office of planning and development …...parish of ascension office of planning and development...
TRANSCRIPT
![Page 1: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/1.jpg)
PARISH OF ASCENSIONOFFICE OF PLANNING AND DEVELOPMENT
PLANNING DEPARTMENTPlanning Commission
February 8, 2017 - 6:00 PMCourthouse East, 2nd Floor, Council Meeting Room
Gonzales, Louisiana
AGENDA
1. Call to Order
2. Roll Call of Members
3. Pledge of Allegiance
4. Introduction of Staff
5. Chairman's Comments
6. General Business
7. Minutes
(A) Approval or Denial of the Minutes and Written Decisions ofthe January 11, 2017 Planning Commission Meeting
8. Consent Agenda
(A) Affidavit of Mortgage DeclarationLyman P. Abadie, Jr. - Lot 2B (42044 Hwy 931, Gonzales, LA)
9. Public Hearing to Approve or Deny the Following Preliminary Plats:
(A) Germany Oaks - Phase 2Quality Engineering & Surveying, LLC(Council District 11)
10.Public Hearing to Approve or Deny the Following Subdivision FinalPlat:
(A) Silver Oaks PUD -Phase IQuality Engineering & Surveying, LLC(Council District 9)
11.Staff Report
12.Engineering Staff Report
13.Adjourn
![Page 2: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/2.jpg)
Description: Approval or Denial of the Minutes and Written Decisions of theJanuary 11, 2017 Planning Commission Meeting
ATTACHMENTS:Description Upload Date TypeMinutes and Written Decisions of Jan 11 2017 PlanningComm 1/27/2017 Cover Memo
Attachments A thru D of Minutes 1.11.17 1/27/2017 Cover Memo
![Page 3: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/3.jpg)
The below minutes and written decisions are taken from the meeting to represent items addressed and actions
taken by this board. All meetings are recorded with video and audio for our records. In the event these
minutes and written decisions are ever in question or controversy, the audio/video archive shall be used to
determine the actual item or action taken by individuals present at this meeting.
MINUTES AND WRITTEN DECISIONS
PLANNING COMMISSIONS
January 11, 2017
The Planning Commission of the Parish of Ascension held a Public Meeting on Wednesday,
January 11, 2017 at 6:00 p.m. in the Courthouse East Meeting Room, Gonzales, Louisiana in a
regular session convened.
I. Meeting was Called to Order
Meeting was called to order by Chairman Matthew Pryor.
II. Roll Call of Members
The following members were present:
Douglas Foster, Aaron Chaisson, Anthony Christy, Matthew Pryor, Morrie Bishop,
Edward Dudley, Julio Dumas
The following members were absent:
None
III. Pledge of Allegiance
IV. Introduction of Staff
Stacie Webb – Secretary, Planning and Development
Cody Martin – Legal Counsel
Eric Poche – Planner
Jerome Fournier – Director of Planning and Development
Lance Brock – Zoning Official
Shaun Sherrow – Engineering Review Agent
Chairman Pryor expressed both Councilman John Cagnolatti and Councilman Doc
Satterlee are in attendance as well.
Chairman Pryor made an announcement that the only item that is on the Joint Planning and
Zoning agenda has been pulled. This meeting will be following the Planning Commission
meeting. There will still be a public hearing if anyone wants to speak since the meeting was
published, but no action will be taken by the Commission on that item.
The Chairman stated he would like a motion to move the agenda item for “Election of Chairman
and Vice Chairman for 2017” up to be placed on the agenda before the “Chairman’s Comments”.
Commission Action: Moved by Mr. Morrie Bishop, seconded by Mr. Julio Dumas and
unanimously adopted, to move the agenda item for “Election of Chairman and Vice Chairman
for 2017” before the “Chairman’s Comments” on this agenda.
![Page 4: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/4.jpg)
Planning Commission Minutes
January 11, 2017
Page 2
V. General Business
A) Election of Chairman and Vice-Chairman for 2017
Commission Action: A motion was made by Mr. Julio Dumas to nominate Mr.
Matthew Pryor to remain as Chairman of the Planning Commission for 2017.
Motion was seconded by Mr. Edward Dudley and unanimously adopted.
Commission Action: A motion was made by Mr. Morrie Bishop to nominate Mr.
Anthony Christy as Vice-Chairman of the Planning Commission for 2017.
Motion was seconded by Mr. Julio Dumas and unanimously adopted.
VI. Chairman’s Comments
Chairman Pryor expressed that he is looking forward to a very productive year in
2017 and gave a brief summary on the following:
- Infrastructure Spending Bill from Federal Government
- Transportation Master Plan
- Comprehensive Land Use Plan
VII. Approval or Denial of the Minutes and Written Decisions of the December 14,
2016 Planning Commission Meeting
Commission Action: Moved by Mr. Morrie Bishop, second by Mr. Anthony Christy
and unanimously adopted, to approve the December 14, 2016 Planning Commission
Minutes and Written Decisions as presented.
