![Page 1: O'HARE INTERNATIONAL AIRPORT PLEASE RECYCLE · 2018. 5. 30. · o'hare international airport april 6, 2018 ord- 314.1f.1 argus job no. 17040 g-001 issued for bid - not for construction](https://reader036.vdocuments.site/reader036/viewer/2022071115/5ff4e4d1e77ca9629d635a0d/html5/thumbnails/1.jpg)
O'HARE INTERNATIONAL AIRPORT
APRIL 6, 2018ORD- 314.1F.1
ARGUS JOB NO. 17040
IS
SU
ED
F
OR
B
ID
- N
OT
F
OR
C
ON
ST
RU
CT
IO
N
G-001
PLE
AS
E R
EC
YC
LE
ARGUS CONSULTING, INC.
VAULT MODIFICATIONS PHASE 1 - PACKAGE 1 SUPER SATELLITEISSUED FOR BID
![Page 2: O'HARE INTERNATIONAL AIRPORT PLEASE RECYCLE · 2018. 5. 30. · o'hare international airport april 6, 2018 ord- 314.1f.1 argus job no. 17040 g-001 issued for bid - not for construction](https://reader036.vdocuments.site/reader036/viewer/2022071115/5ff4e4d1e77ca9629d635a0d/html5/thumbnails/2.jpg)
CS-111
EROSION CONTROL NOTES
ORD-314.1F.1 VAULT MODIFICATIONS PHASE 1
PACKAGE 1 SUPER SATELLITE
O'HARE FUEL COMMITTEE
CHICAGO O'HARE INTERNATIONAL AIRPORT
IS
SU
ED
F
OR
B
ID
- N
OT
F
OR
C
ON
ST
RU
CT
IO
N
DRAWING REVISIONS
CO
PY
RIG
HT
©
NO
TIC
E:
TH
IS
D
OC
UM
EN
T IS
T
HE
P
RO
PE
RT
Y O
F A
RG
US
C
ON
SU
LT
IN
G, IN
C. A
ND
IS
N
OT
T
O B
E P
RO
DU
CE
D O
R C
OP
IE
D IN
W
HO
LE
O
R IN
P
AR
T. IT
IS
O
NL
Y T
O B
E U
SE
D F
OR
T
HE
P
RO
JE
CT
A
ND
S
IT
E S
PE
CIF
IC
AL
LY
ID
EN
TIF
IE
D H
ER
EIN
A
ND
IS
N
OT
T
O B
E U
SE
D F
OR
A
NY
O
TH
ER
P
UR
PO
SE
O
R O
N A
NY
O
TH
ER
P
RO
JE
CT
S. IT
M
US
T B
E R
ET
UR
NE
D U
PO
N R
EQ
UE
ST
.P
LE
AS
E R
EC
YC
LE
ARGUS CONSULTING, INC.ARGUS CONSULTING, INC.
P
R
E
L
IM
I
N
A
R
Y
C
O
N
S
T
RU
C
T
I
O
N
NOT FOR
rtmengineering consultants
650 E. Algonquin Rd., Ste 250
Schaumburg, IL. 60173
T.847.756.4180
www.rtmassociates.com
IL. Design Firm No. 184-006777
rtmengineering consultants
SOIL EROSION CONTROL AND SEDIMENT CONTROL NOTES
SOIL EROSION AND SEDIMENT CONTROL (SESC) FEATURES MUST BE CONSTRUCTED PRIOR TO THE COMMENCEMENT OF UPLAND
29.
3.
4.
5.
CONFERENCE, ONE WEEK PRIOR TO LAND DISTURBING ACTIVITY, AS SOON AS THE INITIAL EROSION CONTROL ITEMS ARE
INSTALLED AND ONE WEEK PRIOR TO FINAL INSPECTION.
DISTURBANCE. SOIL DISTURBANCE MUST BE PHASED OR ENACTED IN SUCH A MANNER AS TO MINIMIZE EROSION. SOIL
STABILIZATION MEASURES MUST CONSIDER THE TIME OF YEAR, SITE CONDITIONS AND THE USE OF TEMPORARY AND/OR
PERMANENT MEASURES. DISTURBANCE OF AREAS NOT INCLUDED IN THE DESIGN WILL REQUIRE NOTIFICATION OF THE NCCSCWD
OR KDSWCD IN ACCORDANCE WITH THE 404 PERMIT SPECIAL CONDITIONS.
UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE
INSTALLED AT MINIMUM ACCORDING TO THE STANDARDS AND SPECIFICATIONS IN THE ILLINOIS URBAN MANUAL, REVISED TO
THE EROSION CONTROL SHOWN ON THE PLANS ARE THE MINIMUM REQUIREMENTS. ADDITIONAL MEASURES MAY BE REQUIRED AS
PRIOR TO COMMENCING LAND-DISTURBING ACTIVITIES OTHER THAN THOSE INDICATED ON THE PLANS (INCLUDING BUT NOT
LIMITED TO ADDITIONAL PHASES OF THE DEVELOPMENT AND OFF-SITE BORROW OR WASTE AREAS), A SUPPLEMENTAL EROSION
THE INSTALLATION, MAINTENANCE, REMOVAL AND RESTORATION OF THE AREA DISTURBED BY THE PLACEMENT OF THE PERIMETER
EROSION BARRIER ARE INCLUDED IN THE CONTRACT UNIT PRICE FOR PERIMETER EROSION BARRIER. AFTER ALL PERIMETER
NCCSWCD, OR KDSWCD.
THE CONTRACTOR MUST CONSULT WITH A CERTIFIED PROFESSIONAL IN EROSION AND SEDIMENT CONTROL (CPESC) FOR THE
1) DISTURBED AREAS OF THE PROJECT SITE THAT HAVE NOT BEEN FULLY STABILIZED, 2) STRUCTURAL CONTROL MEASURES (SILT
FENCES, ETC.), AND 3) LOCATIONS WHERE VEHICLES ENTER AND EXIT THE SITE. AN ADDITIONAL INSPECTION OF THE ITEMS LISTED
THE CONTRACTOR AND SUBCONTRACTORS MUST SUBMIT A WRITTEN AND SIGNED (BY CONTRACTOR) STORM WATER POLLUTION
EROSION BARRIER IS REMOVED, THE AREAS DAMAGED BY THE PERIMETER EROSION BARRIER MUST BE RESTORED.
ALL STORM SEWER INLET STRUCTURES MUST BE PROTECTED WITH STORM SEWER INLET PROTECTION (I.E. INLET FILTERS) PER
THE CONTRACTOR MUST MAINTAIN AND PRESERVE ANY EXISTING SUB-SURFACE DRAINAGE SYSTEMS (I.E. FIELD TILES)
CONSTRUCTION ACTIVITIES MUST BE SCHEDULED TO MINIMIZE THE TIME SOIL IS EXPOSED AND UNPROTECTED. IN NO CASE
WILL THE EXISTING VEGETATION BE DESTROYED, REMOVED, OR DISTURBED MORE THAN FOURTEEN (14) DAYS PRIOR TO THE
INITIATION OF IMPROVEMENTS.
GRAVELED ROADS, ACCESS DRIVES, PARKING AREAS OF SUFFICIENT WIDTH AND LENGTH, AND VEHICLE WASH DOWN FACILITIES
TEMPORARY CONSTRUCTION ENTRANCES WILL BE CONSTRUCTED AT ALL LOCATIONS WHERE CONSTRUCTION TRAFFIC ENTERS
OR LEAVES THE SITE.
28.
9.
14.
ON PROJECTS WHICH INCLUDE STREAMWORK OR IN-STREAM WORK, THE CONTRACTOR MUST MAINTAIN AN OIL ABSORBENT BOOM
DOWNSTREAM OF EQUIPMENT IN THE CHANNEL AT ALL TIMES. THE CONTRACTOR MUST REPLACE THE OIL ABSORBENT BOOM
WHEN IT BECOMES SATURATED WITH OIL.
PREVENTION PLAN (SWPPP), MEETING THE REQUIREMENTS OF THE IEPA'S CURRENT NPDES STORM WATER PERMIT FOR
CONSTRUCTION SITE ACTIVITIES, INCLUDING DETAILS OF SPECIFIC DEVICES SUCH AS SILT FENCE, DITCH CHECK, ETC. TO BE
THE CONTRACTOR MUST CLEAN UP, GRADE THE WORK AREA AS THE PROJECT PROGRESSES, AND INSTALL EROSION PROTECTION
TO ELIMINATE THE CONCENTRATION OF RUNOFF, OR MUST INSTALL APPROPRIATE SEDIMENT CONTROL DEVICES TO TRAP SEDIMENT.
STOCK PILES OF SOIL MUST NOT BE LOCATED IN FLOOD PLAINS, RIPARIAN AREAS (VEGETATED FLOOD PLAINS), WETLANDS
AND WATERS OF THE U.S. UNLESS OTHERWISE AUTHORIZED BY THE RELEVANT PERMITTING AUTHORITY. IF A STOCKPILE IS TO
REMAIN IN PLACE FOR MORE THAN THREE DAYS, PERIMETER EROSION BARRIER MUST BE PROVIDED. IF THE STOCKPILE
IS INACTIVE FOR MORE THAN 14 DAYS, SOIL STABILIZATION MUST BE PROVIDED BY THE 7TH DAY AFTER ACTIVITY HAS STOPPED.
ON PROJECTS WHICH INCLUDE STREAM WORK OR IN-STREAM WORK, NO WORK IS ALLOWED BEYOND THE PERMITTED AREA. ANY
WORK WITHIN A STREAM OR DITCH CAPABLE OF CONVEYING WATER MUST BE CONDUCTED IN THE DRY. PROVISIONS MUST BE MADE
TO BY-PASS PUMP OR DEWATER ANY AREAS WITHIN THE STREAM OR DITCH IN WHICH WORK WILL BE CONDUCTED. IN HIGH FLOW
CHANNELS WHERE DE-WATERING IS NOT POSSIBLE OR PRACTICAL, SILT OR SEDIMENT CURTAINS MAY BE INSTALLED PARALLEL
TO THE STREAM BANK. IN NO CASE WILL THE CURTAINS BE INSTALLED PERPENDICULAR TO THE FLOW.
WHEN THE CONSTRUCTION IS COMPLETED, THE SITE HAS BEEN FULLY STABILIZED AND ALL DISCHARGES OF STORMWATER
WHEN FILLING A WETLAND ADJACENT TO A W.U.S., EROSION CONTROL MEASURES MUST BE IN PLACE SO THAT WHEN
FILL MATERIAL IS PLACED, OVERLAND FLOW IS NOT ALLOWED TO ACCUMULATE SEDIMENT AND ENTER W.U.S.
LATEST VERSION AS AMENDED. A COPY OF THE APPROVED STORMWATER POLLUTION PREVENTION PLAN MUST BE MAINTAINED
ON THE SITE AT ALL TIMES.
