450.00
8 $1,740.00$580.00
Ref #42 608E52140 CURB RAMP, TYPE B2, (19 EACH)
Awd $28,500.00$1,500.00
2 $7,980.00$420.00
3 $8,060.56$424.24
4 $41,230.00$2,170.00
5 $5,700.00$300.00
6 $13,300.00$700.00
7 $9,880.00$520.00
8 $12,350.00$650.00
110628 - Page 8
Ref #43 608E52144 CURB RAMP, TYPE B3, (1 EACH)
Awd $1,500.00$1,500.00
2 $420.00$420.00
3 $424.24$424.24
4 $2,100.00$2,100.00
5 $300.00$300.00
6 $750.00$750.00
7 $500.00$500.00
8 $725.00$725.00
Ref #44 610E50010 SPECIAL - RETAINING WALL, MISC.:CONCRETE BLOCK WAL, (324 SF)
Awd $9,720.00$30.00
2 $17,751.96$54.79
3 $9,350.64$28.86
4 $9,720.00$30.00
5 $9,072.00$28.00
6 $13,608.00$42.00
7 $14,580.00$45.00
8 $9,720.00$30.00
Ref #45 620E60500 REMOVAL OF REBOUNDABLE TUBULAR PYLON, (14 EACH)
Awd $2,100.00$150.00
2 $350.00$25.00
3 $140.00$10.00
4 $28.28$2.02
5 $28.00$2.00
6 $1,190.00$85.00
7 $210.00$15.00
8 $29.40$2.10
Ref #46 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO, (100 TON)
Awd $8,500.00$85.00
2 $11,850.00$118.50
3 $12,000.00$120.00
4 $18,500.00$185.00
5 $4,525.00$45.25
6 $4,400.00$44.00
7 $8,500.00$85.00
8 $13,200.00$132.00
Ref #47 690E65310 SPECIAL - GROUND WATER MONITORING WELL RECONSTRUCT, (2 EACH)
Awd $11,000.00$5,500.00
2 $3,000.00$1,500.00
3 $2,923.64$1,461.82
4 $12,100.00$6,050.00
5 $6,400.00$3,200.00
6 $2,700.00$1,350.00
7 $1,200.00$600.00
8 $3,400.00$1,700.00
Ref #48 690E98400 SPECIAL - MISC.:EMERGENCY RESPONSE CONTINGENCY PLA, (LUMP SUM)
Awd $1,100.00$1,100.00
2 $15,056.31$15,056.31
3 $5,000.00$5,000.00
4 $10,000.00$10,000.00
5 $2,000.00$2,000.00
6 $22,000.00$22,000.00
7 $1,500.00$1,500.00
8 $6,500.00$6,500.00
110628 - Page 9
Ref #600 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $68,000.00$68,000.00
3 $8,840.00$8,840.00
4 $107,400.00$107,400.00
5 $143,500.00$143,500.00
6 $111,000.00$111,000.00
7 $105,000.00$105,000.00
8 $200,000.00$200,000.00
Ref #601 690E98400 SPECIAL - MISC.:MUSSEL SURVEY AND RELOCATION (NEW , (LUMP SUM)
Awd $70,000.00$70,000.00
2 $57,865.00$57,865.00
3 $57,865.00$57,865.00
4 $56,975.00$56,975.00
5 $67,865.00$67,865.00
6 $66,000.00$66,000.00
7 $63,000.00$63,000.00
8 $80,000.00$80,000.00
Ref #602 690E98400 SPECIAL - MISC.:MUSSEL SURVEY AND RELOCATION (EXIS, (LUMP SUM)
Awd $70,000.00$70,000.00
2 $77,221.00$77,221.00
3 $77,221.00$77,221.00
4 $56,081.00$56,081.00
5 $77,221.00$77,221.00
6 $89,000.00$89,000.00
7 $67,000.00$67,000.00
8 $80,000.00$80,000.00
Section 1 - ROADWAY - Totals
Awd $2,302,508.80
2 $2,265,590.62
3 $1,646,319.04
4 $2,181,683.38
5 $3,188,029.96
6 $1,999,924.24
7 $1,982,755.73
8 $2,289,560.60
Ref #50 601E11000 RIPRAP USING 6" REINFORCED CONCRETE SLAB, (379 SY)
Awd $28,425.00$75.00
2 $53,632.29$141.51
3 $26,685.39$70.41
4 $28,425.00$75.00
5 $32,215.00$85.00
6 $34,110.00$90.00
7 $47,375.00$125.00
8 $28,425.00$75.00
110628 - Page 10
Ref #51 601E21070 TIED CONCRETE BLOCK MAT, TYPE 3, (69 SY)
Awd $11,040.00$160.00
2 $15,349.74$222.46
3 $12,235.08$177.32
4 $11,385.00$165.00
5 $10,488.00$152.00
6 $9,315.00$135.00
7 $11,040.00$160.00
8 $11,040.00$160.00
Ref #52 601E51000 CHANNEL PROTECTION, MISC.:KENTUCKY CHANNEL LINING,, (44 CY)
Awd $3,300.00$75.00
2 $4,955.28$112.62
3 $2,605.24$59.21
4 $4,433.00$100.75
5 $4,400.00$100.00
6 $5,500.00$125.00
7 $3,960.00$90.00
8 $4,664.00$106.00
Ref #53 616E10000 WATER, (46 MGAL)
Awd $6,900.00$150.00
2 $3,786.72$82.32
3 $230.00$5.00
4 $230.00$5.00
5 $2,300.00$50.00
6 $1,426.00$31.00
7 $2,300.00$50.00
8 $2,760.00$60.00
Ref #54 659E00100 SOIL ANALYSIS TEST, (3 EACH)
Awd $450.00$150.00
2 $450.00$150.00
3 $450.00$150.00
4 $450.00$150.00
5 $450.00$150.00
6 $510.00$170.00
7 $525.00$175.00
8 $450.00$150.00
Ref #55 659E00300 TOPSOIL, (4085 CY)
Awd $102,125.00$25.00
2 $93,955.00$23.00
3 $122,550.00$30.00
4 $232,845.00$57.00
5 $61,275.00$15.00
6 $26,552.50$6.50
7 $163,400.00$40.00
8 $122,550.00$30.00
Ref #56 659E00500 SEEDING AND MULCHING, CLASS 1, (5770 SY)
Awd $3,462.00$0.60
2 $3,173.50$0.55
3 $3,173.50$0.55
4 $3,173.50$0.55
5 $3,173.50$0.55
6 $3,462.00$0.60
7 $3,173.50$0.55
8 $3,173.50$0.55
110628 - Page 11
Ref #57 659E00510 SEEDING AND MULCHING, CLASS 2, (11051 SY)
Awd $5,525.50$0.50
2 $5,304.48$0.48
3 $5,304.48$0.48
4 $5,304.48$0.48
5 $5,304.48$0.48
6 $5,525.50$0.50
7 $5,304.48$0.48
8 $5,525.50$0.50
Ref #58 659E00530 SEEDING AND MULCHING, CLASS 3B, (5338 SY)
Awd $2,935.90$0.55
2 $2,935.90$0.55
3 $2,935.90$0.55
4 $2,935.90$0.55
5 $2,935.90$0.55
6 $3,202.80$0.60
7 $2,935.90$0.55
8 $2,935.90$0.55
Ref #59 659E00540 SEEDING AND MULCHING, CLASS 3C, (20318 SY)
Awd $10,159.00$0.50
2 $9,752.64$0.48
3 $9,752.64$0.48
4 $9,752.64$0.48
5 $9,752.64$0.48
6 $10,159.00$0.50
7 $9,752.64$0.48
8 $10,159.00$0.50
Ref #60 659E14000 REPAIR SEEDING AND MULCHING, (1837 SY)
Awd $459.25$0.25
2 $367.40$0.20
3 $367.40$0.20
4 $367.40$0.20
5 $367.40$0.20
6 $404.14$0.22
7 $367.40$0.20
8 $367.40$0.20
Ref #61 659E15000 INTER-SEEDING, (1837 SY)
Awd $459.25$0.25
2 $367.40$0.20
3 $367.40$0.20
4 $367.40$0.20
5 $367.40$0.20
6 $404.14$0.22
7 $367.40$0.20
8 $367.40$0.20
Ref #62 659E20000 COMMERCIAL FERTILIZER, (6 TON)
Awd $2,250.00$375.00
2 $2,250.00$375.00
3 $2,250.00$375.00
4 $2,250.00$375.00
5 $2,250.00$375.00
6 $2,580.00$430.00
7 $2,250.00$375.00
8 $2,250.00$375.00
110628 - Page 12
Ref #63 659E31000 LIME, (8.58 ACRE)
Awd $1,287.00$150.00
2 $1,287.00$150.00
3 $1,287.00$150.00
4 $1,287.00$150.00
5 $1,287.00$150.00
6 $1,458.60$170.00
7 $1,287.00$150.00
8 $1,287.00$150.00
Ref #64 659E35000 WATER, (220 MGAL)
Awd $220.00$1.00
2 $220.00$1.00
3 $220.00$1.00
4 $220.00$1.00
5 $220.00$1.00
6 $242.00$1.10
7 $220.00$1.00
8 $220.00$1.00
Ref #65 659E40000 MOWING, (51 MSF)
Awd $51.00$1.00
2 $51.00$1.00
3 $51.00$1.00
4 $51.00$1.00
5 $51.00$1.00
6 $56.10$1.10
7 $51.00$1.00
8 $51.00$1.00
Ref #66 660E30000 SODDING UNSTAKED, (500 SY)
Awd $2,500.00$5.00
2 $2,675.00$5.35
3 $2,675.00$5.35
4 $2,675.00$5.35
5 $2,675.00$5.35
6 $3,000.00$6.00
7 $2,675.00$5.35
8 $2,700.00$5.40
Ref #67 661E20040 DECIDUOUS SHRUB, 2' HEIGHT, ARONIA MEANOCARPA BLAC, (1719 EACH)
Awd $39,537.00$23.00
2 $39,107.25$22.75
3 $39,107.25$22.75
4 $39,107.25$22.75
5 $39,107.25$22.75
6 $42,975.00$25.00
7 $46,000.44$26.76
8 $39,537.00$23.00
Ref #68 661E20040 DECIDUOUS SHRUB, 2' HEIGHT, ILEX VERTICILLATA WINT, (1719 EACH)
Awd $39,537.00$23.00
2 $39,107.25$22.75
3 $39,107.25$22.75
4 $39,107.25$22.75
5 $39,107.25$22.75
6 $42,975.00$25.00
7 $46,000.44$26.76
8 $39,537.00$23.00
110628 - Page 13
Ref #69 661E20040 DECIDUOUS SHRUB, 2' HEIGHT, VIBURNUM DENTATUM ARRO, (1719 EACH)
Awd $39,537.00$23.00
2 $39,107.25$22.75
3 $39,107.25$22.75
4 $39,107.25$22.75
5 $39,107.25$22.75
6 $42,975.00$25.00
7 $46,000.44$26.76
8 $39,537.00$23.00
Ref #70 662E30000 LANDSCAPE WATERING, (21 MGAL)
Awd $21.00$1.00
2 $21.00$1.00
3 $21.00$1.00
4 $21.00$1.00
5 $21.00$1.00
6 $23.10$1.10
7 $24.78$1.18
8 $21.00$1.00
Ref #71 832E15000 STORM WATER POLLUTION PREVENTION PLAN(KENTUCKY), (LUMP SUM)
Awd $11,000.00$11,000.00
2 $14,360.00$14,360.00
3 $10,000.00$10,000.00
4 $40,500.00$40,500.00
5 $5,000.00$5,000.00
6 $8,000.00$8,000.00
7 $9,800.00$9,800.00
8 $5,000.00$5,000.00
Ref #72 832E15000 STORM WATER POLLUTION PREVENTION PLAN(OHIO), (LUMP SUM)
Awd $11,000.00$11,000.00
2 $13,740.00$13,740.00
3 $10,000.00$10,000.00
4 $40,500.00$40,500.00
5 $5,000.00$5,000.00
6 $8,000.00$8,000.00
7 $9,600.00$9,600.00
8 $5,000.00$5,000.00
Ref #73 832E30000 EROSION CONTROL(KENTUCKY), (25000 EACH)
Awd $25,000.00$1.00
2 $25,000.00$1.00
3 $25,000.00$1.00
4 $25,000.00$1.00
5 $25,000.00$1.00
6 $25,000.00$1.00
7 $25,000.00$1.00
8 $25,000.00$1.00
Ref #74 832E30000 EROSION CONTROL(OHIO), (25000 EACH)
Awd $25,000.00$1.00
2 $25,000.00$1.00
3 $25,000.00$1.00
4 $25,000.00$1.00
5 $25,000.00$1.00
6 $25,000.00$1.00
7 $25,000.00$1.00
8 $25,000.00$1.00
110628 - Page 14
Section 2 - EROSION CONTROL - Totals
Awd $372,180.90
2 $395,956.10
3 $380,482.78
4 $554,495.07
5 $316,855.07
6 $302,855.88
7 $464,410.42
8 $377,557.70
Ref #75 602E20001 CONCRETE MASONRY, AS PER PLAN, (17 CY)
Awd $28,475.00$1,675.00
2 $41,463.68$2,439.04
3 $14,650.26$861.78
4 $20,995.00$1,235.00
5 $19,550.00$1,150.00
6 $20,400.00$1,200.00
7 $25,500.00$1,500.00
8 $20,740.00$1,220.00
Ref #76 602E98200 MASONRY, MISC.:KENTUCKY SLOPED AND FLARED HEADWALL, (2 CY)
Awd $2,400.00$1,200.00
2 $7,886.26$3,943.13
3 $1,033.68$516.84
4 $2,150.00$1,075.00
5 $2,000.00$1,000.00
6 $3,000.00$1,500.00
7 $5,000.00$2,500.00
8 $2,120.00$1,060.00
Ref #77 603E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (170 FT)
Awd $3,400.00$20.00
2 $4,552.60$26.78
3 $2,045.10$12.03
4 $4,420.00$26.00
5 $4,080.00$24.00
6 $5,950.00$35.00
7 $3,060.00$18.00
8 $4,250.00$25.00
Ref #78 603E00900 6" CONDUIT, TYPE B, FOR DRAINAGE CONNECTION, (100 FT)
Awd $2,700.00$27.00
2 $4,517.00$45.17
3 $1,133.00$11.33
4 $2,200.00$22.00
5 $2,000.00$20.00
6 $4,400.00$44.00
7 $2,000.00$20.00
8 $2,100.00$21.00
110628 - Page 15
Ref #79 603E00900 6" CONDUIT, TYPE B, FOR SANITARY, (100 FT)
Awd $2,700.00$27.00
2 $4,517.00$45.17
3 $1,133.00$11.33
4 $2,200.00$22.00
5 $2,000.00$20.00
6 $4,000.00$40.00
7 $6,000.00$60.00
8 $2,100.00$21.00
Ref #80 603E01100 6" CONDUIT, TYPE C, (100 FT)
Awd $2,100.00$21.00
2 $3,494.00$34.94
3 $1,133.00$11.33
4 $2,000.00$20.00
5 $1,800.00$18.00
6 $380.00$3.80
7 $6,000.00$60.00
8 $1,900.00$19.00
Ref #81 603E01100 6" CONDUIT, TYPE C, FOR DRAINAGE CONNECTION, (100 FT)
Awd $2,100.00$21.00
2 $3,494.00$34.94
3 $1,133.00$11.33
4 $2,000.00$20.00
5 $1,800.00$18.00
6 $4,200.00$42.00
7 $2,000.00$20.00
8 $1,900.00$19.00
Ref #82 603E01100 6" CONDUIT, TYPE C, FOR SANITARY, (100 FT)
Awd $2,100.00$21.00
2 $3,494.00$34.94
3 $1,133.00$11.33
4 $2,000.00$20.00
5 $1,800.00$18.00
6 $4,200.00$42.00
7 $6,000.00$60.00
8 $1,900.00$19.00
Ref #83 603E01400 6" CONDUIT, TYPE E, FOR DRAINAGE CONNECTION, (100 FT)
Awd $2,000.00$20.00
2 $2,115.00$21.15
3 $1,133.00$11.33
4 $2,000.00$20.00
5 $1,800.00$18.00
6 $4,500.00$45.00
7 $1,500.00$15.00
8 $1,900.00$19.00
Ref #84 603E01500 6" CONDUIT, TYPE F, FOR DRAINAGE CONNECTION, (100 FT)
Awd $2,000.00$20.00
2 $2,102.00$21.02
3 $1,133.00$11.33
4 $2,600.00$26.00
5 $2,400.00$24.00
6 $4,500.00$45.00
7 $1,500.00$15.00
8 $2,500.00$25.00
110628 - Page 16
Ref #85 603E04400 12" CONDUIT, TYPE B, (774 FT)
Awd $47,988.00$62.00
2 $57,430.80$74.20
3 $38,700.00$50.00
4 $23,994.00$31.00
5 $22,523.40$29.10
6 $69,660.00$90.00
7 $65,790.00$85.00
8 $23,220.00$30.00
Ref #86 603E04400 12" CONDUIT, TYPE B, 1250 D-LOAD, (446 FT)
Awd $44,600.00$100.00
2 $36,982.32$82.92
3 $22,808.44$51.14
4 $14,272.00$32.00
5 $12,978.60$29.10
6 $55,750.00$125.00
7 $40,140.00$90.00
8 $13,380.00$30.00
Ref #87 603E04600 12" CONDUIT, TYPE C, (538 FT)
Awd $27,438.00$51.00
2 $35,239.00$65.50
3 $20,395.58$37.91
4 $16,140.00$30.00
5 $14,526.00$27.00
6 $45,730.00$85.00
7 $26,900.00$50.00
8 $15,064.00$28.00
Ref #88 603E05200 12" CONDUIT, TYPE F, (47 FT)
Awd $4,606.00$98.00
2 $3,025.39$64.37
3 $2,374.44$50.52
4 $1,598.00$34.00
5 $1,504.00$32.00
6 $3,760.00$80.00
7 $3,525.00$75.00
8 $1,598.00$34.00
Ref #89 603E07400 18" CONDUIT, TYPE B, (99 FT)
Awd $8,811.00$89.00
2 $11,454.30$115.70
3 $5,481.63$55.37
4 $4,950.00$50.00
5 $4,752.00$48.00
6 $11,385.00$115.00
7 $10,395.00$105.00
8 $5,049.00$51.00
Ref #90 603E07600 18" CONDUIT, TYPE C, (40 FT)
Awd $5,000.00$125.00
2 $3,507.60$87.69
3 $2,378.40$59.46
4 $1,920.00$48.00
5 $1,840.00$46.00
6 $6,800.00$170.00
7 $3,400.00$85.00
8 $1,920.00$48.00
110628 - Page 17
Ref #91 603E10400 24" CONDUIT, TYPE B, (182 FT)
Awd $20,020.00$110.00
2 $23,155.86$127.23
3 $9,747.92$53.56
4 $13,468.00$74.00
5 $12,740.00$70.00
6 $25,480.00$140.00
7 $23,660.00$130.00
8 $13,468.00$74.00
Ref #92 603E13400 30" CONDUIT, TYPE B, (164 FT)
Awd $22,960.00$140.00
2 $27,822.60$169.65
3 $16,629.60$101.40
4 $15,416.00$94.00
5 $15,088.00$92.00
6 $32,800.00$200.00
7 $27,060.00$165.00
8 $15,908.00$97.00
Ref #94 603E13600 30" CONDUIT, TYPE C, (404 FT)
Awd $42,420.00$105.00
2 $58,571.92$144.98
3 $51,303.96$126.99
4 $37,168.00$92.00
5 $35,552.00$88.00
6 $52,520.00$130.00
7 $40,400.00$100.00
8 $37,572.00$93.00
Ref #95 603E16400 36" CONDUIT, TYPE B, 1250 D-LOAD, (41 FT)
Awd $10,660.00$260.00
2 $9,940.86$242.46
3 $7,924.07$193.27
4 $5,125.00$125.00
5 $4,920.00$120.00
6 $15,580.00$380.00
7 $10,250.00$250.00
8 $5,166.00$126.00
Ref #96 603E16600 36" CONDUIT, TYPE C, (90 FT)
Awd $10,980.00$122.00
2 $16,422.30$182.47
3 $13,736.70$152.63
4 $10,890.00$121.00
5 $10,440.00$116.00
6 $12,600.00$140.00
7 $12,150.00$135.00
8 $11,070.00$123.00
Ref #97 603E16600 36" CONDUIT, TYPE C, 1250 D-LOAD, (29 FT)
Awd $5,075.00$175.00
2 $5,351.37$184.53
3 $4,430.33$152.77
4 $3,509.00$121.00
5 $3,364.00$116.00
6 $5,510.00$190.00
7 $4,350.00$150.00
8 $3,567.00$123.00
110628 - Page 18
Ref #98 603E23800 60" CONDUIT, TYPE B, 1250 D-LOAD, (78 FT)
Awd $37,830.00$485.00
2 $48,065.16$616.22
3 $25,801.62$330.79
4 $23,712.00$304.00
5 $23,010.00$295.00
6 $37,440.00$480.00
7 $39,000.00$500.00
8 $24,180.00$310.00
Ref #99 603E23800 60" CONDUIT, TYPE B, 1750 D-LOAD, (307 FT)
Awd $133,545.00$435.00
2 $133,584.91$435.13
3 $112,877.76$367.68
4 $99,775.00$325.00
5 $98,240.00$320.00
6 $92,100.00$300.00
7 $98,240.00$320.00
8 $104,380.00$340.00
Ref #100 603E26400 72" CONDUIT, TYPE C, (60 FT)
Awd $30,600.00$510.00
2 $36,951.60$615.86
3 $28,921.20$482.02
4 $14,700.00$245.00
5 $14,400.00$240.00
6 $36,000.00$600.00
7 $21,000.00$350.00
8 $15,300.00$255.00
Ref #101 603E96600 CONDUIT, BORED OR JACKED:TYPE C, 72", (224 FT)
Awd $526,400.00$2,350.00
2 $696,940.16$3,111.34
3 $448,000.00$2,000.00
4 $397,600.00$1,775.00
5 $268,800.00$1,200.00
6 $448,000.00$2,000.00
7 $313,600.00$1,400.00
8 $285,600.00$1,275.00
Ref #102 603E98300 CONDUIT, MISC.:84" STEEL PIPE ENCASEMENT, BORED OR, (197 FT)
Awd $975,150.00$4,950.00
2 $655,720.41$3,328.53
3 $591,000.00$3,000.00
4 $449,160.00$2,280.00
5 $413,700.00$2,100.00
6 $591,000.00$3,000.00
7 $571,300.00$2,900.00
8 $439,310.00$2,230.00
Ref #103 603E98300 CONDUIT, MISC.:BORE AND JACK PIPE-36 IN, (73 FT)
Awd $59,130.00$810.00
2 $97,273.96$1,332.52
3 $73,000.00$1,000.00
4 $12,775.00$175.00
5 $11,680.00$160.00
6 $73,000.00$1,000.00
7 $69,350.00$950.00
8 $12,410.00$170.00
110628 - Page 19
Ref #104 603E98300 CONDUIT, MISC.:KENTUCKY 15" CIRCULAR REINFORCED CO, (143 FT)
Awd $14,300.00$100.00
2 $17,157.14$119.98
3 $8,447.01$59.07
4 $6,435.00$45.00
5 $6,006.00$42.00
6 $16,445.00$115.00
7 $13,585.00$95.00
8 $6,292.00$44.00
Ref #105 603E98300 CONDUIT, MISC.:KENTUCKY 15" HIGH DENSITY POLYETHYL, (43 FT)
Awd $4,085.00$95.00
2 $10,052.97$233.79
3 $1,664.96$38.72
4 $1,419.00$33.00
5 $1,290.00$30.00
6 $3,870.00$90.00
7 $3,870.00$90.00
8 $1,333.00$31.00
Ref #106 603E98300 CONDUIT, MISC.:KENTUCKY 18" CIRCULAR REINFORCED CO, (309 FT)
Awd $33,990.00$110.00
2 $48,407.94$156.66
3 $19,429.92$62.88
4 $14,832.00$48.00
5 $14,832.00$48.00
6 $35,535.00$115.00
7 $30,900.00$100.00
8 $15,759.00$51.00
Ref #107 603E98300 CONDUIT, MISC.:KENTUCKY 18" HIGH DENSITY POLYETHYL, (138 FT)
Awd $13,110.00$95.00
2 $29,976.36$217.22
3 $6,418.38$46.51
4 $4,968.00$36.00
5 $4,968.00$36.00
6 $12,006.00$87.00
7 $14,490.00$105.00
8 $5,244.00$38.00
Ref #108 603E98300 CONDUIT, MISC.:KENTUCKY 24" CIRCULAR REINFORCED CO, (73 FT)
Awd $11,680.00$160.00
2 $8,937.39$122.43
3 $8,726.42$119.54
4 $8,176.00$112.00
5 $5,548.00$76.00
6 $2,555.00$35.00
7 $3,650.00$50.00
8 $5,840.00$80.00
Ref #109 604E00400 CATCH BASIN, NO. 3, (7 EACH)
Awd $25,200.00$3,600.00
2 $42,293.86$6,041.98
3 $16,481.50$2,354.50
4 $21,000.00$3,000.00
5 $21,000.00$3,000.00
6 $25,200.00$3,600.00
7 $31,500.00$4,500.00
8 $22,050.00$3,150.00
110628 - Page 20
Ref #110 604E00800 CATCH BASIN, NO. 3A, (15 EACH)
Awd $46,500.00$3,100.00
2 $73,460.40$4,897.36
3 $30,258.15$2,017.21
4 $30,000.00$2,000.00
5 $30,000.00$2,000.00
6 $45,000.00$3,000.00
7 $60,000.00$4,000.00
8 $31,500.00$2,100.00
Ref #111 604E02000 CATCH BASIN, NO. 6, (2 EACH)
Awd $6,200.00$3,100.00
2 $10,302.26$5,151.13
3 $4,001.46$2,000.73
4 $4,200.00$2,100.00
5 $4,200.00$2,100.00
6 $5,600.00$2,800.00
7 $8,400.00$4,200.00
8 $4,400.00$2,200.00
Ref #112 604E02400 CATCH BASIN, NO. 7, (1 EACH)
Awd $3,100.00$3,100.00
2 $2,922.88$2,922.88
3 $814.67$814.67
4 $1,000.00$1,000.00
5 $1,000.00$1,000.00
6 $1,900.00$1,900.00
7 $1,400.00$1,400.00
8 $1,060.00$1,060.00
Ref #113 604E04500 CATCH BASIN, NO. 2-2B, (1 EACH)
Awd $2,100.00$2,100.00
2 $2,459.73$2,459.73
3 $1,167.31$1,167.31
4 $1,460.00$1,460.00
5 $1,460.00$1,460.00
6 $1,900.00$1,900.00
7 $2,000.00$2,000.00
8 $1,550.00$1,550.00
Ref #114 604E10100 INLET, SIDE DITCH, (1 EACH)
Awd $3,000.00$3,000.00
2 $2,551.55$2,551.55
3 $836.87$836.87
4 $1,020.00$1,020.00
5 $1,020.00$1,020.00
6 $1,900.00$1,900.00
7 $1,100.00$1,100.00
8 $1,080.00$1,080.00
Ref #115 604E22500 INLET, MISC.:KENTUCKY CURB BOX INLET, TYPE A, PER , (1 EACH)
Awd $2,750.00$2,750.00
2 $5,077.87$5,077.87
3 $3,031.50$3,031.50
4 $2,250.00$2,250.00
5 $2,250.00$2,250.00
6 $4,400.00$4,400.00
7 $5,000.00$5,000.00
8 $2,380.00$2,380.00
110628 - Page 21
Ref #116 604E22500 INLET, MISC.:KENTUCKY DROP BOX INLET TYPE 1, PER K, (1 EACH)
Awd $2,900.00$2,900.00
2 $4,917.08$4,917.08
3 $2,937.72$2,937.72
4 $2,500.00$2,500.00
5 $2,500.00$2,500.00
6 $4,000.00$4,000.00
7 $6,000.00$6,000.00
8 $2,650.00$2,650.00
Ref #117 604E22500 INLET, MISC.:KENTUCKY DROP BOX INLET TYPE 10, PER , (2 EACH)
Awd $6,200.00$3,100.00
2 $9,314.62$4,657.31
3 $3,641.72$1,820.86
4 $6,300.00$3,150.00
5 $6,300.00$3,150.00
6 $5,800.00$2,900.00
7 $8,000.00$4,000.00
8 $6,600.00$3,300.00
Ref #118 604E31500 MANHOLE, NO. 3, (20 EACH)
Awd $164,000.00$8,200.00
2 $242,658.20$12,132.91
3 $62,691.00$3,134.55
4 $91,200.00$4,560.00
5 $91,200.00$4,560.00
6 $114,000.00$5,700.00
7 $112,000.00$5,600.00
8 $96,000.00$4,800.00
Ref #119 604E31500 MANHOLE, NO. 3, E-80 LOAD, (2 EACH)
Awd $37,800.00$18,900.00
2 $45,247.56$22,623.78
3 $57,015.28$28,507.64
4 $171,630.00$85,815.00
5 $21,800.00$10,900.00
6 $24,000.00$12,000.00
7 $21,000.00$10,500.00
8 $23,000.00$11,500.00
Ref #120 604E31501 MANHOLE, NO. 3, AS PER PLAN, (1 EACH)
Awd $20,600.00$20,600.00
2 $22,133.56$22,133.56
3 $9,596.55$9,596.55
4 $11,500.00$11,500.00
5 $11,500.00$11,500.00
6 $14,000.00$14,000.00
7 $11,500.00$11,500.00
8 $12,200.00$12,200.00
Ref #121 604E32500 MANHOLE, MISC.:KENTUCKY MANHOLE TYPE A, PER KY STD, (2 EACH)
Awd $11,400.00$5,700.00
2 $14,950.20$7,475.10
3 $4,653.66$2,326.83
4 $4,200.00$2,100.00
5 $4,200.00$2,100.00
6 $6,600.00$3,300.00
7 $5,400.00$2,700.00
8 $4,400.00$2,200.00
110628 - Page 22
Ref #122 604E32500 MANHOLE, MISC.:KENTUCKY MANHOLE TYPE B, PER KY STD, (1 EACH)
Awd $5,900.00$5,900.00
2 $7,530.17$7,530.17
3 $6,011.51$6,011.51
4 $2,750.00$2,750.00
5 $2,750.00$2,750.00
6 $4,000.00$4,000.00
7 $15,000.00$15,000.00
8 $2,900.00$2,900.00
Ref #123 604E37000 INSPECTION WELL, (2 EACH)
Awd $3,200.00$1,600.00
2 $3,142.48$1,571.24
3 $2,788.60$1,394.30
4 $1,550.00$775.00
5 $1,550.00$775.00
6 $3,800.00$1,900.00
7 $3,000.00$1,500.00
8 $1,640.00$820.00
Ref #124 604E98000 DRAINAGE STRUCTURE, MISC.:GATE WELL, (1 EACH)
Awd $68,000.00$68,000.00
2 $130,000.00$130,000.00
3 $86,356.44$86,356.44
4 $85,000.00$85,000.00
5 $36,900.00$36,900.00
6 $350,000.00$350,000.00
7 $80,000.00$80,000.00
8 $39,000.00$39,000.00
Ref #125 604E98000 DRAINAGE STRUCTURE, MISC.:SLUICE GATE, (1 EACH)
Awd $42,000.00$42,000.00
2 $29,248.44$29,248.44
3 $26,495.21$26,495.21
4 $45,875.00$45,875.00
5 $29,700.00$29,700.00
6 $45,000.00$45,000.00
7 $37,000.00$37,000.00
8 $31,000.00$31,000.00
Ref #126 604E98100 DRAINAGE STRUCTURE, MISC.:KENTUCKY DROP BOX INLET , (108 FT)
Awd $45,360.00$420.00
2 $56,128.68$519.71
3 $25,335.72$234.59
4 $25,920.00$240.00
5 $25,920.00$240.00
6 $36,720.00$340.00
7 $34,020.00$315.00
8 $27,000.00$250.00
Ref #127 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH FABRIC WRAP,, (437 FT)
Awd $5,244.00$12.00
2 $7,966.51$18.23
3 $8,010.21$18.33
4 $10,706.50$24.50
5 $10,706.50$24.50
6 $7,866.00$18.00
7 $8,740.00$20.00
8 $11,362.00$26.00
110628 - Page 23
Ref #128 605E14020 6" BASE PIPE UNDERDRAINS WITH FABRIC WRAP, 707.31 , (1813 FT)
Awd $21,756.00$12.00
2 $22,753.15$12.55
3 $26,234.11$14.47
4 $44,418.50$24.50
5 $44,418.50$24.50
6 $27,195.00$15.00
7 $27,195.00$15.00
8 $47,138.00$26.00
Ref #129 605E31100 AGGREGATE DRAINS, (112 FT)
Awd $1,344.00$12.00
2 $2,085.44$18.62
3 $1,160.32$10.36
4 $2,240.00$20.00
5 $2,240.00$20.00
6 $1,120.00$10.00
7 $1,344.00$12.00
8 $2,352.00$21.00
Ref #130 895E10030 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 3, (1 EACH)
Awd $42,000.00$42,000.00
2 $29,385.62$29,385.62
3 $21,031.44$21,031.44
4 $21,500.00$21,500.00
5 $21,500.00$21,500.00
6 $45,000.00$45,000.00
7 $40,000.00$40,000.00
8 $22,500.00$22,500.00
Ref #604 603E08900 21" CONDUIT, TYPE B, (32 FT)
Awd $3,520.00$110.00
2 $4,494.08$140.44
3 $1,725.12$53.91
4 $5,248.00$164.00
5 $4,800.00$150.00
6 $5,120.00$160.00
7 $3,360.00$105.00
8 $3,520.00$110.00
Section 3 - DRAINAGE - Totals
Awd $2,710,427.00
2 $2,920,632.20
3 $1,948,134.45
4 $1,818,035.00
5 $1,420,847.00
6 $2,521,177.00
7 $2,028,524.00
8 $1,501,322.00
110628 - Page 24
Ref #131 255E20000 FULL DEPTH PAVEMENT SAWING, (3079 FT)
Awd $12,316.00$4.00
2 $3,694.80$1.20
3 $6,158.00$2.00
4 $9,852.80$3.20
5 $7,697.50$2.50
6 $9,237.00$3.00
7 $9,237.00$3.00
8 $6,465.90$2.10
Ref #132 301E46000 ASPHALT CONCRETE BASE, PG64-22, (206 CY)
Awd $42,230.00$205.00
2 $88,580.00$430.00
3 $41,832.42$203.07
4 $92,906.00$451.00
5 $88,580.00$430.00
6 $103,000.00$500.00
7 $92,901.88$450.98
8 $88,580.00$430.00
Ref #133 304E20000 AGGREGATE BASE, (2805 CY)
Awd $168,300.00$60.00
2 $140,250.00$50.00
3 $98,175.00$35.00
4 $217,387.50$77.50
5 $187,935.00$67.00
6 $252,450.00$90.00
7 $235,620.00$84.00
8 $140,250.00$50.00
Ref #134 407E10000 TACK COAT, (178 GAL)
Awd $712.00$4.00
2 $534.00$3.00
3 $2,000.72$11.24
4 $560.70$3.15
5 $534.00$3.00
6 $640.80$3.60
7 $560.70$3.15
8 $534.00$3.00
Ref #135 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (118 GAL)
Awd $472.00$4.00
2 $354.00$3.00
3 $1,899.80$16.10
4 $371.70$3.15
5 $354.00$3.00
6 $424.80$3.60
7 $371.70$3.15
8 $354.00$3.00
Ref #136 408E10000 PRIME COAT, (1369 GAL)
Awd $6,845.00$5.00
2 $5,476.00$4.00
3 $9,733.59$7.11
4 $5,749.80$4.20
5 $5,476.00$4.00
6 $6,571.20$4.80
7 $5,749.80$4.20
8 $5,476.00$4.00
110628 - Page 25
Ref #137 448E46024 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (49 CY)
Awd $22,295.00$455.00
2 $21,315.00$435.00
3 $17,161.27$350.23
4 $22,356.25$456.25
5 $21,315.00$435.00
6 $25,480.00$520.00
7 $22,354.78$456.22
8 $21,315.00$435.00
Ref #138 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (111 CY)
Awd $50,505.00$455.00
2 $48,285.00$435.00
3 $30,876.87$278.17
4 $50,643.75$456.25
5 $48,285.00$435.00
6 $57,720.00$520.00
7 $50,640.42$456.22
8 $48,285.00$435.00
Ref #139 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (81 CY)
Awd $40,500.00$500.00
2 $38,475.00$475.00
3 $26,092.53$322.13
4 $40,354.20$498.20
5 $38,475.00$475.00
6 $45,360.00$560.00
7 $40,351.77$498.17
8 $38,475.00$475.00
Ref #140 448E48020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 (, (34 CY)
Awd $17,000.00$500.00
2 $16,150.00$475.00
3 $13,939.32$409.98
4 $16,938.80$498.20
5 $16,150.00$475.00
6 $19,040.00$560.00
7 $16,937.78$498.17
8 $16,150.00$475.00
Ref #141 451E30000 SPECIAL - PRESSURE RELIEF JOINT, TYPE A, (110 FT)
Awd $6,600.00$60.00
2 $22,000.00$200.00
3 $26,510.00$241.00
4 $46,750.00$425.00
5 $34,100.00$310.00
6 $20,900.00$190.00
7 $19,800.00$180.00
8 $22,000.00$200.00
Ref #142 452E12000 8" NON-REINFORCED CONCRETE PAVEMENT, (363 SY)
Awd $19,965.00$55.00
2 $59,477.55$163.85
3 $19,231.74$52.98
4 $44,649.00$123.00
5 $30,855.00$85.00
6 $23,595.00$65.00
7 $30,855.00$85.00
8 $32,670.00$90.00
110628 - Page 26
Ref #143 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (2484 FT)
Awd $47,196.00$19.00
2 $46,947.60$18.90
3 $99,360.00$40.00
4 $173,880.00$70.00
5 $72,036.00$29.00
6 $86,940.00$35.00
7 $74,520.00$30.00
8 $79,488.00$32.00
Ref #144 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN, (275 FT)
Awd $7,700.00$28.00
2 $7,700.00$28.00
3 $7,777.00$28.28
4 $19,250.00$70.00
5 $9,625.00$35.00
6 $11,000.00$40.00
7 $11,000.00$40.00
8 $10,450.00$38.00
Ref #145 609E26000 CURB, TYPE 6, (893 FT)
Awd $17,860.00$20.00
2 $18,083.25$20.25
3 $22,708.99$25.43
4 $51,347.50$57.50
5 $22,325.00$25.00
6 $28,576.00$32.00
7 $26,790.00$30.00
8 $27,683.00$31.00
Ref #146 609E96000 MEDIAN, MISC.:KENTUCKY MOUNTABLE MEDIAN TYPE 2, PE, (48 SY)
Awd $4,080.00$85.00
2 $4,101.60$85.45
3 $4,142.88$86.31
4 $4,512.00$94.00
5 $4,224.00$88.00
6 $2,592.00$54.00
7 $4,800.00$100.00
8 $2,400.00$50.00
Ref #147 609E98000 CURB, MISC.:KENTUCKY ISLAND HEADER CURB, TYPE 1, P, (58 FT)
Awd $1,160.00$20.00
2 $1,174.50$20.25
3 $1,186.10$20.45
4 $2,378.00$41.00
5 $2,610.00$45.00
6 $1,740.00$30.00
7 $2,610.00$45.00
8 $1,624.00$28.00
Ref #148 609E98000 CURB, MISC.:KENTUCKY STANDARD HEADER CURB, PER KY , (92 FT)
Awd $1,840.00$20.00
2 $1,863.00$20.25
3 $1,881.40$20.45
4 $8,694.00$94.50
5 $5,060.00$55.00
6 $3,220.00$35.00
7 $4,140.00$45.00
8 $3,036.00$33.00
110628 - Page 27
Ref #149 888E01200 PORTLAND CEMENT CONCRETE PAVEMENT, 8" THICK (REINF, (10831 SY)
Awd $758,170.00$70.00
2 $920,635.00$85.00
3 $704,015.00$65.00
4 $1,516,340.00$140.00
5 $866,480.00$80.00
6 $866,480.00$80.00
7 $920,635.00$85.00
8 $866,480.00$80.00
Ref #606 451E31000 SPECIAL - PRESSURE RELIEF JOINT, TYPE B, (36 FT)
Awd $2,700.00$75.00
2 $5,760.00$160.00
3 $3,781.44$105.04
4 $3,564.00$99.00
5 $4,248.00$118.00
6 $3,960.00$110.00
7 $3,240.00$90.00
8 $4,320.00$120.00
Section 4 - PAVEMENT - Totals
Awd $1,228,446.00
2 $1,450,856.30
3 $1,138,464.07
4 $2,328,486.00
5 $1,466,364.50
6 $1,568,926.80
7 $1,573,115.83
8 $1,416,035.90
Ref #150 202E75600 METER VAULT REMOVED, (8 EACH)
Awd $4,000.00$500.00
2 $400.00$50.00
3 $6,988.24$873.53
4 $400.00$50.00
5 $400.00$50.00
6 $4,800.00$600.00
7 $1,120.00$140.00
8 $400.00$50.00
Ref #151 202E98200 REMOVAL MISC.:WATERLINE, (2673 FT)
Awd $120,285.00$45.00
2 $26,730.00$10.00
3 $68,856.48$25.76
4 $29,403.00$11.00
5 $26,730.00$10.00
6 $133,650.00$50.00
7 $40,095.00$15.00
8 $26,730.00$10.00
110628 - Page 28
Ref #152 638E01100 6" WATER MAIN POLYVINYL CHLORIDE PIPE AND FITTINGS, (849 FT)
Awd $52,638.00$62.00
2 $25,470.00$30.00
3 $30,971.52$36.48
4 $27,168.00$32.00
5 $25,470.00$30.00
6 $61,128.00$72.00
7 $101,880.00$120.00
8 $25,470.00$30.00
Ref #153 638E02300 10" WATER MAIN POLYVINYL CHLORIDE PIPE AND FITTING, (255 FT)
Awd $21,675.00$85.00
2 $12,240.00$48.00
3 $13,606.80$53.36
4 $12,750.00$50.00
5 $12,240.00$48.00
6 $25,500.00$100.00
7 $25,500.00$100.00
8 $12,240.00$48.00
Ref #154 638E02900 12" WATER MAIN POLYVINYL CHLORIDE PIPE AND FITTING, (363 FT)
Awd $37,752.00$104.00
2 $21,235.50$58.50
3 $24,419.01$67.27
4 $22,143.00$61.00
5 $21,235.50$58.50
6 $45,375.00$125.00
7 $65,340.00$180.00
8 $21,417.00$59.00
Ref #155 638E03380 16" WATER MAIN POLYVINYL CHLORIDE PIPE AND FITTING, (427 FT)
Awd $78,995.00$185.00
2 $40,351.50$94.50
3 $39,822.02$93.26
4 $41,419.00$97.00
5 $40,351.50$94.50
6 $93,940.00$220.00
7 $98,210.00$230.00
8 $40,565.00$95.00
Ref #156 638E05400 1" POLYETHYLENE SERVICE BRANCH, (832 FT)
Awd $41,600.00$50.00
2 $13,811.20$16.60
3 $8,419.84$10.12
4 $14,560.00$17.50
5 $13,811.20$16.60
6 $49,920.00$60.00
7 $24,960.00$30.00
8 $13,936.00$16.75
Ref #157 638E07800 6" GATE VALVE AND VALVE BOX, (8 EACH)
Awd $8,400.00$1,050.00
2 $9,680.00$1,210.00
3 $6,348.80$793.60
4 $10,600.00$1,325.00
5 $9,680.00$1,210.00
6 $9,600.00$1,200.00
7 $8,000.00$1,000.00
8 $9,800.00$1,225.00
110628 - Page 29
Ref #158 638E08000 10" GATE VALVE AND VALVE BOX, (2 EACH)
Awd $4,360.00$2,180.00
2 $4,480.00$2,240.00
3 $2,987.18$1,493.59
4 $4,640.00$2,320.00
5 $4,480.00$2,240.00
6 $5,200.00$2,600.00
7 $5,600.00$2,800.00
8 $4,540.00$2,270.00
Ref #159 638E08100 12" GATE VALVE AND VALVE BOX, (3 EACH)
Awd $8,100.00$2,700.00
2 $8,550.00$2,850.00
3 $6,315.57$2,105.19
4 $8,925.00$2,975.00
5 $8,550.00$2,850.00
6 $9,900.00$3,300.00
7 $9,300.00$3,100.00
8 $8,670.00$2,890.00
Ref #160 638E08102 16" GATE VALVE AND VALVE BOX, (2 EACH)
Awd $16,200.00$8,100.00
2 $16,580.00$8,290.00
3 $11,354.38$5,677.19
4 $17,600.00$8,800.00
5 $16,580.00$8,290.00
6 $19,000.00$9,500.00
7 $18,000.00$9,000.00
8 $16,820.00$8,410.00
Ref #161 638E08900 6" CUTTING-IN SLEEVE, VALVE AND VALVE BOX, (2 EACH)
Awd $10,400.00$5,200.00
2 $5,540.00$2,770.00
3 $1,707.66$853.83
4 $5,940.00$2,970.00
5 $5,540.00$2,770.00
6 $12,400.00$6,200.00
7 $7,600.00$3,800.00
8 $5,620.00$2,810.00
Ref #162 638E09200 12" CUTTING-IN SLEEVE, VALVE AND VALVE BOX, (2 EACH)
Awd $15,400.00$7,700.00
2 $9,860.00$4,930.00
3 $5,960.00$2,980.00
4 $9,860.00$4,930.00
5 $9,860.00$4,930.00
6 $18,000.00$9,000.00
7 $12,000.00$6,000.00
8 $10,000.00$5,000.00
Ref #163 638E10200 6" FIRE HYDRANT, (3 EACH)
Awd $12,750.00$4,250.00
2 $12,900.00$4,300.00
3 $10,068.99$3,356.33
4 $12,900.00$4,300.00
5 $12,900.00$4,300.00
6 $15,000.00$5,000.00
7 $13,500.00$4,500.00
8 $13,080.00$4,360.00
110628 - Page 30
Ref #164 638E10600 FIRE HYDRANT AND GATE VALVE REMOVED AND RESET, (1 EACH)
Awd $2,500.00$2,500.00
2 $3,400.00$3,400.00
3 $1,174.38$1,174.38
4 $3,400.00$3,400.00
5 $3,400.00$3,400.00
6 $3,000.00$3,000.00
7 $3,500.00$3,500.00
8 $3,450.00$3,450.00
Ref #165 638E11100 METER AND CHAMBER REMOVED AND RESET, (9 EACH)
Awd $9,900.00$1,100.00
2 $15,390.00$1,710.00
3 $2,500.83$277.87
4 $15,390.00$1,710.00
5 $15,390.00$1,710.00
6 $10,800.00$1,200.00
7 $8,100.00$900.00
8 $15,570.00$1,730.00
Ref #166 638E11200 METER, SETTING, STOP AND CHAMBER, (7 EACH)
Awd $10,500.00$1,500.00
2 $770.00$110.00
3 $5,145.98$735.14
4 $770.00$110.00
5 $770.00$110.00
6 $12,600.00$1,800.00
7 $12,600.00$1,800.00
8 $770.00$110.00
Ref #167 638E30400 SPECIAL - PLUGGING EXISTING WATER MAIN AND BRANCHE, (7 EACH)
Awd $15,400.00$2,200.00
2 $7,245.00$1,035.00
3 $3,442.95$491.85
4 $7,245.00$1,035.00
5 $7,245.00$1,035.00
6 $18,900.00$2,700.00
7 $6,650.00$950.00
8 $7,350.00$1,050.00
Ref #168 638E98000 WATER WORK, MISC.:TAPPING SADDLE AND CORPORATION S, (7 EACH)
Awd $1,960.00$280.00
2 $6,650.00$950.00
3 $11,501.98$1,643.14
4 $6,650.00$950.00
5 $6,650.00$950.00
6 $2,380.00$340.00
7 $6,300.00$900.00
8 $6,720.00$960.00
Ref #605 638E05100 2" COPPER SERVICE BRANCH, (100 FT)
Awd $12,000.00$120.00
2 $10,291.00$102.91
3 $2,500.00$25.00
4 $9,000.00$90.00
5 $5,000.00$50.00
6 $7,000.00$70.00
7 $4,000.00$40.00
8 $6,000.00$60.00
110628 - Page 31
Section 5 - WATER WORK - Totals
Awd $484,815.00
2 $251,574.20
3 $264,092.61
4 $260,763.00
5 $246,283.20
6 $558,093.00
7 $472,255.00
8 $249,148.00
Ref #169 603E98300 CONDUIT, MISC.:10" CONDUIT, TYPE B, POLYVINYL CHLO, (69 FT)
Awd $9,315.00$135.00
2 $6,292.80$91.20
3 $3,265.77$47.33
4 $2,725.50$39.50
5 $2,725.50$39.50
6 $11,040.00$160.00
7 $6,900.00$100.00
8 $2,760.00$40.00
Ref #170 603E98300 CONDUIT, MISC.:6" CONDUIT, TYPE B, POLYVINYL CHLOR, (4 FT)
Awd $860.00$215.00
2 $1,332.60$333.15
3 $586.76$146.69
4 $200.00$50.00
5 $200.00$50.00
6 $1,040.00$260.00
7 $760.00$190.00
8 $200.00$50.00
Ref #171 603E98300 CONDUIT, MISC.:8" CONDUIT, TYPE B, POLYVINYL CHLOR, (160 FT)
Awd $18,560.00$116.00
2 $15,080.00$94.25
3 $7,246.40$45.29
4 $5,440.00$34.00
5 $5,440.00$34.00
6 $22,400.00$140.00
7 $11,200.00$70.00
8 $5,440.00$34.00
Ref #172 604E31500 MANHOLE, NO. 3, (4 EACH)
Awd $17,600.00$4,400.00
2 $19,895.20$4,973.80
3 $18,544.56$4,636.14
4 $7,480.00$1,870.00
5 $7,480.00$1,870.00
6 $21,600.00$5,400.00
7 $13,200.00$3,300.00
8 $7,520.00$1,880.00
110628 - Page 32
Section 6 - SANITARY - Totals
Awd $46,335.00
2 $42,600.60
3 $29,643.49
4 $15,845.50
5 $15,845.50
6 $56,080.00
7 $32,060.00
8 $15,920.00
Ref #173 625E00500 CONNECTOR KIT, TYPE II, (6 EACH)
Awd $762.00$127.00
2 $516.18$86.03
3 $510.00$85.00
4 $768.00$128.00
5 $760.20$126.70
6 $510.00$85.00
7 $523.86$87.31
8 $528.00$88.00
Ref #174 625E00600 CONNECTOR KIT, TYPE III, (6 EACH)
Awd $660.00$110.00
2 $516.18$86.03
3 $510.00$85.00
4 $666.60$111.10
5 $660.00$110.00
6 $684.00$114.00
7 $523.86$87.31
8 $528.00$88.00
Ref #175 625E23304 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE, (5850 FT)
Awd $5,850.00$1.00
2 $9,477.00$1.62
3 $9,360.00$1.60
4 $10,296.00$1.76
5 $7,663.50$1.31
6 $12,870.00$2.20
7 $9,594.00$1.64
8 $9,828.00$1.68
Ref #176 625E23308 DISTRIBUTION CABLE, MISC.:3/C #16 "SO" CORD, (18 FT)
Awd $450.00$25.00
2 $273.24$15.18
3 $270.00$15.00
4 $288.00$16.00
5 $450.00$25.00
6 $39.60$2.20
7 $277.38$15.41
8 $279.00$15.50
110628 - Page 33
Ref #177 625E25100 CONDUIT, 1", 725.04, (30 FT)
Awd $990.00$33.00
2 $759.00$25.30
3 $750.00$25.00
4 $810.00$27.00
5 $1,000.20$33.34
6 $300.00$10.00
7 $770.40$25.68
8 $780.00$26.00
Ref #178 625E25300 CONDUIT, 1-1/2", 725.04, (1850 FT)
Awd $27,750.00$15.00
2 $26,214.50$14.17
3 $25,900.00$14.00
4 $27,805.50$15.03
5 $27,528.00$14.88
6 $18,500.00$10.00
7 $26,603.00$14.38
8 $26,825.00$14.50
Ref #179 625E29901 JUNCTION BOX, AS PER PLAN(6" X 6" X 4" NEMA 4 CAST, (6 EACH)
Awd $1,950.00$325.00
2 $2,672.04$445.34
3 $2,640.00$440.00
4 $2,874.00$479.00
5 $1,944.00$324.00
6 $9,300.00$1,550.00
7 $2,711.64$451.94
8 $2,700.00$450.00
Ref #180 625E29940 BARRIER JUNCTION BOX, (6 EACH)
Awd $8,400.00$1,400.00
2 $9,412.80$1,568.80
3 $9,300.00$1,550.00
4 $10,128.00$1,688.00
5 $8,334.00$1,389.00
6 $10,500.00$1,750.00
7 $9,552.36$1,592.06
8 $9,660.00$1,610.00
Ref #181 625E98000 LIGHTING, MISC.:NAVIGATION LIGHTING FIXTURES, (6 EACH)
Awd $22,800.00$3,800.00
2 $26,720.28$4,453.38
3 $26,400.00$4,400.00
4 $28,950.00$4,825.00
5 $22,890.00$3,815.00
6 $26,400.00$4,400.00
7 $27,116.46$4,519.41
8 $27,360.00$4,560.00
Ref #182 625E98200 LIGHTING, MISC.:TEMPORARY NAVIGATION LIGHTING, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $32,894.25$32,894.25
3 $32,500.00$32,500.00
4 $35,403.00$35,403.00
5 $7,950.00$7,950.00
6 $9,200.00$9,200.00
7 $33,381.98$33,381.98
8 $35,000.00$35,000.00
110628 - Page 34
Section 7 - NAVIGATION LIGHTING SYTEM - Totals
Awd $77,612.00
2 $109,455.47
3 $108,140.00
4 $117,989.10
5 $79,179.90
6 $88,303.60
7 $111,054.94
8 $113,488.00
Ref #183 625E98200 LIGHTING, MISC.:AVIATION OBSTRUCTION BEACON SYSTEM, (LUMP SUM)
Awd $6,250.00$6,250.00
2 $11,200.00$11,200.00
3 $13,650.00$13,650.00
4 $14,870.00$14,870.00
5 $6,250.00$6,250.00
6 $7,200.00$7,200.00
7 $14,020.43$14,020.43
8 $14,000.00$14,000.00
Section 8 - AVIATION OBSTRUCTION BEACON SYSTEM - Totals
Awd $6,250.00
2 $11,200.00
3 $13,650.00
4 $14,870.00
5 $6,250.00
6 $7,200.00
7 $14,020.43
8 $14,000.00
Ref #184 625E00480 CONNECTION, UNFUSED PERMANENT, (12 EACH)
Awd $1,536.00$128.00
2 $1,032.36$86.03
3 $1,020.00$85.00
4 $1,544.40$128.70
5 $1,530.00$127.50
6 $1,740.00$145.00
7 $1,047.72$87.31
8 $1,056.00$88.00
Ref #185 625E00500 CONNECTOR KIT, TYPE II, (136 EACH)
Awd $16,320.00$120.00
2 $11,700.08$86.03
3 $11,560.00$85.00
4 $12,512.00$92.00
5 $16,204.40$119.15
6 $18,360.00$135.00
7 $11,874.16$87.31
8 $11,968.00$88.00
110628 - Page 35
Ref #186 625E00600 CONNECTOR KIT, TYPE III, (136 EACH)
Awd $15,096.00$111.00
2 $11,700.08$86.03
3 $11,560.00$85.00
4 $15,272.80$112.30
5 $15,130.00$111.25
6 $17,000.00$125.00
7 $11,874.16$87.31
8 $11,968.00$88.00
Ref #187 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE, (19722 FT)
Awd $19,722.00$1.00
2 $34,907.94$1.77
3 $34,513.50$1.75
4 $37,471.80$1.90
5 $27,019.14$1.37
6 $29,583.00$1.50
7 $35,499.60$1.80
8 $35,499.60$1.80
Ref #188 625E23304 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE, (4137 FT)
Awd $4,137.00$1.00
2 $6,701.94$1.62
3 $6,619.20$1.60
4 $7,198.38$1.74
5 $5,833.17$1.41
6 $6,205.50$1.50
7 $6,784.68$1.64
8 $6,826.05$1.65
Ref #189 625E25100 CONDUIT, 1", 725.04, (680 FT)
Awd $31,280.00$46.00
2 $11,702.80$17.21
3 $11,560.00$17.00
4 $12,593.60$18.52
5 $31,212.00$45.90
6 $36,040.00$53.00
7 $11,872.80$17.46
8 $12,036.00$17.70
Ref #190 625E25300 CONDUIT, 1-1/2", 725.04, (3338 FT)
Awd $56,746.00$17.00
2 $47,299.46$14.17
3 $46,732.00$14.00
4 $50,070.00$15.00
5 $57,179.94$17.13
6 $63,422.00$19.00
7 $48,000.44$14.38
8 $48,401.00$14.50
Ref #191 625E29901 JUNCTION BOX, AS PER PLAN, (136 EACH)
Awd $26,520.00$195.00
2 $60,566.24$445.34
3 $59,840.00$440.00
4 $65,280.00$480.00
5 $25,989.60$191.10
6 $29,920.00$220.00
7 $61,463.84$451.94
8 $61,200.00$450.00
110628 - Page 36
Ref #192 625E29901 JUNCTION BOX, AS PER PLAN(18" X 12" X 8" SURFACE M, (140 EACH)
Awd $183,400.00$1,310.00
2 $180,665.80$1,290.47
3 $178,500.00$1,275.00
4 $194,320.00$1,388.00
5 $182,567.00$1,304.05
6 $210,000.00$1,500.00
7 $183,344.00$1,309.60
8 $184,800.00$1,320.00
Ref #193 625E98000 LIGHTING, MISC.:AESTHETIC LIGHTING FIXTURE TYPE AA, (136 EACH)
Awd $204,000.00$1,500.00
2 $244,328.08$1,796.53
3 $241,400.00$1,775.00
4 $262,888.00$1,933.00
5 $205,428.00$1,510.50
6 $231,200.00$1,700.00
7 $247,951.12$1,823.17
8 $251,600.00$1,850.00
Section 9 - AESTHETIC LIGHTING SYSTEM - Totals
Awd $558,757.00
2 $610,604.78
3 $603,304.70
4 $659,150.98
5 $568,093.25
6 $643,470.50
7 $619,712.52
8 $625,354.65
Ref #194 625E98200 LIGHTING, MISC.:STRUCTURE GROUNDING AND LIGHTNING , (LUMP SUM)
Awd $200,000.00$200,000.00
2 $361,634.29$361,634.29
3 $222,300.00$222,300.00
4 $334,750.00$334,750.00
5 $198,667.00$198,667.00
6 $230,000.00$230,000.00
7 $315,639.46$315,639.46
8 $375,000.00$375,000.00
Section 10 - STRUCTURE GROUNDING AND LIGHTING PROTECT - Totals
Awd $200,000.00
2 $361,634.29
3 $222,300.00
4 $334,750.00
5 $198,667.00
6 $230,000.00
7 $315,639.46
8 $375,000.00
110628 - Page 37
Ref #195 625E23304 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE, (210 FT)
Awd $210.00$1.00
2 $298.20$1.42
3 $294.00$1.40
4 $321.30$1.53
5 $281.40$1.34
6 $945.00$4.50
7 $302.40$1.44
8 $241.50$1.15
Ref #196 625E23306 NO. 10 AWG 600 VOLT DISTRIBUTION CABLE, (4425 FT)
Awd $4,425.00$1.00
2 $5,619.75$1.27
3 $5,531.25$1.25
4 $6,018.00$1.36
5 $4,159.50$0.94
6 $15,045.00$3.40
7 $5,664.00$1.28
8 $4,425.00$1.00
Ref #197 625E23410 NO. 12 AWG POLE AND BRACKET CABLE, (288 FT)
Awd $288.00$1.00
2 $290.88$1.01
3 $288.00$1.00
4 $313.92$1.09
5 $273.60$0.95
6 $1,324.80$4.60
7 $296.64$1.03
8 $288.00$1.00
Ref #198 625E25100 CONDUIT, 1", 725.04, (1534 FT)
Awd $18,408.00$12.00
2 $24,068.46$15.69
3 $23,777.00$15.50
4 $25,924.60$16.90
5 $19,052.28$12.42
6 $19,328.40$12.60
7 $24,421.28$15.92
8 $12,272.00$8.00
Ref #199 625E25401 CONDUIT, 2", 725.04, AS PER PLAN, (3447 FT)
Awd $65,493.00$19.00
2 $82,004.13$23.79
3 $81,004.50$23.50
4 $88,243.20$25.60
5 $65,148.30$18.90
6 $55,152.00$16.00
7 $83,210.58$24.14
8 $34,987.05$10.15
Ref #200 625E25403 CONDUIT, 2", 725.05, AS PER PLAN(SCHEDULE 40), (106 FT)
Awd $1,272.00$12.00
2 $1,716.14$16.19
3 $1,696.00$16.00
4 $1,855.00$17.50
5 $1,320.76$12.46
6 $1,219.00$11.50
7 $1,741.58$16.43
8 $689.00$6.50
110628 - Page 38
Ref #201 625E25403 CONDUIT, 2", 725.05, AS PER PLAN(SCHEDULE 80), (828 FT)
Awd $10,764.00$13.00
2 $13,405.32$16.19
3 $13,248.00$16.00
4 $14,432.04$17.43
5 $10,706.04$12.93
6 $7,617.60$9.20
7 $13,604.04$16.43
8 $6,210.00$7.50
Ref #202 625E25920 CONDUIT, MISC.:1" LIQUIDTIGHT FLEXIBLE CONDUIT, AS, (108 FT)
Awd $2,592.00$24.00
2 $2,514.24$23.28
3 $2,484.00$23.00
4 $2,700.00$25.00
5 $2,580.12$23.89
6 $2,484.00$23.00
7 $2,550.96$23.62
8 $2,160.00$20.00
Ref #203 625E25920 CONDUIT, MISC.:2" LIQUIDTIGHT FLEXIBLE CONDUIT, AS, (231 FT)
Awd $7,161.00$31.00
2 $5,844.30$25.30
3 $5,775.00$25.00
4 $6,237.00$27.00
5 $7,195.65$31.15
6 $5,775.00$25.00
7 $5,932.08$25.68
8 $6,930.00$30.00
Ref #204 625E98000 LIGHTING, MISC.:DATA CABINET 24" X 24" X 72", (2 EACH)
Awd $8,600.00$4,300.00
2 $30,870.00$15,435.00
3 $30,500.00$15,250.00
4 $33,220.00$16,610.00
5 $8,550.00$4,275.00
6 $11,400.00$5,700.00
7 $31,327.70$15,663.85
8 $5,000.00$2,500.00
Ref #205 625E98000 LIGHTING, MISC.:JUNCTION BOX, NEMA 4X (MODIFIED FO, (35 EACH)
Awd $21,175.00$605.00
2 $65,535.40$1,872.44
3 $64,750.00$1,850.00
4 $70,525.00$2,015.00
5 $21,210.00$606.00
6 $25,900.00$740.00
7 $66,507.35$1,900.21
8 $35,000.00$1,000.00
Ref #206 625E98000 LIGHTING, MISC.:PULL BOX, CAST IRON 6" X 6" X 4", , (37 EACH)
Awd $6,475.00$175.00
2 $17,975.34$485.82
3 $17,760.00$480.00
4 $19,314.00$522.00
5 $6,401.00$173.00
6 $21,090.00$570.00
7 $18,242.11$493.03
8 $1,850.00$50.00
110628 - Page 39
Ref #207 625E98000 LIGHTING, MISC.:PULL BOX, CAST IRON 8" X 8" X 6", , (17 EACH)
Awd $7,225.00$425.00
2 $11,700.25$688.25
3 $11,560.00$680.00
4 $12,580.00$740.00
5 $7,174.00$422.00
6 $12,631.00$743.00
7 $11,873.65$698.45
8 $1,700.00$100.00
Ref #208 625E98000 LIGHTING, MISC.:RECEPTACLE WITH BACKBOX - 15A, 120, (13 EACH)
Awd $1,040.00$80.00
2 $1,973.66$151.82
3 $1,950.00$150.00
4 $2,119.00$163.00
5 $1,001.00$77.00
6 $663.00$51.00
7 $2,002.91$154.07
8 $650.00$50.00
Section 11 - BRIDGE HEALTH MONITORING SYSTEM - Totals
Awd $155,128.00
2 $263,816.07
3 $260,617.75
4 $283,803.06
5 $155,053.65
6 $180,574.80
7 $267,677.28
8 $112,402.55
Ref #209 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE, (2901 FT)
Awd $5,802.00$2.00
2 $7,919.73$2.73
3 $7,832.70$2.70
4 $8,528.94$2.94
5 $5,482.89$1.89
6 $6,237.15$2.15
7 $8,035.77$2.77
8 $8,122.80$2.80
Ref #210 625E23308 DISTRIBUTION CABLE, MISC.:NO. 250 KCMIL 600 VOLT D, (11504 FT)
Awd $92,032.00$8.00
2 $104,801.44$9.11
3 $103,536.00$9.00
4 $112,739.20$9.80
5 $88,810.88$7.72
6 $97,784.00$8.50
7 $106,296.96$9.24
8 $106,987.20$9.30
110628 - Page 40
Ref #211 625E25404 CONDUIT, 2-1/2", 725.04, (4628 FT)
Awd $148,096.00$32.00
2 $70,253.04$15.18
3 $69,420.00$15.00
4 $75,436.40$16.30
5 $149,438.12$32.29
6 $171,236.00$37.00
7 $71,317.48$15.41
8 $71,734.00$15.50
Ref #212 625E25500 CONDUIT, 3", 725.04, (788 FT)
Awd $36,248.00$46.00
2 $17,548.76$22.27
3 $17,336.00$22.00
4 $18,912.00$24.00
5 $36,255.88$46.01
6 $40,976.00$52.00
7 $17,808.80$22.60
8 $17,966.40$22.80
Ref #213 625E25502 CONDUIT, 3", 725.05, (30 FT)
Awd $420.00$14.00
2 $243.00$8.10
3 $240.00$8.00
4 $261.00$8.70
5 $421.50$14.05
6 $480.00$16.00
7 $246.60$8.22
8 $249.00$8.30
Ref #214 625E25600 CONDUIT, 4", 725.04, (2565 FT)
Awd $128,250.00$50.00
2 $83,080.35$32.39
3 $82,080.00$32.00
4 $89,775.00$35.00
5 $128,609.10$50.14
6 $148,770.00$58.00
7 $84,311.55$32.87
8 $84,645.00$33.00
Ref #215 625E25602 CONDUIT, 4", 725.05, (52 FT)
Awd $832.00$16.00
2 $526.24$10.12
3 $520.00$10.00
4 $858.00$16.50
5 $850.20$16.35
6 $988.00$19.00
7 $534.04$10.27
8 $533.00$10.25
Ref #216 625E25802 CONDUIT, CONCRETE ENCASED, 2-1/2", 725.05, (420 FT)
Awd $4,620.00$11.00
2 $4,888.80$11.64
3 $4,830.00$11.50
4 $5,271.00$12.55
5 $4,523.40$10.77
6 $5,250.00$12.50
7 $4,960.20$11.81
8 $4,956.00$11.80
110628 - Page 41
Ref #217 625E25802 CONDUIT, CONCRETE ENCASED, 3", 725.05, (270 FT)
Awd $3,510.00$13.00
2 $683.10$2.53
3 $675.00$2.50
4 $742.50$2.75
5 $3,429.00$12.70
6 $3,915.00$14.50
7 $693.90$2.57
8 $702.00$2.60
Ref #218 625E25802 CONDUIT, CONCRETE ENCASED, 4", 725.05, (190 FT)
Awd $3,230.00$17.00
2 $2,692.30$14.17
3 $2,660.00$14.00
4 $3,182.50$16.75
5 $3,144.50$16.55
6 $3,610.00$19.00
7 $2,732.20$14.38
8 $2,755.00$14.50
Ref #219 625E25920 CONDUIT, MISC.:2-1/2" LIQUIDTIGHT FLEXIBLE CONDUIT, (12 FT)
Awd $2,700.00$225.00
2 $461.52$38.46
3 $456.00$38.00
4 $504.00$42.00
5 $2,715.00$226.25
6 $3,000.00$250.00
7 $468.36$39.03
8 $468.00$39.00
Ref #220 625E25920 CONDUIT, MISC.:3" LIQUIDTIGHT FLEXIBLE CONDUIT, AS, (18 FT)
Awd $1,890.00$105.00
2 $801.54$44.53
3 $792.00$44.00
4 $864.00$48.00
5 $1,893.60$105.20
6 $2,070.00$115.00
7 $813.42$45.19
8 $810.00$45.00
Ref #221 625E25920 CONDUIT, MISC.:4" LIQUIDTIGHT FLEXIBLE CONDUIT, AS, (24 FT)
Awd $2,160.00$90.00
2 $1,141.68$47.57
3 $1,128.00$47.00
4 $2,114.40$88.10
5 $2,095.20$87.30
6 $2,400.00$100.00
7 $1,158.72$48.28
8 $1,176.00$49.00
Ref #222 625E25930 CONDUIT, MISC.:2-1/2" EXPANSION/DEFLECTION FITTING, (14 EACH)
Awd $5,110.00$365.00
2 $8,501.92$607.28
3 $8,400.00$600.00
4 $9,170.00$655.00
5 $5,110.00$365.00
6 $5,880.00$420.00
7 $8,627.92$616.28
8 $8,680.00$620.00
110628 - Page 42
Ref #223 625E25930 CONDUIT, MISC.:3" EXPANSION/DEFLECTION FITTNG, AS , (2 EACH)
Awd $1,340.00$670.00
2 $1,619.42$809.71
3 $1,600.00$800.00
4 $1,744.00$872.00
5 $1,340.00$670.00
6 $1,560.00$780.00
7 $1,643.42$821.71
8 $1,660.00$830.00
Ref #224 625E25930 CONDUIT, MISC.:4" EXPANSION/DEFLECTION FITTING, AS, (3 EACH)
Awd $2,505.00$835.00
2 $3,036.39$1,012.13
3 $3,000.00$1,000.00
4 $3,270.00$1,090.00
5 $2,502.00$834.00
6 $2,910.00$970.00
7 $3,081.42$1,027.14
8 $3,060.00$1,020.00
Ref #225 625E25930 CONDUIT, MISC.:WEATHERHEAD, (2 EACH)
Awd $660.00$330.00
2 $404.86$202.43
3 $400.00$200.00
4 $666.10$333.05
5 $660.00$330.00
6 $760.00$380.00
7 $410.86$205.43
8 $400.00$200.00
Ref #226 625E29000 TRENCH, (923 FT)
Awd $34,151.00$37.00
2 $5,602.61$6.07
3 $5,538.00$6.00
4 $6,045.65$6.55
5 $33,781.80$36.60
6 $38,766.00$42.00
7 $5,685.68$6.16
8 $5,630.30$6.10
Ref #227 625E29901 JUNCTION BOX, AS PER PLAN(24" X 24" X 10", NEMA 4X, (12 EACH)
Awd $21,000.00$1,750.00
2 $17,914.68$1,492.89
3 $17,700.00$1,475.00
4 $21,181.20$1,765.10
5 $20,988.00$1,749.00
6 $24,000.00$2,000.00
7 $18,180.36$1,515.03
8 $18,000.00$1,500.00
Ref #228 625E29901 JUNCTION BOX, AS PER PLAN(36" X 24" X 10", NEMA 4X, (6 EACH)
Awd $12,600.00$2,100.00
2 $11,386.50$1,897.75
3 $11,250.00$1,875.00
4 $12,467.70$2,077.95
5 $12,354.00$2,059.00
6 $14,400.00$2,400.00
7 $11,555.28$1,925.88
8 $11,700.00$1,950.00
110628 - Page 43
Ref #229 625E30706 PULL BOX, 725.08, 24", (6 EACH)
Awd $5,610.00$935.00
2 $5,161.86$860.31
3 $5,100.00$850.00
4 $5,673.90$945.65
5 $5,622.00$937.00
6 $6,300.00$1,050.00
7 $5,238.42$873.07
8 $5,280.00$880.00
Ref #230 625E34001 POWER SERVICE, AS PER PLAN, (2 EACH)
Awd $24,000.00$12,000.00
2 $25,303.28$12,651.64
3 $25,000.00$12,500.00
4 $27,220.00$13,610.00
5 $22,300.00$11,150.00
6 $26,000.00$13,000.00
7 $25,678.46$12,839.23
8 $26,000.00$13,000.00
Ref #231 625E36000 PLASTIC CAUTION TAPE, (923 FT)
Awd $323.05$0.35
2 $701.48$0.76
3 $692.25$0.75
4 $756.86$0.82
5 $304.59$0.33
6 $323.05$0.35
7 $710.71$0.77
8 $692.25$0.75
Section 12 - LIGHTING - POWER SERVICE - Totals
Awd $537,089.05
2 $374,674.50
3 $370,185.95
4 $407,384.35
5 $532,631.66
6 $607,615.20
7 $380,190.53
8 $382,206.95
Ref #232 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE, (42 FT)
Awd $210.00$5.00
2 $212.52$5.06
3 $210.00$5.00
4 $228.90$5.45
5 $203.28$4.84
6 $231.00$5.50
7 $215.88$5.14
8 $218.40$5.20
110628 - Page 44
Ref #233 625E23304 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE, (5354 FT)
Awd $5,354.00$1.00
2 $10,815.08$2.02
3 $10,708.00$2.00
4 $11,778.80$2.20
5 $7,120.82$1.33
6 $8,031.00$1.50
7 $10,975.70$2.05
8 $10,975.70$2.05
Ref #234 625E23306 NO. 10 AWG 600 VOLT DISTRIBUTION CABLE, (928 FT)
Awd $928.00$1.00
2 $1,688.96$1.82
3 $1,670.40$1.80
4 $1,818.88$1.96
5 $918.72$0.99
6 $1,020.80$1.10
7 $1,716.80$1.85
8 $1,716.80$1.85
Ref #235 625E23308 DISTRIBUTION CABLE, MISC.:NO. 12 AWG 600 VOLTS DIS, (1374 FT)
Awd $1,099.20$0.80
2 $2,775.48$2.02
3 $2,748.00$2.00
4 $3,022.80$2.20
5 $1,044.24$0.76
6 $1,167.90$0.85
7 $2,816.70$2.05
8 $2,816.70$2.05
Ref #236 625E23308 DISTRIBUTION CABLE, MISC.:NO. 250 KCMIL 600 VOLT D, (168 FT)
Awd $2,520.00$15.00
2 $2,380.56$14.17
3 $2,352.00$14.00
4 $2,612.40$15.55
5 $2,580.48$15.36
6 $2,856.00$17.00
7 $2,415.84$14.38
8 $2,436.00$14.50
Ref #237 625E25000 CONDUIT, 3/4", 725.04, (1970 FT)
Awd $29,550.00$15.00
2 $11,957.90$6.07
3 $11,820.00$6.00
4 $12,903.50$6.55
5 $28,722.60$14.58
6 $33,490.00$17.00
7 $12,135.20$6.16
8 $12,214.00$6.20
Ref #238 625E25404 CONDUIT, 2-1/2", 725.04, (42 FT)
Awd $3,696.00$88.00
2 $892.50$21.25
3 $882.00$21.00
4 $3,725.40$88.70
5 $3,690.12$87.86
6 $4,200.00$100.00
7 $905.94$21.57
8 $911.40$21.70
110628 - Page 45
Ref #239 625E29901 JUNCTION BOX, AS PER PLAN(NEMA 3R 6" X 6" X 4"), (2 EACH)
Awd $570.00$285.00
2 $971.66$485.83
3 $960.00$480.00
4 $1,044.00$522.00
5 $564.00$282.00
6 $650.00$325.00
7 $986.06$493.03
8 $1,000.00$500.00
Ref #240 625E98000 LIGHTING, MISC.:COMBINATION TRANSFORMER/PANEL BOAR, (4 EACH)
Awd $16,500.00$4,125.00
2 $70,849.16$17,712.29
3 $70,000.00$17,500.00
4 $16,651.60$4,162.90
5 $16,500.00$4,125.00
6 $19,200.00$4,800.00
7 $71,899.64$17,974.91
8 $72,000.00$18,000.00
Ref #241 625E98000 LIGHTING, MISC.:DUPLEX GFCI RECEPTACLE, 20A, 120 V, (64 EACH)
Awd $11,200.00$175.00
2 $14,574.72$227.73
3 $14,400.00$225.00
4 $11,296.00$176.50
5 $11,190.40$174.85
6 $12,800.00$200.00
7 $14,791.04$231.11
8 $14,720.00$230.00
Ref #242 625E98000 LIGHTING, MISC.:HOIST RECEPTACLE, 20A, 120 VOLT, (2 EACH)
Awd $700.00$350.00
2 $404.86$202.43
3 $400.00$200.00
4 $698.40$349.20
5 $692.00$346.00
6 $800.00$400.00
7 $410.86$205.43
8 $410.00$205.00
Ref #243 625E98000 LIGHTING, MISC.:INSPECTION LIGHTING, 4'-0" FLUORES, (66 EACH)
Awd $24,750.00$375.00
2 $40,080.48$607.28
3 $39,600.00$600.00
4 $25,023.90$379.15
5 $24,796.20$375.70
6 $28,380.00$430.00
7 $40,674.48$616.28
8 $39,600.00$600.00
Ref #244 625E98000 LIGHTING, MISC.:LOW VOLTAGE LIGHTING RELAY PANEL, (2 EACH)
Awd $14,400.00$7,200.00
2 $24,291.14$12,145.57
3 $24,000.00$12,000.00
4 $26,200.00$13,100.00
5 $14,420.00$7,210.00
6 $16,000.00$8,000.00
7 $24,651.32$12,325.66
8 $25,000.00$12,500.00
110628 - Page 46
Ref #245 625E98000 LIGHTING, MISC.:PANEL BOARDS 225A 480/277V-3PH-4W , (2 EACH)
Awd $6,900.00$3,450.00
2 $11,133.44$5,566.72
3 $11,000.00$5,500.00
4 $11,990.00$5,995.00
5 $6,900.00$3,450.00
6 $8,000.00$4,000.00
7 $11,298.52$5,649.26
8 $11,400.00$5,700.00
Ref #246 625E98000 LIGHTING, MISC.:PHOTOCELL, (2 EACH)
Awd $400.00$200.00
2 $378.54$189.27
3 $374.00$187.00
4 $403.70$201.85
5 $400.00$200.00
6 $460.00$230.00
7 $384.16$192.08
8 $380.00$190.00
Ref #247 625E98000 LIGHTING, MISC.:TOGGLE SWITCH, 20A, 277 VOLT PILOT, (8 EACH)
Awd $1,248.00$156.00
2 $8,906.72$1,113.34
3 $8,800.00$1,100.00
4 $9,600.00$1,200.00
5 $1,250.00$156.25
6 $1,440.00$180.00
7 $9,038.80$1,129.85
8 $9,120.00$1,140.00
Section 13 - LIGHTING - TOWER INSPECTION LIGHTING AND - Totals
Awd $120,025.20
2 $202,313.72
3 $199,924.40
4 $138,998.28
5 $120,992.86
6 $138,726.70
7 $205,316.94
8 $204,919.00
Ref #248 625E00480 CONNECTION, UNFUSED PERMANENT, (3 EACH)
Awd $480.00$160.00
2 $258.09$86.03
3 $255.00$85.00
4 $484.50$161.50
5 $480.00$160.00
6 $540.00$180.00
7 $261.93$87.31
8 $264.00$88.00
110628 - Page 47
Ref #249 625E00500 CONNECTOR KIT, TYPE II, (74 EACH)
Awd $7,030.00$95.00
2 $6,366.22$86.03
3 $6,290.00$85.00
4 $6,989.30$94.45
5 $6,922.70$93.55
6 $7,770.00$105.00
7 $6,460.94$87.31
8 $6,512.00$88.00
Ref #250 625E00600 CONNECTOR KIT, TYPE III, (74 EACH)
Awd $6,734.00$91.00
2 $6,366.22$86.03
3 $6,290.00$85.00
4 $6,815.40$92.10
5 $6,753.24$91.26
6 $7,770.00$105.00
7 $6,460.94$87.31
8 $6,512.00$88.00
Ref #251 625E10481 LIGHT POLE, DECORATIVE, AS PER PLAN, 12'-0", (67 EACH)
Awd $174,200.00$2,600.00
2 $155,969.30$2,327.90
3 $154,100.00$2,300.00
4 $174,313.90$2,601.70
5 $172,726.00$2,578.00
6 $201,000.00$3,000.00
7 $158,282.14$2,362.42
8 $157,450.00$2,350.00