VIII. Consent Agenda
A) Affidavit of Mortgage Declaration
Darla Villar Bruno – Lot 9 (14521 George Rouyea Rd, Gonzales, LA)
Commission Action: Moved by Mr. Edward Dudley, seconded by Mr. Julio Dumas
and unanimously adopted, to approve the consent agenda.
IX. Public Hearing to Approve or Deny the Following Family Partition:
A) Percy Pierce, Sr. Property – Lots 15-A and 15-B
The subject property is located on the east side of Mark Pierce Road near the
corner of Mark Pierce Road and Pierce Road approximately 875 feet west of S.
St. Landry Ave. in Council District 3 and is zoned Light Industrial (LI). The
application is on behalf of Jerome A. Gollop by Earles and Associates, LLC
Surveyors.
The owner is proposing a family partition of existing Lot 15(1.00 acres) into
Lot(s) 15-A (.50 acres) and 15-B (.50 acres). The applicant will retain Lot 15-A,
and transfer Lot 15-B to his son. Both lots have existing frontage on a public
ROW (Mark Pierce Road) and include a 12’ utility servitude as required.
![Page 5: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/5.jpg)
Planning Commission Minutes
January 11, 2017
Page 3
STAFF REVIEW COMMENTS
Comments sent to Earles and Associates by email on 12-06-16:
1. Must request waiver for minimum lot size per section 17-2046.D. Lots do not
contain minimum of one-half (1/2) acre.
2. Add the statement, “This project is subject to sewer development and traffic
impact fees in accordance with Ascension Parish ordinances.”
3. Show dimension to Property Line or set corner(s) at ROW Line. Five (5) foot
offset shown from west property line to edge of ROW as per Reference No. 2,
Instrument No. 590485.
The owner is requesting a waiver for minimum lot area. Although he is using the
hardship request under Paragraph 17-4026.D for lots to be a minimum of ½ acre
regardless of zoning category (Light Industrial has a minimum lot size of 1 acre),
each lot is approximately 600 s.f. below that ½ acre minimum threshold. This is
due to the fact that lot area within a public ROW cannot be counted toward
minimum area requirements.
All other items as per ordinance have been addressed on the plat along with the
required notes, labels, setbacks and servitudes as per Paragraph 17-406 of the
Subdivision Regulations.
STAFF RECOMMENDATIONS
This property division appears to follow the intent of the family partition section
of the ordinance. The owner(s) have owned the property for at least three years or
prior to January 1, 2015 as required by Paragraph 17-4026.B. In the event the
commission concurs with the staff analysis and is inclined to grant the waiver on
minimum lot area, staff recommends approval contingent on addressing all
comments on the final map as listed above and the required conveyance
documents being completed and recorded according to Paragraph 17-4026.F of
the Subdivision Regulations.
Mr. James Falgout with Earles and Associates, LLC presented this family
partition.
Public hearing was opened.
No comments.
Public hearing was closed.
Commission Action: Moved by Mr. Julio Dumas, seconded by Mr. Douglas
Foster and unanimously adopted, to approve this family partition along with a
variance of 600 sq. ft. per lot.
![Page 6: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/6.jpg)
Planning Commission Minutes
January 11, 2017
Page 4
X. Public Hearing to Approve or Deny the Following Mobile Home Park:
A) Family Court Mobile Home Park Expansion – Request for Variance
PUBLIC HEARING FOR GRANTING A VARIANCE AND POSSIBLE
PRELIMINARY APPROVAL TO THE MOBILE HOME PARK
EXPANSION SITE PLAN
The subject property is located on the south side LA Hwy. 429 (Weber City
Road), approximately 825’ east of Denham Road and just under one mile west of
the intersection with LA 431. The property is in Council District 10 and is zoned
Medium Intensity Residential (RM). The application is on behalf of Dustin
Clouatre by B.M. Aguillard and Associates, LLC.
The Owner is requesting a variance to the minimum required 200’ of frontage on
a public ROW according to Paragraph 17-8045.B of the Mobile Home Park
Regulations.
STAFF/ERA SITE PLAN/PRELIMINARY PLAT REVIEW COMMENTS
(See attached Packet from December 14, 2016 Planning Commission
Meeting)
“ATTACHMENT A”
Mr. Brian Aguillard with B. M. Aguillard and Associates, LLC, stated they are
here to ask for the variance on the frontage requirement for the expansion of the
mobile home park.
Mr. Jean Paul Robert, Attorney representing Family Court, LLC, was also
present.
Mr. Robert explained this item originally came before the Commission December
14, 2016 for a one-time expansion of fifty percent (50%) pursuant to Section
17.2071(g)(1)(c) [Nonconforming Uses] which allows for a one-time fifty percent
(50%) expansion of a non-conforming use.