CONSTRUCTION SCHEDULE WEEKLY MEETING, WILL MODIFY STORM WATER POLLUTION PREVENTION PLAN IF NECESSARY. DEPENDING
ON MODIFICATION TO THE WORK SCHEDULE, THE CONTRACTOR MUST SUBMIT DRAWINGS TO THE NCCSWCD OR KDSWCD FOR REVIEW.
13.
IF THE VOLUME, VELOCITY, SEDIMENT LOAD, OR PEAK FLOW RATE OF STORMWATER RUNOFF ARE TEMPORARILY INCREASED
DURING CONSTRUCTION, THEN PROPERTIES AND SPECIAL MANAGEMENT AREAS DOWNSTREAM FROM SUCH DEVELOPMENT
SITES MUST BE PROTECTED FROM EROSION.
DISCRETION OF NCCSWCD, KDSWCD, OR USACE.
DESIGN AND MAINTENANCE OF SEDIMENTATION BASINS WITH BAFFLE SYSTEM AND TRAPS AS WELL AS POLYMERS AND FLOC LOGS.
COMPLIANCE WITH THE PLAN IN THE FIELD AND AUDIT THE LOGS AND RECORDS REQUIRED BY THE PERMIT.
ABOVE MUST BE MADE WITHIN TWENTY-FOUR (24) HOURS OF A 0.5-INCH OR GREATER RAINFALL OR EQUIVALENT SNOWFALL.
ACCORDING TO THE O'HARE MODERNIZATION PROGRAM DESIGN AND CONSTRUCTION STANDARDS.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
ALL CONTROL MEASURES NECESSARY TO MEET THE REQUIREMENTS OF THE DUPAGE COUNTY COUNTYWIDE
STORMWATER AND FLOOD PLAIN ORDINANCE OR THE WAIVER COMMUNITY ORDINANCE MUST BE KEPT OPERATIONAL
AND MAINTAINED CONTINUOUSLY THROUGHOUT THE PERIOD OF LAND DISTURBANCE UNTIL PERMANENT SEDIMENT
AND EROSION CONTROL MEASURES ARE OPERATIONAL (INCLUDED ONLY IN CONSTRUCTION PROJECTS LOCATED
WITHIN DUPAGE COUNTY).
DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO FILTER BAGS, SEDIMENT TRAPS, SILT TRAPS, OR POLYMER
TREATMENT CHANNELS. FILTERED WATER SHOULD BE DISCHARGED ONTO STABILIZED SURFACE TO PREVENT ADDITIONAL EROSION
AND/OR SEDIMENTATION. DEWATERING DIRECTLY INTO FIELD TILES, STORM WATER STRUCTURES, OR "WATERS OF THE U.S."
IS PROHIBITED.
THE COMMISSIONER IS REQUIRED TO SUBMIT A NOTICE OF INTENT (NOI) TO THE ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
(IEPA) FOR THE PROJECT. THE CONTRACTOR IS NOT PERMITTED TO BEGIN WORK UNTIL 30 DAYS FOLLOWING COMMISSIONER'S
SUBMITTAL OF THE NOI.
BE IN PLACE WITHIN 3 DAYS OF DISTURBANCE AND ANY EMERGENCY SESC MEASURES MUST BE INSTALLED IMMEDIATELY AT THE
CONTROL PLAN MUST BE SUBMITTED TO THE COMMISSIONER FOR REVIEW BY NCCSCWD OR KDSWCD. THE CONTRACTOR BASED ON THE
PAVEMENT MUST BE CLEANED DAILY OR AS NECESSARY TO REMOVE EARTHEN MATERIAL TO THE SATISFACTION OF THE COMMISSIONER,
UTILIZED FOR EROSION AND SEDIMENT CONTROL. THE PLAN MUST BE SUBMITTED AND APPROVED BY THE COMMISSIONER A MINIMUM
OF TEN (10) DAYS PRIOR TO INITIATION OF CONSTRUCTION ACTIVITIES. A COPY OF THE APPROVED SWPPP MUST BE GIVEN TO
THE COMMISSIONER'S REPRESENTATIVE FIVE DAYS PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
THE CONTRACTOR AND COMMISSIONER MUST MAKE INSPECTIONS A MINIMUM OF ONCE EVERY SEVEN DAYS OF THE FOLLOWING:
THE CONTRACTOR AND COMMISSIONER MUST KEEP A WRITTEN REPORT SUMMARIZING THE REQUIRED INSPECTION EACH TIME
AN INSPECTION TAKES PLACE. THE REPORTS MUST BE KEPT AT THE SITE DURING CONSTRUCTION. THE REPORTS
MUST ALSO BE RETAINED FOR THREE YEARS FROM THE DATE THE SITE IS FINALLY STABILIZED.
THE COMMISSIONER'S REPRESENTATIVE MUST NOTIFY THE APPROPRIATE AGENCY FIELD OPERATIONS OFFICE OF THE IEPA BY EMAIL,
TELEPHONE OR FAX WITHIN 24 HOURS OF ANY INCIDENCE OF NONCOMPLIANCE AND MUST FILL OUT AND FILE WITHIN FIVE (5) DAYS
WITH THE EPA AN INCIDENCE OF NONCOMPLIANCE (ION) FORM WHEN REQUIRED BY THE PERMIT.
THE CONTRACTOR MUST COOPERATE WITH THE COMMISSIONER'S REPRESENTATIVES WHO WILL MAKE SITE VISITS TO REVIEW
INLET PROTECTION DETAILS IN THE PLANS. ALTERNATE TYPES OF PROTECTION MAY BE SUBMITTED FOR REVIEW AND APPROVAL
BY THE COMMISSIONER, NCCSWCD OR KDSWCD.
NCCSCWD OR KDSWCD MUST APPROVE SIZE AND NUMBER OF TEMPORARY STREAM CROSSINGS. TEMPORARY STREAM CROSSINGS
MUST BE DESIGNED BY A QUALIFIED ENGINEER SUCH THAT ADDITIONAL FLOODING AND EROSION DO NOT OCCUR. AN APPROVED
TEMPORARY STREAM CROSSING DETAIL IS PROVIDED IN THE CONTRACT DOCUMENTS. IN CASE OF REGULATED WATERWAYS,
A TEMPORARY STREAM CROSSING PERMIT MUST BE OBTAINED FROM THE ILLINOIS DEPARTMENT OF NATURAL RESOURCES - OFFICE
OF WATER RESOURCES (IDNR-OWR) PRIOR TO INSTALLATION. THE COMMISSIONER WILL FACILITATE THE PERMIT APPLICATION
PROCESS THROUGH THE (IDNR-OWR). TEMPORARY STREAM CROSSINGS BUILT IN A REGULATED WATERWAY, MUST BE DESIGNED
AND INSTALLED PER IDNR-OWR PERMIT REQUIREMENTS.
AUTHORIZED BY THE PERMIT HAVE BEEN ELIMINATED, THE CONTRACTOR MUST PROVIDE A LETTER TO THE COMMISSIONER OR
COMMISSIONER'S REPRESENTATIVE STATING THESE FACTS.
AFTER THE SITE HAS BEEN PERMANENTLY STABILIZED AND ANY/ALL STORMWATER DISCHARGES, AUTHORIZED UNDER THE ILR10
PERMIT ARE ELIMINATED, THE COMMISSIONER WILL SUBMIT A COMPLETED NOTICE OF TERMINATION (NOT) SIGNED IN ACCORDANCE
WITH PART VI.G (SIGNATORY REQUIREMENTS) OF THE ILR10 PERMIT TO IEPA.
IF NECESSARY, MUST BE PROVIDED TO PREVENT THE DEPOSIT OF SOIL FROM BEING TRACKED ONTO PUBLIC OR PRIVATE ROADWAYS.
ANY SOIL REACHING PUBLIC OR PRIVATE ROADWAY MUST BE REMOVED IMMEDIATELY.
1.
2.
6.
12.
11.
10.
9.
8.
7.
THE CONTRACTOR SHALL CONTACT THE NORTH COOK COUNTY SOIL AND WATER CONSERVATION DISTRICT (NCCSWCD)
AS APPROPRIATE, ONE WEEK PRIOR TO THE PRE-CONSTRUCTION
DIRECTED BY THE COMMISSIONER'S REPRESENTATIVE OR THE NCCSCWD OR USACE. ALL ADDITIONAL MEASURES MUST
30.ANY STORM SEWERS THAT ARE BEING INSTALLED THAT WILL FUNCTION (EVEN PARTIALLY COMPLETED) MUST BE BLOCKED OFF AT
END OF EACH WORKING DAY.
![Page 3: O'HARE INTERNATIONAL AIRPORT PLEASE RECYCLE · 2018. 5. 30. · o'hare international airport april 6, 2018 ord- 314.1f.1 argus job no. 17040 g-001 issued for bid - not for construction](https://reader036.vdocuments.site/reader036/viewer/2022071115/5ff4e4d1e77ca9629d635a0d/html5/thumbnails/3.jpg)
CS-112
STORMWATER POLLUTION
PREVENTION PLAN
ORD-314.1F.1 VAULT MODIFICATIONS PHASE 1
PACKAGE 1 SUPER SATELLITE
O'HARE FUEL COMMITTEE
CHICAGO O'HARE INTERNATIONAL AIRPORT
IS
SU
ED
F
OR
B
ID
- N
OT
F
OR
C
ON
ST
RU
CT
IO
N
DRAWING REVISIONS
CO
PY
RIG
HT
©
NO
TIC
E:
TH
IS
D
OC
UM
EN
T IS
T
HE
P
RO
PE
RT
Y O
F A
RG
US
C
ON
SU
LT
IN
G, IN
C. A
ND
IS
N
OT
T
O B
E P
RO
DU
CE
D O
R C
OP
IE
D IN
W
HO
LE
O
R IN
P
AR
T. IT
IS
O
NL
Y T
O B
E U
SE
D F
OR
T
HE
P
RO
JE
CT
A
ND
S
IT
E S
PE
CIF
IC
AL
LY
ID
EN
TIF
IE
D H
ER
EIN
A
ND
IS
N
OT
T
O B
E U
SE
D F
OR
A
NY
O
TH
ER
P
UR
PO
SE
O
R O
N A
NY
O
TH
ER
P
RO
JE
CT
S. IT
M
US
T B
E R
ET
UR
NE
D U
PO
N R
EQ
UE
ST
.P
LE
AS
E R
EC
YC
LE
ARGUS CONSULTING, INC.ARGUS CONSULTING, INC.