Ref #252 625E10481 LIGHT POLE, DECORATIVE, AS PER PLAN, 14'-6", (7 EACH)
Awd $16,100.00$2,300.00
2 $15,586.83$2,226.69
3 $15,400.00$2,200.00
4 $16,800.00$2,400.00
5 $15,519.00$2,217.00
6 $17,500.00$2,500.00
7 $15,817.90$2,259.70
8 $15,750.00$2,250.00
Ref #253 625E10620 LIGHT POLE ANCHOR BOLTS, MISC.:FOR PILASTER MOUNTE, (268 EACH)
Awd $5,628.00$21.00
2 $10,851.32$40.49
3 $10,720.00$40.00
4 $11,524.00$43.00
5 $5,748.60$21.45
6 $6,700.00$25.00
7 $11,012.12$41.09
8 $10,988.00$41.00
Ref #254 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP, (7 EACH)
Awd $7,175.00$1,025.00
2 $8,147.65$1,163.95
3 $8,050.00$1,150.00
4 $8,785.00$1,255.00
5 $7,175.00$1,025.00
6 $8,050.00$1,150.00
7 $8,268.47$1,181.21
8 $8,260.00$1,180.00
110628 - Page 48
Ref #255 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE, (22134 FT)
Awd $44,268.00$2.00
2 $44,710.68$2.02
3 $44,268.00$2.00
4 $48,694.80$2.20
5 $34,971.72$1.58
6 $39,841.20$1.80
7 $45,374.70$2.05
8 $45,374.70$2.05
Ref #256 625E23410 NO. 12 AWG POLE AND BRACKET CABLE, (2551 FT)
Awd $2,551.00$1.00
2 $2,576.51$1.01
3 $2,551.00$1.00
4 $2,806.10$1.10
5 $1,938.76$0.76
6 $2,168.35$0.85
7 $2,627.53$1.03
8 $2,551.00$1.00
Ref #257 625E25300 CONDUIT, 1-1/2", 725.04, (6306 FT)
Awd $81,978.00$13.00
2 $51,078.60$8.10
3 $50,448.00$8.00
4 $81,347.40$12.90
5 $80,401.50$12.75
6 $88,284.00$14.00
7 $51,835.32$8.22
8 $52,024.50$8.25
Ref #258 625E25930 CONDUIT, MISC.:1-1/2" EXPANSION/DEFLECTION FITTING, (6 EACH)
Awd $1,950.00$325.00
2 $1,821.84$303.64
3 $1,800.00$300.00
4 $1,968.00$328.00
5 $1,950.00$325.00
6 $2,160.00$360.00
7 $1,848.84$308.14
8 $1,800.00$300.00
Ref #259 625E27551 LUMINAIRE, DECORATIVE, AS PER PLAN, (74 EACH)
Awd $72,890.00$985.00
2 $72,650.98$981.77
3 $71,780.00$970.00
4 $78,440.00$1,060.00
5 $72,742.00$983.00
6 $81,400.00$1,100.00
7 $73,727.68$996.32
8 $74,000.00$1,000.00
Ref #260 625E29000 TRENCH, (488 FT)
Awd $2,440.00$5.00
2 $2,469.28$5.06
3 $2,440.00$5.00
4 $2,659.60$5.45
5 $2,635.20$5.40
6 $2,928.00$6.00
7 $2,508.32$5.14
8 $2,537.60$5.20
110628 - Page 49
Ref #261 625E29940 BARRIER JUNCTION BOX, (69 EACH)
Awd $86,250.00$1,250.00
2 $102,311.13$1,482.77
3 $101,085.00$1,465.00
4 $110,400.00$1,600.00
5 $86,422.50$1,252.50
6 $96,600.00$1,400.00
7 $103,828.44$1,504.76
8 $104,880.00$1,520.00
Ref #262 625E32000 GROUND ROD, (7 EACH)
Awd $1,190.00$170.00
2 $1,169.00$167.00
3 $1,155.00$165.00
4 $1,208.20$172.60
5 $1,197.00$171.00
6 $1,330.00$190.00
7 $1,186.36$169.48
8 $1,190.00$170.00
Ref #263 625E36000 PLASTIC CAUTION TAPE, (488 FT)
Awd $170.80$0.35
2 $297.68$0.61
3 $292.80$0.60
4 $317.20$0.65
5 $161.04$0.33
6 $170.80$0.35
7 $302.56$0.62
8 $292.80$0.60
Section 14 - LIGHTING - MAIN AND APPROACH SPAN - Totals
Awd $511,034.80
2 $482,631.33
3 $476,924.80
4 $553,553.40
5 $497,744.26
6 $564,212.35
7 $489,804.19
8 $490,386.60
Ref #264 625E00500 CONNECTOR KIT, TYPE II, (22 EACH)
Awd $2,090.00$95.00
2 $1,892.66$86.03
3 $1,870.00$85.00
4 $2,077.90$94.45
5 $2,058.10$93.55
6 $2,310.00$105.00
7 $1,920.82$87.31
8 $1,936.00$88.00
110628 - Page 50
Ref #265 625E00600 CONNECTOR KIT, TYPE III, (22 EACH)
Awd $1,980.00$90.00
2 $1,892.66$86.03
3 $1,870.00$85.00
4 $2,027.30$92.15
5 $2,008.60$91.30
6 $2,310.00$105.00
7 $1,920.82$87.31
8 $1,936.00$88.00
Ref #266 625E10481 LIGHT POLE, DECORATIVE, AS PER PLAN(STERNBERG), (22 EACH)
Awd $46,200.00$2,100.00
2 $50,100.38$2,277.29
3 $49,500.00$2,250.00
4 $53,900.00$2,450.00
5 $45,078.00$2,049.00
6 $50,600.00$2,300.00
7 $50,843.32$2,311.06
8 $51,040.00$2,320.00
Ref #267 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP, (22 EACH)
Awd $22,550.00$1,025.00
2 $25,606.90$1,163.95
3 $25,300.00$1,150.00
4 $27,610.00$1,255.00
5 $22,550.00$1,025.00
6 $25,300.00$1,150.00
7 $25,986.62$1,181.21
8 $25,960.00$1,180.00
Ref #268 625E23308 DISTRIBUTION CABLE, MISC.:NO. 8 AWG 5000 VOLT DIST, (4071 FT)
Awd $4,071.00$1.00
2 $8,223.42$2.02
3 $8,142.00$2.00
4 $8,956.20$2.20
5 $5,333.01$1.31
6 $6,106.50$1.50
7 $8,345.55$2.05
8 $8,142.00$2.00
Ref #269 625E23410 NO. 12 AWG POLE AND BRACKET CABLE, (748 FT)
Awd $748.00$1.00
2 $755.48$1.01
3 $748.00$1.00
4 $822.80$1.10
5 $568.48$0.76
6 $635.80$0.85
7 $770.44$1.03
8 $748.00$1.00
Ref #270 625E25300 CONDUIT, 1-1/2", 725.04, (802 FT)
Awd $10,426.00$13.00
2 $6,496.20$8.10
3 $6,416.00$8.00
4 $10,345.80$12.90
5 $10,225.50$12.75
6 $11,629.00$14.50
7 $6,592.44$8.22
8 $6,416.00$8.00
110628 - Page 51
Ref #271 625E25500 CONDUIT, 3", 725.04, (429 FT)
Awd $19,734.00$46.00
2 $9,553.83$22.27
3 $9,438.00$22.00
4 $19,927.05$46.45
5 $19,734.00$46.00
6 $22,737.00$53.00
7 $9,695.40$22.60
8 $9,652.50$22.50
Ref #272 625E27551 LUMINAIRE, DECORATIVE, AS PER PLAN(STERNBERG), (22 EACH)
Awd $30,800.00$1,400.00
2 $21,376.30$971.65
3 $21,120.00$960.00
4 $30,750.50$1,397.75
5 $30,470.00$1,385.00
6 $35,200.00$1,600.00
7 $21,693.10$986.05
8 $22,000.00$1,000.00
Ref #273 625E29000 TRENCH, (1232 FT)
Awd $7,392.00$6.00
2 $6,233.92$5.06
3 $6,160.00$5.00
4 $6,960.80$5.65
5 $6,899.20$5.60
6 $8,008.00$6.50
7 $6,332.48$5.14
8 $6,406.40$5.20
Ref #274 625E30706 PULL BOX, 725.08, 24", (1 EACH)
Awd $770.00$770.00
2 $860.31$860.31
3 $850.00$850.00
4 $925.00$925.00
5 $770.00$770.00
6 $880.00$880.00
7 $873.07$873.07
8 $890.00$890.00
Ref #275 625E32000 GROUND ROD, (22 EACH)
Awd $3,740.00$170.00
2 $3,674.00$167.00
3 $3,630.00$165.00
4 $3,797.20$172.60
5 $3,762.00$171.00
6 $4,070.00$185.00
7 $3,728.56$169.48
8 $3,740.00$170.00
Ref #276 625E36000 PLASTIC CAUTION TAPE, (1232 FT)
Awd $431.20$0.35
2 $751.52$0.61
3 $739.20$0.60
4 $862.40$0.70
5 $406.56$0.33
6 $431.20$0.35
7 $763.84$0.62
8 $800.80$0.65
110628 - Page 52
Section 15 - LIGHTING - CITY OF IRONTON - Totals
Awd $150,932.20
2 $137,417.58
3 $135,783.20
4 $168,962.95
5 $149,863.45
6 $170,217.50
7 $139,466.46
8 $139,667.70
Ref #277 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (328.5 FT)
Awd $2,956.50$9.00
2 $2,956.50$9.00
3 $3,462.39$10.54
4 $3,127.32$9.52
5 $2,956.50$9.00
6 $3,285.00$10.00
7 $3,209.45$9.77
8 $2,956.50$9.00
Ref #278 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (703 FT)
Awd $7,030.00$10.00
2 $7,030.00$10.00
3 $8,239.16$11.72
4 $7,437.74$10.58
5 $7,030.00$10.00
6 $7,733.00$11.00
7 $7,627.55$10.85
8 $7,030.00$10.00
Ref #279 630E08510 STREET NAME SIGN SUPPORT, NO. 2 POST, (94 FT)
Awd $1,128.00$12.00
2 $1,128.00$12.00
3 $1,321.64$14.06
4 $1,193.80$12.70
5 $1,128.00$12.00
6 $1,222.00$13.00
7 $1,223.88$13.02
8 $1,128.00$12.00
Ref #280 630E66501 OVERHEAD SIGN SUPPORT, TYPE TC-15.115, AS PER PLAN, (1 EACH)
Awd $16,000.00$16,000.00
2 $15,525.00$15,525.00
3 $18,189.95$18,189.95
4 $16,430.11$16,430.11
5 $15,525.00$15,525.00
6 $17,000.00$17,000.00
7 $16,850.12$16,850.12
8 $15,600.00$15,600.00
110628 - Page 53
Ref #281 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE, (4 EACH)
Awd $700.00$175.00
2 $700.00$175.00
3 $820.16$205.04
4 $740.80$185.20
5 $700.00$175.00
6 $800.00$200.00
7 $759.76$189.94
8 $700.00$175.00
Ref #282 630E79100 SIGN HANGER ASSEMBLY, MAST ARM, (4 EACH)
Awd $900.00$225.00
2 $900.00$225.00
3 $1,054.48$263.62
4 $952.48$238.12
5 $900.00$225.00
6 $1,000.00$250.00
7 $976.84$244.21
8 $900.00$225.00
Ref #283 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (24 EACH)
Awd $1,800.00$75.00
2 $1,800.00$75.00
3 $2,108.88$87.87
4 $1,111.20$46.30
5 $1,800.00$75.00
6 $1,920.00$80.00
7 $1,953.60$81.40
8 $1,800.00$75.00
Ref #284 630E79600 SIGN SUPPORT ASSEMBLY, BRIDGE MOUNTED, TYPE 1, (8 EACH)
Awd $3,360.00$420.00
2 $3,360.00$420.00
3 $3,936.80$492.10
4 $3,555.92$444.49
5 $3,360.00$420.00
6 $3,600.00$450.00
7 $3,646.80$455.85
8 $3,360.00$420.00
Ref #285 630E79604 SIGN SUPPORT ASSEMBLY, BRIDGE MOUNTED, TYPE 2, (7 EACH)
Awd $5,950.00$850.00
2 $5,880.00$840.00
3 $6,889.33$984.19
4 $7,111.79$1,015.97
5 $5,880.00$840.00
6 $6,650.00$950.00
7 $6,381.90$911.70
8 $5,880.00$840.00
Ref #286 630E80100 SIGN, FLAT SHEET, (1048.8 SF)
Awd $17,829.60$17.00
2 $17,829.60$17.00
3 $20,892.10$19.92
4 $18,867.91$17.99
5 $17,829.60$17.00
6 $19,927.20$19.00
7 $19,350.36$18.45
8 $17,829.60$17.00
110628 - Page 54
Ref #287 630E81200 SIGN ERECTED, EXTRUSHEET, (180 SF)
Awd $3,600.00$20.00
2 $3,555.00$19.75
3 $4,165.20$23.14
4 $3,762.00$20.90
5 $3,555.00$19.75
6 $3,960.00$22.00
7 $3,859.20$21.44
8 $3,600.00$20.00
Ref #288 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (8 EACH)
Awd $120.00$15.00
2 $120.00$15.00
3 $140.64$17.58
4 $127.04$15.88
5 $120.00$15.00
6 $136.00$17.00
7 $130.24$16.28
8 $120.00$15.00
Ref #289 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (2 EACH)
Awd $80.00$40.00
2 $80.00$40.00
3 $93.74$46.87
4 $84.66$42.33
5 $80.00$40.00
6 $90.00$45.00
7 $86.84$43.42
8 $80.00$40.00
Ref #290 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (31 EACH)
Awd $620.00$20.00
2 $620.00$20.00
3 $726.33$23.43
4 $656.27$21.17
5 $620.00$20.00
6 $713.00$23.00
7 $673.01$21.71
8 $620.00$20.00
Ref #291 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL, (6 EACH)
Awd $450.00$75.00
2 $450.00$75.00
3 $527.22$87.87
4 $476.22$79.37
5 $450.00$75.00
6 $510.00$85.00
7 $488.40$81.40
8 $450.00$75.00
Ref #292 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL, (27 EACH)
Awd $675.00$25.00
2 $675.00$25.00
3 $790.83$29.29
4 $714.42$26.46
5 $675.00$25.00
6 $756.00$28.00
7 $732.51$27.13
8 $675.00$25.00
110628 - Page 55
Ref #293 644E00100 EDGE LINE, (1.5 MILE)
Awd $7,500.00$5,000.00
2 $7,453.50$4,969.00
3 $7,506.05$5,004.03
4 $7,453.50$4,969.00
5 $7,453.50$4,969.00
6 $8,400.00$5,600.00
7 $7,507.55$5,005.03
8 $7,500.00$5,000.00
Ref #294 644E00200 LANE LINE, (0.74 MILE)
Awd $2,590.00$3,500.00
2 $2,542.64$3,436.00
3 $2,560.56$3,460.22
4 $2,542.64$3,436.00
5 $2,542.64$3,436.00
6 $2,812.00$3,800.00
7 $2,561.08$3,460.92
8 $1,850.00$2,500.00
Ref #295 644E00300 CENTER LINE, (0.37 MILE)
Awd $2,590.00$7,000.00
2 $2,587.78$6,994.00
3 $2,606.02$7,043.30
4 $2,587.78$6,994.00
5 $2,587.78$6,994.00
6 $2,886.00$7,800.00
7 $2,606.55$7,044.73
8 $3,700.00$10,000.00
Ref #296 644E00400 CHANNELIZING LINE, (917 FT)
Awd $3,668.00$4.00
2 $3,943.10$4.30
3 $3,970.61$4.33
4 $3,943.10$4.30
5 $3,943.10$4.30
6 $4,401.60$4.80
7 $3,970.61$4.33
8 $1,696.45$1.85
Ref #297 644E00500 STOP LINE, (87 FT)
Awd $696.00$8.00
2 $678.60$7.80
3 $683.82$7.86
4 $678.60$7.80
5 $678.60$7.80
6 $739.50$8.50
7 $683.82$7.86
8 $739.50$8.50
Ref #298 644E00600 CROSSWALK LINE, (41 FT)
Awd $246.00$6.00
2 $237.80$5.80
3 $239.44$5.84
4 $237.80$5.80
5 $237.80$5.80
6 $266.50$6.50
7 $239.44$5.84
8 $176.30$4.30
110628 - Page 56
Ref #299 644E00700 TRANSVERSE/DIAGONAL LINE, (667 FT)
Awd $5,336.00$8.00
2 $5,102.55$7.65
3 $5,135.90$7.70
4 $5,102.55$7.65
5 $5,102.55$7.65
6 $5,669.50$8.50
7 $5,142.57$7.71
8 $3,868.60$5.80
Ref #300 644E00900 ISLAND MARKING, (189 SF)
Awd $1,134.00$6.00
2 $1,067.85$5.65
3 $1,075.41$5.69
4 $1,067.85$5.65
5 $1,067.85$5.65
6 $1,190.70$6.30
7 $1,075.41$5.69
8 $604.80$3.20
Ref #301 644E01301 LANE ARROW, AS PER PLAN, (6 EACH)
Awd $1,500.00$250.00
2 $1,500.00$250.00
3 $1,510.56$251.76
4 $1,500.00$250.00
5 $1,500.00$250.00
6 $1,680.00$280.00
7 $1,510.86$251.81
8 $1,560.00$260.00
Ref #302 644E01510 DOTTED LINE, 6", (149 FT)
Awd $596.00$4.00
2 $618.35$4.15
3 $622.82$4.18
4 $618.35$4.15
5 $618.35$4.15
6 $685.40$4.60
7 $622.82$4.18
8 $387.40$2.60
Ref #303 644E30000 REMOVAL OF PAVEMENT MARKING, (2666 FT)
Awd $10,664.00$4.00
2 $9,331.00$3.50
3 $9,384.32$3.52
4 $9,331.00$3.50
5 $9,331.00$3.50
6 $10,130.80$3.80
7 $9,410.98$3.53
8 $5,865.20$2.20
Ref #304 645E00110 EDGE LINE, TYPE A3, (1.28 MILE)
Awd $22,848.00$17,850.00
2 $22,848.00$17,850.00
3 $23,009.06$17,975.83
4 $22,848.00$17,850.00
5 $22,848.00$17,850.00
6 $24,960.00$19,500.00
7 $23,013.70$17,979.45
8 $24,320.00$19,000.00
110628 - Page 57
Ref #305 645E00310 CENTER LINE, TYPE A3, (0.92 MILE)
Awd $28,520.00$31,000.00
2 $28,382.00$30,850.00
3 $28,582.07$31,067.47
4 $28,382.00$30,850.00
5 $28,382.00$30,850.00
6 $31,280.00$34,000.00
7 $28,587.83$31,073.73
8 $34,960.00$38,000.00
Ref #306 645E00410 CHANNELIZING LINE, TYPE A3, (1663 FT)
Awd $11,641.00$7.00
2 $11,641.00$7.00
3 $11,724.15$7.05
4 $11,641.00$7.00
5 $11,641.00$7.00
6 $14,135.50$8.50
7 $11,724.15$7.05
8 $16,630.00$10.00
Ref #307 645E00510 STOP LINE, TYPE A3, (337 FT)
Awd $6,066.00$18.00
2 $6,066.00$18.00
3 $6,109.81$18.13
4 $6,066.00$18.00
5 $6,066.00$18.00
6 $6,403.00$19.00
7 $6,109.81$18.13
8 $11,795.00$35.00
Ref #308 645E00610 CROSSWALK LINE, TYPE A3, (1232 FT)
Awd $11,088.00$9.00
2 $10,780.00$8.75
3 $10,853.92$8.81
4 $10,780.00$8.75
5 $10,780.00$8.75
6 $11,704.00$9.50
7 $10,853.92$8.81
8 $23,408.00$19.00
Ref #309 645E00710 TRANSVERSE/DIAGONAL LINE, TYPE A3, (810 FT)
Awd $14,580.00$18.00
2 $14,377.50$17.75
3 $14,482.80$17.88
4 $14,377.50$17.75
5 $14,377.50$17.75
6 $15,390.00$19.00
7 $14,482.80$17.88
8 $28,350.00$35.00
Ref #311 645E00910 ISLAND MARKING, TYPE A3, (427 SF)
Awd $4,270.00$10.00
2 $4,270.00$10.00
3 $4,299.89$10.07
4 $4,270.00$10.00
5 $4,270.00$10.00
6 $4,697.00$11.00
7 $4,299.89$10.07
8 $8,967.00$21.00
110628 - Page 58
Ref #312 645E01010 RAILROAD SYMBOL MARKING, TYPE A3, (1 EACH)
Awd $1,000.00$1,000.00
2 $1,000.00$1,000.00
3 $1,007.05$1,007.05
4 $1,000.00$1,000.00
5 $1,000.00$1,000.00
6 $1,100.00$1,100.00
7 $1,007.25$1,007.25
8 $2,800.00$2,800.00
Ref #313 645E01310 LANE ARROW, TYPE A3, (27 EACH)
Awd $8,100.00$300.00
2 $8,100.00$300.00
3 $8,156.97$302.11
4 $8,100.00$300.00
5 $8,100.00$300.00
6 $9,180.00$340.00
7 $8,158.86$302.18
8 $13,770.00$510.00
Ref #314 645E01311 LANE ARROW, TYPE A3, AS PER PLAN, (3 EACH)
Awd $2,400.00$800.00
2 $2,400.00$800.00
3 $2,416.92$805.64
4 $2,400.00$800.00
5 $2,400.00$800.00
6 $2,700.00$900.00
7 $2,417.40$805.80
8 $3,240.00$1,080.00
Ref #315 645E01480 DOTTED LINE, 4", TYPE A3, (393 FT)
Awd $1,965.00$5.00
2 $1,965.00$5.00
3 $1,980.72$5.04
4 $1,965.00$5.00
5 $1,965.00$5.00
6 $2,161.50$5.50
7 $1,980.72$5.04
8 $1,179.00$3.00
Section 16 - TRAFFIC CONTROL - Totals
Awd $212,197.10
2 $209,501.77
3 $221,277.72
4 $213,242.35
5 $209,501.77
6 $231,875.20
7 $215,918.48
8 $260,096.35
110628 - Page 59
Ref #316 625E25010 CONDUIT, 3/4", 725.05, (120 FT)
Awd $480.00$4.00
2 $394.80$3.29
3 $390.00$3.25
4 $504.00$4.20
5 $494.40$4.12
6 $564.00$4.70
7 $390.00$3.25
8 $396.00$3.30
Ref #317 625E25102 CONDUIT, 1", 725.05, (90 FT)
Awd $360.00$4.00
2 $400.50$4.45
3 $396.00$4.40
4 $364.50$4.05
5 $360.00$4.00
6 $405.00$4.50
7 $396.00$4.40
8 $405.00$4.50
Ref #318 625E25402 CONDUIT, 2", 725.05, (75 FT)
Awd $525.00$7.00
2 $455.25$6.07
3 $450.00$6.00
4 $558.75$7.45
5 $551.25$7.35
6 $600.00$8.00
7 $450.00$6.00
8 $457.50$6.10
Ref #319 625E25502 CONDUIT, 3", 725.05, (1420 FT)
Awd $8,520.00$6.00
2 $11,502.00$8.10
3 $11,360.00$8.00
4 $9,088.00$6.40
5 $9,002.80$6.34
6 $9,940.00$7.00
7 $11,360.00$8.00
8 $11,644.00$8.20
Ref #320 625E29000 TRENCH, (1265 FT)
Awd $7,590.00$6.00
2 $7,678.55$6.07
3 $7,590.00$6.00
4 $8,285.75$6.55
5 $8,159.25$6.45
6 $8,855.00$7.00
7 $7,590.00$6.00
8 $7,843.00$6.20
Ref #321 625E30706 PULL BOX, 725.08, 24", (17 EACH)
Awd $13,175.00$775.00
2 $14,625.27$860.31
3 $14,450.00$850.00
4 $13,261.70$780.10
5 $13,141.00$773.00
6 $14,450.00$850.00
7 $14,450.00$850.00
8 $14,875.00$875.00
110628 - Page 60
Ref #322 625E32000 GROUND ROD, (12 EACH)
Awd $2,100.00$175.00
2 $2,004.00$167.00
3 $1,980.00$165.00
4 $2,139.60$178.30
5 $2,119.80$176.65
6 $2,400.00$200.00
7 $1,980.00$165.00
8 $2,040.00$170.00
Ref #323 632E05005 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS,, (10 EACH)
Awd $6,300.00$630.00
2 $7,591.00$759.10
3 $7,500.00$750.00
4 $6,348.00$634.80
5 $6,290.00$629.00
6 $7,000.00$700.00
7 $7,500.00$750.00
8 $7,550.00$755.00
Ref #324 632E05085 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS,, (6 EACH)
Awd $6,000.00$1,000.00
2 $6,680.04$1,113.34
3 $6,600.00$1,100.00
4 $6,051.00$1,008.50
5 $5,994.00$999.00
6 $6,600.00$1,100.00
7 $6,600.00$1,100.00
8 $6,750.00$1,125.00
Ref #325 632E20721 PEDESTRIAN SIGNAL HEAD (LED) , TYPE D2, AS PER PLA, (14 EACH)
Awd $6,090.00$435.00
2 $8,076.74$576.91
3 $7,980.00$570.00
4 $6,132.00$438.00
5 $6,076.00$434.00
6 $6,300.00$450.00
7 $7,980.00$570.00
8 $8,050.00$575.00
Ref #326 632E25000 COVERING OF VEHICULAR SIGNAL HEAD, (16 EACH)
Awd $2,000.00$125.00
2 $890.72$55.67
3 $880.00$55.00
4 $1,970.40$123.15
5 $1,952.00$122.00
6 $2,080.00$130.00
7 $880.00$55.00
8 $928.00$58.00
Ref #327 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD, (14 EACH)
Awd $1,050.00$75.00
2 $495.88$35.42
3 $490.00$35.00
4 $1,017.80$72.70
5 $1,008.00$72.00
6 $1,078.00$77.00
7 $490.00$35.00
8 $532.00$38.00
110628 - Page 61
Ref #328 632E26000 PEDESTRIAN PUSHBUTTON, (14 EACH)
Awd $1,540.00$110.00
2 $1,771.28$126.52
3 $1,750.00$125.00
4 $1,904.00$136.00
5 $1,550.08$110.72
6 $1,680.00$120.00
7 $1,750.00$125.00
8 $1,820.00$130.00
Ref #329 632E26500 DETECTOR LOOP, (18 EACH)
Awd $36,000.00$2,000.00
2 $20,040.12$1,113.34
3 $19,800.00$1,100.00
4 $36,240.30$2,013.35
5 $35,910.00$1,995.00
6 $37,800.00$2,100.00
7 $19,800.00$1,100.00
8 $20,700.00$1,150.00
Ref #330 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (2233 FT)
Awd $4,466.00$2.00
2 $5,202.89$2.33
3 $5,135.90$2.30
4 $5,582.50$2.50
5 $4,577.65$2.05
6 $4,912.60$2.20
7 $5,135.90$2.30
8 $5,247.55$2.35
Ref #331 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (3680 FT)
Awd $7,360.00$2.00
2 $9,126.40$2.48
3 $9,016.00$2.45
4 $9,568.00$2.60
5 $7,801.60$2.12
6 $8,464.00$2.30
7 $9,016.00$2.45
8 $9,200.00$2.50
Ref #332 632E53202 INTERCONNECT CABLE, 6 PAIR, NO. 19 AWG, SOLID, REA, (431 FT)
Awd $1,724.00$4.00
2 $1,353.34$3.14
3 $1,336.10$3.10
4 $1,831.75$4.25
5 $1,810.20$4.20
6 $1,939.50$4.50
7 $1,336.10$3.10
8 $1,357.65$3.15
Ref #333 632E64010 SIGNAL SUPPORT FOUNDATION, (7 EACH)
Awd $18,550.00$2,650.00
2 $27,276.90$3,896.70
3 $26,950.00$3,850.00
4 $30,100.00$4,300.00
5 $18,480.00$2,640.00
6 $21,000.00$3,000.00
7 $26,950.00$3,850.00
8 $28,000.00$4,000.00
110628 - Page 62
Ref #334 632E64020 PEDESTAL FOUNDATION, (4 EACH)
Awd $4,200.00$1,050.00
2 $2,631.56$657.89
3 $2,600.00$650.00
4 $4,240.00$1,060.00
5 $4,200.00$1,050.00
6 $4,800.00$1,200.00
7 $2,600.00$650.00
8 $2,720.00$680.00
Ref #335 632E65200 LOOP DETECTOR LEAD-IN CABLE, (3453 FT)
Awd $3,453.00$1.00
2 $3,487.53$1.01
3 $3,453.00$1.00
4 $5,179.50$1.50
5 $4,834.20$1.40
6 $5,179.50$1.50
7 $3,453.00$1.00
8 $3,453.00$1.00
Ref #336 632E67300 POWER CABLE, 3 CONDUCTOR, NO. 8 AWG, (79 FT)
Awd $632.00$8.00
2 $240.16$3.04
3 $237.00$3.00
4 $600.40$7.60
5 $592.50$7.50
6 $632.00$8.00
7 $237.00$3.00
8 $237.00$3.00
Ref #337 632E70001 POWER SERVICE, AS PER PLAN, (1 EACH)
Awd $2,100.00$2,100.00
2 $1,720.62$1,720.62
3 $1,700.00$1,700.00
4 $2,069.00$2,069.00
5 $2,050.00$2,050.00
6 $2,200.00$2,200.00
7 $1,700.00$1,700.00
8 $2,000.00$2,000.00
Ref #338 632E75002 SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 3 POLE, WITH , (1 EACH)
Awd $10,000.00$10,000.00
2 $8,248.87$8,248.87
3 $8,150.00$8,150.00
4 $9,991.00$9,991.00
5 $9,900.00$9,900.00
6 $11,000.00$11,000.00
7 $8,150.00$8,150.00
8 $8,500.00$8,500.00
Ref #339 632E80202 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 2, (1 EACH)
Awd $8,000.00$8,000.00
2 $5,667.93$5,667.93
3 $5,600.00$5,600.00
4 $7,973.00$7,973.00
5 $7,900.00$7,900.00
6 $9,000.00$9,000.00
7 $5,600.00$5,600.00
8 $5,800.00$5,800.00
110628 - Page 63
Ref #340 632E80402 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 4, (1 EACH)
Awd $9,200.00$9,200.00
2 $7,287.34$7,287.34
3 $7,200.00$7,200.00
4 $9,305.00$9,305.00
5 $9,220.00$9,220.00
6 $10,000.00$10,000.00
7 $7,200.00$7,200.00
8 $7,500.00$7,500.00
Ref #341 632E80502 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11, (4 EACH)
Awd $41,200.00$10,300.00
2 $36,436.72$9,109.18
3 $36,000.00$9,000.00
4 $41,540.00$10,385.00
5 $41,160.00$10,290.00
6 $44,000.00$11,000.00
7 $36,000.00$9,000.00
8 $36,800.00$9,200.00
Ref #342 632E89900 PEDESTAL, 8', TRANSFORMER BASE, (4 EACH)
Awd $2,400.00$600.00
2 $1,619.40$404.85
3 $1,600.00$400.00
4 $2,382.00$595.50
5 $2,360.00$590.00
6 $2,600.00$650.00
7 $1,600.00$400.00
8 $1,700.00$425.00
Ref #343 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, (2 EACH)
Awd $9,400.00$4,700.00
2 $3,643.68$1,821.84
3 $3,600.00$1,800.00
4 $3,922.00$1,961.00
5 $9,400.00$4,700.00
6 $10,400.00$5,200.00
7 $3,600.00$1,800.00
8 $3,700.00$1,850.00
Ref #344 633E01501 CONTROLLER UNIT, TYPE TS2/A1, WITH CABINET, TYPE T, (1 EACH)
Awd $14,200.00$14,200.00
2 $15,181.96$15,181.96
3 $15,000.00$15,000.00
4 $16,500.00$16,500.00
5 $14,200.00$14,200.00
6 $15,000.00$15,000.00
7 $15,000.00$15,000.00
8 $16,000.00$16,000.00
Ref #345 633E75000 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, (1 EACH)
Awd $4,700.00$4,700.00
2 $4,706.41$4,706.41
3 $4,650.00$4,650.00
4 $5,100.00$5,100.00
5 $4,700.00$4,700.00
6 $5,000.00$5,000.00
7 $4,650.00$4,650.00
8 $4,800.00$4,800.00
110628 - Page 64
Section 17 - TRAFFIC SIGNALS - OHIO - Totals
Awd $233,315.00
2 $216,437.86
3 $213,844.00
4 $249,749.95
5 $235,794.73
6 $255,879.60
7 $213,844.00
8 $221,005.70
Ref #346 625E25920 CONDUIT, MISC.:CON.1",AS PER KY.STD.DET.SHTS:SGNL., (110 FT)
Awd $2,310.00$21.00
2 $891.00$8.10
3 $880.00$8.00
4 $957.00$8.70
5 $2,332.00$21.20
6 $2,640.00$24.00
7 $880.00$8.00
8 $902.00$8.20
Ref #347 625E25920 CONDUIT, MISC.:CON.2",AS PER KY.STD.DET.SHTS:SGNL., (897 FT)
Awd $21,528.00$24.00
2 $9,983.61$11.13
3 $9,867.00$11.00
4 $10,764.00$12.00
5 $21,662.55$24.15
6 $23,322.00$26.00
7 $9,867.00$11.00
8 $10,315.50$11.50
Ref #348 625E25920 CONDUIT, MISC.:CON.3/4",AS PER KY.STD.DET.SHTS:SGN, (50 FT)
Awd $800.00$16.00
2 $354.50$7.09
3 $350.00$7.00
4 $381.50$7.63
5 $775.00$15.50
6 $825.00$16.50
7 $350.00$7.00
8 $362.50$7.25
Ref #349 625E29700 TRENCH, MISC.:TRENCHING AND BACKFILLING, AS PER KE, (920 FT)
Awd $5,520.00$6.00
2 $8,381.20$9.11
3 $8,280.00$9.00
4 $9,200.00$10.00
5 $5,152.00$5.60
6 $5,520.00$6.00
7 $8,280.00$9.00
8 $8,556.00$9.30
110628 - Page 65
Ref #350 625E31600 PULL BOX, MISC.:JCT.BOX TYPE B,AS PER KY STD. DET., (6 EACH)
Awd $1,590.00$265.00
2 $4,129.50$688.25
3 $4,080.00$680.00
4 $4,446.00$741.00
5 $1,602.00$267.00
6 $1,800.00$300.00
7 $4,080.00$680.00
8 $4,200.00$700.00
Ref #351 632E04000 VEHICULAR SIGNAL HEAD, MISC.:SGNL-3SEC.12", AS PER, (8 EACH)
Awd $5,040.00$630.00
2 $10,121.28$1,265.16
3 $10,000.00$1,250.00
4 $10,888.00$1,361.00
5 $5,024.00$628.00
6 $5,600.00$700.00
7 $10,000.00$1,250.00
8 $10,400.00$1,300.00
Ref #352 632E04000 VEHICULAR SIGNAL HEAD, MISC.:SGNL.5SEC.12",AS PER , (2 EACH)
Awd $2,200.00$1,100.00
2 $202.44$101.22
3 $200.00$100.00
4 $218.00$109.00
5 $2,200.00$1,100.00
6 $2,400.00$1,200.00
7 $200.00$100.00
8 $230.00$115.00
Ref #353 632E30500 MESSENGER WIRE, MISC.:MESS-10800LB,AS PER KY STD. , (205 FT)
Awd $3,280.00$16.00
2 $3,111.90$15.18
3 $3,075.00$15.00
4 $3,310.75$16.15
5 $3,280.00$16.00
6 $3,690.00$18.00
7 $3,075.00$15.00
8 $3,280.00$16.00
Ref #354 632E30500 MESSENGER WIRE, MISC.:MESS-15400LB, AS PER KY STD., (198 FT)
Awd $3,564.00$18.00
2 $3,205.62$16.19
3 $3,168.00$16.00
4 $3,623.40$18.30
5 $3,583.80$18.10
6 $3,960.00$20.00
7 $3,168.00$16.00
8 $3,366.00$17.00
Ref #355 632E43300 SIGNAL CABLE, MISC.:CABLE-NO.14/5C,AS PER KY STD. , (703 FT)
Awd $2,109.00$3.00
2 $2,137.12$3.04
3 $2,109.00$3.00
4 $2,319.90$3.30
5 $1,757.50$2.50
6 $1,898.10$2.70
7 $2,109.00$3.00
8 $2,179.30$3.10
110628 - Page 66
Ref #356 632E43300 SIGNAL CABLE, MISC.:CABLE-NO.14/7C, AS PER KY STD., (396 FT)
Awd $1,584.00$4.00
2 $1,243.44$3.14
3 $1,227.60$3.10
4 $1,346.40$3.40
5 $1,623.60$4.10
6 $1,782.00$4.50
7 $1,227.60$3.10
8 $1,287.00$3.25
Ref #357 632E83600 STRAIN POLE, MISC.:STEEL STRAIN POLE 26', AS PER K, (1 EACH)
Awd $14,200.00$14,200.00
2 $4,048.52$4,048.52
3 $4,000.00$4,000.00
4 $4,358.00$4,358.00
5 $14,200.00$14,200.00
6 $15,500.00$15,500.00
7 $4,000.00$4,000.00
8 $4,500.00$4,500.00
Ref #358 632E83600 STRAIN POLE, MISC.:STEEL STRAIN POLE 32', AS PER K, (2 EACH)
Awd $32,000.00$16,000.00
2 $10,627.38$5,313.69
3 $10,500.00$5,250.00
4 $11,440.00$5,720.00
5 $31,980.00$15,990.00
6 $35,000.00$17,500.00
7 $10,500.00$5,250.00
8 $11,000.00$5,500.00
Ref #359 632E83600 STRAIN POLE, MISC.:STEEL STRAIN POLE 38', AS PER K, (1 EACH)
Awd $17,250.00$17,250.00
2 $7,337.95$7,337.95
3 $7,250.00$7,250.00
4 $7,897.00$7,897.00
5 $17,240.00$17,240.00
6 $18,500.00$18,500.00
7 $7,250.00$7,250.00
8 $7,500.00$7,500.00
Ref #360 632E90400 SIGNALIZATION, MISC.:ELECTRICAL SERVICE, AS PER KY, (1 EACH)
Awd $1,625.00$1,625.00
2 $2,125.47$2,125.47
3 $2,100.00$2,100.00
4 $2,300.00$2,300.00
5 $1,625.00$1,625.00
6 $1,800.00$1,800.00
7 $2,100.00$2,100.00
8 $2,300.00$2,300.00
Ref #361 632E90400 SIGNALIZATION, MISC.:GROUND ROD, AS PER KY STD. DE, (9 EACH)
Awd $1,305.00$145.00
2 $1,503.00$167.00
3 $1,485.00$165.00
4 $1,620.00$180.00
5 $1,305.00$145.00
6 $1,440.00$160.00
7 $1,485.00$165.00
8 $1,530.00$170.00
110628 - Page 67
Ref #362 632E90400 SIGNALIZATION, MISC.:REMOVE SGNL. EQUIP., AS PER K, (1 EACH)
Awd $13,000.00$13,000.00
2 $202.43$202.43
3 $200.00$200.00
4 $13,120.00$13,120.00
5 $13,000.00$13,000.00
6 $14,000.00$14,000.00
7 $200.00$200.00
8 $210.00$210.00
Ref #363 632E90400 SIGNALIZATION, MISC.:TRAF. SGNL. POLE BASE, AS PER, (4 EACH)
Awd $10,600.00$2,650.00
2 $15,586.80$3,896.70
3 $15,400.00$3,850.00
4 $16,800.00$4,200.00
5 $10,600.00$2,650.00
6 $12,000.00$3,000.00
7 $15,400.00$3,850.00
8 $16,000.00$4,000.00
Ref #364 632E90400 SIGNALIZATION, MISC.:VIDEO DETECTION-INSTALL, AS P, (2 EACH)
Awd $13,120.00$6,560.00
2 $10,728.60$5,364.30
3 $10,600.00$5,300.00
4 $13,241.00$6,620.50
5 $13,120.00$6,560.00
6 $14,000.00$7,000.00
7 $10,600.00$5,300.00
8 $11,000.00$5,500.00
Ref #365 632E90500 SIGNALIZATION, MISC.:INSTALL VIDEO DETECTION CABLE, (66 FT)
Awd $660.00$10.00
2 $333.96$5.06
3 $330.00$5.00
4 $663.30$10.05
5 $656.70$9.95
6 $726.00$11.00
7 $330.00$5.00
8 $336.60$5.10
Ref #366 632E90500 SIGNALIZATION, MISC.:LEAD-IN WIRE, AS PER KY STD. , (2966 FT)
Awd $5,932.00$2.00
2 $6,317.58$2.13
3 $6,228.60$2.10
4 $6,881.12$2.32
5 $5,635.40$1.90
6 $6,228.60$2.10
7 $6,228.60$2.10
8 $6,376.90$2.15
Ref #367 632E90500 SIGNALIZATION, MISC.:LOOP SAW SLOT AND FILL, AS PE, (554 FT)
Awd $6,094.00$11.00
2 $4,487.40$8.10
3 $4,432.00$8.00
4 $5,872.40$10.60
5 $5,817.00$10.50
6 $6,648.00$12.00
7 $4,432.00$8.00
8 $4,542.80$8.20
110628 - Page 68
Ref #368 632E90500 SIGNALIZATION, MISC.:LOOP WIRE, AS PER KY STD. DET, (1370 FT)
Awd $2,740.00$2.00
2 $2,082.40$1.52
3 $2,055.00$1.50
4 $2,466.00$1.80
5 $2,397.50$1.75
6 $2,740.00$2.00
7 $2,055.00$1.50
8 $2,123.50$1.55
Ref #369 633E99000 CONTROLLER ITEM, MISC.:SGNL.CONTLR.-TYPE170,AS PER, (1 EACH)
Awd $10,500.00$10,500.00
2 $11,386.47$11,386.47
3 $11,250.00$11,250.00
4 $12,300.00$12,300.00
5 $10,500.00$10,500.00
6 $11,000.00$11,000.00
7 $11,250.00$11,250.00
8 $12,000.00$12,000.00
Section 18 - TRAFFIC SIGNALS - KENTUCKY - Totals
Awd $178,551.00
2 $120,529.57
3 $119,067.20
4 $146,413.77
5 $177,069.05
6 $193,019.70
7 $119,067.20
8 $124,498.10
Ref #370 202E56100 BUILDING DEMOLISHED, PARCEL 24, 1 STORY COMMMERCIA, (1 EACH)
Awd $13,000.00$13,000.00
2 $10,000.00$10,000.00
3 $14,000.00$14,000.00
4 $33,000.00$33,000.00
5 $14,000.00$14,000.00
6 $8,000.00$8,000.00
7 $9,300.00$9,300.00
8 $15,000.00$15,000.00
Section 19 - BUILDING DEMOLITION - Totals
Awd $13,000.00
2 $10,000.00
3 $14,000.00
4 $33,000.00
5 $14,000.00
6 $8,000.00
7 $9,300.00
8 $15,000.00
110628 - Page 69
Ref #371 410E22000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (3350 TON)
Awd $100,500.00$30.00
2 $102,945.50$30.73
3 $100,500.00$30.00
4 $556,100.00$166.00
5 $83,750.00$25.00
6 $90,450.00$27.00
7 $103,850.00$31.00
8 $78,725.00$23.50
Ref #372 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (100 HOUR)
Awd $4,500.00$45.00
2 $6,000.00$60.00
3 $6,500.00$65.00
4 $5,500.00$55.00
5 $5,000.00$50.00
6 $6,800.00$68.00
7 $6,500.00$65.00
8 $10,000.00$100.00
Ref #373 614E12346 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL)(FOR 2, (2 EACH)
Awd $7,000.00$3,500.00
2 $3,800.00$1,900.00
3 $6,000.00$3,000.00
4 $4,000.00$2,000.00
5 $3,800.00$1,900.00
6 $4,200.00$2,100.00
7 $7,000.00$3,500.00
8 $20,000.00$10,000.00
Ref #374 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $12,500.00$12,500.00
2 $16,876.60$16,876.60
3 $12,682.46$12,682.46
4 $12,500.00$12,500.00
5 $12,500.00$12,500.00
6 $13,500.00$13,500.00
7 $40,000.00$40,000.00
8 $18,000.00$18,000.00
Ref #375 614E12460 WORK ZONE MARKING SIGN, (4 EACH)
Awd $440.00$110.00
2 $440.00$110.00
3 $446.44$111.61
4 $472.00$118.00
5 $440.00$110.00
6 $480.00$120.00
7 $1,400.00$350.00
8 $460.00$115.00
Ref #376 614E12600 REPLACEMENT DRUM, (10 EACH)
Awd $500.00$50.00
2 $500.00$50.00
3 $507.30$50.73
4 $500.00$50.00
5 $500.00$50.00
6 $550.00$55.00
7 $800.00$80.00
8 $500.00$50.00
110628 - Page 70
Ref #377 614E12740 WORK ZONE LIGHTING SYSTEM, (3 EACH)
Awd $40,950.00$13,650.00
2 $22,410.00$7,470.00
3 $30,000.00$10,000.00
4 $41,550.00$13,850.00
5 $51,999.99$17,333.33
6 $33,000.00$11,000.00
7 $54,000.00$18,000.00
8 $36,000.00$12,000.00
Ref #378 614E12800 WORK ZONE RAISED PAVEMENT MARKER, (100 EACH)
Awd $8,500.00$85.00
2 $565.00$5.65
3 $406.00$4.06
4 $1,400.00$14.00
5 $400.00$4.00
6 $450.00$4.50
7 $600.00$6.00
8 $400.00$4.00
Ref #379 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (50 CY)
Awd $12,900.00$258.00
2 $8,600.00$172.00
3 $12,875.00$257.50
4 $51,900.00$1,038.00
5 $12,500.00$250.00
6 $14,000.00$280.00
7 $16,000.00$320.00
8 $15,000.00$300.00
Ref #380 614E13300 BARRIER REFLECTOR, TYPE B, (100 EACH)
Awd $600.00$6.00
2 $600.00$6.00
3 $609.00$6.09
4 $600.00$6.00
5 $600.00$6.00
6 $650.00$6.50
7 $900.00$9.00
8 $600.00$6.00
Ref #381 614E13350 OBJECT MARKER, ONE WAY, (100 EACH)
Awd $1,100.00$11.00
2 $1,100.00$11.00
3 $1,116.00$11.16
4 $1,100.00$11.00
5 $1,100.00$11.00
6 $1,250.00$12.50
7 $1,800.00$18.00
8 $1,100.00$11.00
Ref #382 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (366 DAY)
Awd $10,980.00$30.00
2 $36,969.66$101.01
3 $12,004.80$32.80
4 $1,573.80$4.30
5 $10,980.00$30.00
6 $12,078.00$33.00
7 $8,052.00$22.00
8 $11,346.00$31.00
110628 - Page 71
Ref #383 614E20100 WORK ZONE LANE LINE, CLASS I, 642 PAINT, (0.5 MILE)
Awd $2,900.00$5,800.00
2 $2,894.50$5,789.00
3 $2,914.90$5,829.80
4 $3,112.50$6,225.00
5 $2,894.50$5,789.00
6 $3,300.00$6,600.00
7 $2,915.49$5,830.98
8 $2,925.00$5,850.00
Ref #384 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (0.51 MILE)
Awd $3,111.00$6,100.00
2 $3,084.99$6,049.00
3 $3,106.74$6,091.65
4 $3,315.00$6,500.00
5 $3,084.99$6,049.00
6 $3,519.00$6,900.00
7 $3,107.36$6,092.86
8 $3,111.00$6,100.00
Ref #385 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (2.45 MILE)
Awd $14,700.00$6,000.00
2 $14,464.80$5,904.00
3 $14,566.77$5,945.62
4 $23,299.50$9,510.00
5 $14,464.80$5,904.00
6 $16,660.00$6,800.00
7 $14,569.71$5,946.82
8 $14,700.00$6,000.00
Ref #386 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, (3597 FT)
Awd $3,597.00$1.00
2 $3,597.00$1.00
3 $3,632.97$1.01
4 $7,733.55$2.15
5 $3,597.00$1.00
6 $3,956.70$1.10
7 $3,632.97$1.01
8 $3,597.00$1.00
Ref #387 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, (1900 FT)
Awd $1,900.00$1.00
2 $1,710.00$0.90
3 $1,729.00$0.91
4 $3,230.00$1.70
5 $1,710.00$0.90
6 $1,900.00$1.00
7 $1,729.00$0.91
8 $1,710.00$0.90
Ref #388 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P, (100 FT)
Awd $300.00$3.00
2 $275.00$2.75
3 $277.00$2.77
4 $275.00$2.75
5 $275.00$2.75
6 $300.00$3.00
7 $277.00$2.77
8 $280.00$2.80
110628 - Page 72
Ref #389 614E26000 WORK ZONE STOP LINE, CLASS I, (348 FT)
Awd $1,044.00$3.00
2 $1,044.00$3.00
3 $1,050.96$3.02
4 $602.04$1.73
5 $1,044.00$3.00
6 $1,183.20$3.40
7 $1,050.96$3.02
8 $1,044.00$3.00
Ref #390 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)
Awd $11,000.00$11,000.00
2 $143,524.01$143,524.01
3 $50,000.00$50,000.00
4 $24,650.00$24,650.00
5 $25,000.00$25,000.00
6 $16,000.00$16,000.00
7 $8,144.64$8,144.64
8 $3,000.00$3,000.00
Ref #391 615E35001 PAVEMENT FOR MAINTAINING TRAFFIC, AS PER PLAN, (523 SY)
Awd $20,920.00$40.00
2 $14,121.00$27.00
3 $25,867.58$49.46
4 $37,656.00$72.00
5 $14,121.00$27.00
6 $8,368.00$16.00
7 $26,150.00$50.00
8 $14,644.00$28.00
Ref #392 616E10000 WATER, (150 MGAL)
Awd $18,750.00$125.00
2 $12,348.00$82.32
3 $3,066.00$20.44
4 $18,750.00$125.00
5 $3,750.00$25.00
6 $4,800.00$32.00
7 $7,050.00$47.00
8 $8,100.00$54.00
Ref #393 622E40020 PORTABLE CONCRETE BARRIER, 32", (3270 FT)
Awd $81,750.00$25.00
2 $47,415.00$14.50
3 $81,750.00$25.00
4 $171,675.00$52.50
5 $47,415.00$14.50
6 $52,320.00$16.00
7 $52,320.00$16.00
8 $196,200.00$60.00
110628 - Page 73
Section 20 - MAINTENANCE OF TRAFFIC - Totals
Awd $360,442.00
2 $445,285.06
3 $371,608.92
4 $971,494.39
5 $300,926.28
6 $289,714.90
7 $361,849.13
8 $441,442.00
Ref #394 203E20001 EMBANKMENT, AS PER PLAN, (351 CY)
Awd $8,775.00$25.00
2 $1,663.74$4.74
3 $3,341.52$9.52
4 $19,656.00$56.00
5 $33,345.00$95.00
6 $8,775.00$25.00
7 $5,616.00$16.00
8 $4,914.00$14.00
Ref #395 203E35110 GRANULAR MATERIAL, TYPE B, (465 CY)
Awd $20,925.00$45.00
2 $30,848.10$66.34
3 $17,358.45$37.33
4 $27,900.00$60.00
5 $28,830.00$62.00
6 $23,250.00$50.00
7 $23,250.00$50.00
8 $29,295.00$63.00
Ref #396 203E35120 GRANULAR MATERIAL, TYPE C, (420 CY)
Awd $21,000.00$50.00
2 $29,085.00$69.25
3 $21,378.00$50.90
4 $21,000.00$50.00
5 $29,400.00$70.00
6 $21,000.00$50.00
7 $21,000.00$50.00
8 $28,560.00$68.00
Ref #397 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1.00$1.00
3 $1.00$1.00
4 $1.00$1.00
5 $500.00$500.00
6 $1.00$1.00
7 $35,000.00$35,000.00
8 $1.00$1.00
110628 - Page 74
Ref #398 507E98000 PILING, MISC.:18" DIAMETER SLEEVES, (319 FT)
Awd $14,355.00$45.00
2 $18,980.50$59.50
3 $4,255.46$13.34
4 $15,950.00$50.00
5 $47,850.00$150.00
6 $15,950.00$50.00
7 $11,484.00$36.00
8 $2,871.00$9.00
Ref #399 509E10000 EPOXY COATED REINFORCING STEEL, (31183 LB)
Awd $31,183.00$1.00
2 $40,849.73$1.31
3 $43,656.20$1.40
4 $45,839.01$1.47
5 $68,602.60$2.20
6 $31,183.00$1.00
7 $43,656.20$1.40
8 $51,451.95$1.65
Ref #400 511E71200 CONCRETE, MISC.:9" MIN. CAST-IN-PLACE REINFORCED C, (3385 SF)
Awd $321,575.00$95.00
2 $184,414.80$54.48
3 $135,400.00$40.00
4 $50,775.00$15.00
5 $270,800.00$80.00
6 $220,025.00$65.00
7 $236,950.00$70.00
8 $318,190.00$94.00
Ref #401 511E71200 CONCRETE, MISC.:RAISED RELIEF IMAGES ON STRUCTURES, (2549 SF)
Awd $382,350.00$150.00
2 $143,534.19$56.31
3 $318,625.00$125.00
4 $548,035.00$215.00
5 $165,685.00$65.00
6 $382,350.00$150.00
7 $137,646.00$54.00
8 $458,820.00$180.00
Ref #402 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN(PERMANEN, (924 SY)
Awd $29,568.00$32.00
2 $135,061.08$146.17
3 $14,784.00$16.00
4 $14,922.60$16.15
5 $14,784.00$16.00
6 $18,480.00$20.00
7 $33,264.00$36.00
8 $108,108.00$117.00
Ref #403 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (347 SY)
Awd $7,981.00$23.00
2 $5,552.00$16.00
3 $5,552.00$16.00
4 $5,604.05$16.15
5 $5,552.00$16.00
6 $6,940.00$20.00
7 $6,940.00$20.00
8 $40,599.00$117.00
110628 - Page 75
Ref #404 517E76300 RAILING, MISC.:CONCRETE PARAPET WITH STEEL TUBE RA, (543 FT)
Awd $122,175.00$225.00
2 $181,052.49$333.43
3 $108,600.00$200.00
4 $220,458.00$406.00
5 $162,900.00$300.00
6 $119,460.00$220.00
7 $176,475.00$325.00
8 $325,800.00$600.00
Ref #405 530E00400 SPECIAL - STRUCTURE, MISC.:BRIDGE COMMEMORATIVE PL, (2 EACH)
Awd $6,000.00$3,000.00
2 $14,515.14$7,257.57
3 $24,517.22$12,258.61
4 $5,900.00$2,950.00
5 $9,000.00$4,500.00
6 $4,000.00$2,000.00
7 $8,000.00$4,000.00
8 $10,000.00$5,000.00
Ref #406 840E20000 MECHANICALLY STABILIZED EARTH WALL, (5193 SF)
Awd $259,650.00$50.00
2 $138,393.45$26.65
3 $129,825.00$25.00
4 $207,720.00$40.00
5 $233,685.00$45.00
6 $259,650.00$50.00
7 $181,755.00$35.00
8 $311,580.00$60.00
Ref #407 840E20001 MECHANICALLY STABILIZED EARTH WALL, AS PER PLAN, (, (3633 SF)
Awd $163,485.00$45.00
2 $89,299.14$24.58
3 $90,825.00$25.00
4 $101,724.00$28.00
5 $130,788.00$36.00
6 $108,990.00$30.00
7 $108,990.00$30.00
8 $83,559.00$23.00
Ref #408 840E21000 WALL EXCAVATION, (2268 CY)
Awd $56,700.00$25.00
2 $82,940.76$36.57
3 $19,867.68$8.76
4 $40,824.00$18.00
5 $36,288.00$16.00
6 $27,216.00$12.00
7 $56,700.00$25.00
8 $27,216.00$12.00
Ref #409 840E22000 FOUNDATION PREPARATION, (1260 SY)
Awd $3,780.00$3.00
2 $8,946.00$7.10
3 $4,296.60$3.41
4 $4,410.00$3.50
5 $32,760.00$26.00
6 $12,600.00$10.00
7 $8,820.00$7.00
8 $15,750.00$12.50
110628 - Page 76
Ref #410 840E23000 SELECT GRANULAR BACKFILL, (4592 CY)
Awd $206,640.00$45.00
2 $235,615.52$51.31
3 $160,720.00$35.00
4 $270,928.00$59.00
5 $229,600.00$50.00
6 $321,440.00$70.00
7 $229,600.00$50.00
8 $298,480.00$65.00
Ref #411 840E23050 NATURAL SOIL, (23 CY)
Awd $1,725.00$75.00
2 $3,565.69$155.03
3 $1,106.07$48.09
4 $1,564.00$68.00
5 $1,955.00$85.00
6 $1,380.00$60.00
7 $690.00$30.00
8 $276.00$12.00
Ref #412 840E25010 6" DRAINAGE PIPE, PERFORATED, (1171 FT)
Awd $11,710.00$10.00
2 $17,857.75$15.25
3 $8,618.56$7.36
4 $12,295.50$10.50
5 $30,446.00$26.00
6 $17,565.00$15.00
7 $7,026.00$6.00
8 $44,498.00$38.00
Ref #413 840E25020 6" DRAINAGE PIPE, NON-PERFORATED, (12 FT)
Awd $900.00$75.00
2 $531.00$44.25
3 $94.80$7.90
4 $432.00$36.00
5 $348.00$29.00
6 $300.00$25.00
7 $300.00$25.00
8 $384.00$32.00
Ref #414 840E26000 CONCRETE COPING, (610 FT)
Awd $91,500.00$150.00
2 $108,201.80$177.38
3 $76,250.00$125.00
4 $114,070.00$187.00
5 $183,000.00$300.00
6 $213,500.00$350.00
7 $85,400.00$140.00
8 $67,100.00$110.00
Ref #415 840E27000 ON-SITE ASSISTANCE, (5 DAY)
Awd $3,250.00$650.00
2 $3,854.80$770.96
3 $4,000.00$800.00
4 $3,500.00$700.00
5 $4,500.00$900.00
6 $4,250.00$850.00
7 $2,500.00$500.00
8 $5,000.00$1,000.00
110628 - Page 77
Ref #417 898E98000 QC/QA CONCRETE, MISC.:SLEEPER SLAB, (280 CY)
Awd $84,000.00$300.00
2 $106,615.60$380.77
3 $95,172.00$339.90
4 $154,000.00$550.00
5 $170,800.00$610.00
6 $112,000.00$400.00
7 $117,600.00$420.00
8 $70,000.00$250.00
Section 21 - MSE WALL - Totals
Awd $1,850,227.00
2 $1,581,379.28
3 $1,288,244.56
4 $1,887,508.16
5 $1,891,418.60
6 $1,930,305.00
7 $1,538,662.20
8 $2,302,452.95
Ref #418 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN (WT, (LUMP SUM)
Awd $4,300,000.00$4,300,000.00
2 $10,164,000.00$10,164,000.00
3 $8,650,000.00$8,650,000.00
4 $7,831,250.00$7,831,250.00
5 $7,000,000.00$7,000,000.00
6 $6,000,000.00$6,000,000.00
7 $22,724,541.00$22,724,541.00
8 $7,000,000.00$7,000,000.00
Ref #419 503E21100 UNCLASSIFIED EXCAVATION (WT: 22), (1331 CY)
Awd $46,585.00$35.00
2 $90,987.16$68.36
3 $33,275.00$25.00
4 $82,522.00$62.00
5 $24,623.50$18.50
6 $133,100.00$100.00
7 $159,720.00$120.00
8 $55,902.00$42.00
Ref #420 503E31100 ROCK EXCAVATION, (119 CY)
Awd $14,875.00$125.00
2 $12,367.67$103.93
3 $14,875.00$125.00
4 $10,829.00$91.00
5 $39,270.00$330.00
6 $17,850.00$150.00
7 $14,280.00$120.00
8 $11,305.00$95.00
110628 - Page 78
Ref #421 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $50,000.00$50,000.00
3 $185,000.00$185,000.00
4 $98,000.00$98,000.00
5 $14,000.00$14,000.00
6 $35,000.00$35,000.00
7 $20,000.00$20,000.00
8 $35,000.00$35,000.00
Ref #422 507E00200 STEEL PILES HP12X53, FURNISHED, (7240 FT)
Awd $362,000.00$50.00
2 $187,878.00$25.95
3 $186,647.20$25.78
4 $202,720.00$28.00
5 $202,720.00$28.00
6 $209,960.00$29.00
7 $275,120.00$38.00
8 $362,000.00$50.00
Ref #423 507E00250 STEEL PILES HP12X53, DRIVEN, (6755 FT)
Awd $54,040.00$8.00
2 $141,855.00$21.00
3 $73,629.50$10.90
4 $219,537.50$32.50
5 $74,305.00$11.00
6 $270,200.00$40.00
7 $87,815.00$13.00
8 $87,815.00$13.00
Ref #424 509E10000 EPOXY COATED REINFORCING STEEL (WT: 23) (WT: 23), (4776444 LB)
Awd $6,209,377.20$1.30
2 $8,119,954.80$1.70
3 $8,358,777.00$1.75
4 $6,973,608.24$1.46
5 $12,896,398.80$2.70
6 $6,209,377.20$1.30
7 $9,552,888.00$2.00
8 $9,552,888.00$2.00
Ref #425 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN, (72 SY)
Awd $25,200.00$350.00
2 $1,800.00$25.00
3 $1,800.00$25.00
4 $1,814.40$25.20
5 $1,800.00$25.00
6 $1,584.00$22.00
7 $3,654.72$50.76
8 $936.00$13.00
Ref #426 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) (WT:, (20015 SY)
Awd $460,345.00$23.00
2 $395,696.55$19.77
3 $280,210.00$14.00
4 $332,249.00$16.60
5 $280,210.00$14.00
6 $440,330.00$22.00
7 $447,135.10$22.34
8 $540,405.00$27.00
110628 - Page 79
Ref #427 512E33000 TYPE 2 WATERPROOFING, (50 SY)
Awd $2,500.00$50.00
2 $5,544.50$110.89
3 $1,557.50$31.15
4 $1,125.00$22.50
5 $2,400.00$48.00
6 $275.00$5.50
7 $1,350.00$27.00
8 $750.00$15.00
Ref #428 513E10300 STRUCTURAL STEEL MEMBERS, LEVEL 5 (WT: 24), (2592876 LB)
Awd $4,537,533.00$1.75
2 $4,407,889.20$1.70
3 $5,185,752.00$2.00
4 $4,615,319.28$1.78
5 $6,871,121.40$2.65
6 $7,778,628.00$3.00
7 $4,148,601.60$1.60
8 $6,741,477.60$2.60
Ref #429 513E10321 STRUCTURAL STEEL MEMBERS, LEVEL 6, AS PER PLAN, (634660 LB)
Awd $2,538,640.00$4.00
2 $2,411,708.00$3.80
3 $1,903,980.00$3.00
4 $3,903,159.00$6.15
5 $3,807,960.00$6.00
6 $3,078,101.00$4.85
7 $3,566,789.20$5.62
8 $3,681,028.00$5.80
Ref #430 513E17001 STRUCTURAL STEEL MEMBERS, MODULAR EXPANSION JOINT,, (98 FT)
Awd $269,500.00$2,750.00
2 $302,886.64$3,090.68
3 $245,000.00$2,500.00
4 $333,690.00$3,405.00
5 $443,450.00$4,525.00
6 $436,100.00$4,450.00
7 $392,000.00$4,000.00
8 $392,000.00$4,000.00
Ref #431 513E20000 WELDED STUD SHEAR CONNECTORS (WT: 25), (15792 EACH)
Awd $78,960.00$5.00
2 $83,223.84$5.27
3 $63,168.00$4.00
4 $50,534.40$3.20
5 $34,742.40$2.20
6 $63,168.00$4.00
7 $69,484.80$4.40
8 $123,177.60$7.80
Ref #432 513E20001 WELDED STUD SHEAR CONNECTORS, AS PER PLAN, (14400 EACH)
Awd $14,400.00$1.00
2 $55,440.00$3.85
3 $57,600.00$4.00
4 $21,600.00$1.50
5 $89,280.00$6.20
6 $57,600.00$4.00
7 $46,800.00$3.25
8 $12,240.00$0.85
110628 - Page 80
Ref #433 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (24510 SF)
Awd $24,510.00$1.00
2 $98,040.00$4.00
3 $98,040.00$4.00
4 $101,716.50$4.15
5 $98,040.00$4.00
6 $58,824.00$2.40
7 $107,353.80$4.38
8 $62,500.50$2.55
Ref #434 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT (WT: , (24510 SF)
Awd $24,510.00$1.00
2 $98,040.00$4.00
3 $98,040.00$4.00
4 $101,716.50$4.15
5 $98,040.00$4.00
6 $58,824.00$2.40
7 $107,353.80$4.38
8 $62,500.50$2.55
Ref #435 514E10000 FINAL INSPECTION REPAIR (WT: 26), (25 EACH)
Awd $12,500.00$500.00
2 $250.00$10.00
3 $250.00$10.00
4 $260.00$10.40
5 $250.00$10.00
6 $7,125.00$285.00
7 $273.50$10.94
8 $10,000.00$400.00
Ref #436 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (89 FT)
Awd $62,300.00$700.00
2 $96,929.01$1,089.09
3 $35,600.00$400.00
4 $46,725.00$525.00
5 $72,980.00$820.00
6 $62,300.00$700.00
7 $35,600.00$400.00
8 $24,920.00$280.00
Ref #437 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (413 SF)
Awd $2,065.00$5.00
2 $6,859.93$16.61
3 $1,928.71$4.67
4 $4,377.80$10.60
5 $2,891.00$7.00
6 $2,065.00$5.00
7 $1,858.50$4.50
8 $9,912.00$24.00
Ref #438 516E13600 1" PREFORMED EXPANSION JOINT FILLER (WT: 22), (160 SF)
Awd $1,280.00$8.00
2 $2,862.40$17.89
3 $414.40$2.59
4 $2,592.00$16.20
5 $1,248.00$7.80
6 $1,600.00$10.00
7 $960.00$6.00
8 $4,000.00$25.00
110628 - Page 81
Ref #439 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (48 SF)
Awd $480.00$10.00
2 $979.20$20.40
3 $159.84$3.33
4 $542.40$11.30
5 $470.40$9.80
6 $480.00$10.00
7 $384.00$8.00
8 $1,296.00$27.00
Ref #440 516E25000 NYLON REINFORCED NEOPRENE SHEETING, (49 SF)
Awd $1,715.00$35.00
2 $2,107.49$43.01
3 $382.20$7.80
4 $624.75$12.75
5 $931.00$19.00
6 $1,225.00$25.00
7 $637.00$13.00
8 $4,900.00$100.00
Ref #441 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (6 EACH)
Awd $24,000.00$4,000.00
2 $24,687.42$4,114.57
3 $30,000.00$5,000.00
4 $26,604.00$4,434.00
5 $17,790.00$2,965.00
6 $49,800.00$8,300.00
7 $24,000.00$4,000.00
8 $28,800.00$4,800.00
Ref #442 516E44401 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (5 EACH)
Awd $23,250.00$4,650.00
2 $26,021.55$5,204.31
3 $15,000.00$3,000.00
4 $22,170.00$4,434.00
5 $22,600.00$4,520.00
6 $41,500.00$8,300.00
7 $25,000.00$5,000.00
8 $30,000.00$6,000.00
Ref #443 516E46900 BEARING DEVICE, MISC.:ELAS. BRG.W/INT. LAM. & LD. , (2 EACH)
Awd $50,000.00$25,000.00
2 $27,526.10$13,763.05
3 $12,000.00$6,000.00
4 $15,660.00$7,830.00
5 $15,000.00$7,500.00
6 $19,200.00$9,600.00
7 $15,600.00$7,800.00
8 $29,000.00$14,500.00
Ref #444 516E46900 BEARING DEVICE, MISC.:ELAS.BRG.W/INT.LAM.&LD.PLT.W, (2 EACH)
Awd $50,000.00$25,000.00
2 $22,991.20$11,495.60
3 $9,000.00$4,500.00
4 $15,660.00$7,830.00
5 $7,600.00$3,800.00
6 $19,200.00$9,600.00
7 $18,000.00$9,000.00
8 $30,000.00$15,000.00
110628 - Page 82
Ref #445 516E46900 BEARING DEVICE, MISC.:ELAS.BRG.W/INT.LAM.&LD.PLT.W, (5 EACH)
Awd $21,250.00$4,250.00
2 $23,674.45$4,734.89
3 $20,000.00$4,000.00
4 $28,625.00$5,725.00
5 $19,250.00$3,850.00
6 $35,000.00$7,000.00
7 $25,000.00$5,000.00
8 $28,500.00$5,700.00
Ref #446 516E46900 BEARING DEVICE, MISC.:ELAS.BRG.W/INT.LAM.&LD.PLT.W, (5 EACH)
Awd $25,000.00$5,000.00
2 $28,284.85$5,656.97
3 $20,000.00$4,000.00
4 $28,625.00$5,725.00
5 $25,850.00$5,170.00
6 $35,000.00$7,000.00
7 $30,000.00$6,000.00
8 $32,000.00$6,400.00
Ref #447 516E46900 BEARING DEVICE, MISC.:ELAS.BRG.W/INT.LAM.&LD.PLT.W, (5 EACH)
Awd $23,250.00$4,650.00
2 $23,423.00$4,684.60
3 $27,500.00$5,500.00
4 $28,625.00$5,725.00
5 $42,100.00$8,420.00
6 $35,000.00$7,000.00
7 $25,000.00$5,000.00
8 $27,500.00$5,500.00
Ref #448 516E46900 BEARING DEVICE, MISC.:ELAS.BRG.W/INT.LAM.&LD.PLT.W, (5 EACH)
Awd $28,500.00$5,700.00
2 $32,196.70$6,439.34
3 $15,000.00$3,000.00
4 $28,625.00$5,725.00
5 $31,500.00$6,300.00
6 $34,500.00$6,900.00
7 $35,000.00$7,000.00
8 $36,000.00$7,200.00
Ref #449 516E46900 BEARING DEVICE, MISC.:ELAS.BRG.W/INT.LAM.&LD.PLT.W, (6 EACH)
Awd $33,600.00$5,600.00
2 $38,602.38$6,433.73
3 $60,000.00$10,000.00
4 $34,362.00$5,727.00
5 $37,680.00$6,280.00
6 $54,000.00$9,000.00
7 $42,000.00$7,000.00
8 $49,800.00$8,300.00
Ref #450 516E46900 BEARING DEVICE, MISC.:ELAS.BRG.W/INT.LAM.&LD.PLT.W, (6 EACH)
Awd $60,000.00$10,000.00
2 $62,809.98$10,468.33
3 $18,000.00$3,000.00
4 $34,362.00$5,727.00
5 $70,200.00$11,700.00
6 $54,600.00$9,100.00
7 $78,000.00$13,000.00
8 $66,000.00$11,000.00
110628 - Page 83
Ref #451 517E76300 RAILING, MISC.:CONCRETE PARAPET WITH STEEL RAILS (, (5329 FT)
Awd $1,199,025.00$225.00
2 $932,575.00$175.00
3 $932,575.00$175.00
4 $1,811,860.00$340.00
5 $1,577,384.00$296.00
6 $1,065,800.00$200.00
7 $1,598,700.00$300.00
8 $852,640.00$160.00
Ref #452 518E12201 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN (WT: 22, (16 EACH)
Awd $24,000.00$1,500.00
2 $45,903.04$2,868.94
3 $32,000.00$2,000.00
4 $37,680.00$2,355.00
5 $52,800.00$3,300.00
6 $35,200.00$2,200.00
7 $16,960.00$1,060.00
8 $38,400.00$2,400.00
Ref #453 518E21200 POROUS BACKFILL WITH FILTER FABRIC (WT: 22), (420 CY)
Awd $31,500.00$75.00
2 $36,666.00$87.30
3 $21,768.60$51.83
4 $31,500.00$75.00
5 $47,040.00$112.00
6 $16,800.00$40.00
7 $29,400.00$70.00
8 $25,200.00$60.00
Ref #454 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (67 FT)
Awd $1,005.00$15.00
2 $1,270.99$18.97
3 $459.62$6.86
4 $1,098.80$16.40
5 $938.00$14.00
6 $536.00$8.00
7 $871.00$13.00
8 $2,010.00$30.00
Ref #455 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (4 FT)
Awd $140.00$35.00
2 $180.00$45.00
3 $37.04$9.26
4 $65.20$16.30
5 $136.00$34.00
6 $120.00$30.00
7 $260.00$65.00
8 $140.00$35.00
Ref #456 518E42000 8" PERFORATED CORRUGATED PLASTIC PIPE, (229 FT)
Awd $9,160.00$40.00
2 $4,776.94$20.86
3 $1,706.05$7.45
4 $4,305.20$18.80
5 $4,351.00$19.00
6 $2,290.00$10.00
7 $2,977.00$13.00
8 $6,870.00$30.00
110628 - Page 84
Ref #457 518E42010 8" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (8 FT)
Awd $320.00$40.00
2 $365.20$45.65
3 $91.92$11.49
4 $150.40$18.80
5 $288.00$36.00
6 $160.00$20.00
7 $312.00$39.00
8 $280.00$35.00
Ref #458 523E20000 DYNAMIC LOAD TESTING, (1 EACH)
Awd $2,500.00$2,500.00
2 $3,425.00$3,425.00
3 $5,776.26$5,776.26
4 $5,505.00$5,505.00
5 $7,100.00$7,100.00
6 $8,000.00$8,000.00
7 $3,850.00$3,850.00
8 $6,000.00$6,000.00
Ref #459 523E20500 RESTRIKE, (1 EACH)
Awd $700.00$700.00
2 $1,336.72$1,336.72
3 $500.43$500.43
4 $3,810.00$3,810.00
5 $7,100.00$7,100.00
6 $4,000.00$4,000.00
7 $5,000.00$5,000.00
8 $4,000.00$4,000.00
Ref #460 524E94804 DRILLED SHAFTS, 42" DIAMETER, INTO BEDROCK, (120 FT)
Awd $138,000.00$1,150.00
2 $312,000.00$2,600.00
3 $120,000.00$1,000.00
4 $224,400.00$1,870.00
5 $76,560.00$638.00
6 $93,000.00$775.00
7 $360,000.00$3,000.00
8 $252,000.00$2,100.00
Ref #461 524E94902 DRILLED SHAFTS, 48" DIAMETER, ABOVE BEDROCK, (192 FT)
Awd $96,000.00$500.00
2 $499,200.00$2,600.00
3 $124,800.00$650.00
4 $292,800.00$1,525.00
5 $109,824.00$572.00
6 $318,720.00$1,660.00
7 $556,800.00$2,900.00
8 $168,960.00$880.00
Ref #462 524E94950 DRILLED SHAFTS, 72" DIAMETER, INTO BEDROCK, (45 FT)
Awd $101,250.00$2,250.00
2 $225,000.00$5,000.00
3 $112,500.00$2,500.00
4 $104,625.00$2,325.00
5 $111,600.00$2,480.00
6 $85,500.00$1,900.00
7 $157,500.00$3,500.00
8 $319,500.00$7,100.00
110628 - Page 85
Ref #463 524E94970 DRILLED SHAFTS, 78" DIAMETER ABOVE BEDROCK, (84 FT)
Awd $123,900.00$1,475.00
2 $369,600.00$4,400.00
3 $168,000.00$2,000.00
4 $254,100.00$3,025.00
5 $155,400.00$1,850.00
6 $315,000.00$3,750.00
7 $294,000.00$3,500.00
8 $306,600.00$3,650.00
Ref #464 524E94999 DRILLED SHAFTS, 96" DIAMETER, INTO BEDROCK, AS PER, (724 FT)
Awd $2,298,700.00$3,175.00
2 $3,620,000.00$5,000.00
3 $3,620,000.00$5,000.00
4 $2,534,000.00$3,500.00
5 $3,909,600.00$5,400.00
6 $2,280,600.00$3,150.00
7 $3,258,000.00$4,500.00
8 $5,357,600.00$7,400.00
Ref #465 524E95000 DRILLED SHAFTS, MISC.:102" DIAMETER, ABOVE BEDROCK, (523 FT)
Awd $2,196,600.00$4,200.00
2 $3,138,000.00$6,000.00
3 $3,138,000.00$6,000.00
4 $1,555,925.00$2,975.00
5 $2,562,700.00$4,900.00
6 $5,491,500.00$10,500.00
7 $2,196,600.00$4,200.00
8 $3,190,300.00$6,100.00
Ref #466 524E95200 DRILLED SHAFTS, MISC.LATERAL LOAD TESTING OF DRILL, (LUMP SUM)
Awd $200,000.00$200,000.00
2 $150,000.00$150,000.00
3 $200,000.00$200,000.00
4 $177,137.98$177,137.98
5 $130,000.00$130,000.00
6 $130,000.00$130,000.00
7 $240,000.00$240,000.00
8 $200,000.00$200,000.00
Ref #467 524E95200 DRILLED SHAFTS, MISC.OSTERBERG CELL LOAD TESTING O, (LUMP SUM)
Awd $575,000.00$575,000.00
2 $600,000.00$600,000.00
3 $500,000.00$500,000.00
4 $660,124.67$660,124.67
5 $330,000.00$330,000.00
6 $455,000.00$455,000.00
7 $825,000.00$825,000.00
8 $750,000.00$750,000.00
Ref #468 524E95200 DRILLED SHAFTS, MISC.TEMPORARY 102" DIAMETER, ABOV, (LUMP SUM)
Awd $500,000.00$500,000.00
2 $650,000.00$650,000.00
3 $750,000.00$750,000.00
4 $132,500.00$132,500.00
5 $340,000.00$340,000.00
6 $2,810,000.00$2,810,000.00
7 $225,000.00$225,000.00
8 $1,400,000.00$1,400,000.00
110628 - Page 86
Ref #469 524E95200 DRILLED SHAFTS, MISC.TEMPORARY 96" DIAMETER, INTO , (LUMP SUM)
Awd $225,000.00$225,000.00
2 $600,000.00$600,000.00
3 $500,000.00$500,000.00
4 $255,000.00$255,000.00
5 $240,000.00$240,000.00
6 $2,125,000.00$2,125,000.00