After comments from some of the area neighbors, he expressed the Commission
seemed to focus on Section 17.8097(c)(1) [Mobile Home Parks Constructed After
Date]. He stated from here, the Commission and staff went back and forth as to
whether the expansion and/or entire park had to be brought up to code.
Mr. Robert stated the expansion seemed to have been denied at the December 14,
2016 meeting on the basis that the existing mobile home park does not meet the
200ft. road frontage requirement. The owner has come to this meeting to ask for
a variance on that rule to appease any concerns. The variance is on the existing
nonconforming use in order for the applicant to do their fifty percent (50%)
expansion.
![Page 7: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/7.jpg)
Planning Commission Minutes
January 11, 2017
Page 5
Mr. Lance Brock stated it has always been his interpretation that the expansion
needs to meet the requirements that are in place at the time and the existing, older
park that is nonconforming will not have to meet those requirements.
Public hearing was opened.
The following spoke:
1. Bartley Bourgeois – against expansion
2. JoAnn Eiswirth – against expansion
3. Matt Madere – against expansion
4. Bryan Klibert – against expansion
Public hearing was closed.
Mr. Dumas feels the applicant should resubmit and come back before the
Commission with a revised site plan/preliminary plat that conforms to the greatest
extent possible for a nonconforming use; making the best effort to comply with
code and then ask for the appropriate variances. He stated he thinks the current
application is insufficient and what is before the Commission is incomplete and
does not feel he can support or approve it at this time.
Mr. Robert requested this item be pulled from the agenda in order to get with
Staff and try to work on the issues.
Commission Action: Moved by Mr. Morrie Bishop, seconded by Mr. Julio
Dumas and unanimously adopted, to grant the applicant to pull this item from the
agenda.
XI. Public Hearing to Approve or Deny the Following Preliminary Subdivision
Plats:
A) Oaks on the Bluff Estates – REVISION
The subject property is located on the east side of Bluff Road approximately
1,700’ north of C. Braud Road in Council District 8. The property is adjacent to
the Oaks on the Bluff 2nd
filing, and is zoned Medium Intensity (RM). The
application is on behalf of Coastal Contractors, Inc. by Centerline Engineering
and Land Surveying, LLC.
The property is 24.0 acres and the applicant is proposing to add an additional
‘Estates’ phase adding to the existing Oaks on the Bluff subdivision. This
proposal contains 46 single family residential lots. Typical lot widths range from
80 to 90 feet; and have a minimum size of 12,400 square feet. The subdivision
will include 1.5 acres of designated park space and complies with all adopted
major subdivision regulations.
This phase will be accessed by an entrance off of LA Hwy. 928 (Bluff Road) and
Vista Drive, an existing street within Oaks on the Bluff. Sewer treatment will be
through the existing private sewer treatment plant between existing lot 113 and
proposed lots 13-14.
![Page 8: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/8.jpg)
Planning Commission Minutes
January 11, 2017
Page 6
STAFF REVIEW COMMENTS
All elements of the subdivision as per ordinance have been provided and
addressed on the plat along with the required notes, labels, setbacks and
servitudes as per Paragraph 17-406 of the Subdivision Regulations.
All comments have been addressed by the consultant.
ENGINEER REVIEW COMMENTS
Preliminary Plat:
The Preliminary Plat has been reviewed by the Engineer Review Agent (ERA)
Comments are attached. “ATTACHMENT B”
Drainage impact study:
The drainage impact study has been reviewed by the Engineer Review Agent
(ERA) Comments are attached. “ATTACHMENT B”
Traffic impact study:
The traffic impact study has been reviewed by the Engineer Review Agent (ERA)
Comments are attached. “ATTACHMENT B”
STAFF RECOMMENDATIONS
The proposed plat meets all guidelines for a major subdivision preliminary plat
and should the commission concur with staff’s analysis, staff recommends
approval.
Mr. Bo Booty with Centerline Engineering and Land Surveying, LLC presented
this revision to preliminary subdivision plat.
Public hearing was opened.
The following spoke:
1 – George Kurz – neither for or against the development
2 – Todd Zirkle (on behalf of the HOA of Oaks on the Bluff Subd) - in support
of this development
Public hearing was closed.
There was a lengthy discussion regarding Tract B, labeled as common area, on the
preliminary plat. It was said that it would be in the best interest for the public and
to follow the spirit of the ordinance to make this common area a stub-out for
future connectivity if ever needed.
Commission Action: Moved by Mr. Julio Dumas, seconded by Mr. Aaron
Chaisson and unanimously adopted, to approve this revision to preliminary
subdivision plat with the condition of a) final approval or obtaining a permit for
the connection to Bluff Road from DOTD; and b) stubbing out Tract B which is
south of what is currently labeled as Vista Drive.
B) Ascension Business Park
The subject property is located on the north side of LA Hwy. 30 approximately
2,800 feet west of Interstate Hwy. 10 in Council District 3 and is zoned Light
![Page 9: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/9.jpg)
Planning Commission Minutes
January 11, 2017
Page 7
Industrial (LI). The application is on behalf of America Homeland, LLC by
Quality Engineering & Surveying, LLC.