P
R
E
L
IM
I
N
A
R
Y
C
O
N
S
T
RU
C
T
I
O
N
NOT FOR
rtmengineering consultants
650 E. Algonquin Rd., Ste 250
Schaumburg, IL. 60173
T.847.756.4180
www.rtmassociates.com
IL. Design Firm No. 184-006777
rtmengineering consultants
" TEMPORARY STABILIZATION WITH POLYMER, STRAW MULCH AT A RATE OF 2 TON/ACRE,
OR TEMPORARY SEEDING MUST BE USED TO STABILIZE CONSTRUCTION AREAS WHERE
AT A MINIMUM, SITE EROSION AND SEDIMENT CONTROLS AND OVERALL SITE MANAGEMENT
SHOULD:
* CONTROL STORM WATER VOLUME WITHIN THE SITE TO MINIMIZE SOIL EROSION;
* CONTROL STORM WATER DISCHARGES, INCLUDING BOTH PEAK FLOW RATES AND
TOTAL STORM WATER VOLUME, TO MINIMIZE EROSION AT OUTLETS AND TO
MINIMIZE DOWNSTREAM CHANNEL AND STREAM BANK EROSION;
* MINIMZE THE AMOUNT OF SOIL EXPOSED DURING CONSRUCTION ACTIVITY;
* MINIMIZE THE DISTURBANCE OF STEEP SLOPES;
PRECIPITATION, THE NATURE OF RESULTING STORM WATER RUNOFF, AND SOIL
CHARACTERISTICS, INCLUDING THE RANGE OF SOIL PARTICLE SIZES EXPECTED TO
* ADDRESS FACTORS SUCH AS THE AMOUNT, FREQUENCY, INTENSITY, AND DURATION OF
* PROVIDE AND MAINTAIN NATURAL BUFFERS AROUND SURFACE WTAERS, DIRECT STORM
WATER TO VEGETATED AREAS TO INCREASE SEDIMENT REMOVAL AND MAXIMIZE STORM
WATER INFILTRATION (UNLESS INFEASIBLE);
AND;
* MINIMZE SOIL COMPACTION AND UNLESS INFEASIBLE, PRESERVE TOPSOIL.
THE TOTAL AREA OF THE SITE THAT IS ESTIMATED TO BE DISTURBED BY
THE TOTAL AREA OF THE CONSTRUCTION SITE IS ESTIMATED TO BE 0.70 ACRES.
EXCAVATION, GRADING, EXCAVATION, GRADING OR OTHER ACTIVITIES IS 0.70
ACRES. THE ESTIMATED RUNOFF COEFFICIENT OF THE SITE WILL NOT EXCEED EXISTING
CONDITIONS AFTER CONSTRUCTION ACTIVITIES ARE COMPLETED. THE EXISTING SOIL IS LEAN
CLAY TO SILTY CLAY.
SITE DESCRIPTION
CONSTRUCTION ACTIVITIES MAY BE AS FOLLOWS: (GRUBBING, CLEARING, EXCAVATION,
THIS PLAN HAS BEEN PREPARED TO COMPLY WITH IEPA'S GENERAL NPDES
PERMIT NO. ILR10 FOR STORMWATER DISCHARGES FROM CONSTRUCTION
SITE ACTIVITIES.
THE AERIAL EXTENT OF WETLAND ACREAGE AT THE SITE IS 0.00 ACRES.
EROSION AND SEDIMENT CONTROLS
STABILIZATION PRACTICES: THE FOLLOWING INTERIM AND PERMANENT STABILIZATION
" STABILIZATION OF DISTURBED AREAS MUST, AT A MINIMUM, BE INITIATED
IMMEDIATELY WHENEVER ANY CLEARING, GRADING, EXCAVATING, OR OTHER EARTH
DISTURBING ACTIVITIES HAVE PERMANENTLY CEASED ON ANY PORTION OF THE SITE
AND WILL NOT RESUME FOR A PERIOD EXCEEDING 14 CALENDAR DAYS.
" STABILIZATION OF DISTURBED AREAS MUST BE INITIATED WITHIN 1 WORKING DAY OF
PERMANENT OR TEMPORARY CESSATION OF EARTH DISTURBING ACTIVITIES AND
SHALL BE COMPLETED AS SOON AS POSSIBLE BUT NOT LATER THAN 14 DAYS FROM
THE INITIATION OF STABILIZATION WORK IN AN AREA. EXCEPTIONS TO THESE TIME
FRAMES ARE SPECIFIED AS FOLLOWS:
" WHERE THE INITIATION OF STABILIZATION MEASURES IS PRECLUDED
BY SNOW COVER. STABILIZATION MEASURES SHALL BE INITIATED A SOON
AS PRACTICABLE.
" ON AREAS WHERE CONSTRUCTION ACTIVITY CEASED AND WILL RESUME
AFTER 14 DAYS, A TEMPORARY STABILIZATION METHOD CAN BE USED.
STABILIZATION PRACTICES - IMPLEMENTATION REQUIREMENTS (CONTINUED)
* LIST ADDITIONAL PRACTICES HERE
STABILIZATION MUST BE INITIATED WITHIN 1 DAY OF PERMANENT OR TEMPORARY
CESSATION OF EARTH DISTURBING ACTIVITIES. BOTH MULCH AND/OR TEMPORARY SEEDING
MUST INCLUDE POLYMER IN ADDITION TO THE MIX.
TEMPORARY STABILIZATION. STOCKPILES OF SOIL MUST NOT BE LOCATED IN FLOODPLAINS,
RIPARIAN AREAS (VEGETATIVE FLOODPLAINS), WETLANDS, AND WATER OF THE U.S.
BMPS - POST-CONSTRUCTION STORM WATER MANAGEMENT
PROVIDED BELOW IS A DESCRIPTION OF MEASURES THAT WILL BE INSTALLED DURING THE
CONSTRUCTION PROCESS TO CONTROL THE POLLUTANTS IN STORM WATER DISCHARGES THAT
* INFILTRATION OF ONSITE RUNOFF
THE TECHNICAL GUIDANCE CONTAINED IN THE ILLINOIS URBAN MANUAL, 2012 AND OTHER
ORDINANCES LISTED IN THE SPECIFICATIONS. POST CONSTRUCTION STORM WATER CONTROL
MEASURES SHALL INCLUDE:
USE OF TREATMENT CHEMICALS:
IF POLYMERS, FLOCCULATES, OR OTHER TREATMENT CHEMICALS ARE USED AT THE SITE, THEIR USE
MUST COMPLY WITH THE FOLLOWING MINIMUM REQUIREMENTS:
* SELECT APPROPRIATE TREATMENT CHEMICALS. CHEMICALS MUST BE SELECTED THAT ARE
APPROPRIATELY SUITED TO THE TYPES OF SOILS LIKELY TO BE EXPOSED DURING CONSTRUCTION
AND DISCHARGED TO LOCATIONS WHERE CHEMICALS WILL BE APPLIED, AND TO THE EXPECTED
TURBIDITY, PH, AND FLOW RATE OF STORM WATER FLOWING INTO THE CHEMICAL TREATMENT
SYSTEM OR AREA.
* MINIMIZE DISCHARGE RISK FROM STORED CHEMICALS. STORE ALL TREATMENT CHEMICALS IN
LEAK-PROOF CONTAINERS THAT ARE KEPT UNDER STORM-RESISTANT COVER AND SURROUNDED
BY SECONDARY CONTAINMENT STRUCTURES (E.G. SPILL BERMS, DECKS, SPILL CONTAINMENT
PALLETS), OR PROVIDED EQUIVALENT MEASURES, DESIGNED AND MAINTAINED TO MINIMIZE THE
POTENTIAL DISCHARGE OF TREATMENT CHEMICALS IN STORM WATER OR BY ANY OTHER MEANS
(E.G. STORING CHEMICALS IN COVERED AREA OR HAVING A SPILL KIT AVAILABLE ON SITE).
USE OF TREATMENT CHEMICALS (CONTINUED):
* TREATMENT CHEMICALS AND CHEMICAL TREATMENT SYSTEMS SHOULD BE USED IN
ACCORDANCE WITH GOOD ENGINEERING PRACTICES, AND WITH DOSING
SPECIFICATIONS AND SEDIMENT REMOVAL DESIGN SPECIFICATIONS PROVED BY
THE PROVIDED/SUPPLIER OF THE APPLICABLE CHEMICALS, OR DOCUMENT SPECIFIC
DEPARTURES FROM THESE PRACTICES OR SPECIFICATIONS AND HOW THEY REFLECT
GOOD ENGINEERING PRACTICE.
* MAINTAIN ASSOCIATED MSDS ON SITE.
* ENSURE THAT ALL PERSONS WHO HANDLE AND USE TREATMENT CHEMICALS AT THE
CONSTRUCTION SITE ARE PROVIDE WITH APPROPRIATE, PRODUCT-SPECIFIC
TRAINING. THE TRAINING MUST COVER PROPER DOSING REQUIREMENTS.
PROVIDE AN EXPLANATION OF THE TECHNICAL BASIS USED TO SELECT PRACTICES TO
CONTROL POLLUTION PREVENTION WHERE POST-CONSTRUCTOIN FLOWS WILL EXCEED
PREDEVELOPMENT LEVELS HERE:
CONCRETE WASTE OR WASHOUT SHOULD NOT BE ALLOWED IN THE STREET OR ALLOWED
TO REACH A STORM WATER DRAINAGE SYSTEM OR WATERCOURSE. CONCRETE WASHOUT
SHOULD BE COMPLETED OFF SITE, OR IF ALLOWED ON SITE BY THE PRIMARY CONTACT,
WASHOUT SHOULD BE CONTAINED AND COMPLETED IN A LOCATION DESIGNATED BY THE
PRIMARY OR SECONDARY CONTACT.
INSTALLATION OF THESE DEVICES MAY BE SUBJECT TO SECTION 404 OF THE CLEAN WATER ACT.
WILL OCCUR AFTER THE CONSTRUCTION OPERATIONS HAVE BEEN COMPLETED. THE
ENGINEER SUCH THAT ADDITIONAL FLOODING AND EROSION DOES NOT OCCUR. AN
APPROVED TEMPORARY STREAM CROSSING DETAILS IS PROVIDED IN THE CONTRACT
DOCUMENTS. IN CASE OF REGULATED WATERWAYS, A TEMPORARY STREAM CROSSING
PERMIT MUST BE OBTAINED FROM THE ILLINOIS DEPARTMENT OF NATURAL RESOURCES -
OFFICE OF WATER RESOURCES (IDNR-OWR) PRIOR TO INSTALLATION. THE COMMISSIONER
WILL FACILITATE THE PERMIT APPLICATION PROCESS THROUGH THE (IDNR-OWR).
TEMPORARY STREAM CROSSINGS BUILT IN A REGULATED WATERWAY, MUST BE DESIGNED
AND INSTALLED PER IDNR-OWR PERMIT REQUIREMENTS.
VEHICLE/EQUIPMENT STORAGE, MAINTENANCE, & WASHING:
* STORMWATER DETENTION STRUCTURES (INCLUDING WET PONDS)
* STORMWATER RETENTION STRUCTURES
* SEQUENTIAL SYSTEMS (WHICH COMBINE SEVERAL PRACTICES)
* FLOW AND ATTENUATION BY USE OF OPEN VEGETATED
SWALES AND NATURAL DEPRESSIONS
THE FOLLOWING IS A DESCRIPTION OF THE NATURE OF THE CONSTRUCTION ACTIVITY
OR DEMOLITION WHICH IS THE SUBJECT OF THIS PLAN:
THE PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF A NEW
UNDERGROUND FUEL VAULT AND ASSOCIATED PIPING.
