*official 1 public disclosure authorized 0; ?(ju1mentsiji filedear sirs and mesdames: this refers to...
TRANSCRIPT
*OFFICIAL 10; ?(jU1MENTSiJ
ISupplemental Letter
OFFICE NATIONAL DE L'ELECTRICITE ET DE L'EAU POTABLE
bepteyhLec AR, 2013
International Bank for Reconstructionand Development1818 H Street, N.W.Washington, D.C. 20433United States of America
Re: Loan No. 7564-MA(Office National de l'Electricit6 et de 1' Eau Potable (ONEE) Support Project (formerly,Office National de l'Electricit6 (ONE) Support Project))Project Monitoring Indicators
Dear Sirs and Mesdames:
This refers to the provisions of Section II.A. of Schedule 2 to the Loan Agreement between the
International Bank for Reconstruction and Development (Bank) and Office National de l'Electricit6 et de 1'
Eau Potable (the Borrower) for the above-captioned Project.
The Borrower hereby confirms to the Bank that the indicators set forth in the attachment to this
letter shall serve as a basis for the Borrower to monitor and evaluate the progress of the Project and the
achievement of the objective thereof.
This Supplemental Letter replaces and supersedes the Supplemental Letter No.2 dated June 23,2008 signed by Office National de l'Electricit6.
Very truly yours,
OFFICE NATIONAL DE L'ELECT ET DE L'EAU POTABLE
ByAut orized resentative
Attachment
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Attachment ISupplemental Lett(
Project Monitoring IndicatorsOffice National de l'Electricitk et de I'Eau Potable (ONEE) Support Project
PDO Project Outcome Indicators Use of Project OutcomeInformation
Increase efficiency and reliability 1.reduced transmission losses Input to assess achievement of
of electricity supply the PDO
2. reduction of un-served energyMonitoring by ONE of the
3. electricity savings due to CFLs performance (efficiency and
deployment reliability) of the transmissionand distribution system.Annual Report and other ONEstatistical documents
Input to the ImplementationCompletion Report
Intermediate Outcomes Intermediate Outcome Use of Intermediate Outcome
Indicators Monitoring
Targeted Beneficiaries reached Direct Project Beneficiaries Assessment, by both ONEE
(Core indicator) (number), of which female (%) PMU and Bank, of progresstowards achievement of PDO
Progress in implementation of Transmission lines constructed Assessment, by both ONE PMU
the transmission and distribution under the project- (Km) and Bank, of progress towards
infrastructure Number of substations added achievement of PDO andformulation of corrective actionsif needed
Progress in marketing CFLs Number of CFLs distributed Assessment of progress towardsachievement of PDO and
formulation of corrective actionsif needed
Progress in implementing the TA Progress in tariff, Assessment of progress towards
subcomponents contractualisation and VER achievement of PDO and
studies formulation of corrective actionsif needed
i~ LI. 11u~AI1t. 1,at - A IL I,1UIt..CLLu1 V allU IVU IIIIII,IIL%,U III E,i ay at %., UItIJP%,u- ~. UI %,~ i zaLVLI nav%,Y a n%,vv 3%,I#IUUIALU I%J L~.uiiiut u AM,.
extension of the closing date and realistically track project implementation of sub-components that have been delayed.
Project Development Objective (PDO):
The objective of the Project is to increase the efficiency and reliability of electricity supply to electricity consumers.
Revised Project Development Objective:
No changes to the PDO.