The property is approximately 25.5acres and the applicant is proposing a major
subdivision containing 20 industrial/commercial lots. The typical lot is 100 feet
wide with a minimum size of 28,800 square feet.
STAFF REVIEW COMMENTS
All elements of the subdivision as per ordinance have been provided and
addressed on the preliminary plat along with the required notes, labels, setbacks
and servitudes as per Paragraph 17-406 of the Subdivision Regulations.
The developer is proposing a sewer treatment plant that will be owned and
operated by the parish. All other comments have been addressed by the
consultant.
ENGINEER REVIEW COMMENTS
Preliminary Plat:
The Preliminary Plat has been reviewed by the Engineer Review Agent (ERA)
Comments are attached. “ATTACHMENT C”
Drainage impact study:
The drainage impact study has been reviewed by the Engineer Review Agent
(ERA) Comments are attached. “ATTACHMENT C”
Traffic impact study:
The traffic impact study has been reviewed by the Engineer Review Agent (ERA)
Comments are attached. “ATTACHMENT C”
STAFF RECOMMENDATIONS
The proposed preliminary plat meets all guidelines for a major subdivision per
current ordinance and should the commission concur with staff’s analysis, staff
recommends approval.
Mr. Deric Murphy with Quality Engineering & Surveying, LLC presented this
preliminary subdivision plat.
Public hearing was opened.
No comments.
Public hearing was closed.
Commission Action: Moved by Mr. Julio Dumas, seconded by Mr. Morrie
Bishop and unanimously adopted, to approve this preliminary subdivision plat
subject to a) approval from DOTD for the turn lanes warranted; b) approval of the
waiver for the alleyway; and c) satisfy current parish regulations for a commercial
roadway.
C) Black Bayou Estates
The subject property is located on the north side of LA Hwy 934 (Black Bayou
Road) approximately 1,700 feet west of Roddy Road in Council District 11 and
![Page 10: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/10.jpg)
Planning Commission Minutes
January 11, 2017
Page 8
zoned Medium Intensity (RM). The application is on behalf of Michael D’Luca
by Quality Engineering & Surveying, LLC.
The property is approximately 7.4 acres and the applicant is proposing a major
subdivision containing 20 single family residential lots. Lots range from 65 – 80
feet wide with a minimum size of 7,995 square feet. The subdivision will include
0.5 acres of designated park space.
STAFF REVIEW COMMENTS
All elements of the subdivision as per ordinance have been provided and
addressed on the plat along with the required notes, labels, setbacks and
servitudes as per Paragraph 17-406 of the Subdivision Regulations.
The developer is proposing a sewer treatment plant that will be owned and
operated by Ascension Parish. There is not currently public water available at the
site, so the developer is proposing a DHH approved well to provide water to the
subdivision. All other comments have been addressed by the consultant.
ENGINEER REVIEW COMMENTS
Preliminary Plat:
The Preliminary Plat has been reviewed by the Engineer Review Agent (ERA)
Comments are attached. “ATTACHMENT D”
Drainage impact study:
The drainage impact study has been reviewed by the Engineer Review Agent
(ERA) Comments are attached. “ATTACHMENT D”
Traffic impact study:
The traffic impact study has been reviewed by the Engineer Review Agent (ERA)
Comments are attached. “ATTACHMENT D”
STAFF RECOMMENDATIONS
The proposed plat meets all guidelines for a major subdivision per current
ordinance and should the commission concur with staff’s analysis, staff
recommends approval provided applicant receives DHH approval for a potable
water source.
Mr. Deric Murphy with Quality Engineering & Surveying, LLC presented this
preliminary subdivision plat.
Public hearing was opened.
No comments.
Public hearing was closed.
Commission Action: Moved by Mr. Anthony Christy, seconded by Mr. Julio
Dumas and unanimously adopted, to approve this preliminary subdivision plat as
presented.
![Page 11: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/11.jpg)
Planning Commission Minutes
January 11, 2017
Page 9
XII. Public Hearing to Approve or Deny the Following Final Subdivision Plats:
A) Silver Oaks PUD
Quality Engineering & Surveying, LLC
(Council District 9)
This item was pulled from the agenda prior to the meeting by the engineer.
B) Lion Copolymer Geismar – REVISION
The subject property is located on the south side of LA Hwy. 30 approximately
2,500 feet east of LA Hwy. 73 (Jefferson Hwy.) in Council District 3 and is
currently zoned as Medium Industry (MI) and Heavy Industry (HI). The
application is on behalf of Lion Copolymer Geismar, LLC by Baton Rouge Land
Surveying Inc.
From a 204.45± acre tract (Tract A-1), eight (8) tracts are being removed:
1. Tract A-1-A, a 170.8± acre tract is being removed and has public ROW
frontage on LA Hwy. 30.