WHICH WILL DISTURB SOIL ON MAJOR PORTIONS OF THE CONSTRUCTION SITE. THE
GRADING, BUILDING INFRASTRUCTURE, ETC.).
THE RECEIVING WATER BODY FOR THIS PROJECT IS: O'HARE SOUTH DETENTION BASIN
CONTROLS:
THIS SECTION OF THE PLAN ADDRESSES THE VARIOUS CONTROLS THAT MUST BE
IMPLEMENTED FOR EACH OF THE MAJOR CONSTRUCTION ACTIVITIES DESCRIBED ABOVE.
FOR EACH MEASURE DISCUSSED, THE CONTRACTOR WILL BE RESPONSIBLE FOR ITS
IMPLEMENTATION AS INDICATED. EACH SUCH CONTRACTOR HAS SIGNED THE REQUIRED
CERTIFICATION ON FORMS WHICH ARE ATTACHED TO, AND ARE A PART OF THIS PLAN.
THE EROSION CONTROL PLAN DRAWINGS INCLUDED DEFINE THE SIZE AND LOCATION OF
THE MEASURES TO BE INSTALLED DURING THE CONSTRUCTION OF THIS PROJECT.
UNLESS OTHERWISE SPECIFIED IN THE ILLINOIS URBAN MANUAL, THE STORM WATER
POLLUTION PREVENTION PLAN MUST BE DESIGNED FOR A STORM EVENT EQUAL TO OR
GREATER THAN A 25-YEAR 24 HOUR RAINSTORM EVENT.
* MINIMIZE SEDIMENT DISCHARGES FROM THE SITE;
BE PRESENT ON SITE;
PRACTICES, AS A MINIMUM, MUST BE IMPLEMENTED TO STABILIZE THE DISTURBED
AREA OF THE SITE:
TEMPORARY SEEDING
* PERMANENT SEEDING
ROLLED EROSION CONTROL PRODUCTS (STRAW MULCH BLANKET, ETC...)
GRANULAR POLYMER STABILIZATION
SOD STABILIZATION
ROCK STABILIZATION
MULCHING/HYDROSEEDING
DUST CONTROL (WATER OR POLYMER)
PRESERVATION OF EXISTING VEGETATION
LIST ADDITIONAL PRACTICES HERE
INTERIM AND PERMANENT STABILIZATION PRACTICES, INCLUDING SITE-SPECIFIC
SCHEDULING OF THE IMPLEMENTATION OF THE PRACTICES ARE INCLUDED IN THIS
STORMWATER POLLUTION PREVENTION PLAN. SITE PLANS MUST ENSURE THAT EXISTING
VEGETATION IS PRESERVED WHERE ATTAINABLE AND DISTURBED PORTIONS OF THE SITE
WILL BE STABILIZED. STABILIZATION PRACTICES MAY INCLUDE: TEMPORARY
STABILIZATION WITH STRAW MULCH, TEMPORARY PRESERVATION OF EXISTING
VEGETATION, AND OTHER APPROPRIATE MEASURES. THE SURFACE OF STRIPPED AREAS
MUST BE PERMANENTLY OR TEMPORARILY PROTECTED FROM SOIL EROSION WITHIN 7
DAYS AFTER FINAL GRADING IS REACHED. TEMPORARY SEDIMENT AND EROSION CONTROL
MEASURES MUST BE MAINTAINED CONTINUOUSLY UNTIL PERMANENT COVER IS
ESTABLISHED. ANY OPEN DITCH OR SWALE MUST BE STABILIZED 24 HOURS AFTER
REACHING FINAL GRADE AND BEFORE CONCENTRATED FLOWS ARE DIVERTED TO THOSE
DITCHES. NO PART OF THE DITCH OR SWALE MUST BE LEFT UNSTABLE FOR MORE THAN
7 DAYS.
STABILIZATION PRACTICES - IMPLEMENTATION REQUIREMENTS
CONSTRUCTION ACTIVITY IS HALTED FOR MORE THAN 14 DAYS. TEMPORARY
" STOCKPILES TO REMAIN IN PLACE MORE THAN 3 DAYS MUST BE SURROUNDED
WITH SILT FENCE AND "TRACK WALKED" UP AND DOWN THE SLOPE TO PREVENT FURTHER
EROSION. STOCKPILES TO REMAIN UNDISTURBED MORE THAN 14 DAYS MUST RECEIVE
" REMOVAL OF EXISTING VEGETATION /TOPSOIL AND GRADING ACTIVITIES
MUST BE CONDUCTED IN A MANNER THAT LIMITS THE AMOUNT OF EXPOSED AREA AT ANY
ONE TIME. WHEN GRADING IS FINAL, PERMANENT SITE STABILIZATION MUST BE
COMPLETED USING PERMANENT SEEDING AND EROSION BLANKET ON SLOPES 4:1 OR
STEEPER AND HYDROMULCH ON SLOPES FLATTER THAN 4:1.
" DUST CONTROL MUST BE ACCOMPLISHED USING WATERING TRUCKS.
STRUCTURAL PRACTICES: THE FOLLOWING STRUCTURAL PRACTICES, AS A MINIMUM,
MUST BE IMPLEMENTED TO CONTROL SEDIMENT FROM THE DISTURBED AREAS ON SITE:
* PERIMETER EROSION BARRIER (SILT FENCE)
* AREA INLET OR CURB INLET PROTECTION
* OUTLET PROTECTION
* STABILIZED CONSTRUCTION ENTRANCE, HAUL ROAD, STAGING AREA
* TEMPORARY OR PERMANENT SEDIMENT BASIN/TRAP
* STABILIZED DIVERSION DITCHES
* POLYMER (FLOC LOG) FILTRATION SYSTEM
* SEDIMENT FILTER BAGS
* CHECK DAMS, ROCK OR OTHER MATERIALS
* RETAINING OR GABION WALLS
* NON-ERODIBLE COFFERDAM
STRUCTURAL PRACTICES MUST BE IMPLEMENTED, TO THE DEGREE ATTAINABLE, TO
DIVERT FLOWS FROM EXPOSED SOILS, STORE FLOWS OR OTHERWISE LIMIT RUNOFF AND
THE DISCHARGE OF POLLUTANTS FROM EXPOSED AREA OF THE SITE. THE
INSTALLATION OF THESE DEVICES MAY BE SUBJECT TO SECTION 404 OF THE CLEAN
WATER ACT.
STRUCTURAL PRACTICES - IMPLEMENTATION REQUIREMENTS
* WATERS OF THE U.S. WITHIN OR ADJACENT TO THE PROJECT MUST BE PROTECTED
WITH PERIMETER EROSION BARRIER.
* ALL STORM SEWER INLET STRUCTURES MUST BE PROTECTED WITH STORM SEWER
INLET PROTECTION (I.E. INLET FILTERS) PER INLET PROTECTION DETAILS IN THE
PLANS. ALTERNATE TYPES OF PROTECTION MAY BE SUBMITTED FOR REVIEW AND
APPROVAL BY THE COMMISSIONER, NCCSWCD OR KDSWCD.
* TEMPORARY SEDIMENT BASINS/TRAPS MUST BE CONSTRUCTED TO COLLECT SEDIMENT
AND HAVE A STABILIZED OUTFALL INSTALLED TO PREVENT ADDITIONAL SEDIMENTATION INTO
THE RECEIVING BODY OF WATER. A STABILIZED SURFACE MUST BE PROVIDED AT THE
DISCHARGE POINT OF PUMPS TO PREVENT SCOURING THE WALLS OF THE BASIN/TRAP.
THE USE OF POLYMERS AND/OR BAFFLES MAY BE REQUIRED IN THE SEDIMENT
BASINS/TRAPS IF THE WATER QUALITY IS NOT IMPROVED SUFFICIENTLY WITH
SEDIMENT BASINS/TRAPS ALONE.
* NCCSCWD OR KDSWCD MUST APPROVE SIZE AND NUMBER OF TEMPORARY STREAM
CROSSINGS. TEMPORARY STREAM CROSSING MUST BE DESIGNED BY A QUALIFIED
* TEMPORARY CONSTRUCTION ENTRANCES AND EXITS MUST BE CONSTRUCTED AT ALL
LOCATIONS WHERE CONSTRUCTION TRAFFIC ENTERS OR LEAVES THE SITE. RUNOFF FROM
HAUL ROADS MUST NOT DRAIN DIRECTLY TO WATERS OF THE U.S.
* COMPLY WITH ILLINOIS URBAN MANUAL, 2012 POLYACRYLAMIDE PRACTICE STANDARDS
THE PRACTICES SELECTED FOR IMPLEMENTATION WERE DETERMINED ON THE BASIS OF
* STORMWATER DETENTION BASINS
* STORMWATER RETENTION STRUCTURES
* UNDERGROUND DETENTION SYSTEMS
* SEPARATORS
* OPEN VEGETATED SWALES & NATURALIZED BASINS
* LIST ADDITIONAL PRACTICES HERE
VELOCITY DISSIPATION DEVICES MUST BE PLACED AT DISCHARGE LOCATIONS AND
ALONG THE LENGTH OF ANY OUTFALL CHANNEL AS NECESSARY TO PROVIDE A
NON-EROSIVE VELOCITY FLOW FROM THE STRUCTURE TO A WATER COURSE SO THAT THE
NATURAL PHYSICAL AND BIOLOGICAL CHARACTERISTICS AND FUNCTIONS ARE
MAINTAINED AND PROTECTED (I.E., MAINTENANCE OF HYDROLOGIC CONDITIONS, SUCH
AS THE HYDROPERIOD AND HYDRODYNAMICS PRESENT PRIOR TO THE INITIATION OF
CONSTRUCTION ACTIVITIES).
* INFILTRATION OF RUNOFF ON SITE
* LIST ADDITIONAL PRACTICES HERE
OTHER CONTROLS
WASTE DISPOSAL: THE SOLID WASTE MATERIALS INCLUDING TRASH, CONSTRUCTION
DEBRIS, EXCESS CONSTRUCTION MATERIALS, MACHINERY, TOOLS AND OTHER ITEMS
MUST BE COLLECTED AND DISPOSED OFF-SITE BY THE CONTRACTOR. THE CONTRACTOR
IS RESPONSIBLE FOR THE ACQUISITION OF THE NECESSARY DISPOSAL PERMITS. BURNING
ON THE SITE WILL NOT BE PERMITTED. NO SOLID MATERIALS, INCLUDING BUILDING
MATERIALS, MUST BE DISCHARGED INTO WATERS OF THE STATE, EXCEPT AS
AUTHORIZED BY A SECTION 404 PERMIT.