7 $275,000.00$275,000.00
8 $725,000.00$725,000.00
Ref #470 530E00200 SPECIAL - STRUCTURE, MISC.:PERMANENT MAINTENANCE, , (LUMP SUM)
Awd $950,000.00$950,000.00
2 $900,000.00$900,000.00
3 $500,000.00$500,000.00
4 $808,845.00$808,845.00
5 $646,000.00$646,000.00
6 $1,000,000.00$1,000,000.00
7 $900,000.00$900,000.00
8 $750,000.00$750,000.00
Ref #471 530E00300 SPECIAL - STRUCTURE, MISC.:POST-TENSIONING TENDONS, (154266 LB)
Awd $1,542,660.00$10.00
2 $1,234,128.00$8.00
3 $1,542,660.00$10.00
4 $2,159,724.00$14.00
5 $1,542,660.00$10.00
6 $925,596.00$6.00
7 $1,288,121.10$8.35
8 $2,622,522.00$17.00
Ref #472 530E00300 SPECIAL - STRUCTURE, MISC.:POST-TENSIONING BARS, (112532 LB)
Awd $900,256.00$8.00
2 $787,724.00$7.00
3 $900,256.00$8.00
4 $815,857.00$7.25
5 $753,964.40$6.70
6 $438,874.80$3.90
7 $843,990.00$7.50
8 $1,012,788.00$9.00
Ref #473 530E00200 SPECIAL - STRUCTURE, MISC.:STAY CABLE ASSEMBLAGE, (LUMP SUM)
Awd $9,275,000.00$9,275,000.00
2 $6,700,000.00$6,700,000.00
3 $5,110,000.00$5,110,000.00
4 $8,875,000.00$8,875,000.00
5 $9,500,000.00$9,500,000.00
6 $6,970,000.00$6,970,000.00
7 $7,700,000.00$7,700,000.00
8 $11,749,000.00$11,749,000.00
Ref #474 530E00200 SPECIAL - STRUCTURE, MISC.:STAY CABLE TESTING, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $300,000.00$300,000.00
3 $200,000.00$200,000.00
4 $10,000.00$10,000.00
5 $280,000.00$280,000.00
6 $329,000.00$329,000.00
7 $100,000.00$100,000.00
8 $15,000.00$15,000.00
110628 - Page 87
Ref #475 530E00400 SPECIAL - STRUCTURE, MISC.:DATA LOGGER (PERMANENT , (5 EACH)
Awd $30,000.00$6,000.00
2 $25,296.70$5,059.34
3 $26,391.05$5,278.21
4 $24,000.00$4,800.00
5 $30,000.00$6,000.00
6 $26,000.00$5,200.00
7 $27,990.10$5,598.02
8 $5,150.00$1,030.00
Ref #476 530E00400 SPECIAL - STRUCTURE, MISC.:DATA LOGGER (TEMPORARY , (16 EACH)
Awd $96,000.00$6,000.00
2 $80,949.44$5,059.34
3 $84,451.36$5,278.21
4 $76,800.00$4,800.00
5 $96,000.00$6,000.00
6 $83,200.00$5,200.00
7 $89,568.32$5,598.02
8 $16,480.00$1,030.00
Ref #477 530E00400 SPECIAL - STRUCTURE, MISC.:MULTIPLEXER (PERMANENT , (24 EACH)
Awd $4,560.00$190.00
2 $27,716.40$1,154.85
3 $28,915.44$1,204.81
4 $28,800.00$1,200.00
5 $48,000.00$2,000.00
6 $28,800.00$1,200.00
7 $30,667.44$1,277.81
8 $24,720.00$1,030.00
Ref #478 530E00400 SPECIAL - STRUCTURE, MISC.:MULTIPLEXER (TEMPORARY , (13 EACH)
Awd $2,470.00$190.00
2 $15,013.05$1,154.85
3 $15,662.53$1,204.81
4 $15,600.00$1,200.00
5 $26,000.00$2,000.00
6 $15,600.00$1,200.00
7 $16,611.53$1,277.81
8 $13,390.00$1,030.00
Ref #479 530E00400 SPECIAL - STRUCTURE, MISC.:RESISTIVE FOIL EMBEDMEN, (112 EACH)
Awd $35,280.00$315.00
2 $30,179.52$269.46
3 $31,485.44$281.12
4 $45,920.00$410.00
5 $31,360.00$280.00
6 $31,360.00$280.00
7 $33,393.92$298.16
8 $115,360.00$1,030.00
Ref #480 530E00400 SPECIAL - STRUCTURE, MISC.:VIBRATING WIRE EMBEDMEN, (192 EACH)
Awd $96,000.00$500.00
2 $83,201.28$433.34
3 $86,801.28$452.09
4 $108,480.00$565.00
5 $82,560.00$430.00
6 $86,400.00$450.00
7 $92,060.16$479.48
8 $197,760.00$1,030.00
110628 - Page 88
Ref #481 530E00400 SPECIAL - STRUCTURE, MISC.:VIBRATING WIRE INTERFAC, (24 EACH)
Awd $20,400.00$850.00
2 $17,685.60$736.90
3 $18,450.72$768.78
4 $20,880.00$870.00
5 $19,440.00$810.00
6 $18,360.00$765.00
7 $19,568.64$815.36
8 $24,720.00$1,030.00
Ref #482 530E00400 SPECIAL - STRUCTURE, MISC.:VIBRATING WIRE INTERFAC, (16 EACH)
Awd $13,600.00$850.00
2 $11,790.40$736.90
3 $12,300.48$768.78
4 $12,960.00$810.00
5 $13,120.00$820.00
6 $12,240.00$765.00
7 $13,045.76$815.36
8 $16,480.00$1,030.00
Ref #483 530E00400 SPECIAL - STRUCTURE, MISC.:VIBRATING WIRE SISTER B, (46 EACH)
Awd $34,500.00$750.00
2 $29,799.72$647.82
3 $31,088.64$675.84
4 $35,420.00$770.00
5 $34,500.00$750.00
6 $30,820.00$670.00
7 $32,972.34$716.79
8 $47,380.00$1,030.00
Ref #484 530E00400 SPECIAL - STRUCTURE, MISC.:VIBRATING WIRE SURFACE , (128 EACH)
Awd $76,800.00$600.00
2 $64,899.84$507.03
3 $67,708.16$528.97
4 $76,800.00$600.00
5 $83,200.00$650.00
6 $67,840.00$530.00
7 $71,810.56$561.02
8 $131,840.00$1,030.00
Ref #485 530E00400 SPECIAL - STRUCTURE, MISC.:VIBRATING WIRE TILT MET, (1 EACH)
Awd $2,100.00$2,100.00
2 $1,759.77$1,759.77
3 $1,835.90$1,835.90
4 $1,850.00$1,850.00
5 $2,200.00$2,200.00
6 $1,800.00$1,800.00
7 $1,947.14$1,947.14
8 $1,030.00$1,030.00
Ref #486 601E11000 RIPRAP USING 6" REINFORCED CONCRETE SLAB, (495 SY)
Awd $39,600.00$80.00
2 $61,691.85$124.63
3 $36,714.15$74.17
4 $34,650.00$70.00
5 $71,775.00$145.00
6 $42,075.00$85.00
7 $55,935.00$113.00
8 $12,375.00$25.00
110628 - Page 89
Ref #487 607E39910 VANDAL PROTECTION FENCE, 8' STRAIGHT, COATED FABRI, (544 FT)
Awd $54,400.00$100.00
2 $49,378.88$90.77
3 $42,704.00$78.50
4 $42,704.00$78.50
5 $42,704.00$78.50
6 $48,960.00$90.00
7 $48,960.00$90.00
8 $43,520.00$80.00
Ref #488 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA, (5855 SY)
Awd $187,360.00$32.00
2 $445,272.75$76.05
3 $234,200.00$40.00
4 $322,025.00$55.00
5 $380,575.00$65.00
6 $257,620.00$44.00
7 $234,200.00$40.00
8 $282,503.75$48.25
Ref #489 898E10000 QC/QA CONCRETE, CLASS QSC3(CABLE STAYED SUPERSTRUC, (5732 CY)
Awd $10,604,200.00$1,850.00
2 $7,594,900.00$1,325.00
3 $13,756,800.00$2,400.00
4 $15,218,460.00$2,655.00
5 $12,037,200.00$2,100.00
6 $15,029,304.00$2,622.00
7 $10,031,000.00$1,750.00
8 $17,081,360.00$2,980.00
Ref #490 898E10000 QC/QA CONCRETE, CLASS QSC3(PIER 2, TOWER 3, TOWER , (5640 CY)
Awd $7,332,000.00$1,300.00
2 $15,510,000.00$2,750.00
3 $16,920,000.00$3,000.00
4 $11,674,800.00$2,070.00
5 $12,972,000.00$2,300.00
6 $15,792,000.00$2,800.00
7 $13,254,000.00$2,350.00
8 $13,536,000.00$2,400.00
Ref #491 898E10211 QC/QA CONCRETE, CLASS QSC2, SUPERSTRUCTURE (DECK),, (1638 CY)
Awd $2,293,200.00$1,400.00
2 $1,146,600.00$700.00
3 $1,310,400.00$800.00
4 $1,728,090.00$1,055.00
5 $1,654,380.00$1,010.00
6 $2,227,680.00$1,360.00
7 $1,556,100.00$950.00
8 $2,915,640.00$1,780.00
Ref #492 898E10709 QC/QA CONCRETE, CLASS QSC2, SUPERSTRUCTURE (APPROA, (362 SY)
Awd $117,650.00$325.00
2 $126,700.00$350.00
3 $144,800.00$400.00
4 $148,420.00$410.00
5 $135,388.00$374.00
6 $119,460.00$330.00
7 $190,050.00$525.00
8 $144,800.00$400.00
110628 - Page 90
Ref #493 898E20100 QC/QA CONCRETE, CLASS QSC1, SUBSTRUCTURE (PIER ABO, (558 CY)
Awd $669,600.00$1,200.00
2 $558,000.00$1,000.00
3 $1,116,000.00$2,000.00
4 $644,490.00$1,155.00
5 $641,700.00$1,150.00
6 $613,800.00$1,100.00
7 $502,200.00$900.00
8 $920,700.00$1,650.00
Ref #494 898E20150 QC/QA CONCRETE, CLASS QSC1, SUBSTRUCTURE (ABUTMENT, (576 CY)
Awd $691,200.00$1,200.00
2 $576,000.00$1,000.00
3 $460,800.00$800.00
4 $737,280.00$1,280.00
5 $544,320.00$945.00
6 $748,800.00$1,300.00
7 $460,800.00$800.00
8 $1,002,240.00$1,740.00
Ref #495 898E20300 QC/QA CONCRETE, CLASS QSC1, SUBSTRUCTURE (FOOTING), (4109 CY)
Awd $1,849,050.00$450.00
2 $4,109,000.00$1,000.00
3 $4,930,800.00$1,200.00
4 $2,075,045.00$505.00
5 $1,746,325.00$425.00
6 $1,972,320.00$480.00
7 $2,288,713.00$557.00
8 $2,629,760.00$640.00
Section 22 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $64,137,851.20
2 $78,725,503.11
3 $83,542,026.42
4 $79,029,318.02
5 $85,424,893.90
6 $87,456,652.00
7 $92,012,135.03
8 $98,052,571.95
Ref #496 201E11000 CLEARING AND GRUBBING (WT: 01) (WT: 01), (LUMP SUM)
Awd $10,000.00$10,000.00
2 $18,669.24$18,669.24
3 $50,000.00$50,000.00
4 $1,100.00$1,100.00
5 $1,000.00$1,000.00
6 $1.00$1.00
7 $6,000.00$6,000.00
8 $5,000.00$5,000.00
110628 - Page 91
Ref #497 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN , (LUMP SUM)
Awd $1,100,000.00$1,100,000.00
2 $1,000,000.00$1,000,000.00
3 $1,500,000.00$1,500,000.00
4 $2,820,000.00$2,820,000.00
5 $1,799,597.00$1,799,597.00
6 $2,000,000.00$2,000,000.00
7 $2,000,000.00$2,000,000.00
8 $2,390,000.00$2,390,000.00
Ref #498 202E11100 STRUCTURE REMOVED, RETAINING WALL, (16 CY)
Awd $800.00$50.00
2 $17,375.52$1,085.97
3 $2,391.20$149.45
4 $3,200.00$200.00
5 $3,520.00$220.00
6 $3,520.00$220.00
7 $2,080.00$130.00
8 $4,960.00$310.00
Ref #499 202E11300 PORTIONS OF STRUCTURE REMOVED, RETAINING WALL, (30 CY)
Awd $2,250.00$75.00
2 $31,502.40$1,050.08
3 $3,852.00$128.40
4 $3,720.00$124.00
5 $5,400.00$180.00
6 $8,400.00$280.00
7 $3,900.00$130.00
8 $12,750.00$425.00
Ref #500 202E23000 PAVEMENT REMOVED (WT: NR), (805 SY)
Awd $9,660.00$12.00
2 $12,751.20$15.84
3 $2,608.20$3.24
4 $8,130.50$10.10
5 $8,050.00$10.00
6 $7,245.00$9.00
7 $4,830.00$6.00
8 $8,050.00$10.00
Ref #501 202E30000 WALK REMOVED, (1071 SF)
Awd $3,213.00$3.00
2 $5,280.03$4.93
3 $439.11$0.41
4 $2,838.15$2.65
5 $2,784.60$2.60
6 $2,142.00$2.00
7 $1,285.20$1.20
8 $2,838.15$2.65
Ref #502 202E32000 CURB REMOVED (WT: NR), (496 FT)
Awd $4,960.00$10.00
2 $3,427.36$6.91
3 $2,926.40$5.90
4 $2,802.40$5.65
5 $2,777.60$5.60
6 $1,636.80$3.30
7 $1,339.20$2.70
8 $2,827.20$5.70
110628 - Page 92
Ref #503 202E32500 CURB AND GUTTER REMOVED, (73 FT)
Awd $1,825.00$25.00
2 $821.98$11.26
3 $489.83$6.71
4 $664.30$9.10
5 $657.00$9.00
6 $401.50$5.50
7 $317.55$4.35
8 $671.60$9.20
Ref #504 202E35100 PIPE REMOVED, 24" AND UNDER, (46 FT)
Awd $1,840.00$40.00
2 $1,807.34$39.29
3 $1,202.90$26.15
4 $834.90$18.15
5 $828.00$18.00
6 $644.00$14.00
7 $506.00$11.00
8 $828.00$18.00
Ref #505 202E38000 GUARDRAIL REMOVED, (381 FT)
Awd $1,143.00$3.00
2 $781.05$2.05
3 $1,905.00$5.00
4 $1,352.55$3.55
5 $1,333.50$3.50
6 $533.40$1.40
7 $571.50$1.50
8 $1,333.50$3.50
Ref #506 203E10000 EXCAVATION (WT: 06), (3359 CY)
Awd $67,180.00$20.00
2 $84,646.80$25.20
3 $45,984.71$13.69
4 $30,566.90$9.10
5 $30,231.00$9.00
6 $30,231.00$9.00
7 $77,257.00$23.00
8 $30,231.00$9.00
Ref #507 203E20000 EMBANKMENT, (28 CY)
Awd $1,400.00$50.00
2 $1,328.04$47.43
3 $1,270.92$45.39
4 $282.80$10.10
5 $280.00$10.00
6 $78.40$2.80
7 $53.20$1.90
8 $280.00$10.00
Ref #508 304E20000 AGGREGATE BASE, (68 CY)
Awd $5,100.00$75.00
2 $7,316.12$107.59
3 $3,426.52$50.39
4 $5,508.00$81.00
5 $5,780.00$85.00
6 $3,060.00$45.00
7 $3,740.00$55.00
8 $3,740.00$55.00
110628 - Page 93
Ref #509 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (12 GAL)
Awd $48.00$4.00
2 $36.00$3.00
3 $193.20$16.10
4 $37.80$3.15
5 $36.00$3.00
6 $42.00$3.50
7 $37.80$3.15
8 $36.00$3.00
Ref #510 408E10000 PRIME COAT, (123 GAL)
Awd $615.00$5.00
2 $492.00$4.00
3 $874.53$7.11
4 $516.60$4.20
5 $492.00$4.00
6 $553.50$4.50
7 $516.60$4.20
8 $492.00$4.00
Ref #511 448E46024 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (16 CY)
Awd $7,280.00$455.00
2 $6,960.00$435.00
3 $4,021.28$251.33
4 $7,300.00$456.25
5 $6,960.00$435.00
6 $8,320.00$520.00
7 $7,299.52$456.22
8 $6,960.00$435.00
Ref #512 448E48020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 (, (11 CY)
Awd $5,500.00$500.00
2 $5,225.00$475.00
3 $3,268.76$297.16
4 $5,480.20$498.20
5 $5,225.00$475.00
6 $6,160.00$560.00
7 $5,479.87$498.17
8 $5,225.00$475.00
Ref #513 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,000.00$1,000.00
3 $1.00$1.00
4 $1.00$1.00
5 $1.00$1.00
6 $17,000.00$17,000.00
7 $100.00$100.00
8 $1.00$1.00
Ref #514 608E10000 4" CONCRETE WALK, (100 SF)
Awd $3,500.00$35.00
2 $485.00$4.85
3 $490.00$4.90
4 $2,040.00$20.40
5 $1,475.00$14.75
6 $550.00$5.50
7 $1,400.00$14.00
8 $1,475.00$14.75
110628 - Page 94
Ref #515 608E98000 WALKWAY, MISC.:SIDEWALK-4 IN. CONCRETE, (1156 SF)
Awd $28,900.00$25.00
2 $5,606.60$4.85
3 $5,664.40$4.90
4 $19,883.20$17.20
5 $9,248.00$8.00
6 $6,358.00$5.50
7 $6,936.00$6.00
8 $9,248.00$8.00
Ref #516 608E98200 WALKWAY, MISC.:SIDEWALK RAMP TYPE 1, PER KY STD. D, (3 EACH)
Awd $7,500.00$2,500.00
2 $2,250.00$750.00
3 $2,272.74$757.58
4 $3,501.00$1,167.00
5 $900.00$300.00
6 $16.50$5.50
7 $855.00$285.00
8 $900.00$300.00
Ref #517 608E98200 WALKWAY, MISC.:SIDEWALK RAMP TYPE 3, PER KY STD. D, (2 EACH)
Awd $5,000.00$2,500.00
2 $1,500.00$750.00
3 $1,515.16$757.58
4 $2,284.00$1,142.00
5 $600.00$300.00
6 $440.00$220.00
7 $570.00$285.00
8 $600.00$300.00
Ref #518 609E26000 CURB, TYPE 6, (30 FT)
Awd $3,000.00$100.00
2 $738.00$24.60
3 $745.50$24.85
4 $2,550.00$85.00
5 $1,950.00$65.00
6 $960.00$32.00
7 $1,140.00$38.00
8 $1,950.00$65.00
Ref #519 609E98000 CURB, MISC.:STANDARD CURB AND GUTTER, PER KY STD. , (226 FT)
Awd $28,250.00$125.00
2 $5,559.60$24.60
3 $5,616.10$24.85
4 $15,368.00$68.00
5 $9,492.00$42.00
6 $6,102.00$27.00
7 $6,780.00$30.00
8 $9,492.00$42.00
Ref #520 625E31510 PULL BOX REMOVED, (1 EACH)
Awd $750.00$750.00
2 $180.16$180.16
3 $178.00$178.00
4 $232.00$232.00
5 $260.00$260.00
6 $300.00$300.00
7 $182.83$182.83
8 $180.00$180.00
110628 - Page 95
Ref #521 625E75400 LIGHT POLE REMOVED (WT: NR), (8 EACH)
Awd $2,800.00$350.00
2 $1,416.96$177.12
3 $1,400.00$175.00
4 $976.00$122.00
5 $3,800.00$475.00
6 $4,400.00$550.00
7 $1,438.00$179.75
8 $1,400.00$175.00
Ref #522 625E75500 LIGHT POLE FOUNDATION REMOVED (WT: NR), (8 EACH)
Awd $6,000.00$750.00
2 $688.24$86.03
3 $680.00$85.00
4 $920.00$115.00
5 $6,264.00$783.00
6 $7,200.00$900.00
7 $698.48$87.31
8 $720.00$90.00
Ref #523 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (37 FT)
Awd $370.00$10.00
2 $370.00$10.00
3 $433.64$11.72
4 $388.50$10.50
5 $370.00$10.00
6 $407.00$11.00
7 $401.45$10.85
8 $370.00$10.00
Ref #524 630E80100 SIGN, FLAT SHEET, (10 SF)
Awd $170.00$17.00
2 $170.00$17.00
3 $199.20$19.92
4 $170.00$17.00
5 $170.00$17.00
6 $180.00$18.00
7 $184.50$18.45
8 $170.00$17.00
Ref #525 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL (WT: , (39 EACH)
Awd $585.00$15.00
2 $585.00$15.00
3 $685.23$17.57
4 $585.00$15.00
5 $585.00$15.00
6 $624.00$16.00
7 $634.92$16.28
8 $585.00$15.00
Ref #526 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (22 EACH)
Awd $440.00$20.00
2 $440.00$20.00
3 $515.46$23.43
4 $440.00$20.00
5 $440.00$20.00
6 $484.00$22.00
7 $477.62$21.71
8 $440.00$20.00
110628 - Page 96
Ref #527 630E97800 SIGNING, MISC.:SBM ALUM SHEET SIGNS .125 IN., PER , (9 SF)
Awd $153.00$17.00
2 $153.00$17.00
3 $179.28$19.92
4 $153.00$17.00
5 $153.00$17.00
6 $171.00$19.00
7 $166.05$18.45
8 $153.00$17.00
Ref #528 630E97900 SIGNING, MISC.:STEEL POST TYPE 2, PER KY STD. DETA, (13 FT)
Awd $156.00$12.00
2 $156.00$12.00
3 $182.78$14.06
4 $156.00$12.00
5 $156.00$12.00
6 $169.00$13.00
7 $169.26$13.02
8 $156.00$12.00
Ref #529 642E30000 REMOVAL OF PAVEMENT MARKING, (54 FT)
Awd $216.00$4.00
2 $189.00$3.50
3 $190.08$3.52
4 $189.00$3.50
5 $189.00$3.50
6 $864.00$16.00
7 $190.62$3.53
8 $189.00$3.50
Ref #530 644E00300 CENTER LINE, (0.01 MILE)
Awd $5,780.00$578,000.01
2 $5,780.00$578,000.01
3 $5,820.75$582,075.01
4 $5,780.00$578,000.01
5 $5,780.00$578,000.01
6 $65.00$6,500.00
7 $150.00$15,000.00
8 $5,780.00$578,000.01
Ref #531 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $300.00$150.00
2 $300.00$150.00
3 $300.00$150.00
4 $300.00$150.00
5 $300.00$150.00
6 $340.00$170.00
7 $300.00$150.00
8 $300.00$150.00
Ref #532 659E00300 TOPSOIL, (801 CY)
Awd $20,025.00$25.00
2 $22,371.93$27.93
3 $31,807.71$39.71
4 $44,055.00$55.00
5 $20,025.00$25.00
6 $5,206.50$6.50
7 $32,040.00$40.00
8 $24,831.00$31.00
110628 - Page 97
Ref #533 659E00500 SEEDING AND MULCHING, CLASS 1, (6816 SY)
Awd $3,748.80$0.55
2 $3,748.80$0.55
3 $3,748.80$0.55
4 $3,748.80$0.55
5 $3,748.80$0.55
6 $4,089.60$0.60
7 $3,748.80$0.55
8 $3,748.80$0.55
Ref #534 659E00510 SEEDING AND MULCHING, CLASS 2, (417 SY)
Awd $417.00$1.00
2 $417.00$1.00
3 $417.00$1.00
4 $417.00$1.00
5 $417.00$1.00
6 $458.70$1.10
7 $417.00$1.00
8 $417.00$1.00
Ref #535 659E14000 REPAIR SEEDING AND MULCHING, (362 SY)
Awd $362.00$1.00
2 $362.00$1.00
3 $362.00$1.00
4 $362.00$1.00
5 $362.00$1.00
6 $398.20$1.10
7 $362.00$1.00
8 $362.00$1.00
Ref #536 659E15000 INTER-SEEDING, (362 SY)
Awd $362.00$1.00
2 $362.00$1.00
3 $362.00$1.00
4 $362.00$1.00
5 $362.00$1.00
6 $398.20$1.10
7 $362.00$1.00
8 $362.00$1.00
Ref #537 659E20000 COMMERCIAL FERTILIZER, (1 TON)
Awd $500.00$500.00
2 $500.00$500.00
3 $500.00$500.00
4 $500.00$500.00
5 $500.00$500.00
6 $550.00$550.00
7 $500.00$500.00
8 $500.00$500.00
Ref #538 659E31000 LIME, (1.49 ACRE)
Awd $298.00$200.00
2 $298.00$200.00
3 $298.00$200.00
4 $298.00$200.00
5 $298.00$200.00
6 $342.70$230.00
7 $298.00$200.00
8 $298.00$200.00
110628 - Page 98
Ref #539 659E35000 WATER, (40 MGAL)
Awd $40.00$1.00
2 $40.00$1.00
3 $40.00$1.00
4 $40.00$1.00
5 $40.00$1.00
6 $44.00$1.10
7 $40.00$1.00
8 $40.00$1.00
Ref #540 659E40000 MOWING, (16 MSF)
Awd $16.00$1.00
2 $16.00$1.00
3 $16.00$1.00
4 $16.00$1.00
5 $16.00$1.00
6 $17.60$1.10
7 $16.00$1.00
8 $16.00$1.00
Ref #541 832E15000 STORM WATER POLLUTION PREVENTION PLAN (WT: NR), (LUMP SUM)
Awd $11,000.00$11,000.00
2 $4,335.00$4,335.00
3 $11,987.55$11,987.55
4 $25,500.00$25,500.00
5 $1,500.00$1,500.00
6 $8,000.00$8,000.00
7 $3,068.18$3,068.18
8 $5,000.00$5,000.00
Ref #542 832E30000 EROSION CONTROL (WT: 08), (16500 EACH)
Awd $16,500.00$1.00
2 $16,500.00$1.00
3 $16,500.00$1.00
4 $16,500.00$1.00
5 $16,500.00$1.00
6 $16,500.00$1.00
7 $16,500.00$1.00
8 $16,500.00$1.00
Section 23 - DEMOLITION - Totals
Awd $1,370,952.80
2 $1,274,938.37
3 $1,717,962.94
4 $3,042,050.60
5 $1,960,853.50
6 $2,155,604.60
7 $2,195,340.15
8 $2,562,406.25
110628 - Page 99
Ref #543 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)
Awd $40,000.00$40,000.00
2 $22,994.04$22,994.04
3 $100,000.00$100,000.00
4 $438,820.00$438,820.00
5 $45,000.00$45,000.00
6 $25,000.00$25,000.00
7 $45,000.00$45,000.00
8 $40,000.00$40,000.00
Ref #544 100E50000 SPECIAL - DISPUTE REVIEW BOARD (WT: NR) (WT: NR), (LUMP SUM)
Awd $144,000.00$144,000.00
2 $144,000.00$144,000.00
3 $144,000.00$144,000.00
4 $144,000.00$144,000.00
5 $144,000.00$144,000.00
6 $144,000.00$144,000.00
7 $144,000.00$144,000.00
8 $144,000.00$144,000.00
Ref #545 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $524,665.00$524,665.00
2 $805,718.14$805,718.14
3 $750,000.00$750,000.00
4 $668,539.61$668,539.61
5 $446,000.00$446,000.00
6 $1,020,000.00$1,020,000.00
7 $700,000.00$700,000.00
8 $870,000.00$870,000.00
Ref #546 108E10000 SPECIAL - CPM PROGRESS SCHEDULE (WT: NR) (WT: NR, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $40,938.12$40,938.12
3 $1.00$1.00
4 $10,000.00$10,000.00
5 $42,500.00$42,500.00
6 $450,000.00$450,000.00
7 $25,000.00$25,000.00
8 $200,000.00$200,000.00
Ref #547 614E11000 MAINTAINING TRAFFIC (WT: 39) (WT: 39), (LUMP SUM)
Awd $125,000.00$125,000.00
2 $400,000.00$400,000.00
3 $100,000.00$100,000.00
4 $101,200.00$101,200.00
5 $260,975.00$260,975.00
6 $115,000.00$115,000.00
7 $300,000.00$300,000.00
8 $100,000.00$100,000.00
Ref #548 619E16020 FIELD OFFICE, TYPE C (WT: NR) (WT: NR), (48 MNTH)
Awd $240,000.00$5,000.00
2 $288,000.00$6,000.00
3 $120,000.00$2,500.00
4 $361,920.00$7,540.00
5 $235,200.00$4,900.00
6 $288,000.00$6,000.00
7 $288,000.00$6,000.00
8 $67,200.00$1,400.00
110628 - Page 100
Ref #549 623E10000 CONSTRUCTION LAYOUT STAKES (WT: NR) (WT: NR), (LUMP SUM)
Awd $350,000.00$350,000.00
2 $400,000.00$400,000.00
3 $300,000.00$300,000.00
4 $252,250.00$252,250.00
5 $800,000.00$800,000.00
6 $1,000,000.00$1,000,000.00
7 $700,000.00$700,000.00
8 $650,000.00$650,000.00
Ref #550 624E10000 MOBILIZATION (WT: NR) (WT: NR), (LUMP SUM)
Awd $2,000,000.00$2,000,000.00
2 $2,000,000.00$2,000,000.00
3 $2,000,000.00$2,000,000.00
4 $2,000,000.00$2,000,000.00
5 $2,000,000.00$2,000,000.00
6 $2,000,000.00$2,000,000.00
7 $2,000,000.00$2,000,000.00
8 $2,000,000.00$2,000,000.00
Section 24 - INCIDENTALS - Totals
Awd $3,448,665.00
2 $4,101,650.30
3 $3,514,001.00
4 $3,976,729.61
5 $3,973,675.00
6 $5,042,000.00
7 $4,202,000.00
8 $4,071,200.00
110628 - Page 101
Project No. 120001
PID 86041
ASD-TR-T.R.1275-1.58
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 9/30/2012
Award Amount: $416,875.03
Contract Awarded To: R & I CONSTRUCTION INC
Letting Date: 1/12/2012
Engineer's Estimate: $566,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
R & I CONSTRUCTION INC
2931 STATE ROUTE 67 SOUTH
TIFFIN, OH 44883
Seneca
Bidder 1
Bid $416,875.03
V O MENUEZ & SON INC
1016 S WASHINGTON ST
MILLERSBURG, OH 44654
Holmes
Bidder 2
Bid $436,989.53
RIETSCHLIN CONSTRUCTION INC
4240 BAKER RD
CRESTLINE, OH 44827
Crawford
Bidder 3
Bid $486,867.20
BOG CONSTRUCTION INC
8235 HUXLEY RD
BERLIN CENTER, OH 44401
Mahoning
Bidder 4
Bid $487,707.56
SHELLY & SANDS INC
3570 SOUTH RIVER RD
ZANESVILLE, OH 43701
Muskingum
Bidder 5
Bid $564,080.30
DOT CONSTRUCTION CORP
535 NORTH BROAD ST STE 5
CANFIELD, OH 44406
Mahoning
Bidder 6
Bid $642,376.56
120001 - Page 102
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $465.00$465.00
3 $1,500.00$1,500.00
4 $3,200.00$3,200.00
5 $1,061.00$1,061.00
6 $3,000.00$3,000.00
Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (550 SY)
Awd $1,650.00$3.00
2 $1,650.00$3.00
3 $7,700.00$14.00
4 $8,250.00$15.00
5 $4,400.00$8.00
6 $5,500.00$10.00
Ref #3 202E23500 WEARING COURSE REMOVED, (92 SY)
Awd $1,426.00$15.50
2 $1,196.00$13.00
3 $1,150.00$12.50
4 $1,564.00$17.00
5 $5,290.00$57.50
6 $1,104.00$12.00
Ref #4 203E10000 EXCAVATION, (644 CY)
Awd $3,220.00$5.00
2 $9,016.00$14.00
3 $6,440.00$10.00
4 $7,728.00$12.00
5 $11,327.96$17.59
6 $9,660.00$15.00
Ref #5 203E20000 EMBANKMENT, (726 CY)
Awd $6,534.00$9.00
2 $10,164.00$14.00
3 $7,260.00$10.00
4 $8,712.00$12.00
5 $6,897.00$9.50
6 $14,520.00$20.00
Ref #6 204E10000 SUBGRADE COMPACTION, (1410 SY)
Awd $1,410.00$1.00
2 $987.00$0.70
3 $1,410.00$1.00
4 $2,115.00$1.50
5 $3,102.00$2.20
6 $2,820.00$2.00
Ref #7 604E38500 MONUMENT ASSEMBLY, (4 EACH)
Awd $2,000.00$500.00
2 $2,800.00$700.00
3 $2,800.00$700.00
4 $2,200.00$550.00
5 $3,160.00$790.00
6 $3,200.00$800.00
120001 - Page 103
Ref #8 606E13000 GUARDRAIL, TYPE 5, (350 FT)
Awd $4,865.00$13.90
2 $4,900.00$14.00
3 $4,900.00$14.00
4 $5,250.00$15.00
5 $5,425.00$15.50
6 $4,865.00$13.90
Ref #9 606E25000 ANCHOR ASSEMBLY, TYPE A, (2 EACH)
Awd $1,790.00$895.00
2 $1,850.00$925.00
3 $1,856.00$928.00
4 $2,000.00$1,000.00
5 $1,932.00$966.00
6 $1,790.00$895.00
Ref #10 606E26500 ANCHOR ASSEMBLY, TYPE T, (2 EACH)
Awd $1,260.00$630.00
2 $1,150.00$575.00
3 $1,122.00$561.00
4 $1,400.00$700.00
5 $1,170.00$585.00
6 $1,260.00$630.00
Ref #11 606E32160 BRIDGE TERMINAL ASSEMBLY, TYPE TST, (4 EACH)
Awd $4,760.00$1,190.00
2 $4,100.00$1,025.00
3 $4,140.00$1,035.00
4 $5,200.00$1,300.00
5 $4,312.00$1,078.00
6 $4,760.00$1,190.00
Section 1 - ROADWAY - Totals
Awd $29,915.00
2 $38,278.00
3 $40,278.00
4 $47,619.00
5 $48,076.96
6 $52,479.00
Ref #12 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (46 CY)
Awd $2,760.00$60.00
2 $4,027.30$87.55
3 $3,496.00$76.00
4 $1,840.00$40.00
5 $4,968.00$108.00
6 $4,600.00$100.00
Ref #13 659E00300 TOPSOIL, (303 CY)
Awd $3,030.00$10.00
2 $1,672.56$5.52
3 $7,575.00$25.00
4 $7,272.00$24.00
5 $7,575.00$25.00
6 $6,666.00$22.00
120001 - Page 104
Ref #14 659E10000 SEEDING AND MULCHING, (2724 SY)
Awd $2,724.00$1.00
2 $2,724.00$1.00
3 $2,724.00$1.00
4 $4,086.00$1.50
5 $2,941.92$1.08
6 $1,443.72$0.53
Ref #15 659E14000 REPAIR SEEDING AND MULCHING, (137 SY)
Awd $13.70$0.10
2 $34.25$0.25
3 $137.00$1.00
4 $137.00$1.00
5 $76.72$0.56
6 $137.00$1.00
Ref #16 659E20000 COMMERCIAL FERTILIZER, (0.37 TON)
Awd $185.00$500.00
2 $314.50$850.00
3 $296.00$800.00
4 $370.00$1,000.00
5 $197.95$535.00
6 $259.00$700.00
Ref #17 659E31000 LIME, (0.57 ACRE)
Awd $5.70$10.00
2 $159.60$280.00
3 $57.00$100.00
4 $57.00$100.00
5 $303.81$533.00
6 $57.00$100.00
Ref #18 659E35000 WATER, (15 MGAL)
Awd $15.00$1.00
2 $75.00$5.00
3 $75.00$5.00
4 $15.00$1.00
5 $16.35$1.09
6 $15.00$1.00
Ref #19 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $3,600.00$3,600.00
2 $4,500.00$4,500.00
3 $2,000.00$2,000.00
4 $5,000.00$5,000.00
5 $5,655.00$5,655.00
6 $4,000.00$4,000.00
Ref #20 832E30000 EROSION CONTROL, (6000 EACH)
Awd $6,000.00$1.00
2 $6,000.00$1.00
3 $6,000.00$1.00
4 $6,000.00$1.00
5 $6,000.00$1.00
6 $6,000.00$1.00
120001 - Page 105
Section 2 - EROSION CONTROL - Totals
Awd $18,333.40
2 $19,507.21
3 $22,360.00
4 $24,777.00
5 $27,734.75
6 $23,177.72
Ref #21 603E01800 8" CONDUIT, TYPE B, (50 FT)
Awd $250.00$5.00
2 $250.00$5.00
3 $1,000.00$20.00
4 $300.00$6.00
5 $750.00$15.00
6 $600.00$12.00
Ref #22 603E02500 8" CONDUIT, TYPE E, (50 FT)
Awd $250.00$5.00
2 $200.00$4.00
3 $700.00$14.00
4 $300.00$6.00
5 $750.00$15.00
6 $600.00$12.00
Ref #23 603E02600 8" CONDUIT, TYPE F, (50 FT)
Awd $250.00$5.00
2 $200.00$4.00
3 $700.00$14.00
4 $300.00$6.00
5 $750.00$15.00
6 $600.00$12.00
Ref #24 603E04900 12" CONDUIT, TYPE D, (150 FT)
Awd $3,000.00$20.00
2 $3,075.00$20.50
3 $3,450.00$23.00
4 $3,750.00$25.00
5 $7,800.00$52.00
6 $3,750.00$25.00
Ref #25 605E31100 AGGREGATE DRAINS, (126 FT)
Awd $882.00$7.00
2 $808.92$6.42
3 $1,512.00$12.00
4 $1,260.00$10.00
5 $3,150.00$25.00
6 $2,520.00$20.00
Section 3 - DRAINAGE - Totals
Awd $4,632.00
2 $4,533.92
3 $7,362.00
4 $5,910.00
5 $13,200.00
6 $8,070.00
120001 - Page 106
Ref #26 301E46000 ASPHALT CONCRETE BASE, PG64-22, (122 CY)
Awd $18,300.00$150.00
2 $18,422.00$151.00
3 $18,666.00$153.00
4 $19,520.00$160.00
5 $20,374.00$167.00
6 $18,300.00$150.00
Ref #27 304E20000 AGGREGATE BASE, (226 CY)
Awd $7,910.00$35.00
2 $10,418.60$46.10
3 $12,204.00$54.00
4 $11,752.00$52.00
5 $16,950.00$75.00
6 $13,560.00$60.00
Ref #28 407E10000 TACK COAT, (113 GAL)
Awd $282.50$2.50
2 $632.80$5.60
3 $339.00$3.00
4 $565.00$5.00
5 $226.00$2.00
6 $282.50$2.50
Ref #29 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (52 GAL)
Awd $130.00$2.50
2 $135.20$2.60
3 $156.00$3.00
4 $520.00$10.00
5 $104.00$2.00
6 $130.00$2.50
Ref #30 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (51 CY)
Awd $7,905.00$155.00
2 $8,007.00$157.00
3 $8,058.00$158.00
4 $8,568.00$168.00
5 $9,333.00$183.00
6 $7,905.00$155.00
Ref #31 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (40 CY)
Awd $6,600.00$165.00
2 $6,680.00$167.00
3 $6,720.00$168.00
4 $7,000.00$175.00
5 $8,280.00$207.00
6 $6,600.00$165.00
Ref #32 448E48020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 (, (4 CY)
Awd $740.00$185.00
2 $760.00$190.00
3 $756.00$189.00
4 $800.00$200.00
5 $1,200.00$300.00
6 $740.00$185.00
120001 - Page 107
Section 4 - PAVEMENT - Totals
Awd $41,867.50
2 $45,055.60
3 $46,899.00
4 $48,725.00
5 $56,467.00
6 $47,517.50
Ref #33 626E00100 BARRIER REFLECTOR, (8 EACH)
Awd $50.80$6.35
2 $72.00$9.00
3 $80.00$10.00
4 $96.00$12.00
5 $80.00$10.00
6 $50.80$6.35
Ref #34 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, (7 EACH)
Awd $70.00$10.00
2 $35.00$5.00
3 $140.00$20.00
4 $350.00$50.00
5 $119.00$17.00
6 $105.00$15.00
Ref #35 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (6 EACH)
Awd $60.00$10.00
2 $30.00$5.00
3 $90.00$15.00
4 $120.00$20.00
5 $102.00$17.00
6 $60.00$10.00
Ref #36 630E86006 REMOVAL OF GROUND MOUNTED POST SUPPORT AND STORAGE, (1 EACH)
Awd $10.00$10.00
2 $5.00$5.00
3 $15.00$15.00
4 $100.00$100.00
5 $17.00$17.00
6 $15.00$15.00
Ref #37 642E00300 CENTER LINE, TYPE 1, (0.07 MILE)
Awd $2,100.00$30,000.00
2 $1,120.00$16,000.00
3 $1,057.00$15,100.00
4 $840.00$12,000.00
5 $1,101.45$15,735.00
6 $1,272.39$18,177.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $2,290.80
2 $1,262.00
3 $1,382.00
4 $1,506.00
5 $1,419.45
6 $1,503.19
120001 - Page 108
Ref #38 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (10 CY)
Awd $250.00$25.00
2 $150.00$15.00
3 $500.00$50.00
4 $400.00$40.00
5 $2,050.00$205.00
6 $1,000.00$100.00
Ref #39 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $1,979.18$1,979.18
2 $4,200.00$4,200.00
3 $4,500.00$4,500.00
4 $3,500.00$3,500.00
5 $4,425.00$4,425.00
6 $2,540.00$2,540.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $2,229.18
2 $4,350.00
3 $5,000.00
4 $3,900.00
5 $6,475.00
6 $3,540.00
Ref #40 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $20,240.00$20,240.00
3 $24,000.00$24,000.00
4 $25,000.00$25,000.00
5 $19,600.00$19,600.00
6 $90,000.00$90,000.00
Ref #41 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $1,000.00$1,000.00
3 $10,600.00$10,600.00
4 $2,000.00$2,000.00
5 $18,900.00$18,900.00
6 $40,000.00$40,000.00
Ref #42 503E21100 UNCLASSIFIED EXCAVATION, (103 CY)
Awd $3,090.00$30.00
2 $4,120.00$40.00
3 $3,605.00$35.00
4 $3,090.00$30.00
5 $10,918.00$106.00
6 $5,150.00$50.00
Ref #43 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $2,000.00$2,000.00
3 $25,000.00$25,000.00
4 $26,000.00$26,000.00
5 $16,600.00$16,600.00
6 $21,000.00$21,000.00
120001 - Page 109
Ref #44 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE, (480 FT)
Awd $2,400.00$5.00
2 $4,320.00$9.00
3 $5,280.00$11.00
4 $5,040.00$10.50
5 $11,040.00$23.00
6 $5,760.00$12.00
Ref #45 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI, (540 FT)
Awd $18,900.00$35.00
2 $14,040.00$26.00
3 $15,120.00$28.00
4 $22,140.00$41.00
5 $12,420.00$23.00
6 $21,600.00$40.00
Ref #46 507E00700 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE, (520 FT)
Awd $2,600.00$5.00
2 $8,320.00$16.00
3 $6,240.00$12.00
4 $8,320.00$16.00
5 $8,580.00$16.50
6 $7,800.00$15.00
Ref #47 507E00750 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI, (560 FT)
Awd $28,000.00$50.00
2 $20,720.00$37.00
3 $28,000.00$50.00
4 $40,320.00$72.00
5 $21,000.00$37.50
6 $36,400.00$65.00
Ref #48 509E10000 EPOXY COATED REINFORCING STEEL, (42898 LB)
Awd $64,347.00$1.50
2 $42,898.00$1.00
3 $42,898.00$1.00
4 $42,898.00$1.00
5 $45,042.90$1.05
6 $42,898.00$1.00
Ref #49 511E42501 CLASS C CONCRETE, PIER CAP, AS PER PLAN, (10 CY)
Awd $7,000.00$700.00
2 $11,300.00$1,130.00
3 $12,600.00$1,260.00
4 $13,000.00$1,300.00
5 $20,520.00$2,052.00
6 $10,000.00$1,000.00
Ref #50 511E43501 CLASS C CONCRETE, ABUTMENT INCLUDING FOOTING, AS P, (48 CY)
Awd $21,600.00$450.00
2 $25,680.00$535.00
3 $22,464.00$468.00
4 $18,240.00$380.00
5 $30,384.00$633.00
6 $33,600.00$700.00
120001 - Page 110
Ref #51 511E50001 CLASS HP CONCRETE, BRIDGE DECK, AS PER PLAN, (145 CY)
Awd $79,750.00$550.00
2 $68,150.00$470.00
3 $71,340.00$492.00
4 $46,400.00$320.00
5 $95,845.00$661.00
6 $87,000.00$600.00
Ref #52 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)
Awd $500.00$500.00
2 $1,000.00$1,000.00
3 $2,600.00$2,600.00
4 $650.00$650.00
5 $1,163.00$1,163.00
6 $900.00$900.00
Ref #53 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (135 SY)
Awd $2,700.00$20.00
2 $3,564.00$26.40
3 $6,210.00$46.00
4 $2,565.00$19.00
5 $2,970.00$22.00
6 $3,375.00$25.00
Ref #54 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (41 SF)
Awd $123.00$3.00
2 $205.00$5.00
3 $205.00$5.00
4 $410.00$10.00
5 $205.00$5.00
6 $410.00$10.00
Ref #55 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (68 SF)
Awd $272.00$4.00
2 $680.00$10.00
3 $340.00$5.00
4 $816.00$12.00
5 $272.00$4.00
6 $1,360.00$20.00
Ref #56 516E14015 INTEGRAL ABUTMENT EXPANSION JOINT SEAL, AS PER PLA, (77 FT)
Awd $1,540.00$20.00
2 $2,310.00$30.00
3 $2,310.00$30.00
4 $2,310.00$30.00
5 $1,925.00$25.00
6 $2,310.00$30.00
Ref #57 517E70000 RAILING (TWIN STEEL TUBE), (197.34 FT)
Awd $24,174.15$122.50
2 $33,547.80$170.00
3 $25,654.20$130.00
4 $26,443.56$134.00
5 $26,838.24$136.00
6 $24,174.15$122.50
120001 - Page 111
Ref #58 518E21201 POROUS BACKFILL WITH FILTER FABRIC, AS PER PLAN, (46 CY)
Awd $2,530.00$55.00
2 $4,600.00$100.00
3 $2,576.00$56.00
4 $2,990.00$65.00
5 $4,324.00$94.00
6 $2,760.00$60.00
Ref #59 518E22300 SPECIAL - STEEL DRIP STRIP, (114 FT)
Awd $912.00$8.00
2 $1,140.00$10.00
3 $1,482.00$13.00
4 $1,368.00$12.00
5 $1,710.00$15.00
6 $1,368.00$12.00
Ref #60 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (84 FT)
Awd $588.00$7.00
2 $588.00$7.00
3 $672.00$8.00
4 $840.00$10.00
5 $420.00$5.00
6 $1,008.00$12.00
Ref #61 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (43 FT)
Awd $301.00$7.00
2 $301.00$7.00
3 $430.00$10.00
4 $430.00$10.00
5 $258.00$6.00
6 $516.00$12.00
Ref #62 523E20000 DYNAMIC LOAD TESTING, (2 EACH)
Awd $4,780.00$2,390.00
2 $4,460.00$2,230.00
3 $10,000.00$5,000.00
4 $10,000.00$5,000.00
5 $8,360.00$4,180.00
6 $9,000.00$4,500.00
Ref #63 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12"), (80 SY)
Awd $16,000.00$200.00
2 $14,800.00$185.00
3 $14,560.00$182.00
4 $14,000.00$175.00
5 $19,200.00$240.00
6 $16,000.00$200.00
Section 7 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $299,607.15
2 $289,983.80
3 $334,186.20
4 $315,270.56
5 $378,495.14
6 $464,389.15
120001 - Page 112
Ref #64 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,000.00$5,000.00
3 $11,000.00$11,000.00
4 $18,000.00$18,000.00
5 $3,126.00$3,126.00
6 $6,500.00$6,500.00
Ref #65 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $6,000.00$6,000.00
3 $2,600.00$2,600.00
4 $5,500.00$5,500.00
5 $2,531.00$2,531.00
6 $10,000.00$10,000.00
Ref #66 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)
Awd $500.00$500.00
2 $1,819.00$1,819.00
3 $3,800.00$3,800.00
4 $1,500.00$1,500.00
5 $6,555.00$6,555.00
6 $4,000.00$4,000.00
Ref #67 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $21,200.00$21,200.00
3 $12,000.00$12,000.00
4 $15,000.00$15,000.00
5 $20,000.00$20,000.00
6 $21,200.00$21,200.00
Section 8 - INCIDENTALS - Totals
Awd $18,000.00
2 $34,019.00
3 $29,400.00
4 $40,000.00
5 $32,212.00
6 $41,700.00
120001 - Page 113
Project No. 120003
PID 84365
CAR-SR-164-0.00
Federal
Type: TWO LANE RESURFACING
Completion Date: 6/30/2012
Award Amount: $1,136,256.00
Contract Awarded To: NEWTON ASPHALT PAVING INC
Letting Date: 1/12/2012
Engineer's Estimate: $1,143,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
NEWTON ASPHALT PAVING INC
8344 CENTRAL RD NW
STRASBURG, OH 44680
Tuscarawas
Bidder 1
Bid $1,136,256.00
SHELLY & SANDS INC
3570 SOUTH RIVER RD
ZANESVILLE, OH 43701
Muskingum
Bidder 2
Bid $1,191,438.25
SUPERIOR PAVING & MATERIALS INC
5945 WHIPPLE AVE NW
NORTH CANTON, OH 44720
Stark
Bidder 3
Bid $1,209,288.73
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 4
Bid $1,272,944.25
LASH PAVING INC
P O BOX 296
COLERAIN, OH 43916
Belmont
Bidder 5
Bid $1,279,868.10
BARBICAS CONSTRUCTION COMPANY INC
124 DARROW RD
AKRON, OH 44305
Summit
Bidder 6
Bid $1,377,261.42
BURTON SCOT CONTRACTORS LLC
11330 KINSMAN RD
NEWBURY, OH 44065
Geauga
Bidder 7
Bid $1,416,302.70
120003 - Page 114
Ref #1 202E23500 WEARING COURSE REMOVED, (1075 SY)
Awd $8,600.00$8.00
2 $10,750.00$10.00
3 $9,352.50$8.70
4 $7,525.00$7.00
5 $6,450.00$6.00
6 $7,525.00$7.00
7 $21,500.00$20.00
Section 1 - ROADWAY - Totals
Awd $8,600.00
2 $10,750.00
3 $9,352.50
4 $7,525.00
5 $6,450.00
6 $7,525.00
7 $21,500.00
Ref #2 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
6 $1,000.00$1.00
7 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
5 $1,000.00
6 $1,000.00
7 $1,000.00
Ref #3 605E31101 AGGREGATE DRAINS, AS PER PLAN, (650 FT)
Awd $3,250.00$5.00
2 $5,200.00$8.00
3 $2,762.50$4.25
4 $3,250.00$5.00
5 $4,777.50$7.35
6 $6,500.00$10.00
7 $9,750.00$15.00
120003 - Page 115
Section 3 - DRAINAGE - Totals
Awd $3,250.00
2 $5,200.00
3 $2,762.50
4 $3,250.00
5 $4,777.50
6 $6,500.00
7 $9,750.00
Ref #4 253E02000 PAVEMENT REPAIR, (325 CY)
Awd $61,750.00$190.00
2 $73,125.00$225.00
3 $63,375.00$195.00
4 $95,875.00$295.00
5 $74,100.00$228.00
6 $81,250.00$250.00
7 $105,625.00$325.00
Ref #5 407E10000 TACK COAT, (9050 GAL)
Awd $18,100.00$2.00
2 $18,100.00$2.00
3 $20,362.50$2.25
4 $16,742.50$1.85
5 $23,530.00$2.60
6 $18,100.00$2.00
7 $22,625.00$2.50
Ref #6 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (3423 GAL)
Awd $6,846.00$2.00
2 $6,846.00$2.00
3 $7,701.75$2.25
4 $6,332.55$1.85
5 $8,899.80$2.60
6 $6,846.00$2.00
7 $8,557.50$2.50
Ref #7 408E10001 PRIME COAT, AS PER PLAN, (6731 GAL)
Awd $23,558.50$3.50
2 $21,875.75$3.25
3 $21,875.75$3.25
4 $17,837.15$2.65
5 $24,568.15$3.65
6 $26,924.00$4.00
7 $26,924.00$4.00
Ref #8 422E10000 SINGLE CHIP SEAL, (80005 SY)
Awd $140,808.80$1.76
2 $148,009.25$1.85
3 $140,008.75$1.75
4 $142,408.90$1.78
5 $134,408.40$1.68
6 $139,208.70$1.74
7 $139,208.70$1.74
120003 - Page 116
Ref #9 448E46020 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, PG64, (1189 CY)
Awd $142,680.00$120.00
2 $156,948.00$132.00
3 $154,570.00$130.00
4 $160,515.00$135.00
5 $159,920.50$134.50
6 $190,240.00$160.00
7 $190,240.00$160.00
Ref #10 448E46905 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG70-22M,, (3439 CY)
Awd $464,265.00$135.00
2 $505,533.00$147.00
3 $502,094.00$146.00
4 $498,655.00$145.00
5 $511,895.15$148.85
6 $567,435.00$165.00
7 $567,435.00$165.00
Ref #11 448E48021 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 (, (384 CY)
Awd $59,520.00$155.00
2 $74,880.00$195.00
3 $76,800.00$200.00
4 $55,680.00$145.00
5 $76,800.00$200.00
6 $76,800.00$200.00
7 $99,840.00$260.00
Ref #12 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (818 CY)
Awd $20,450.00$25.00
2 $40,900.00$50.00
3 $40,900.00$50.00
4 $31,697.50$38.75
5 $41,309.00$50.50
6 $32,720.00$40.00
7 $53,170.00$65.00
Ref #13 617E20000 SHOULDER PREPARATION, (16826 SY)
Awd $1,682.60$0.10
2 $2,523.90$0.15
3 $2,355.64$0.14
4 $4,206.50$0.25
5 $2,355.64$0.14
6 $8,413.00$0.50
7 $25,239.00$1.50
Section 4 - PAVEMENT - Totals
Awd $939,660.90
2 $1,048,740.90
3 $1,030,043.39
4 $1,029,950.10
5 $1,057,786.64
6 $1,147,936.70
7 $1,238,864.20
120003 - Page 117
Ref #14 621E00100 RPM, (960 EACH)
Awd $15,360.00$16.00
2 $15,360.00$16.00
3 $13,344.00$13.90
4 $13,344.00$13.90
5 $13,344.00$13.90
6 $14,899.20$15.52
7 $15,744.00$16.40
Ref #15 621E54000 RAISED PAVEMENT MARKER REMOVED, (960 EACH)
Awd $3,840.00$4.00
2 $5,760.00$6.00
3 $5,856.00$6.10
4 $4,800.00$5.00
5 $7,200.00$7.50
6 $3,840.00$4.00
7 $4,800.00$5.00
Ref #16 642E00100 EDGE LINE, TYPE 1, (14.54 MILE)
Awd $7,560.80$520.00
2 $7,124.60$490.00
3 $6,746.56$464.00
4 $6,746.56$464.00
5 $7,080.98$487.00
6 $7,531.72$518.00
7 $6,746.56$464.00
Ref #17 642E00300 CENTER LINE, TYPE 1, (7.27 MILE)
Awd $5,743.30$790.00
2 $5,816.00$800.00
3 $5,576.09$767.00
4 $5,576.09$767.00
5 $6,099.53$839.00
6 $5,706.95$785.00
7 $5,576.09$767.00
Ref #18 642E00500 STOP LINE, TYPE 1, (87 FT)
Awd $435.00$5.00
2 $456.75$5.25
3 $435.00$5.00
4 $435.00$5.00
5 $304.50$3.50
6 $435.00$5.00
7 $435.00$5.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $32,939.10
2 $34,517.35
3 $31,957.65
4 $30,901.65
5 $34,029.01
6 $32,412.87
7 $33,301.65
120003 - Page 118
Ref #19 614E12460 WORK ZONE MARKING SIGN, (56 EACH)
Awd $3,640.00$65.00
2 $8,120.00$145.00
3 $3,640.00$65.00
4 $3,640.00$65.00
5 $7,560.00$135.00
6 $6,048.00$108.00
7 $6,048.00$108.00
Ref #20 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (36.35 MILE)
Awd $42,166.00$1,160.00
2 $21,810.00$600.00
3 $34,032.69$936.25
4 $23,627.50$650.00
5 $70,409.95$1,937.00
6 $41,838.85$1,151.00
7 $41,838.85$1,151.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $45,806.00
2 $29,930.00
3 $37,672.69
4 $27,267.50
5 $77,969.95
6 $47,886.85
7 $47,886.85
Ref #21 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $4,800.00$4,800.00
3 $11,000.00$11,000.00
4 $3,500.00$3,500.00
5 $5,120.00$5,120.00
6 $9,000.00$9,000.00
7 $8,000.00$8,000.00
Ref #22 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $65,000.00$65,000.00
2 $43,500.00$43,500.00
3 $45,500.00$45,500.00
4 $120,450.00$120,450.00
5 $42,735.00$42,735.00
6 $85,000.00$85,000.00
7 $35,000.00$35,000.00
Ref #23 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $13,000.00$13,000.00
3 $40,000.00$40,000.00
4 $49,100.00$49,100.00
5 $50,000.00$50,000.00
6 $40,000.00$40,000.00
7 $21,000.00$21,000.00
120003 - Page 119
Section 7 - INCIDENTALS - Totals
Awd $105,000.00
2 $61,300.00
3 $96,500.00
4 $173,050.00
5 $97,855.00
6 $134,000.00
7 $64,000.00
120003 - Page 120
Project No. 120004
PID 83891
FRA-SR-16-9.64
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 10/30/2012
Award Amount: $818,205.60
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 1/12/2012
Engineer's Estimate: $888,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
3570 SOUTH RIVER RD
ZANESVILLE, OH 43701
Muskingum
Bidder 1
Bid $818,205.60
BUDS INC
6260 NEWARK RD
NASHPORT, OH 43830
Muskingum
Bidder 2
Bid $824,217.60
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 3
Bid $826,321.75
DOUBLE Z CONSTRUCTION COMPANY
2550 HARRISON RD
COLUMBUS, OH 43204
Franklin
Bidder 4
Bid $869,889.94
GEORGE J IGEL & CO INC
2040 ALUM CREEK DR
COLUMBUS, OH 43207
Franklin
Bidder 5
Bid $969,196.43
120004 - Page 121
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $2,500.00$2,500.00
3 $9,500.00$9,500.00
4 $1,000.00$1,000.00
5 $5,000.00$5,000.00
Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (950 SY)
Awd $7,600.00$8.00
2 $9,500.00$10.00
3 $7,600.00$8.00
4 $3,800.00$4.00
5 $9,500.00$10.00
Ref #3 202E32000 CURB REMOVED, (40 FT)
Awd $280.00$7.00
2 $400.00$10.00
3 $200.00$5.00
4 $600.00$15.00
5 $400.00$10.00
Ref #4 202E35100 PIPE REMOVED, 24" AND UNDER, (20 FT)
Awd $280.00$14.00
2 $300.00$15.00
3 $80.00$4.00
4 $200.00$10.00
5 $160.00$8.00
Ref #5 202E38000 GUARDRAIL REMOVED, (449 FT)
Awd $673.50$1.50
2 $673.50$1.50
3 $785.75$1.75
4 $1,391.90$3.10
5 $898.00$2.00
Ref #6 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (1 EACH)
Awd $230.00$230.00
2 $200.00$200.00
3 $195.00$195.00
4 $550.00$550.00
5 $250.00$250.00
Ref #7 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E, (2 EACH)
Awd $160.00$80.00
2 $150.00$75.00
3 $330.00$165.00
4 $550.00$275.00
5 $170.00$85.00
Ref #8 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (1 EACH)
Awd $80.00$80.00
2 $75.00$75.00
3 $55.00$55.00
4 $275.00$275.00
5 $75.00$75.00
120004 - Page 122
Ref #9 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (4 EACH)
Awd $300.00$75.00
2 $300.00$75.00
3 $320.00$80.00
4 $2,100.00$525.00
5 $340.00$85.00
Ref #10 203E20000 EMBANKMENT, (87 CY)
Awd $2,175.00$25.00
2 $2,175.00$25.00
3 $435.00$5.00
4 $4,350.00$50.00
5 $913.50$10.50
Ref #11 204E10000 SUBGRADE COMPACTION, (951 SY)
Awd $1,902.00$2.00
2 $2,853.00$3.00
3 $1,902.00$2.00
4 $1,426.50$1.50
5 $2,710.35$2.85
Ref #12 604E38500 MONUMENT ASSEMBLY, (2 EACH)
Awd $1,160.00$580.00
2 $3,000.00$1,500.00
3 $1,400.00$700.00
4 $1,200.00$600.00
5 $4,600.00$2,300.00
Ref #13 606E13000 GUARDRAIL, TYPE 5, (375 FT)
Awd $5,250.00$14.00
2 $5,062.50$13.50
3 $5,250.00$14.00
4 $5,418.75$14.45
5 $5,437.50$14.50
Ref #14 606E13040 GUARDRAIL, NESTED TYPE 5 WITH TUBULAR BACKUP, (62.5 FT)
Awd $5,937.50$95.00
2 $5,625.00$90.00
3 $6,081.25$97.30
4 $8,562.50$137.00
5 $6,125.00$98.00
Ref #15 606E20000 FLARED END SECTION, (2 EACH)
Awd $96.00$48.00
2 $90.00$45.00
3 $126.00$63.00
4 $114.00$57.00
5 $98.00$49.00
Ref #16 606E26100 ANCHOR ASSEMBLY, TYPE E, (2 EACH)
Awd $3,800.00$1,900.00
2 $3,700.00$1,850.00
3 $3,760.00$1,880.00
4 $3,950.00$1,975.00
5 $4,020.00$2,010.00
120004 - Page 123
Ref #17 606E26500 ANCHOR ASSEMBLY, TYPE T, (2 EACH)
Awd $1,260.00$630.00
2 $1,200.00$600.00
3 $1,170.00$585.00
4 $1,150.00$575.00
5 $1,300.00$650.00
Ref #18 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4, (3 EACH)
Awd $1,890.00$630.00
2 $1,800.00$600.00
3 $1,740.00$580.00
4 $2,910.00$970.00
5 $1,950.00$650.00
Ref #19 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN, (1 EACH)
Awd $740.00$740.00
2 $700.00$700.00
3 $620.00$620.00
4 $1,200.00$1,200.00
5 $760.00$760.00
Section 1 - ROADWAY - Totals
Awd $35,814.00
2 $40,304.00
3 $41,550.00
4 $40,748.65
5 $44,707.35
Ref #20 659E10000 SEEDING AND MULCHING, (296 SY)
Awd $740.00$2.50
2 $1,480.00$5.00
3 $592.00$2.00
4 $1,332.00$4.50
5 $680.80$2.30
Ref #21 659E14000 REPAIR SEEDING AND MULCHING, (15 SY)
Awd $360.00$24.00
2 $2.25$0.15
3 $15.00$1.00
4 $345.00$23.00
5 $345.00$23.00
Ref #22 659E20000 COMMERCIAL FERTILIZER, (0.05 TON)
Awd $30.00$600.00
2 $40.00$800.00
3 $30.00$600.00
4 $30.00$600.00
5 $30.00$600.00
Ref #23 659E35000 WATER, (5 MGAL)
Awd $25.00$5.00
2 $10.00$2.00
3 $5.00$1.00
4 $25.00$5.00
5 $25.00$5.00
120004 - Page 124
Ref #24 670E00500 SLOPE EROSION PROTECTION, (88 SY)
Awd $176.00$2.00
2 $440.00$5.00
3 $264.00$3.00
4 $176.00$2.00
5 $176.00$2.00
Ref #25 832E30000 EROSION CONTROL, (4000 EACH)
Awd $4,000.00$1.00
2 $4,000.00$1.00
3 $4,000.00$1.00
4 $4,000.00$1.00
5 $4,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $5,331.00
2 $5,972.25
3 $4,906.00
4 $5,908.00
5 $5,256.80
Ref #26 603E03600 10" CONDUIT, TYPE E, (50 FT)
Awd $2,250.00$45.00
2 $1,250.00$25.00
3 $1,100.00$22.00
4 $500.00$10.00
5 $1,200.00$24.00
Section 3 - DRAINAGE - Totals
Awd $2,250.00
2 $1,250.00
3 $1,100.00
4 $500.00
5 $1,200.00
Ref #27 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (11617 SY)
Awd $29,042.50$2.50
2 $14,521.25$1.25
3 $11,617.00$1.00
4 $29,042.50$2.50
5 $26,138.25$2.25
Ref #28 301E46000 ASPHALT CONCRETE BASE, PG64-22, (274 CY)
Awd $42,470.00$155.00
2 $47,676.00$174.00
3 $47,539.00$173.50
4 $42,470.00$155.00
5 $54,800.00$200.00
Ref #29 304E20000 AGGREGATE BASE, (159 CY)
Awd $10,335.00$65.00
2 $11,130.00$70.00
3 $7,155.00$45.00
4 $7,155.00$45.00
5 $7,433.25$46.75
120004 - Page 125
Ref #30 407E10000 TACK COAT, (872 GAL)
Awd $1,744.00$2.00
2 $1,744.00$2.00
3 $1,744.00$2.00
4 $1,744.00$2.00
5 $1,526.00$1.75
Ref #31 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (503 GAL)
Awd $1,006.00$2.00
2 $1,006.00$2.00
3 $1,006.00$2.00
4 $1,006.00$2.00
5 $880.25$1.75
Ref #32 408E10000 PRIME COAT, (381 GAL)
Awd $1,143.00$3.00
2 $381.00$1.00
3 $1,143.00$3.00
4 $1,143.00$3.00
5 $1,714.50$4.50
Ref #33 448E50001 ASPHALT CONCRETE SURFACE COURSE, TYPE 1H, AS PER P, (1048 CY)
Awd $157,200.00$150.00
2 $199,644.00$190.50
3 $199,120.00$190.00
4 $157,200.00$150.00
5 $199,120.00$190.00
Ref #34 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH FABRIC WRAP, (200 FT)
Awd $2,400.00$12.00
2 $3,000.00$15.00
3 $2,400.00$12.00
4 $1,200.00$6.00
5 $2,300.00$11.50
Ref #35 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN, (40 FT)
Awd $4,000.00$100.00
2 $2,000.00$50.00
3 $1,800.00$45.00
4 $2,000.00$50.00
5 $1,840.00$46.00
Section 4 - PAVEMENT - Totals
Awd $249,340.50
2 $281,102.25
3 $273,524.00
4 $242,960.50
5 $295,752.25
Ref #36 621E00100 RPM, (97 EACH)
Awd $2,425.00$25.00
2 $2,328.00$24.00
3 $2,328.00$24.00
4 $2,281.44$23.52
5 $2,328.00$24.00
120004 - Page 126
Ref #37 621E54000 RAISED PAVEMENT MARKER REMOVED, (97 EACH)
Awd $582.00$6.00
2 $388.00$4.00
3 $388.00$4.00
4 $485.00$5.00
5 $679.00$7.00
Ref #38 626E00100 BARRIER REFLECTOR, (8 EACH)
Awd $56.00$7.00
2 $56.00$7.00
3 $64.00$8.00
4 $56.00$7.00
5 $56.00$7.00
Ref #39 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7 FT)
Awd $77.00$11.00
2 $70.00$10.00
3 $71.40$10.20
4 $80.50$11.50
5 $70.00$10.00
Ref #40 630E80100 SIGN, FLAT SHEET, (1 SF)
Awd $75.00$75.00
2 $35.00$35.00
3 $70.00$70.00
4 $29.00$29.00
5 $35.00$35.00
Ref #41 644E00100 EDGE LINE, (0.38 MILE)
Awd $1,520.00$4,000.00
2 $1,558.00$4,100.00
3 $1,546.60$4,070.00
4 $1,546.60$4,070.00
5 $1,453.50$3,825.00
Ref #42 644E00200 LANE LINE, (0.45 MILE)
Awd $810.00$1,800.00
2 $765.00$1,700.00
3 $765.00$1,700.00
4 $765.00$1,700.00
5 $783.00$1,740.00
Ref #43 644E00300 CENTER LINE, (0.44 MILE)
Awd $2,992.00$6,800.00
2 $2,948.00$6,700.00
3 $2,948.00$6,700.00
4 $2,948.00$6,700.00
5 $2,838.00$6,450.00
Ref #44 644E00400 CHANNELIZING LINE, (165 FT)
Awd $247.50$1.50
2 $280.50$1.70
3 $280.50$1.70
4 $280.50$1.70
5 $214.50$1.30
120004 - Page 127
Ref #45 644E00500 STOP LINE, (130 FT)
Awd $1,040.00$8.00
2 $910.00$7.00
3 $910.00$7.00
4 $910.00$7.00
5 $975.00$7.50
Ref #46 644E01300 LANE ARROW, (10 EACH)
Awd $1,000.00$100.00
2 $880.00$88.00
3 $870.00$87.00
4 $870.00$87.00
5 $900.00$90.00
Ref #47 644E01400 WORD ON PAVEMENT, 72", (1 EACH)
Awd $100.00$100.00
2 $128.00$128.00
3 $127.00$127.00
4 $127.00$127.00
5 $100.00$100.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $10,924.50
2 $10,346.50
3 $10,368.50
4 $10,379.04
5 $10,432.00
Ref #48 625E25400 CONDUIT, 2", 725.04, (95 FT)
Awd $1,425.00$15.00
2 $1,425.00$15.00
3 $855.00$9.00
4 $1,045.00$11.00
5 $1,140.00$12.00
Ref #49 625E29000 TRENCH, (95 FT)
Awd $1,425.00$15.00
2 $1,425.00$15.00
3 $522.50$5.50
4 $665.00$7.00
5 $712.50$7.50
Ref #50 625E31451 PULL BOX, AS PER PLAN, (1 EACH)
Awd $650.00$650.00
2 $620.00$620.00
3 $750.00$750.00
4 $550.00$550.00
5 $600.00$600.00
Ref #51 625E31510 PULL BOX REMOVED, (1 EACH)
Awd $160.00$160.00
2 $150.00$150.00
3 $250.00$250.00
4 $125.00$125.00
5 $140.00$140.00
120004 - Page 128
Ref #52 625E32000 GROUND ROD, (1 EACH)
Awd $285.00$285.00
2 $270.00$270.00
3 $150.00$150.00
4 $130.00$130.00
5 $140.00$140.00
Ref #53 632E26501 DETECTOR LOOP, AS PER PLAN, (7 EACH)
Awd $10,500.00$1,500.00
2 $10,150.00$1,450.00
3 $10,500.00$1,500.00
4 $7,525.00$1,075.00
5 $8,190.00$1,170.00
Ref #54 632E27200 LOOP DETECTOR TIE IN, (5 EACH)
Awd $125.00$25.00
2 $125.00$25.00
3 $400.00$80.00
4 $350.00$70.00
5 $380.00$76.00
Ref #55 632E29901 MESSENGER WIRE, 7 STRAND, 1/4" DIAMETER WITH ACCES, (965 FT)
Awd $2,412.50$2.50
2 $2,895.00$3.00
3 $3,377.50$3.50
4 $11,580.00$12.00
5 $12,545.00$13.00
Ref #56 632E30201 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES, (170 FT)
Awd $3,230.00$19.00
2 $2,890.00$17.00
3 $1,445.00$8.50
4 $2,125.00$12.50
5 $2,295.00$13.50
Ref #57 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (260 FT)
Awd $780.00$3.00
2 $780.00$3.00
3 $715.00$2.75
4 $650.00$2.50
5 $715.00$2.75
Ref #58 632E53203 INTERCONNECT CABLE, 6 PAIR, NO. 19 AWG, SOLID, REA, (1050 FT)
Awd $5,250.00$5.00
2 $4,987.50$4.75
3 $4,987.50$4.75
4 $2,835.00$2.70
5 $3,150.00$3.00
Ref #59 632E64001 STRAIN POLE FOUNDATION, AS PER PLAN, (1 EACH)
Awd $3,800.00$3,800.00
2 $3,500.00$3,500.00
3 $3,500.00$3,500.00
4 $3,200.00$3,200.00
5 $3,480.00$3,480.00
120004 - Page 129
Ref #60 632E65200 LOOP DETECTOR LEAD-IN CABLE, (850 FT)
Awd $1,360.00$1.60
2 $1,275.00$1.50
3 $1,147.50$1.35
4 $1,020.00$1.20
5 $1,062.50$1.25
Ref #61 632E70400 CONDUIT RISER, 2" DIAMETER, (1 EACH)
Awd $700.00$700.00
2 $650.00$650.00
3 $450.00$450.00
4 $450.00$450.00
5 $490.00$490.00
Ref #62 632E82701 STRAIN POLE, TYPE TC-81.10, DESIGN 7, AS PER PLAN, (1 EACH)
Awd $4,500.00$4,500.00
2 $4,400.00$4,400.00
3 $5,000.00$5,000.00
4 $4,800.00$4,800.00
5 $5,220.00$5,220.00
Ref #63 632E90300 SIGNALIZATION, MISC.:MESSENGER WIRE ADJUSTMENTS, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,000.00$1,000.00
3 $850.00$850.00
4 $500.00$500.00
5 $540.00$540.00
Ref #64 632E90400 SIGNALIZATION, MISC.:RELOCATE SIGNAL HEAD, (2 EACH)
Awd $800.00$400.00
2 $720.00$360.00
3 $1,050.00$525.00
4 $900.00$450.00
5 $980.00$490.00
Ref #65 632E90400 SIGNALIZATION, MISC.:SLEEVE FOR ANCHOR BASE FOUNDA, (1 EACH)
Awd $200.00$200.00
2 $200.00$200.00
3 $1,000.00$1,000.00
4 $100.00$100.00
5 $1,090.00$1,090.00
Section 6 - TRAFFIC SIGNALS - Totals
Awd $38,602.50
2 $37,462.50
3 $36,950.00
4 $38,550.00
5 $42,870.00
Ref #66 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)
Awd $2,800.00$70.00
2 $2,800.00$70.00
3 $2,800.00$70.00
4 $2,200.00$55.00
5 $2,320.00$58.00
120004 - Page 130
Ref #67 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (6 EACH)
Awd $10,800.00$1,800.00
2 $12,600.00$2,100.00
3 $12,000.00$2,000.00
4 $11,700.00$1,950.00
5 $12,720.00$2,120.00
Ref #68 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $1,200.00$1,200.00
2 $4,500.00$4,500.00
3 $1,800.00$1,800.00
4 $2,500.00$2,500.00
5 $2,500.00$2,500.00
