office of research and development | office of railroad policy and development dr. john tunna...
Post on 21-Dec-2015
218 views
TRANSCRIPT
Office of Research and Development | Office of Railroad Policy and Development
FRA ResearchProgram Overview
FRA ResearchProgram Overview
Dr. John TunnaDirector
Office of Research & DevelopmentOffice of Railroad Policy & Development
Office of Research and Development | Office of Railroad Policy and Development 2
Content
• Organizational structure• Strategic goals• Facilities and equipment• Core research program
• Project selection• Current projects
• High Speed & Intercity Passenger Rail research program• Priorities• Current status
• Evaluation• Looking forward
Office of Research and Development | Office of Railroad Policy and Development 3
Office of Railroad Policy and Development
Office of Passenger and Freight Programs
Director, Paul Nissenbaum
Grant Management DivisionChief, MaryAnn McNamara
Credit Programs DivisionChief, Barbara Amani
Environment and Systems Planning Division
Chief, David Valenstein
Engineering and Project Development Division
Chief, Leonard Evans
Financial and Economic Analysis Division
Chief, Neil Moyer
Program Development and Strategy Division
Chief, Rebecca Reyes-Alicea (Acting)
Surface Transportation Intermodal Program
Strategic Forecasting and Environmental Issues
International Affairs
Rail Data Analysis
Office of Railroad Policy and DevelopmentAssociate Administrator, Mark E. Yachmetz
Office of Research and Development
Director, John Tunna
Office of PolicyDirector,
Scott Greene (Acting)
Track Research DivisionChief, Gary Carr
Signals, Train Control, and Communications DivisionChief, Sam Alibrahim, P.E.
Human Factors Research Staff
Equipment and Operating Practices Division
Chief, Kevin Kesler
Project Development and Delivery
Director, Corey Hill
Office of Research and Development | Office of Railroad Policy and Development
Equipment and Operating
Practices DivisionChief, Kevin Kesler
Signals, Train Control & Communications
DivisionChief, Sam Alibrahim, P.E.
Office of Research and Development
Office of Research and Development
Director, Dr. John Tunna
Track ResearchDivision
Chief, Gary Carr
8 Staff Members including Human Factors Research Staff led by Tom Raslear, Ph.D.,
3 Staff Members 6 Staff Members
Office of Research and Development | Office of Railroad Policy and Development 5
Fit with D.O.T.’s Strategic Goals
• Safety• Highest statutory and programmatic priority
• Livable Communities• Noise and vibration, closing grade crossings
• State of good repair• Rail corridor inspection and assessment, understanding rail asset life cycles
(including defect initiation and growth rates)
• Economic competitiveness• Increasing capacity, workforce development
• Environmental sustainability• Higher fuel efficiency locomotives with fewer carbon emmissions
Office of Research and Development | Office of Railroad Policy and Development 6
R&D Facilities and Equipment
TTC DOTX-218
CTIL
Office of Research and Development | Office of Railroad Policy and Development
Core Research Program Areas
7
Track Research Division
• Track and Structures• Track / Train Interaction• Operations / Facilities
Equipment and Operating Practices
• Rolling Stock And Components• Locomotives• Energy, Efficiency and Environment• Human Factors• Hazardous Materials
Signals, Train Control and Communications
• Signals and Train Control (Including PTC)• Grade Crossing• Communications
~150 projectstypically $40M/year
Track & Structures
Signals, Train Control & Comms
Equipment & Operating Practices
Office of Research and Development | Office of Railroad Policy and Development
Identification and Selection of Core Research Projects
Program Concept
(PM*)
DevelopQUADSheet
Accidenthistory
Stakeholders(RRs, unions)
Accident investigations
ProjectExecution
ImprovedSafety…
ProgramManagerRating
R&DManagement
Rating
ResolveDifferences
SteeringCommittee
(not yet implemented)
ProjectRanking,
Prioritization
*PM: Program Manager
ProjectSelection
8
Office of Research and Development | Office of Railroad Policy and Development
High Speed and Intercity Passenger Rail Research - $25M in FY 2010
Broad Agency Announcement priorities
9
• Equipment• 125 mph non-electric locomotive• 125+ mph passenger equipment• Vehicle weight and unsprung mass
reduction• High-speed truck – passenger and freight• Train occupant protection
• Human factors• Interface with controls and displays• Cab environment• Employee training for new technology
and operations
• Track & structures• Autonomous and efficient inspection• Materials and construction• Improved turnout performance• Corridor hardening• Modeling and simulation software
• Train control• Grade crossing protection• Capacity improvements• Interoperable wireless
communications• Positive Train Control (PTC)
integration and enhancements
Office of Research and Development | Office of Railroad Policy and Development
High Speed and Intercity Passenger Rail Program Status – 3/9/2011
10
Supplier contacts 80+
Concept papers submitted 50
Concept papers accepted 21
Concept papers rejected 18
Proposals submitted 18
Proposals accepted 15
Awards to date 1
HSR R&D Account $25.0M
Obligated to date $1.24M
Committed to date $7.15M
Account Balance $16.61M
Office of Research and Development | Office of Railroad Policy and Development
Evaluation – TRB Review Panel
• Annual review and evaluation of FRA’s R&D program
• Covers program management, allocation of resources among program areas, outreach to customers and stakeholders, project selection criteria, and project management
• Also provides direction to the FRA R&D program, and comments on the substance of the research program areas
• A copy of the 2009 review letter report is available on the R&D section of the FRA website www.fra.dot.gov
• The letter report from the December 2010 Review will be available on March 21, 2011
11
Office of Research and Development | Office of Railroad Policy and DevelopmentSource: FRA Safety Database
Evaluation Metrics
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
2004 2005 2006 2007 2008 2009
Acc
iden
ts p
er M
illio
n Tr
ain
Mile
s
YEAR
Equipment
Human Factors
Grade Crossing
Misc. (excl. GC)
Signal
Track
Reportable train accidents
Cause Category
Office of Research and Development | Office of Railroad Policy and Development 13
Looking Forward
• FRA’s 5-year Strategic Research and Development Plan – summer 2011• Increased focus on safety risk analysis• Continued improvement on program evaluation