ON SITE CONCRETE WASHOUT CONTAINMENT FACILITIES SHOULD BE OF SUFFICIENT VOLUME
TO COMPLETELY CONTAIN ALL LIQUID AND CONCRETE WASTE MATERIALS INCLUDING ENOUGH
CAPACITY FOR ANTICIPATED LEVELS OF RAINWATER. CONTAINMENT FACILITIES SHALL BE
LINED WITH A 30-MIL IMPERMEABLE LINER. THE DRIED CONCRETE WASTE MATERIAL SHOULD
BE PICKED UP AND DISPOSED OF PROPERLY WHEN TWO-THIRDS CAPACITY IS REACHED.
APPLICABLE STATE AND/OR LOCAL WASTE DISPOSAL, SANITARY SEWER OR SEPTIC
SYSTEM REGULATIONS.
THE PROVISIONS OF THIS PLAN MUST ENSURE AND DEMONSTRATE COMPLIANCE WITH
WHENEVER POSSIBLE, VEHICLE AND EQUIPMENT MAINTENANCE AND WASHING SHOULD OCCUR
OFF SITE AT APPROPRIATE AREAS. IF VEHICLE AND EQUIPMENT MAINTENANCE MUST OCCUR
ON SITE, (INCLUDING BOTH ROUTINE MAINTENANCE) REPAIRS AND MAINTENANCE SHOULD BE
MADE WITHIN A DESIGNATED CONTAINMENT AREA TO PREVENT THE MIGRATION OF MECHANICAL
FLUIDS (OIL, ANTIFREEZE, ETC.) INTO WATERCOURSES, WETLANDS OR STORM DRAINS. DRIP
PANS OR ABSORBENT PADS SHOULD BE USED FOR ALL VEHICLE AND EQUIPMENT MAINTENANCE
ACTIVITIES THAT INVOLVE GREASE, OIL, SOLVENTS, OR OTHER VEHICLE FLUIDS. CONSTRUCTION
VEHICLES SHOULD BE INSPECTED FREQUENTLY TO IDENTIFY ANY LEAKS; LEAKS SHOULD BE
REPAIRED IMMEDIATELY OR THE VEHICLE SHOULD BE REMOVED FROM SITE. DISPOSE OF ALL
USED OIL, ANTIFREEZE, SOLVENTS AND OTHER VEHICLE RELATED CHEMICALS IN ACCORDANCE
WITH USEPA AND IEPA REGULATIONS AND PER MATERIAL SAFETY DATA SHEET (MSDS) AND/OR
MANUFACTURER INSTRUCTIONS. CONTRACTORS SHOULD IMMEDIATELY REPORT SPILLS TO
THE COMMISSIONER.
VEHICLE/EQUIPMENT WASH WATER SHOULD BE TREATED IN A SEDIMENT TRAP OR OTHER BMP
THAT WILL PROVIDE EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE. BLOWERS
OR VACUUMS SHOULD BE USED INSTEAD OF RINSE WATER TO REMOVE DRY MATERIALS FROM
VEHICLES WHENEVER POSSIBLE. IF DETERGENTS ARE REQUIRED TO CLEAN VEHICLES OR
EQUIPMENT, BIODEGRADABLE DETERGENTS AND WASH PRODUCTS FREE OF HALOGENATED
SOLVENTS SHOULD BE USED. THE LOCATION OF WASH AREAS SHOULD BE DOCUMENTED ON
THE SITE MAP, AND WORKERS SHOULD BE NOTIFIED OF THE WASH AREAS. DO NOT PERFORM
OTHER ACTIVITIES, SUCH AS VEHICLE REPAIRS, IN A WASH AREA. WHEN NOT IN USE, VEHICLES
UTILIZED ON SITE FOR CONSTRUCTION OPERATIONS SHOULD BE STORED IN A DESIGNATED
AREA OUTSIDE OF THE REGULATORY FLOODPLAIN, AWAY FROM ANY NATURAL OR CREATED
WATERCOURSE, POND, DRAINAGE-WAY OR STORM DRAIN.
THE FOLLOWING IS A DESCRIPTION OF THE INTENDED SEQUENCE OF MAJOR ACTIVITIES
1. INSTALL PERIMETER EROSION BARRIER
2. DEMOLITION, EXCAVATION, GRADING AND TOPSOIL STRIPPING
3. INSTALLATION OF PIPING AND FUEL VAULT
4. RESTORATION OF PAVEMENTS AND LANDSCAPE AREAS WITH SEEDING &
PERMANENT STABILIZATION
![Page 4: O'HARE INTERNATIONAL AIRPORT PLEASE RECYCLE · 2018. 5. 30. · o'hare international airport april 6, 2018 ord- 314.1f.1 argus job no. 17040 g-001 issued for bid - not for construction](https://reader036.vdocuments.site/reader036/viewer/2022071115/5ff4e4d1e77ca9629d635a0d/html5/thumbnails/4.jpg)
CS-113
STORMWATER POLLUTION
PREVENTION PLAN
ORD-314.1F.1 VAULT MODIFICATIONS PHASE 1
PACKAGE 1 SUPER SATELLITE
O'HARE FUEL COMMITTEE
CHICAGO O'HARE INTERNATIONAL AIRPORT
IS
SU
ED
F
OR
B
ID
- N
OT
F
OR
C
ON
ST
RU
CT
IO
N
DRAWING REVISIONS
CO
PY
RIG
HT
©N
OT
IC
E:
TH
IS
D
OC
UM
EN
T IS
T
HE
P
RO
PE
RT
Y O
F A
RG
US
C
ON
SU
LT
IN
G, IN
C. A
ND
IS
N
OT
T
O B
E P
RO
DU
CE
D O
R C
OP
IE
D IN
W
HO
LE
O
R IN
P
AR
T. IT
IS
O
NL
Y T
O B
E U
SE
D F
OR
T
HE
P
RO
JE
CT
A
ND
S
IT
E S
PE
CIF
IC
AL
LY
ID
EN
TIF
IE
D H
ER
EIN
A
ND
IS
N
OT
T
O B
E U
SE
D F
OR
A
NY
O
TH
ER
P
UR
PO
SE
O
R O
N A
NY
O
TH
ER
P
RO
JE
CT
S. IT
M
US
T B
E R
ET
UR
NE
D U
PO
N R
EQ
UE
ST
.P
LE
AS
E R
EC
YC
LE
ARGUS CONSULTING, INC.ARGUS CONSULTING, INC.
P
R
E
L
IM
I
N
A
R
Y
C
O
N
S
T
RU
C
T
I
O
N
NOT FOR
rtmengineering consultants
650 E. Algonquin Rd., Ste 250
Schaumburg, IL. 60173
T.847.756.4180
www.rtmassociates.com
IL. Design Firm No. 184-006777
rtmengineering consultants
MATERIAL STORAGE AND GOOD HOUSEKEEPING:
SOLID WASTE MATERIALS INCLUDING TRASH, CONSTRUCTION DEBRIS, EXCESS CONSTRUCTION
MATERIALS, MACHINERY, TOOLS AND OTHER ITEMS WILL BE COLLECTED AND DISPOSED OF
OFFSITE. THE TRADE/CONTRACTOR IS RESPONSIBLE TO ACQUIRE THE PERMIT REQUIRED FOR
SUCH DISPOSAL. BURNING ON SITE WILL NOT BE PERMITTED. NO SOLID MATERIALS, INCLUDING
BUILDING MATERIALS, SHALL BE DISCHARGED TO WATERS OF THE STATE, EXCEPT AS
AUTHORIZED BY A SECTION 404 PERMIT. ALL WASTE MATERIALS SHOULD BE COLLECTED AND
STORED IN APPROVED RECEPTACLES. NO WASTES SHOULD BE PLACED IN ANY LOCATION OTHER
THAN IN THE APPROVED CONTAINERS APPROPRIATE FOR THE MATERIALS BEING DISCARDED.
THERE SHOULD BE NO LIQUID WASTES DEPOSITED INTO DUMPSTERS OR OTHER CONTAINERS
WHICH MAY LEAK. RECEPTACLES WITH DEFICIENCIES SHOULD BE REPLACED AS SOON AS
POSSIBLE AND THE APPROPRIATE CLEAN-UP PROCEDURE SHOULD TAKE PLACE, IF NECESSARY.
CONSTRUCTION WASTE MATERIAL IS NOT TO BE BURIED ON SITE. WASTE DISPOSAL SHOULD
COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS. CONTRACTORS SHOULD
IMMEDIATELY REPORT ALL SPILLS TO THE PRIMARY CONTACT, WHO SHOULD NOTIFY THE
APPROPRIATE AGENCIES, IF NEEDED.
THE FOLLOWING GOOD HOUSEKEEPING PRACTICES SHOULD BE FOLLOWED ON SITE DURING
THE CONSTRUCTION PROJECT:
* MINIMIZE THE EXPOSURE OF BUILDING MATERIALS, BUILDING PRODUCTS, CONSTRUCTION
WASTE, TRASH, LANDSCAPE MATERIALS, FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS,
SANITARY WASTE AND OTHER MATERIALS ONSITE TO PRECIPITATION AND STORM WATER.
* AN EFFORT SHOULD BE MADE TO STORE ONLY ENOUGH PRODUCT REQUIRED TO DO THE JOB.
* ALL MATERIALS STORED ON SITE SHOULD BE STORED IN A NEAT, ORDERLY MANNER IN THEIR
APPROPRIATE CONTAINERS AND ADEQUATELY PROTECTED FROM THE ENVIRONMENT.
* PRODUCTS SHOULD BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE ORIGINAL
MANUFACTURER’S LABEL.
* SUBSTANCES SHOULD NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY
THE MANUFACTURER.
* OPERATIONS SHOULD BE OBSERVED AS NECESSARY TO ENSURE PROPER USE AND
DISPOSAL OF MATERIALS ON SITE.
* WHENEVER POSSIBLE, ALL OF A PRODUCT SHOULD BE USED UP BEFORE DISPOSING OF
THE CONTAINER.
* MANUFACTURER’S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL SHOULD BE
FOLLOWED.
FOR BUILDING PRODUCTS:
STORE IN DESIGNATED STORAGE AREAS AND PROVIDE EITHER A COVER (E.G.,
PLASTIC SHEETING OR TEMPORARY ROOFS) TO PREVENT THESE PRODUCTS
FROM COMING INTO CONTACT WITH RAINWATER, OR A SIMILARLY EFFECTIVE
MEANS DESIGNED TO PREVENT THE DISCHARGE OF POLLUTANTS FROM THESE
AREAS.
FOR PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, AND LANDSCAPE
MATERIALS:
STORE IN DESIGNATED STORAGE AREAS AND PROVIDE EITHER A COVER (E.G.,
PLASTIC SHEETING OR TEMPORARY ROOFS) TO PREVENT THESE CHEMICALS
FROM COMING INTO CONTACT WITH RAINWATER, OR A SIMILARLY EFFECTIVE
MEANS DESIGNED TO PREVENT THE DISCHARGE OF POLLUTANTS FROM THESE
AREAS. PULTE MUST ALSO COMPLY WITH ALL APPLICATION AND DISPOSAL
REQUIREMENTS INCLUDED ON THE REGISTERED PESTICIDE, HERBICIDE,
INSECTICIDE, AND FERTILIZER LABEL.