D=Dr Cumulative Target Values**
oppedPDO C=Co Data Respons
Level , ntinue Unit o Basel Freq Source ibility
tesults o N= Measu Bae uenc / for Data
ndcat i New re 2008 2009 2010 2011 2012 2013 2014 2015 y Metho Collecti
ors* dology on
R=Revised
ndicatr One:lectricransmision StatistiDsses Annu calor ] R % 4.7% 3% al Report ONEE
[HV s.nd HV;rid400ond 225
ndicat)rrwo: Statistiknnual MW 400 Annu cal
mserve R h 832.7 MWh al Report ONEE
I5mergy'or60(V MV
rid (inlWh) ___
Number of
CFLsplaced
andensuin
gelectric
itysaving
s(progre
ndicat ssr reports'hree:lectric 472.7 Assum
GW . (cumulat Annu ptions:avings R GW 0 47.5 304.7 419.1 440.1 450.4 ed total al - P for ONEE.ue to h of untilconvenIFLs 2134.5) 2012 tionaleploy lampsnent = 85W
in (averajWh) ge)
- Timeof useper day= 3.5hours(average)- P forCFL =18W- Life
4
cycle =
10,000hoursNumbe
r ofCFLsplaced
andensuin
gelectric
itysaving
S
ndicat (progre
r ss
Iour: Annu reports
'eak al, )ower (recur Assum
avings R MW 0 182.9 192 192 rent ptions :
ue to MW MW MW from - P for
FLs 2014 conven
eploy onwa tional
rient rd) lamps
in = 85W
AW) (average)- Timeof useper day= 3.5hours(average)- P forCFL=18W
5
- _- Lifecycle =
10,000hours
(milladicat(ml
ion),r of
ivte X whic 0 0 0 0 0 0 0 0 30(51) ONEE
roject femenefic aletries
INTERMEDIATE RESULTS
D=Dr Cumulative Target Values**
opped Respon
PDO C=Co Data sibility
Level , ntinue Unit of Basel Freq Source/ for
eesults N= Measu Be 2009 2010 2011 2012 2013 2014 2015 nenc Method Data
ndicat New re ology Collect
ors* ion
=Revised L I
I I
Intermediate Result (Component One - Infrastructure Investments):
1. Progress in implementation of the transmission and distribution infrastructure
Revised Intermediate Result (Component One- Infrastructure Investments):
Unchanged
ntermeHate 13% of 40 %of 67% 88% of 100%of
Tesult total line total line of total the line Annu
ndicat -1 Text No total line (120 al Progress ONEE
>r line 100% 66% line km) until Reports
f:One Studies of Topograp 60%M 2012
'ine 400 Environm hic 60% ounting 40%
'cV_ ental studies Civil comple Unrollin
6
louble impact + complete works ted grcuit) 33%Topo d comp + +fediou graphic + leted 60% 100%Re
I2- studies 40%Civil + Unrolli ception)
hane + works 40% ng
(120 22%Suppl + Moun
W) - y and 44%Supp ting
'K-01 delivery ly and +delivery 33%S
upplyanddelive
ry
Fiterme Studies Studie Studies
iate and s and and
,esult Civil Civil Civil
ndicat Work: I Work Work: 1
r 0%(SI) :60% 00%
:Two and 35% (Sl) (Sl)
ines (S2) and +
'00 kV + 85% Supply:
single Supply: (S2) 100%
ircuit) 10% + (Sl)(Si) and Suppl + Every
oafiEss R Text lno 30% y: Mounti seme pors ONEE
rouira (S2) 55% ng: 90% ster+ (SI) (SI) and
'hamai Mounti and 100%
(2x55 ng: 0% 80% (S2)
m) (SI) and (S2) Tests
IND 15% + and
:onnect (S2) Moun Commis
on of ting: sioning:
ine 400 40% 50%
CV (Sl) (S2)
'double and Tests __I
7
rcuit) 65% and
hane (S2) Commissioning:
hicha 100%
va to (Si)
ibstati
'hamai- TK-
terme 13% of 40 %of 67% 88%of 95%of 100%of
ate total line total line of total the line the line
lesul total line (1*70+ 6 (1*70+ 6
idicat 100% 66%*Top line km) km)
r Studies of ographic 60%
:One Environm studies 60% Mounti 35% 5%
ne 225 ental complete Civil ng Unrollin Unrollin
V impact + d works comple g g
iouble 33%Topo + comp ted + +
ircuit) graphic 40%Civil leted + 90% 10%
. studies+ works+ + 60% Receptio Receptio
.hamai No 22%Suppl 44%Supp 40% Unrolli n n
I nlun y and ly and Moun ng Annu Progress'ensift R Text n delivery delivery ting al Reports ONEE
'0 km) conne 33%
IND ction Suppl,onnec y and
ion of delive
ines ry!25kVsingle-ircuit)-hichaua -
forfLasar and I
8
hichava -ouged2, toibstati
'hamai
Studies Studie Studiesand s and andCivil Civil CivilWork: 1 Work Work: 10%(SI) :60% 00%and 35% (SI) (SI)
uterme (S2) and +
Vate + 85% Supply:
tesult Supply: (S2) 100%
ndicat 10% + (SI)
r (SI)and Suppi +
t:One 30% y:55% Mounti
ine 400 (S2) (SI) ng: 90% EveryNo + and (SI) and Seme Progress O
double R Text line Mounti 80% 100% Ste Reports NEE
ircuit) ng: 0% (S2) (S2) ster(SI) and + Tests
hicha 15% Moun and
ua - (S2) ting: Commis
Igadir 40% sioning:
1x160 (SI) 50%and (S2)65% Tests(S2) and
Commissioning:
100%
-(SI)
6% of 35% of 65% 79% of 95% of 100% of
total total of total total totaliterme substation substatio total substat substati substatiae n subst ion on onesull 100%Stud ation (2*450 (2*450idicat ies of 66%Topo 57% MVA) MVA)r Environm graphic 60% Mounti:Cham ental studies Civil ng 10% 4%ia No impact complete works Mountin Mountinwbstati subst + d comp g g"- ation 33%Topo + leted + +00/225 O C Text and graphic 40% + 80% 20%V & no studies Civil 29% Control Controlrtensio exten works+ Moun & essays & essays
of sion 57%Supp ting Receptio Receptioubstati ly and + n n
ns delivery 43%Slediou upplya and and'ensift delive
ry
32% of 95% of 100total total %ofsubstation substatio total
Fte n subst
tiat 100% ation
resuk Studies of 66%Civil (2*70ondica No Environm works + MA Annu Progress
r:arD Text subst ental 100% )al Reports ONE3:Dar ation impact + Mountingouazz 100%Top +100% 100%
ographic Control, starti?25/22 studies essays & ngV + Receptio
33%Civil nworks + 1
10
+ 50%Supp50%Suppl ly andy and deliverydelivery
Studies Studiesand andCivil CivilWork:9 Work: 1
iterme 5% 00%
Iate Supply: Supply:esult 90% 100%dica+ +
r No Mounti Mounti:Subst R Text subst ng: 50% ng: Annu Progress ONEE
tion ation 100% al Reports
0/22 TestsV in and)ar Commis)uledZi sioning:louh 100%
FinalReception
Studies Finaland receptio
nierme Civil n?iate Work:1esukt 00%
rndicat Supply:
?:Subst R Text subst 100% Annu Progress ONEEiinain+
al Reportsvtion ation Mut
50122Mounti50/22ngcV in 100%
Tamans Tests
9urt andCommis
11
*
sioning:100%
Intermediate Result (Component One - Infrastructure Investments):
2. Progress in marketing CFLs
Intermediate Result (Component One - Infrastructure Investments):
Unchanged
itermefateesult 4,800,00
idRtNum 4,500 4,573,47 0 Annu Progressr R ber 40,000 004 installed, 20 0ONEE
:berb,010 al Reports:Numb installed 200,000
rof in stock
'FLslaced _
Intermediate Result (Component One - Infrastructure Investments):
3. Progress in establishing the trading desk
Intermediate Result (Component One - Infrastructure Investments):
DroppedSoftware Hardware
uternow selected andand RFP software
fesult NO launched installedndiat D trading Hardware and Annu Progress
desk, selected tested al Reports ONE
0:Pro operati Trading
,ress in onal deskmnplem operationntation al
Intermediate Result (Component Two - Technical Assistance):
4. Progress in implementing the technical assistance subcomponents
Revised Intermediate Result (Component Two - Technical Assistance):
Unchanged
12
rterme TORs
ate complete
esult d and
idicat agreed
r with
1:Pro Bank
ress No Studies OE
gmpar R studies c Annu Progress
ito launch d al Reports
ie ed
rocuretentlan of4eifferenstudies
13
%The World Bank 1818 H Street N.W. (202) 473-1000
INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD
INTERNATIONAL DEVELOPMENT ASSOCIATION U.S.A. Cable Address: INDEVAS
La.pb i -e AR ,2013
Mr. Ali Fassi Fihri r
Director GeneralOffice National de I'Electricit6 et de I'Eau PotableAvenue Belhassan El Ouazzani10002 RabatKingdom of Morocco
Excellency:
Re: Kingdom of Morocco - Loan Assumption and Amendment Agreement- Loan
Number 7564-MA(Office National de l'Electricit6 et de I' Eau Potable (ONEE) Support Project
(formerly, Office National de l'Electricitk (ONE) Support Project))
Enclosed are the following documents regarding the above-mentioned Loan, which are
delivered to you as the authorized representative of the Office National de l'Electricite et de l'Eau
Potable (the Borrower):
1. one signed original of the Loan Assumption and Amendment Agreement of even
date herewith, between the Borrower and the International Bank for
Reconstruction and Development (the Bank); and
2. one signed original of the Supplemental Letter re: Article VI of the General
Conditions, Financial and Economic Data
Please confirm, on behalf of the Borrower, receipt of the documents listed above, by
signing the enclosed copy of this letter.
Sincerely yours,
Simon GrayDirector, Maghreb Department
Middle East & North Africa Region
Enclosures
RECENED BY: ad TName and Title