Ref #69 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY)
Awd $4,000.00$200.00
2 $1,600.00$80.00
3 $4,000.00$200.00
4 $2,500.00$125.00
5 $4,040.00$202.00
Ref #70 614E13300 BARRIER REFLECTOR, TYPE B, (58 EACH)
Awd $580.00$10.00
2 $406.00$7.00
3 $348.00$6.00
4 $348.00$6.00
5 $377.00$6.50
Ref #71 614E13350 OBJECT MARKER, ONE WAY, (29 EACH)
Awd $667.00$23.00
2 $406.00$14.00
3 $377.00$13.00
4 $377.00$13.00
5 $348.00$12.00
Ref #72 614E18002 MAINTAINING TRAFFIC, MISC.:TEMPORARY TRAFFIC SIGNA, (LUMP SUM)
Awd $24,000.00$24,000.00
2 $22,000.00$22,000.00
3 $17,500.00$17,500.00
4 $7,950.00$7,950.00
5 $8,600.00$8,600.00
Ref #73 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (0.87 MILE)
Awd $1,392.00$1,600.00
2 $2,175.00$2,500.00
3 $1,365.90$1,570.00
4 $1,365.90$1,570.00
5 $1,487.70$1,710.00
Ref #74 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (0.9 MILE)
Awd $900.00$1,000.00
2 $1,350.00$1,500.00
3 $855.00$950.00
4 $855.00$950.00
5 $927.00$1,030.00
120004 - Page 131
Ref #75 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, (4371 FT)
Awd $2,622.60$0.60
2 $2,622.60$0.60
3 $2,622.60$0.60
4 $2,622.60$0.60
5 $3,059.70$0.70
Ref #76 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, (835 FT)
Awd $417.50$0.50
2 $668.00$0.80
3 $375.75$0.45
4 $375.75$0.45
5 $417.50$0.50
Ref #77 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (120 FT)
Awd $360.00$3.00
2 $360.00$3.00
3 $348.00$2.90
4 $348.00$2.90
5 $390.00$3.25
Ref #78 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, (326 SY)
Awd $22,494.00$69.00
2 $27,710.00$85.00
3 $20,212.00$62.00
4 $27,710.00$85.00
5 $21,516.00$66.00
Ref #79 616E10000 WATER, (1 MGAL)
Awd $550.00$550.00
2 $2.00$2.00
3 $40.00$40.00
4 $100.00$100.00
5 $85.00$85.00
Ref #80 622E40020 PORTABLE CONCRETE BARRIER, 32", (700 FT)
Awd $10,500.00$15.00
2 $12,600.00$18.00
3 $10,500.00$15.00
4 $7,000.00$10.00
5 $7,000.00$10.00
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $83,283.10
2 $91,799.60
3 $75,144.25
4 $67,952.25
5 $65,787.90
Ref #81 202E11001 STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $20,000.00$20,000.00
3 $28,500.00$28,500.00
4 $25,000.00$25,000.00
5 $15,000.00$15,000.00
120004 - Page 132
Ref #82 202E22900 APPROACH SLAB REMOVED, (525 SY)
Awd $9,450.00$18.00
2 $5,250.00$10.00
3 $13,125.00$25.00
4 $16,800.00$32.00
5 $8,662.50$16.50
Ref #83 202E38500 BRIDGE RAILING REMOVED, (62.5 FT)
Awd $1,125.00$18.00
2 $937.50$15.00
3 $312.50$5.00
4 $1,250.00$20.00
5 $265.63$4.25
Ref #84 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM)
Awd $45,000.00$45,000.00
2 $45,000.00$45,000.00
3 $52,500.00$52,500.00
4 $87,000.00$87,000.00
5 $150,000.00$150,000.00
Ref #85 503E21100 UNCLASSIFIED EXCAVATION, (159 CY)
Awd $5,724.00$36.00
2 $3,180.00$20.00
3 $12,720.00$80.00
4 $8,745.00$55.00
5 $19,875.00$125.00
Ref #86 509E10000 EPOXY COATED REINFORCING STEEL, (3190 LB)
Awd $4,785.00$1.50
2 $4,785.00$1.50
3 $3,190.00$1.00
4 $6,380.00$2.00
5 $3,190.00$1.00
Ref #87 511E46000 CLASS C CONCRETE, (11 CY)
Awd $17,600.00$1,600.00
2 $10,450.00$950.00
3 $13,200.00$1,200.00
4 $11,000.00$1,000.00
5 $11,110.00$1,010.00
Ref #88 511E46500 CLASS C CONCRETE, FOOTING, (36 CY)
Awd $19,800.00$550.00
2 $15,120.00$420.00
3 $14,040.00$390.00
4 $16,200.00$450.00
5 $18,360.00$510.00
Ref #89 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (61 SY)
Awd $1,708.00$28.00
2 $2,135.00$35.00
3 $976.00$16.00
4 $1,525.00$25.00
5 $4,453.00$73.00
120004 - Page 133
Ref #90 512E33000 TYPE 2 WATERPROOFING, (222 SY)
Awd $3,108.00$14.00
2 $3,108.00$14.00
3 $3,774.00$17.00
4 $3,885.00$17.50
5 $3,330.00$15.00
Ref #91 512E33010 TYPE 3 WATERPROOFING, (323 SY)
Awd $8,075.00$25.00
2 $12,274.00$38.00
3 $8,559.50$26.50
4 $8,559.50$26.50
5 $8,398.00$26.00
Ref #92 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (36 SF)
Awd $540.00$15.00
2 $216.00$6.00
3 $252.00$7.00
4 $432.00$12.00
5 $99.00$2.75
Ref #93 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (5 CY)
Awd $1,450.00$290.00
2 $625.00$125.00
3 $425.00$85.00
4 $750.00$150.00
5 $600.00$120.00
Ref #94 601E11001 RIPRAP USING 6" REINFORCED CONCRETE SLAB, AS PER P, (60 SY)
Awd $7,200.00$120.00
2 $8,700.00$145.00
3 $5,880.00$98.00
4 $9,000.00$150.00
5 $4,620.00$77.00
Ref #95 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH FABRIC FILTER, (11 CY)
Awd $1,595.00$145.00
2 $1,100.00$100.00
3 $825.00$75.00
4 $1,265.00$115.00
5 $847.00$77.00
Ref #96 603E96497 20' X 6' CONDUIT, TYPE A, 706.05, AS PER PLAN, (120 FT)
Awd $174,000.00$1,450.00
2 $168,000.00$1,400.00
3 $150,000.00$1,250.00
4 $172,800.00$1,440.00
5 $205,800.00$1,715.00
Section 8 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $321,160.00
2 $300,880.50
3 $308,279.00
4 $370,591.50
5 $454,610.13
120004 - Page 134
Ref #97 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $8,000.00$8,000.00
3 $6,500.00$6,500.00
4 $6,500.00$6,500.00
5 $4,080.00$4,080.00
Ref #98 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $23,000.00$23,000.00
3 $34,000.00$34,000.00
4 $51,800.00$51,800.00
5 $7,500.00$7,500.00
Ref #99 619E16010 FIELD OFFICE, TYPE B, (6 MNTH)
Awd $12,000.00$2,000.00
2 $2,100.00$350.00
3 $9,000.00$1,500.00
4 $6,000.00$1,000.00
5 $12,000.00$2,000.00
Ref #100 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $4,000.00$4,000.00
3 $5,000.00$5,000.00
4 $8,000.00$8,000.00
5 $5,000.00$5,000.00
Ref #101 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $18,000.00$18,000.00
3 $20,000.00$20,000.00
4 $20,000.00$20,000.00
5 $20,000.00$20,000.00
Section 9 - INCIDENTALS - Totals
Awd $71,500.00
2 $55,100.00
3 $74,500.00
4 $92,300.00
5 $48,580.00
120004 - Page 135
Project No. 120005
PID 87321
FRA-IR-670-3.87
Federal
Type: BRIDGE REPAIR
Completion Date: 5/31/2012
Award Amount: $93,000.00
Contract Awarded To: RIGHTER COMPANY INC
Letting Date: 1/12/2012
Engineer's Estimate: $91,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
RIGHTER COMPANY INC
2424 HARRISON RD
COLUMBUS, OH 43204
Franklin
Bidder 1
Bid $93,000.00
EAGLE BRIDGE CO
800 S VAN DEMARK RD
SIDNEY, OH 45365
Shelby
Bidder 2
Bid $97,464.73
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 3
Bid $103,782.94
CONCRETE RESTORATION SPECIALISTS LLC
P O BOX 283
SHARON CENTER, OH 44274
Medina
Bidder 4
Bid $118,278.90
SHELLY & SANDS INC
3570 SOUTH RIVER RD
ZANESVILLE, OH 43701
Muskingum
Bidder 5
Bid $118,360.09
DOT CONSTRUCTION CORP
535 NORTH BROAD ST STE 5
CANFIELD, OH 44406
Mahoning
Bidder 6
Bid $134,695.00
120005 - Page 136
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $3,000.00$3,000.00
3 $3,000.00$3,000.00
4 $800.00$800.00
5 $1,975.00$1,975.00
6 $2,000.00$2,000.00
Ref #2 202E32800 CONCRETE SLOPE PROTECTION REMOVED, (52 SY)
Awd $5,200.00$100.00
2 $4,940.00$95.00
3 $1,040.00$20.00
4 $7,956.00$153.00
5 $8,476.00$163.00
6 $5,200.00$100.00
Ref #3 202E75000 FENCE REMOVED, (110 FT)
Awd $319.00$2.90
2 $320.10$2.91
3 $319.00$2.90
4 $484.00$4.40
5 $605.00$5.50
6 $319.00$2.90
Ref #4 607E23000 FENCE, TYPE CLT, (98 FT)
Awd $3,381.00$34.50
2 $3,392.76$34.62
3 $3,381.00$34.50
4 $3,934.70$40.15
5 $1,372.00$14.00
6 $3,381.00$34.50
Ref #5 607E61200 GATE, TYPE CLT, (2 EACH)
Awd $1,750.00$875.00
2 $1,755.96$877.98
3 $1,750.00$875.00
4 $2,112.00$1,056.00
5 $536.00$268.00
6 $1,750.00$875.00
Section 1 - ROADWAY - Totals
Awd $12,150.00
2 $13,408.82
3 $9,490.00
4 $15,286.70
5 $12,964.00
6 $12,650.00
Ref #6 601E21001 CONCRETE SLOPE PROTECTION, AS PER PLAN, (52 SY)
Awd $5,200.00$100.00
2 $7,800.00$150.00
3 $7,800.00$150.00
4 $6,916.00$133.00
5 $11,700.00$225.00
6 $5,200.00$100.00
120005 - Page 137
Ref #7 659E10000 SEEDING AND MULCHING, (100 SY)
Awd $500.00$5.00
2 $2,000.00$20.00
3 $900.00$9.00
4 $990.00$9.90
5 $110.00$1.10
6 $900.00$9.00
Ref #8 659E14000 REPAIR SEEDING AND MULCHING, (5 SY)
Awd $5.00$1.00
2 $0.75$0.15
3 $75.00$15.00
4 $82.50$16.50
5 $5.50$1.10
6 $75.00$15.00
Ref #9 659E15000 INTER-SEEDING, (5 SY)
Awd $5.00$1.00
2 $0.75$0.15
3 $50.00$10.00
4 $55.00$11.00
5 $5.50$1.10
6 $50.00$10.00
Ref #10 659E20000 COMMERCIAL FERTILIZER, (0.01 TON)
Awd $5.00$500.00
2 $6.00$600.00
3 $5.00$500.00
4 $5.50$550.00
5 $7.47$747.00
6 $5.00$500.00
Ref #11 659E31000 LIME, (0.02 ACRE)
Awd $6.00$300.00
2 $1.00$50.00
3 $2.00$100.00
4 $2.20$110.00
5 $10.72$536.00
6 $2.00$100.00
Ref #12 659E35000 WATER, (1 MGAL)
Awd $1.00$1.00
2 $25.00$25.00
3 $50.00$50.00
4 $55.00$55.00
5 $1.10$1.10
6 $50.00$50.00
Ref #13 832E30000 EROSION CONTROL, (500 EACH)
Awd $500.00$1.00
2 $500.00$1.00
3 $500.00$1.00
4 $500.00$1.00
5 $500.00$1.00
6 $500.00$1.00
120005 - Page 138
Section 2 - EROSION CONTROL - Totals
Awd $6,222.00
2 $10,333.50
3 $9,382.00
4 $8,606.20
5 $12,340.29
6 $6,782.00
Ref #14 630E80100 SIGN, FLAT SHEET, (1 SF)
Awd $160.00$160.00
2 $160.54$160.54
3 $160.00$160.00
4 $66.00$66.00
5 $40.00$40.00
6 $160.00$160.00
Section 3 - TRAFFIC CONTROL - Totals
Awd $160.00
2 $160.54
3 $160.00
4 $66.00
5 $40.00
6 $160.00
Ref #15 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (10 CY)
Awd $400.00$40.00
2 $400.00$40.00
3 $200.00$20.00
4 $1,500.00$150.00
5 $700.00$70.00
6 $1,000.00$100.00
Ref #16 616E10000 WATER, (1 MGAL)
Awd $1.00$1.00
2 $25.00$25.00
3 $250.00$250.00
4 $10.00$10.00
5 $90.00$90.00
6 $1.00$1.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $401.00
2 $425.00
3 $450.00
4 $1,510.00
5 $790.00
6 $1,001.00
120005 - Page 139
Ref #17 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN, (LUMP SUM)
Awd $7,000.00$7,000.00
2 $8,500.00$8,500.00
3 $2,000.00$2,000.00
4 $11,000.00$11,000.00
5 $12,270.00$12,270.00
6 $10,000.00$10,000.00
Ref #18 509E10000 EPOXY COATED REINFORCING STEEL, (1876 LB)
Awd $3,752.00$2.00
2 $4,690.00$2.50
3 $3,470.60$1.85
4 $7,504.00$4.00
5 $4,783.80$2.55
6 $3,752.00$2.00
Ref #19 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (92 EACH)
Awd $2,760.00$30.00
2 $2,300.00$25.00
3 $1,380.00$15.00
4 $2,300.00$25.00
5 $2,024.00$22.00
6 $2,300.00$25.00
Ref #20 511E45700 CLASS C CONCRETE, ABUTMENT, (12 CY)
Awd $10,332.00$861.00
2 $7,800.00$650.00
3 $9,900.00$825.00
4 $15,600.00$1,300.00
5 $13,920.00$1,160.00
6 $24,000.00$2,000.00
Ref #21 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (299 SY)
Awd $4,485.00$15.00
2 $4,470.05$14.95
3 $4,455.10$14.90
4 $2,990.00$10.00
5 $5,083.00$17.00
6 $5,980.00$20.00
Ref #22 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (299 SY)
Awd $3,588.00$12.00
2 $1,500.98$5.02
3 $1,495.00$5.00
4 $1,196.00$4.00
5 $4,186.00$14.00
6 $8,970.00$30.00
Ref #23 513E10001 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $20,000.00$20,000.00
3 $29,000.00$29,000.00
4 $16,500.00$16,500.00
5 $18,617.00$18,617.00
6 $25,000.00$25,000.00
120005 - Page 140
Ref #24 519E11100 PATCHING CONCRETE STRUCTURE, (50 SF)
Awd $7,500.00$150.00
2 $5,017.00$100.34
3 $5,987.00$119.74
4 $6,250.00$125.00
5 $4,400.00$88.00
6 $5,000.00$100.00
Ref #25 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (26 SF)
Awd $1,300.00$50.00
2 $2,608.84$100.34
3 $3,113.24$119.74
4 $4,420.00$170.00
5 $2,860.00$110.00
6 $2,600.00$100.00
Section 5 - STRUCTURE REPAIR BRIDGE NO. FRA-670-038 - Totals
Awd $60,717.00
2 $56,886.87
3 $60,800.94
4 $67,760.00
5 $68,143.80
6 $87,602.00
Ref #26 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $2,000.00$2,000.00
3 $1,500.00$1,500.00
4 $7,000.00$7,000.00
5 $615.00$615.00
6 $1,500.00$1,500.00
Ref #27 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $3,000.00$3,000.00
3 $9,500.00$9,500.00
4 $3,000.00$3,000.00
5 $15,200.00$15,200.00
6 $10,000.00$10,000.00
Ref #28 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $2,250.00$750.00
2 $2,250.00$750.00
3 $7,500.00$2,500.00
4 $2,550.00$850.00
5 $2,400.00$800.00
6 $3,000.00$1,000.00
Ref #29 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)
Awd $100.00$100.00
2 $2,000.00$2,000.00
3 $1,000.00$1,000.00
4 $500.00$500.00
5 $1,867.00$1,867.00
6 $2,000.00$2,000.00
120005 - Page 141
Ref #30 624E10000 MOBILIZATION, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $7,000.00$7,000.00
3 $4,000.00$4,000.00
4 $12,000.00$12,000.00
5 $4,000.00$4,000.00
6 $10,000.00$10,000.00
Section 6 - INCIDENTALS - Totals
Awd $13,350.00
2 $16,250.00
3 $23,500.00
4 $25,050.00
5 $24,082.00
6 $26,500.00
120005 - Page 142
Project No. 120006
PID 87818
JEF-SR-213-0.04
Federal
Type: TWO LANE RESURFACING
Completion Date: 7/31/2012
Award Amount: $2,112,881.96
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 1/12/2012
Engineer's Estimate: $1,940,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
3570 SOUTH RIVER RD
ZANESVILLE, OH 43701
Muskingum
Bidder 1
Bid $2,112,881.96
LASH PAVING INC
P O BOX 296
COLERAIN, OH 43916
Belmont
Bidder 2
Bid $2,185,831.58
120006 - Page 143
Ref #1 202E23500 WEARING COURSE REMOVED (WT: NR), (607 SY)
Awd $7,891.00$13.00
2 $4,309.70$7.10
Section 1 - ROADWAY - Totals
Awd $7,891.00
2 $4,309.70
Ref #2 832E30000 EROSION CONTROL (WT: 08), (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
Ref #3 605E31101 AGGREGATE DRAINS, AS PER PLAN (WT: 35), (1054 FT)
Awd $10,118.40$9.60
2 $7,641.50$7.25
Section 3 - DRAINAGE - Totals
Awd $10,118.40
2 $7,641.50
Ref #4 253E02000 PAVEMENT REPAIR (WT: 16), (527 CY)
Awd $144,398.00$274.00
2 $121,210.00$230.00
Ref #5 407E10000 TACK COAT (WT: 10), (10487 GAL)
Awd $20,974.00$2.00
2 $27,266.20$2.60
Ref #6 407E14000 TACK COAT FOR INTERMEDIATE COURSE (WT: 10), (5572 GAL)
Awd $11,144.00$2.00
2 $14,487.20$2.60
Ref #7 408E10001 PRIME COAT, AS PER PLAN (WT: 10), (8251 GAL)
Awd $30,116.15$3.65
2 $29,703.60$3.60
Ref #8 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (6771 CY)
Awd $785,436.00$116.00
2 $824,707.80$121.80
Ref #9 448E46905 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG70-22M,, (5046 CY)
Awd $655,980.00$130.00
2 $747,817.20$148.20
Ref #10 448E48021 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 (, (609 CY)
Awd $115,710.00$190.00
2 $115,710.00$190.00
Ref #11 617E10100 COMPACTED AGGREGATE (WT: 06), (1719 CY)
Awd $51,570.00$30.00
2 $79,933.50$46.50
120006 - Page 144
Ref #12 617E20000 SHOULDER PREPARATION (WT: 06), (20627 SY)
Awd $4,744.21$0.23
2 $6,188.10$0.30
Section 4 - PAVEMENT - Totals
Awd $1,820,072.36
2 $1,967,023.60
Ref #13 621E00100 RPM (WT: 41), (1162 EACH)
Awd $19,463.50$16.75
2 $16,372.58$14.09
Ref #14 621E54000 RAISED PAVEMENT MARKER REMOVED (WT: NR), (1162 EACH)
Awd $11,620.00$10.00
2 $6,972.00$6.00
Ref #15 642E00100 EDGE LINE, TYPE 1 (WT: 45), (17.58 MILE)
Awd $13,185.00$750.00
2 $12,481.80$710.00
Ref #16 642E00300 CENTER LINE, TYPE 1 (WT: 45), (8.79 MILE)
Awd $13,185.00$1,500.00
2 $12,481.80$1,420.00
Ref #17 642E00500 STOP LINE, TYPE 1, (14 FT)
Awd $560.00$40.00
2 $532.00$38.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $58,013.50
2 $48,840.18
Ref #18 614E12460 WORK ZONE MARKING SIGN (WT: 39), (100 EACH)
Awd $13,000.00$130.00
2 $12,500.00$125.00
Ref #19 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT (WT: 39, (17.58 MILE)
Awd $32,786.70$1,865.00
2 $31,116.60$1,770.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $45,786.70
2 $43,616.60
Ref #20 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $7,500.00$7,500.00
2 $8,750.00$8,750.00
Ref #21 614E11000 MAINTAINING TRAFFIC (WT: 39), (LUMP SUM)
Awd $67,000.00$67,000.00
2 $87,500.00$87,500.00
Ref #22 624E10000 MOBILIZATION (WT: NR), (LUMP SUM)
Awd $95,500.00$95,500.00
2 $17,150.00$17,150.00
120006 - Page 145
Section 7 - INCIDENTALS - Totals
Awd $170,000.00
2 $113,400.00
120006 - Page 146
Project No. 120007
PID 83489
LAK-IR-90-3.77
Federal
Type: BRIDGE REPAIR
Completion Date: 6/15/2013
Award Amount: $3,737,152.40
Contract Awarded To: GREAT LAKES CONSTRUCTION CO
Letting Date: 1/12/2012
Engineer's Estimate: $3,605,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
GREAT LAKES CONSTRUCTION CO
2608 GREAT LAKES WAY
HINCKLEY, OH 44233
Medina
Bidder 1
Bid $3,737,152.40
J D WILLIAMSON CONSTRUCTION CO INC
441 GENEVA AVE
TALLMADGE, OH 44278
Summit
Bidder 2
Bid $3,549,126.20
BECDIR CONSTRUCTION COMPANY
15764 W AKRON-CANFIELD RD
BERLIN CENTER, OH 44401
Mahoning
Bidder 3
Bid $3,964,891.10
COSMOS INDUSTRIAL SERVICES INC
9103 DETROIT AVE
CLEVELAND, OH 44102
Cuyahoga
Bidder 4
Bid $4,146,132.19
TERRACE CONSTRUCTION CO INC
3965 PEARL RD
CLEVELAND, OH 44109
Cuyahoga
Bidder 5
Bid $4,156,389.25
UNION INDUSTRIAL CONTRACTORS INC
1800 EAST 21ST STREET
ASHTABULA, OH 44004
Ashtabula
Bidder 6
Bid $4,182,319.81
120007 - Page 147
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $37,000.00$37,000.00
2 $4,500.00$4,500.00
3 $5,000.00$5,000.00
4 $1,795.22$1,795.22
5 $550.00$550.00
6 $600.00$600.00
Ref #2 202E38000 GUARDRAIL REMOVED, (321 FT)
Awd $642.00$2.00
2 $385.20$1.20
3 $401.25$1.25
4 $462.24$1.44
5 $385.20$1.20
6 $481.50$1.50
Ref #3 202E75000 FENCE REMOVED, (112 FT)
Awd $224.00$2.00
2 $140.00$1.25
3 $145.60$1.30
4 $168.00$1.50
5 $140.00$1.25
6 $168.00$1.50
Ref #4 203E10000 EXCAVATION, (427 CY)
Awd $8,540.00$20.00
2 $6,191.50$14.50
3 $11,102.00$26.00
4 $12,763.03$29.89
5 $3,843.00$9.00
6 $7,686.00$18.00
Ref #5 203E20000 EMBANKMENT, (148 CY)
Awd $7,400.00$50.00
2 $2,220.00$15.00
3 $3,256.00$22.00
4 $4,241.68$28.66
5 $1,924.00$13.00
6 $7,400.00$50.00
Ref #6 204E10000 SUBGRADE COMPACTION, (683 SY)
Awd $5,464.00$8.00
2 $2,049.00$3.00
3 $1,024.50$1.50
4 $2,021.68$2.96
5 $683.00$1.00
6 $1,366.00$2.00
Ref #7 606E13000 GUARDRAIL, TYPE 5, (258 FT)
Awd $4,773.00$18.50
2 $4,644.00$18.00
3 $4,063.50$15.75
4 $5,418.00$21.00
5 $4,515.00$17.50
6 $4,515.00$17.50
120007 - Page 148
Ref #8 606E26100 ANCHOR ASSEMBLY, TYPE E, (1 EACH)
Awd $2,000.00$2,000.00
2 $2,000.00$2,000.00
3 $2,000.00$2,000.00
4 $774.00$774.00
5 $1,985.00$1,985.00
6 $1,900.00$1,900.00
Ref #9 606E26500 ANCHOR ASSEMBLY, TYPE T, (1 EACH)
Awd $650.00$650.00
2 $660.00$660.00
3 $685.00$685.00
4 $1,494.00$1,494.00
5 $645.00$645.00
6 $645.00$645.00
Ref #10 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)
Awd $5,000.00$1,250.00
2 $5,080.00$1,270.00
3 $4,720.00$1,180.00
4 $5,976.00$1,494.00
5 $4,980.00$1,245.00
6 $4,980.00$1,245.00
Ref #11 607E23000 FENCE, TYPE CLT, (97 FT)
Awd $2,134.00$22.00
2 $2,134.00$22.00
3 $2,182.50$22.50
4 $2,502.60$25.80
5 $2,085.50$21.50
6 $2,085.50$21.50
Ref #12 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (1 EACH)
Awd $100.00$100.00
2 $110.00$110.00
3 $95.00$95.00
4 $116.40$116.40
5 $97.00$97.00
6 $97.00$97.00
Section 1 - ROADWAY - Totals
Awd $73,927.00
2 $30,113.70
3 $34,675.35
4 $37,732.85
5 $21,832.70
6 $31,924.00
Ref #13 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (2 CY)
Awd $400.00$200.00
2 $170.00$85.00
3 $770.00$385.00
4 $535.12$267.56
5 $260.00$130.00
6 $1,000.00$500.00
120007 - Page 149
Ref #14 659E10000 SEEDING AND MULCHING, (442 SY)
Awd $1,127.10$2.55
2 $1,105.00$2.50
3 $1,215.50$2.75
4 $3,182.40$7.20
5 $2,210.00$5.00
6 $2,210.00$5.00
Ref #15 659E14000 REPAIR SEEDING AND MULCHING, (22 SY)
Awd $68.20$3.10
2 $66.00$3.00
3 $66.00$3.00
4 $7.92$0.36
5 $6.60$0.30
6 $6.60$0.30
Ref #16 659E20000 COMMERCIAL FERTILIZER, (0.06 TON)
Awd $60.00$1,000.00
2 $60.00$1,000.00
3 $60.00$1,000.00
4 $35.28$588.00
5 $29.40$490.00
6 $29.40$490.00
Ref #17 659E31000 LIME, (0.09 ACRE)
Awd $4.50$50.00
2 $0.90$10.00
3 $0.90$10.00
4 $10.80$120.00
5 $9.00$100.00
6 $9.00$100.00
Ref #18 659E35000 WATER, (2 MGAL)
Awd $40.00$20.00
2 $2.00$1.00
3 $2.00$1.00
4 $2.40$1.20
5 $2.00$1.00
6 $2.00$1.00
Ref #19 670E00710 DITCH EROSION PROTECTION MAT, TYPE A, (135 SY)
Awd $405.00$3.00
2 $337.50$2.50
3 $357.75$2.65
4 $421.20$3.12
5 $351.00$2.60
6 $351.00$2.60
Ref #20 832E30000 EROSION CONTROL, (5747 EACH)
Awd $5,747.00$1.00
2 $5,747.00$1.00
3 $5,747.00$1.00
4 $5,747.00$1.00
5 $5,747.00$1.00
6 $5,747.00$1.00
120007 - Page 150
Section 2 - EROSION CONTROL - Totals
Awd $7,851.80
2 $7,488.40
3 $8,219.15
4 $9,942.12
5 $8,615.00
6 $9,355.00
Ref #21 602E20000 CONCRETE MASONRY, (0.2 CY)
Awd $640.00$3,200.00
2 $680.00$3,400.00
3 $400.00$2,000.00
4 $276.26$1,381.30
5 $220.00$1,100.00
6 $560.00$2,800.00
Ref #22 603E04400 12" CONDUIT, TYPE B, (48 FT)
Awd $2,400.00$50.00
2 $2,544.00$53.00
3 $3,840.00$80.00
4 $1,897.92$39.54
5 $1,824.00$38.00
6 $3,024.00$63.00
Ref #23 603E04600 12" CONDUIT, TYPE C, (61 FT)
Awd $2,745.00$45.00
2 $3,050.00$50.00
3 $3,660.00$60.00
4 $2,138.66$35.06
5 $1,220.00$20.00
6 $3,721.00$61.00
Ref #24 604E00800 CATCH BASIN, NO. 3A, (2 EACH)
Awd $4,500.00$2,250.00
2 $2,900.00$1,450.00
3 $4,000.00$2,000.00
4 $2,800.28$1,400.14
5 $2,400.00$1,200.00
6 $2,300.00$1,150.00
Ref #25 605E31100 AGGREGATE DRAINS, (15 FT)
Awd $240.00$16.00
2 $150.00$10.00
3 $360.00$24.00
4 $401.55$26.77
5 $150.00$10.00
6 $915.00$61.00
Section 3 - DRANAGE - Totals
Awd $10,525.00
2 $9,324.00
3 $12,260.00
4 $7,514.67
5 $5,814.00
6 $10,520.00
120007 - Page 151
Ref #26 301E46000 ASPHALT CONCRETE BASE, PG64-22, (106 CY)
Awd $21,200.00$200.00
2 $21,200.00$200.00
3 $19,080.00$180.00
4 $21,961.08$207.18
5 $19,186.00$181.00
6 $20,670.00$195.00
Ref #27 304E20000 AGGREGATE BASE, (111 CY)
Awd $9,990.00$90.00
2 $5,328.00$48.00
3 $7,548.00$68.00
4 $7,137.30$64.30
5 $6,105.00$55.00
6 $13,320.00$120.00
Ref #28 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (18 GAL)
Awd $36.00$2.00
2 $180.00$10.00
3 $378.00$21.00
4 $432.00$24.00
5 $360.00$20.00
6 $180.00$10.00
Ref #29 408E10000 PRIME COAT, (189 GAL)
Awd $567.00$3.00
2 $945.00$5.00
3 $2,173.50$11.50
4 $2,494.80$13.20
5 $2,079.00$11.00
6 $945.00$5.00
Ref #30 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (22 CY)
Awd $4,356.00$198.00
2 $5,060.00$230.00
3 $6,160.00$280.00
4 $7,128.00$324.00
5 $6,270.00$285.00
6 $4,950.00$225.00
Ref #31 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (16 CY)
Awd $4,240.00$265.00
2 $5,280.00$330.00
3 $5,600.00$350.00
4 $6,470.40$404.40
5 $5,648.00$353.00
6 $5,200.00$325.00
Ref #32 609E24000 CURB, TYPE 4-A, (40 FT)
Awd $800.00$20.00
2 $400.00$10.00
3 $1,400.00$35.00
4 $440.80$11.02
5 $48.00$1.20
6 $640.00$16.00
120007 - Page 152
Ref #33 609E24510 CURB, TYPE 4-C, (74 FT)
Awd $2,960.00$40.00
2 $2,368.00$32.00
3 $3,700.00$50.00
4 $2,114.18$28.57
5 $1,850.00$25.00
6 $2,960.00$40.00
Section 4 - PAVEMENT - Totals
Awd $44,149.00
2 $40,761.00
3 $46,039.50
4 $48,178.56
5 $41,546.00
6 $48,865.00
Ref #34 638E10800 VALVE BOX ADJUSTED TO GRADE, (1 EACH)
Awd $150.00$150.00
2 $150.00$150.00
3 $200.00$200.00
4 $189.50$189.50
5 $120.00$120.00
6 $400.00$400.00
Section 5 - WATER WORK - Totals
Awd $150.00
2 $150.00
3 $200.00
4 $189.50
5 $120.00
6 $400.00
Ref #35 620E00500 DELINEATOR, POST MOUNTED, (1 EACH)
Awd $70.00$70.00
2 $75.00$75.00
3 $42.00$42.00
4 $66.00$66.00
5 $75.00$75.00
6 $55.00$55.00
Ref #36 626E00100 BARRIER REFLECTOR, (19 EACH)
Awd $133.00$7.00
2 $152.00$8.00
3 $152.00$8.00
4 $182.40$9.60
5 $114.00$6.00
6 $152.00$8.00
Ref #37 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (14 FT)
Awd $84.00$6.00
2 $168.00$12.00
3 $147.00$10.50
4 $252.00$18.00
5 $168.00$12.00
6 $210.00$15.00
120007 - Page 153
Ref #38 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (1 EACH)
Awd $60.00$60.00
2 $75.00$75.00
3 $31.50$31.50
4 $60.00$60.00
5 $75.00$75.00
6 $50.00$50.00
Ref #39 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $12.00$12.00
2 $25.00$25.00
3 $12.50$12.50
4 $12.00$12.00
5 $25.00$25.00
6 $10.00$10.00
Ref #40 630E97700 SIGNING, MISC.:OVERPASS NAME INSTALLATION, (2 EACH)
Awd $400.00$200.00
2 $600.00$300.00
3 $630.00$315.00
4 $277.92$138.96
5 $600.00$300.00
6 $1,650.00$825.00
Ref #41 642E00100 EDGE LINE, TYPE 1, (0.32 MILE)
Awd $800.00$2,500.00
2 $640.00$2,000.00
3 $608.00$1,900.00
4 $691.20$2,160.00
5 $400.00$1,250.00
6 $576.00$1,800.00
Ref #42 642E00300 CENTER LINE, TYPE 1, (0.16 MILE)
Awd $800.00$5,000.00
2 $480.00$3,000.00
3 $608.00$3,800.00
4 $691.20$4,320.00
5 $400.80$2,505.00
6 $576.00$3,600.00
Section 6 - TRAFFIC CONTROL - Totals
Awd $2,359.00
2 $2,215.00
3 $2,231.00
4 $2,232.72
5 $1,857.80
6 $3,279.00
Ref #43 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (37 CY)
Awd $1,480.00$40.00
2 $1,665.00$45.00
3 $2,960.00$80.00
4 $2,719.87$73.51
5 $1,295.00$35.00
6 $4,440.00$120.00
120007 - Page 154
Ref #44 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (244 HOUR)
Awd $14,640.00$60.00
2 $14,640.00$60.00
3 $14,884.00$61.00
4 $21,960.00$90.00
5 $16,348.00$67.00
6 $18,300.00$75.00
Ref #45 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $3,000.00$3,000.00
3 $3,800.00$3,800.00
4 $1,800.00$1,800.00
5 $3,650.00$3,650.00
6 $3,650.00$3,650.00
Ref #46 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (60 DAY)
Awd $1,800.00$30.00
2 $3,300.00$55.00
3 $3,600.00$60.00
4 $2,160.00$36.00
5 $3,300.00$55.00
6 $3,300.00$55.00
Ref #47 616E10000 WATER, (52 MGAL)
Awd $2,600.00$50.00
2 $260.00$5.00
3 $1,820.00$35.00
4 $575.64$11.07
5 $52.00$1.00
6 $520.00$10.00
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $30,520.00
2 $22,865.00
3 $27,064.00
4 $29,215.51
5 $24,645.00
6 $30,210.00
Ref #48 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $300,000.00$300,000.00
2 $305,000.00$305,000.00
3 $410,000.00$410,000.00
4 $271,398.06$271,398.06
5 $495,000.00$495,000.00
6 $405,000.00$405,000.00
Ref #49 202E22901 APPROACH SLAB REMOVED, AS PER PLAN, (156 SY)
Awd $3,900.00$25.00
2 $3,432.00$22.00
3 $2,340.00$15.00
4 $7,498.92$48.07
5 $3,120.00$20.00
6 $4,836.00$31.00
120007 - Page 155
Ref #50 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $1.00$1.00
2 $500.00$500.00
3 $1.00$1.00
4 $2,120.98$2,120.98
5 $100.00$100.00
6 $10,000.00$10,000.00
Ref #51 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $20,000.00$20,000.00
3 $23,000.00$23,000.00
4 $13,194.78$13,194.78
5 $10,000.00$10,000.00
6 $13,000.00$13,000.00
Ref #52 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (220976 LB)
Awd $243,073.60$1.10
2 $243,073.60$1.10
3 $209,927.20$0.95
4 $278,429.76$1.26
5 $265,171.20$1.20
6 $267,380.96$1.21
Ref #53 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (190 EACH)
Awd $4,370.00$23.00
2 $3,135.00$16.50
3 $4,750.00$25.00
4 $3,608.10$18.99
5 $2,850.00$15.00
6 $8,170.00$43.00
Ref #54 511E50001 CLASS HP CONCRETE, BRIDGE DECK, AS PER PLAN, (657 CY)
Awd $361,350.00$550.00
2 $252,945.00$385.00
3 $427,050.00$650.00
4 $392,675.76$597.68
5 $295,650.00$450.00
6 $524,943.00$799.00
Ref #55 511E50101 CLASS HP CONCRETE, BRIDGE DECK (PARAPET), AS PER P, (151 CY)
Awd $120,800.00$800.00
2 $85,315.00$565.00
3 $90,600.00$600.00
4 $83,285.56$551.56
5 $75,500.00$500.00
6 $108,720.00$720.00
Ref #56 511E50201 CLASS HP CONCRETE, SUBSTRUCTURE, AS PER PLAN, (222 CY)
Awd $210,900.00$950.00
2 $129,870.00$585.00
3 $222,000.00$1,000.00
4 $167,290.32$753.56
5 $122,100.00$550.00
6 $104,340.00$470.00
120007 - Page 156
Ref #57 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)
Awd $500.00$500.00
2 $1,000.00$1,000.00
3 $1,000.00$1,000.00
4 $789.95$789.95
5 $900.00$900.00
6 $100.00$100.00
Ref #58 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (2134 SY)
Awd $27,742.00$13.00
2 $30,409.50$14.25
3 $28,488.90$13.35
4 $29,022.40$13.60
5 $30,089.40$14.10
6 $30,089.40$14.10
Ref #59 512E71500 SPECIAL - URETHANE TOP COAT SEALER, (272 SY)
Awd $2,448.00$9.00
2 $2,176.00$8.00
3 $2,584.00$9.50
4 $2,706.40$9.95
5 $5,222.40$19.20
6 $5,222.40$19.20
Ref #60 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (455 SY)
Awd $2,730.00$6.00
2 $2,275.00$5.00
3 $2,730.00$6.00
4 $3,344.25$7.35
5 $5,118.75$11.25
6 $5,118.75$11.25
Ref #61 513E10300 STRUCTURAL STEEL MEMBERS, LEVEL 5, (960000 LB)
Awd $1,372,800.00$1.43
2 $1,411,200.00$1.47
3 $1,363,200.00$1.42
4 $1,680,000.00$1.75
5 $1,708,800.00$1.78
6 $1,632,000.00$1.70
Ref #62 514E00061 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (57500 SF)
Awd $186,875.00$3.25
2 $221,375.00$3.85
3 $201,250.00$3.50
4 $287,500.00$5.00
5 $218,500.00$3.80
6 $215,625.00$3.75
Ref #63 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (57500 SF)
Awd $186,875.00$3.25
2 $172,500.00$3.00
3 $172,500.00$3.00
4 $215,625.00$3.75
5 $171,925.00$2.99
6 $169,625.00$2.95
120007 - Page 157
Ref #64 514E10000 FINAL INSPECTION REPAIR, (22 EACH)
Awd $4,400.00$200.00
2 $2,200.00$100.00
3 $1,980.00$90.00
4 $3,960.00$180.00
5 $2,090.00$95.00
6 $2,090.00$95.00
Ref #65 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (104 FT)
Awd $41,600.00$400.00
2 $36,608.00$352.00
3 $44,200.00$425.00
4 $40,435.20$388.80
5 $37,440.00$360.00
6 $41,600.00$400.00
Ref #66 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (5 EACH)
Awd $5,500.00$1,100.00
2 $5,000.00$1,000.00
3 $6,000.00$1,200.00
4 $6,480.00$1,296.00
5 $6,000.00$1,200.00
6 $5,510.00$1,102.00
Ref #67 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (5 EACH)
Awd $5,500.00$1,100.00
2 $5,750.00$1,150.00
3 $5,500.00$1,100.00
4 $6,360.00$1,272.00
5 $5,000.00$1,000.00
6 $5,410.00$1,082.00
Ref #68 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (5 EACH)
Awd $6,250.00$1,250.00
2 $6,250.00$1,250.00
3 $6,000.00$1,200.00
4 $7,650.00$1,530.00
5 $6,500.00$1,300.00
6 $6,535.00$1,307.00
Ref #69 516E46900 BEARING DEVICE, MISC.:ELASTOMERIC BEARING WITH IN, (5 EACH)
Awd $4,875.00$975.00
2 $5,000.00$1,000.00
3 $4,875.00$975.00
4 $5,460.00$1,092.00
5 $5,000.00$1,000.00
6 $5,025.00$1,005.00
Ref #70 516E46900 BEARING DEVICE, MISC.:ELASTOMERIC BEARING WITH INT, (10 EACH)
Awd $16,500.00$1,650.00
2 $16,500.00$1,650.00
3 $16,000.00$1,600.00
4 $20,190.00$2,019.00
5 $17,000.00$1,700.00
6 $18,930.00$1,893.00
120007 - Page 158
Ref #71 516E46900 BEARING DEVICE, MISC.:ELASTOMERIC BEARING WITH INT, (5 EACH)
Awd $4,400.00$880.00
2 $4,500.00$900.00
3 $5,000.00$1,000.00
4 $4,830.00$966.00
5 $4,000.00$800.00
6 $4,425.00$885.00
Ref #72 518E21231 POROUS BACKFILL WITH FILTER FABRIC, AS PER PLAN, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $8,000.00$8,000.00
3 $8,500.00$8,500.00
4 $6,439.52$6,439.52
5 $5,500.00$5,500.00
6 $15,879.00$15,879.00
Ref #73 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (118 FT)
Awd $1,416.00$12.00
2 $1,652.00$14.00
3 $1,062.00$9.00
4 $955.80$8.10
5 $708.00$6.00
6 $855.50$7.25
Ref #74 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (92 FT)
Awd $2,760.00$30.00
2 $1,288.00$14.00
3 $1,564.00$17.00
4 $2,501.48$27.19
5 $644.00$7.00
6 $818.80$8.90
Ref #75 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (240 SF)
Awd $16,800.00$70.00
2 $19,200.00$80.00
3 $18,960.00$79.00
4 $13,581.60$56.59
5 $18,000.00$75.00
6 $21,600.00$90.00
Ref #76 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (179 SY)
Awd $58,175.00$325.00
2 $42,065.00$235.00
3 $59,965.00$335.00
4 $45,965.41$256.79
5 $36,695.00$205.00
6 $57,638.00$322.00
Ref #77 530E00600 SPECIAL - STRUCTURE, MISC.:COMPOSITE FIBER WRAP SY, (455 SF)
Awd $8,190.00$18.00
2 $14,560.00$32.00
3 $8,645.00$19.00
4 $10,364.90$22.78
5 $34,125.00$75.00
6 $10,465.00$23.00
120007 - Page 159
Ref #78 601E21100 SLOPE PROTECTION, MISC.:NEW AND REGRADED EXISTING , (1770 SY)
Awd $38,940.00$22.00
2 $33,630.00$19.00
3 $17,700.00$10.00
4 $39,435.60$22.28
5 $26,550.00$15.00
6 $51,330.00$29.00
Ref #79 607E39901 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (1210 FT)
Awd $72,600.00$60.00
2 $72,600.00$60.00
3 $78,650.00$65.00
4 $84,869.40$70.14
5 $73,810.00$61.00
6 $70,785.00$58.50
Ref #80 690E71000 SPECIAL - ASBESTOS ABATEMENT, (LUMP SUM)
Awd $100.00$100.00
2 $500.00$500.00
3 $80.00$80.00
4 $420.00$420.00
5 $50.00$50.00
6 $1,000.00$1,000.00
Section 8 - STRUCTURE REPAIR BRIDGE NO. LAK-90-0377 - Totals
Awd $3,345,370.60
2 $3,159,509.10
3 $3,446,102.10
4 $3,738,389.15
5 $3,689,158.75
6 $3,824,066.81
Ref #81 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $58,300.00$58,300.00
2 $35,000.00$35,000.00
3 $60,000.00$60,000.00
4 $60,000.00$60,000.00
5 $35,000.00$35,000.00
6 $35,000.00$35,000.00
Ref #82 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $100,000.00$100,000.00
3 $190,000.00$190,000.00
4 $108,955.72$108,955.72
5 $180,000.00$180,000.00
6 $52,000.00$52,000.00
Ref #83 619E16010 FIELD OFFICE, TYPE B, (14 MNTH)
Awd $21,000.00$1,500.00
2 $21,700.00$1,550.00
3 $23,100.00$1,650.00
4 $21,840.00$1,560.00
5 $37,800.00$2,700.00
6 $28,000.00$2,000.00
120007 - Page 160
Ref #84 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)
Awd $13,000.00$13,000.00
2 $20,000.00$20,000.00
3 $15,000.00$15,000.00
4 $18,000.00$18,000.00
5 $10,000.00$10,000.00
6 $8,700.00$8,700.00
Ref #85 624E10000 MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $100,000.00$100,000.00
3 $100,000.00$100,000.00
4 $63,941.39$63,941.39
5 $100,000.00$100,000.00
6 $100,000.00$100,000.00
Section 9 - INCIDENTALS - Totals
Awd $222,300.00
2 $276,700.00
3 $388,100.00
4 $272,737.11
5 $362,800.00
6 $223,700.00
120007 - Page 161
Project No. 120008
PID 22466
MAH-IR-680-7.05, PART 1;MAH-680-9.21, PART 2
Federal
Type: BRIDGE REPAIR
Completion Date: 9/30/2012
Award Amount: $4,524,000.00
Contract Awarded To: A P O'HORO COMPANY
Letting Date: 1/12/2012
Engineer's Estimate: $4,480,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
A P O'HORO COMPANY
3130 BELMONT AVE
YOUNGSTOWN, OH 44504
Mahoning
Bidder 1
Bid $4,524,000.00
KEFFLER BRIDGE COMPANY
9790 AKRON-CANFIELD RD
CANFIELD, OH 44406
Mahoning
Bidder 2
Bid $4,634,116.55
MARUCCI & GAFFNEY EXCAVATING CO
18 HOGUE ST
YOUNGSTOWN, OH 44502
Mahoning
Bidder 3
Bid $4,741,738.84
J D WILLIAMSON CONSTRUCTION CO INC
441 GENEVA AVE
TALLMADGE, OH 44278
Summit
Bidder 4
Bid $5,294,167.76
120008 - Page 162
Ref #1 202E23500 WEARING COURSE REMOVED, (557 SY)
Awd $4,177.50$7.50
2 $5,013.00$9.00
3 $4,177.50$7.50
4 $4,456.00$8.00
Ref #2 209E60200 LINEAR GRADING, (2 STA)
Awd $1,200.00$600.00
2 $700.00$350.00
3 $1,200.00$600.00
4 $600.00$300.00
Section 1 - ROADWAY - PART 1 - Totals
Awd $5,377.50
2 $5,713.00
3 $5,377.50
4 $5,056.00
Ref #3 659E10000 SEEDING AND MULCHING, (112 SY)
Awd $98.56$0.88
2 $1,680.00$15.00
3 $403.20$3.60
4 $672.00$6.00
Ref #4 659E20000 COMMERCIAL FERTILIZER, (0.02 TON)
Awd $11.70$585.00
2 $40.00$2,000.00
3 $6.00$300.00
4 $20.00$1,000.00
Ref #5 659E31000 LIME, (0.02 ACRE)
Awd $4.70$235.00
2 $40.00$2,000.00
3 $1.40$70.00
4 $2.00$100.00
Ref #6 659E35000 WATER, (1 MGAL)
Awd $1.00$1.00
2 $5.00$5.00
3 $1.00$1.00
4 $5.00$5.00
Section 2 - EROSION CONTROL - PART 1 - Totals
Awd $115.96
2 $1,765.00
3 $411.60
4 $699.00
Ref #7 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (100 SY)
Awd $7,500.00$75.00
2 $7,500.00$75.00
3 $7,500.00$75.00
4 $7,700.00$77.00
120008 - Page 163
Ref #8 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, (21515 SY)
Awd $43,030.00$2.00
2 $49,484.50$2.30
3 $48,408.75$2.25
4 $43,030.00$2.00
Ref #9 407E13900 TACK COAT, 702.13, (3228 GAL)
Awd $8,070.00$2.50
2 $9,684.00$3.00
3 $8,070.00$2.50
4 $8,070.00$2.50
Ref #10 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (861 GAL)
Awd $1,722.00$2.00
2 $2,583.00$3.00
3 $1,722.00$2.00
4 $1,722.00$2.00
Ref #11 442E10050 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE B (4, (897 CY)
Awd $139,035.00$155.00
2 $148,005.00$165.00
3 $143,520.00$160.00
4 $139,035.00$155.00
Ref #12 442E10150 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE B, (1046 CY)
Awd $125,520.00$120.00
2 $135,980.00$130.00
3 $130,750.00$125.00
4 $125,520.00$120.00
Ref #13 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (185 CY)
Awd $9,250.00$50.00
2 $9,250.00$50.00
3 $9,250.00$50.00
4 $9,250.00$50.00
Ref #14 690E98100 SPECIAL - MISC.:CONCRETE PAVEMENT SAWING, (60 FT)
Awd $600.00$10.00
2 $600.00$10.00
3 $600.00$10.00
4 $600.00$10.00
Section 3 - PAVEMENT - PART 1 - Totals
Awd $334,727.00
2 $363,086.50
3 $349,820.75
4 $334,927.00
Ref #15 621E10020 RPM, LOW PROFILE WHITE/RED, (138 EACH)
Awd $3,484.50$25.25
2 $3,174.00$23.00
3 $3,484.50$25.25
4 $3,450.00$25.00
Ref #16 621E10030 RPM, LOW PROFILE YELLOW/RED, (90 EACH)
Awd $2,272.50$25.25
2 $2,070.00$23.00
3 $2,272.50$25.25
4 $2,250.00$25.00
120008 - Page 164
Ref #17 621E54000 RAISED PAVEMENT MARKER REMOVED, (180 EACH)
Awd $900.00$5.00
2 $900.00$5.00
3 $900.00$5.00
4 $900.00$5.00
Ref #18 646E10000 EDGE LINE, (2.47 MILE)
Awd $6,916.00$2,800.00
2 $8,645.00$3,500.00
3 $6,916.00$2,800.00
4 $8,645.00$3,500.00
Ref #19 646E10300 CHANNELIZING LINE, (110 FT)
Awd $198.00$1.80
2 $550.00$5.00
3 $198.00$1.80
4 $467.50$4.25
Ref #20 646E10400 STOP LINE, (73 FT)
Awd $730.00$10.00
2 $876.00$12.00
3 $730.00$10.00
4 $857.75$11.75
Ref #21 646E20300 LANE ARROW, (4 EACH)
Awd $580.00$145.00
2 $800.00$200.00
3 $580.00$145.00
4 $752.00$188.00
Section 4 - TRAFFIC CONTROL - PART 1 - Totals
Awd $15,081.00
2 $17,015.00
3 $15,081.00
4 $17,322.25
Ref #300 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (320 HOUR)
Awd $17,600.00$55.00
2 $14,400.00$45.00
3 $19,840.00$62.00
4 $19,200.00$60.00
Ref #301 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (1 EACH)
Awd $1,800.00$1,800.00
2 $1,500.00$1,500.00
3 $2,000.00$2,000.00
4 $6,200.00$6,200.00
Ref #302 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $17,000.00$17,000.00
3 $8,200.00$8,200.00
4 $10,000.00$10,000.00
Ref #303 614E12460 WORK ZONE MARKING SIGN, (15 EACH)
Awd $1,875.00$125.00
2 $3,000.00$200.00
3 $1,875.00$125.00
4 $2,400.00$160.00
120008 - Page 165
Ref #304 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY)
Awd $2,900.00$145.00
2 $2,500.00$125.00
3 $3,200.00$160.00
4 $2,600.00$130.00
Ref #305 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (60 DAY)
Awd $1,800.00$30.00
2 $3,000.00$50.00
3 $1,200.00$20.00
4 $2,400.00$40.00
Ref #306 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (2.47 MILE)
Awd $1,852.50$750.00
2 $6,175.00$2,500.00
3 $1,852.50$750.00
4 $13,214.50$5,350.00
Ref #307 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (220 FT)
Awd $220.00$1.00
2 $660.00$3.00
3 $220.00$1.00
4 $440.00$2.00
Ref #308 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (110 FT)
Awd $110.00$1.00
2 $330.00$3.00
3 $110.00$1.00
4 $220.00$2.00
Ref #309 614E26000 WORK ZONE STOP LINE, CLASS I, (146 FT)
Awd $438.00$3.00
2 $1,460.00$10.00
3 $438.00$3.00
4 $876.00$6.00
Ref #310 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (73 FT)
Awd $219.00$3.00
2 $730.00$10.00
3 $219.00$3.00
4 $438.00$6.00
Ref #311 622E40020 PORTABLE CONCRETE BARRIER, 32", (20 FT)
Awd $600.00$30.00
2 $1,000.00$50.00
3 $500.00$25.00
4 $300.00$15.00
Section 5 - MAINTENANCE OF TRAFFIC - PART 1 - Totals
Awd $34,414.50
2 $51,755.00
3 $39,654.50
4 $58,288.50
Ref #22 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $500.00$500.00
2 $2,000.00$2,000.00
3 $500.00$500.00
4 $6,100.00$6,100.00
120008 - Page 166
Ref #23 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $20,000.00$20,000.00
3 $10,000.00$10,000.00
4 $12,000.00$12,000.00
Ref #24 202E38000 GUARDRAIL REMOVED, (93.75 FT)
Awd $150.00$1.60
2 $468.75$5.00
3 $187.50$2.00
4 $187.50$2.00
Ref #25 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (594 LB)
Awd $891.00$1.50
2 $1,188.00$2.00
3 $1,485.00$2.50
4 $594.00$1.00
Ref #26 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $100.00$2.00
2 $50.00$1.00
3 $100.00$2.00
4 $150.00$3.00
Ref #27 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (78 EACH)
Awd $936.00$12.00
2 $1,716.00$22.00
3 $936.00$12.00
4 $1,248.00$16.00
Ref #28 511E34436 CLASS S CONCRETE, BRIDGE DECK (PARAPET), (1 CY)
Awd $1,500.00$1,500.00
2 $5,000.00$5,000.00
3 $3,000.00$3,000.00
4 $2,000.00$2,000.00
Ref #29 511E71100 CONCRETE, MISC.:BACKWALL REPAIR, (8 CY)
Awd $7,600.00$950.00
2 $3,200.00$400.00
3 $7,600.00$950.00
4 $8,000.00$1,000.00
Ref #30 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1750 SY)
Awd $22,750.00$13.00
2 $28,000.00$16.00
3 $19,250.00$11.00
4 $27,125.00$15.50
Ref #31 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (1650 SY)
Awd $8,250.00$5.00
2 $6,600.00$4.00
3 $8,250.00$5.00
4 $4,125.00$2.50
Ref #32 516E14110 SPECIAL - CONTINUOUS SEAL IN STRUCTURAL STEEL JOIN, (130 FT)
Awd $1,560.00$12.00
2 $2,860.00$22.00
3 $3,250.00$25.00
4 $2,600.00$20.00
120008 - Page 167
Ref #33 517E75121 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI, (15 FT)
Awd $885.00$59.00
2 $1,500.00$100.00
3 $2,400.00$160.00
4 $1,650.00$110.00
Ref #34 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (500 SF)
Awd $25,000.00$50.00
2 $30,000.00$60.00
3 $37,500.00$75.00
4 $33,500.00$67.00
Ref #35 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $2,500.00$2,500.00
3 $1,000.00$1,000.00
4 $7,000.00$7,000.00
Ref #36 530E00200 SPECIAL - STRUCTURE, MISC.:STRUCTURE CLEANING, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $1,000.00$1,000.00
3 $7,040.00$7,040.00
4 $7,000.00$7,000.00
Ref #37 606E13000 GUARDRAIL, TYPE 5, (93.75 FT)
Awd $1,837.50$19.60
2 $1,875.00$20.00
3 $1,875.00$20.00
4 $1,875.00$20.00
Ref #38 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (3 EACH)
Awd $3,990.00$1,330.00
2 $4,200.00$1,400.00
3 $3,990.00$1,330.00
4 $4,050.00$1,350.00
Ref #39 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT)
Awd $270.00$18.00
2 $270.00$18.00
3 $270.00$18.00
4 $277.50$18.50
Ref #40 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $50.00$25.00
2 $60.00$30.00
3 $50.00$25.00
4 $52.00$26.00
Ref #41 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH)
Awd $20.00$10.00
2 $20.00$10.00
3 $20.00$10.00
4 $40.00$20.00
Ref #42 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $20.00$10.00
2 $20.00$10.00
3 $20.00$10.00
4 $40.00$20.00
120008 - Page 168
Ref #43 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (300 SF)
Awd $15,000.00$50.00
2 $19,800.00$66.00
3 $28,500.00$95.00
4 $20,100.00$67.00
Ref #44 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO, (1404 SY)
Awd $53,352.00$38.00
2 $60,372.00$43.00
3 $53,352.00$38.00
4 $70,200.00$50.00
Ref #45 848E20001 SURFACE PREPARATION USING HYDRO DEMOLITION, AS PER, (1404 SY)
Awd $95,472.00$68.00
2 $77,220.00$55.00
3 $95,472.00$68.00
4 $112,320.00$80.00
Ref #46 848E30001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T, (36 CY)
Awd $6,480.00$180.00
2 $5,040.00$140.00
3 $6,480.00$180.00
4 $7,200.00$200.00
Ref #47 848E50000 HAND CHIPPING, (43 SY)
Awd $2,365.00$55.00
2 $1,720.00$40.00
3 $2,365.00$55.00
4 $4,300.00$100.00
Ref #48 848E50100 TEST SLAB, (LUMP SUM)
Awd $130.00$130.00
2 $100.00$100.00
3 $130.00$130.00
4 $500.00$500.00
Ref #49 848E50201 FULL DEPTH REPAIR, AS PER PLAN, (1 CY)
Awd $150.00$150.00
2 $100.00$100.00
3 $150.00$150.00
4 $1,200.00$1,200.00
Section 6 - STRUCTURE REPAIR - PART 1 BRIDGE NO. MAH - Totals
Awd $275,258.50
2 $276,879.75
3 $295,172.50
4 $335,434.00
Ref #50 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,500.00$1,500.00
3 $1,000.00$1,000.00
4 $6,000.00$6,000.00
Ref #51 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $4,000.00$4,000.00
3 $1,000.00$1,000.00
4 $8,000.00$8,000.00
120008 - Page 169
Ref #52 202E32800 CONCRETE SLOPE PROTECTION REMOVED, (78 SY)
Awd $3,120.00$40.00
2 $1,950.00$25.00
3 $3,120.00$40.00
4 $1,170.00$15.00
Ref #53 202E38000 GUARDRAIL REMOVED, (31.25 FT)
Awd $50.00$1.60
2 $156.25$5.00
3 $62.50$2.00
4 $62.50$2.00
Ref #54 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (198 LB)
Awd $495.00$2.50
2 $396.00$2.00
3 $495.00$2.50
4 $594.00$3.00
Ref #55 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (26 EACH)
Awd $312.00$12.00
2 $728.00$28.00
3 $312.00$12.00
4 $416.00$16.00
Ref #56 511E34436 CLASS S CONCRETE, BRIDGE DECK (PARAPET), (1 CY)
Awd $950.00$950.00
2 $1,000.00$1,000.00
3 $920.00$920.00
4 $2,000.00$2,000.00
Ref #57 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1233 SY)
Awd $16,029.00$13.00
2 $19,728.00$16.00
3 $14,796.00$12.00
4 $19,111.50$15.50
Ref #58 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (962 SY)
Awd $4,810.00$5.00
2 $3,848.00$4.00
3 $4,810.00$5.00
4 $2,405.00$2.50
Ref #59 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN, (10 EACH)
Awd $7,500.00$750.00
2 $4,000.00$400.00
3 $7,500.00$750.00
4 $5,750.00$575.00
Ref #60 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $6,500.00$6,500.00
2 $4,000.00$4,000.00
3 $4,500.00$4,500.00
4 $4,650.00$4,650.00
Ref #61 517E75121 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI, (5 FT)
Awd $340.00$68.00
2 $500.00$100.00
3 $850.00$170.00
4 $600.00$120.00
120008 - Page 170
Ref #62 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (500 SF)
Awd $28,250.00$56.50
2 $15,000.00$30.00
3 $37,500.00$75.00
4 $33,500.00$67.00
Ref #63 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $2,500.00$2,500.00
3 $1,000.00$1,000.00
4 $6,000.00$6,000.00
Ref #64 530E00200 SPECIAL - STRUCTURE, MISC.:REMOVE GRAFFITI FROM SU, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $2,000.00$2,000.00
3 $3,000.00$3,000.00
4 $10,000.00$10,000.00
Ref #65 601E21000 CONCRETE SLOPE PROTECTION, (78 SY)
Awd $4,680.00$60.00
2 $5,070.00$65.00
3 $4,680.00$60.00
4 $5,850.00$75.00
Ref #66 601E26000 DUMPED ROCK FILL, TYPE B, (300 CY)
Awd $13,500.00$45.00
2 $21,000.00$70.00
3 $16,500.00$55.00
4 $28,500.00$95.00
Ref #67 606E13000 GUARDRAIL, TYPE 5, (31.25 FT)
Awd $612.50$19.60
2 $625.00$20.00
3 $625.00$20.00
4 $625.00$20.00
Ref #68 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (1 EACH)
Awd $1,330.00$1,330.00
2 $1,400.00$1,400.00
3 $1,300.00$1,300.00
4 $1,350.00$1,350.00
Ref #69 613E41200 LOW STRENGTH MORTAR BACKFILL, (10 CY)
Awd $1,000.00$100.00
2 $750.00$75.00
3 $1,000.00$100.00
4 $3,500.00$350.00
Ref #70 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $135.00$18.00
2 $75.00$10.00
3 $135.00$18.00
4 $138.75$18.50
Ref #71 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $25.00$25.00
2 $100.00$100.00
3 $25.00$25.00
4 $26.00$26.00
120008 - Page 171
Ref #72 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH)
Awd $20.00$10.00
2 $20.00$10.00
3 $20.00$10.00
4 $40.00$20.00
Ref #73 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $20.00$10.00
2 $20.00$10.00
3 $40.00$20.00
4 $40.00$20.00
Ref #74 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (300 SF)
Awd $16,950.00$56.50
2 $9,000.00$30.00
3 $28,500.00$95.00
4 $20,100.00$67.00
Ref #75 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO, (910 SY)
Awd $31,850.00$35.00
2 $39,130.00$43.00
3 $31,850.00$35.00
4 $45,500.00$50.00
Ref #76 848E20001 SURFACE PREPARATION USING HYDRO DEMOLITION, AS PER, (910 SY)
Awd $52,780.00$58.00
2 $50,050.00$55.00
3 $52,780.00$58.00
4 $56,420.00$62.00
Ref #77 848E30001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T, (23 CY)
Awd $4,140.00$180.00
2 $3,220.00$140.00
3 $4,140.00$180.00
4 $4,600.00$200.00
Ref #78 848E50000 HAND CHIPPING, (28 SY)
Awd $1,540.00$55.00
2 $1,848.00$66.00
3 $1,540.00$55.00
4 $2,800.00$100.00
Ref #79 848E50100 TEST SLAB, (LUMP SUM)
Awd $130.00$130.00
2 $100.00$100.00
3 $130.00$130.00
4 $500.00$500.00
Ref #80 848E50201 FULL DEPTH REPAIR, AS PER PLAN, (1 CY)
Awd $150.00$150.00
2 $100.00$100.00
3 $150.00$150.00
4 $1,200.00$1,200.00
Ref #81 848E50301 WEARING COURSE REMOVED, ASPHALT, AS PER PLAN, (125 SY)
Awd $625.00$5.00
2 $1,125.00$9.00
3 $625.00$5.00
4 $562.50$4.50
120008 - Page 172
Ref #82 848E50321 EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN, (786 SY)
Awd $11,004.00$14.00
2 $8,646.00$11.00
3 $11,004.00$14.00
4 $11,004.00$14.00
Ref #83 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA, (24 SY)
Awd $960.00$40.00
2 $336.00$14.00
3 $960.00$40.00
4 $1,080.00$45.00
Section 7 - BRIDGE NO. MAH-680-0792E - PART 1 - Totals
Awd $217,807.50
2 $203,921.25
3 $236,869.50
4 $284,095.25
Ref #84 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $3,000.00$3,000.00
3 $1,000.00$1,000.00
4 $6,000.00$6,000.00
Ref #85 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1313 SY)
Awd $17,069.00$13.00
2 $21,008.00$16.00
3 $14,443.00$11.00
4 $20,351.50$15.50
Ref #86 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (1238 SY)
Awd $6,190.00$5.00
2 $4,952.00$4.00
3 $6,190.00$5.00
4 $3,095.00$2.50
Ref #87 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (500 SF)
Awd $25,000.00$50.00
2 $25,000.00$50.00
3 $37,500.00$75.00
4 $33,500.00$67.00
Ref #88 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $2,000.00$2,000.00
3 $1,000.00$1,000.00
4 $6,000.00$6,000.00
Ref #89 530E00200 SPECIAL - STRUCTURE, MISC.:REMOVE GRAFFITI FROM SU, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $3,500.00$3,500.00
3 $8,000.00$8,000.00
4 $10,000.00$10,000.00
Ref #90 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (42 FT)
Awd $756.00$18.00
2 $420.00$10.00
3 $756.00$18.00
4 $777.00$18.50
120008 - Page 173
Ref #91 630E80100 SIGN, FLAT SHEET, (12 SF)
Awd $279.00$23.25
2 $600.00$50.00
3 $279.00$23.25
4 $300.00$25.00
Ref #92 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $50.00$25.00
2 $100.00$50.00
3 $50.00$25.00
4 $52.00$26.00
Ref #93 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (6 EACH)
Awd $60.00$10.00
2 $60.00$10.00
3 $60.00$10.00
4 $120.00$20.00
Ref #94 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (6 EACH)
Awd $60.00$10.00
2 $60.00$10.00
3 $60.00$10.00
4 $120.00$20.00
Ref #95 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (300 SF)
Awd $15,000.00$50.00
2 $13,500.00$45.00
3 $28,500.00$95.00
4 $20,100.00$67.00
Ref #96 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO, (2942 SY)
Awd $111,796.00$38.00
2 $123,564.00$42.00
3 $111,796.00$38.00
4 $147,100.00$50.00
Ref #97 848E20001 SURFACE PREPARATION USING HYDRO DEMOLITION, AS PER, (2942 SY)
Awd $170,636.00$58.00
2 $161,810.00$55.00
3 $170,636.00$58.00
4 $191,230.00$65.00
Ref #98 848E30001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T, (74 CY)
Awd $13,320.00$180.00
2 $10,360.00$140.00
3 $13,320.00$180.00
4 $14,800.00$200.00
Ref #99 848E50000 HAND CHIPPING, (89 SY)
Awd $4,895.00$55.00
2 $5,874.00$66.00
3 $4,895.00$55.00
4 $8,900.00$100.00
Ref #100 848E50100 TEST SLAB, (LUMP SUM)
Awd $130.00$130.00
2 $100.00$100.00
3 $130.00$130.00
4 $500.00$500.00
120008 - Page 174
Ref #101 848E50201 FULL DEPTH REPAIR, AS PER PLAN, (1 CY)
Awd $150.00$150.00
2 $100.00$100.00
3 $150.00$150.00
4 $2,000.00$2,000.00
Ref #102 848E50301 WEARING COURSE REMOVED, ASPHALT, AS PER PLAN, (526 SY)
Awd $2,630.00$5.00
2 $3,682.00$7.00
3 $2,630.00$5.00
4 $2,630.00$5.00
Ref #103 848E50321 EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN, (2416 SY)
Awd $33,824.00$14.00
2 $26,576.00$11.00
3 $33,824.00$14.00
4 $36,240.00$15.00
Ref #104 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA, (73 SY)
Awd $2,920.00$40.00
2 $1,095.00$15.00
3 $2,920.00$40.00
4 $2,920.00$40.00
Section 8 - BRIDGE NO. MAH-680-0794 - PART 1 - Totals
Awd $411,765.00
2 $407,361.00
3 $438,139.00
4 $506,735.50
Ref #105 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $10,000.00$10,000.00
3 $1,000.00$1,000.00
4 $6,000.00$6,000.00
Ref #106 202E32800 CONCRETE SLOPE PROTECTION REMOVED, (150 SY)
Awd $6,000.00$40.00
2 $3,000.00$20.00
3 $6,000.00$40.00
4 $2,250.00$15.00
Ref #107 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $100.00$2.00
2 $50.00$1.00
3 $100.00$2.00
4 $150.00$3.00
Ref #108 511E71100 CONCRETE, MISC.:BACKWALL REPAIR, (5 CY)
Awd $4,750.00$950.00