FOR DIESEL FUEL, OIL, HYDRAULIC FLUIDS, OTHER PETROLEUM PRODUCTS, AND
OTHER CHEMICALS:
STORE CHEMICALS IN WATER-TIGHT CONTAINERS, AND PROVIDE EITHER A COVER
(E.G., PLASTIC SHEETING OR TEMPORARY ROOFS) TO PREVENT THESE CONTAINERS
FROM COMING INTO CONTACT WITH RAINWATER, OR A SIMILARLY EFFECTIVE MEANS
DESIGNED TO PREVENT THE DISCHARGE OF POLLUTANTS FROM THESE AREAS (E.G.,
SPILL KITS), OR PROVIDE SECONDARY CONTAINMENT (E.G., SPILL BERMS, DECKS, SPILL
CONTAINMENT PALLETS). SPILLS MUST BE CLEANED UP IMMEDIATELY, USING DRY CLEAN-UP
METHODS WHERE POSSIBLE. DO NOT CLEAN THE SURFACES OR SPILLS BY HOSING THE
AREA DOWN. ELIMINATE THE SOURCE OF THE SPILL TO PREVENT A DISCHARGE OR A
CONTINUATION OF AN ONGOING DISCHARGE.
APPROVED STATE OR LOCAL PLANS
THE MANAGEMENT PRACTICES, CONTROLS, AND OTHER PROVISIONS CONTAINED IN THIS
PLAN ARE AT LEAST AS PROTECTIVE AS THE REQUIREMENTS CONTAINED IN THE
PROCEDURES AND STANDARDS FOR URBAN SOIL EROSION AND SEDIMENTATION PLAN THAT
ARE APPLICABLE TO PROTECTING SURFACE WATER RESOURCES ARE, UPON SUBMITTAL OF
A NOTICE OF INTENT TO BE AUTHORIZED TO DISCHARGE UNDER THIS PERMIT,
INCORPORATED BY REFERENCE AND ARE ENFORCEABLE UNDER THIS PERMIT EVEN IF
THEY ARE NOT SPECIFICALLY INCLUDED IN THE PLAN.
ILLINOIS ENVIRONMENTAL PROTECTION AGENCY'S STANDARDS AND SPECIFICATIONS FOR
SOIL EROSION AND SEDIMENT CONTROL, DATED DECEMBER 2012. ILLINOIS
VEGETATION, EROSION AND SEDIMENT CONTROL MEASURES AND OTHER PROTECTIVE
MEASURES IDENTIFIED IN THIS PLAN AND THE OMP STANDARD SPECIFICATIONS P-156
AND T-901 MUST BE MAINTAINED IN GOOD AND EFFECTIVE OPERATING CONDITIONS.
FOR EACH SPECIFIC EROSION AND SEDIMENT CONTROL MEASURE, MAINTENANCE AND
INSPECTION, CONTRACTOR MUST REFER TO THE ILLINOIS URBAN MANUAL STANDARD
PRACTICE.
MAINTENANCE
DISTURBED AREAS OF THE CONSTRUCTION SITE WHICH HAVE NOT BEEN FINALLY
DISTURBED AREAS AND AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO
PRECIPITATION MUST BE INSPECTED FOR EVIDENCE OF OR THE POTENTIAL FOR,
POLLUTANTS ENTERING THE DRAINAGE SYSTEM. EROSION AND SEDIMENT CONTROL
MEASURES IDENTIFIED IN THE PLAN MUST BE OBSERVED TO ENSURE THAT THEY ARE
OPERATING CORRECTLY. WHERE DISCHARGE LOCATIONS OR POINTS ARE ACCESSIBLE,
THEY MUST BE INSPECTED TO ASCERTAIN WHETHER EROSION CONTROL MEASURES ARE
EFFECTIVE IN PREVENTING SIGNIFICANT IMPACTS TO RECEIVING WATERS. LOCATIONS
WHERE VEHICLES ENTER OR EXIT THE SITE MUST BE INSPECTED FOR EVIDENCE OF
OFF-SITE SEDIMENT TRACKING.
NAME(S) AND QUALIFICATIONS OF PERSONNEL MAKING THE INSPECTION, THE DATE(S)
OF THE INSPECTION, MAJOR OBSERVATIONS RELATING TO THE IMPLEMENTATION OF
THIS STORMWATER POLLUTION PREVENTION PLAN, AND ACTIONS TAKEN. THE REPORT
MUST BE MADE AND RETAINED AS PART OF THE PLAN FOR AT LEAST THREE (3) YEARS
AFTER THE DATE OF THE INSPECTION. THE REPORT MUST BE SIGNED IN ACCORDANCE
IF ANY VIOLATION OF THE PROVISIONS OF THIS PLAN IS IDENTIFIED DURING THE
CONDUCT OF THE CONSTRUCTION WORK COVERED BY THIS PLAN, THE RESIDENT
ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
DIVISION OF WATER POLLUTION CONTROL
ATTN: COMPLIANCE ASSURANCE SECTION
1021 NORTH GRAND AVENUE EAST
POST OFFICE BOX 19276
SPRINGFIELD, IL 62794-9276
INSPECTIONS
THE COMMISSIONER AND CONTRACTOR MUST PROVIDE QUALIFIED PERSONNEL TO INSPECT
ENGINEER OR COMMISSIONER'S REPRESENTATIVE MUST NOTIFY THE APPROPRIATE AGENCY
FIELD OPERATIONS OFFICE OF THE IEPA BY EMAIL, TELEPHONE OR FAX WITHIN 24 HOURS
OF ANY INCIDENCE OF NON-COMPLIANCE (ION) OR FOR VIOLATIONS OF ANY CONDITION
OF THE PERMIT. ADDITIONALLY, THE COMMISSIONER'S REPRESENTATIVE MUST FILE WITHIN
5 DAYS, FORMS PROVIDED BY THE ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
AND WILL INCLUDE SPECIFIC INFORMATION ON THE CAUSE OF NONCOMPLIANCE, ACTIONS
WHICH WERE TAKEN TO PREVENT FURTHER CAUSES OF NONCOMPLIANCE, AND A
STATEMENT DETAILING ANY ENVIRONMENTAL IMPACT WHICH MAY HAVE RESULTED
FROM THE NONCOMPLIANCE. ALL REPORTS OF NONCOMPLIANCE MUST BE SIGNED
BY A RESPONSIBLE AUTHORITY IN ACCORDANCE WITH PART VI.G OF THE GENERAL PERMIT.
THE REPORT OF NONCOMPLIANCE MUST BE MAILED TO THE FOLLOWING ADDRESS:
AT THE DISCRETION OF THE COMMISSIONER, NCCSWCD, KDSWCD, OR UNITED STATES ARMY CORPS
OF ENGINEERS (USACE), VIOLATIONS FOUND DURING INSPECTIONS MUST BE CORRECTED
WITHIN SEVEN (7) DAYS IF MINOR, THREE (3) DAYS IF MODERATE, AND IMMEDIATELY IF SEVERE.
STABILIZED, STRUCTURAL CONTROL MEASURES, DISCHARGE POINTS, AND LOCATIONS
WHERE VEHICLES ENTER OR EXIT THE SITE. SUCH INSPECTIONS MUST BE CONDUCTED
AT LEAST ONCE EVERY 7 DAYS AND WITHIN 24 HOURS OF THE END OF A STORM, OR BY THE
END OF THE FOLLOWING BUSINESS OR WORK DAY, THAT IS 0.5 INCHES OR GREATER.
INSPECTIONS MAY BE REDUCED TO ONCE PER MONTH WHEN CONSTRUCTION ACTIVITIES
HAVE CEASED DUE TO FROZEN CONDITIONS. INSPECTIONS MUST COMMENCE WHEN
CONSTRUCTION ACTIVITIES ARE CONDUCTED, OR IF THERE IS A 0.5 INCHES OR GREATER
RAIN EVENT, OR DISCHARGE DUE TO SNOWMELT OCCURS.
WITH PART VI.G OF THE ILR10 GENERAL PERMIT.
DURING DEWATERING OPERATIONS, WATER MUST BE PUMPED INTO FILTER BAGS,
SEDIMENT TRAPS OR SILT TRAPS. FILTERED WATER MUST BE DISCHARGED ONTO
STABILIZED SURFACE TO PREVENT ADDITIONAL EROSION AND SEDIMENTATION.
* WATERS USED TO CONTROL DUST
* POTABLE WATER SOURCES INCLUDING UNCONTAMINATED WATERLINE FLUSHINGS
* LANDSCAPE IRRIGATION DITCHES
* WATERS USED TO WASH VEHICLES WHERE DETERGENTS ARE NOT USED
ROUTINE EXTERNAL BUILDING WASHDOWN WHICH DOES NOT USE
DETERGENTS
PAVEMENT WASHWATERS WHERE SPILLS OR LEAKS
OF TOXIC OR HAZARDOUS MATERIALS MAY HAVE NOT OCCURRED
(UNLESS ALL MATERIAL HAS BEEN REMOVED) AND DETERGENTS
ARE NOT USED
UNCONTAMINATED AIR CONDITIONING CONDENSATE
SPRINGS
UNCONTAMINATED GROUND WATER
FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED
WITH PROCESS MATERIALS SUCH AS SOLVENTS
THE PLAN MUST IDENTIFY AND ENSURE THE IMPLEMENTATION OF APPROPRIATE POLLUTION
PREVENTION AND EROSION AND SEDIMENT CONTROL MEASURES FOR THE NON-STORMWATER
COMPONENTS OF THE DISCHARGE.