2. Tract A-1-B, a 3.97± acre tract is being removed and has access on a 75’
private access servitude to the 50’ private access servitude (Avenue E)
extending from LA Hwy. 75.
3. Tract A-1-C, a 2.53± acre tract is being removed and has access to the
50’private access servitude (Avenue E) extending from LA Hwy. 75.
4. Tract A-1-D, a 4.89± acre tract is being removed and has public ROW
frontage on LA Hwy. 75.
5. Tract A-1-E, a 5.06± acre tract is being removed and has public ROW
frontage on LA Hwy. 75.
6. Tract A-1-F, a 14.39± acre tract is being removed and has access to the 100’
private access servitude (40th
Street) extending from LA Hwy. 73.
7. Tract A-1-G, a 1.14± acre tract is being removed and has access to the 100’
private access servitude (40th
Street) extending from LA Hwy. 73.
8. Tract A-1-H, a 1.66± acre tract is being removed and has public ROW
frontage on LA Hwy. 75.
A waiver of providing lot frontage on a public street is being requested for the
division of tracts in items 2, 3, 6 and 7 listed above. All acreage in parent tract A-
1 is zoned HI (Heavy Industry).
From a 73.16± acre tract (Tract A-2-B), two (2) tracts are being removed:
1. Tract A-2-B-1, a 67.0± acre tract is being removed and has access to the 100’
private access servitude extending from LA Hwy. 30.
2. Tract A-2-B-2, a 6.16± acre tract is being removed and has access to the 30’
private access servitude extending to the 100’ private access servitude
extending from LA Hwy. 30.
A waiver of providing lot frontage on a public street is being requested for the
division of tracts in items 1 and 2 listed above. A small portion of the acreage in
parent tract A-2-B is zoned MI (Medium Industry) with the remainder zoned HI
(Heavy Industry).
![Page 12: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/12.jpg)
Planning Commission Minutes
January 11, 2017
Page 10
From a 41.86± acre tract (Tract A-3), one (1) tract is being removed:
1. Tract A-3-A, a 39.35± acre tract is being removed and has access to the 75’
private access servitude extending from LA Hwy. 30.
A waiver of providing lot frontage on a public street is being requested for the
division of the tract in item 1 listed above. A portion of the acreage in parent tract
A-3 is zoned MI (Medium Industry) with the remainder zoned HI (Heavy
Industry).
STAFF REVIEW COMMENTS
a) Clearly show all Rights of Way and Access Servitudes on map. Plat has
been corrected.
b) Show Instrument No. 798493 for Reference No. 1. Plat has been corrected.
c) Add the Subdivision of Tract A-2 from August 5, 2013 and Instrument No.
832013 as a reference. Plat has been corrected.
d) Add information on Certification under item ‘S’, Land Surveyor Certification
contained on Plat Review Submittal Checklist. Plat has been corrected.
e) Tract A-3-A is not detailed or dimensioned with bearings. Plat has been
corrected.
f) Denote block and list “Waiver Requested” – Subdividing Lots Not Upon a
Public ROW”, on map. Plat has been corrected.
STAFF RECOMMENDATIONS
Staff has reviewed this application and recommends approval of the request for
waiver and the subdivision of these tracts. All facilities and tracts contained
within this property contain servitude(s) of access and asphalt paved roads
maintained by the industrial companies that they serve. Should the Planning
Commission agree with the Staff’s assessment, Staff recommends approval.
Mr. Gerry Middleton with Baton Rouge Land Surveying Inc., presented this
revision to final subdivision plat.
Public hearing was opened.
No comments.
Public hearing was closed.
Commissioner Foster recused himself from voting. He stated his wife works for
Lion Copolymer.
Commission Action: Moved by Mr. Julio Dumas, seconded by Mr. Edward
Dudley and unanimously adopted, to approve this revision to final subdivision
plat as presented.
XIII. Staff Report
Mr. Jerome Fournier expressed based on conversations last year, the Parish was going
to give an update on the Traffic Impact Fees. Staff has received a draft of this report,
reviewing it at this time and plan to make a report to the Commission at next month’s
meeting.
![Page 13: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/13.jpg)
Planning Commission Minutes
January 11, 2017
Page 11
Mr. Fournier also stated staff, along with CSRS, has prepared a set of subdivision
specifications which have been distributed to the engineering community and the
construction community in the parish and they have had an opportunity to review. A
meeting has been scheduled to go over these specifications on Wednesday, January
18, 2017 at 3:00 p.m. at the Governmental Complex and the public is invited to
attend.
XIV. Engineering Staff Report
Mr. Shaun Sherrow gave a status report on projects:
Thirteen (13) subdivision projects in construction
Four (4) subdivision projects near construction
One (1) subdivision project in construction plan review
XV. Adjourn
Moved by Mr. Aaron Chaisson and unanimously adopted, meeting adjourned at 7:50
p.m.