2 $3,000.00$600.00
3 $4,750.00$950.00
4 $5,000.00$1,000.00
Ref #109 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (570 SY)
Awd $7,410.00$13.00
2 $9,120.00$16.00
3 $6,270.00$11.00
4 $8,835.00$15.50
120008 - Page 175
Ref #110 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (520 SY)
Awd $2,600.00$5.00
2 $2,080.00$4.00
3 $2,600.00$5.00
4 $1,300.00$2.50
Ref #111 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (500 SF)
Awd $25,000.00$50.00
2 $20,000.00$40.00
3 $37,500.00$75.00
4 $33,500.00$67.00
Ref #112 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $500.00$500.00
2 $2,000.00$2,000.00
3 $500.00$500.00
4 $6,000.00$6,000.00
Ref #113 601E21000 CONCRETE SLOPE PROTECTION, (150 SY)
Awd $7,500.00$50.00
2 $7,500.00$50.00
3 $7,500.00$50.00
4 $11,700.00$78.00
Ref #114 613E41200 LOW STRENGTH MORTAR BACKFILL, (19 CY)
Awd $1,900.00$100.00
2 $1,900.00$100.00
3 $1,900.00$100.00
4 $5,700.00$300.00
Ref #115 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (21 FT)
Awd $378.00$18.00
2 $210.00$10.00
3 $378.00$18.00
4 $388.50$18.50
Ref #116 630E80100 SIGN, FLAT SHEET, (6 SF)
Awd $139.50$23.25
2 $300.00$50.00
3 $139.50$23.25
4 $150.00$25.00
Ref #117 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $25.00$25.00
2 $50.00$50.00
3 $25.00$25.00
4 $26.00$26.00
Ref #118 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (3 EACH)
Awd $30.00$10.00
2 $30.00$10.00
3 $30.00$10.00
4 $60.00$20.00
Ref #119 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (3 EACH)
Awd $30.00$10.00
2 $30.00$10.00
3 $30.00$10.00
4 $60.00$20.00
120008 - Page 176
Ref #120 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (300 SF)
Awd $15,000.00$50.00
2 $12,000.00$40.00
3 $28,500.00$95.00
4 $20,100.00$67.00
Ref #121 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO, (877 SY)
Awd $33,326.00$38.00
2 $30,695.00$35.00
3 $33,326.00$38.00
4 $43,850.00$50.00
Ref #122 848E20001 SURFACE PREPARATION USING HYDRO DEMOLITION, AS PER, (877 SY)
Awd $50,866.00$58.00
2 $48,235.00$55.00
3 $50,866.00$58.00
4 $57,005.00$65.00
Ref #123 848E30001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T, (22 CY)
Awd $3,960.00$180.00
2 $3,080.00$140.00
3 $3,960.00$180.00
4 $4,400.00$200.00
Ref #124 848E50000 HAND CHIPPING, (27 SY)
Awd $1,485.00$55.00
2 $1,350.00$50.00
3 $1,485.00$55.00
4 $2,700.00$100.00
Ref #125 848E50100 TEST SLAB, (LUMP SUM)
Awd $130.00$130.00
2 $100.00$100.00
3 $130.00$130.00
4 $500.00$500.00
Ref #126 848E50201 FULL DEPTH REPAIR, AS PER PLAN, (1 CY)
Awd $150.00$150.00
2 $100.00$100.00
3 $150.00$150.00
4 $2,000.00$2,000.00
Ref #127 848E50301 WEARING COURSE REMOVED, ASPHALT, AS PER PLAN, (284 SY)
Awd $1,420.00$5.00
2 $1,704.00$6.00
3 $1,420.00$5.00
4 $1,704.00$6.00
Ref #128 848E50321 EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN, (594 SY)
Awd $8,316.00$14.00
2 $5,346.00$9.00
3 $8,316.00$14.00
4 $10,692.00$18.00
Ref #129 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA, (18 SY)
Awd $720.00$40.00
2 $198.00$11.00
3 $720.00$40.00
4 $720.00$40.00
120008 - Page 177
Section 9 - BRIDGE NO. MAH-680-1073L - PART 1 - Totals
Awd $172,735.50
2 $162,078.00
3 $197,595.50
4 $224,790.50
Ref #130 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $10,000.00$10,000.00
3 $1,000.00$1,000.00
4 $6,000.00$6,000.00
Ref #131 202E32800 CONCRETE SLOPE PROTECTION REMOVED, (20 SY)
Awd $800.00$40.00
2 $1,000.00$50.00
3 $800.00$40.00
4 $300.00$15.00
Ref #132 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $100.00$2.00
2 $100.00$2.00
3 $100.00$2.00
4 $150.00$3.00
Ref #133 511E71100 CONCRETE, MISC.:BACKWALL REPAIR, (5 CY)
Awd $4,750.00$950.00
2 $3,000.00$600.00
3 $4,750.00$950.00
4 $5,000.00$1,000.00
Ref #134 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (569 SY)
Awd $7,397.00$13.00
2 $9,104.00$16.00
3 $6,259.00$11.00
4 $8,819.50$15.50
Ref #135 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (519 SY)
Awd $2,595.00$5.00
2 $2,076.00$4.00
3 $2,595.00$5.00
4 $1,297.50$2.50
Ref #136 513E95000 STRUCTURAL STEEL, MISC.:REPAIR OF BROKEN SECONDARY, (33 FT)
Awd $825.00$25.00
2 $825.00$25.00
3 $1,650.00$50.00
4 $990.00$30.00
Ref #137 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN, (14 EACH)
Awd $10,500.00$750.00
2 $5,600.00$400.00
3 $7,700.00$550.00
4 $8,400.00$600.00
Ref #138 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $5,100.00$5,100.00
2 $4,000.00$4,000.00
3 $4,500.00$4,500.00
4 $5,000.00$5,000.00
120008 - Page 178
Ref #139 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (500 SF)
Awd $25,000.00$50.00
2 $20,000.00$40.00
3 $37,500.00$75.00
4 $33,500.00$67.00
Ref #140 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $500.00$500.00
2 $2,000.00$2,000.00
3 $500.00$500.00
4 $6,000.00$6,000.00
Ref #141 601E21000 CONCRETE SLOPE PROTECTION, (20 SY)
Awd $1,000.00$50.00
2 $3,000.00$150.00
3 $1,000.00$50.00
4 $1,400.00$70.00
Ref #142 613E41200 LOW STRENGTH MORTAR BACKFILL, (3 CY)
Awd $300.00$100.00
2 $300.00$100.00
3 $300.00$100.00
4 $900.00$300.00
Ref #143 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (21 FT)
Awd $378.00$18.00
2 $210.00$10.00
3 $378.00$18.00
4 $388.50$18.50
Ref #144 630E80100 SIGN, FLAT SHEET, (6 SF)
Awd $139.50$23.25
2 $150.00$25.00
3 $139.50$23.25
4 $150.00$25.00
Ref #145 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $25.00$25.00
2 $25.00$25.00
3 $25.00$25.00
4 $26.00$26.00
Ref #146 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (3 EACH)
Awd $30.00$10.00
2 $30.00$10.00
3 $30.00$10.00
4 $60.00$20.00
Ref #147 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (3 EACH)
Awd $30.00$10.00
2 $30.00$10.00
3 $30.00$10.00
4 $60.00$20.00
Ref #148 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (300 SF)
Awd $15,000.00$50.00
2 $12,000.00$40.00
3 $28,500.00$95.00
4 $20,100.00$67.00
120008 - Page 179
Ref #149 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO, (877 SY)
Awd $33,326.00$38.00
2 $30,695.00$35.00
3 $33,326.00$38.00
4 $43,850.00$50.00
Ref #150 848E20001 SURFACE PREPARATION USING HYDRO DEMOLITION, AS PER, (877 SY)
Awd $50,866.00$58.00
2 $48,235.00$55.00
3 $50,866.00$58.00
4 $57,005.00$65.00
Ref #151 848E30001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T, (22 CY)
Awd $3,960.00$180.00
2 $2,860.00$130.00
3 $3,960.00$180.00
4 $4,400.00$200.00
Ref #152 848E50000 HAND CHIPPING, (27 SY)
Awd $1,485.00$55.00
2 $1,350.00$50.00
3 $1,485.00$55.00
4 $2,700.00$100.00
Ref #153 848E50100 TEST SLAB, (LUMP SUM)
Awd $130.00$130.00
2 $100.00$100.00
3 $130.00$130.00
4 $500.00$500.00
Ref #154 848E50201 FULL DEPTH REPAIR, AS PER PLAN, (1 CY)
Awd $150.00$150.00
2 $100.00$100.00
3 $150.00$150.00
4 $2,000.00$2,000.00
Ref #155 848E50301 WEARING COURSE REMOVED, ASPHALT, AS PER PLAN, (284 SY)
Awd $1,420.00$5.00
2 $1,704.00$6.00
3 $1,420.00$5.00
4 $1,988.00$7.00
Ref #156 848E50321 EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN, (594 SY)
Awd $8,316.00$14.00
2 $5,346.00$9.00
3 $8,316.00$14.00
4 $11,286.00$19.00
Ref #157 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA, (18 SY)
Awd $720.00$40.00
2 $180.00$10.00
3 $720.00$40.00
4 $720.00$40.00
Section 10 - BRIDGE NO. MAH-680-1073R - PART 1 - Totals
Awd $175,842.50
2 $164,020.00
3 $198,129.50
4 $222,990.50
120008 - Page 180
Ref #158 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $1,500.00$1,500.00
3 $2,000.00$2,000.00
4 $6,000.00$6,000.00
Ref #159 202E23000 PAVEMENT REMOVED, (1045 SY)
Awd $9,927.50$9.50
2 $12,540.00$12.00
3 $7,315.00$7.00
4 $11,495.00$11.00
Ref #160 202E23500 WEARING COURSE REMOVED, (1921 SY)
Awd $14,407.50$7.50
2 $11,526.00$6.00
3 $14,407.50$7.50
4 $15,368.00$8.00
Ref #161 202E30700 CONCRETE BARRIER REMOVED, (167 FT)
Awd $3,006.00$18.00
2 $2,171.00$13.00
3 $1,670.00$10.00
4 $3,674.00$22.00
Ref #162 202E35100 PIPE REMOVED, 24" AND UNDER, (55 FT)
Awd $880.00$16.00
2 $715.00$13.00
3 $440.00$8.00
4 $550.00$10.00
Ref #163 202E38000 GUARDRAIL REMOVED, (362.5 FT)
Awd $580.00$1.60
2 $362.50$1.00
3 $725.00$2.00
4 $725.00$2.00
Ref #164 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (4 EACH)
Awd $340.00$85.00
2 $800.00$200.00
3 $340.00$85.00
4 $360.00$90.00
Ref #165 202E58100 CATCH BASIN REMOVED, (1 EACH)
Awd $150.00$150.00
2 $600.00$600.00
3 $175.00$175.00
4 $300.00$300.00
Ref #166 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (80 FT)
Awd $720.00$9.00
2 $1,360.00$17.00
3 $520.00$6.50
4 $1,280.00$16.00
Ref #167 203E10000 EXCAVATION, (350 CY)
Awd $4,200.00$12.00
2 $4,550.00$13.00
3 $3,500.00$10.00
4 $4,900.00$14.00
120008 - Page 181
Ref #168 203E20000 EMBANKMENT, (540 CY)
Awd $5,400.00$10.00
2 $8,640.00$16.00
3 $8,100.00$15.00
4 $8,100.00$15.00
Ref #169 204E10000 SUBGRADE COMPACTION, (1858 SY)
Awd $4,645.00$2.50
2 $1,858.00$1.00
3 $2,787.00$1.50
4 $7,432.00$4.00
Ref #170 606E13000 GUARDRAIL, TYPE 5, (312.5 FT)
Awd $6,000.00$19.20
2 $6,250.00$20.00
3 $6,000.00$19.20
4 $6,250.00$20.00
Ref #171 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (2 EACH)
Awd $2,660.00$1,330.00
2 $2,800.00$1,400.00
3 $2,660.00$1,330.00
4 $2,700.00$1,350.00
Ref #172 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2, (2 EACH)
Awd $850.00$425.00
2 $1,000.00$500.00
3 $850.00$425.00
4 $880.00$440.00
Ref #173 606E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL)(70 MPH, , (1 EACH)
Awd $24,000.00$24,000.00
2 $25,000.00$25,000.00
3 $22,650.00$22,650.00
4 $23,000.00$23,000.00
Ref #174 622E23405 CONCRETE BARRIER, TYPE B1, AS PER PLAN, (166 FT)
Awd $15,770.00$95.00
2 $19,090.00$115.00
3 $26,228.00$158.00
4 $9,130.00$55.00
Section 11 - ROADWAY - PART 2 - Totals
Awd $95,036.00
2 $100,762.50
3 $100,367.50
4 $102,144.00
Ref #175 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (124 SY)
Awd $7,440.00$60.00
2 $4,960.00$40.00
3 $7,440.00$60.00
4 $23,560.00$190.00
Ref #176 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (2 CY)
Awd $200.00$100.00
2 $400.00$200.00
3 $120.00$60.00
4 $230.00$115.00
120008 - Page 182
Ref #177 659E10000 SEEDING AND MULCHING, (4807 SY)
Awd $4,326.30$0.90
2 $12,017.50$2.50
3 $6,489.45$1.35
4 $4,085.95$0.85
Ref #178 659E14000 REPAIR SEEDING AND MULCHING, (241 SY)
Awd $325.35$1.35
2 $24.10$0.10
3 $108.45$0.45
4 $241.00$1.00
Ref #179 659E15000 INTER-SEEDING, (241 SY)
Awd $325.35$1.35
2 $24.10$0.10
3 $24.10$0.10
4 $24.10$0.10
Ref #180 659E20000 COMMERCIAL FERTILIZER, (0.68 TON)
Awd $408.00$600.00
2 $340.00$500.00
3 $204.00$300.00
4 $421.60$620.00
Ref #181 659E31000 LIME, (1 ACRE)
Awd $235.00$235.00
2 $400.00$400.00
3 $70.00$70.00
4 $50.00$50.00
Ref #182 659E35000 WATER, (28 MGAL)
Awd $280.00$10.00
2 $28.00$1.00
3 $28.00$1.00
4 $28.00$1.00
Ref #183 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
Section 12 - EROSION CONTROL - PART 2 - Totals
Awd $14,540.00
2 $19,193.70
3 $15,484.00
4 $29,640.65
Ref #184 602E20000 CONCRETE MASONRY, (0.3 CY)
Awd $300.00$1,000.00
2 $600.00$2,000.00
3 $360.00$1,200.00
4 $300.00$1,000.00
Ref #185 603E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (247 FT)
Awd $2,964.00$12.00
2 $2,964.00$12.00
3 $2,470.00$10.00
4 $3,705.00$15.00
120008 - Page 183
Ref #186 603E00900 6" CONDUIT, TYPE B, (90 FT)
Awd $1,350.00$15.00
2 $1,620.00$18.00
3 $1,080.00$12.00
4 $1,800.00$20.00
Ref #187 603E01500 6" CONDUIT, TYPE F, (50 FT)
Awd $500.00$10.00
2 $650.00$13.00
3 $600.00$12.00
4 $800.00$16.00
Ref #188 603E05900 15" CONDUIT, TYPE B, (90 FT)
Awd $3,420.00$38.00
2 $5,400.00$60.00
3 $3,150.00$35.00
4 $4,500.00$50.00
Ref #189 603E06700 15" CONDUIT, TYPE F, (44 FT)
Awd $1,980.00$45.00
2 $2,200.00$50.00
3 $1,540.00$35.00
4 $2,200.00$50.00
Ref #190 604E20514 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE B1, (1 EACH)
Awd $5,000.00$5,000.00
2 $4,500.00$4,500.00
3 $7,000.00$7,000.00
4 $3,500.00$3,500.00
Ref #191 604E36600 PRECAST REINFORCED CONCRETE OUTLET, (8 EACH)
Awd $800.00$100.00
2 $1,200.00$150.00
3 $1,000.00$125.00
4 $1,720.00$215.00
Ref #192 605E11100 6" SHALLOW PIPE UNDERDRAINS, (184 FT)
Awd $1,840.00$10.00
2 $2,208.00$12.00
3 $2,576.00$14.00
4 $2,024.00$11.00
Ref #193 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (100 FT)
Awd $1,200.00$12.00
2 $1,200.00$12.00
3 $1,400.00$14.00
4 $1,100.00$11.00
Section 13 - DRAINAGE - PART 2 - Totals
Awd $19,354.00
2 $22,542.00
3 $21,176.00
4 $21,649.00
Ref #194 301E46000 ASPHALT CONCRETE BASE, PG64-22, (95 CY)
Awd $15,675.00$165.00
2 $16,150.00$170.00
3 $15,675.00$165.00
4 $16,150.00$170.00
120008 - Page 184
Ref #195 304E20000 AGGREGATE BASE, (310 CY)
Awd $13,950.00$45.00
2 $15,190.00$49.00
3 $15,500.00$50.00
4 $17,050.00$55.00
Ref #196 305E12000 8" CONCRETE BASE, (1067 SY)
Awd $44,814.00$42.00
2 $74,690.00$70.00
3 $64,020.00$60.00
4 $69,355.00$65.00
Ref #197 407E13900 TACK COAT, 702.13, (224 GAL)
Awd $560.00$2.50
2 $672.00$3.00
3 $560.00$2.50
4 $582.40$2.60
Ref #198 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (161 GAL)
Awd $322.00$2.00
2 $483.00$3.00
3 $322.00$2.00
4 $338.10$2.10
Ref #199 442E20050 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE B (4, (124 CY)
Awd $27,900.00$225.00
2 $31,000.00$250.00
3 $29,760.00$240.00
4 $27,900.00$225.00
Ref #200 442E20250 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE , (245 CY)
Awd $36,750.00$150.00
2 $40,425.00$165.00
3 $39,200.00$160.00
4 $36,750.00$150.00
Ref #201 609E24510 CURB, TYPE 4-C, (57 FT)
Awd $1,140.00$20.00
2 $2,850.00$50.00
3 $1,425.00$25.00
4 $912.00$16.00
Ref #202 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE), (754 FT)
Awd $754.00$1.00
2 $3,016.00$4.00
3 $3,393.00$4.50
4 $3,204.50$4.25
Ref #203 618E40200 RUMBLE STRIPS, (CONCRETE), (941 FT)
Awd $1,411.50$1.50
2 $4,705.00$5.00
3 $6,587.00$7.00
4 $3,999.25$4.25
Section 14 - PAVEMENT - PART 2 - Totals
Awd $143,276.50
2 $189,181.00
3 $176,442.00
4 $176,241.25
120008 - Page 185
Ref #204 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE, (932 FT)
Awd $2,796.00$3.00
2 $2,796.00$3.00
3 $2,796.00$3.00
4 $2,889.20$3.10
Ref #205 625E25200 CONDUIT, 1-1/4", 725.04, (290 FT)
Awd $2,900.00$10.00
2 $2,900.00$10.00
3 $2,900.00$10.00
4 $2,987.00$10.30
Ref #206 625E25920 CONDUIT, MISC.:1-1/4" FLEXIBLE, (16 FT)
Awd $128.00$8.00
2 $128.00$8.00
3 $128.00$8.00
4 $132.80$8.30
Ref #207 625E27501 LUMINAIRE, UNDERPASS, AS PER PLAN, 250 WATT, HPS, , (8 EACH)
Awd $5,200.00$650.00
2 $5,600.00$700.00
3 $5,200.00$650.00
4 $5,360.00$670.00
Ref #208 625E29900 JUNCTION BOX, (8 EACH)
Awd $4,800.00$600.00
2 $4,800.00$600.00
3 $4,800.00$600.00
4 $4,960.00$620.00
Ref #209 625E75801 DISCONNECT CIRCUIT, AS PER PLAN, (1 EACH)
Awd $250.00$250.00
2 $300.00$300.00
3 $250.00$250.00
4 $260.00$260.00
Ref #210 625E98200 LIGHTING, MISC.:REMOVE UNDERPASS LIGHTING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,000.00$1,000.00
3 $1,000.00$1,000.00
4 $1,050.00$1,050.00
Ref #211 631E85000 DISCONNECT SWITCH, 30 AMP, (2 EACH)
Awd $1,600.00$800.00
2 $1,600.00$800.00
3 $1,600.00$800.00
4 $1,650.00$825.00
Section 15 - LIGHTING - PART 2 - Totals
Awd $18,674.00
2 $19,124.00
3 $18,674.00
4 $19,289.00
Ref #212 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR)
Awd $4,400.00$55.00
2 $4,000.00$50.00
3 $4,960.00$62.00
4 $4,800.00$60.00
120008 - Page 186
Ref #213 614E11500 WORKSITE TRAFFIC SUPERVISOR, (6 MNTH)
Awd $3,000.00$500.00
2 $12,000.00$2,000.00
3 $8,580.00$1,430.00
4 $9,000.00$1,500.00
Ref #214 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (8 EACH)
Awd $14,400.00$1,800.00
2 $9,600.00$1,200.00
3 $15,000.00$1,875.00
4 $16,800.00$2,100.00
Ref #215 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $2,000.00$2,000.00
3 $13,200.00$13,200.00
4 $6,000.00$6,000.00
Ref #216 614E12800 WORK ZONE RAISED PAVEMENT MARKER, (1498 EACH)
Awd $4,868.50$3.25
2 $4,494.00$3.00
3 $82,390.00$55.00
4 $6,366.50$4.25
Ref #217 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P, (8 CY)
Awd $9,600.00$1,200.00
2 $1,200.00$150.00
3 $4,000.00$500.00
4 $10,000.00$1,250.00
Ref #218 614E13100 BARRIER REFLECTOR, (86 EACH)
Awd $258.00$3.00
2 $430.00$5.00
3 $430.00$5.00
4 $451.50$5.25
Ref #219 614E13300 BARRIER REFLECTOR, TYPE B, (97 EACH)
Awd $291.00$3.00
2 $485.00$5.00
3 $582.00$6.00
4 $509.25$5.25
Ref #220 614E13350 OBJECT MARKER, ONE WAY, (150 EACH)
Awd $1,050.00$7.00
2 $3,000.00$20.00
3 $2,250.00$15.00
4 $1,650.00$11.00
Ref #221 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (28 DAY)
Awd $700.00$25.00
2 $1,400.00$50.00
3 $560.00$20.00
4 $980.00$35.00
Ref #222 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (5.11 MILE)
Awd $26,444.25$5,175.00
2 $25,550.00$5,000.00
3 $28,105.00$5,500.00
4 $27,594.00$5,400.00
120008 - Page 187
Ref #223 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 740.06, TYPE, (10496 FT)
Awd $20,572.16$1.96
2 $16,793.60$1.60
3 $20,992.00$2.00
4 $20,992.00$2.00
Ref #224 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER , (356 SY)
Awd $17,800.00$50.00
2 $28,480.00$80.00
3 $26,700.00$75.00
4 $27,412.00$77.00
Ref #225 615E35001 PAVEMENT FOR MAINTAINING TRAFFIC, AS PER PLAN, (4000 SY)
Awd $120,000.00$30.00
2 $140,000.00$35.00
3 $120,000.00$30.00
4 $124,000.00$31.00
Ref #226 616E10000 WATER, (15 MGAL)
Awd $300.00$20.00
2 $15.00$1.00
3 $15.00$1.00
4 $75.00$5.00
Ref #227 621E54001 RAISED PAVEMENT MARKER REMOVED, AS PER PLAN, (120 EACH)
Awd $600.00$5.00
2 $600.00$5.00
3 $600.00$5.00
4 $600.00$5.00
Ref #228 622E40020 PORTABLE CONCRETE BARRIER, 32", (3720 FT)
Awd $24,180.00$6.50
2 $33,480.00$9.00
3 $19,530.00$5.25
4 $40,920.00$11.00
Ref #229 622E40040 PORTABLE CONCRETE BARRIER, 32", BRIDGE MOUNTED, (780 FT)
Awd $9,360.00$12.00
2 $9,360.00$12.00
3 $4,095.00$5.25
4 $11,700.00$15.00
Section 16 - MAINTENANCE OF TRAFFIC - PART 2 - Totals
Awd $263,823.91
2 $292,887.60
3 $351,989.00
4 $309,850.25
Ref #230 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $285,000.00$285,000.00
2 $220,000.00$220,000.00
3 $220,000.00$220,000.00
4 $300,000.00$300,000.00
Ref #231 202E22900 APPROACH SLAB REMOVED, (702 SY)
Awd $12,636.00$18.00
2 $18,252.00$26.00
3 $12,636.00$18.00
4 $15,444.00$22.00
120008 - Page 188
Ref #232 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM)
Awd $35,000.00$35,000.00
2 $27,000.00$27,000.00
3 $57,940.00$57,940.00
4 $30,000.00$30,000.00
Ref #233 503E21100 UNCLASSIFIED EXCAVATION, (221 CY)
Awd $11,050.00$50.00
2 $18,785.00$85.00
3 $17,680.00$80.00
4 $13,260.00$60.00
Ref #234 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (286793 LB)
Awd $272,453.35$0.95
2 $301,132.65$1.05
3 $295,396.79$1.03
4 $318,340.23$1.11
Ref #235 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS , (588 EACH)
Awd $6,468.00$11.00
2 $7,644.00$13.00
3 $7,056.00$12.00
4 $9,408.00$16.00
Ref #236 511E45700 CLASS C CONCRETE, ABUTMENT, (93 CY)
Awd $32,550.00$350.00
2 $42,315.00$455.00
3 $41,850.00$450.00
4 $39,525.00$425.00
Ref #237 511E50001 CLASS HP CONCRETE, BRIDGE DECK, AS PER PLAN, (746 CY)
Awd $354,350.00$475.00
2 $387,920.00$520.00
3 $369,270.00$495.00
4 $328,240.00$440.00
Ref #238 511E50101 CLASS HP CONCRETE, BRIDGE DECK (PARAPET), AS PER P, (108 CY)
Awd $37,800.00$350.00
2 $55,080.00$510.00
3 $58,320.00$540.00
4 $54,000.00$500.00
Ref #239 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)
Awd $500.00$500.00
2 $100.00$100.00
3 $300.00$300.00
4 $1,200.00$1,200.00
Ref #240 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1768 SY)
Awd $22,984.00$13.00
2 $28,288.00$16.00
3 $22,984.00$13.00
4 $27,404.00$15.50
Ref #241 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (162 SY)
Awd $3,240.00$20.00
2 $3,888.00$24.00
3 $1,620.00$10.00
4 $2,025.00$12.50
120008 - Page 189
Ref #242 512E33000 TYPE 2 WATERPROOFING, (110 SY)
Awd $2,200.00$20.00
2 $2,750.00$25.00
3 $2,200.00$20.00
4 $2,750.00$25.00
Ref #243 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (769 SY)
Awd $3,845.00$5.00
2 $3,076.00$4.00
3 $2,307.00$3.00
4 $1,922.50$2.50
Ref #244 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN, (5000 LB)
Awd $18,750.00$3.75
2 $25,000.00$5.00
3 $22,500.00$4.50
4 $20,000.00$4.00
Ref #245 513E10221 STRUCTURAL STEEL MEMBERS, LEVEL 1, AS PER PLAN, (25075 LB)
Awd $225,675.00$9.00
2 $175,525.00$7.00
3 $165,495.00$6.60
4 $200,600.00$8.00
Ref #246 513E20000 WELDED STUD SHEAR CONNECTORS, (7992 EACH)
Awd $25,574.40$3.20
2 $30,369.60$3.80
3 $24,775.20$3.10
4 $27,172.80$3.40
Ref #247 514E00300 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $30,000.00$30,000.00
3 $25,000.00$25,000.00
4 $42,000.00$42,000.00
Ref #248 514E00400 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $30,000.00$30,000.00
3 $25,000.00$25,000.00
4 $42,000.00$42,000.00
Ref #249 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (8 MNHR)
Awd $800.00$100.00
2 $720.00$90.00
3 $960.00$120.00
4 $600.00$75.00
Ref #250 514E27700 FIELD PAINTING, MISC.:REPAIR PAINTING, (550 SF)
Awd $55,000.00$100.00
2 $41,250.00$75.00
3 $24,750.00$45.00
4 $41,250.00$75.00
Ref #251 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (30 SF)
Awd $120.00$4.00
2 $150.00$5.00
3 $150.00$5.00
4 $240.00$8.00
120008 - Page 190
Ref #252 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.:REINFORCED, (293 FT)
Awd $234,400.00$800.00
2 $240,846.00$822.00
3 $271,025.00$925.00
4 $249,050.00$850.00
Ref #253 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN, (68 EACH)
Awd $85,000.00$1,250.00
2 $61,200.00$900.00
3 $77,452.00$1,139.00
4 $61,200.00$900.00
Ref #254 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $33,000.00$33,000.00
3 $26,500.00$26,500.00
4 $27,500.00$27,500.00
Ref #255 518E12201 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN, (21 EACH)
Awd $37,800.00$1,800.00
2 $48,300.00$2,300.00
3 $36,540.00$1,740.00
4 $26,250.00$1,250.00
Ref #256 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (180 CY)
Awd $11,700.00$65.00
2 $14,400.00$80.00
3 $8,100.00$45.00
4 $9,900.00$55.00
Ref #257 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (271 FT)
Awd $2,439.00$9.00
2 $1,355.00$5.00
3 $2,710.00$10.00
4 $3,658.50$13.50
Ref #258 519E11100 PATCHING CONCRETE STRUCTURE, (100 SF)
Awd $7,500.00$75.00
2 $6,000.00$60.00
3 $6,500.00$65.00
4 $6,700.00$67.00
Ref #259 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (779 SY)
Awd $144,115.00$185.00
2 $167,485.00$215.00
3 $151,905.00$195.00
4 $179,575.08$230.52
Section 17 - STRUCTURE REPAIR - PART 2 BRIDGE NO. MAH - Totals
Awd $1,993,949.75
2 $2,021,831.25
3 $1,978,921.99
4 $2,081,215.11
Ref #260 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $55,220.88$55,220.88
2 $30,000.00$30,000.00
3 $29,900.00$29,900.00
4 $40,000.00$40,000.00
120008 - Page 191
Ref #261 108E30000 SPECIAL - CPM PROGRESS SCHEDULE SHORT DURATION PRO, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $5,000.00$5,000.00
3 $2,000.00$2,000.00
4 $5,000.00$5,000.00
Ref #262 614E11000 MAINTAINING TRAFFIC- PARTS 1 & 2 (WT: 39), (LUMP SUM)
Awd $160,000.00$160,000.00
2 $155,000.00$155,000.00
3 $114,000.00$114,000.00
4 $270,000.00$270,000.00
Ref #263 619E16010 FIELD OFFICE, TYPE B- PARTS 1 & 2 (WT: NR), (8 MNTH)
Awd $10,000.00$1,250.00
2 $20,000.00$2,500.00
3 $8,000.00$1,000.00
4 $12,800.00$1,600.00
Ref #264 623E10000 CONSTRUCTION LAYOUT STAKES- PARTS 1 & 2 (WT: NR), (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,000.00$5,000.00
3 $48,533.00$48,533.00
4 $36,000.00$36,000.00
Ref #265 624E10000 MOBILIZATION- PARTS 1 & 2 (WT: NR), (LUMP SUM)
Awd $100,000.00$100,000.00
2 $100,000.00$100,000.00
3 $100,000.00$100,000.00
4 $200,000.00$200,000.00
Section 18 - INCIDENTALS - Totals
Awd $332,220.88
2 $315,000.00
3 $302,433.00
4 $563,800.00
120008 - Page 192
Project No. 120009
PID 82909
MAH-SR-7/165/170-0.00/21.80/0.00
Federal
Type: TWO LANE RESURFACING
Completion Date: 8/30/2012
Award Amount: $1,522,160.50
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 1/12/2012
Engineer's Estimate: $1,580,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
3570 SOUTH RIVER RD
ZANESVILLE, OH 43701
Muskingum
Bidder 1
Bid $1,522,160.50
DIORIO PAVING CO INC
1200 SOUTH STATE ST
GIRARD, OH 44420
Trumbull
Bidder 2
Bid $1,571,772.79
KARVO PAVING COMPANY
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 3
Bid $1,592,163.84
BUTCH & MC CREE PAVING INC
4862 W STATE ST PO BOX 272
HILLSVILLE, PA 16132
Bidder 4
Bid $1,615,991.00
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 5
Bid $1,632,369.01
BARBICAS CONSTRUCTION COMPANY INC
124 DARROW RD
AKRON, OH 44305
Summit
Bidder 6
Bid $1,772,472.17
BURTON SCOT CONTRACTORS LLC
11330 KINSMAN RD
NEWBURY, OH 44065
Geauga
Bidder 7
Bid $1,889,379.00
120009 - Page 193
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $500.00$500.00
2 $500.00$500.00
3 $100.00$100.00
4 $1,500.00$1,500.00
5 $500.00$500.00
6 $500.00$500.00
7 $2,000.00$2,000.00
Ref #2 202E23500 WEARING COURSE REMOVED, (3554 SY)
Awd $14,216.00$4.00
2 $11,728.20$3.30
3 $6,219.50$1.75
4 $10,662.00$3.00
5 $16,206.24$4.56
6 $7,108.00$2.00
7 $17,770.00$5.00
Ref #3 202E30000 WALK REMOVED, (806 SF)
Awd $1,612.00$2.00
2 $2,659.80$3.30
3 $5,037.50$6.25
4 $4,030.00$5.00
5 $2,418.00$3.00
6 $2,418.00$3.00
7 $2,418.00$3.00
Ref #4 202E32000 CURB REMOVED, (12 FT)
Awd $51.00$4.25
2 $156.00$13.00
3 $192.00$16.00
4 $240.00$20.00
5 $144.00$12.00
6 $144.00$12.00
7 $144.00$12.00
Ref #5 202E32500 CURB AND GUTTER REMOVED, (63 FT)
Awd $283.50$4.50
2 $1,039.50$16.50
3 $1,134.00$18.00
4 $1,134.00$18.00
5 $945.00$15.00
6 $945.00$15.00
7 $945.00$15.00
Ref #6 203E10000 EXCAVATION, (184 CY)
Awd $1,380.00$7.50
2 $3,680.00$20.00
3 $2,760.00$15.00
4 $4,600.00$25.00
5 $920.00$5.00
6 $4,600.00$25.00
7 $3,312.00$18.00
120009 - Page 194
Ref #7 604E38501 MONUMENT ASSEMBLY, AS PER PLAN, (20 EACH)
Awd $20,000.00$1,000.00
2 $10,380.00$519.00
3 $14,000.00$700.00
4 $10,000.00$500.00
5 $15,000.00$750.00
6 $8,000.00$400.00
7 $16,000.00$800.00
Ref #8 608E12000 5" CONCRETE WALK, (100 SF)
Awd $425.00$4.25
2 $650.00$6.50
3 $655.00$6.55
4 $1,000.00$10.00
5 $600.00$6.00
6 $600.00$6.00
7 $600.00$6.00
Ref #9 608E52000 CURB RAMP, (856 SF)
Awd $10,272.00$12.00
2 $11,299.20$13.20
3 $11,556.00$13.50
4 $17,120.00$20.00
5 $10,272.00$12.00
6 $10,272.00$12.00
7 $10,272.00$12.00
Ref #10 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (5 EACH)
Awd $750.00$150.00
2 $600.00$120.00
3 $625.00$125.00
4 $375.00$75.00
5 $1,000.00$200.00
6 $1,175.00$235.00
7 $1,000.00$200.00
Section 1 - ROADWAY - Totals
Awd $49,489.50
2 $42,692.70
3 $42,279.00
4 $50,661.00
5 $48,005.24
6 $35,762.00
7 $54,461.00
Ref #11 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
6 $1,000.00$1.00
7 $1,000.00$1.00
120009 - Page 195
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
5 $1,000.00
6 $1,000.00
7 $1,000.00
Ref #12 604E09000 CATCH BASIN ADJUSTED TO GRADE, (3 EACH)
Awd $1,050.00$350.00
2 $1,500.00$500.00
3 $1,800.00$600.00
4 $600.00$200.00
5 $2,550.00$850.00
6 $2,100.00$700.00
7 $1,500.00$500.00
Section 3 - DRAINAGE - Totals
Awd $1,050.00
2 $1,500.00
3 $1,800.00
4 $600.00
5 $2,550.00
6 $2,100.00
7 $1,500.00
Ref #13 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (1000 SY)
Awd $35,000.00$35.00
2 $19,820.00$19.82
3 $22,000.00$22.00
4 $16,250.00$16.25
5 $23,630.00$23.63
6 $22,000.00$22.00
7 $29,000.00$29.00
Ref #14 252E01500 FULL DEPTH PAVEMENT SAWING, (600 FT)
Awd $600.00$1.00
2 $1,800.00$3.00
3 $1,200.00$2.00
4 $3,000.00$5.00
5 $1,200.00$2.00
6 $1,200.00$2.00
7 $1,350.00$2.25
Ref #15 253E01000 PAVEMENT REPAIR, (1100 SY)
Awd $55,000.00$50.00
2 $72,270.00$65.70
3 $60,500.00$55.00
4 $67,100.00$61.00
5 $40,601.00$36.91
6 $77,000.00$70.00
7 $82,500.00$75.00
120009 - Page 196
Ref #16 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (120774 SY)
Awd $90,580.50$0.75
2 $138,890.10$1.15
3 $118,358.52$0.98
4 $90,580.50$0.75
5 $90,580.50$0.75
6 $169,083.60$1.40
7 $157,006.20$1.30
Ref #17 304E20000 AGGREGATE BASE, (194 CY)
Awd $4,850.00$25.00
2 $10,670.00$55.00
3 $4,850.00$25.00
4 $10,088.00$52.00
5 $3,880.00$20.00
6 $6,790.00$35.00
7 $9,700.00$50.00
Ref #18 407E10000 TACK COAT, (9812 GAL)
Awd $17,171.00$1.75
2 $21,586.40$2.20
3 $17,171.00$1.75
4 $19,624.00$2.00
5 $18,152.20$1.85
6 $19,624.00$2.00
7 $24,530.00$2.50
Ref #19 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (6767 GAL)
Awd $11,842.25$1.75
2 $14,887.40$2.20
3 $11,842.25$1.75
4 $13,534.00$2.00
5 $12,518.95$1.85
6 $13,534.00$2.00
7 $16,917.50$2.50
Ref #20 422E10000 SINGLE CHIP SEAL, (57435 SY)
Awd $100,511.25$1.75
2 $98,788.20$1.72
3 $91,896.00$1.60
4 $103,383.00$1.80
5 $91,321.65$1.59
6 $114,870.00$2.00
7 $98,788.20$1.72
Ref #21 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (816 CY)
Awd $81,600.00$100.00
2 $96,206.40$117.90
3 $92,208.00$113.00
4 $101,184.00$124.00
5 $89,760.00$110.00
6 $97,920.00$120.00
7 $110,160.00$135.00
120009 - Page 197
Ref #22 448E46904 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG70-22M, (5138 CY)
Awd $719,320.00$140.00
2 $680,939.14$132.53
3 $765,562.00$149.00
4 $745,010.00$145.00
5 $765,562.00$149.00
6 $806,666.00$157.00
7 $899,150.00$175.00
Ref #23 448E48020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 (, (24 CY)
Awd $4,800.00$200.00
2 $6,000.00$250.00
3 $4,200.00$175.00
4 $5,808.00$242.00
5 $6,000.00$250.00
6 $7,200.00$300.00
7 $7,200.00$300.00
Ref #24 448E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1H, (747 CY)
Awd $108,315.00$145.00
2 $103,556.61$138.63
3 $116,532.00$156.00
4 $108,315.00$145.00
5 $124,749.00$167.00
6 $118,026.00$158.00
7 $149,400.00$200.00
Ref #25 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (917 CY)
Awd $32,095.00$35.00
2 $29,875.86$32.58
3 $24,759.00$27.00
4 $37,597.00$41.00
5 $21,274.40$23.20
6 $45,850.00$50.00
7 $50,435.00$55.00
Section 4 - PAVEMENT - Totals
Awd $1,261,685.00
2 $1,295,290.11
3 $1,331,078.77
4 $1,321,473.50
5 $1,289,229.70
6 $1,499,763.60
7 $1,636,136.90
Ref #26 621E10000 RPM, LOW PROFILE, YELLOW/YELLOW, (538 EACH)
Awd $8,877.00$16.50
2 $10,760.00$20.00
3 $8,608.00$16.00
4 $11,836.00$22.00
5 $8,608.00$16.00
6 $10,410.30$19.35
7 $8,608.00$16.00
120009 - Page 198
Ref #27 621E10010 RPM, LOW PROFILE, WHITE, (65 EACH)
Awd $1,072.50$16.50
2 $1,300.00$20.00
3 $1,040.00$16.00
4 $1,430.00$22.00
5 $1,040.00$16.00
6 $1,266.20$19.48
7 $1,040.00$16.00
Ref #28 621E10020 RPM, LOW PROFILE WHITE/RED, (10 EACH)
Awd $165.00$16.50
2 $200.00$20.00
3 $160.00$16.00
4 $220.00$22.00
5 $160.00$16.00
6 $193.50$19.35
7 $160.00$16.00
Ref #29 621E54000 RAISED PAVEMENT MARKER REMOVED, (645 EACH)
Awd $2,580.00$4.00
2 $1,935.00$3.00
3 $1,935.00$3.00
4 $3,870.00$6.00
5 $3,225.00$5.00
6 $2,580.00$4.00
7 $3,225.00$5.00
Ref #30 644E00100 EDGE LINE, (14.5 MILE)
Awd $34,800.00$2,400.00
2 $36,250.00$2,500.00
3 $34,350.50$2,369.00
4 $46,400.00$3,200.00
5 $34,350.50$2,369.00
6 $34,350.50$2,369.00
7 $35,786.00$2,468.00
Ref #31 644E00300 CENTER LINE, (7.25 MILE)
Awd $29,000.00$4,000.00
2 $28,637.50$3,950.00
3 $28,202.50$3,890.00
4 $50,750.00$7,000.00
5 $28,202.50$3,890.00
6 $28,202.50$3,890.00
7 $24,200.50$3,338.00
Ref #32 644E00400 CHANNELIZING LINE, (348 FT)
Awd $522.00$1.50
2 $525.48$1.51
3 $518.52$1.49
4 $609.00$1.75
5 $518.52$1.49
6 $518.52$1.49
7 $1,757.40$5.05
120009 - Page 199
Ref #33 644E00500 STOP LINE, (188 FT)
Awd $1,316.00$7.00
2 $1,316.00$7.00
3 $1,297.20$6.90
4 $1,128.00$6.00
5 $1,297.20$6.90
6 $1,297.20$6.90
7 $1,626.20$8.65
Ref #34 644E00600 CROSSWALK LINE, (639 FT)
Awd $1,917.00$3.00
2 $1,917.00$3.00
3 $1,853.10$2.90
4 $1,917.00$3.00
5 $1,853.10$2.90
6 $1,853.10$2.90
7 $4,153.50$6.50
Ref #35 644E01000 RAILROAD SYMBOL MARKING, (2 EACH)
Awd $1,400.00$700.00
2 $1,400.00$700.00
3 $1,380.00$690.00
4 $1,200.00$600.00
5 $1,380.00$690.00
6 $1,380.00$690.00
7 $1,000.00$500.00
Ref #36 644E01300 LANE ARROW, (4 EACH)
Awd $400.00$100.00
2 $400.00$100.00
3 $396.00$99.00
4 $440.00$110.00
5 $396.00$99.00
6 $396.00$99.00
7 $580.00$145.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $82,049.50
2 $84,640.98
3 $79,740.82
4 $119,800.00
5 $81,030.82
6 $82,447.82
7 $82,136.60
Ref #37 632E26501 DETECTOR LOOP, AS PER PLAN, (7 EACH)
Awd $5,950.00$850.00
2 $5,775.00$825.00
3 $5,250.00$750.00
4 $5,600.00$800.00
5 $5,775.00$825.00
6 $7,000.00$1,000.00
7 $5,250.00$750.00
120009 - Page 200
Section 6 - TRAFFIC SURVEILLANCE - Totals
Awd $5,950.00
2 $5,775.00
3 $5,250.00
4 $5,600.00
5 $5,775.00
6 $7,000.00
7 $5,250.00
Ref #38 614E12460 WORK ZONE MARKING SIGN, (72 EACH)
Awd $7,200.00$100.00
2 $7,200.00$100.00
3 $4,680.00$65.00
4 $10,296.00$143.00
5 $4,680.00$65.00
6 $6,480.00$90.00
7 $6,480.00$90.00
Ref #39 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY)
Awd $3,500.00$175.00
2 $4,000.00$200.00
3 $3,000.00$150.00
4 $4,000.00$200.00
5 $6,700.00$335.00
6 $1,900.00$95.00
7 $4,000.00$200.00
Ref #40 614E21400 WORK ZONE CENTER LINE, CLASS II, (9.09 MILE)
Awd $2,954.25$325.00
2 $3,181.50$350.00
3 $2,954.25$325.00
4 $5,454.00$600.00
5 $2,954.25$325.00
6 $12,271.50$1,350.00
7 $5,454.00$600.00
Ref #41 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (7.25 MILE)
Awd $6,706.25$925.00
2 $6,887.50$950.00
3 $6,525.00$900.00
4 $6,162.50$850.00
5 $6,525.00$900.00
6 $7,068.75$975.00
7 $6,162.50$850.00
Ref #42 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (14.5 MILE)
Awd $4,495.00$310.00
2 $5,075.00$350.00
3 $4,350.00$300.00
4 $8,700.00$600.00
5 $4,350.00$300.00
6 $7,612.50$525.00
7 $8,700.00$600.00
120009 - Page 201
Ref #43 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (696 FT)
Awd $522.00$0.75
2 $696.00$1.00
3 $522.00$0.75
4 $522.00$0.75
5 $522.00$0.75
6 $348.00$0.50
7 $522.00$0.75
Ref #44 614E26000 WORK ZONE STOP LINE, CLASS I, (304 FT)
Awd $608.00$2.00
2 $608.00$2.00
3 $608.00$2.00
4 $1,064.00$3.50
5 $608.00$2.00
6 $1,216.00$4.00
7 $912.00$3.00
Ref #45 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (188 FT)
Awd $376.00$2.00
2 $376.00$2.00
3 $376.00$2.00
4 $658.00$3.50
5 $376.00$2.00
6 $752.00$4.00
7 $564.00$3.00
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $26,361.50
2 $28,024.00
3 $23,015.25
4 $36,856.50
5 $26,715.25
6 $37,648.75
7 $32,794.50
Ref #46 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)
Awd $575.00$575.00
2 $2,750.00$2,750.00
3 $2,500.00$2,500.00
4 $4,000.00$4,000.00
5 $1,500.00$1,500.00
6 $2,500.00$2,500.00
7 $2,500.00$2,500.00
Ref #47 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $17,000.00$17,000.00
3 $12,000.00$12,000.00
4 $11,000.00$11,000.00
5 $4,500.00$4,500.00
6 $12,000.00$12,000.00
7 $10,000.00$10,000.00
120009 - Page 202
Ref #48 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $59,500.00$59,500.00
3 $42,000.00$42,000.00
4 $41,500.00$41,500.00
5 $102,263.00$102,263.00
6 $50,000.00$50,000.00
7 $40,000.00$40,000.00
Ref #49 619E16010 FIELD OFFICE, TYPE B, (3 MNTH)
Awd $6,000.00$2,000.00
2 $3,600.00$1,200.00
3 $4,500.00$1,500.00
4 $4,500.00$1,500.00
5 $3,300.00$1,100.00
6 $2,250.00$750.00
7 $3,600.00$1,200.00
Ref #50 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $15,000.00$15,000.00
3 $2,000.00$2,000.00
4 $4,000.00$4,000.00
5 $6,500.00$6,500.00
6 $5,000.00$5,000.00
7 $5,000.00$5,000.00
Ref #51 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $15,000.00$15,000.00
3 $45,000.00$45,000.00
4 $15,000.00$15,000.00
5 $60,000.00$60,000.00
6 $35,000.00$35,000.00
7 $15,000.00$15,000.00
Section 8 - INCIDENTALS - Totals
Awd $94,575.00
2 $112,850.00
3 $108,000.00
4 $80,000.00
5 $178,063.00
6 $106,750.00
7 $76,100.00
120009 - Page 203
Project No. 120010
PID 88892
MOE-SR-536-7.08
Federal
Type: SLIDE REPAIR
Completion Date: 7/15/2012
Award Amount: $268,331.00
Contract Awarded To: BBR DRILLING COMPANY INC
Letting Date: 1/12/2012
Engineer's Estimate: $270,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BBR DRILLING COMPANY INC
41462 PALMER RD
BELMONT, OH 43718
Belmont
Bidder 1
Bid $268,331.00
SHELLY & SANDS INC
3570 SOUTH RIVER RD
ZANESVILLE, OH 43701
Muskingum
Bidder 2
Bid $269,988.83
ALAN STONE CO INC
1324 ELLIS RUN RD
CUTLER, OH 45724
Washington
Bidder 3
Bid $289,243.50
OHIO-WEST VIRGINIA EXCAVATING CO
56461 FERRY LANDING ROAD
SHADYSIDE, OH 43947
Belmont
Bidder 4
Bid $296,269.00
SUBURBAN MAINTENANCE & CONSTRUCTION INC
16330 YORK RD
NORTH ROYALTON, OH 44133
Cuyahoga
Bidder 5
Bid $297,418.25
R C CONSTRUCTION COMPANY AND SON INC
8096 FEDERAL ROAD
CUTLER, OH 45724
Washington
Bidder 6
Bid $382,703.30
120010 - Page 204
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $100.00$100.00
2 $4,500.00$4,500.00
3 $2,000.00$2,000.00
4 $1,500.00$1,500.00
5 $5,000.00$5,000.00
6 $6,500.00$6,500.00
Ref #2 202E35100 PIPE REMOVED, 24" AND UNDER, (40 FT)
Awd $400.00$10.00
2 $500.00$12.50
3 $800.00$20.00
4 $600.00$15.00
5 $600.00$15.00
6 $800.00$20.00
Ref #3 202E58100 CATCH BASIN REMOVED, (1 EACH)
Awd $100.00$100.00
2 $250.00$250.00
3 $200.00$200.00
4 $250.00$250.00
5 $750.00$750.00
6 $1,000.00$1,000.00
Ref #4 202E98000 REMOVAL MISC.:PILING REMOVED, (LUMP SUM)
Awd $100.00$100.00
2 $1,550.00$1,550.00
3 $5,000.00$5,000.00
4 $1,000.00$1,000.00
5 $10,000.00$10,000.00
6 $25,000.00$25,000.00
Ref #5 203E10000 EXCAVATION, (1108 CY)
Awd $5,540.00$5.00
2 $8,864.00$8.00
3 $11,080.00$10.00
4 $8,310.00$7.50
5 $13,296.00$12.00
6 $16,620.00$15.00
Ref #6 203E20000 EMBANKMENT, (2098 CY)
Awd $41,960.00$20.00
2 $34,617.00$16.50
3 $36,715.00$17.50
4 $33,568.00$16.00
5 $29,372.00$14.00
6 $41,960.00$20.00
Ref #7 204E10000 SUBGRADE COMPACTION, (208 SY)
Awd $832.00$4.00
2 $1,518.40$7.30
3 $208.00$1.00
4 $468.00$2.25
5 $728.00$3.50
6 $416.00$2.00
120010 - Page 205
Ref #8 606E13050 GUARDRAIL, TYPE 5A, (262.5 FT)
Awd $5,250.00$20.00
2 $5,446.88$20.75
3 $5,407.50$20.60
4 $6,562.50$25.00
5 $5,670.00$21.60
6 $5,775.00$22.00
Ref #9 606E25000 ANCHOR ASSEMBLY, TYPE A, (2 EACH)
Awd $1,600.00$800.00
2 $1,710.00$855.00
3 $1,576.00$788.00
4 $2,000.00$1,000.00
5 $1,850.00$925.00
6 $2,200.00$1,100.00
Ref #10 607E15001 FENCE, TYPE 47, AS PER PLAN, (475 FT)
Awd $5,700.00$12.00
2 $6,768.75$14.25
3 $5,700.00$12.00
4 $6,887.50$14.50
5 $5,890.00$12.40
6 $7,125.00$15.00
Section 1 - ROADWAY - Totals
Awd $61,582.00
2 $65,725.03
3 $68,686.50
4 $61,146.00
5 $73,156.00
6 $107,396.00
Ref #11 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (3 CY)
Awd $210.00$70.00
2 $552.00$184.00
3 $450.00$150.00
4 $480.00$160.00
5 $450.00$150.00
6 $750.00$250.00
Ref #12 659E10000 SEEDING AND MULCHING, (2360 SY)
Awd $1,770.00$0.75
2 $4,248.00$1.80
3 $4,720.00$2.00
4 $4,130.00$1.75
5 $2,360.00$1.00
6 $2,360.00$1.00
Ref #13 659E20000 COMMERCIAL FERTILIZER, (0.21 TON)
Awd $252.00$1,200.00
2 $107.10$510.00
3 $126.00$600.00
4 $105.00$500.00
5 $84.00$400.00
6 $378.00$1,800.00
120010 - Page 206
Ref #14 659E31000 LIME, (0.48 ACRE)
Awd $240.00$500.00
2 $98.40$205.00
3 $240.00$500.00
4 $60.00$125.00
5 $48.00$100.00
6 $384.00$800.00
Ref #15 659E35000 WATER, (6 MGAL)
Awd $6.00$1.00
2 $6.00$1.00
3 $60.00$10.00
4 $6.00$1.00
5 $6.00$1.00
6 $0.30$0.05
Ref #16 832E30000 EROSION CONTROL, (6000 EACH)
Awd $6,000.00$1.00
2 $6,000.00$1.00
3 $6,000.00$1.00
4 $6,000.00$1.00
5 $6,000.00$1.00
6 $6,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $8,478.00
2 $11,011.50
3 $11,596.00
4 $10,781.00
5 $8,948.00
6 $9,872.30
Ref #17 603E07400 18" CONDUIT, TYPE B, (36 FT)
Awd $2,520.00$70.00
2 $6,840.00$190.00
3 $5,940.00$165.00
4 $3,600.00$100.00
5 $1,080.00$30.00
6 $1,620.00$45.00
Ref #18 604E04500 CATCH BASIN, NO. 2-2B, (1 EACH)
Awd $2,000.00$2,000.00
2 $2,200.00$2,200.00
3 $1,000.00$1,000.00
4 $2,500.00$2,500.00
5 $2,400.00$2,400.00
6 $2,500.00$2,500.00
Ref #19 604E36600 PRECAST REINFORCED CONCRETE OUTLET, (1 EACH)
Awd $200.00$200.00
2 $300.00$300.00
3 $150.00$150.00
4 $150.00$150.00
5 $300.00$300.00
6 $150.00$150.00
120010 - Page 207
Section 3 - DRAINAGE - Totals
Awd $4,720.00
2 $9,340.00
3 $7,090.00
4 $6,250.00
5 $3,780.00
6 $4,270.00
Ref #20 301E46000 ASPHALT CONCRETE BASE, PG64-22, (25 CY)
Awd $6,375.00$255.00
2 $6,250.00$250.00
3 $6,625.00$265.00
4 $8,625.00$345.00
5 $6,250.00$250.00
6 $10,000.00$400.00
Ref #21 304E20000 AGGREGATE BASE, (30 CY)
Awd $1,950.00$65.00
2 $3,390.00$113.00
3 $2,250.00$75.00
4 $3,900.00$130.00
5 $2,400.00$80.00
6 $2,400.00$80.00
Ref #22 407E10000 TACK COAT, (48 GAL)
Awd $96.00$2.00
2 $96.00$2.00
3 $144.00$3.00
4 $115.20$2.40
5 $96.00$2.00
6 $96.00$2.00
Ref #23 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (27 GAL)
Awd $54.00$2.00
2 $54.00$2.00
3 $81.00$3.00
4 $64.80$2.40
5 $54.00$2.00
6 $54.00$2.00
Ref #24 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (33 CY)
Awd $8,580.00$260.00
2 $8,250.00$250.00
3 $8,745.00$265.00
4 $9,735.00$295.00
5 $8,250.00$250.00
6 $14,850.00$450.00
Ref #25 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (24 CY)
Awd $9,120.00$380.00
2 $8,880.00$370.00
3 $9,360.00$390.00
4 $10,440.00$435.00
5 $8,880.00$370.00
6 $10,800.00$450.00
120010 - Page 208
Section 4 - PAVEMENT - Totals
Awd $26,175.00
2 $26,920.00
3 $27,205.00
4 $32,880.00
5 $25,930.00
6 $38,200.00
Ref #26 621E00100 RPM, (13 EACH)
Awd $325.00$25.00
2 $1,716.00$132.00
3 $1,755.00$135.00
4 $1,950.00$150.00
5 $2,015.00$155.00
6 $5,135.00$395.00
Ref #27 621E54000 RAISED PAVEMENT MARKER REMOVED, (13 EACH)
Awd $130.00$10.00
2 $91.00$7.00
3 $65.00$5.00
4 $260.00$20.00
5 $195.00$15.00
6 $650.00$50.00
Ref #28 630E84901 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, AS PE, (1 EACH)
Awd $100.00$100.00
2 $97.00$97.00
3 $50.00$50.00
4 $50.00$50.00
5 $100.00$100.00
6 $100.00$100.00
Ref #29 642E00090 EDGE LINE, (0.34 MILE)
Awd $1,360.00$4,000.00
2 $1,054.00$3,100.00
3 $1,088.00$3,200.00
4 $1,207.00$3,550.00
5 $1,569.78$4,617.00
6 $2,890.00$8,500.00
Ref #30 642E00290 CENTER LINE, (0.17 MILE)
Awd $1,190.00$7,000.00
2 $1,037.00$6,100.00
3 $1,088.00$6,400.00
4 $1,207.00$7,100.00
5 $832.32$4,896.00
6 $1,445.00$8,500.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $3,105.00
2 $3,995.00
3 $4,046.00
4 $4,674.00
5 $4,712.10
6 $10,220.00
120010 - Page 209
Ref #31 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (2 EACH)
Awd $5,000.00$2,500.00
2 $4,300.00$2,150.00
3 $5,000.00$2,500.00
4 $4,700.00$2,350.00
5 $3,950.00$1,975.00
6 $4,400.00$2,200.00
Ref #32 614E13302 BARRIER REFLECTOR, TYPE B2, (7 EACH)
Awd $35.00$5.00
2 $52.50$7.50
3 $70.00$10.00
4 $70.00$10.00
5 $56.00$8.00
6 $70.00$10.00
Ref #33 614E13360 OBJECT MARKER, TWO WAY, (7 EACH)
Awd $70.00$10.00
2 $91.00$13.00
3 $112.00$16.00
4 $126.00$18.00
5 $91.00$13.00
6 $70.00$10.00
Ref #34 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (0.14 MILE)
Awd $840.00$6,000.00
2 $728.00$5,200.00
3 $770.00$5,500.00
4 $847.00$6,050.00
5 $823.20$5,880.00
6 $1,190.00$8,500.00
Ref #35 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I, (20 FT)
Awd $100.00$5.00
2 $40.00$2.00
3 $100.00$5.00
4 $50.00$2.50
5 $120.00$6.00
6 $1,000.00$50.00
Ref #36 622E40020 PORTABLE CONCRETE BARRIER, 32", (330 FT)
Awd $4,950.00$15.00
2 $6,105.00$18.50
3 $4,950.00$15.00
4 $7,590.00$23.00
5 $10,725.00$32.50
6 $3,960.00$12.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $10,995.00
2 $11,316.50
3 $11,002.00
4 $13,383.00
5 $15,765.20
6 $10,690.00
120010 - Page 210
Ref #37 507E00400 STEEL PILES, MISC.:SOLDIER PILES HP12X53, (573 FT)
Awd $97,410.00$170.00
2 $30,369.00$53.00
3 $22,920.00$40.00
4 $28,077.00$49.00
5 $20,140.95$35.15
6 $25,785.00$45.00
Ref #38 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (85 CY)
Awd $5,525.00$65.00
2 $9,690.00$114.00
3 $15,980.00$188.00
4 $12,325.00$145.00
5 $3,400.00$40.00
6 $6,800.00$80.00
Ref #39 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (164 FT)
Awd $328.00$2.00
2 $524.80$3.20
3 $1,312.00$8.00
4 $656.00$4.00
5 $1,968.00$12.00
6 $1,640.00$10.00
Ref #40 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, (7 FT)
Awd $70.00$10.00
2 $147.00$21.00
3 $140.00$20.00
4 $56.00$8.00
5 $126.00$18.00
6 $70.00$10.00
Ref #41 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE, (54 FT)
Awd $54.00$1.00
2 $4,482.00$83.00
3 $1,620.00$30.00
4 $3,240.00$60.00
5 $1,944.00$36.00
6 $9,720.00$180.00
Ref #42 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER, (289 FT)
Awd $289.00$1.00
2 $30,056.00$104.00
3 $26,010.00$90.00
4 $34,680.00$120.00
5 $34,680.00$120.00
6 $60,690.00$210.00
Ref #43 524E95000 DRILLED SHAFTS, MISC.:STRUCTURAL BACKFILL, TYPE 2, (112 FT)
Awd $1,680.00$15.00
2 $112.00$1.00
3 $1,792.00$16.00
4 $1,680.00$15.00
5 $1,568.00$14.00
6 $11,200.00$100.00
120010 - Page 211
Ref #44 530E00400 SPECIAL - STRUCTURE, MISC.:PRECAST CONCRETE PANEL,, (104 EACH)
Awd $18,720.00$180.00
2 $29,640.00$285.00
3 $32,344.00$311.00
4 $22,880.00$220.00
5 $31,200.00$300.00
6 $23,400.00$225.00
Ref #45 530E00400 SPECIAL - STRUCTURE, MISC.:PRECAST CONCRETE PANEL,, (1 EACH)
Awd $500.00$500.00
2 $295.00$295.00
3 $500.00$500.00
4 $350.00$350.00
5 $300.00$300.00
6 $350.00$350.00
Ref #46 530E00400 SPECIAL - STRUCTURE, MISC.:PRECAST CONCRETE PANEL,, (1 EACH)
Awd $500.00$500.00
2 $295.00$295.00
3 $1,000.00$1,000.00
4 $350.00$350.00
5 $300.00$300.00
6 $400.00$400.00
Section 7 - DRILLED SHAFTS - Totals
Awd $125,076.00
2 $105,610.80
3 $103,618.00
4 $104,294.00
5 $95,626.95
6 $140,055.00
Ref #47 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $200.00$200.00
2 $1,475.00$1,475.00
3 $5,000.00$5,000.00
4 $4,500.00$4,500.00
5 $10,000.00$10,000.00
6 $8,000.00$8,000.00
Ref #48 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $12,000.00$12,000.00
3 $35,000.00$35,000.00
4 $46,861.00$46,861.00
5 $30,000.00$30,000.00
6 $32,000.00$32,000.00
Ref #49 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $1,785.00$1,785.00
3 $5,000.00$5,000.00
4 $1,500.00$1,500.00
5 $5,000.00$5,000.00
6 $7,500.00$7,500.00
120010 - Page 212
Ref #50 624E10000 MOBILIZATION, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $20,810.00$20,810.00
3 $11,000.00$11,000.00
4 $10,000.00$10,000.00
5 $24,500.00$24,500.00
6 $14,500.00$14,500.00
Section 8 - INCIDENTALS - Totals
Awd $28,200.00
2 $36,070.00
3 $56,000.00
4 $62,861.00
5 $69,500.00
6 $62,000.00
120010 - Page 213
Project No. 120011
PID 87386
MOT-SR-725-21.88
Federal
Type: BRIDGE REPAIR
Completion Date: 8/15/2012
Award Amount: $164,849.00
Contract Awarded To: BRUMBAUGH CONSTRUCTION INC
Letting Date: 1/12/2012
Engineer's Estimate: $212,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BRUMBAUGH CONSTRUCTION INC
P O BOX 309
ARCANUM, OH 45304
Darke
Bidder 1
Bid $164,849.00
EAGLE BRIDGE CO
800 S VAN DEMARK RD
SIDNEY, OH 45365
Shelby
Bidder 2
Bid $189,089.29
BARRETT PAVING MATERIALS INC
600 SHEPHERD AVE
CINCINNATI, OH 45215
Hamilton
Bidder 3
Bid $207,512.00
SUNESIS CONSTRUCTION CO
2610 CRESCENTVILLE RD
WEST CHESTER, OH 45069
Butler
Bidder 4
Bid $220,768.84
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 5
Bid $234,330.91
R B JERGENS CONTRACTORS INC
11418 N DIXIE DR
VANDALIA, OH 45377
Montgomery
Bidder 6
Bid $234,389.95
120011 - Page 214
Ref #1 202E23500 WEARING COURSE REMOVED, (475 SY)
Awd $1,425.00$3.00
2 $4,750.00$10.00
3 $3,325.00$7.00
4 $5,676.25$11.95
5 $5,700.00$12.00
6 $4,750.00$10.00
Section 1 - ROADWAY - Totals
Awd $1,425.00
2 $4,750.00
3 $3,325.00
4 $5,676.25
5 $5,700.00
6 $4,750.00
Ref #2 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (440 SY)
Awd $3,740.00$8.50
2 $4,400.00$10.00
3 $6,160.00$14.00
4 $6,670.40$15.16
5 $5,720.00$13.00
6 $4,400.00$10.00
Ref #3 407E10000 TACK COAT, (69 GAL)
Awd $345.00$5.00
2 $138.69$2.01
3 $158.70$2.30
4 $160.77$2.33
5 $138.00$2.00
6 $241.50$3.50
Ref #4 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (37 GAL)
Awd $185.00$5.00
2 $74.37$2.01
3 $85.10$2.30
4 $86.21$2.33
5 $74.00$2.00
6 $129.50$3.50
Ref #5 448E46040 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (41 CY)
Awd $10,086.00$246.00
2 $9,873.62$240.82
3 $8,651.00$211.00
4 $11,478.36$279.96
5 $9,840.00$240.00
6 $8,435.75$205.75
Ref #6 448E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1H, (39 CY)
Awd $9,984.00$256.00
2 $9,391.98$240.82
3 $9,438.00$242.00
4 $10,918.44$279.96
5 $9,360.00$240.00
6 $8,580.00$220.00
120011 - Page 215
Section 2 - PAVEMENT - Totals
Awd $24,340.00
2 $23,878.66
3 $24,492.80
4 $29,314.18
5 $25,132.00
6 $21,786.75
Ref #7 621E54000 RAISED PAVEMENT MARKER REMOVED, (6 EACH)
Awd $390.00$65.00
2 $120.00$20.00
3 $210.00$35.00
4 $111.84$18.64
5 $120.00$20.00
6 $510.00$85.00
Ref #8 644E00100 EDGE LINE, (0.09 MILE)
Awd $1,064.70$11,830.00
2 $653.28$7,258.67
3 $651.06$7,234.00
4 $759.47$8,438.56
5 $651.06$7,234.00
6 $723.15$8,035.00
Ref #9 644E00300 CENTER LINE, (0.08 MILE)
Awd $1,064.00$13,300.00
2 $727.26$9,090.75
3 $724.80$9,060.00
4 $845.49$10,568.63
5 $724.80$9,060.00
6 $805.20$10,065.00
Ref #10 644E00700 TRANSVERSE/DIAGONAL LINE, (107 FT)
Awd $749.00$7.00
2 $805.71$7.53
3 $802.50$7.50
4 $936.25$8.75
5 $802.50$7.50
6 $893.45$8.35
Section 3 - TRAFFIC CONTROL - Totals
Awd $3,267.70
2 $2,306.25
3 $2,388.36
4 $2,653.05
5 $2,298.36
6 $2,931.80
Ref #11 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $5,400.00$5,400.00
2 $5,750.00$5,750.00
3 $8,000.00$8,000.00
4 $5,575.95$5,575.95
5 $7,000.00$7,000.00
6 $13,450.00$13,450.00
120011 - Page 216
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $5,400.00
2 $5,750.00
3 $8,000.00
4 $5,575.95
5 $7,000.00
6 $13,450.00
Ref #12 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $19,000.00$19,000.00
2 $25,000.00$25,000.00
3 $38,702.84$38,702.84
4 $29,994.65$29,994.65
5 $40,000.00$40,000.00
6 $19,850.00$19,850.00
Ref #13 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS , (18 EACH)
Awd $1,224.00$68.00
2 $540.00$30.00
3 $900.00$50.00
4 $113.40$6.30
5 $990.00$55.00
6 $1,800.00$100.00
Ref #14 512E33011 TYPE 3 WATERPROOFING, AS PER PLAN, (230 SY)
Awd $5,060.00$22.00
2 $5,750.00$25.00
3 $5,750.00$25.00
4 $8,178.80$35.56
5 $5,566.00$24.20
6 $6,187.00$26.90
Ref #15 515E10051 PRESTRESSED CONCRETE NON-COMPOSITE BOX BEAM BRIDGE, (9 EACH)
Awd $81,900.00$9,100.00
2 $79,200.00$8,800.00
3 $79,200.00$8,800.00
4 $78,184.35$8,687.15
5 $91,350.00$10,150.00
6 $117,990.00$13,110.00
Ref #16 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (127 SF)
Awd $127.00$1.00
2 $635.00$5.00
3 $508.00$4.00
4 $381.00$3.00
5 $1,079.50$8.50
6 $1,200.15$9.45
Ref #17 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (253 SF)
Awd $379.50$1.50
2 $1,518.00$6.00
3 $1,265.00$5.00
4 $966.46$3.82
5 $2,530.00$10.00
6 $2,530.00$10.00
120011 - Page 217
Ref #18 516E31001 JOINT SEALER, AS PER PLAN, (465 FT)
Awd $930.00$2.00
2 $3,720.00$8.00
3 $3,255.00$7.00
4 $1,715.85$3.69
5 $6,045.00$13.00
6 $4,138.50$8.90
Ref #19 516E31401 SPECIAL - POLYMER MODIFIED ASPHALT EXPANSION JOINT, (3 CY)
Awd $6,525.00$2,175.00
2 $17,160.00$5,720.00
3 $18,600.00$6,200.00
4 $22,648.14$7,549.38
5 $17,091.75$5,697.25
6 $18,990.00$6,330.00
Ref #20 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY (, (18 EACH)
Awd $5,040.00$280.00
2 $5,400.00$300.00
3 $5,400.00$300.00
4 $4,752.72$264.04
5 $8,100.00$450.00
6 $6,300.00$350.00
Ref #21 518E22300 SPECIAL - STEEL DRIP STRIP, (109 FT)
Awd $817.50$7.50
2 $1,090.00$10.00
3 $1,635.00$15.00
4 $1,462.78$13.42
5 $948.30$8.70