NON-STORMWATER DISCHARGES
THE FOLLOWING NON-STORM WATER DISCHARGES MAY BE AUTHORIZED PROVIDED THE
NON-STORM WATER COMPONENT OF THE DISCHARGES IS IN COMPLIANCE WITH PART IV.D.5
OF THE ILR10 PERMIT:
FIRE HYDRANT FLUSHING
DISCHARGES FROM FIREFIGHTING ACTIVITES
THE FOLLOWING NON-STORM WATER DISCHARGES ARE PROHIBITED:
CONCRETE AND WASTEWATER FROM WASHOUT OF CONCRETE (UNLESS MANAGED BY
AN APPROPRIATE CONTROL)
* DRYWALL COMPOUND
* WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO AND PAINT
* FORM RELEASE OILS
* CURING COMPOUNDS
* CONSTRUCTION MATERIALS, FUELS, OILS, OR OTHER POLLUTANTS USED IN
VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE
* SOAPS, SOLVENTS, OR DETERGENTS
* TOXIC OR HAZARDOUS SUBSTANCES FROM A SPILL OR OTHER RELEASE
* OR ANY OTHER POLLUTANT THAT COULD CAUSE OR TEND TO CAUSE WATER POLLUTION
THE CONTRACTOR MUST PREPARE REPORT SUMMARIZING THE SCOPE OF THE INSPECTION,
![Page 5: O'HARE INTERNATIONAL AIRPORT PLEASE RECYCLE · 2018. 5. 30. · o'hare international airport april 6, 2018 ord- 314.1f.1 argus job no. 17040 g-001 issued for bid - not for construction](https://reader036.vdocuments.site/reader036/viewer/2022071115/5ff4e4d1e77ca9629d635a0d/html5/thumbnails/5.jpg)
CS-114
SWPPP - CERTIFICATION,
LEGEND & SCHEDULE
ORD-314.1F.1 VAULT MODIFICATIONS PHASE 1
PACKAGE 1 SUPER SATELLITE
O'HARE FUEL COMMITTEE
CHICAGO O'HARE INTERNATIONAL AIRPORT
IS
SU
ED
F
OR
B
ID
- N
OT
F
OR
C
ON
ST
RU
CT
IO
N
DRAWING REVISIONS
CO
PY
RIG
HT
©
NO
TIC
E:
TH
IS
D
OC
UM
EN
T IS
T
HE
P
RO
PE
RT
Y O
F A
RG
US
C
ON
SU
LT
IN
G, IN
C. A
ND
IS
N
OT
T
O B
E P
RO
DU
CE
D O
R C
OP
IE
D IN
W
HO
LE
O
R IN
P
AR
T. IT
IS
O
NL
Y T
O B
E U
SE
D F
OR
T
HE
P
RO
JE
CT
A
ND
S
IT
E S
PE
CIF
IC
AL
LY
ID
EN
TIF
IE
D H
ER
EIN
A
ND
IS
N
OT
T
O B
E U
SE
D F
OR
A
NY
O
TH
ER
P
UR
PO
SE
O
R O
N A
NY
O
TH
ER
P
RO
JE
CT
S. IT
M
US
T B
E R
ET
UR
NE
D U
PO
N R
EQ
UE
ST
.P
LE
AS
E R
EC
YC
LE
ARGUS CONSULTING, INC.ARGUS CONSULTING, INC.
P
R
E
L
IM
I
N
A
R
Y
C
O
N
S
T
RU
C
T
I
O
N
NOT FOR
rtmengineering consultants
650 E. Algonquin Rd., Ste 250
Schaumburg, IL. 60173
T.847.756.4180
www.rtmassociates.com
IL. Design Firm No. 184-006777
rtmengineering consultants
CO
NT
RA
CT
OR
M
US
T R
ET
AIN
A
S
IG
NE
D
AN
D A
PP
RO
VE
D C
OP
Y O
F T
HE
S
WP
PP
ON
T
HE
JO
B S
IT
E A
T A
LL T
IM
ES
.
JAN.
INSPECTION AND MAINTENANCE SCHEDULE
* **
*** **
**
*
FEB. MAR. APR. MAY JUNE JULY AUG. OCT. NOV. DEC.SEPT.
PROPOSED WORK SCHEDULE
SOIL PROTECTION SCHEDULE
SWPPP OPERATOR CERTIFICATION STATEMENT
SW
PP
P O
PE
RA
TO
RS
UB
-C
ON
TR
AC
TO
R
CONTRACTOR CERTIFICATION
AG
EB
GT
P
AGGREGATE COVER
EROSION BLANKET
M MULCHING
PAVING
GEO-TEXILE FABRIC
PM POLYMER (POWDERED FORM)
LA LINED APRONOUTLETS
DS
PS
SO
TS
DORMANT SEEDING
PERMANENT SEEDING
PLANTS, TREES, & SHRUBSPTS
SODDING
TEMPORARY SEEDING
VF VEGETATIVE FILTER
FL
PM
SP SUMP PIT AND FILTER BAG
POLYMER (FLOC LOG FORM)
POLYMER (POWDERED FORM)
JN JUTE NETTING
ABOVE GROUND INLET PROTECTION
DT
SE
DUST AND TRAFFIC CONTROL
STABILIZED CONST. ENTRANCE
CULVERT INLET PROTECTION - STONE
RS CONSTRUCTION ROAD STABILIZATION
IPA
IPB
IPC
SF SILT FENCE
XS
ST
EXCAVATED SEDIMENT BASIN
TEMPORARY SEDIMENT TRAPS
CD
DIVERSIONS RD
CHANNEL DIVERSION
RIDGE DIVERSION
SD TEMPORARY SLOPE DRAIN
GC
RC
RR
SL
ROCK CHECK DAM - RIP RAP
SEDIMENT LOG
GEOSYNTHETIC CHECK STRUCTURE
SS
UD
STORM SEWER
UNDERDRAIN
CW
TO
TEMPORARY CONCRETE WASHOUT
TOPSOILING
LC
VC
LINED CHANNEL
VEGETATIVE CHANNEL
SSS
VSS
CC
MULCH
POLYMERS
STABILIZATION TYPE
TYPE 3 - DORMANT SEED MIX
TEMPORARY SEEDING
EROSION BLANKET / HYDROMULCH
STABILIZATION DURING CONSTRUCTION MAINTENANCE
RESPONSIBLE PARTYACTIVITY
VEGETATION MAINTENANCE
VEGETATION AND STABILIZATION MAINTENANCE DEPARTMENT OF AVIATION
COMPLETION OF CONTRACT
ONGOING AFTER CONSTRUCTION COMPLETION
CONTRACTOR
TYPE 1:
TYPE 2:
TYPE 3:
TEMP. SEEDING:
FINAL STABILIZATIONDESCRIPTION OF CONSTRUCTION ACTIVITIESMOBILIZATION / IMPLEMENT EROSION CONTROL
TYPE 2 - LATE FALL SEED MIX
TYPE 1 - OMP PERMANENT SEED MIX
DURATION
STABILIZATION DURING CONSTRUCTION-OBSERVATION
NO
TE
:
COMMISSIONER
COMMISSIONER
FO
R P
UR
PO
SE
S O
F T
HIS
N
OT
E, S
WP
PP
IN
CLU
DE
S:
1. A
LL S
OIL E
RO
SIO
N A
ND
S
ED
IM
EN
T C
ON
TR
OL P
LA
N S
HE
ET
S A
ND
D
ET
AILS
2. G
RA
DIN
G P
LA
NS
3. E
XIS
TIN
G C
ON
DIT
IO
NS
A
ND
D
EM
OLIT
IO
N P
LA
NS
4. U
TILIT
Y P
LA
NS
S
HO
WIN
G D
RA
IN
AG
E A
ND
S
TO
RM
S
EW
ER
S
YS
TE
MS
5. ILR
10 N
PD
ES
IN
SP
EC
TIO
N R
EP
OR
TS
6. A
SS
OC
IA
TE
D S
PE
CIF
IC
AT
IO
NS
WITH THE
APPROVAL
OF DIRECTOR
OR UNTIL
GROUND
FREEZES
"I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND THE TERMS AND CONDITIONS OF THE GENERAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT
ILR10 THAT AUTHORIZES THE STORM WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY FROM THE CONSTRUCTION SITE IDENTIFIED AS PART OF THIS CERTIFICATION."
"I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACHMENTS WERE PREPARED UNDER MY DIRECTION OR SUPERVISION IN ACCORDANCE WITH A SYSTEM
DESIGNED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHERED AND EVALUATED THE INFORMATION SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS
WHO MANAGE THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE INFORMATION, THE INFORMATION IS, TO THE BEST OF MY KNOWLEDGE AND BELIEF,
TRUE, ACCURATE, AND COMPLETE. I AM AWARE THAT THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING THE POSSIBILITY OF FINE AND
IMPRISONMENT FOR KNOWING VIOLATIONS."
GE
NE
RA
L
CO
NT
RA
CT
OR
WIT
NE
SS
ED
BY
O
WN
ER
TALL FESCUE @ 325 LBS/ACRE (FOR OMP PERMANENT SEED MIX TALL FESCUE VARIETIES, REFER TO OMP SPECIFICATION
T-901 SEEDING (AIRSIDE) OR SPECIFICATION 02931 SEEDING AND HYDRO-MULCHING LANDSIDE / OUTSIDE AIRPORT PROPERTY)
TALL FESCUE @ 250 LBS/ACRE AND PERENNIAL RYE @ 75 LBS/ACRE
TALL FESCUE @ 300 LBS/ACRE AND PERENNIAL RYE @ 75 LBS/ACRE
PERENNIAL RYE 25 LBS/ACRE AND CEREAL RYE 90 LBS/ACRE, OR PERENNIAL RYE @
25 LBS/ACRE AND SPRING OATS @ 90 LBS/ACRE FOR TEMPORARY SEEDING, EROSION
CONTROL BLANKET/HYDROMULCH, MULCH AND POLYMERS, REFER TO OMP SPECIFICATION P-156
CONTROL
MEASURE
GROUP
CONTROL MEASURE CONTROL MEASURE CHARACTERISTICS
TE
MP
OR
AR
Y
PE
RM
AN
EN
T
KE
Y
PROVIDES SOIL COVER ON ROADS AND PARKING LOTS AND AREAS
WHEREVEGETATION CANNOT BE ESTABLISHED. PREVENTS MUD FROM BEING
PICKEDUP AND TRANSPORTED OFF-SITE.
ADDED INSURANCE OF A SUCCESSFUL TEMPORARY OR PERMANENT SEEDING.
CONTROLS UNWANTED VEGETATION AND PRESERVES MOISTURE. PROVIDESCOVER
WHERE VEGETATION CANNOT BE ESTABLISHED.
PROTECTS THE SOIL SURFACE FROM RAINDROPIMPACTS AND OVERLAND FLOW
DURING THE ESTABLISHMENT OF VEGETATION.REDUCES SOIL MOISTURE LOSS DUE
TO EVAPORATION.
PROVIDES PERMANENT COVER ON PARKING LOTS AND ROADS OR OTHER
AREASWHERE VEGETATION CANNOT BE ESTABLISHED.
NON-
VEGETATIVE
SOIL COVER
- X
X X
X X
X
X X
A PERMEABLE GEOSYNTHETIC FABRIC USED TO ENHANCE WATER MOVEMENT
AND RETARD SOIL MOVEMENT; AND AS A BLANKET TO ADD REINFORCEMENT
AND SEPARATION
A WATER SOLUBLE POLYACRYLAMIDE (PAM) IN POWDER FORM, USED
FOR EROSION CONTROL WHEN BROADCASTED ON DISTURBED SOIL.
X
X -
X X
PROTECTS DOWNSTREAM CHANNELS AND FLAT AREAS FROM HIGH VELOCITY
OF FLOW DISCHARGING FROM STRUCTURES.
PROVIDES QUICK TEMPORARY COVER TO CONTROL EROSION WHEN
PERMANENTSEEDING IS NOT DESIRED OR TIME OF YEAR IS INAPPROPRIATE.