______________________________________
Matthew Pryor, Chairman
-
![Page 14: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/14.jpg)
![Page 15: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/15.jpg)
![Page 16: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/16.jpg)
![Page 17: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/17.jpg)
![Page 18: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/18.jpg)
![Page 19: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/19.jpg)
![Page 20: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/20.jpg)
![Page 21: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/21.jpg)
![Page 22: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/22.jpg)
![Page 23: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/23.jpg)
![Page 24: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/24.jpg)
![Page 25: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/25.jpg)
![Page 26: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/26.jpg)
![Page 27: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/27.jpg)
![Page 28: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/28.jpg)
![Page 29: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/29.jpg)
![Page 30: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/30.jpg)
![Page 31: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/31.jpg)
![Page 32: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/32.jpg)
![Page 33: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/33.jpg)
![Page 34: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/34.jpg)
![Page 35: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/35.jpg)
![Page 36: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/36.jpg)
Description: Affidavit of Mortgage DeclarationLyman P. Abadie, Jr. - Lot 2B (42044 Hwy 931, Gonzales, LA)
ATTACHMENTS:Description Upload Date TypeLyman Abadie Jr 1/19/2017 Cover Memo
![Page 37: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/37.jpg)
![Page 38: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/38.jpg)
![Page 39: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/39.jpg)
![Page 40: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/40.jpg)
![Page 41: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/41.jpg)
![Page 42: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/42.jpg)
![Page 43: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/43.jpg)
Description: Germany Oaks - Phase 2Quality Engineering & Surveying, LLC(Council District 11)
ATTACHMENTS:Description Upload Date TypeGermany Oaks - Phase 2 2/1/2017 Cover MemoGermany Oaks-Phase 2 Prel Plat Final Review Lettter 2/1/2017 Cover MemoGermany Oaks-Phase 2 Preliminary Plat 2/1/2017 Cover Memo
![Page 44: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/44.jpg)
February 08, 2017
MAJOR SUBDIVISION PRELIMINARY PLAT
A) Germany Oaks Subdivision-Phase 2
The proposed subdivision is located on Germany Road approximately 2,543 feet east of Airline
Hwy in Council District 11 and zoned Medium Intensity (RM). The application is on behalf of
Kelly C. Sills, LLC by Quality Engineering & Surveying, LLC.
The property consists of +/-25 acres. The applicant is proposing a subdivision containing 75 lots,
60, 70, 80 and 100 feet in width, with a minimum size of 8,000 square feet. The proposed
subdivision will contain .40 acres of park space, bringing the total park space for both phases to
3.4 acres which complies with the major subdivision regulations.
STAFF REVIEW COMMENTS
All elements of the subdivision as per ordinance have been provided and addressed on the
plat along with the required notes, labels, setbacks and servitudes as per Paragraph 17-
406 of the Subdivision Regulations.
The developer is proposing to tie into an existing parish owned sewer treatment plant.
All other comments have been addressed by the consultant.
ENGINEER REVIEW COMMENTS
Preliminary Plat:
The Preliminary Plat has been reviewed by Staff and the Engineer Review Agent (ERA)
Comments are attached.
Drainage impact study:
The drainage impact study has been reviewed by the Engineer Review Agent (ERA)
Comments are attached.
Traffic impact study:
The traffic impact study has been reviewed by the Engineer Review Agent (ERA)
Comments are attached.
STAFF RECOMMENDATIONS
The proposed plat meets all guidelines for a major subdivision per current ordinance and
should the commission concur with staff’s analysis, staff recommends approval provided
applicant receives approval from DEQ for the expansion of the existing Sewer Treatment
Plant.
![Page 45: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/45.jpg)
WWW.CSRSONL INE .COM
CSRS, INC.
6767 Perkins Road, Suite 200 Baton Rouge, Louisiana 70808
Phone. (225) 769-0546
Fax. (225) 767-0060
January 30, 2017
Mr. Jerome Fournier
Ascension Parish Planning Commission
P.O. Box 1659
Gonzales, La 70707
RE: Germany Oaks- Phase 2
Preliminary Plat Review
Mr. Fournier:
As the Engineering Review Agency for the Ascension Parish Planning Commission, we have reviewed the
Preliminary Plat, Drainage Impact Study, and Traffic Impact Study submitted for the above referenced
development for compliance with the Ascension Parish Subdivision Regulations and the Ascension Parish
Development Code. Shown below are the comments made to the Consulting Engineer for the project as a
result of our review of their submittals, as well as a description of their correction or response made to our
comments (shown in bold print).
Preliminary Plat
1. Resubmit all required STP items with adequate capacity for approval ensure connection to existing STP
in Phase 1 is permitted by the Parish Attorney. Consultant stated further investigation will continue
through the construction document process and all STP items will be provided.