6 $1,280.75$11.75
Ref #22 601E54000 CHANNEL PROTECTION, MISC.:GRADING EXISTING GRAVEL, (LUMP SUM)
Awd $1,550.00$1,550.00
2 $4,500.00$4,500.00
3 $3,500.00$3,500.00
4 $3,354.58$3,354.58
5 $3,000.00$3,000.00
6 $1,100.00$1,100.00
Section 5 - STRUCTURE REPAIR BRIDGE NO. MOT-725-218 - Totals
Awd $122,553.00
2 $144,513.00
3 $158,715.84
4 $151,752.73
5 $176,700.55
6 $181,366.40
Ref #23 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,350.00$1,350.00
2 $2,000.00$2,000.00
3 $1,090.00$1,090.00
4 $1,788.24$1,788.24
5 $2,500.00$2,500.00
6 $2,225.00$2,225.00
120011 - Page 218
Ref #24 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $1,569.30$1,569.30
2 $500.00$500.00
3 $3,000.00$3,000.00
4 $7,913.60$7,913.60
5 $2,000.00$2,000.00
6 $1,930.00$1,930.00
Ref #25 624E10000 MOBILIZATION, (LUMP SUM)
Awd $4,094.00$4,094.00
2 $4,000.00$4,000.00
3 $5,500.00$5,500.00
4 $14,053.43$14,053.43
5 $10,000.00$10,000.00
6 $4,000.00$4,000.00
Ref #26 823E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)
Awd $850.00$850.00
2 $1,391.38$1,391.38
3 $1,000.00$1,000.00
4 $2,041.41$2,041.41
5 $3,000.00$3,000.00
6 $1,950.00$1,950.00
Section 6 - INCIDENTALS - Totals
Awd $7,863.30
2 $7,891.38
3 $10,590.00
4 $25,796.68
5 $17,500.00
6 $10,105.00
120011 - Page 219
Project No. 120012
PID 82507
MOT-SR-741-4.55
Federal
Type: TWO LANE RESURFACING
Completion Date: 9/29/2012
Award Amount: $702,002.16
Contract Awarded To: BARRETT PAVING MATERIALS INC
Letting Date: 1/12/2012
Engineer's Estimate: $704,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BARRETT PAVING MATERIALS INC
600 SHEPHERD AVE
CINCINNATI, OH 45215
Hamilton
Bidder 1
Bid $702,002.16
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 2
Bid $703,160.67
R B JERGENS CONTRACTORS INC
11418 N DIXIE DR
VANDALIA, OH 45377
Montgomery
Bidder 3
Bid $786,368.95
120012 - Page 220
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $9,000.00$9,000.00
2 $1,721.91$1,721.91
3 $3,450.00$3,450.00
Ref #2 202E23500 WEARING COURSE REMOVED, (2740 SY)
Awd $8,220.00$3.00
2 $7,014.40$2.56
3 $14,385.00$5.25
Ref #3 202E30000 WALK REMOVED, (315 SF)
Awd $1,575.00$5.00
2 $1,323.00$4.20
3 $708.75$2.25
Ref #4 202E32001 CURB REMOVED, AS PER PLAN, (362 FT)
Awd $3,258.00$9.00
2 $5,068.00$14.00
3 $3,982.00$11.00
Ref #5 203E10000 EXCAVATION, (15 CY)
Awd $330.00$22.00
2 $67.50$4.50
3 $319.50$21.30
Ref #6 203E20000 EMBANKMENT, (150 CY)
Awd $6,000.00$40.00
2 $7,698.00$51.32
3 $4,747.50$31.65
Ref #7 452E12000 8" NON-REINFORCED CONCRETE PAVEMENT, (56.3 SY)
Awd $2,083.10$37.00
2 $2,083.10$37.00
3 $2,913.53$51.75
Ref #8 604E39500 MONUMENT BOX ADJUSTED TO GRADE, (11 EACH)
Awd $1,650.00$150.00
2 $3,807.76$346.16
3 $2,807.20$255.20
Ref #9 608E10000 4" CONCRETE WALK, (11901.2 SF)
Awd $34,513.48$2.90
2 $43,320.37$3.64
3 $41,654.20$3.50
Ref #10 608E52044 CURB RAMP, TYPE B3, (462 SF)
Awd $3,996.30$8.65
2 $3,996.30$8.65
3 $6,329.40$13.70
Ref #11 608E52070 CURB RAMP, TYPE D, DIAGONAL, (858 SF)
Awd $7,207.20$8.40
2 $7,207.20$8.40
3 $8,408.40$9.80
Ref #12 608E98000 WALKWAY, MISC.:PEDESTRIAN BUS STOP PAD, (75 SF)
Awd $300.00$4.00
2 $300.00$4.00
3 $525.00$7.00
120012 - Page 221
Ref #13 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN, (219 FT)
Awd $4,139.10$18.90
2 $4,139.10$18.90
3 $5,475.00$25.00
Section 1 - ROADWAY - Totals
Awd $82,272.18
2 $87,746.64
3 $95,705.48
Ref #14 659E00100 SOIL ANALYSIS TEST, (1 EACH)
Awd $50.00$50.00
2 $50.00$50.00
3 $83.30$83.30
Ref #15 659E00300 TOPSOIL, (281 CY)
Awd $10,678.00$38.00
2 $6,544.49$23.29
3 $8,977.95$31.95
Ref #16 659E10000 SEEDING AND MULCHING, (2529 SY)
Awd $1,922.04$0.76
2 $1,340.37$0.53
3 $1,770.30$0.70
Ref #17 659E14000 REPAIR SEEDING AND MULCHING, (126 SY)
Awd $75.60$0.60
2 $35.28$0.28
3 $63.00$0.50
Ref #18 659E15000 INTER-SEEDING, (126 SY)
Awd $75.60$0.60
2 $35.28$0.28
3 $63.00$0.50
Ref #19 659E20000 COMMERCIAL FERTILIZER, (0.35 TON)
Awd $175.00$500.00
2 $105.00$300.00
3 $699.51$1,998.60
Ref #20 659E31000 LIME, (0.52 ACRE)
Awd $104.00$200.00
2 $5.20$10.00
3 $519.64$999.31
Ref #21 659E35000 WATER, (14 MGAL)
Awd $168.00$12.00
2 $560.00$40.00
3 $310.80$22.20
Ref #22 832E30000 EROSION CONTROL, (5000 EACH)
Awd $5,000.00$1.00
2 $5,000.00$1.00
3 $5,000.00$1.00
120012 - Page 222
Section 2 - EROSION CONTROL - Totals
Awd $18,248.24
2 $13,675.62
3 $17,487.50
Ref #23 604E34500 MANHOLE ADJUSTED TO GRADE, (16 EACH)
Awd $4,160.00$260.00
2 $7,362.88$460.18
3 $4,128.80$258.05
Section 3 - DRAINAGE - Totals
Awd $4,160.00
2 $7,362.88
3 $4,128.80
Ref #24 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (43834 SY)
Awd $24,108.70$0.55
2 $24,108.70$0.55
3 $65,751.00$1.50
Ref #25 407E20000 TACK COAT, TRACKLESS TACK, INTERMEDIATE COURSE, (1753.4 GAL)
Awd $7,013.60$4.00
2 $7,890.30$4.50
3 $5,523.21$3.15
Ref #26 407E20100 TACK COAT, TRACKLESS TACK, SURFACE COURSE, (3493 GAL)
Awd $13,972.00$4.00
2 $15,718.50$4.50
3 $11,002.95$3.15
Ref #27 446E50015 ASPHALT CONCRETE SURFACE COURSE, TYPE 1H, PG76-22M, (1912 CY)
Awd $319,304.00$167.00
2 $289,591.52$151.46
3 $325,231.20$170.10
Ref #28 448E46010 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, PG64, (913 CY)
Awd $118,690.00$130.00
2 $131,864.59$144.43
3 $131,243.75$143.75
Section 4 - PAVEMENT - Totals
Awd $483,088.30
2 $469,173.61
3 $538,752.11
Ref #29 638E10800 VALVE BOX ADJUSTED TO GRADE, (17 EACH)
Awd $1,615.00$95.00
2 $5,412.12$318.36
3 $4,338.40$255.20
120012 - Page 223
Section 5 - WATER WORK - Totals
Awd $1,615.00
2 $5,412.12
3 $4,338.40
Ref #30 621E00100 RPM, (424 EACH)
Awd $6,996.00$16.50
2 $6,784.00$16.00
3 $7,504.80$17.70
Ref #31 621E54000 RAISED PAVEMENT MARKER REMOVED, (424 EACH)
Awd $1,823.20$4.30
2 $3,273.28$7.72
3 $2,586.40$6.10
Ref #32 644E00100 EDGE LINE, (2.55 MILE)
Awd $6,023.10$2,362.00
2 $6,023.10$2,362.00
3 $6,687.76$2,622.65
Ref #33 644E00200 LANE LINE, (2.55 MILE)
Awd $2,440.35$957.00
2 $2,440.35$957.00
3 $2,709.63$1,062.60
Ref #34 644E00300 CENTER LINE, (2.19 MILE)
Awd $6,287.49$2,871.00
2 $6,287.49$2,871.00
3 $6,981.28$3,187.80
Ref #35 644E00400 CHANNELIZING LINE, (309.8 FT)
Awd $542.15$1.75
2 $542.15$1.75
3 $604.11$1.95
Ref #36 644E00500 STOP LINE, (130 FT)
Awd $682.50$5.25
2 $682.50$5.25
3 $760.50$5.85
Ref #37 644E00600 CROSSWALK LINE, (503 FT)
Awd $1,634.75$3.25
2 $1,634.75$3.25
3 $1,810.80$3.60
Ref #38 644E00900 ISLAND MARKING, (53 SF)
Awd $164.30$3.10
2 $164.30$3.10
3 $182.85$3.45
Ref #39 644E01110 SCHOOL SYMBOL MARKING, 96", (3 EACH)
Awd $2,412.00$804.00
2 $2,412.00$804.00
3 $2,678.10$892.70
Ref #40 644E01300 LANE ARROW, (29 EACH)
Awd $2,175.00$75.00
2 $2,175.00$75.00
3 $2,415.70$83.30
120012 - Page 224
Section 6 - TRAFFIC CONTROL - Totals
Awd $31,180.84
2 $32,418.92
3 $34,921.93
Ref #41 632E26500 DETECTOR LOOP, (12 EACH)
Awd $9,900.00$825.00
2 $10,776.00$898.00
3 $11,991.60$999.30
Ref #42 632E27200 LOOP DETECTOR TIE IN, (12 EACH)
Awd $600.00$50.00
2 $1,003.20$83.60
3 $865.80$72.15
Section 7 - TRAFFIC SIGNALS - Totals
Awd $10,500.00
2 $11,779.20
3 $12,857.40
Ref #43 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (150 HOUR)
Awd $9,300.00$62.00
2 $7,923.00$52.82
3 $11,250.00$75.00
Ref #44 614E12500 REPLACEMENT SIGN, (10 EACH)
Awd $1,250.00$125.00
2 $1,338.60$133.86
3 $2,209.50$220.95
Ref #45 614E12600 REPLACEMENT DRUM, (30 EACH)
Awd $1,500.00$50.00
2 $1,651.20$55.04
3 $2,164.50$72.15
Ref #46 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (5.1 MILE)
Awd $1,489.20$292.00
2 $1,489.20$292.00
3 $1,653.42$324.20
Ref #47 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (4.4 MILE)
Awd $1,962.40$446.00
2 $1,962.40$446.00
3 $2,178.88$495.20
Ref #48 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (5.1 MILE)
Awd $2,091.00$410.00
2 $2,091.00$410.00
3 $2,321.78$455.25
Ref #49 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (620 FT)
Awd $279.00$0.45
2 $279.00$0.45
3 $310.00$0.50
120012 - Page 225
Ref #50 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (620 FT)
Awd $1,240.00$2.00
2 $1,240.00$2.00
3 $1,364.00$2.20
Ref #51 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT, (1006 FT)
Awd $1,006.00$1.00
2 $1,006.00$1.00
3 $1,106.60$1.10
Ref #52 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT, (60 EACH)
Awd $2,400.00$40.00
2 $2,400.00$40.00
3 $2,664.00$44.40
Section 8 - MAINTENANCE OF TRAFFIC - Totals
Awd $22,517.60
2 $21,380.40
3 $27,222.68
Ref #53 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $4,503.18$4,503.18
3 $6,125.50$6,125.50
Ref #54 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $15,662.89$15,662.89
3 $21,802.20$21,802.20
Ref #55 619E16010 FIELD OFFICE, TYPE B, (3 MNTH)
Awd $3,000.00$1,000.00
2 $4,805.94$1,601.98
3 $3,300.00$1,100.00
Ref #56 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $9,239.27$9,239.27
3 $2,220.70$2,220.70
Ref #57 624E10000 MOBILIZATION, (LUMP SUM)
Awd $11,920.00$11,920.00
2 $20,000.00$20,000.00
3 $17,506.25$17,506.25
Section 9 - INCIDENTALS - Totals
Awd $48,420.00
2 $54,211.28
3 $50,954.65
120012 - Page 226
Project No. 120013
PID 90420
MRG-SR-60-9.40
Federal
Type: TWO LANE RESURFACING
Completion Date: 7/31/2012
Award Amount: $804,365.35
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 1/12/2012
Engineer's Estimate: $758,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
3570 SOUTH RIVER RD
ZANESVILLE, OH 43701
Muskingum
Bidder 1
Bid $804,365.35
120013 - Page 227
Ref #1 202E30000 WALK REMOVED, (206 SF)
Awd $618.00$3.00
Ref #2 202E32000 CURB REMOVED, (13 FT)
Awd $344.50$26.50
Ref #3 202E32600 GUTTER REMOVED, (1771 FT)
Awd $17,710.00$10.00
Ref #4 204E10000 SUBGRADE COMPACTION, (448 SY)
Awd $1,792.00$4.00
Ref #5 204E13000 EXCAVATION OF SUBGRADE, (95 CY)
Awd $4,750.00$50.00
Ref #6 608E10000 4" CONCRETE WALK, (104 SF)
Awd $858.00$8.25
Ref #7 608E52000 CURB RAMP, (78 SF)
Awd $1,443.00$18.50
Ref #8 608E53020 DETECTABLE WARNING, (24 SF)
Awd $624.00$26.00
Section 1 - ROADWAY - Totals
Awd $28,139.50
Ref #9 601E39501 PAVED GUTTER, TYPE 5, AS PER PLAN, (1771 FT)
Awd $67,298.00$38.00
Ref #10 659E10000 SEEDING AND MULCHING, (200 SY)
Awd $2,000.00$10.00
Section 2 - EROSION CONTROL - Totals
Awd $69,298.00
Ref #11 603E01500 6" CONDUIT, TYPE F, (10 FT)
Awd $285.00$28.50
Ref #12 603E05900 15" CONDUIT, TYPE B, (181 FT)
Awd $9,955.00$55.00
Ref #13 604E00400 CATCH BASIN, NO. 3, (1 EACH)
Awd $3,650.00$3,650.00
Ref #14 604E02000 CATCH BASIN, NO. 6, (1 EACH)
Awd $4,600.00$4,600.00
Ref #15 604E09500 CATCH BASIN RECONSTRUCTED TO GRADE, (3 EACH)
Awd $2,850.00$950.00
Ref #16 605E11100 6" SHALLOW PIPE UNDERDRAINS, (1015 FT)
Awd $12,180.00$12.00
Section 3 - DRAINAGE - Totals
Awd $33,520.00
Ref #17 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (750 SY)
Awd $45,000.00$60.00
120013 - Page 228
Ref #18 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (47115 SY)
Awd $87,162.75$1.85
Ref #19 301E46000 ASPHALT CONCRETE BASE, PG64-22, (79 CY)
Awd $10,665.00$135.00
Ref #20 407E10000 TACK COAT, (3353 GAL)
Awd $6,706.00$2.00
Ref #21 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (2380 GAL)
Awd $4,760.00$2.00
Ref #22 442E20050 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE B (4, (1999 CY)
Awd $294,852.50$147.50
Ref #23 448E46020 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, PG64, (673 CY)
Awd $94,220.00$140.00
Ref #24 609E23000 COMBINATION CURB AND GUTTER, TYPE 4, (387 FT)
Awd $13,932.00$36.00
Section 4 - PAVEMENT - Totals
Awd $557,298.25
Ref #25 621E00100 RPM, (274 EACH)
Awd $5,343.00$19.50
Ref #26 621E54000 RAISED PAVEMENT MARKER REMOVED, (274 EACH)
Awd $2,466.00$9.00
Ref #27 642E00090 EDGE LINE, (3.57 MILE)
Awd $2,320.50$650.00
Ref #28 642E00190 LANE LINE, (1.07 MILE)
Awd $642.00$600.00
Ref #29 642E00290 CENTER LINE, (2.15 MILE)
Awd $3,977.50$1,850.00
Ref #30 644E00500 STOP LINE, (220 FT)
Awd $935.00$4.25
Section 5 - TRAFFIC CONTROL - Totals
Awd $15,684.00
Ref #31 614E12460 WORK ZONE MARKING SIGN, (28 EACH)
Awd $3,640.00$130.00
Ref #32 614E20100 WORK ZONE LANE LINE, CLASS I, 642 PAINT, (3.21 MILE)
Awd $2,568.00$800.00
Ref #33 614E20500 WORK ZONE LANE LINE, CLASS II, 642 PAINT, (3.21 MILE)
Awd $722.25$225.00
Ref #34 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (6.45 MILE)
Awd $7,740.00$1,200.00
Ref #35 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (6.45 MILE)
Awd $1,451.25$225.00
Ref #36 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (1.14 MILE)
Awd $1,396.50$1,225.00
120013 - Page 229
Ref #37 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (1.14 MILE)
Awd $957.60$840.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $18,475.60
Ref #38 516E31300 SPECIAL - POLYMER MODIFIED ASPHALT EXPANSION JOINT, (70 FT)
Awd $8,750.00$125.00
Section 7 - STRUCTURE REPAIR - Totals
Awd $8,750.00
Ref #39 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $3,200.00$3,200.00
Ref #40 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $45,000.00$45,000.00
Ref #41 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)
Awd $5,000.00$5,000.00
Ref #42 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
Section 8 - INCIDENTALS - Totals
Awd $73,200.00
120013 - Page 230
Project No. 120014
PID 89171
NOB-IR-77-1.98
Federal
Type: BRIDGE REPAIR
Completion Date: 11/1/2012
Award Amount: $1,464,881.25
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 1/12/2012
Engineer's Estimate: $1,542,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
3570 SOUTH RIVER RD
ZANESVILLE, OH 43701
Muskingum
Bidder 1
Bid $1,464,881.25
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 2
Bid $1,587,917.24
COSMOS INDUSTRIAL SERVICES INC
9103 DETROIT AVE
CLEVELAND, OH 44102
Cuyahoga
Bidder 3
Bid $1,728,477.38
DOT CONSTRUCTION CORP
535 NORTH BROAD ST STE 5
CANFIELD, OH 44406
Mahoning
Bidder 4
Bid $1,732,776.98
120014 - Page 231
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,000.00$3,000.00
3 $2,282.17$2,282.17
4 $10,000.00$10,000.00
Ref #2 202E23000 PAVEMENT REMOVED, (863 SY)
Awd $8,630.00$10.00
2 $9,493.00$11.00
3 $8,008.64$9.28
4 $8,630.00$10.00
Ref #3 202E38000 GUARDRAIL REMOVED, (810 FT)
Awd $1,255.50$1.55
2 $972.00$1.20
3 $1,555.20$1.92
4 $972.00$1.20
Ref #4 202E38300 GUARDRAIL REMOVED, BARRIER DESIGN, (180 FT)
Awd $288.00$1.60
2 $288.00$1.60
3 $388.80$2.16
4 $288.00$1.60
Ref #5 204E10000 SUBGRADE COMPACTION, (1404 SY)
Awd $4,212.00$3.00
2 $2,808.00$2.00
3 $4,212.00$3.00
4 $2,808.00$2.00
Ref #6 209E60200 LINEAR GRADING, (7 STA)
Awd $2,625.00$375.00
2 $4,550.00$650.00
3 $1,940.96$277.28
4 $2,100.00$300.00
Ref #7 209E60201 LINEAR GRADING, AS PER PLAN, (5 STA)
Awd $3,000.00$600.00
2 $5,250.00$1,050.00
3 $2,911.40$582.28
4 $2,500.00$500.00
Ref #8 606E13000 GUARDRAIL, TYPE 5, (800 FT)
Awd $10,600.00$13.25
2 $12,160.00$15.20
3 $12,464.00$15.58
4 $12,160.00$15.20
Ref #9 606E26000 ANCHOR ASSEMBLY, TYPE B, (2 EACH)
Awd $3,000.00$1,500.00
2 $3,060.00$1,530.00
3 $3,552.00$1,776.00
4 $3,060.00$1,530.00
Ref #10 606E26500 ANCHOR ASSEMBLY, TYPE T, (1 EACH)
Awd $635.00$635.00
2 $645.00$645.00
3 $660.00$660.00
4 $645.00$645.00
120014 - Page 232
Ref #11 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)
Awd $4,440.00$1,110.00
2 $4,780.00$1,195.00
3 $4,080.00$1,020.00
4 $4,780.00$1,195.00
Ref #12 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2, (2 EACH)
Awd $630.00$315.00
2 $750.00$375.00
3 $600.00$300.00
4 $750.00$375.00
Ref #13 607E35000 FENCE REMOVED AND REBUILT, (20 FT)
Awd $500.00$25.00
2 $570.00$28.50
3 $820.80$41.04
4 $570.00$28.50
Section 1 - ROADWAY - Totals
Awd $42,815.50
2 $48,326.00
3 $43,475.97
4 $49,263.00
Ref #14 659E10000 SEEDING AND MULCHING, (2201 SY)
Awd $4,071.85$1.85
2 $3,851.75$1.75
3 $4,754.16$2.16
4 $3,961.80$1.80
Ref #15 659E20000 COMMERCIAL FERTILIZER, (0.2 TON)
Awd $106.00$530.00
2 $100.00$500.00
3 $120.00$600.00
4 $99.80$499.00
Ref #16 659E31000 LIME, (0.46 ACRE)
Awd $96.60$210.00
2 $92.00$200.00
3 $49.68$108.00
4 $41.40$90.00
Ref #17 659E35000 WATER, (12 MGAL)
Awd $12.00$1.00
2 $12.00$1.00
3 $43.20$3.60
4 $12.00$1.00
Ref #18 832E30000 EROSION CONTROL, (3000 EACH)
Awd $3,000.00$1.00
2 $3,000.00$1.00
3 $3,000.00$1.00
4 $3,000.00$1.00
120014 - Page 233
Section 2 - EROSION CONTROL - Totals
Awd $7,286.45
2 $7,055.75
3 $7,967.04
4 $7,115.00
Ref #19 603E00406 4" CONDUIT, TYPE F, (8 FT)
Awd $200.00$25.00
2 $280.00$35.00
3 $261.84$32.73
4 $96.00$12.00
Ref #20 603E01500 6" CONDUIT, TYPE F, (140 FT)
Awd $1,400.00$10.00
2 $1,680.00$12.00
3 $1,996.40$14.26
4 $1,680.00$12.00
Ref #21 604E36600 PRECAST REINFORCED CONCRETE OUTLET, (2 EACH)
Awd $380.00$190.00
2 $400.00$200.00
3 $452.28$226.14
4 $600.00$300.00
Ref #22 605E06000 4" BASE PIPE UNDERDRAINS, (376 FT)
Awd $2,444.00$6.50
2 $3,384.00$9.00
3 $5,764.08$15.33
4 $4,512.00$12.00
Ref #23 605E11100 6" SHALLOW PIPE UNDERDRAINS, (331 FT)
Awd $2,317.00$7.00
2 $3,310.00$10.00
3 $5,587.28$16.88
4 $3,972.00$12.00
Ref #24 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (182 FT)
Awd $1,092.00$6.00
2 $2,366.00$13.00
3 $3,359.72$18.46
4 $2,184.00$12.00
Section 3 - DRAINAGE - Totals
Awd $7,833.00
2 $11,420.00
3 $17,421.60
4 $13,044.00
Ref #25 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1035 SY)
Awd $13,455.00$13.00
2 $7,245.00$7.00
3 $14,531.40$14.04
4 $7,245.00$7.00
120014 - Page 234
Ref #26 304E20000 AGGREGATE BASE, (319 CY)
Awd $25,520.00$80.00
2 $23,925.00$75.00
3 $15,621.43$48.97
4 $19,140.00$60.00
Ref #27 407E10000 TACK COAT, (78 GAL)
Awd $156.00$2.00
2 $117.00$1.50
3 $936.00$12.00
4 $117.00$1.50
Ref #28 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (42 GAL)
Awd $84.00$2.00
2 $63.00$1.50
3 $504.00$12.00
4 $63.00$1.50
Ref #29 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (44 CY)
Awd $22,000.00$500.00
2 $12,100.00$275.00
3 $17,952.00$408.00
4 $12,100.00$275.00
Ref #30 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE , (52 CY)
Awd $23,400.00$450.00
2 $14,300.00$275.00
3 $21,216.00$408.00
4 $14,300.00$275.00
Ref #31 448E46061 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, UNDE, (14 CY)
Awd $9,100.00$650.00
2 $3,850.00$275.00
3 $5,208.00$372.00
4 $3,850.00$275.00
Ref #32 451E31000 SPECIAL - PRESSURE RELIEF JOINT, TYPE B, (81 FT)
Awd $9,720.00$120.00
2 $14,175.00$175.00
3 $7,866.72$97.12
4 $20,250.00$250.00
Ref #33 452E14100 11" NON-REINFORCED CONCRETE PAVEMENT, (833 SY)
Awd $41,650.00$50.00
2 $58,310.00$70.00
3 $40,916.96$49.12
4 $83,300.00$100.00
Ref #34 609E24510 CURB, TYPE 4-C, (80 FT)
Awd $1,840.00$23.00
2 $1,840.00$23.00
3 $3,256.80$40.71
4 $3,200.00$40.00
Ref #35 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE), (501 FT)
Awd $3,256.50$6.50
2 $501.00$1.00
3 $4,929.84$9.84
4 $4,108.20$8.20
120014 - Page 235
Ref #36 618E40200 RUMBLE STRIPS, (CONCRETE), (391 FT)
Awd $2,541.50$6.50
2 $3,616.75$9.25
3 $3,487.72$8.92
4 $2,905.13$7.43
Section 4 - PAVEMENT - Totals
Awd $152,723.00
2 $140,042.75
3 $136,426.87
4 $170,578.33
Ref #37 626E00100 BARRIER REFLECTOR, (34 EACH)
Awd $204.00$6.00
2 $170.00$5.00
3 $224.40$6.60
4 $170.00$5.00
Ref #38 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (4 EACH)
Awd $140.00$35.00
2 $140.00$35.00
3 $192.00$48.00
4 $140.00$35.00
Ref #39 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT, (4 EACH)
Awd $200.00$50.00
2 $380.00$95.00
3 $192.00$48.00
4 $380.00$95.00
Ref #40 646E10000 EDGE LINE, (2.17 MILE)
Awd $10,416.00$4,800.00
2 $9,916.90$4,570.00
3 $9,647.82$4,446.00
4 $8,039.85$3,705.00
Ref #41 646E10100 LANE LINE, (1.09 MILE)
Awd $3,270.00$3,000.00
2 $3,134.84$2,876.00
3 $3,786.67$3,474.01
4 $3,155.55$2,895.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $14,230.00
2 $13,741.74
3 $14,042.89
4 $11,885.40
Ref #42 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (4 EACH)
Awd $9,200.00$2,300.00
2 $7,540.00$1,885.00
3 $9,120.00$2,280.00
4 $8,180.00$2,045.00
120014 - Page 236
Ref #43 614E13302 BARRIER REFLECTOR, TYPE B2, (130 EACH)
Awd $650.00$5.00
2 $910.00$7.00
3 $1,248.00$9.60
4 $780.00$6.00
Ref #44 614E13350 OBJECT MARKER, ONE WAY, (130 EACH)
Awd $1,300.00$10.00
2 $1,040.00$8.00
3 $2,028.00$15.60
4 $1,950.00$15.00
Ref #45 614E22000 WORK ZONE EDGE LINE, CLASS I, (3.95 MILE)
Awd $5,016.50$1,270.00
2 $7,900.00$2,000.00
3 $3,299.04$835.20
4 $7,900.00$2,000.00
Ref #46 614E24000 WORK ZONE DOTTED LINE, CLASS I, (4690 FT)
Awd $1,172.50$0.25
2 $1,407.00$0.30
3 $2,532.60$0.54
4 $2,345.00$0.50
Ref #47 622E40020 PORTABLE CONCRETE BARRIER, 32", (2070 FT)
Awd $20,700.00$10.00
2 $26,910.00$13.00
3 $31,878.00$15.40
4 $24,840.00$12.00
Ref #48 622E40040 PORTABLE CONCRETE BARRIER, 32", BRIDGE MOUNTED, (1040 FT)
Awd $11,440.00$11.00
2 $14,560.00$14.00
3 $18,772.00$18.05
4 $15,600.00$15.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $49,479.00
2 $60,267.00
3 $68,877.64
4 $61,595.00
Ref #49 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $41,200.00$41,200.00
2 $90,000.00$90,000.00
3 $90,410.39$90,410.39
4 $100,000.00$100,000.00
Ref #50 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $11,000.00$11,000.00
2 $7,000.00$7,000.00
3 $8,279.14$8,279.14
4 $5,000.00$5,000.00
Ref #51 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $13,740.00$13,740.00
2 $9,000.00$9,000.00
3 $15,007.00$15,007.00
4 $5,000.00$5,000.00
120014 - Page 237
Ref #52 509E10000 EPOXY COATED REINFORCING STEEL, (100900 LB)
Awd $103,927.00$1.03
2 $110,990.00$1.10
3 $118,053.00$1.17
4 $116,035.00$1.15
Ref #53 510E09950 DOWEL HOLES WITH CEMENT GROUT, (232 EACH)
Awd $3,248.00$14.00
2 $3,016.00$13.00
3 $3,995.04$17.22
4 $4,640.00$20.00
Ref #54 511E34434 CLASS S CONCRETE, BRIDGE DECK, (302.9 CY)
Awd $177,196.50$585.00
2 $196,885.00$650.00
3 $189,691.13$626.25
4 $212,030.00$700.00
Ref #55 511E45700 CLASS C CONCRETE, ABUTMENT, (28.7 CY)
Awd $26,691.00$930.00
2 $25,830.00$900.00
3 $47,997.31$1,672.38
4 $20,090.00$700.00
Ref #56 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (672 SY)
Awd $5,342.40$7.95
2 $5,040.00$7.50
3 $5,510.40$8.20
4 $3,360.00$5.00
Ref #57 512E44400 TYPE B WATERPROOFING, (39 SY)
Awd $1,170.00$30.00
2 $1,950.00$50.00
3 $1,126.71$28.89
4 $1,170.00$30.00
Ref #58 513E20000 WELDED STUD SHEAR CONNECTORS, (4020 EACH)
Awd $12,060.00$3.00
2 $12,462.00$3.10
3 $14,954.40$3.72
4 $12,060.00$3.00
Ref #59 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (82 FT)
Awd $29,930.00$365.00
2 $27,880.00$340.00
3 $30,731.96$374.78
4 $28,700.00$350.00
Ref #60 518E12200 SCUPPERS, INCLUDING SUPPORTS, (16 EACH)
Awd $12,480.00$780.00
2 $12,480.00$780.00
3 $21,081.60$1,317.60
4 $24,000.00$1,500.00
Ref #61 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (41 CY)
Awd $3,977.00$97.00
2 $4,510.00$110.00
3 $5,551.40$135.40
4 $2,460.00$60.00
120014 - Page 238
Ref #62 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (116 FT)
Awd $232.00$2.00
2 $812.00$7.00
3 $911.76$7.86
4 $1,392.00$12.00
Ref #63 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (28 FT)
Awd $56.00$2.00
2 $448.00$16.00
3 $408.24$14.58
4 $336.00$12.00
Ref #64 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (231 SY)
Awd $53,130.00$230.00
2 $51,975.00$225.00
3 $59,110.59$255.89
4 $53,130.00$230.00
Ref #100 511E34436 CLASS S CONCRETE, BRIDGE DECK (PARAPET), (94 CY)
Awd $21,620.00$230.00
2 $37,130.00$395.00
3 $19,998.50$212.75
4 $47,000.00$500.00
Section 7 - STRUCTURE REPAIR BRIDGE NO. NOB-77-0201 - Totals
Awd $516,999.90
2 $597,408.00
3 $632,818.57
4 $636,403.00
Ref #65 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $60,000.00$60,000.00
2 $90,000.00$90,000.00
3 $90,410.39$90,410.39
4 $100,000.00$100,000.00
Ref #66 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $11,000.00$11,000.00
2 $7,000.00$7,000.00
3 $8,279.14$8,279.14
4 $5,000.00$5,000.00
Ref #67 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $16,200.00$16,200.00
2 $9,000.00$9,000.00
3 $15,007.00$15,007.00
4 $5,000.00$5,000.00
Ref #68 509E10000 EPOXY COATED REINFORCING STEEL, (100915 LB)
Awd $103,942.45$1.03
2 $111,006.50$1.10
3 $118,070.55$1.17
4 $116,052.25$1.15
Ref #69 510E09950 DOWEL HOLES WITH CEMENT GROUT, (232 EACH)
Awd $3,480.00$15.00
2 $3,016.00$13.00
3 $3,995.04$17.22
4 $4,640.00$20.00
120014 - Page 239
Ref #70 511E34434 CLASS S CONCRETE, BRIDGE DECK, (302.9 CY)
Awd $181,740.00$600.00
2 $196,885.00$650.00
3 $189,691.13$626.25
4 $212,030.00$700.00
Ref #71 511E45700 CLASS C CONCRETE, ABUTMENT, (29.3 CY)
Awd $26,370.00$900.00
2 $26,370.00$900.00
3 $48,915.76$1,669.48
4 $20,510.00$700.00
Ref #72 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (661 SY)
Awd $5,254.95$7.95
2 $4,957.50$7.50
3 $5,420.20$8.20
4 $3,305.00$5.00
Ref #73 512E44400 TYPE B WATERPROOFING, (39 SY)
Awd $1,131.00$29.00
2 $1,950.00$50.00
3 $1,126.71$28.89
4 $1,170.00$30.00
Ref #74 513E20000 WELDED STUD SHEAR CONNECTORS, (4020 EACH)
Awd $10,050.00$2.50
2 $12,462.00$3.10
3 $14,954.40$3.72
4 $12,060.00$3.00
Ref #75 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (82 FT)
Awd $29,848.00$364.00
2 $27,880.00$340.00
3 $30,731.96$374.78
4 $28,700.00$350.00
Ref #76 518E12200 SCUPPERS, INCLUDING SUPPORTS, (16 EACH)
Awd $12,480.00$780.00
2 $12,480.00$780.00
3 $21,081.60$1,317.60
4 $24,000.00$1,500.00
Ref #77 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (42 CY)
Awd $3,906.00$93.00
2 $4,620.00$110.00
3 $5,686.80$135.40
4 $2,520.00$60.00
Ref #78 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (116 FT)
Awd $319.00$2.75
2 $812.00$7.00
3 $911.76$7.86
4 $1,392.00$12.00
Ref #79 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (32 FT)
Awd $88.00$2.75
2 $512.00$16.00
3 $465.92$14.56
4 $384.00$12.00
120014 - Page 240
Ref #80 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (231 SY)
Awd $54,285.00$235.00
2 $51,975.00$225.00
3 $59,110.59$255.89
4 $53,130.00$230.00
Ref #101 511E34436 CLASS S CONCRETE, BRIDGE DECK (PARAPET), (94 CY)
Awd $21,620.00$230.00
2 $37,130.00$395.00
3 $19,998.50$212.75
4 $47,000.00$500.00
Section 8 - BRIDGE NO. NOB-77-0201 RT - Totals
Awd $541,714.40
2 $598,056.00
3 $633,857.45
4 $636,893.25
Ref #81 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $13,000.00$13,000.00
3 $27,600.00$27,600.00
4 $18,000.00$18,000.00
Ref #82 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $58,000.00$58,000.00
2 $35,000.00$35,000.00
3 $50,956.30$50,956.30
4 $60,000.00$60,000.00
Ref #83 619E16010 FIELD OFFICE, TYPE B, (8 MNTH)
Awd $14,800.00$1,850.00
2 $17,600.00$2,200.00
3 $13,440.00$1,680.00
4 $8,000.00$1,000.00
Ref #84 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)
Awd $7,000.00$7,000.00
2 $6,000.00$6,000.00
3 $7,200.00$7,200.00
4 $10,000.00$10,000.00
Ref #85 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $40,000.00$40,000.00
3 $74,393.05$74,393.05
4 $50,000.00$50,000.00
Section 9 - INCIDENTALS - Totals
Awd $131,800.00
2 $111,600.00
3 $173,589.35
4 $146,000.00
120014 - Page 241
Project No. 120015
PID 84473
PRE-US-40-9.96
Federal
Type: TWO LANE RESURFACING
Completion Date: 7/27/2012
Award Amount: $2,179,220.45
Contract Awarded To: WALLS BROS ASPHALT CO INC
Letting Date: 1/12/2012
Engineer's Estimate: $2,385,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
WALLS BROS ASPHALT CO INC
3690 HOLLANSBURG-SAMPSON RD
GREENVILLE, OH 45331
Darke
Bidder 1
Bid $2,179,220.45
BARRETT PAVING MATERIALS INC
600 SHEPHERD AVE
CINCINNATI, OH 45215
Hamilton
Bidder 2
Bid $2,284,039.82
120015 - Page 242
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,253.09$1,253.09
2 $3,000.00$3,000.00
Ref #2 202E38000 GUARDRAIL REMOVED, (800 FT)
Awd $1,200.00$1.50
2 $1,200.00$1.50
Ref #3 202E38500 BRIDGE RAILING REMOVED, (52 FT)
Awd $301.60$5.80
2 $301.60$5.80
Ref #4 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN, (12 EACH)
Awd $1,380.00$115.00
2 $1,380.00$115.00
Ref #5 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (4 EACH)
Awd $300.00$75.00
2 $300.00$75.00
Ref #6 203E20000 EMBANKMENT, (20 CY)
Awd $1,088.60$54.43
2 $1,000.00$50.00
Ref #7 606E13000 GUARDRAIL, TYPE 5, (800 FT)
Awd $11,400.00$14.25
2 $11,400.00$14.25
Ref #8 606E22010 ANCHOR ASSEMBLY, TYPE E-98, (12 EACH)
Awd $21,900.00$1,825.00
2 $21,900.00$1,825.00
Ref #9 606E32160 BRIDGE TERMINAL ASSEMBLY, TYPE TST, (4 EACH)
Awd $4,180.00$1,045.00
2 $4,180.00$1,045.00
Ref #10 606E98200 GUARDRAIL, MISC.:RESETTING OF BRIDGE TERMINAL ASSE, (LUMP SUM)
Awd $1,995.00$1,995.00
2 $1,995.00$1,995.00
Ref #11 848E50300 WEARING COURSE REMOVED, ASPHALT, (971 SY)
Awd $8,845.81$9.11
2 $15,536.00$16.00
Section 1 - ROADWAY - Totals
Awd $53,844.10
2 $62,192.60
Ref #12 659E10000 SEEDING AND MULCHING, (573 SY)
Awd $2,005.50$3.50
2 $859.50$1.50
Ref #13 659E20000 COMMERCIAL FERTILIZER, (0.05 TON)
Awd $25.00$500.00
2 $20.00$400.00
Ref #14 659E35000 WATER, (1.55 MGAL)
Awd $77.50$50.00
2 $155.00$100.00
120015 - Page 243
Ref #15 832E30000 EROSION CONTROL, (10000 EACH)
Awd $10,000.00$1.00
2 $10,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $12,108.00
2 $11,034.50
Ref #16 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (5600 SY)
Awd $191,968.00$34.28
2 $207,200.00$37.00
Ref #17 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (143302 SY)
Awd $75,950.06$0.53
2 $97,445.36$0.68
Ref #18 254E01600 PATCHING PLANED SURFACE, (7167 SY)
Awd $27,521.28$3.84
2 $7,167.00$1.00
Ref #19 407E10000 TACK COAT, (10748 GAL)
Awd $22,570.80$2.10
2 $22,570.80$2.10
Ref #20 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (9169 GAL)
Awd $19,254.90$2.10
2 $19,254.90$2.10
Ref #21 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (6938 CY)
Awd $707,745.38$102.01
2 $749,304.00$108.00
Ref #22 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (4965 CY)
Awd $625,341.75$125.95
2 $665,310.00$134.00
Ref #23 617E10100 COMPACTED AGGREGATE, (267 CY)
Awd $8,952.51$33.53
2 $15,486.00$58.00
Ref #24 617E20000 SHOULDER PREPARATION, (12830 SY)
Awd $1,026.40$0.08
2 $4,490.50$0.35
Ref #25 617E25000 WATER, (5.34 MGAL)
Awd $106.80$20.00
2 $53.40$10.00
Section 3 - PAVEMENT - Totals
Awd $1,680,437.88
2 $1,788,281.96
Ref #26 621E00100 RPM, (547 EACH)
Awd $8,478.50$15.50
2 $9,572.50$17.50
Ref #27 621E54000 RAISED PAVEMENT MARKER REMOVED, (600 EACH)
Awd $2,832.00$4.72
2 $2,700.00$4.50
120015 - Page 244
Ref #28 626E00100 BARRIER REFLECTOR, (16 EACH)
Awd $128.00$8.00
2 $128.00$8.00
Ref #29 644E00100 EDGE LINE, (14.26 MILE)
Awd $29,361.34$2,059.00
2 $29,361.34$2,059.00
Ref #30 644E00300 CENTER LINE, (7.66 MILE)
Awd $21,907.60$2,860.00
2 $21,907.60$2,860.00
Ref #31 644E00500 STOP LINE, (52 FT)
Awd $416.00$8.00
2 $416.00$8.00
Ref #32 645E00110 EDGE LINE, TYPE A3, (0.12 MILE)
Awd $2,208.36$18,403.00
2 $2,208.36$18,403.00
Ref #33 645E00310 CENTER LINE, TYPE A3, (0.06 MILE)
Awd $2,208.36$36,806.00
2 $2,208.36$36,806.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $67,540.16
2 $68,502.16
Ref #34 632E26501 DETECTOR LOOP, AS PER PLAN, (3 EACH)
Awd $3,135.00$1,045.00
2 $3,000.00$1,000.00
Ref #35 632E27200 LOOP DETECTOR TIE IN, (3 EACH)
Awd $360.00$120.00
2 $150.00$50.00
Section 5 - TRAFFIC SIGNALS - Totals
Awd $3,495.00
2 $3,150.00
Ref #36 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (166 SY)
Awd $3,320.00$20.00
2 $6,059.00$36.50
Ref #37 516E31400 SPECIAL - POLYMER MODIFIED ASPHALT EXPANSION JOINT, (1.2 CY)
Awd $7,322.44$6,102.03
2 $7,322.40$6,102.00
Ref #38 518E22300 SPECIAL - STEEL DRIP STRIP, (272 FT)
Awd $2,516.00$9.25
2 $2,516.00$9.25
Ref #39 519E11100 PATCHING CONCRETE STRUCTURE, (40 SF)
Awd $3,900.00$97.50
2 $3,900.00$97.50
Ref #40 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (475 SY)
Awd $26,125.00$55.00
2 $26,125.00$55.00
120015 - Page 245
Ref #41 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (475 SY)
Awd $29,806.25$62.75
2 $29,806.25$62.75
Ref #42 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (33 CY)
Awd $4,290.00$130.00
2 $4,290.00$130.00
Ref #43 848E50000 HAND CHIPPING, (47 SY)
Awd $4,582.50$97.50
2 $4,582.50$97.50
Ref #44 848E50100 TEST SLAB, (LUMP SUM)
Awd $750.00$750.00
2 $750.00$750.00
Ref #45 848E50200 FULL-DEPTH REPAIR, (25 CY)
Awd $3,250.00$130.00
2 $3,250.00$130.00
Ref #46 848E50321 EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN(T =, (26 SY)
Awd $405.60$15.60
2 $405.60$15.60
Ref #47 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA, (26 SY)
Awd $845.00$32.50
2 $845.00$32.50
Ref #100 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (112 SY)
Awd $2,800.00$25.00
2 $2,632.00$23.50
Section 6 - STRUCTURE REPAIR BRIDGE NO. PRE-40-1116 - Totals
Awd $89,912.79
2 $92,483.75
Ref #48 516E31400 SPECIAL - POLYMER MODIFIED ASPHALT EXPANSION JOINT, (1.2 CY)
Awd $7,322.44$6,102.03
2 $7,322.40$6,102.00
Section 7 - BRIDGE NO. PRE-40-1510 - Totals
Awd $7,322.44
2 $7,322.40
Ref #49 516E31400 SPECIAL - POLYMER MODIFIED ASPHALT EXPANSION JOINT, (1 CY)
Awd $6,102.03$6,102.03
2 $6,102.00$6,102.00
Section 8 - BRIDGE NO. PRE-40-1519 - Totals
Awd $6,102.03
2 $6,102.00
Ref #50 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $6,500.00$6,500.00
2 $6,500.00$6,500.00
120015 - Page 246
Ref #51 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $1,950.00$1,950.00
2 $1,950.00$1,950.00
Ref #52 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $1,950.00$1,950.00
2 $1,950.00$1,950.00
Ref #53 509E10000 EPOXY COATED REINFORCING STEEL, (2014 LB)
Awd $2,618.20$1.30
2 $2,618.20$1.30
Ref #54 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $65.00$1.30
2 $65.00$1.30
Ref #55 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (24 EACH)
Awd $360.00$15.00
2 $360.00$15.00
Ref #56 511E34400 CLASS S CONCRETE, SUPERSTRUCTURE, (10 CY)
Awd $5,000.00$500.00
2 $5,000.00$500.00
Ref #57 511E45700 CLASS C CONCRETE, ABUTMENT, (2 CY)
Awd $1,651.00$825.50
2 $1,651.00$825.50
Ref #58 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (162 SY)
Awd $3,240.00$20.00
2 $5,913.00$36.50
Ref #59 512E44400 TYPE B WATERPROOFING, (2 SY)
Awd $31.00$15.50
2 $31.00$15.50
Ref #60 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (14 SF)
Awd $91.00$6.50
2 $91.00$6.50
Ref #61 516E31400 SPECIAL - POLYMER MODIFIED ASPHALT EXPANSION JOINT, (1.3 CY)
Awd $7,932.64$6,102.03
2 $7,932.60$6,102.00
Ref #62 517E70000 RAILING (TWIN STEEL TUBE), (52 FT)
Awd $6,656.00$128.00
2 $8,840.00$170.00
Ref #63 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (6 CY)
Awd $1,170.00$195.00
2 $1,170.00$195.00
Ref #64 518E22300 SPECIAL - STEEL DRIP STRIP, (46 FT)
Awd $448.50$9.75
2 $448.50$9.75
Ref #65 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (265 SY)
Awd $14,575.00$55.00
2 $14,575.00$55.00
Ref #66 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (265 SY)
Awd $16,628.75$62.75
2 $16,628.75$62.75
120015 - Page 247
Ref #67 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (19 CY)
Awd $2,470.00$130.00
2 $2,470.00$130.00
Ref #68 848E50000 HAND CHIPPING, (27 SY)
Awd $2,632.50$97.50
2 $2,632.50$97.50
Ref #69 848E50100 TEST SLAB, (LUMP SUM)
Awd $750.00$750.00
2 $750.00$750.00
Ref #70 848E50200 FULL-DEPTH REPAIR, (12 CY)
Awd $1,560.00$130.00
2 $1,560.00$130.00
Ref #71 848E90000 OVERLAY, MISC.:REMOVAL OF EXISTING EPOXY OVERLAY, (52 SY)
Awd $806.00$15.50
2 $806.00$15.50
Ref #101 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (12 SY)
Awd $300.00$25.00
2 $282.00$23.50
Section 9 - BRIDGE NO. PRE-40-1619 - Totals
Awd $79,385.59
2 $84,224.55
Ref #72 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (191 SY)
Awd $3,820.00$20.00
2 $6,971.50$36.50
Ref #73 516E31400 SPECIAL - POLYMER MODIFIED ASPHALT EXPANSION JOINT, (1.2 CY)
Awd $7,322.44$6,102.03
2 $7,322.40$6,102.00
Ref #74 518E22300 SPECIAL - STEEL DRIP STRIP, (40 FT)
Awd $390.00$9.75
2 $390.00$9.75
Ref #75 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (250 SY)
Awd $13,750.00$55.00
2 $13,750.00$55.00
Ref #76 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (250 SY)
Awd $15,687.50$62.75
2 $15,687.50$62.75
Ref #77 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (18 CY)
Awd $2,340.00$130.00
2 $2,340.00$130.00
Ref #78 848E50000 HAND CHIPPING, (25 SY)
Awd $2,437.50$97.50
2 $2,437.50$97.50
Ref #79 848E50100 TEST SLAB, (LUMP SUM)
Awd $750.00$750.00
2 $750.00$750.00
120015 - Page 248
Ref #80 848E50200 FULL-DEPTH REPAIR, (11 CY)
Awd $1,430.00$130.00
2 $1,430.00$130.00
Ref #81 848E90000 OVERLAY, MISC.:REMOVAL OF EXISTING EPOXY OVERLAY, (44 SY)
Awd $682.00$15.50
2 $682.00$15.50
Ref #102 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (10 SY)
Awd $250.00$25.00
2 $235.00$23.50
Section 10 - BRIDGE NO. PRE-40-1637 - Totals
Awd $48,859.44
2 $51,995.90
Ref #82 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $7,075.06$7,075.06
2 $12,750.00$12,750.00
Ref #83 614E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM)
Awd $85,532.00$85,532.00
2 $65,500.00$65,500.00
Ref #84 623E10001 CONSTRUCTION LAYOUT STAKES, AS PER PLAN, (LUMP SUM)
Awd $1,605.96$1,605.96
2 $4,000.00$4,000.00
Ref #85 624E10000 MOBILIZATION, (LUMP SUM)
Awd $36,000.00$36,000.00
2 $26,500.00$26,500.00
Section 11 - INCIDENTALS - Totals
Awd $130,213.02
2 $108,750.00
120015 - Page 249
Project No. 120016
PID 84674
SEN-SR-19-15.34
Federal
Type: CULVERT REPLACEMENT
Completion Date: 8/1/2012
Award Amount: $89,440.52
Contract Awarded To: ACI CONST CO INC
Letting Date: 1/12/2012
Engineer's Estimate: $101,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
ACI CONST CO INC
2959 S US 23
ALVADA, OH 44802
Seneca
Bidder 1
Bid $89,440.52
HELMS AND SONS EXCAVATING
1753 LIMA AVE
FINDLAY, OH 45840
Hancock
Bidder 2
Bid $93,999.00
R & I CONSTRUCTION INC
2931 STATE ROUTE 67 SOUTH
TIFFIN, OH 44883
Seneca
Bidder 3
Bid $104,133.05
GEDDIS PAVING & EXCAVATING INC
1019 WAMBA AVE
TOLEDO, OH 43607
Lucas
Bidder 4
Bid $107,165.50
CRESTLINE PAVING & EXCAVATING CO INC
1913 NEBRASKA AVE
TOLEDO, OH 43607
Lucas
Bidder 5
Bid $108,907.41
BCC OHIO INC
1199 CHENANGO RD
NEW LONDON, OH 44851
Huron
Bidder 6
Bid $110,345.28
R G ZACHRICH CONSTRUCTION INC
10105 HALLER ST
DEFIANCE, OH 43512
Defiance
Bidder 7
Bid $110,523.78
RIETSCHLIN CONSTRUCTION INC
4240 BAKER RD
CRESTLINE, OH 44827
Crawford
Bidder 8
Bid $111,969.50
SCHALK BROTHERS INC
3481 NORTH TWP RD 69
TIFFIN, OH 44883
Seneca
Bidder 9
Bid $112,169.23
MARK HAYNES CONSTRUCTION INC
3130 ST RT 18 E
NORWALK, OH 44857
Huron
Bidder 10
Bid $113,841.40
120016 - Page 250
PAGE EXCAVATING INC
2398 APPLEGATE RD
LUCAS, OH 44843
Richland
Bidder 11
Bid $129,792.00
120016 - Page 251
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $948.00$948.00
2 $2,500.00$2,500.00
3 $1,000.00$1,000.00
4 $6,100.00$6,100.00
5 $2,500.00$2,500.00
6 $1,086.00$1,086.00
7 $6,057.00$6,057.00
8 $2,500.00$2,500.00
9 $2,000.00$2,000.00
10 $3,100.00$3,100.00
11 $4,000.00$4,000.00
Ref #2 202E11001 STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $7,362.00$7,362.00
2 $1,125.00$1,125.00
3 $4,000.00$4,000.00
4 $6,500.00$6,500.00
5 $6,000.00$6,000.00
6 $4,557.00$4,557.00
7 $8,752.00$8,752.00
8 $4,500.00$4,500.00
9 $4,000.00$4,000.00
10 $3,600.00$3,600.00
11 $6,000.00$6,000.00
Ref #3 202E23010 PAVEMENT REMOVED, ASPHALT, (267 SY)
Awd $2,392.32$8.96
2 $2,136.00$8.00
3 $1,869.00$7.00
4 $3,204.00$12.00
5 $1,335.00$5.00
6 $1,407.09$5.27
7 $1,335.00$5.00
8 $6,942.00$26.00
9 $2,136.00$8.00
10 $801.00$3.00
11 $5,340.00$20.00
Ref #4 202E23800 BASE REMOVED, (267 SY)
Awd $216.27$0.81
2 $1,869.00$7.00
3 $267.00$1.00
4 $801.00$3.00
5 $1,335.00$5.00
6 $2,306.88$8.64
7 $267.00$1.00
8 $3,204.00$12.00
9 $2,136.00$8.00
10 $267.00$1.00
11 $2,670.00$10.00
120016 - Page 252
Ref #5 202E35100 PIPE REMOVED, 24" AND UNDER, (47 FT)
Awd $211.50$4.50
2 $340.75$7.25
3 $94.00$2.00
4 $235.00$5.00
5 $611.00$13.00
6 $73.32$1.56
7 $589.38$12.54
8 $1,034.00$22.00
9 $282.00$6.00
10 $94.00$2.00
11 $470.00$10.00
Ref #6 202E58100 CATCH BASIN REMOVED, (1 EACH)
Awd $157.00$157.00
2 $350.00$350.00
3 $100.00$100.00
4 $50.00$50.00
5 $300.00$300.00
6 $73.50$73.50
7 $304.00$304.00
8 $200.00$200.00
9 $50.00$50.00
10 $100.00$100.00
11 $100.00$100.00
Ref #7 203E10000 EXCAVATION, (215 CY)
Awd $1,051.35$4.89
2 $2,795.00$13.00
3 $1,290.00$6.00
4 $4,300.00$20.00
5 $4,300.00$20.00
6 $2,474.65$11.51
7 $1,763.00$8.20
8 $3,010.00$14.00
9 $2,150.00$10.00
10 $3,225.00$15.00
11 $5,375.00$25.00
Ref #8 203E20000 EMBANKMENT, (248 CY)
Awd $1,651.68$6.66
2 $1,984.00$8.00
3 $2,480.00$10.00
4 $1,240.00$5.00
5 $3,720.00$15.00
6 $2,279.12$9.19
7 $1,453.28$5.86
8 $3,472.00$14.00
9 $4,960.00$20.00
10 $6,200.00$25.00
11 $7,440.00$30.00
120016 - Page 253
Ref #9 204E10000 SUBGRADE COMPACTION, (384 SY)
Awd $376.32$0.98
2 $384.00$1.00
3 $384.00$1.00
4 $384.00$1.00
5 $921.60$2.40
6 $576.00$1.50
7 $503.04$1.31
8 $384.00$1.00
9 $768.00$2.00
10 $768.00$2.00
11 $768.00$2.00
Ref #10 690E50350 SPECIAL - MAILBOX REMOVED AND RESET, (1 EACH)
Awd $206.00$206.00
2 $80.00$80.00
3 $100.00$100.00
4 $150.00$150.00
5 $175.00$175.00
6 $408.00$408.00
7 $114.00$114.00
8 $200.00$200.00
9 $100.00$100.00
10 $90.00$90.00
11 $50.00$50.00
Section 1 - ROADWAY - Totals
Awd $14,572.44
2 $13,563.75
3 $11,584.00
4 $22,964.00
5 $21,197.60
6 $15,241.56
7 $21,137.70
8 $25,446.00
9 $18,582.00
10 $18,245.00
11 $32,213.00
Ref #11 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (28 CY)
Awd $3,322.48$118.66
2 $2,100.00$75.00
3 $1,820.00$65.00
4 $1,400.00$50.00
5 $2,380.00$85.00
6 $3,629.92$129.64
7 $1,624.00$58.00
8 $2,632.00$94.00
9 $2,800.00$100.00
10 $2,660.00$95.00
11 $2,520.00$90.00
120016 - Page 254
Ref #12 659E00300 TOPSOIL, (122 CY)
Awd $3,407.46$27.93
2 $1,708.00$14.00
3 $2,440.00$20.00
4 $2,928.00$24.00
5 $4,270.00$35.00
6 $4,836.08$39.64
7 $1,011.38$8.29
8 $3,660.00$30.00
9 $366.00$3.00
10 $3,416.00$28.00
11 $610.00$5.00
Ref #13 659E10000 SEEDING AND MULCHING, (1095 SY)
Awd $2,365.20$2.16
2 $1,478.25$1.35
3 $1,368.75$1.25
4 $2,190.00$2.00
5 $1,642.50$1.50
6 $2,299.50$2.10
7 $2,190.00$2.00
8 $1,642.50$1.50
9 $2,190.00$2.00
10 $2,190.00$2.00
11 $2,190.00$2.00
Ref #14 659E20000 COMMERCIAL FERTILIZER, (0.15 TON)
Awd $71.43$476.20
2 $99.00$660.00
3 $75.00$500.00
4 $66.00$440.00
5 $120.00$800.00
6 $69.30$462.00
7 $66.00$440.00
8 $120.00$800.00
9 $75.00$500.00
10 $82.50$550.00
11 $60.00$400.00
Ref #15 659E31000 LIME, (0.23 ACRE)
Awd $24.89$108.22
2 $115.00$500.00
3 $2.30$10.00
4 $23.00$100.00
5 $1.15$5.00
6 $24.15$105.00
7 $23.00$100.00
8 $23.00$100.00
9 $0.23$1.00
10 $6.90$30.00
11 $46.00$200.00
120016 - Page 255
Ref #16 659E35000 WATER, (6 MGAL)
Awd $6.48$1.08
2 $150.00$25.00
3 $6.00$1.00
4 $6.00$1.00
5 $18.00$3.00
6 $6.30$1.05
7 $6.00$1.00
8 $30.00$5.00
9 $3.00$0.50
10 $6.00$1.00
11 $6.00$1.00
Ref #17 832E30000 EROSION CONTROL, (10000 EACH)
Awd $10,000.00$1.00
2 $10,000.00$1.00
3 $10,000.00$1.00
4 $10,000.00$1.00
5 $10,000.00$1.00
6 $10,000.00$1.00
7 $10,000.00$1.00
8 $10,000.00$1.00
9 $10,000.00$1.00
10 $10,000.00$1.00
11 $10,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $19,197.94
2 $15,650.25
3 $15,712.05
4 $16,613.00
5 $18,431.65
6 $20,865.25
7 $14,920.38
8 $18,107.50
9 $15,434.23
10 $18,361.40
11 $15,432.00
Ref #18 602E20000 CONCRETE MASONRY, (2.3 CY)
Awd $1,932.67$840.29
2 $3,783.50$1,645.00
3 $2,300.00$1,000.00
4 $1,840.00$800.00
5 $3,162.50$1,375.00
6 $3,492.00$1,518.26
7 $1,938.90$843.00
8 $2,645.00$1,150.00
9 $2,530.00$1,100.00
10 $1,564.00$680.00
11 $3,910.00$1,700.00
120016 - Page 256
Ref #19 603E03700 10" CONDUIT, TYPE F, (10 FT)
Awd $607.30$60.73
2 $225.00$22.50
3 $100.00$10.00
4 $220.00$22.00
5 $200.00$20.00
6 $120.00$12.00
7 $110.00$11.00
8 $120.00$12.00
9 $40.00$4.00
10 $380.00$38.00
11 $100.00$10.00
Ref #20 603E04600 12" CONDUIT, TYPE C, (30 FT)
Awd $765.60$25.52
2 $630.00$21.00
3 $600.00$20.00
4 $930.00$31.00
5 $1,200.00$40.00
6 $2,280.00$76.00
7 $1,023.60$34.12
8 $1,020.00$34.00
9 $600.00$20.00
10 $1,260.00$42.00
11 $540.00$18.00
Ref #21 603E05200 12" CONDUIT, TYPE F, (10 FT)
Awd $586.30$58.63
2 $210.00$21.00
3 $100.00$10.00
4 $250.00$25.00
5 $200.00$20.00
6 $75.00$7.50
7 $190.00$19.00
8 $150.00$15.00
9 $50.00$5.00
10 $400.00$40.00
11 $100.00$10.00
Ref #22 603E06100 15" CONDUIT, TYPE C, (10 FT)
Awd $557.60$55.76
2 $280.00$28.00
3 $100.00$10.00
4 $280.00$28.00
5 $240.00$24.00
6 $240.00$24.00
7 $170.00$17.00
8 $200.00$20.00
9 $80.00$8.00
10 $450.00$45.00
11 $150.00$15.00
120016 - Page 257
Ref #23 603E09100 21" CONDUIT, TYPE C, (56 FT)
Awd $1,786.96$31.91
2 $2,184.00$39.00
3 $1,680.00$30.00
4 $2,520.00$45.00
5 $2,800.00$50.00
6 $5,101.60$91.10
7 $2,448.32$43.72
8 $2,296.00$41.00
9 $3,136.00$56.00
10 $3,472.00$62.00
11 $2,856.00$51.00
Ref #24 603E53000 38" X 60" CONDUIT, TYPE A, 706.04, (72 FT)
Awd $13,056.48$181.34
2 $14,040.00$195.00
3 $21,600.00$300.00
4 $14,328.00$199.00
5 $16,920.00$235.00
6 $20,716.56$287.73
7 $19,388.88$269.29
8 $18,000.00$250.00
9 $21,600.00$300.00
10 $14,256.00$198.00
11 $25,200.00$350.00
Ref #25 604E04500 CATCH BASIN, NO. 2-2B, (2 EACH)
Awd $1,481.44$740.72
2 $1,900.00$950.00
3 $3,000.00$1,500.00
4 $1,400.00$700.00
5 $2,560.00$1,280.00
6 $3,529.50$1,764.75
7 $2,158.00$1,079.00
8 $2,882.00$1,441.00
9 $2,000.00$1,000.00
10 $2,600.00$1,300.00
11 $1,400.00$700.00
Section 3 - DRAINAGE - Totals
Awd $20,774.35
2 $23,252.50
3 $29,480.00
4 $21,768.00
5 $27,282.50
6 $35,554.66
7 $27,427.70
8 $27,313.00
9 $30,036.00
10 $24,382.00
11 $34,256.00
120016 - Page 258
Ref #26 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (45 SY)
Awd $1,807.65$40.17
2 $956.25$21.25
3 $1,800.00$40.00
4 $1,125.00$25.00
5 $900.00$20.00
6 $1,800.90$40.02
7 $1,575.00$35.00
8 $1,350.00$30.00
9 $1,800.00$40.00
10 $1,800.00$40.00
11 $1,800.00$40.00
Ref #27 301E46000 ASPHALT CONCRETE BASE, PG64-22, (100 CY)
Awd $14,069.00$140.69
2 $17,500.00$175.00
3 $17,000.00$170.00
4 $17,000.00$170.00
5 $15,100.00$151.00
6 $13,650.00$136.50
7 $13,000.00$130.00
8 $13,300.00$133.00
9 $17,000.00$170.00
10 $17,500.00$175.00
11 $13,000.00$130.00
Ref #28 304E20000 AGGREGATE BASE, (64 CY)
Awd $1,663.36$25.99
2 $2,176.00$34.00
3 $2,560.00$40.00
4 $2,304.00$36.00
5 $3,008.00$47.00
6 $4,878.08$76.22
7 $2,688.00$42.00
8 $2,944.00$46.00
9 $3,840.00$60.00
10 $2,688.00$42.00
11 $3,200.00$50.00
Ref #29 407E10000 TACK COAT, (30 GAL)
Awd $81.30$2.71
2 $82.50$2.75
3 $75.00$2.50
4 $52.50$1.75
5 $120.00$4.00
6 $78.90$2.63
7 $75.00$2.50
8 $90.00$3.00
9 $75.00$2.50
10 $75.00$2.50
11 $75.00$2.50
120016 - Page 259
Ref #30 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (16 GAL)
Awd $43.36$2.71
2 $44.00$2.75
3 $40.00$2.50
4 $28.00$1.75
5 $64.00$4.00
6 $42.08$2.63
7 $40.00$2.50
8 $48.00$3.00
9 $40.00$2.50
10 $40.00$2.50
11 $40.00$2.50
Ref #31 408E10000 PRIME COAT, (153 GAL)
Awd $992.97$6.49
2 $726.75$4.75
3 $612.00$4.00
4 $306.00$2.00
5 $765.00$5.00
6 $963.90$6.30
7 $918.00$6.00
8 $1,071.00$7.00
9 $612.00$4.00
10 $6,120.00$40.00
11 $918.00$6.00
Ref #32 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (17 CY)
Awd $3,237.99$190.47
2 $5,270.00$310.00
3 $5,100.00$300.00
4 $4,675.00$275.00
5 $4,590.00$270.00
6 $3,141.60$184.80
7 $2,992.00$176.00
8 $3,060.00$180.00
9 $5,100.00$300.00
10 $6,460.00$380.00
11 $3,060.00$180.00
Ref #33 442E20101 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE, (17 CY)
Awd $3,237.99$190.47
2 $5,270.00$310.00
3 $5,100.00$300.00
4 $4,420.00$260.00
5 $4,590.00$270.00
6 $3,141.60$184.80
7 $2,992.00$176.00
8 $3,060.00$180.00
9 $5,100.00$300.00
10 $6,460.00$380.00
11 $3,060.00$180.00
120016 - Page 260
Section 4 - PAVEMENT - Totals
Awd $25,133.62
2 $32,025.50
3 $32,287.00
4 $29,910.50
5 $29,137.00
6 $27,697.06
7 $24,280.00
8 $24,923.00
9 $33,567.00
10 $41,143.00
11 $25,153.00
Ref #34 621E54000 RAISED PAVEMENT MARKER REMOVED, (3 EACH)
Awd $45.51$15.17
2 $135.00$45.00
3 $15.00$5.00
4 $75.00$25.00
5 $150.00$50.00
6 $15.00$5.00
7 $18.00$6.00
8 $150.00$50.00
9 $30.00$10.00
10 $30.00$10.00
11 $150.00$50.00
Ref #35 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (30 FT)
Awd $503.10$16.77
2 $810.00$27.00
3 $465.00$15.50
4 $465.00$15.50
5 $744.90$24.83
6 $488.40$16.28
7 $450.00$15.00
8 $780.00$26.00
9 $450.00$15.00
10 $450.00$15.00
11 $480.00$16.00
Ref #36 630E08600 SIGN POST REFLECTOR, (2 EACH)
Awd $86.58$43.29
2 $33.00$16.50
3 $80.00$40.00
4 $80.00$40.00
5 $30.70$15.35
6 $84.00$42.00
7 $80.00$40.00
8 $32.00$16.00
9 $80.00$40.00
10 $70.00$35.00
11 $80.00$40.00
120016 - Page 261
Ref #37 630E80100 SIGN, FLAT SHEET, (18 SF)
Awd $389.70$21.65
2 $243.00$13.50
3 $360.00$20.00
4 $360.00$20.00
5 $225.00$12.50
6 $378.00$21.00
7 $360.00$20.00
8 $234.00$13.00
9 $360.00$20.00
10 $720.00$40.00
11 $360.00$20.00
Ref #38 630E81100 SIGN ERECTED, FLAT SHEET, (18 SF)
Awd $97.38$5.41
2 $342.00$19.00
3 $90.00$5.00
4 $90.00$5.00
5 $318.06$17.67
6 $94.50$5.25
7 $90.00$5.00
8 $324.00$18.00
9 $90.00$5.00
10 $720.00$40.00
11 $108.00$6.00
Ref #39 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH)
Awd $17.58$8.79
2 $18.00$9.00
3 $30.00$15.00
4 $30.00$15.00
5 $16.00$8.00
6 $52.50$26.25
7 $30.00$15.00
8 $30.00$15.00
9 $20.00$10.00
10 $160.00$80.00
11 $30.00$15.00
Ref #40 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $27.32$13.66
2 $26.00$13.00
3 $30.00$15.00
4 $30.00$15.00
5 $24.00$12.00
6 $52.50$26.25
7 $30.00$15.00
8 $30.00$15.00
9 $20.00$10.00
10 $160.00$80.00
11 $30.00$15.00
120016 - Page 262
Section 5 - TRAFFIC CONTROL - Totals
Awd $1,167.17
2 $1,607.00
3 $1,070.00
4 $1,130.00
5 $1,508.66
6 $1,164.90
7 $1,058.00
8 $1,580.00
9 $1,050.00
10 $2,310.00
11 $1,238.00
Ref #41 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,008.00$1,008.00
2 $1,250.00$1,250.00
3 $1,200.00$1,200.00
4 $1,025.00$1,025.00
5 $800.00$800.00
6 $1,362.00$1,362.00
7 $1,700.00$1,700.00
8 $2,400.00$2,400.00
9 $1,500.00$1,500.00
10 $1,500.00$1,500.00
11 $4,000.00$4,000.00
Ref #42 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $2,785.00$2,785.00
2 $2,200.00$2,200.00
3 $2,000.00$2,000.00
4 $2,800.00$2,800.00
5 $3,000.00$3,000.00
6 $1,764.00$1,764.00
7 $6,500.00$6,500.00
8 $2,900.00$2,900.00
9 $3,500.00$3,500.00
10 $3,500.00$3,500.00
11 $5,000.00$5,000.00
Ref #43 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)
Awd $1,190.00$1,190.00
2 $1,050.00$1,050.00
3 $1,000.00$1,000.00
4 $1,500.00$1,500.00
5 $950.00$950.00
6 $1,260.00$1,260.00
7 $3,500.00$3,500.00
8 $1,500.00$1,500.00
9 $2,500.00$2,500.00
10 $1,800.00$1,800.00
11 $2,500.00$2,500.00
120016 - Page 263
Ref #44 624E10000 MOBILIZATION, (LUMP SUM)
Awd $3,612.00$3,612.00
2 $3,400.00$3,400.00
3 $9,800.00$9,800.00
4 $9,455.00$9,455.00
5 $6,600.00$6,600.00
6 $5,435.85$5,435.85
7 $10,000.00$10,000.00
8 $7,800.00$7,800.00
9 $6,000.00$6,000.00
10 $2,600.00$2,600.00
11 $10,000.00$10,000.00
Section 6 - INCIDENTALS - Totals
Awd $8,595.00
2 $7,900.00
3 $14,000.00
4 $14,780.00
5 $11,350.00
6 $9,821.85
7 $21,700.00
8 $14,600.00
9 $13,500.00
10 $9,400.00
11 $21,500.00
120016 - Page 264
Project No. 120017
PID 77869
STA-SR-172-17.28
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 9/30/2012
Award Amount: $1,943,492.80
Contract Awarded To: J D WILLIAMSON CONSTRUCTION CO INC
Letting Date: 1/12/2012
Engineer's Estimate: $2,262,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
J D WILLIAMSON CONSTRUCTION CO INC