QUICK PERMANENT COVER TO CONTROL EROSION. QUICK WAY TO
ESTABLISHVEGETATION FILTER STRIP. CAN BE USED ON STEEP SLOPES OR
INDRAINAGEWAYS WHERE SEEDING MAY BE DIFFICULT.
SAME AS PERMANENT SEEDING EXCEPT IS DONE DURING DORMANT SEASON.
HIGHER RATES OF SEED APPLICATION ARE REQUIRED.
PROVIDES PERMANENT VEGETATIVE COVER TO CONTROL EROSION,
FILTERSSEDIMENT FROM WATER. MAY BE PART OF FINAL LANDSCAPE PLAN.
PROVIDES GROUND COVER, SHRUBS AND TREES IN ADDITION TO
PERMANENTVEGETATION. MAY BE USED AS PART OF A FINAL LANDSCAPE PLAN
ALONGWITH SHRUBS AND TREES.
VEGETATIVE
SOIL COVER
X X
- X
X -
- X
X X
USED ALONG DRAINAGEWAYS OR PROPERTY LINES TO FILTER SEDIMENT
FROMRUNOFF. SIZE MUST BE INCREASED IN PROPORTION TO DRAINAGE AREA.
X X
TEMPORARY PRACTICE TO REMOVE EXCESSIVE WATER FROM EXCAVATIONWITH
IMPROVED WATER QUALITY AND WITHOUT SEDIMENT
X -
X -
X -
A WATER SOLUBLE POLYACRYLAMIDE (PAM) USED IN FLOWING CONDITIONS
TO REMOVE SUSPENDED SEDIMENT FROM STORM WATER.
A WATER SOLUBLE POLYACRYLAMIDE (PAM) IN POWDER FORM, USED IN
CONJUNCTION WITH FLOC LOGS AND JUTE IN FLOWING CONDITIONS, TO
REMOVE SUSPENDED SEDIMENT.
A NATURAL FIBER MESH USED FOR EROSION AND SEDIMENT CONTROL.MAY BE USED
IN COMBINATION WITH POLYMERS AND FLOC LOGS TOREMOVE SUSPENDED
SEDIMENT FROM STORM WATER.
X -
DEWATERING
INLETPROTECTION
PREVENT MUD FROM BEING PICKED UP AND CARRIED OFF-SITE.
PREVENTS DUST FROM LEAVING CONSTRUCTION SITE.
X -
X -
X -
X X
X X
BELOW GROUND INLET PROTECTION
(INLET BASKET)
X -
STABILIZATION OF TEMPORARY CONSTRUCTION ACCESS ROUTES TO REDUCE
EROSION OF TEMPORARY ROADBEDS AND PARKING AREAS.
MUD &
DUST CONTROL
TEMPORARY PRACTICE TO CONTROL SEDIMENT AT STORM DRAIN INLET FOR
INSIDE DISTURBED DRAINAGE AREAS.
TEMPORARY PRACTICE TO CONTROL SEDIMENT AT STORM DRAIN INLET FOR
ALL CONCRETE AND PAVED SURFACES.
TEMPORARY PRACTICE TO CONTROL SEDIMENT AT CULVERT INLETS.
X -
PERIMETER
CONTROL
USED FOR SINGLE LOTS OR DRAINAGE AREAS LESS THAN 1/2 ACRE TO
CONTROLSEDIMENT FROM RUNOFF.
X -
X -
A TEMPORARY PONDING BASIN, WITH OUTLET STRUCTURE, FORMED BY
CONSTRUCTION OF AN EMBANKMENT OR EXCAVATED BASIN TO TEMPORARILY
DETAIN SEDIMENT-LADEN RUNOFF FROM LARGER DISTURBED AREAS. USED
WHEN DRAINAGE AREA IS GREATER THAN 5 ACRES.
A TEMPORARY PONDING BASIN FORMED BY CONSTRUCTION OF AN EMBANKMENT
OR EXCAVATED BASIN TO TEMPORARILY DETAIN SEDIMENT-LADEN RUNOFF FROM
SMALL, DISTURBED AREAS. USED WHEN DRAINAGE AREA IS LESS THAN 5 ACRES.
TEMPORARY
SEDIMENT
BASINS/
TRAPS
X X
X X
TYPICALLY USED AT TOP OR BASE OF SLOPES. USED WHEN EXCESS SOILIS NOT AVAILABLE.
TYPICALLY USED ABOVE SLOPES. USED WHERE AN EXCESS OF SOILIS AVAILABLE.
X -
A TUBING OR CONDUIT TO CONVEY CONCENTRATED RUNOFF DOWN A SLOPE
WITHOUT CAUSING EROSION ON OR BELOW THE SLOPE.
ROCK CHECK DAM - COARSE
AGGREGATE
TEMPORARY PRACTICE TO REDUCE VELOCITY AND TRAP SEDIMENT
X -
X -
X -
X -
TEMPORARY PRACTICE TO REDUCE VELOCITY AND TRAP SEDIMENT.
A ROCK DAM CONSTRUCTED ACROSS A SWALE OR DITCH TO REDUCE THE
VELOCITY OF CONCENTRATED STORM WATER FLOWS. TO BE USED WHEN
EACH DAM HAS A DRAINAGE AREA OF LESS THAN 2 ACRES.
A ROCK DAM CONSTRUCTED ACROSS A SWALE OR DITCH TO REDUCE THE
VELOCITY OF CONCENTRATED STORM WATER FLOWS. TO BE USED WHEN
EACH DAM HAS A DRAINAGE AREA OF LESS THAN 10 ACRES.
CHECK
DAMS
--
DITCH
CHECKS
ENCLOSED
DRAINAGE
CAN BE USED TO CONVEY SEDIMENT LADEN WATER TO SEDIMENT BASIN OR IN
CONJUNCTION WITH A WATERWAY.
USED TO LOWER WATER TABLE AND INTERCEPT GROUNDWATER FOR BETTER
VEGETATION GROWTH AND SLOPE STABILITY. USED TO CARRY BASE FLOW IN
WATERWAYS AND TO DEWATER SEDIMENT BASINS.
X X
X X
X -
X X
OTHER
A DEVICE USED TO MANAGE LIQUID AND SOLID WASTES FROM CONCRETE
USAGE ON CONSTRUCTION SITES.
METHODS OF PRESERVING AND USING TOPSOIL TO PROVIDE A SUITABLE GROWTH
MEDUIM FOR SITE STABILIZATION WITH VEGETATION.
VEGETATIVE STREAMBANKSTABILIZATION
PROTECTS STREAMBANKS FROM THE EROSIVE FORCE OF FLOWING WATER AND
PROVIDES NATURAL, PLEASING APPEARANCE
PROVIDED ADDED STABILITY TO CHANNEL. USED WHEN VELOCITY OF FLOWIS NOT
EXTREMELY FAST.
PROTECTS STREAMBANKS FROM EROSIVE FORCE OF FLOWING WATER
USED WHEN VEGETATION WILL NOT PROTECT THE CHANNEL AGAINST
HIGHVELOCITIES OF FLOW OR WHERE VEGETATION CANNOT BE ESTABLISHED.
X X
- X
X X
- X
WATERWAYS -XTEMPORARY CREEK CROSSING
A TEMPORARY STRUCTURE INSTALLED ACROSS A WATERCOURSE TO ALLOW
CONSTRUCTION VEHICLES TO CROSS WITHOUT CAUSING SEDIMENTATION,
STREAMBED DAMAGE, OR FLOODING.
STRUCTURAL STREAMBANK
STABILIZATION - RIPRAP/GABIONS
MIS
CE
LL
AN
EO
US
RU
NO
FF
C
ON
TR
OL
SE
DIM
EN
T C
ON
TR
OL
ER
OS
IO
N C
ON
TR
OL
X
XXX DAYS XXX DAYS XXX DAYS
AP
PLIC
AB
LE
AT LEAST ONCE EVERY 7 CALENDAR DAYS AND
WITHIN 24 HOURS OF THE END OF A RAIN EVENT,
OR BY THE END OF THE FOLLOWING BUSINESS
OR WORK DAY, THAT IS 0.5 INCHES OR GREATER.
AT LEAST ONCE EVERY 7 CALENDAR DAYS AND
WITHIN 24 HOURS OF THE END OF A RAIN EVENT,
OR BY THE END OF THE FOLLOWING BUSINESS
OR WORK DAY, THAT IS 0.5 INCHES OR GREATER.
SIGNATURE
COMPANY
TITLE
DATE
SIGNATURE
COMPANY
TITLE
DATE
SIGNATURE
COMPANY
TITLE
DATE
SIGNATURE
COMPANY
TITLE
DATE
RESPONSIBLE FOR
![Page 6: O'HARE INTERNATIONAL AIRPORT PLEASE RECYCLE · 2018. 5. 30. · o'hare international airport april 6, 2018 ord- 314.1f.1 argus job no. 17040 g-001 issued for bid - not for construction](https://reader036.vdocuments.site/reader036/viewer/2022071115/5ff4e4d1e77ca9629d635a0d/html5/thumbnails/6.jpg)
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
DROP INLET PROTECTION
PERMANENT SEEDING
WITH 4" TOPSOIL
EROSION CONTROL LEGEND
STANDARD EROSION CONTROL
BLANKET
SILT FENCE
CS-121
EROSION CONTROL PLAN
ORD-314.1F.1 VAULT MODIFICATIONS PHASE 1
PACKAGE 1 SUPER SATELLITE
O'HARE FUEL COMMITTEE
CHICAGO O'HARE INTERNATIONAL AIRPORT
IS
SU
ED
F
OR
B
ID
- N
OT
F
OR
C
ON
ST
RU
CT
IO
N
N
DRAWING REVISIONS
CO
PY
RIG
HT
©
NO
TIC
E:
TH
IS
D
OC
UM
EN
T IS
T
HE
P
RO
PE
RT
Y O
F A
RG
US
C
ON
SU
LT
IN
G, IN
C. A
ND
IS
N
OT
T
O B
E P
RO
DU
CE
D O
R C
OP
IE
D IN
W
HO
LE
O
R IN
P
AR
T. IT
IS
O
NL
Y T
O B
E U
SE
D F
OR
T
HE
P
RO
JE
CT
A
ND
S
IT
E S
PE
CIF
IC
AL
LY
ID
EN
TIF
IE
D H
ER
EIN
A
ND
IS
N
OT
T
O B
E U
SE
D F
OR
A
NY
O
TH
ER
P
UR
PO
SE
O
R O
N A
NY
O
TH
ER
P
RO
JE
CT
S. IT
M
US
T B
E R
ET
UR
NE
D U
PO
N R
EQ
UE
ST
.P
LE
AS
E R
EC
YC
LE
ARGUS CONSULTING, INC.ARGUS CONSULTING, INC.
P
R
E
L
IM
I
N
A
R
Y
C
O
N
S
T
RU
C
T
I
O
N