2. Show servitudes for all proposed swales. This has been updated on the plat.
3. The plat and/or construction plans needs to ensure adequate servitude widths per the AP Drainage
Ordinance for new re-routed ditch are provided. These servitudes cannot have trees, fences, or other
obstructions that would limit usability of servitudes by DPW maintenance. If the developer wishes to
use an offsite servitude to address servitude requirements for this project, then the developer would
need permission from surrounding homeowners to remove any trees, fences, or other obstructions
that would limit usability of servitudes for DPW maintenance. Consultant stated there is an existing
public drainage servitude and all fences are on the servitude line rather than on the property line.
Additionally, consultant stated any future permissions that may be required to access the existing
servitude will be further reviewed during the construction plan process.
4. Confirm there is adequate accessibility to the northern re-routed ditch for DPW maintenance.
Consultant added culvert to ditch on eastern boundary for access to the north bank of the ditch. This
design will be further reviewed during the construction plan review process.
5. Add note: “All structures shall be constructed a minimum of one foot above FEMA BFE and top
elevation of nearest adjacent sanitary sewer manhole on the sewer collection system servicing the
proposed structure.” This has been updated on the plat.
![Page 46: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/46.jpg)
WWW.CSRSONL INE .COM
6. A note is required regarding private ownership and maintenance of lake/pond and shoreline and that
Ascension Parish does not own or maintain lake/pond and shoreline. This has been updated on the
plat.
7. Show the culvert and weir outfall locations of the proposed ponds. This has been updated on the plat.
8. Show the sanitary sewer outfall location. This has been updated on the plat.
9. Ensure any servitudes that are to be revoked are listed as such. This has been updated on the plat.
10. Depict widths of pavement for Germany Rd, Park Oak Ave, Bayou Oak Ave, and Shumard Oak Dr. This
has been updated on the plat.
11. Depict roadway striping and edge roadway of Germany Rd.to show existing left turn lane at main
entrance and width of road way. This has been updated on the plat.
12. Label addresses of all adjacent properties. This has been updated on the plat.
13. Add information as to the drainage route to the ultimate (named) drainage channel. This has been
updated on the plat.
14. The completed Preliminary Plat and Submittal Checklist contains information that does not correspond
with noted plat items. Confirm information is correctly shown on the plat (i.e. flood zones, BFE, lot
numbers, acreage). This has been updated on the plat.
15. Under ‘General Subdivision Information Sewer’ note, add to end: “…owned and operated by Ascension
Parish.” This has been updated on the plat.
16. Under ‘Trees and Parks Notes’, under number 3 at the end of the first sentence, add, “Trees to be
planted prior to issuance of C. O. on first home”. This has been updated on the plat.
17. Bayou Oak Avenue cannot be used as there is a Bayou Oak St. in existence. Please choose another
street name and submit for review and approval. This has been updated on the plat.
18. Add a demarcation line between Phase 1 and Phase 2. This has been updated on the plat.
19. Under ‘General Notes’, numbers 2 and 6 are redundant. This has been updated on the plat.
20. Add statement, “This project is subject to sewer development and traffic impact fees in accordance
with Ascension Parish ordinances.” This has been updated on the plat.
21. Show existing drainage servitudes off property that this drainage will tie into. This has been updated
on the plat.
![Page 47: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/47.jpg)
WWW.CSRSONL INE .COM
22. Label individual trees with caliper inches to be used for credits on map. This has been updated on the
plat.
23. Calculations show that 1.94 (or 1.90 if rounded down) acres are needed for the Phase 1 park space and
1.5 acres are needed for Phase 2 park space. Since park space and tree requirements are being
combined for both phases, provide a chart showing how much park space is being set aside in each
tract for each phase (ex., 1.2 acres of park space in Tract CA2) along with the required number and
type of trees for each phase so that credits can be calculated and allowed. Existing park space in Tract
CA2 is shown as 1.4 acres and in Tract CA4 as .8 acres. This does not add up to the 3.0 acres as shown
in the Trees and Parks Notes section. This has been updated on the plat.
24. The contour lines should be lightened as they currently make other items difficult to read. This has
been updated on the plat.
25. Incorporate the changes to the Tree and Park Requirements block per the exhibit. This has been
updated on the plat.
Drainage Study
1. Per Section 17-506 of the AP Drainage Ordinance, drainage for proposed developments shall be
designed to limit the post developed peak flow rate to the existing condition peak flow rate. The DIS
narrative and Appendix F note the post-development peak discharge entering Black Bayou Lateral
from the site as 76.46 cfs, but this rate is greater than the pre-developed model’s output rate (75.16
cfs). Furthermore, Appendix F notes the total post-developed onsite flow to Black Bayou Lateral as
76.46 cfs, but the model shows a total of 81.97 cfs for these same nodes. Update Appendices E & F,
revise narrative, and correct model so that all rates properly correspond with one another and ensure
onsite post-developed rates are limited to pre-developed rates. This has been updated in the DIS.