441 GENEVA AVE
TALLMADGE, OH 44278
Summit
Bidder 1
Bid $1,943,492.80
WOLF CREEK ENGINEERING AND CONTRACTING INC
1288 STARLIGHT DR
AKRON, OH 44306
Summit
Bidder 2
Bid $1,984,405.96
KEFFLER BRIDGE COMPANY
9790 AKRON-CANFIELD RD
CANFIELD, OH 44406
Mahoning
Bidder 3
Bid $1,987,773.40
BEAVER EXCAVATING COMPANY
P O BOX 6059
CANTON, OH 44706
Stark
Bidder 4
Bid $2,182,771.99
MARUCCI & GAFFNEY EXCAVATING CO
18 HOGUE ST
YOUNGSTOWN, OH 44502
Mahoning
Bidder 5
Bid $2,196,859.40
TERRACE CONSTRUCTION CO INC
3965 PEARL RD
CLEVELAND, OH 44109
Cuyahoga
Bidder 6
Bid $2,336,419.19
120017 - Page 265
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $10,000.00$10,000.00
3 $10,000.00$10,000.00
4 $20,000.00$20,000.00
5 $6,300.00$6,300.00
6 $8,500.00$8,500.00
Ref #2 202E20010 HEADWALL REMOVED, (1 EACH)
Awd $320.00$320.00
2 $100.00$100.00
3 $120.00$120.00
4 $300.00$300.00
5 $100.00$100.00
6 $260.00$260.00
Ref #3 202E23000 PAVEMENT REMOVED, (1116 SY)
Awd $12,555.00$11.25
2 $7,142.40$6.40
3 $12,276.00$11.00
4 $8,928.00$8.00
5 $8,928.00$8.00
6 $11,160.00$10.00
Ref #4 202E32000 CURB REMOVED, (233 FT)
Awd $815.50$3.50
2 $489.30$2.10
3 $466.00$2.00
4 $815.50$3.50
5 $466.00$2.00
6 $932.00$4.00
Ref #5 202E35100 PIPE REMOVED, 24" AND UNDER, (857 FT)
Awd $7,498.75$8.75
2 $2,056.80$2.40
3 $6,856.00$8.00
4 $5,999.00$7.00
5 $1,714.00$2.00
6 $5,741.90$6.70
Ref #6 202E38000 GUARDRAIL REMOVED, (325 FT)
Awd $487.50$1.50
2 $455.00$1.40
3 $650.00$2.00
4 $455.00$1.40
5 $650.00$2.00
6 $455.00$1.40
Ref #7 202E52990 SPECIAL - PARKING BLOCK REMOVED, (1 EACH)
Awd $65.00$65.00
2 $100.00$100.00
3 $50.00$50.00
4 $50.00$50.00
5 $100.00$100.00
6 $100.00$100.00
120017 - Page 266
Ref #8 202E56000 BUILDING DEMOLISHED(PARCEL 14 GARAGE), (LUMP SUM)
Awd $2,600.00$2,600.00
2 $2,000.00$2,000.00
3 $2,000.00$2,000.00
4 $2,000.00$2,000.00
5 $500.00$500.00
6 $2,500.00$2,500.00
Ref #9 202E58001 MANHOLE REMOVED, AS PER PLAN, (1 EACH)
Awd $365.00$365.00
2 $150.00$150.00
3 $250.00$250.00
4 $600.00$600.00
5 $100.00$100.00
6 $125.00$125.00
Ref #10 202E58100 CATCH BASIN REMOVED, (4 EACH)
Awd $1,120.00$280.00
2 $600.00$150.00
3 $1,000.00$250.00
4 $600.00$150.00
5 $400.00$100.00
6 $600.00$150.00
Ref #11 202E98100 REMOVAL MISC.:BILLBOARD REMOVED, (2 EACH)
Awd $1,200.00$600.00
2 $1,730.00$865.00
3 $1,200.00$600.00
4 $1,000.00$500.00
5 $200.00$100.00
6 $1,600.00$800.00
Ref #12 203E10000 EXCAVATION, (10000 CY)
Awd $104,500.00$10.45
2 $128,000.00$12.80
3 $90,000.00$9.00
4 $95,000.00$9.50
5 $150,000.00$15.00
6 $100,000.00$10.00
Ref #13 203E20000 EMBANKMENT, (102 CY)
Awd $1,096.50$10.75
2 $1,963.50$19.25
3 $816.00$8.00
4 $918.00$9.00
5 $2,040.00$20.00
6 $1,020.00$10.00
Ref #14 203E35141 GRANULAR MATERIAL, TYPE E, AS PER PLAN, (179 CY)
Awd $11,769.25$65.75
2 $8,234.00$46.00
3 $11,635.00$65.00
4 $7,160.00$40.00
5 $10,024.00$56.00
6 $10,740.00$60.00
120017 - Page 267
Ref #15 204E10000 SUBGRADE COMPACTION, (935 SY)
Awd $3,833.50$4.10
2 $1,870.00$2.00
3 $935.00$1.00
4 $2,337.50$2.50
5 $935.00$1.00
6 $935.00$1.00
Ref #16 204E45000 PROOF ROLLING, (1 HOUR)
Awd $130.00$130.00
2 $110.00$110.00
3 $25.00$25.00
4 $250.00$250.00
5 $100.00$100.00
6 $200.00$200.00
Ref #17 204E50000 GEOTEXTILE FABRIC, TYPE D, NONWOVEN, (1071 SY)
Awd $2,677.50$2.50
2 $1,071.00$1.00
3 $2,142.00$2.00
4 $1,606.50$1.50
5 $2,142.00$2.00
6 $1,874.25$1.75
Ref #18 530E00400 SPECIAL - STRUCTURE, MISC.:MONITORING OF ACCOUSTIC, (2 EACH)
Awd $1,150.00$575.00
2 $3,200.00$1,600.00
3 $2,000.00$1,000.00
4 $4,000.00$2,000.00
5 $5,000.00$2,500.00
6 $3,050.00$1,525.00
Ref #19 530E00400 SPECIAL - STRUCTURE, MISC.:MONITORING OF VIBRATION, (2 EACH)
Awd $1,150.00$575.00
2 $3,200.00$1,600.00
3 $2,000.00$1,000.00
4 $2,000.00$1,000.00
5 $5,000.00$2,500.00
6 $3,050.00$1,525.00
Ref #20 530E00400 SPECIAL - STRUCTURE, MISC.:STRUCTURE SURVEY, (2 EACH)
Awd $2,000.00$1,000.00
2 $1,350.00$675.00
3 $2,000.00$1,000.00
4 $2,000.00$1,000.00
5 $2,400.00$1,200.00
6 $1,960.00$980.00
Ref #21 530E00400 SPECIAL - STRUCTURE, MISC.:WATER QUALITY TESTS, (2 EACH)
Awd $320.00$160.00
2 $1,000.00$500.00
3 $500.00$250.00
4 $200.00$100.00
5 $200.00$100.00
6 $150.00$75.00
120017 - Page 268
Ref #22 606E13000 GUARDRAIL, TYPE 5, (75 FT)
Awd $1,650.00$22.00
2 $1,587.00$21.16
3 $1,875.00$25.00
4 $1,587.00$21.16
5 $1,593.75$21.25
6 $1,650.00$22.00
Ref #23 606E22000 ANCHOR ASSEMBLY, TYPE B-98, (1 EACH)
Awd $1,625.00$1,625.00
2 $1,575.00$1,575.00
3 $2,700.00$2,700.00
4 $1,575.00$1,575.00
5 $1,600.00$1,600.00
6 $1,575.00$1,575.00
Ref #24 606E26500 ANCHOR ASSEMBLY, TYPE T, (3 EACH)
Awd $1,935.00$645.00
2 $1,890.00$630.00
3 $2,040.00$680.00
4 $1,890.00$630.00
5 $1,950.00$650.00
6 $1,890.00$630.00
Ref #25 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)
Awd $5,200.00$1,300.00
2 $4,900.00$1,225.00
3 $5,600.00$1,400.00
4 $4,900.00$1,225.00
5 $5,000.00$1,250.00
6 $4,900.00$1,225.00
Ref #26 690E98300 SPECIAL - MISC.:GEOWEB SLOPE PROTECTION SYSTEM (GW, (1071 SY)
Awd $18,956.70$17.70
2 $20,563.20$19.20
3 $32,130.00$30.00
4 $16,065.00$15.00
5 $23,562.00$22.00
6 $23,829.75$22.25
Section 1 - ROADWAY - Totals
Awd $195,020.20
2 $205,337.20
3 $191,266.00
4 $182,236.50
5 $231,004.75
6 $188,797.90
Ref #27 601E21000 CONCRETE SLOPE PROTECTION, (646 SY)
Awd $34,722.50$53.75
2 $29,716.00$46.00
3 $38,760.00$60.00
4 $45,220.00$70.00
5 $38,760.00$60.00
6 $32,300.00$50.00
120017 - Page 269
Ref #28 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (3 CY)
Awd $555.00$185.00
2 $300.00$100.00
3 $390.00$130.00
4 $345.00$115.00
5 $300.00$100.00
6 $375.00$125.00
Ref #29 659E00100 SOIL ANALYSIS TEST, (1 EACH)
Awd $205.00$205.00
2 $100.00$100.00
3 $100.00$100.00
4 $100.00$100.00
5 $100.00$100.00
6 $150.00$150.00
Ref #30 659E00300 TOPSOIL, (238 CY)
Awd $5,355.00$22.50
2 $7,687.40$32.30
3 $2,380.00$10.00
4 $4,760.00$20.00
5 $7,140.00$30.00
6 $6,664.00$28.00
Ref #31 659E10000 SEEDING AND MULCHING, (2141 SY)
Awd $1,498.70$0.70
2 $3,018.81$1.41
3 $4,282.00$2.00
4 $3,425.60$1.60
5 $3,532.65$1.65
6 $1,605.75$0.75
Ref #32 659E14000 REPAIR SEEDING AND MULCHING, (107 SY)
Awd $112.35$1.05
2 $107.00$1.00
3 $10.70$0.10
4 $42.80$0.40
5 $26.75$0.25
6 $187.25$1.75
Ref #33 659E15000 INTER-SEEDING, (107 SY)
Awd $10.70$0.10
2 $107.00$1.00
3 $10.70$0.10
4 $10.70$0.10
5 $26.75$0.25
6 $187.25$1.75
Ref #34 659E20000 COMMERCIAL FERTILIZER, (0.3 TON)
Awd $217.50$725.00
2 $225.00$750.00
3 $120.00$400.00
4 $157.50$525.00
5 $180.00$600.00
6 $214.50$715.00
120017 - Page 270
Ref #35 659E31000 LIME, (0.44 ACRE)
Awd $8.80$20.00
2 $88.00$200.00
3 $176.00$400.00
4 $44.00$100.00
5 $44.00$100.00
6 $121.00$275.00
Ref #36 659E35000 WATER, (12 MGAL)
Awd $60.00$5.00
2 $12.00$1.00
3 $12.00$1.00
4 $12.00$1.00
5 $120.00$10.00
6 $480.00$40.00
Ref #37 670E00550 SLOPE EROSION PROTECTION MAT, TYPE E, (1071 SY)
Awd $3,320.10$3.10
2 $2,142.00$2.00
3 $6,426.00$6.00
4 $2,463.30$2.30
5 $2,142.00$2.00
6 $1,338.75$1.25
Ref #38 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $5,000.00$5,000.00
3 $1,000.00$1,000.00
4 $5,000.00$5,000.00
5 $2,500.00$2,500.00
6 $900.00$900.00
Ref #39 832E30000 EROSION CONTROL, (23000 EACH)
Awd $23,000.00$1.00
2 $23,000.00$1.00
3 $23,000.00$1.00
4 $23,000.00$1.00
5 $23,000.00$1.00
6 $23,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $72,065.65
2 $71,503.21
3 $76,667.40
4 $84,580.90
5 $77,872.15
6 $67,523.50
Ref #40 602E20000 CONCRETE MASONRY, (1 CY)
Awd $2,400.00$2,400.00
2 $500.00$500.00
3 $1,000.00$1,000.00
4 $1,000.00$1,000.00
5 $500.00$500.00
6 $550.00$550.00
120017 - Page 271
Ref #41 603E04400 12" CONDUIT, TYPE B, (74 FT)
Awd $3,626.00$49.00
2 $2,590.00$35.00
3 $4,440.00$60.00
4 $1,480.00$20.00
5 $4,440.00$60.00
6 $2,368.00$32.00
Ref #42 603E04600 12" CONDUIT, TYPE C, (221 FT)
Awd $6,851.00$31.00
2 $5,525.00$25.00
3 $9,945.00$45.00
4 $5,746.00$26.00
5 $9,724.00$44.00
6 $4,420.00$20.00
Ref #43 603E05200 12" CONDUIT, TYPE F, (88 FT)
Awd $1,936.00$22.00
2 $3,080.00$35.00
3 $6,160.00$70.00
4 $2,288.00$26.00
5 $3,520.00$40.00
6 $1,760.00$20.00
Ref #44 604E00400 CATCH BASIN, NO. 3, (2 EACH)
Awd $3,400.00$1,700.00
2 $3,600.00$1,800.00
3 $4,400.00$2,200.00
4 $5,000.00$2,500.00
5 $5,400.00$2,700.00
6 $3,400.00$1,700.00
Ref #45 604E00800 CATCH BASIN, NO. 3A, (2 EACH)
Awd $2,600.00$1,300.00
2 $2,500.00$1,250.00
3 $3,400.00$1,700.00
4 $3,500.00$1,750.00
5 $4,600.00$2,300.00
6 $2,600.00$1,300.00
Ref #46 604E31500 MANHOLE, NO. 3, (4 EACH)
Awd $6,000.00$1,500.00
2 $5,200.00$1,300.00
3 $6,800.00$1,700.00
4 $6,800.00$1,700.00
5 $9,200.00$2,300.00
6 $8,000.00$2,000.00
Ref #47 605E11100 6" SHALLOW PIPE UNDERDRAINS, (227 FT)
Awd $2,043.00$9.00
2 $2,270.00$10.00
3 $2,951.00$13.00
4 $2,724.00$12.00
5 $3,405.00$15.00
6 $2,270.00$10.00
120017 - Page 272
Ref #48 605E11101 6" SHALLOW PIPE UNDERDRAINS, AS PER PLAN, (169 FT)
Awd $1,521.00$9.00
2 $1,690.00$10.00
3 $2,197.00$13.00
4 $2,028.00$12.00
5 $3,380.00$20.00
6 $2,232.49$13.21
Ref #49 835E10020 EXFILTRATION TRENCH, TYPE C, (16 FT)
Awd $2,400.00$150.00
2 $1,600.00$100.00
3 $1,200.00$75.00
4 $1,200.00$75.00
5 $4,480.00$280.00
6 $640.00$40.00
Section 3 - DRAINAGE - Totals
Awd $32,777.00
2 $28,555.00
3 $42,493.00
4 $31,766.00
5 $48,649.00
6 $28,240.49
Ref #50 304E20001 AGGREGATE BASE, AS PER PLAN, (128 CY)
Awd $5,120.00$40.00
2 $6,208.00$48.50
3 $6,400.00$50.00
4 $5,120.00$40.00
5 $5,120.00$40.00
6 $6,400.00$50.00
Ref #51 305E13000 9" CONCRETE BASE, (494 SY)
Awd $27,787.50$56.25
2 $20,748.00$42.00
3 $30,628.00$62.00
4 $24,206.00$49.00
5 $23,712.00$48.00
6 $29,640.00$60.00
Ref #52 407E10000 TACK COAT, (38 GAL)
Awd $79.80$2.10
2 $190.00$5.00
3 $76.00$2.00
4 $76.00$2.00
5 $190.00$5.00
6 $190.00$5.00
Ref #53 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (20 GAL)
Awd $42.00$2.10
2 $100.00$5.00
3 $40.00$2.00
4 $40.00$2.00
5 $100.00$5.00
6 $100.00$5.00
120017 - Page 273
Ref #54 424E10000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE A, (11 CY)
Awd $3,960.00$360.00
2 $7,315.00$665.00
3 $8,800.00$800.00
4 $3,850.00$350.00
5 $7,315.00$665.00
6 $7,920.00$720.00
Ref #55 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (35 CY)
Awd $6,650.00$190.00
2 $8,400.00$240.00
3 $10,500.00$300.00
4 $6,440.00$184.00
5 $8,400.00$240.00
6 $9,100.00$260.00
Ref #56 451E30000 SPECIAL - PRESSURE RELIEF JOINT, TYPE A, (84 FT)
Awd $9,660.00$115.00
2 $8,400.00$100.00
3 $9,660.00$115.00
4 $13,020.00$155.00
5 $10,080.00$120.00
6 $11,760.00$140.00
Ref #57 452E10000 6" NON-REINFORCED CONCRETE PAVEMENT, (17 SY)
Awd $748.00$44.00
2 $782.00$46.00
3 $1,037.00$61.00
4 $476.00$28.00
5 $2,210.00$130.00
6 $595.00$35.00
Ref #58 452E12000 8" NON-REINFORCED CONCRETE PAVEMENT, (175 SY)
Awd $9,450.00$54.00
2 $8,925.00$51.00
3 $11,550.00$66.00
4 $7,000.00$40.00
5 $7,875.00$45.00
6 $7,350.00$42.00
Ref #59 609E14000 CURB, TYPE 2-A, (89 FT)
Awd $979.00$11.00
2 $1,424.00$16.00
3 $2,225.00$25.00
4 $712.00$8.00
5 $1,780.00$20.00
6 $267.00$3.00
Ref #60 609E16000 CURB, TYPE 2-B, (172 FT)
Awd $2,236.00$13.00
2 $1,892.00$11.00
3 $5,504.00$32.00
4 $1,720.00$10.00
5 $2,580.00$15.00
6 $860.00$5.00
120017 - Page 274
Ref #61 609E26001 CURB, TYPE 6, AS PER PLAN, (140 FT)
Awd $4,340.00$31.00
2 $2,660.00$19.00
3 $5,320.00$38.00
4 $3,060.40$21.86
5 $2,800.00$20.00
6 $2,100.00$15.00
Section 4 - PAVEMENT - Totals
Awd $71,052.30
2 $67,044.00
3 $91,740.00
4 $65,720.40
5 $72,162.00
6 $76,282.00
Ref #62 638E02404 12" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 53, PU, (32 FT)
Awd $16,640.00$520.00
2 $11,520.00$360.00
3 $3,520.00$110.00
4 $3,520.00$110.00
5 $8,000.00$250.00
6 $1,952.00$61.00
Ref #63 638E02605 12" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 53, BO, (142 FT)
Awd $37,630.00$265.00
2 $36,920.00$260.00
3 $22,720.00$160.00
4 $31,950.00$225.00
5 $26,270.00$185.00
6 $124,250.00$875.00
Ref #64 638E98000 WATER WORK, MISC.:1" MANUAL AIR RELEASE VALVE, (1 EACH)
Awd $1,100.00$1,100.00
2 $950.00$950.00
3 $900.00$900.00
4 $1,150.00$1,150.00
5 $1,500.00$1,500.00
6 $1,000.00$1,000.00
Ref #65 638E98000 WATER WORK, MISC.:EX-TEND EXPANSION JOINT, (1 EACH)
Awd $2,425.00$2,425.00
2 $2,100.00$2,100.00
3 $5,000.00$5,000.00
4 $4,000.00$4,000.00
5 $5,200.00$5,200.00
6 $650.00$650.00
Section 5 - WATER WORK - Totals
Awd $57,795.00
2 $51,490.00
3 $32,140.00
4 $40,620.00
5 $40,970.00
6 $127,852.00
120017 - Page 275
Ref #66 690E98100 SPECIAL - MISC.:4" CONDUIT, AS PER PLAN, (185 FT)
Awd $4,116.25$22.25
2 $3,191.25$17.25
3 $2,775.00$15.00
4 $3,977.50$21.50
5 $4,070.00$22.00
6 $1,665.00$9.00
Section 6 - UTILITIES - Totals
Awd $4,116.25
2 $3,191.25
3 $2,775.00
4 $3,977.50
5 $4,070.00
6 $1,665.00
Ref #67 621E00100 RPM, (6 EACH)
Awd $300.00$50.00
2 $1,500.00$250.00
3 $600.00$100.00
4 $1,500.00$250.00
5 $300.00$50.00
6 $1,500.00$250.00
Ref #68 621E54000 RAISED PAVEMENT MARKER REMOVED, (3 EACH)
Awd $33.00$11.00
2 $45.00$15.00
3 $30.00$10.00
4 $30.00$10.00
5 $30.00$10.00
6 $27.00$9.00
Ref #69 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (24 FT)
Awd $264.00$11.00
2 $288.00$12.00
3 $336.00$14.00
4 $288.00$12.00
5 $240.00$10.00
6 $288.00$12.00
Ref #70 630E79610 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED, (2 EACH)
Awd $1,010.00$505.00
2 $310.00$155.00
3 $200.00$100.00
4 $310.00$155.00
5 $1,000.00$500.00
6 $310.00$155.00
Ref #71 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH)
Awd $21.00$10.50
2 $40.00$20.00
3 $20.00$10.00
4 $40.00$20.00
5 $20.00$10.00
6 $40.00$20.00
120017 - Page 276
Ref #72 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (3 EACH)
Awd $156.00$52.00
2 $225.00$75.00
3 $150.00$50.00
4 $225.00$75.00
5 $150.00$50.00
6 $225.00$75.00
Ref #73 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (6 EACH)
Awd $66.00$11.00
2 $120.00$20.00
3 $60.00$10.00
4 $120.00$20.00
5 $60.00$10.00
6 $120.00$20.00
Ref #74 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION, (2 EACH)
Awd $134.00$67.00
2 $150.00$75.00
3 $200.00$100.00
4 $150.00$75.00
5 $130.00$65.00
6 $150.00$75.00
Ref #75 646E10000 EDGE LINE, (0.1 MILE)
Awd $770.00$7,700.00
2 $750.00$7,500.00
3 $2,500.00$25,000.00
4 $750.00$7,500.00
5 $1,000.00$10,000.00
6 $750.00$7,500.00
Ref #76 646E10200 CENTER LINE, (0.1 MILE)
Awd $1,550.00$15,500.00
2 $1,500.00$15,000.00
3 $2,500.00$25,000.00
4 $1,500.00$15,000.00
5 $1,000.00$10,000.00
6 $1,500.00$15,000.00
Section 7 - TRAFFIC CONTROL - Totals
Awd $4,304.00
2 $4,928.00
3 $6,596.00
4 $4,913.00
5 $3,930.00
6 $4,910.00
Ref #77 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (16 HOUR)
Awd $960.00$60.00
2 $960.00$60.00
3 $480.00$30.00
4 $880.00$55.00
5 $800.00$50.00
6 $1,072.00$67.00
120017 - Page 277
Ref #78 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $5,300.00$5,300.00
2 $12,000.00$12,000.00
3 $9,000.00$9,000.00
4 $5,000.00$5,000.00
5 $8,000.00$8,000.00
6 $8,200.00$8,200.00
Section 8 - MAINTENANCE OF TRAFFIC - Totals
Awd $6,260.00
2 $12,960.00
3 $9,480.00
4 $5,880.00
5 $8,800.00
6 $9,272.00
Ref #79 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN, (LUMP SUM)
Awd $125,000.00$125,000.00
2 $256,000.00$256,000.00
3 $45,000.00$45,000.00
4 $200,000.00$200,000.00
5 $135,000.00$135,000.00
6 $110,000.00$110,000.00
Ref #80 203E57110 SPECIAL - FOUNDATION TEST PIT, (16 HOUR)
Awd $2,000.00$125.00
2 $1,792.00$112.00
3 $1,680.00$105.00
4 $4,000.00$250.00
5 $1,600.00$100.00
6 $2,080.00$130.00
Ref #81 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $70,000.00$70,000.00
2 $95,000.00$95,000.00
3 $42,000.00$42,000.00
4 $65,000.00$65,000.00
5 $100,000.00$100,000.00
6 $120,000.00$120,000.00
Ref #82 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, (1504 CY)
Awd $66,176.00$44.00
2 $94,000.00$62.50
3 $87,232.00$58.00
4 $120,320.00$80.00
5 $120,320.00$80.00
6 $75,200.00$50.00
Ref #83 503E31101 ROCK EXCAVATION, AS PER PLAN, (1264 CY)
Awd $51,824.00$41.00
2 $30,841.60$24.40
3 $56,880.00$45.00
4 $45,504.00$36.00
5 $126,400.00$100.00
6 $69,520.00$55.00
120017 - Page 278
Ref #84 509E10000 EPOXY COATED REINFORCING STEEL, (151590 LB)
Awd $140,978.70$0.93
2 $140,978.70$0.93
3 $151,590.00$1.00
4 $144,010.50$0.95
5 $151,590.00$1.00
6 $174,328.50$1.15
Ref #85 511E44100 CLASS C CONCRETE, ABUTMENT NOT INCLUDING FOOTING, (187 CY)
Awd $69,190.00$370.00
2 $48,620.00$260.00
3 $80,410.00$430.00
4 $86,020.00$460.00
5 $66,385.00$355.00
6 $74,800.00$400.00
Ref #86 511E46000 CLASS C CONCRETE, (322 CY)
Awd $132,020.00$410.00
2 $94,346.00$293.00
3 $136,850.00$425.00
4 $122,360.00$380.00
5 $114,310.00$355.00
6 $128,800.00$400.00
Ref #87 511E46500 CLASS C CONCRETE, FOOTING, (571 CY)
Awd $117,055.00$205.00
2 $87,363.00$153.00
3 $114,200.00$200.00
4 $114,200.00$200.00
5 $102,780.00$180.00
6 $125,620.00$220.00
Ref #88 511E46501 CLASS C CONCRETE, FOOTING, AS PER PLAN, (216 CY)
Awd $46,440.00$215.00
2 $34,560.00$160.00
3 $37,800.00$175.00
4 $44,280.00$205.00
5 $60,480.00$280.00
6 $45,360.00$210.00
Ref #89 511E50001 CLASS HP CONCRETE, BRIDGE DECK, AS PER PLAN, (190 CY)
Awd $72,200.00$380.00
2 $87,020.00$458.00
3 $115,900.00$610.00
4 $112,100.00$590.00
5 $95,000.00$500.00
6 $106,400.00$560.00
Ref #90 511E51001 CLASS HP CONCRETE, SUPERSTRUCTURE, AS PER PLAN, (57 CY)
Awd $20,805.00$365.00
2 $18,468.00$324.00
3 $29,640.00$520.00
4 $29,640.00$520.00
5 $28,500.00$500.00
6 $30,210.00$530.00
120017 - Page 279
Ref #91 511E51501 CLASS HP CONCRETE, SIDEWALK, AS PER PLAN, (44 CY)
Awd $10,560.00$240.00
2 $10,164.00$231.00
3 $16,280.00$370.00
4 $11,220.00$255.00
5 $11,000.00$250.00
6 $19,800.00$450.00
Ref #92 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1082 SY)
Awd $15,148.00$14.00
2 $14,607.00$13.50
3 $19,476.00$18.00
4 $15,689.00$14.50
5 $16,230.00$15.00
6 $21,640.00$20.00
Ref #93 512E33000 TYPE 2 WATERPROOFING, (28 SY)
Awd $616.00$22.00
2 $434.00$15.50
3 $1,120.00$40.00
4 $700.00$25.00
5 $840.00$30.00
6 $616.00$22.00
Ref #94 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN(FO, (1430 LB)
Awd $6,435.00$4.50
2 $5,148.00$3.60
3 $8,580.00$6.00
4 $7,865.00$5.50
5 $6,077.50$4.25
6 $7,150.00$5.00
Ref #95 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN(FO, (2000 LB)
Awd $12,500.00$6.25
2 $22,000.00$11.00
3 $12,000.00$6.00
4 $10,800.00$5.40
5 $7,500.00$3.75
6 $10,000.00$5.00
Ref #96 515E15040 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M, (7 EACH)
Awd $329,000.00$47,000.00
2 $262,500.00$37,500.00
3 $315,000.00$45,000.00
4 $311,500.00$44,500.00
5 $336,000.00$48,000.00
6 $392,000.00$56,000.00
Ref #97 515E20000 INTERMEDIATE DIAPHRAMS, (15 EACH)
Awd $16,500.00$1,100.00
2 $21,060.00$1,404.00
3 $18,000.00$1,200.00
4 $22,500.00$1,500.00
5 $22,875.00$1,525.00
6 $28,500.00$1,900.00
120017 - Page 280
Ref #98 515E20001 INTERMEDIATE DIAPHRAMS, AS PER PLAN, (3 EACH)
Awd $3,900.00$1,300.00
2 $5,016.00$1,672.00
3 $4,500.00$1,500.00
4 $4,500.00$1,500.00
5 $5,550.00$1,850.00
6 $5,700.00$1,900.00
Ref #99 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (271 SF)
Awd $1,409.20$5.20
2 $1,355.00$5.00
3 $1,626.00$6.00
4 $1,626.00$6.00
5 $1,355.00$5.00
6 $1,355.00$5.00
Ref #100 516E14021 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, AS PE, (202 FT)
Awd $4,292.50$21.25
2 $4,040.00$20.00
3 $8,686.00$43.00
4 $4,646.00$23.00
5 $4,040.00$20.00
6 $3,030.00$15.00
Ref #101 516E43200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY (, (14 EACH)
Awd $5,880.00$420.00
2 $5,950.00$425.00
3 $7,000.00$500.00
4 $5,950.00$425.00
5 $5,810.00$415.00
6 $8,050.00$575.00
Ref #102 517E75125 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI, (247 FT)
Awd $29,640.00$120.00
2 $33,345.00$135.00
3 $44,460.00$180.00
4 $35,511.19$143.77
5 $27,664.00$112.00
6 $43,225.00$175.00
Ref #103 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (268 CY)
Awd $12,596.00$47.00
2 $13,400.00$50.00
3 $21,440.00$80.00
4 $14,204.00$53.00
5 $21,440.00$80.00
6 $20,100.00$75.00
Ref #104 518E62100 STRUCTURE DRAINAGE, MISC.:6" NON-PERFORATED CORRUG, (42 FT)
Awd $756.00$18.00
2 $420.00$10.00
3 $546.00$13.00
4 $462.00$11.00
5 $630.00$15.00
6 $210.00$5.00
120017 - Page 281
Ref #105 518E62100 STRUCTURE DRAINAGE, MISC.:6" PERFORATED CORRUGATED, (260 FT)
Awd $3,120.00$12.00
2 $1,560.00$6.00
3 $1,560.00$6.00
4 $2,860.00$11.00
5 $3,900.00$15.00
6 $1,560.00$6.00
Ref #106 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13"), (178 SY)
Awd $34,176.00$192.00
2 $28,480.00$160.00
3 $30,260.00$170.00
4 $35,600.00$200.00
5 $30,260.00$170.00
6 $35,600.00$200.00
Ref #107 607E39920 VANDAL PROTECTION FENCE, 10' CURVED, COATED FABRIC, (209 FT)
Awd $24,035.00$115.00
2 $16,929.00$81.00
3 $20,900.00$100.00
4 $18,810.00$90.00
5 $17,765.00$85.00
6 $16,929.00$81.00
Section 9 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals
Awd $1,424,252.40
2 $1,435,397.30
3 $1,430,616.00
4 $1,591,877.69
5 $1,621,301.50
6 $1,677,783.50
Ref #108 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)
Awd $3,200.00$3,200.00
2 $19,000.00$19,000.00
3 $10,000.00$10,000.00
4 $15,000.00$15,000.00
5 $3,600.00$3,600.00
6 $9,000.00$9,000.00
Ref #109 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $12,500.00$12,500.00
2 $15,000.00$15,000.00
3 $15,000.00$15,000.00
4 $15,000.00$15,000.00
5 $20,000.00$20,000.00
6 $15,000.00$15,000.00
Ref #110 108E30000 SPECIAL - CPM PROGRESS SCHEDULE SHORT DURATION PRO, (LUMP SUM)
Awd $1,050.00$1,050.00
2 $2,000.00$2,000.00
3 $1,000.00$1,000.00
4 $1,000.00$1,000.00
5 $1,000.00$1,000.00
6 $720.00$720.00
120017 - Page 282
Ref #111 614E11000 MAINTAINING TRAFFIC (WT: 39) (WT: 39) (WT: 39), (LUMP SUM)
Awd $2,500.00$2,500.00
2 $10,000.00$10,000.00
3 $10,000.00$10,000.00
4 $5,000.00$5,000.00
5 $3,000.00$3,000.00
6 $1,000.00$1,000.00
Ref #112 619E16010 FIELD OFFICE, TYPE B (WT: NR) (WT: NR) (WT: NR), (8 MNTH)
Awd $10,400.00$1,300.00
2 $8,000.00$1,000.00
3 $20,000.00$2,500.00
4 $15,200.00$1,900.00
5 $8,000.00$1,000.00
6 $21,672.80$2,709.10
Ref #113 623E10000 CONSTRUCTION LAYOUT STAKES (WT: NR) (WT: NR) (WT, (LUMP SUM)
Awd $6,200.00$6,200.00
2 $10,000.00$10,000.00
3 $8,000.00$8,000.00
4 $20,000.00$20,000.00
5 $10,000.00$10,000.00
6 $6,700.00$6,700.00
Ref #114 624E10000 MOBILIZATION (WT: NR) (WT: NR) (WT: NR), (LUMP SUM)
Awd $40,000.00$40,000.00
2 $40,000.00$40,000.00
3 $40,000.00$40,000.00
4 $100,000.00$100,000.00
5 $42,500.00$42,500.00
6 $100,000.00$100,000.00
Section 10 - INCIDENTALS - Totals
Awd $75,850.00
2 $104,000.00
3 $104,000.00
4 $171,200.00
5 $88,100.00
6 $154,092.80
120017 - Page 283
Project No. 120018
PID 76407
TRU-SR-5-6.45, PART 1;TRU-5-10.51, PART 2
Federal
Type: FOUR LANE RESURFACING
Completion Date: 8/15/2013
Award Amount: $6,995,428.11
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 1/12/2012
Engineer's Estimate: $7,503,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
3570 SOUTH RIVER RD
ZANESVILLE, OH 43701
Muskingum
Bidder 1
Bid $6,995,428.11
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 2
Bid $7,367,912.97
KARVO PAVING COMPANY
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 3
Bid $7,406,724.28
120018 - Page 284
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $500.00$500.00
3 $250.00$250.00
Ref #2 202E23500 WEARING COURSE REMOVED, (13216 SY)
Awd $72,688.00$5.50
2 $6,608.00$0.50
3 $23,788.80$1.80
Ref #3 203E10000 EXCAVATION, (67 CY)
Awd $670.00$10.00
2 $670.00$10.00
3 $1,005.00$15.00
Ref #4 690E98000 SPECIAL - MISC.:VERTICAL CLEARANCE, (3 EACH)
Awd $900.00$300.00
2 $1,500.00$500.00
3 $750.00$250.00
Section 1 - ROADWAY - PART 1 - Totals
Awd $76,258.00
2 $9,278.00
3 $25,793.80
Ref #5 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 2 - EROSION CONTROL - PART 1 - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
Ref #6 604E09000 CATCH BASIN ADJUSTED TO GRADE, (6 EACH)
Awd $2,400.00$400.00
2 $3,000.00$500.00
3 $5,100.00$850.00
Section 3 - DRAINAGE - PART 1 - Totals
Awd $2,400.00
2 $3,000.00
3 $5,100.00
Ref #7 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (200 SY)
Awd $15,000.00$75.00
2 $16,300.00$81.50
3 $13,800.00$69.00
Ref #8 252E01500 FULL DEPTH PAVEMENT SAWING, (2400 FT)
Awd $4,800.00$2.00
2 $9,600.00$4.00
3 $4,320.00$1.80
120018 - Page 285
Ref #9 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (218004 SY)
Awd $185,303.40$0.85
2 $109,002.00$0.50
3 $196,203.60$0.90
Ref #10 255E10000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (400 SY)
Awd $40,000.00$100.00
2 $52,000.00$130.00
3 $48,000.00$120.00
Ref #11 304E20000 AGGREGATE BASE, (67 CY)
Awd $2,345.00$35.00
2 $4,020.00$60.00
3 $2,546.00$38.00
Ref #12 407E10000 TACK COAT, (32701 GAL)
Awd $57,226.75$1.75
2 $60,496.85$1.85
3 $57,226.75$1.75
Ref #13 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (8721 GAL)
Awd $15,261.75$1.75
2 $16,133.85$1.85
3 $15,261.75$1.75
Ref #14 442E10050 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE B (4, (9084 CY)
Awd $1,226,340.00$135.00
2 $1,317,180.00$145.00
3 $1,353,516.00$149.00
Ref #15 442E10150 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE B, (10598 CY)
Awd $1,059,800.00$100.00
2 $1,165,780.00$110.00
3 $1,155,182.00$109.00
Ref #16 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (1226 CY)
Awd $42,910.00$35.00
2 $36,780.00$30.00
3 $34,328.00$28.00
Ref #17 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE), (17 MILE)
Awd $10,200.00$600.00
2 $8,755.00$515.00
3 $16,405.00$965.00
Section 4 - PAVEMENT - PART 1 - Totals
Awd $2,659,186.90
2 $2,796,047.70
3 $2,896,789.10
Ref #18 621E10010 RPM, LOW PROFILE, WHITE, (358 EACH)
Awd $6,086.00$17.00
2 $6,050.20$16.90
3 $6,050.20$16.90
Ref #19 621E10020 RPM, LOW PROFILE WHITE/RED, (290 EACH)
Awd $4,930.00$17.00
2 $4,901.00$16.90
3 $4,901.00$16.90
120018 - Page 286
Ref #20 621E10030 RPM, LOW PROFILE YELLOW/RED, (269 EACH)
Awd $4,573.00$17.00
2 $4,546.10$16.90
3 $4,546.10$16.90
Ref #21 621E54000 RAISED PAVEMENT MARKER REMOVED, (917 EACH)
Awd $3,668.00$4.00
2 $4,585.00$5.00
3 $2,751.00$3.00
Ref #22 642E00090 EDGE LINE, (0.2 MILE)
Awd $920.00$4,600.00
2 $900.00$4,500.00
3 $900.00$4,500.00
Ref #23 642E00290 CENTER LINE, (0.1 MILE)
Awd $610.00$6,100.00
2 $600.00$6,000.00
3 $600.00$6,000.00
Ref #24 646E10000 EDGE LINE, (19.77 MILE)
Awd $41,517.00$2,100.00
2 $40,212.18$2,034.00
3 $40,212.18$2,034.00
Ref #25 646E10100 LANE LINE, (8.52 MILE)
Awd $8,520.00$1,000.00
2 $8,392.20$985.00
3 $8,392.20$985.00
Ref #26 646E10300 CHANNELIZING LINE, (5790 FT)
Awd $8,106.00$1.40
2 $7,932.30$1.37
3 $7,932.30$1.37
Ref #27 646E10400 STOP LINE, (167 FT)
Awd $1,544.75$9.25
2 $1,503.00$9.00
3 $1,503.00$9.00
Ref #28 646E20300 LANE ARROW, (10 EACH)
Awd $1,450.00$145.00
2 $1,400.00$140.00
3 $1,400.00$140.00
Section 5 - TRAFFIC CONTROL - PART 1 - Totals
Awd $81,924.75
2 $81,021.98
3 $79,187.98
Ref #29 614E12460 WORK ZONE MARKING SIGN, (28 EACH)
Awd $3,500.00$125.00
2 $2,800.00$100.00
3 $2,100.00$75.00
Ref #30 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY)
Awd $3,000.00$150.00
2 $3,000.00$150.00
3 $3,400.00$170.00
120018 - Page 287
Ref #31 614E20400 WORK ZONE LANE LINE, CLASS II, (17.04 MILE)
Awd $6,134.40$360.00
2 $5,964.00$350.00
3 $6,645.60$390.00
Ref #32 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (8.52 MILE)
Awd $3,237.60$380.00
2 $3,195.00$375.00
3 $3,919.20$460.00
Ref #33 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (19.77 MILE)
Awd $6,128.70$310.00
2 $5,931.00$300.00
3 $7,848.69$397.00
Ref #34 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (167 FT)
Awd $334.00$2.00
2 $334.00$2.00
3 $501.00$3.00
Section 6 - MAINTENANCE OF TRAFFIC - PART 1 - Totals
Awd $22,334.70
2 $21,224.00
3 $24,414.49
Ref #35 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #36 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (75 LB)
Awd $150.00$2.00
2 $150.00$2.00
3 $150.00$2.00
Ref #37 511E71100 CONCRETE, MISC.:BACKWALL REPAIR, (11 CY)
Awd $11,000.00$1,000.00
2 $11,000.00$1,000.00
3 $11,000.00$1,000.00
Ref #38 511E81100 CONCRETE, MISC.:PARAPET REPAIR, (7 FT)
Awd $1,295.00$185.00
2 $1,260.00$180.00
3 $1,260.00$180.00
Ref #39 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1400 SY)
Awd $20,300.00$14.50
2 $19,600.00$14.00
3 $15,400.00$11.00
Ref #40 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #41 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
120018 - Page 288
Ref #42 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $76.88$10.25
2 $75.00$10.00
3 $75.00$10.00
Ref #43 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #44 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $5.00$5.00
Ref #45 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #46 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Ref #47 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO, (1599 SY)
Awd $52,767.00$33.00
2 $51,168.00$32.00
3 $51,168.00$32.00
Ref #48 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION(T = 1-1/, (1599 SY)
Awd $71,955.00$45.00
2 $71,955.00$45.00
3 $71,955.00$45.00
Ref #49 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T, (40 CY)
Awd $8,000.00$200.00
2 $8,000.00$200.00
3 $8,000.00$200.00
Ref #50 848E50000 HAND CHIPPING, (48 SY)
Awd $2,928.00$61.00
2 $2,880.00$60.00
3 $2,880.00$60.00
Ref #51 848E50100 TEST SLAB, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #52 848E50200 FULL-DEPTH REPAIR, (1 CY)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Section 7 - STRUCTURE REPAIR - PART 1 BRIDGE NO. TRU - Totals
Awd $179,656.88
2 $177,248.00
3 $178,033.00
120018 - Page 289
Ref #53 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #54 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $100.00$2.00
2 $100.00$2.00
3 $100.00$2.00
Ref #55 511E71100 CONCRETE, MISC.:BACKWALL REPAIR, (13 CY)
Awd $13,000.00$1,000.00
2 $13,000.00$1,000.00
3 $13,000.00$1,000.00
Ref #56 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1465 SY)
Awd $21,242.50$14.50
2 $20,510.00$14.00
3 $16,115.00$11.00
Ref #57 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #58 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #59 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $76.88$10.25
2 $75.00$10.00
3 $75.00$10.00
Ref #60 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #61 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $5.00$5.00
Ref #62 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #63 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Ref #64 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO, (1599 SY)
Awd $52,767.00$33.00
2 $51,168.00$32.00
3 $51,168.00$32.00
120018 - Page 290
Ref #65 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION(T = 1-1/, (1599 SY)
Awd $71,955.00$45.00
2 $71,955.00$45.00
3 $71,955.00$45.00
Ref #66 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T, (40 CY)
Awd $8,000.00$200.00
2 $8,000.00$200.00
3 $8,000.00$200.00
Ref #67 848E50000 HAND CHIPPING, (48 SY)
Awd $2,928.00$61.00
2 $2,880.00$60.00
3 $2,880.00$60.00
Ref #68 848E50100 TEST SLAB, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #69 848E50200 FULL-DEPTH REPAIR, (1 CY)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Section 8 - BRIDGE NO. TRU-5-0658R - PART 1 - Totals
Awd $181,254.38
2 $178,848.00
3 $179,438.00
Ref #70 202E23500 WEARING COURSE REMOVED, (1246 SY)
Awd $9,345.00$7.50
2 $6,230.00$5.00
3 $5,108.60$4.10
Ref #71 407E10000 TACK COAT, (187 GAL)
Awd $327.25$1.75
2 $345.95$1.85
3 $327.25$1.75
Ref #72 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (50 GAL)
Awd $87.50$1.75
2 $92.50$1.85
3 $87.50$1.75
Ref #73 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (61 CY)
Awd $9,150.00$150.00
2 $10,370.00$170.00
3 $11,590.00$190.00
Ref #74 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (44 CY)
Awd $8,800.00$200.00
2 $9,900.00$225.00
3 $8,580.00$195.00
Ref #75 519E10000 SPECIAL - PATCHING CONCRETE BRIDGE DECK OVERLAY WI, (25 SY)
Awd $10,000.00$400.00
2 $10,000.00$400.00
3 $10,000.00$400.00
120018 - Page 291
Ref #76 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT)
Awd $153.75$10.25
2 $150.00$10.00
3 $150.00$10.00
Ref #77 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #78 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH)
Awd $40.00$20.00
2 $40.00$20.00
3 $10.00$5.00
Ref #79 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Section 9 - BRIDGE NO. TRU-5-0688 - PART 1 - Totals
Awd $37,983.50
2 $37,208.45
3 $35,933.35
Ref #80 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #81 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (867 SY)
Awd $9,103.50$10.50
2 $8,670.00$10.00
3 $9,537.00$11.00
Ref #82 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (867 SY)
Awd $3,684.75$4.25
2 $3,468.00$4.00
3 $6,069.00$7.00
Ref #83 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $76.88$10.25
2 $75.00$10.00
3 $75.00$10.00
Ref #84 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #85 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $5.00$5.00
Ref #86 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
120018 - Page 292
Section 10 - BRIDGE NO. TRU-5-0765L - PART 1 - Totals
Awd $13,450.13
2 $12,773.00
3 $16,226.00
Ref #87 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #88 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (852 SY)
Awd $8,946.00$10.50
2 $8,520.00$10.00
3 $9,372.00$11.00
Ref #89 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (852 SY)
Awd $3,621.00$4.25
2 $3,408.00$4.00
3 $5,964.00$7.00
Ref #90 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $76.88$10.25
2 $75.00$10.00
3 $75.00$10.00
Ref #91 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #92 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $5.00$5.00
Ref #93 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Section 11 - BRIDGE NO. TRU-5-0765R - PART 1 - Totals
Awd $13,228.88
2 $12,563.00
3 $15,956.00
Ref #94 202E23500 WEARING COURSE REMOVED, (808 SY)
Awd $6,060.00$7.50
2 $4,040.00$5.00
3 $3,312.80$4.10
Ref #95 407E10000 TACK COAT, (122 GAL)
Awd $213.50$1.75
2 $225.70$1.85
3 $213.50$1.75
120018 - Page 293
Ref #96 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (33 GAL)
Awd $57.75$1.75
2 $61.05$1.85
3 $57.75$1.75
Ref #97 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (40 CY)
Awd $6,000.00$150.00
2 $8,000.00$200.00
3 $7,600.00$190.00
Ref #98 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (29 CY)
Awd $5,800.00$200.00
2 $8,265.00$285.00
3 $5,655.00$195.00
Ref #99 519E10000 SPECIAL - PATCHING CONCRETE BRIDGE DECK OVERLAY WI, (17 SY)
Awd $6,800.00$400.00
2 $6,800.00$400.00
3 $6,800.00$400.00
Ref #100 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT)
Awd $153.75$10.25
2 $150.00$10.00
3 $150.00$10.00
Ref #101 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #102 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH)
Awd $40.00$20.00
2 $40.00$20.00
3 $10.00$5.00
Ref #103 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Section 12 - BRIDGE NO. TRU-5-0779 - PART 1 - Totals
Awd $25,205.00
2 $27,661.75
3 $23,879.05
Ref #104 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #105 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (431 SY)
Awd $4,525.50$10.50
2 $4,310.00$10.00
3 $4,741.00$11.00
Ref #106 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (548 SY)
Awd $3,014.00$5.50
2 $2,877.00$5.25
3 $2,877.00$5.25
120018 - Page 294
Ref #107 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (431 SY)
Awd $1,831.75$4.25
2 $1,724.00$4.00
3 $3,017.00$7.00
Ref #108 519E10000 SPECIAL - PATCHING CONCRETE BRIDGE DECK OVERLAY WI, (6 SY)
Awd $600.00$100.00
2 $600.00$100.00
3 $600.00$100.00
Ref #109 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #110 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $76.88$10.25
2 $75.00$10.00
3 $75.00$10.00
Ref #111 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #112 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $5.00$5.00
Ref #113 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #114 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 13 - BRIDGE NO. TRU-5-0813L - PART 1 - Totals
Awd $20,633.13
2 $20,146.00
3 $26,855.00
Ref #115 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #116 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (431 SY)
Awd $4,525.50$10.50
2 $4,310.00$10.00
3 $4,741.00$11.00
Ref #117 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (548 SY)
Awd $3,014.00$5.50
2 $2,877.00$5.25
3 $2,877.00$5.25
120018 - Page 295
Ref #118 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (431 SY)
Awd $1,831.75$4.25
2 $1,724.00$4.00
3 $3,017.00$7.00
Ref #119 519E10000 SPECIAL - PATCHING CONCRETE BRIDGE DECK OVERLAY WI, (6 SY)
Awd $600.00$100.00
2 $600.00$100.00
3 $600.00$100.00
Ref #120 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #121 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $76.88$10.25
2 $75.00$10.00
3 $75.00$10.00
Ref #122 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #123 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $5.00$5.00
Ref #124 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #125 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 14 - BRIDGE NO. TRU-5-0813R - PART 1 - Totals
Awd $20,633.13
2 $20,146.00
3 $26,855.00
Ref #126 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #127 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (939 SY)
Awd $9,859.50$10.50
2 $9,390.00$10.00
3 $10,329.00$11.00
Ref #128 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1052 SY)
Awd $5,786.00$5.50
2 $5,523.00$5.25
3 $5,523.00$5.25
120018 - Page 296
Ref #129 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (939 SY)
Awd $3,990.75$4.25
2 $3,756.00$4.00
3 $6,573.00$7.00
Ref #130 519E10000 SPECIAL - PATCHING CONCRETE BRIDGE DECK OVERLAY WI, (11 SY)
Awd $1,100.00$100.00
2 $1,100.00$100.00
3 $1,100.00$100.00
Ref #131 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #132 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $76.88$10.25
2 $75.00$10.00
3 $75.00$10.00
Ref #133 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #134 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 15 - BRIDGE NO. TRU-5-0860L - PART 1 - Totals
Awd $31,358.13
2 $30,364.00
3 $39,120.00
Ref #135 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #136 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1077 SY)
Awd $11,308.50$10.50
2 $10,770.00$10.00
3 $11,847.00$11.00
Ref #137 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1497 SY)
Awd $8,233.50$5.50
2 $7,859.25$5.25
3 $7,859.25$5.25
Ref #138 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (1077 SY)
Awd $4,577.25$4.25
2 $4,308.00$4.00
3 $7,539.00$7.00
Ref #139 519E10000 SPECIAL - PATCHING CONCRETE BRIDGE DECK OVERLAY WI, (15 SY)
Awd $1,500.00$100.00
2 $1,500.00$100.00
3 $1,500.00$100.00
120018 - Page 297
Ref #140 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #141 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $76.88$10.25
2 $75.00$10.00
3 $75.00$10.00
Ref #142 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #143 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 16 - BRIDGE NO. TRU-5-0860R - PART 1 - Totals
Awd $36,241.13
2 $35,032.25
3 $44,340.25
Ref #144 202E23500 WEARING COURSE REMOVED, (1021 SY)
Awd $7,657.50$7.50
2 $5,105.00$5.00
3 $4,186.10$4.10
Ref #145 407E10000 TACK COAT, (154 GAL)
Awd $269.50$1.75
2 $284.90$1.85
3 $269.50$1.75
Ref #146 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (41 GAL)
Awd $71.75$1.75
2 $75.85$1.85
3 $71.75$1.75
Ref #147 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (50 CY)
Awd $7,500.00$150.00
2 $9,250.00$185.00
3 $9,500.00$190.00
Ref #148 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (36 CY)
Awd $7,200.00$200.00
2 $9,000.00$250.00
3 $7,020.00$195.00
Ref #149 519E10000 SPECIAL - PATCHING CONCRETE BRIDGE DECK OVERLAY WI, (21 SY)
Awd $8,400.00$400.00
2 $8,400.00$400.00
3 $8,400.00$400.00
Ref #150 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT)
Awd $153.75$10.25
2 $150.00$10.00
3 $150.00$10.00
120018 - Page 298
Ref #151 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #152 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $5.00$5.00
Ref #153 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Section 17 - BRIDGE NO. TRU-5-0923 - PART 1 - Totals
Awd $31,332.50
2 $32,345.75
3 $29,662.35
Ref #154 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #155 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1346 SY)
Awd $14,133.00$10.50
2 $13,460.00$10.00
3 $14,806.00$11.00
Ref #156 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1848 SY)
Awd $10,164.00$5.50
2 $9,702.00$5.25
3 $9,702.00$5.25
Ref #157 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (1346 SY)
Awd $5,720.50$4.25
2 $5,384.00$4.00
3 $9,422.00$7.00
Ref #158 519E10000 SPECIAL - PATCHING CONCRETE BRIDGE DECK OVERLAY WI, (19 SY)
Awd $1,900.00$100.00
2 $1,900.00$100.00
3 $1,900.00$100.00
Ref #159 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #160 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $76.88$10.25
2 $75.00$10.00
3 $75.00$10.00
Ref #161 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
120018 - Page 299
Ref #162 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $5.00$5.00
Ref #163 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #164 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 18 - BRIDGE NO. TRU-5-1041L - PART 1 - Totals
Awd $42,579.38
2 $41,081.00
3 $51,450.00
Ref #165 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #166 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1368 SY)
Awd $14,364.00$10.50
2 $13,680.00$10.00
3 $15,048.00$11.00
Ref #167 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1713 SY)
Awd $9,421.50$5.50
2 $8,993.25$5.25
3 $8,993.25$5.25
Ref #168 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (1368 SY)
Awd $5,814.00$4.25
2 $5,472.00$4.00
3 $9,576.00$7.00
Ref #169 519E10000 SPECIAL - PATCHING CONCRETE BRIDGE DECK OVERLAY WI, (18 SY)
Awd $1,800.00$100.00
2 $1,800.00$100.00
3 $1,800.00$100.00
Ref #170 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #171 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $76.88$10.25
2 $75.00$10.00
3 $75.00$10.00
Ref #172 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
120018 - Page 300
Ref #173 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $5.00$5.00
Ref #174 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #175 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 19 - BRIDGE NO. TRU-5-1041R - PART 1 - Totals
Awd $42,061.38
2 $40,580.25
3 $51,037.25
Ref #176 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $500.00$500.00
3 $250.00$250.00
Ref #177 202E23500 WEARING COURSE REMOVED, (6083 SY)
Awd $54,747.00$9.00
2 $3,041.50$0.50
3 $10,949.40$1.80
Ref #178 203E10000 EXCAVATION, (17 CY)
Awd $170.00$10.00
2 $170.00$10.00
3 $340.00$20.00
Ref #179 690E98000 SPECIAL - MISC.:VERTICAL CLEARANCE, (1 EACH)
Awd $300.00$300.00
2 $500.00$500.00
3 $250.00$250.00
Section 20 - ROADWAY - PART 2 - Totals
Awd $57,217.00
2 $4,211.50
3 $11,789.40
Ref #180 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 21 - EROSION CONTROL - PART 2 - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
120018 - Page 301
Ref #181 604E09000 CATCH BASIN ADJUSTED TO GRADE, (4 EACH)
Awd $1,600.00$400.00
2 $2,000.00$500.00
3 $3,400.00$850.00
Section 22 - DRAINAGE - PART 2 - Totals
Awd $1,600.00
2 $2,000.00
3 $3,400.00
Ref #182 252E01500 FULL DEPTH PAVEMENT SAWING, (608 FT)
Awd $1,216.00$2.00
2 $2,432.00$4.00
3 $1,094.40$1.80
Ref #183 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (198011 SY)
Awd $168,309.35$0.85
2 $99,005.50$0.50
3 $178,209.90$0.90
Ref #184 255E10000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (100 SY)
Awd $10,000.00$100.00
2 $13,000.00$130.00
3 $12,000.00$120.00
Ref #185 304E20000 AGGREGATE BASE, (17 CY)
Awd $595.00$35.00
2 $1,020.00$60.00
3 $510.00$30.00
Ref #186 407E10000 TACK COAT, (29702 GAL)
Awd $51,978.50$1.75
2 $54,948.70$1.85
3 $51,978.50$1.75
Ref #187 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (7921 GAL)
Awd $13,861.75$1.75
2 $14,653.85$1.85
3 $13,861.75$1.75
Ref #188 442E10050 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE B (4, (8251 CY)
Awd $1,113,885.00$135.00
2 $1,196,395.00$145.00
3 $1,229,399.00$149.00
Ref #189 442E10150 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE B, (9626 CY)
Awd $962,600.00$100.00
2 $1,058,860.00$110.00
3 $1,049,234.00$109.00
Ref #190 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (1162 CY)
Awd $40,670.00$35.00
2 $34,860.00$30.00
3 $32,536.00$28.00
Ref #191 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE), (15 MILE)
Awd $9,000.00$600.00
2 $7,725.00$515.00
3 $14,475.00$965.00
120018 - Page 302
Section 23 - PAVEMENT - PART 2 - Totals
Awd $2,372,115.60
2 $2,482,900.05
3 $2,583,298.55
Ref #192 621E10010 RPM, LOW PROFILE, WHITE, (323 EACH)
Awd $5,491.00$17.00
2 $5,458.70$16.90
3 $5,458.70$16.90
Ref #193 621E10020 RPM, LOW PROFILE WHITE/RED, (94 EACH)
Awd $1,598.00$17.00
2 $1,588.60$16.90
3 $1,588.60$16.90
Ref #194 621E10030 RPM, LOW PROFILE YELLOW/RED, (126 EACH)
Awd $2,142.00$17.00
2 $2,129.40$16.90
3 $2,129.40$16.90
Ref #195 621E54000 RAISED PAVEMENT MARKER REMOVED, (543 EACH)
Awd $2,172.00$4.00
2 $2,715.00$5.00
3 $1,629.00$3.00
Ref #196 646E10000 EDGE LINE, (18.76 MILE)
Awd $39,396.00$2,100.00
2 $38,157.84$2,034.00
3 $38,157.84$2,034.00
Ref #197 646E10100 LANE LINE, (7.78 MILE)
Awd $7,780.00$1,000.00
2 $7,663.30$985.00
3 $7,663.30$985.00
Ref #198 646E10300 CHANNELIZING LINE, (6485 FT)
Awd $9,079.00$1.40
2 $8,884.45$1.37
3 $8,884.45$1.37
Ref #199 646E10400 STOP LINE, (211 FT)
Awd $1,951.75$9.25
2 $1,899.00$9.00
3 $1,899.00$9.00
Ref #200 646E20300 LANE ARROW, (27 EACH)
Awd $3,915.00$145.00
2 $3,780.00$140.00
3 $3,780.00$140.00
Ref #201 646E20500 DOTTED LINE, (60 FT)
Awd $555.00$9.25
2 $540.00$9.00
3 $540.00$9.00
120018 - Page 303
Section 24 - TRAFFIC CONTROL - PART 2 - Totals
Awd $74,079.75
2 $72,816.29
3 $71,730.29
Ref #202 632E26501 DETECTOR LOOP, AS PER PLAN, (8 EACH)
Awd $6,800.00$850.00
2 $6,600.00$825.00
3 $6,600.00$825.00
Section 25 - TRAFFIC SUREILLANCE - PART 2 - Totals
Awd $6,800.00
2 $6,600.00
3 $6,600.00
Ref #203 614E12460 WORK ZONE MARKING SIGN, (28 EACH)
Awd $3,500.00$125.00
2 $2,800.00$100.00
3 $2,100.00$75.00
Ref #204 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY)
Awd $3,000.00$150.00
2 $3,000.00$150.00
3 $3,400.00$170.00
Ref #205 614E20400 WORK ZONE LANE LINE, CLASS II, (15.56 MILE)
Awd $5,601.60$360.00
2 $5,446.00$350.00
3 $6,068.40$390.00
Ref #206 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (7.78 MILE)
Awd $2,956.40$380.00
2 $2,917.50$375.00
3 $3,578.80$460.00
Ref #207 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (18.76 MILE)
Awd $5,815.60$310.00
2 $5,628.00$300.00
3 $7,447.72$397.00
Ref #208 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (211 FT)
Awd $422.00$2.00
2 $422.00$2.00
3 $633.00$3.00
Section 26 - MAINTENANCE OF TRAFFIC - PART 2 - Totals
Awd $21,295.60
2 $20,213.50
3 $23,227.92
Ref #209 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
120018 - Page 304
Ref #210 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (857 SY)
Awd $8,998.50$10.50
2 $8,570.00$10.00
3 $9,427.00$11.00
Ref #211 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (949 SY)
Awd $5,219.50$5.50
2 $4,982.25$5.25
3 $4,982.25$5.25
Ref #212 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (857 SY)
Awd $3,642.25$4.25
2 $3,428.00$4.00
3 $5,999.00$7.00
Ref #213 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #214 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #215 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT)
Awd $153.75$10.25
2 $150.00$10.00
3 $150.00$10.00
Ref #216 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #217 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $5.00$5.00
Ref #218 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #219 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 27 - STRUCTURE REPAIR - PART 2 BRIDGE NO. TRU - Totals
Awd $28,819.00
2 $27,910.25
3 $36,323.25
Ref #220 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
120018 - Page 305
Ref #221 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1004 SY)
Awd $10,542.00$10.50
2 $10,040.00$10.00
3 $11,044.00$11.00
Ref #222 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1392 SY)
Awd $7,656.00$5.50
2 $7,308.00$5.25
3 $7,308.00$5.25
Ref #223 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (1004 SY)
Awd $4,267.00$4.25
2 $4,016.00$4.00
3 $7,028.00$7.00
Ref #224 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #225 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #226 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT)
Awd $153.75$10.25
2 $150.00$10.00
3 $150.00$10.00
Ref #227 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #228 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $5.00$5.00
Ref #229 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #230 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 28 - BRIDGE NO. TRU-5-1077R - PART 2 - Totals
Awd $33,423.75
2 $32,294.00
3 $41,295.00
Ref #231 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
120018 - Page 306
Ref #232 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (622 SY)
Awd $6,531.00$10.50
2 $6,220.00$10.00
3 $6,842.00$11.00
Ref #233 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (622 SY)
Awd $2,643.50$4.25
2 $2,488.00$4.00
3 $4,354.00$7.00
Ref #234 519E10000 SPECIAL - PATCHING CONCRETE BRIDGE DECK OVERLAY WI, (30 SY)
Awd $4,500.00$150.00
2 $4,500.00$150.00
3 $4,500.00$150.00
Ref #235 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Ref #236 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #237 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $76.88$10.25
2 $75.00$10.00
3 $75.00$10.00
Ref #238 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #239 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $5.00$5.00
Ref #240 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #241 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (75 SF)
Awd $3,000.00$40.00
2 $3,000.00$40.00
3 $4,500.00$60.00
Section 29 - BRIDGE NO. TRU-5-1103L - PART 2 - Totals
Awd $21,536.38
2 $21,043.00
3 $27,016.00
Ref #242 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
120018 - Page 307
Ref #243 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (536 SY)
Awd $5,628.00$10.50
2 $5,360.00$10.00
3 $5,896.00$11.00
Ref #244 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (536 SY)
Awd $2,278.00$4.25
2 $2,144.00$4.00
3 $3,752.00$7.00
Ref #245 519E10000 SPECIAL - PATCHING CONCRETE BRIDGE DECK OVERLAY WI, (30 SY)
Awd $4,500.00$150.00
2 $4,500.00$150.00
3 $4,500.00$150.00
Ref #246 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Ref #247 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #248 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $76.88$10.25
2 $75.00$10.00
3 $75.00$10.00
Ref #249 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #250 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $5.00$5.00
Ref #251 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #252 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (75 SF)
Awd $3,000.00$40.00
2 $3,000.00$40.00
3 $4,500.00$60.00
Section 30 - BRIDGE NO. TRU-5-1103R - PART 2 - Totals
Awd $20,267.88
2 $19,839.00
3 $25,468.00
Ref #253 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
120018 - Page 308
Ref #254 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (645 SY)
Awd $6,772.50$10.50
2 $6,450.00$10.00
3 $7,095.00$11.00
Ref #255 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (849 SY)
Awd $4,669.50$5.50
2 $4,457.25$5.25
3 $4,457.25$5.25
Ref #256 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (645 SY)
Awd $2,741.25$4.25
2 $2,580.00$4.00
3 $4,515.00$7.00
Ref #257 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #258 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #259 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (21 FT)
Awd $215.25$10.25
2 $210.00$10.00
3 $210.00$10.00
Ref #260 630E80100 SIGN, FLAT SHEET, (6 SF)
Awd $120.00$20.00
2 $120.00$20.00
3 $120.00$20.00
Ref #261 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #262 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (3 EACH)
Awd $60.00$20.00
2 $60.00$20.00
3 $15.00$5.00
Ref #263 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (3 EACH)
Awd $60.00$20.00
2 $60.00$20.00
3 $60.00$20.00
Ref #264 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 31 - BRIDGE NO. TRU-5-1202L - PART 2 - Totals
Awd $25,383.50
2 $24,657.25
3 $32,192.25
120018 - Page 309
Ref #265 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #266 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (646 SY)
Awd $6,783.00$10.50
2 $6,460.00$10.00
3 $7,106.00$11.00
Ref #267 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (846 SY)
Awd $4,653.00$5.50
2 $4,441.50$5.25
3 $4,441.50$5.25
Ref #268 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (646 SY)
Awd $2,745.50$4.25
2 $2,584.00$4.00
3 $4,522.00$7.00
Ref #269 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #270 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #271 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (21 FT)
Awd $215.25$10.25
2 $210.00$10.00
3 $210.00$10.00
Ref #272 630E80100 SIGN, FLAT SHEET, (6 SF)
Awd $120.00$20.00
2 $120.00$20.00
3 $120.00$20.00
Ref #273 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #274 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (3 EACH)
Awd $60.00$20.00
2 $60.00$20.00
3 $30.00$10.00
Ref #275 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (3 EACH)
Awd $60.00$20.00
2 $60.00$20.00
3 $60.00$20.00
Ref #276 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
120018 - Page 310
Section 32 - BRIDGE NO. TRU-5-1202R - PART 2 - Totals
Awd $25,381.75
2 $24,655.50
3 $32,209.50
Ref #277 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #278 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (540 SY)
Awd $5,670.00$10.50
2 $5,400.00$10.00
3 $5,940.00$11.00
Ref #279 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (731 SY)
Awd $4,020.50$5.50
2 $3,837.75$5.25
3 $3,837.75$5.25
Ref #280 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (540 SY)
Awd $2,295.00$4.25
2 $2,160.00$4.00
3 $3,780.00$7.00
Ref #281 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Ref #282 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #283 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (21 FT)
Awd $215.25$10.25
2 $210.00$10.00
3 $210.00$10.00
Ref #284 630E80100 SIGN, FLAT SHEET, (6 SF)
Awd $120.00$20.00
2 $120.00$20.00
3 $120.00$20.00
Ref #285 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #286 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (3 EACH)
Awd $60.00$20.00
2 $60.00$20.00
3 $15.00$5.00
Ref #287 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (3 EACH)
Awd $60.00$20.00
2 $60.00$20.00
3 $60.00$20.00
120018 - Page 311
Ref #288 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (75 SF)
Awd $3,000.00$40.00
2 $3,000.00$40.00
3 $4,500.00$60.00
Section 33 - BRIDGE NO. TRU-5-1226L - PART 2 - Totals
Awd $20,185.75
2 $19,567.75
3 $25,182.75
Ref #289 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #290 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (540 SY)
Awd $5,670.00$10.50
2 $5,400.00$10.00
3 $5,940.00$11.00
Ref #291 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (731 SY)
Awd $4,020.50$5.50
2 $3,837.75$5.25
3 $3,837.75$5.25
Ref #292 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (540 SY)
Awd $2,295.00$4.25
2 $2,160.00$4.00
3 $3,780.00$7.00
Ref #293 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Ref #294 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #295 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (21 FT)
Awd $215.25$10.25
2 $210.00$10.00
3 $210.00$10.00
Ref #296 630E80100 SIGN, FLAT SHEET, (6 SF)
Awd $120.00$20.00
2 $120.00$20.00
3 $120.00$20.00
Ref #297 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #298 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (3 EACH)
Awd $60.00$20.00
2 $60.00$20.00
3 $15.00$5.00
120018 - Page 312
Ref #299 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (3 EACH)
Awd $60.00$20.00
2 $60.00$20.00
3 $60.00$20.00
Ref #300 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (75 SF)
Awd $3,000.00$40.00
2 $3,000.00$40.00
3 $4,500.00$60.00
Section 34 - BRIDGE NO. TRU-5-1226R - PART 2 - Totals
Awd $20,185.75
2 $19,567.75
3 $25,182.75
Ref #301 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #302 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1029 SY)
Awd $10,804.50$10.50
2 $10,290.00$10.00
3 $11,319.00$11.00
Ref #303 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1843 SY)
Awd $10,136.50$5.50
2 $9,675.75$5.25
3 $9,675.75$5.25
Ref #304 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (1029 SY)
Awd $4,373.25$4.25
2 $4,116.00$4.00
3 $7,203.00$7.00
Ref #305 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #306 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #307 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT)
Awd $153.75$10.25
2 $150.00$10.00
3 $150.00$10.00
Ref #308 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #309 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH)
Awd $40.00$20.00
2 $40.00$20.00
3 $10.00$5.00
120018 - Page 313
Ref #310 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #311 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 35 - BRIDGE NO. TRU-5-1286 - PART 2 - Totals
Awd $36,313.00
2 $35,051.75
3 $44,137.75
Ref #312 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #313 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1128 SY)
Awd $11,844.00$10.50
2 $11,280.00$10.00
3 $12,408.00$11.00
Ref #314 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1409 SY)
Awd $7,749.50$5.50
2 $7,397.25$5.25
3 $7,397.25$5.25
Ref #315 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (1128 SY)
Awd $4,794.00$4.25
2 $4,512.00$4.00
3 $7,896.00$7.00
Ref #316 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #317 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #318 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (21 FT)
Awd $215.25$10.25
2 $210.00$10.00
3 $210.00$10.00
Ref #319 630E80100 SIGN, FLAT SHEET, (6 SF)
Awd $120.00$20.00
2 $120.00$20.00
3 $120.00$20.00
Ref #320 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
120018 - Page 314
Ref #321 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (4 EACH)
Awd $80.00$20.00
2 $80.00$20.00
3 $20.00$5.00
Ref #322 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (4 EACH)
Awd $80.00$20.00
2 $80.00$20.00
3 $80.00$20.00
Ref #323 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 36 - BRIDGE NO. TRU-5-1395L - PART 2 - Totals
Awd $35,627.75
2 $34,399.25
3 $43,851.25
Ref #324 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #325 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (873 SY)
Awd $9,166.50$10.50
2 $8,730.00$10.00
3 $9,603.00$11.00
Ref #326 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (986 SY)
Awd $5,423.00$5.50
2 $5,176.50$5.25
3 $5,176.50$5.25
Ref #327 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (873 SY)
Awd $3,710.25$4.25
2 $3,492.00$4.00
3 $6,111.00$7.00
Ref #328 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #329 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #330 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (21 FT)
Awd $215.25$10.25
2 $210.00$10.00
3 $210.00$10.00
Ref #331 630E80100 SIGN, FLAT SHEET, (6 SF)
Awd $120.00$20.00
2 $120.00$20.00
3 $120.00$20.00
120018 - Page 315
Ref #332 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #333 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (4 EACH)
Awd $80.00$20.00
2 $80.00$20.00
3 $20.00$5.00
Ref #334 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (4 EACH)
Awd $80.00$20.00
2 $80.00$20.00
3 $80.00$20.00
Ref #335 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 37 - BRIDGE NO. TRU-5-1395R - PART 2 - Totals
Awd $29,540.00
2 $28,608.50
3 $37,040.50
Ref #336 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #337 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (860 SY)
Awd $9,030.00$10.50
2 $8,600.00$10.00
3 $9,460.00$11.00
Ref #338 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1268 SY)
Awd $6,974.00$5.50
2 $6,657.00$5.25
3 $6,657.00$5.25
Ref #339 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (860 SY)
Awd $3,655.00$4.25
2 $3,440.00$4.00
3 $6,020.00$7.00
Ref #340 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN, (5 EACH)
Awd $4,125.00$825.00
2 $4,000.00$800.00
3 $4,000.00$800.00
Ref #341 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $3,600.00$3,600.00
2 $3,500.00$3,500.00
3 $3,500.00$3,500.00
Ref #342 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
120018 - Page 316
Ref #343 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #344 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (36 FT)
Awd $369.00$10.25
2 $360.00$10.00
3 $360.00$10.00
Ref #345 630E80100 SIGN, FLAT SHEET, (6 SF)
Awd $120.00$20.00
2 $120.00$20.00
3 $120.00$20.00
Ref #346 630E80100 SIGN, FLAT SHEET, 730.20, (3 SF)
Awd $60.00$20.00
2 $60.00$20.00
3 $60.00$20.00
Ref #347 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (6 EACH)
Awd $120.00$20.00
2 $120.00$20.00
3 $30.00$5.00
Ref #348 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (6 EACH)
Awd $120.00$20.00
2 $120.00$20.00
3 $120.00$20.00
Ref #349 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 38 - BRIDGE NO. TRU-5-1413L - PART 2 - Totals
Awd $38,898.00
2 $37,677.00
3 $46,027.00
Ref #350 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $525.00$525.00
2 $500.00$500.00
3 $500.00$500.00
Ref #351 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (985 SY)
Awd $10,342.50$10.50
2 $9,850.00$10.00
3 $10,835.00$11.00
Ref #352 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1726 SY)
Awd $9,493.00$5.50
2 $9,061.50$5.25
3 $9,061.50$5.25
Ref #353 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (985 SY)
Awd $4,186.25$4.25
2 $3,940.00$4.00
3 $6,895.00$7.00
120018 - Page 317
Ref #354 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $6,000.00$40.00
2 $6,000.00$40.00
3 $9,000.00$60.00
Ref #355 530E00200 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL, (LUMP SUM)
Awd $200.00$200.00
2 $200.00$200.00
3 $200.00$200.00
Ref #356 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (36 FT)
Awd $369.00$10.25
2 $360.00$10.00
3 $360.00$10.00
Ref #357 630E80100 SIGN, FLAT SHEET, (6 SF)
Awd $120.00$20.00
2 $120.00$20.00
3 $120.00$20.00
Ref #358 630E80100 SIGN, FLAT SHEET, 730.20, (3 SF)
Awd $60.00$20.00
2 $60.00$20.00
3 $60.00$20.00
Ref #359 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (6 EACH)
Awd $120.00$20.00
2 $120.00$20.00
3 $30.00$5.00
Ref #360 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (6 EACH)
Awd $120.00$20.00
2 $120.00$20.00
3 $120.00$20.00
Ref #361 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $4,000.00$40.00
2 $4,000.00$40.00
3 $6,000.00$60.00
Section 39 - BRIDGE NO. TRU-5-1413R - PART 2 - Totals
Awd $35,535.75
2 $34,331.50
3 $43,181.50
Ref #362 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)
Awd $1,000.00$1,000.00
2 $5,000.00$5,000.00
3 $2,500.00$2,500.00
Ref #363 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $45,000.00$45,000.00
2 $20,000.00$20,000.00
3 $50,000.00$50,000.00
Ref #364 614E11000 MAINTAINING TRAFFIC- PARTS 1 & 2 (WT: 39), (LUMP SUM)
Awd $297,000.00$297,000.00
2 $582,000.00$582,000.00
3 $215,000.00$215,000.00
120018 - Page 318
Ref #365 619E16020 FIELD OFFICE, TYPE C- PARTS 1 & 2 (WT: NR), (16 MNTH)
Awd $24,000.00$1,500.00
2 $24,000.00$1,500.00
3 $24,000.00$1,500.00
Ref #366 623E10000 CONSTRUCTION LAYOUT STAKES- PARTS 1 & 2 (WT: NR), (LUMP SUM)
Awd $4,500.00$4,500.00
2 $10,000.00$10,000.00
3 $4,000.00$4,000.00
Ref #367 624E10000 MOBILIZATION- PARTS 1 & 2 (WT: NR), (LUMP SUM)
Awd $200,000.00$200,000.00
2 $200,000.00$200,000.00
3 $200,000.00$200,000.00
Section 40 - INCIDENTALS - Totals
Awd $571,500.00
2 $841,000.00
3 $495,500.00
120018 - Page 319
Project No. 120019
PID 84307
WAR-SR-741-1.12
Federal
Type: TWO LANE RESURFACING
Completion Date: 7/15/2012
Award Amount: $543,705.46
Contract Awarded To: BARRETT PAVING MATERIALS INC
Letting Date: 1/12/2012
Engineer's Estimate: $556,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BARRETT PAVING MATERIALS INC
600 SHEPHERD AVE
CINCINNATI, OH 45215
Hamilton
Bidder 1
Bid $543,705.46
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 2
Bid $555,976.09
120019 - Page 320
Ref #1 253E01001 PAVEMENT REPAIR, AS PER PLAN, (500 SY)
Awd $26,500.00$53.00
2 $38,445.00$76.89
Ref #2 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (42200 SY)
Awd $37,980.00$0.90
2 $22,788.00$0.54
Ref #3 254E01600 PATCHING PLANED SURFACE, (1677 SY)
Awd $1,677.00$1.00
2 $2,632.89$1.57
Ref #4 407E10000 TACK COAT, (3030 GAL)
Awd $6,060.00$2.00
2 $6,060.00$2.00
Ref #5 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (17 GAL)
Awd $34.00$2.00
2 $34.00$2.00
Ref #6 448E46010 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, PG64, (6 CY)
Awd $1,050.00$175.00
2 $2,194.74$365.79
Ref #7 448E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1H, (2579 CY)
Awd $357,191.50$138.50
2 $382,543.07$148.33
Section 1 - PAVEMENT - Totals
Awd $430,492.50
2 $454,697.70
Ref #8 621E00100 RPM, (358 EACH)
Awd $5,907.00$16.50
2 $5,889.10$16.45
Ref #9 621E54000 RAISED PAVEMENT MARKER REMOVED, (310 EACH)
Awd $1,550.00$5.00
2 $3,158.90$10.19
Ref #10 644E00100 EDGE LINE, (2.94 MILE)
Awd $6,997.20$2,380.00
2 $6,997.20$2,380.00
Ref #11 644E00300 CENTER LINE, (2.28 MILE)
Awd $9,591.96$4,207.00
2 $9,591.96$4,207.00
Ref #12 644E00400 CHANNELIZING LINE, (4328 FT)
Awd $4,328.00$1.00
2 $4,328.00$1.00
Ref #13 644E00500 STOP LINE, (220 FT)
Awd $1,023.00$4.65
2 $1,023.00$4.65
Ref #14 644E00700 TRANSVERSE/DIAGONAL LINE, (1060 FT)
Awd $4,770.00$4.50
2 $4,770.00$4.50
120019 - Page 321
Ref #15 644E01000 RAILROAD SYMBOL MARKING, (1 EACH)
Awd $500.00$500.00
2 $500.00$500.00
Ref #16 644E01300 LANE ARROW, (54 EACH)
Awd $4,050.00$75.00
2 $4,050.00$75.00
Section 2 - TRAFFIC CONTROL - Totals
Awd $38,717.16
2 $40,308.16
Ref #17 632E26500 DETECTOR LOOP, (10 EACH)
Awd $8,250.00$825.00
2 $8,250.00$825.00
Ref #18 632E27200 LOOP DETECTOR TIE IN, (10 EACH)
Awd $500.00$50.00
2 $500.00$50.00
Section 3 - TRAFFIC SIGNALS - Totals
Awd $8,750.00
2 $8,750.00
Ref #19 614E18400 PORTABLE CHANGEABLE MESSAGE SIGN, (14 DAY)
Awd $490.00$35.00
2 $1,349.18$96.37
Ref #20 614E21000 WORK ZONE CENTER LINE, CLASS I, (2.28 MILE)
Awd $1,710.00$750.00
2 $1,940.28$851.00
Ref #21 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (2.28 MILE)
Awd $2,052.00$900.00
2 $1,326.96$582.00
Ref #22 614E22000 WORK ZONE EDGE LINE, CLASS I, (2.94 MILE)
Awd $1,470.00$500.00
2 $1,716.96$584.00
Ref #23 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (2.94 MILE)
Awd $1,764.00$600.00
2 $1,302.42$443.00
Ref #24 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (4328 FT)
Awd $1,082.00$0.25
2 $2,164.00$0.50
Ref #25 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (4328 FT)
Awd $1,514.80$0.35
2 $2,380.40$0.55
Ref #26 614E26000 WORK ZONE STOP LINE, CLASS I, (220 FT)
Awd $495.00$2.25
2 $528.00$2.40
Ref #27 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (220 FT)
Awd $605.00$2.75
2 $550.00$2.50
120019 - Page 322
Ref #28 614E30000 WORK ZONE ARROW, CLASS I, (54 EACH)
Awd $1,620.00$30.00
2 $2,160.00$40.00
Ref #29 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT, (54 EACH)
Awd $1,728.00$32.00
2 $2,430.00$45.00
Ref #30 614E32000 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I, (1 EACH)
Awd $100.00$100.00
2 $240.00$240.00
Ref #31 614E32210 WORK ZONE RAILROAD SYMBOL MARKING, CLASS III, 642 , (1 EACH)
Awd $115.00$115.00
2 $250.00$250.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $14,745.80
2 $18,338.20
Ref #32 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $2,275.93$2,275.93
Ref #33 614E11000 MAINTAINING TRAFFIC (WT: 39), (LUMP SUM)
Awd $25,000.00$25,000.00
2 $9,445.83$9,445.83
Ref #34 623E10001 CONSTRUCTION LAYOUT STAKES, AS PER PLAN (WT: NR), (LUMP SUM)
Awd $3,000.00$3,000.00
2 $2,160.27$2,160.27
Ref #35 624E10000 MOBILIZATION (WT: NR), (LUMP SUM)
Awd $20,000.00$20,000.00
2 $20,000.00$20,000.00
Section 5 - INCIDENTALS - Totals
Awd $51,000.00
2 $33,882.03
120019 - Page 323
Project No. 120020
PID 82363
ALL-VA-PM-FY2012
Non-Federal
Type: PAVEMENT MARKING
Completion Date: 10/15/2012
Award Amount: $874,312.00
Contract Awarded To: AERO-MARK INC
Letting Date: 1/12/2012
Engineer's Estimate: $879,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
AERO-MARK INC
10423 DANNER DR
STREETSBORO, OH 44241
Portage
Bidder 1
Bid $874,312.00
OGLESBY CONSTRUCTION INC
1600 TOLEDO RD
NORWALK, OH 44857
Huron
Bidder 2
Bid $878,459.40
DURA MARK INC
72 EMERALD AVE
STREETSBORO, OH 44241
Portage
Bidder 3
Bid $1,224,926.20
120020 - Page 324
Ref #1 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (50 HOUR)
Awd $2,000.00$40.00
2 $2,250.00$45.00
3 $3,750.00$75.00
Ref #2 642E00100 EDGE LINE, TYPE 1, (200 MILE)
Awd $61,000.00$305.00
2 $58,000.00$290.00
3 $95,000.00$475.00
Ref #3 642E00200 LANE LINE, TYPE 1, (10 MILE)
Awd $760.00$76.00
2 $700.00$70.00
3 $2,990.00$299.00
Ref #4 642E00300 CENTER LINE, TYPE 1, (100 MILE)
Awd $22,200.00$222.00
2 $22,000.00$220.00
3 $57,900.00$579.00
Ref #5 643E00100 EDGE LINE, (791.8 MILE)
Awd $439,449.00$555.00
2 $425,988.40$538.00
3 $482,998.00$610.00
Ref #6 643E00200 LANE LINE, (104.6 MILE)
Awd $21,756.80$208.00
2 $25,104.00$240.00
3 $30,020.20$287.00
Ref #7 643E00300 CENTER LINE, (292 MILE)
Awd $136,072.00$466.00
2 $131,692.00$451.00
3 $181,040.00$620.00
Ref #8 647E18010 CHANNELIZING LINE, TYPE B90, (4000 FT)
Awd $18,080.00$4.52
2 $21,000.00$5.25
3 $26,000.00$6.50
Ref #9 647E18060 STOP LINE, TYPE B90, (4500 FT)
Awd $61,200.00$13.60
2 $63,000.00$14.00
3 $90,000.00$20.00
Ref #10 647E20110 TRANSVERSE/DIAGONAL LINE, TYPE B90, (1500 FT)
Awd $19,500.00$13.00
2 $19,500.00$13.00
3 $30,000.00$20.00
Ref #11 647E20310 RAILROAD SYMBOL MARKING, TYPE B90, (6 EACH)
Awd $6,276.00$1,046.00
2 $3,900.00$650.00
3 $4,500.00$750.00
Ref #12 647E20440 SCHOOL SYMBOL MARKING, 96", TYPE B90, (6 EACH)
Awd $3,798.00$633.00
2 $3,300.00$550.00
3 $5,328.00$888.00
120020 - Page 325
Ref #13 647E20610 LANE ARROW, TYPE B90, (120 EACH)
Awd $24,948.00$207.90
2 $25,800.00$215.00
3 $35,400.00$295.00
Ref #14 647E50000 REMOVAL OF PAVEMENT MARKING, (500 FT)
Awd $500.00$1.00
2 $875.00$1.75
3 $5,000.00$10.00
Ref #15 647E50010 REMOVAL OF PAVEMENT MARKING, (10 EACH)
Awd $500.20$50.02
2 $450.00$45.00
3 $2,000.00$200.00
Ref #16 690E98000 SPECIAL - MISC.:FOURTEEN (14) DAY WORK ORDER, (8 EACH)
Awd $3,200.00$400.00
2 $4,000.00$500.00
3 $20,000.00$2,500.00
Ref #17 690E98000 SPECIAL - MISC.:SEVENTY-TWO (72) HOUR WORK ORDER, (8 EACH)
Awd $7,200.00$900.00
2 $6,400.00$800.00
3 $40,000.00$5,000.00
Section 1 - ITEMS OF WORK - Totals
Awd $828,440.00
2 $813,959.40
3 $1,111,926.20
Ref #18 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,372.00$4,372.00
2 $6,500.00$6,500.00
3 $13,000.00$13,000.00
Ref #19 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $50,500.00$50,500.00
3 $50,000.00$50,000.00
Ref #20 624E10000 MOBILIZATION, (LUMP SUM)
Awd $39,000.00$39,000.00
2 $7,500.00$7,500.00
3 $50,000.00$50,000.00
Section 2 - INCIDENTALS - Totals
Awd $45,872.00
2 $64,500.00
3 $113,000.00
120020 - Page 326
Project No. 120021
PID 88941
FAY-VA-MOWC-FY2012
Non-Federal
Type: MOWING
Completion Date: 10/31/2013
Award Amount: $128,172.00
Contract Awarded To: CUSTOM MOWING
Letting Date: 1/12/2012
Engineer's Estimate: $126,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
CUSTOM MOWING
5728 MAD RIVER ROAD
HILLSBORO, OH 45133
Highland
Bidder 1
Bid $128,172.00
THOMPSON INTERSTATE MOWING INC
12878 ST RT 62 N
LEESBURG, OH 45135
Highland
Bidder 2
Bid $149,990.44
BRYPAN LLC
1525 DITMORE STROLL
NEWARK, OH 43055
Licking
Bidder 3
Bid $179,394.00
COUNTRYSIDE GARDENS INC
3272 ST RT 502
GREENVILLE, OH 45331
Darke
Bidder 4
Bid $182,952.16
TOM MAYLE & SONS CONSTRUCTION INC
P O BOX 151
BARTLETT, OH 45713
Washington
Bidder 5
Bid $372,204.50
120021 - Page 327
Ref #1 614E11001 MAINTAINING TRAFFIC, AS PER PLAN, 2012, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $1,000.00$1,000.00
3 $1,500.00$1,500.00
4 $5,500.00$5,500.00
5 $12,000.00$12,000.00
Ref #2 624E10000 MOBILIZATION, 2012, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $1,000.00$1,000.00
3 $8,000.00$8,000.00
4 $5,500.00$5,500.00
5 $8,000.00$8,000.00
Ref #3 692E10000 SPECIAL - FIRST MOWING, 2012, (65.03 MILE)
Awd $13,006.00$200.00
2 $19,999.98$307.55
3 $19,509.00$300.00
4 $18,447.06$283.67
5 $58,527.00$900.00
Ref #4 692E20000 SPECIAL - SECOND MOWING, 2012, (65.03 MILE)
Awd $13,006.00$200.00
2 $19,999.98$307.55
3 $19,509.00$300.00
4 $18,447.06$283.67
5 $39,018.00$600.00
Ref #5 692E30000 SPECIAL - THIRD MOWING, 2012, (65.03 MILE)
Awd $13,006.00$200.00
2 $19,999.98$307.55
3 $19,509.00$300.00
4 $18,447.06$283.67
5 $32,515.00$500.00
Ref #6 692E30400 SPECIAL - MOWBACK, 2012, (946 ACRE)
Awd $7,568.00$8.00
2 $11,995.28$12.68
3 $18,920.00$20.00
4 $21,417.44$22.64
5 $23,650.00$25.00
Section 1 - MOWING SEASON - 2012 - Totals
Awd $53,086.00
2 $73,995.22
3 $86,947.00
4 $87,758.62
5 $173,710.00
Ref #7 614E11001 MAINTAINING TRAFFIC, AS PER PLAN, 2013, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $1,000.00$1,000.00
3 $1,500.00$1,500.00
4 $5,500.00$5,500.00
5 $13,000.00$13,000.00
120021 - Page 328
Ref #8 624E10000 MOBILIZATION, 2013, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $1,000.00$1,000.00
3 $8,000.00$8,000.00
4 $5,500.00$5,500.00
5 $10,000.00$10,000.00
Ref #9 692E10000 SPECIAL - FIRST MOWING, 2013, (65.03 MILE)
Awd $13,006.00$200.00
2 $19,999.98$307.55
3 $19,509.00$300.00
4 $18,858.70$290.00
5 $61,778.50$950.00
Ref #10 692E20000 SPECIAL - SECOND MOWING, 2013, (65.03 MILE)
Awd $13,006.00$200.00
2 $19,999.98$307.55
3 $19,509.00$300.00
4 $18,858.70$290.00
5 $42,269.50$650.00
Ref #11 692E30000 SPECIAL - THIRD MOWING, 2013, (65.03 MILE)
Awd $13,006.00$200.00
2 $19,999.98$307.55
3 $19,509.00$300.00
4 $18,858.70$290.00
5 $35,766.50$550.00
Ref #12 692E30400 SPECIAL - MOWBACK, 2013, (946 ACRE)
Awd $7,568.00$8.00
2 $11,995.28$12.68
3 $18,920.00$20.00
4 $21,417.44$22.64
5 $28,380.00$30.00
Section 2 - MOWING SEASON - 2013 - Totals
Awd $53,086.00
2 $73,995.22
3 $86,947.00
4 $88,993.54
5 $191,194.50
Ref #13 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $22,000.00$22,000.00
2 $2,000.00$2,000.00
3 $5,500.00$5,500.00
4 $6,200.00$6,200.00
5 $7,300.00$7,300.00
Section 3 - INCIDENTALS - Totals
Awd $22,000.00
2 $2,000.00
3 $5,500.00
4 $6,200.00
5 $7,300.00
120021 - Page 329
Project No. 120022
PID 89608
ADA-VA-RPM-FY2012
Non-Federal
Type: RAISED PAVEMENT MARKERS
Completion Date: 6/1/2013
Award Amount: $198,625.00
Contract Awarded To: K & S MARKERS INC
Letting Date: 1/12/2012
Engineer's Estimate: $227,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
K & S MARKERS INC
2189 N 600 W
THORNTOWN, IN 46071
Bidder 1
Bid $198,625.00
A & A SAFETY INC
1126 FERRIS RD
AMELIA, OH 45102
Clermont
Bidder 2
Bid $206,612.50
W L MARKERS INC
2808 FISHER RD
COLUMBUS, OH 43204
Franklin
Bidder 3
Bid $216,720.00
TRAFFIC SPECIALISTS INC
P O BOX 180
SHANDON, OH 45063-0180
Bidder 4
Bid $232,412.50
AMERICAN HIGHWAY SAFETY LLC
108 WHITTLESEY AVE
NORWALK, OH 44857
Huron
Bidder 5
Bid $324,370.00
120022 - Page 330
Ref #1 621E00100 RPM, (1500 EACH)
Awd $15,000.00$10.00
2 $23,550.00$15.70
3 $18,750.00$12.50
4 $21,000.00$14.00
5 $22,500.00$15.00
Ref #2 621E00300 RPM REFLECTOR, (62250 EACH)
Awd $155,625.00$2.50
2 $152,512.50$2.45
3 $158,737.50$2.55
4 $177,412.50$2.85
5 $256,470.00$4.12
Section 1 - ITEMS OF WORK - Totals
Awd $170,625.00
2 $176,062.50
3 $177,487.50
4 $198,412.50
5 $278,970.00
Ref #3 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $1,550.00$1,550.00
3 $2,832.50$2,832.50
4 $4,000.00$4,000.00
5 $4,400.00$4,400.00
Ref #4 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $27,000.00$27,000.00
3 $31,400.00$31,400.00
4 $20,000.00$20,000.00
5 $35,500.00$35,500.00
Ref #5 624E10000 MOBILIZATION, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $2,000.00$2,000.00
3 $5,000.00$5,000.00
4 $10,000.00$10,000.00
5 $5,500.00$5,500.00
Section 2 - INCIDENTALS - Totals
Awd $28,000.00
2 $30,550.00
3 $39,232.50
4 $34,000.00
5 $45,400.00
120022 - Page 331
Project No. 120023
PID 88473
BEL-VA-CH-FY2012
Non-Federal
Type: CLEANING/SWEEPING HIGHWAYS
Completion Date: 6/30/2012
Award Amount: $217,974.60
Contract Awarded To: VASTA CONSTRUCTION COMPANY INC
Letting Date: 1/12/2012
Engineer's Estimate: $280,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
VASTA CONSTRUCTION COMPANY INC
12980 AVON BELDEN RD
EATON, OH 44044
Lorain
Bidder 1
Bid $217,974.60
BRYPAN LLC
1525 DITMORE STROLL
NEWARK, OH 43055
Licking
Bidder 2
Bid $240,450.00
DEANGELO BROTHERS INC
100 NORTH CONAHAN DR
HAZLETON, PA 18201
Bidder 3
Bid $299,712.04
CONTRACT SWEEPERS & EQUIPMENT CO
561 SHORT ST
COLUMBUS, OH 43215
Franklin
Bidder 4
Bid $354,999.42
INDEPENDENCE EXCAVATING INC
5720 SCHAAF RD
INDEPENDENCE, OH 44131
Cuyahoga
Bidder 5
Bid $513,360.00
120023 - Page 332
Ref #1 690E98500 SPECIAL - MISC.:DEBRIS REMOVAL, (194 MILE)
Awd $87,474.60$450.90
2 $179,450.00$925.00
3 $278,712.04$1,436.66
4 $183,801.42$947.43
5 $376,360.00$1,940.00
Ref #2 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
Section 1 - ITEMS OF WORK - Totals
Awd $88,474.60
2 $180,450.00
3 $279,712.04
4 $184,801.42
5 $377,360.00
Ref #3 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $20,000.00$20,000.00
3 $8,000.00$8,000.00
4 $3,000.00$3,000.00
5 $10,000.00$10,000.00
Ref #4 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $75,000.00$75,000.00
2 $35,000.00$35,000.00
3 $6,000.00$6,000.00
4 $111,131.00$111,131.00
5 $93,000.00$93,000.00
Ref #5 624E10000 MOBILIZATION, (LUMP SUM)
Awd $50,000.00$50,000.00
2 $5,000.00$5,000.00
3 $6,000.00$6,000.00
4 $56,067.00$56,067.00
5 $33,000.00$33,000.00
Section 2 - INCIDENTALS - Totals
Awd $129,500.00
2 $60,000.00
3 $20,000.00
4 $170,198.00
5 $136,000.00
120023 - Page 333
Project No. 120024
PID 89317
CUY-VA-LG-FY2012
Non-Federal
Type: LIGHTING
Completion Date: 10/15/2012
Award Amount: $487,200.00
Contract Awarded To: MILLER CABLE COMPANY
Letting Date: 1/12/2012
Engineer's Estimate: $580,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
MILLER CABLE COMPANY
210 S BROADWAY ST P O BOX 68
GREEN SPRINGS, OH 44836
Seneca
Bidder 1
Bid $487,200.00
PERRAM ELECTRIC INC
6882 RIDGE RD
WADSWORTH, OH 44281
Medina
Bidder 2
Bid $531,170.00
TERRACE CONSTRUCTION CO INC
3965 PEARL RD
CLEVELAND, OH 44109
Cuyahoga
Bidder 3
Bid $626,799.60
J RANCK ELECTRIC INC
1993 GOVER PARKWAY
MT PLEASANT, MI 48858
Bidder 4
Bid $655,501.01
120024 - Page 334
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,650.00$3,650.00
2 $200.00$200.00
3 $560.00$560.00
4 $0.01$0.01
Ref #2 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (100 HOUR)
Awd $5,200.00$52.00
2 $6,000.00$60.00
3 $7,000.00$70.00
4 $5,000.00$50.00
Ref #3 625E00500 CONNECTOR KIT, TYPE II, (144 EACH)
Awd $13,248.00$92.00
2 $13,946.40$96.85
3 $11,088.00$77.00
4 $16,560.00$115.00
Ref #4 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, DESIGN A12B, (15 EACH)
Awd $23,325.00$1,555.00
2 $24,375.00$1,625.00
3 $25,200.00$1,680.00
4 $24,750.00$1,650.00
Ref #5 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, DESIGN A15B, (5 EACH)
Awd $8,500.00$1,700.00
2 $8,625.00$1,725.00
3 $8,850.00$1,770.00
4 $9,000.00$1,800.00
Ref #6 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, DESIGN AT15, (16 EACH)
Awd $29,680.00$1,855.00
2 $31,840.00$1,990.00
3 $34,080.00$2,130.00
4 $32,000.00$2,000.00
Ref #7 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, DESIGN AT25, (1 EACH)
Awd $2,650.00$2,650.00
2 $2,665.00$2,665.00
3 $3,540.00$3,540.00
4 $2,200.00$2,200.00
Ref #8 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, DESIGN AT25, (1 EACH)
Awd $2,700.00$2,700.00
2 $2,715.00$2,715.00
3 $3,130.00$3,130.00
4 $2,500.00$2,500.00
Ref #9 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, DESIGN AT30, (34 EACH)
Awd $113,900.00$3,350.00
2 $116,450.00$3,425.00
3 $123,080.00$3,620.00
4 $108,800.00$3,200.00
Ref #10 625E11100 LIGHT TOWER, BB90, (1 EACH)
Awd $9,530.00$9,530.00
2 $12,240.00$12,240.00
3 $13,260.00$13,260.00
4 $16,000.00$16,000.00
120024 - Page 335
Ref #11 625E11200 LIGHT TOWER, BB100, (1 EACH)
Awd $9,600.00$9,600.00
2 $12,480.00$12,480.00
3 $14,490.00$14,490.00
4 $16,500.00$16,500.00
Ref #12 625E11300 LIGHT TOWER, BB110, (3 EACH)
Awd $30,000.00$10,000.00
2 $39,795.00$13,265.00
3 $47,700.00$15,900.00
4 $51,750.00$17,250.00
Ref #13 625E11400 LIGHT TOWER, BB120, (4 EACH)
Awd $42,400.00$10,600.00
2 $55,980.00$13,995.00
3 $71,840.00$17,960.00
4 $76,000.00$19,000.00
Ref #14 625E11500 LIGHT TOWER, BB130, (1 EACH)
Awd $11,000.00$11,000.00
2 $14,710.00$14,710.00
3 $18,570.00$18,570.00
4 $20,000.00$20,000.00
Ref #15 625E12430 LIGHT TOWER, BBB150, (1 EACH)
Awd $14,000.00$14,000.00
2 $18,340.00$18,340.00
3 $20,780.00$20,780.00
4 $25,100.00$25,100.00
Ref #16 625E13208 LIGHT TOWER, BBBB120, (1 EACH)
Awd $10,675.00$10,675.00
2 $13,995.00$13,995.00
3 $17,980.00$17,980.00
4 $19,000.00$19,000.00
Ref #17 625E13210 LIGHT TOWER, BBBB130, (1 EACH)
Awd $11,100.00$11,100.00
2 $14,705.00$14,705.00
3 $18,570.00$18,570.00
4 $20,000.00$20,000.00
Ref #18 625E13220 LIGHT TOWER, BBBB140, (2 EACH)
Awd $23,400.00$11,700.00
2 $31,680.00$15,840.00
3 $38,160.00$19,080.00
4 $44,000.00$22,000.00
Ref #19 625E13230 LIGHT TOWER, BBBB150, (1 EACH)
Awd $14,000.00$14,000.00
2 $18,385.00$18,385.00
3 $20,780.00$20,780.00
4 $25,100.00$25,100.00
Ref #20 625E23400 NO. 10 AWG POLE AND BRACKET CABLE, (9088 FT)
Awd $8,633.60$0.95
2 $2,908.16$0.32
3 $6,361.60$0.70
4 $6,816.00$0.75
120024 - Page 336
Ref #21 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, 400 WATT HPS, (72 EACH)
Awd $31,680.00$440.00
2 $19,800.00$275.00
3 $20,160.00$280.00
4 $28,800.00$400.00
Ref #22 625E26261 LUMINAIRE, HIGH MAST, AS PER PLAN, ASYMMETRIC, 400, (18 EACH)
Awd $10,170.00$565.00
2 $11,430.00$635.00
3 $13,860.00$770.00
4 $13,500.00$750.00
Ref #23 625E26261 LUMINAIRE, HIGH MAST, AS PER PLAN, SYMMETRIC, 400 , (25 EACH)
Awd $14,125.00$565.00
2 $15,875.00$635.00
3 $14,750.00$590.00
4 $18,750.00$750.00
Ref #24 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM)
Awd $1.00$1.00
2 $630.00$630.00
3 $530.00$530.00
4 $1,000.00$1,000.00
Ref #25 625E75350 LIGHT TOWER REMOVED, (16 EACH)
Awd $4,800.00$300.00
2 $6,320.00$395.00
3 $22,720.00$1,420.00
4 $4,800.00$300.00
Ref #26 625E75400 LIGHT POLE REMOVED, (57 EACH)
Awd $6,840.00$120.00
2 $3,705.00$65.00
3 $15,390.00$270.00
4 $4,275.00$75.00
Ref #27 630E97800 SIGNING, MISC.:ADDITIONAL SIGNS, GROUND MOUNTED, A, (100 SF)
Awd $500.00$5.00
2 $100.00$1.00
3 $2,100.00$21.00
4 $1,000.00$10.00
Section 1 - ITEMS OF WORK - Totals
Awd $455,307.60
2 $499,894.56
3 $594,529.60
4 $593,201.01
Ref #28 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $3,977.40$3,977.40
2 $3,375.44$3,375.44
3 $4,270.00$4,270.00
4 $4,500.00$4,500.00
Ref #29 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $15,215.00$15,215.00
2 $2,500.00$2,500.00
3 $4,000.00$4,000.00
4 $11,000.00$11,000.00
120024 - Page 337
Ref #30 619E16010 FIELD OFFICE, TYPE B, (9 MNTH)
Awd $2,700.00$300.00
2 $5,400.00$600.00
3 $7,200.00$800.00
4 $9,000.00$1,000.00
Ref #31 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $20,000.00$20,000.00
3 $16,800.00$16,800.00
4 $37,800.00$37,800.00
Section 2 - INCIDENTALS - Totals
Awd $31,892.40
2 $31,275.44
3 $32,270.00
4 $62,300.00
120024 - Page 338
Project No. 123000
PID 91094
POR-IR-76-(3.95)(4.82)
Federal
Type: BRIDGE REPAIR
Completion Date: 9/30/2012
Award Amount: $1,858,000.00
Contract Awarded To: A P O'HORO COMPANY
Letting Date: 1/12/2012
Engineer's Estimate: $2,257,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
A P O'HORO COMPANY
3130 BELMONT AVE
YOUNGSTOWN, OH 44504
Mahoning
Bidder 1
Bid $1,858,000.00
WOLF CREEK ENGINEERING AND CONTRACTING INC
1288 STARLIGHT DR
AKRON, OH 44306
Summit
Bidder 2
Bid $1,890,600.00
MARUCCI & GAFFNEY EXCAVATING CO
18 HOGUE ST
YOUNGSTOWN, OH 44502
Mahoning
Bidder 3
Bid $1,929,784.00
KENMORE CONSTRUCTION CO INC
700 HOME AVE
AKRON, OH 44310
Summit
Bidder 4
Bid $1,930,350.00
GREAT LAKES CONSTRUCTION CO
2608 GREAT LAKES WAY
HINCKLEY, OH 44233
Medina
Bidder 5
Bid $1,994,150.00
J D WILLIAMSON CONSTRUCTION CO INC
441 GENEVA AVE
TALLMADGE, OH 44278
Summit
Bidder 6
Bid $2,168,124.75
123000 - Page 339
Ref #1 201E99000 SPECIAL - CLEARING AND GRUBBING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $36,000.00$36,000.00
3 $8,000.00$8,000.00
4 $5,000.00$5,000.00
5 $6,000.00$6,000.00
6 $7,000.00$7,000.00
Ref #2 203E99000 SPECIAL - EARTHWORK, (LUMP SUM)
Awd $35,000.00$35,000.00
2 $10,000.00$10,000.00
3 $30,000.00$30,000.00
4 $15,000.00$15,000.00
5 $40,000.00$40,000.00
6 $35,971.70$35,971.70
Ref #3 606E99000 SPECIAL - GUARDRAIL, (LUMP SUM)
Awd $42,000.00$42,000.00
2 $50,000.00$50,000.00
3 $46,860.00$46,860.00
4 $50,000.00$50,000.00
5 $55,000.00$55,000.00
6 $50,751.25$50,751.25
Section 1 - ROADWAY - Totals
Awd $82,000.00
2 $96,000.00
3 $84,860.00
4 $70,000.00
5 $101,000.00
6 $93,722.95
Ref #4 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $20,000.00$20,000.00
3 $7,450.00$7,450.00
4 $40,000.00$40,000.00
5 $5,000.00$5,000.00
6 $13,675.60$13,675.60
Ref #5 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (20000 EACH)
Awd $20,000.00$1.00
2 $20,000.00$1.00
3 $20,000.00$1.00
4 $20,000.00$1.00
5 $20,000.00$1.00
6 $20,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $23,000.00
2 $40,000.00
3 $27,450.00
4 $60,000.00
5 $25,000.00
6 $33,675.60
123000 - Page 340
Ref #6 603E99000 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $6,000.00$6,000.00
3 $34,000.00$34,000.00
4 $4,000.00$4,000.00
5 $37,000.00$37,000.00
6 $9,372.00$9,372.00
Section 3 - DRAINAGE - Totals
Awd $30,000.00
2 $6,000.00
3 $34,000.00
4 $4,000.00
5 $37,000.00
6 $9,372.00
Ref #7 305E99000 SPECIAL - CONCRETE BASE, (LUMP SUM)
Awd $70,000.00$70,000.00
2 $27,000.00$27,000.00
3 $69,840.00$69,840.00
4 $20,000.00$20,000.00
5 $30,000.00$30,000.00
6 $82,402.00$82,402.00
Ref #8 304E99000 SPECIAL - AGGREGATE BASE, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $5,000.00$5,000.00
3 $16,555.00$16,555.00
4 $6,000.00$6,000.00
5 $15,000.00$15,000.00
6 $19,894.00$19,894.00
Ref #9 448E99000 SPECIAL - FLEXIBLE PAVEMENT, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $25,000.00$25,000.00
3 $33,552.00$33,552.00
4 $45,000.00$45,000.00
5 $70,000.00$70,000.00
6 $54,179.50$54,179.50
Section 4 - PAVEMENT - Totals
Awd $125,000.00
2 $57,000.00
3 $119,947.00
4 $71,000.00
5 $115,000.00
6 $156,475.50
Ref #10 626E99000 SPECIAL - BARRIER REFLECTORS, (LUMP SUM)
Awd $300.00$300.00
2 $300.00$300.00
3 $250.00$250.00
4 $250.00$250.00
5 $150.00$150.00
6 $408.00$408.00
123000 - Page 341
Ref #11 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $800.00$800.00
2 $1,800.00$1,800.00
3 $600.00$600.00
4 $900.00$900.00
5 $2,000.00$2,000.00
6 $380.00$380.00
Ref #12 642E99000 SPECIAL - PAVEMENT MARKING, (LUMP SUM)
Awd $1,800.00$1,800.00
2 $3,200.00$3,200.00
3 $6,600.00$6,600.00
4 $500.00$500.00
5 $2,000.00$2,000.00
6 $746.20$746.20
Section 5 - TRAFFIC CONTROL - Totals
Awd $2,900.00
2 $5,300.00
3 $7,450.00
4 $1,650.00
5 $4,150.00
6 $1,534.20
Ref #13 616E99000 SPECIAL - DUST CONTROL, (LUMP SUM)
Awd $20.00$20.00
2 $100.00$100.00
3 $510.00$510.00
4 $200.00$200.00
5 $500.00$500.00
6 $40.00$40.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $20.00
2 $100.00
3 $510.00
4 $200.00
5 $500.00
6 $40.00
Ref #14 202E99010 SPECIAL - PORTIONS OF STRUCTURE REMOVED, (LUMP SUM)
Awd $105,000.00$105,000.00
2 $133,000.00$133,000.00
3 $55,266.00$55,266.00
4 $50,000.00$50,000.00
5 $95,000.00$95,000.00
6 $102,464.00$102,464.00
Ref #15 512E99000 SPECIAL - SEALING OF CONCRETE, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $16,500.00$16,500.00
3 $16,200.00$16,200.00
4 $10,000.00$10,000.00
5 $20,000.00$20,000.00
6 $23,667.00$23,667.00
123000 - Page 342
Ref #16 513E90000 STRUCTURAL STEEL, MISC.:STEEL BEAM REPAIRS, (500 LB)
Awd $1,500.00$3.00
2 $3,500.00$7.00
3 $1,750.00$3.50
4 $11,000.00$22.00
5 $1,750.00$3.50
6 $2,000.00$4.00
Ref #17 514E99000 SPECIAL - BRIDGE PAINTING, (LUMP SUM)
Awd $97,000.00$97,000.00
2 $129,000.00$129,000.00
3 $118,000.00$118,000.00
4 $120,000.00$120,000.00
5 $140,000.00$140,000.00
6 $117,500.00$117,500.00
Ref #18 519E11100 PATCHING CONCRETE STRUCTURE, (200 SF)
Awd $14,000.00$70.00
2 $6,000.00$30.00
3 $13,000.00$65.00
4 $10,000.00$50.00
5 $6,000.00$30.00
6 $10,000.00$50.00
Ref #19 526E99000 SPECIAL - REINFORCED CONCRETE APPROACH SLABS, AS P, (LUMP SUM)
Awd $35,000.00$35,000.00
2 $31,500.00$31,500.00
3 $35,465.00$35,465.00
4 $45,000.00$45,000.00
5 $45,000.00$45,000.00
6 $40,655.00$40,655.00
Ref #20 530E99030 SPECIAL - STRUCTURE REHABILITATION, (LUMP SUM)
Awd $320,000.00$320,000.00
2 $357,000.00$357,000.00
3 $355,500.00$355,500.00
4 $430,000.00$430,000.00
5 $352,000.00$352,000.00
6 $370,824.50$370,824.50
Section 7 - STRUCTURE REPAIR BRIDGE NO. POR-76-0395 - Totals
Awd $582,500.00
2 $676,500.00
3 $595,181.00
4 $676,000.00
5 $659,750.00
6 $667,110.50
Ref #21 202E99010 SPECIAL - PORTIONS OF STRUCTURE REMOVED, (LUMP SUM)
Awd $110,000.00$110,000.00
2 $148,000.00$148,000.00
3 $64,000.00$64,000.00
4 $50,000.00$50,000.00
5 $95,000.00$95,000.00
6 $122,948.00$122,948.00
123000 - Page 343
Ref #22 512E99000 SPECIAL - SEALING OF CONCRETE, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $18,000.00$18,000.00
3 $18,450.00$18,450.00
4 $12,000.00$12,000.00
5 $20,000.00$20,000.00
6 $27,232.00$27,232.00
Ref #23 513E90000 STRUCTURAL STEEL, MISC.:STEEL BEAM REPAIRS, (500 LB)
Awd $1,500.00$3.00
2 $3,500.00$7.00
3 $1,750.00$3.50
4 $12,500.00$25.00
5 $1,750.00$3.50
6 $2,000.00$4.00
Ref #24 514E99000 SPECIAL - BRIDGE PAINTING, (LUMP SUM)
Awd $137,000.00$137,000.00
2 $133,000.00$133,000.00
3 $152,000.00$152,000.00
4 $145,000.00$145,000.00
5 $175,000.00$175,000.00
6 $148,000.00$148,000.00
Ref #25 519E11100 PATCHING CONCRETE STRUCTURE, (200 SF)
Awd $14,000.00$70.00
2 $6,000.00$30.00
3 $13,000.00$65.00
4 $10,000.00$50.00
5 $6,000.00$30.00
6 $10,000.00$50.00
Ref #26 526E99000 SPECIAL - REINFORCED CONCRETE APPROACH SLABS, AS P, (LUMP SUM)
Awd $37,000.00$37,000.00
2 $32,000.00$32,000.00
3 $35,465.00$35,465.00
4 $48,000.00$48,000.00
5 $45,000.00$45,000.00
6 $41,520.00$41,520.00
Ref #27 530E99030 SPECIAL - STRUCTURE REHABILITATION, (LUMP SUM)
Awd $360,000.00$360,000.00
2 $399,000.00$399,000.00
3 $413,000.00$413,000.00
4 $485,000.00$485,000.00
5 $405,000.00$405,000.00
6 $411,794.00$411,794.00
Section 8 - BRIDGE NO. POR-76-0482 - Totals
Awd $674,500.00
2 $739,500.00
3 $697,665.00
4 $762,500.00
5 $747,750.00
6 $763,494.00
123000 - Page 344
Ref #28 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $11,000.00$11,000.00
3 $22,500.00$22,500.00
4 $11,000.00$11,000.00
5 $4,500.00$4,500.00
6 $20,000.00$20,000.00
Ref #29 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $6,000.00$6,000.00
3 $8,000.00$8,000.00
4 $6,000.00$6,000.00
5 $5,000.00$5,000.00
6 $3,000.00$3,000.00
Ref #30 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $17,000.00$17,000.00
3 $4,000.00$4,000.00
4 $8,000.00$8,000.00
5 $15,000.00$15,000.00
6 $20,500.00$20,500.00
Ref #31 690E20040 SPECIAL - PRELIMINARY DESIGN, (LUMP SUM)
Awd $90,000.00$90,000.00
2 $43,000.00$43,000.00
3 $120,000.00$120,000.00
4 $40,000.00$40,000.00
5 $75,000.00$75,000.00
6 $62,000.00$62,000.00
Ref #32 690E20050 SPECIAL - FINAL DESIGN, (LUMP SUM)
Awd $75,000.00$75,000.00
2 $74,000.00$74,000.00
3 $60,000.00$60,000.00
4 $66,000.00$66,000.00
5 $40,000.00$40,000.00
6 $104,000.00$104,000.00
Ref #33 690E20220 SPECIAL - CONSTRUCTION PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $13,000.00$13,000.00
3 $24,000.00$24,000.00
4 $19,000.00$19,000.00
5 $18,000.00$18,000.00
6 $5,000.00$5,000.00
Ref #100 690E98000 SPECIAL - MISC.:SUE LEVEL A TEST HOLE, (4 EACH)
Awd $1,000.00$250.00
2 $7,200.00$1,800.00
3 $4,800.00$1,200.00
4 $2,000.00$500.00
5 $2,000.00$500.00
6 $2,000.00$500.00
123000 - Page 345
Section 9 - ENGINEERING AND SURVEYING SERVICES - Totals
Awd $208,000.00
2 $171,200.00
3 $243,300.00
4 $152,000.00
5 $159,500.00
6 $216,500.00
Ref #34 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $1,000.00$1,000.00
3 $1.00$1.00
4 $2,500.00$2,500.00
5 $5,000.00$5,000.00
6 $2,000.00$2,000.00
Ref #35 103E99010 SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AN, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $20,000.00$20,000.00
3 $25,620.00$25,620.00
4 $20,000.00$20,000.00
5 $20,000.00$20,000.00
6 $20,000.00$20,000.00
Ref #36 108E99000 SPECIAL - CPM PROGRESS SCHEDULE, (LUMP SUM)
Awd $2,080.00$2,080.00
2 $2,000.00$2,000.00
3 $500.00$500.00
4 $3,500.00$3,500.00
5 $2,500.00$2,500.00
6 $2,000.00$2,000.00
Ref #37 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $45,000.00$45,000.00
2 $24,000.00$24,000.00
3 $40,000.00$40,000.00
4 $45,000.00$45,000.00
5 $50,000.00$50,000.00
6 $62,200.00$62,200.00
Ref #38 619E99000 SPECIAL - FIELD OFFICE, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $7,000.00$7,000.00
3 $6,300.00$6,300.00
4 $12,000.00$12,000.00
5 $14,000.00$14,000.00
6 $15,000.00$15,000.00
Ref #39 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,000.00$5,000.00
3 $7,000.00$7,000.00
4 $10,000.00$10,000.00
5 $13,000.00$13,000.00
6 $25,000.00$25,000.00
123000 - Page 346
Ref #40 624E99000 SPECIAL - MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $40,000.00$40,000.00
3 $40,000.00$40,000.00
4 $40,000.00$40,000.00
5 $40,000.00$40,000.00
6 $100,000.00$100,000.00
Section 10 - INCIDENTALS - Totals
Awd $130,080.00
2 $99,000.00
3 $119,421.00
4 $133,000.00
5 $144,500.00
6 $226,200.00
123000 - Page 347
Project No. 125000
PID 92205
HAM-IR-74-11.21
Non-Federal
Type: MISCELLANEOUS
Completion Date: 8/15/2012
Award Amount: $64,887.85
Contract Awarded To: BARRETT PAVING MATERIALS INC
Letting Date: 1/12/2012
Engineer's Estimate: $60,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BARRETT PAVING MATERIALS INC
600 SHEPHERD AVE
CINCINNATI, OH 45215
Hamilton
Bidder 1
Bid $64,887.85
RACK & BALLAUER EXCAVATING CO INC
11321 PADDY'S RUN RD
HAMILTON, OH 45013
Butler
Bidder 2
Bid $98,150.00
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 3
Bid $104,908.02
SUNESIS CONSTRUCTION CO
2610 CRESCENTVILLE RD
WEST CHESTER, OH 45069
Butler
Bidder 4
Bid $111,021.92
GREAT LAKES CONSTRUCTION CO
2608 GREAT LAKES WAY
HINCKLEY, OH 44233
Medina
Bidder 5
Bid $112,379.00
PRUS CONSTRUCTION COMPANY
5325 WOOSTER RD
CINCINNATI, OH 45226
Hamilton
Bidder 6
Bid $166,384.50
125000 - Page 348
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $2,800.00$2,800.00
2 $2,000.00$2,000.00
3 $7,623.33$7,623.33
4 $4,403.84$4,403.84
5 $5,000.00$5,000.00
6 $12,000.00$12,000.00
Ref #2 202E35100 PIPE REMOVED, 24" AND UNDER, (10 FT)
Awd $35.00$3.50
2 $200.00$20.00
3 $1,130.50$113.05
4 $132.30$13.23
5 $400.00$40.00
6 $200.00$20.00
Ref #3 202E35200 PIPE REMOVED, OVER 24", (60 FT)
Awd $210.00$3.50
2 $4,440.00$74.00
3 $2,339.40$38.99
4 $1,132.80$18.88
5 $2,400.00$40.00
6 $1,500.00$25.00
Ref #4 203E20000 EMBANKMENT, (190 CY)
Awd $2,280.00$12.00
2 $6,650.00$35.00
3 $8,128.20$42.78
4 $4,782.30$25.17
5 $4,750.00$25.00
6 $6,650.00$35.00
Section 1 - ROADWAY - Totals
Awd $5,325.00
2 $13,290.00
3 $19,221.43
4 $10,451.24
5 $12,550.00
6 $20,350.00
Ref #5 659E10000 SEEDING AND MULCHING, (834 SY)
Awd $2,710.50$3.25
2 $1,251.00$1.50
3 $2,085.00$2.50
4 $1,776.42$2.13
5 $3,127.50$3.75
6 $3,336.00$4.00
Ref #6 659E14000 REPAIR SEEDING AND MULCHING, (42 SY)
Awd $42.00$1.00
2 $42.00$1.00
3 $10.50$0.25
4 $11.76$0.28
5 $42.00$1.00
6 $84.00$2.00
125000 - Page 349
Ref #7 659E20000 COMMERCIAL FERTILIZER, (0.11 TON)
Awd $53.35$485.00
2 $55.00$500.00
3 $49.50$450.00
4 $55.59$505.36
5 $55.00$500.00
6 $110.00$1,000.00
Ref #8 659E35000 WATER, (4.5 MGAL)
Awd $45.00$10.00
2 $27.00$6.00
3 $450.00$100.00
4 $505.40$112.31
5 $4.50$1.00
6 $4.50$1.00
Ref #9 832E30000 EROSION CONTROL, (2000 EACH)
Awd $2,000.00$1.00
2 $2,000.00$1.00
3 $2,000.00$1.00
4 $2,000.00$1.00
5 $2,000.00$1.00
6 $2,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $4,850.85
2 $3,375.00
3 $4,595.00
4 $4,349.17
5 $5,229.00
6 $5,534.50
Ref #10 602E20000 CONCRETE MASONRY, (2 CY)
Awd $2,400.00$1,200.00
2 $1,848.00$924.00
3 $2,783.62$1,391.81
4 $5,289.82$2,644.91
5 $4,000.00$2,000.00
6 $600.00$300.00
Ref #11 603E05900 15" CONDUIT, TYPE B, 706.02, (5 FT)
Awd $600.00$120.00
2 $850.00$170.00
3 $2,715.40$543.08
4 $278.65$55.73
5 $1,500.00$300.00
6 $1,000.00$200.00
Ref #12 603E07400 18" CONDUIT, TYPE B, 706.02, (5 FT)
Awd $625.00$125.00
2 $885.00$177.00
3 $2,868.90$573.78
4 $310.10$62.02
5 $1,500.00$300.00
6 $1,000.00$200.00
125000 - Page 350
Ref #13 603E25200 66" CONDUIT, TYPE B, 706.02 (2500 D LOAD), (60 FT)
Awd $34,500.00$575.00
2 $52,140.00$869.00
3 $39,184.80$653.08
4 $42,133.80$702.23
5 $45,000.00$750.00
6 $40,800.00$680.00
Ref #14 604E08600 CATCH BASIN, MISC.:TOP AND GRATE, (1 EACH)
Awd $987.00$987.00
2 $1,097.00$1,097.00
3 $2,493.76$2,493.76
4 $1,100.22$1,100.22
5 $1,600.00$1,600.00
6 $800.00$800.00
Ref #15 604E35501 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN, (1 EACH)
Awd $4,500.00$4,500.00
2 $5,008.00$5,008.00
3 $4,798.27$4,798.27
4 $6,039.23$6,039.23
5 $6,000.00$6,000.00
6 $5,000.00$5,000.00
Section 3 - DRAINAGE - Totals
Awd $43,612.00
2 $61,828.00
3 $54,844.75
4 $55,151.82
5 $59,600.00
6 $49,200.00
Ref #16 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $500.00$500.00
3 $1,835.96$1,835.96
4 $16,438.00$16,438.00
5 $18,000.00$18,000.00
6 $81,000.00$81,000.00
Ref #17 519E11100 PATCHING CONCRETE STRUCTURE, (20 SF)
Awd $1,600.00$80.00
2 $2,400.00$120.00
3 $3,719.20$185.96
4 $2,606.00$130.30
5 $4,000.00$200.00
6 $2,600.00$130.00
Section 4 - STRUCTURE REPAIR - Totals
Awd $5,600.00
2 $2,900.00
3 $5,555.16
4 $19,044.00
5 $22,000.00
6 $83,600.00
125000 - Page 351
Ref #18 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $500.00$500.00
2 $980.00$980.00
3 $603.56$603.56
4 $899.32$899.32
5 $1,000.00$1,000.00
6 $1,200.00$1,200.00
Ref #19 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $13,777.00$13,777.00
3 $16,088.12$16,088.12
4 $7,223.73$7,223.73
5 $8,000.00$8,000.00
6 $2,500.00$2,500.00
Ref #20 624E10000 MOBILIZATION, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $2,000.00$2,000.00
3 $4,000.00$4,000.00
4 $13,902.64$13,902.64
5 $4,000.00$4,000.00
6 $4,000.00$4,000.00
Section 5 - INCIDENTALS - Totals
Awd $5,500.00
2 $16,757.00
3 $20,691.68
4 $22,025.69
5 $13,000.00
6 $7,700.00
125000 - Page 352
Project No. 128000
PID 92384
GUE-IR-70-16.56
Federal
Type: BRIDGE REPAIR
Completion Date: 2/29/2012
Award Amount: $67,215.00
Contract Awarded To: ARMSTRONG STEEL ERECTORS INC
Letting Date: 1/12/2012
Engineer's Estimate: $65,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
ARMSTRONG STEEL ERECTORS INC
50 SOUTH FOURTH ST P O BOX 577
NEWARK, OH 43058
Licking
Bidder 1
Bid $67,215.00
CIVIL CONSTRUCTION INC
10310 STATE ROUTE 161
PLAIN CITY, OH 43064
Madison
Bidder 2
Bid $82,885.18
128000 - Page 353
Ref #1 832E30000 EROSION CONTROL, (2000 EACH)
Awd $2,000.00$1.00
2 $2,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $2,000.00
2 $2,000.00
Ref #2 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C, (10 CY)
Awd $750.00$75.00
2 $1,050.00$105.00
Ref #3 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (10 CY)
Awd $2,000.00$200.00
2 $2,100.00$210.00
Section 2 - MAINTENANCE OF TRAFFIC - Totals
Awd $2,750.00
2 $3,150.00
Ref #4 202E11401 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN(MAIN ME, (264 LB)
Awd $2,640.00$10.00
2 $1,056.00$4.00
Ref #5 202E11401 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN(SECONDA, (146 LB)
Awd $1,022.00$7.00
2 $525.60$3.60
Ref #6 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN, (410 LB)
Awd $3,485.00$8.50
2 $5,391.50$13.15
Ref #7 513E95000 STRUCTURAL STEEL, MISC.:REPAIR OF DAMAGED MAIN OR , (5.9 FT)
Awd $1,003.00$170.00
2 $262.55$44.50
Ref #8 513E95000 STRUCTURAL STEEL, MISC.:REPAIR OF DAMAGED MAIN OR , (8.1 FT)
Awd $6,075.00$750.00
2 $577.53$71.30
Ref #9 513E95030 STRUCTURAL STEEL, MISC.:REPAIR OF DAMAGED MEMBERS,, (4 EACH)
Awd $100.00$25.00
2 $1,050.00$262.50
Ref #10 514E27700 FIELD PAINTING, MISC.:MAIN AND SECONDARY MEMBERS, (160 SF)
Awd $20,640.00$129.00
2 $3,955.20$24.72
Ref #11 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $2,174.00$2,174.00
Ref #12 849E10000 DAMAGE ASSESSMENT, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,050.00$1,050.00
Ref #13 849E10500 SURFACE PREPARATION, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $1,050.00$1,050.00
128000 - Page 354
Ref #14 849E10600 REPAIRING DAMAGED MEMBERS BY GRINDING, (5 HOUR)
Awd $750.00$150.00
2 $820.80$164.16
Ref #15 849E10700 STRAIGHTENING DAMAGED MEMBERS, (LUMP SUM)
Awd $9,000.00$9,000.00
2 $38,980.00$38,980.00
Section 3 - STRUCTURE REPAIR - Totals
Awd $53,215.00
2 $56,893.18
Ref #16 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,250.00$1,250.00
2 $1,225.00$1,225.00
Ref #17 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $11,838.00$11,838.00
Ref #18 624E10000 MOBILIZATION, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $7,779.00$7,779.00
Section 4 - INCIDENTALS - Totals
Awd $9,250.00
2 $20,842.00
128000 - Page 355