2. Drainage Exhibit 6 shows the outfall location of Pond 2 is currently proposed to straddle two lot lines
and connect perpendicularly with the Black Bayou lateral that is offsite of the property. However, Pond
1 already has an outfall that is directly aligned with Black Bayou Lateral. In order to minimize the
number of outfall locations and to ensure maintainability, reposition the discharge point of Pond 2 so
that it is connected with Pond 1. Consultant added drainage servitude between lots 109 & 110 to
allow for proposed pond outfall culverts. This design will be further reviewed during the
construction plan review process.
3. Per Section 17-506 of the AP Drainage Ordinance, provide pre and post-developed condition profile
analysis of the rerouted ditch is needed. Provide HEC-RAS analysis that starts at least three sections
downstream of the 3- 42” RCPs and ends at the eastern property line. Consultant provided HEC-RAS
model.
Traffic Study
No comments
![Page 48: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/48.jpg)
WWW.CSRSONL INE .COM
Drainage Impact Study Summary:
Consulting Engineer: Jeff Loup, P.E., Quality Engineering & Surveying, LLC
Date of Study: December 2016
Size of Development: 23.67 acres
Existing Land Use: Low-density residential area in the south; wooded area in the north
Receiving Basin: Black Bayou
FEMA Flood Zone: X
100-year Flood Elevation: 17.0 ft (Nearest)
Offsite Drainage Area: ~47 acres surrounding; 49.52 acres Black Bayou Lateral upstream
Fill Mitigation: Site elevations are greater than the nearest 100-year BFE
Storm Water Mitigation: Expansion of existing detention pond from Phase 1
The Drainage Impact Study substantially conforms to the requirements of the Drainage Impact Study Policy
included in the Subdivision Regulations. The Engineering Review Agency has performed a review of the input
parameters and results of the submitted drainage calculations for compliance with the Subdivision Regulations
and generally accepted practices for storm water hydrologic design. The Engineering Review Agency has not
performed a detailed numerical check of the analysis submitted. Upon approval of the preliminary plat, the
applicant can proceed with final drainage design in accordance with the concepts submitted in the impact
study.
Traffic Impact Study Summary:
Consulting Engineer: Prasanth Malisetty, P.E., PTOE, Neel-Schaffer
Date of Study: January 16, 2017
Dates of Movement Counts: November 17, 2016
Number of Proposed Lots: 172 Combined Phases 1 & 2 (P1: 97 lots; P2: 75 lots)
Peak Hour A.M. Trips: 129
Peak Hour P.M. Trips: 170
Study Threshold Level: 2
Conclusion: As part of the approval for Phase 1, an eastbound left turn lane along Germany
Road at the Germany Oaks driveway was warranted and has since been
constructed. No additional roadway improvements were recommended by the
consultant.
Sight Distance Evaluation: Sight distance was evaluated at the current condition and concluded that sight
distance will cause no traffic operational problems for this proposed
development.
In the vicinity of this development there are three recently approved developments: Silver Oaks Subdivision,
Walmart grocery store, and an expansion of Lagniappe Shopping center. For this study, the anticipated trips
generated by these three developments were considered and analyzed as Base conditions.*
It should be noted that there is a proposed school planned to be constructed along Germany Road with an
access across from Germany Oaks Subdivision. It is anticipated that the proposed school access will warrant
exclusive left and right turn lanes along Germany Road. However, the consultant recommended that a detailed
traffic impact study be performed for the proposed school as the planning for this school progress.
![Page 49: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/49.jpg)
WWW.CSRSONL INE .COM
The following intersections were studied with the following conclusions:
Germany Road at Germany Oaks Driveway: The southbound approach is anticipated to operate at a level of
service (LOS) B during AM and PM peak hour periods. The eastbound approach is anticipated to operate at a
LOS of A during AM and PM peak periods. No additional roadway improvements were recommended by the
consultant at this location other than the eastbound left turn lane.
Germany Road at Braud Road: All approaches for the future build condition are anticipated to operate at a LOS
equal to that of the base conditions during the AM & PM peak hours (with the exception of the minimally
increased LOS in the northbound direction). During AM peak hour, the eastbound will remain at a B,
westbound will remain at a C, northbound increases from LOS A (10 s/veh) to LOS B (10.2 s/veh), southbound
will remain at a B, and overall intersection will remain at a LOS C. During PM peak hour, eastbound will remain
at an E, westbound will remain at a C, northbound will remain at a C, southbound will remain at a C, and
overall intersection will remain at a LOS D. Consultant recommended this intersection be monitored in the
future as this development and others begin to build out to determine if alternate intersection control is
warranted.
Germany Road at US 61 (Airline Highway):
*Along with the construction of the adjacent developments, the intersection of US 61 (Airline Highway) at
Germany Road will be modified to accommodate the anticipated traffic growth. The modified intersection
geometry consists of one (1) exclusive left turn lane, one (1) through lane, and one (1) exclusive right turn lane
for the eastbound approach on Duplessis Road. The westbound approach on Germany Road will consist of one
(1) shared left / through lane and one (1) exclusive right turn lane. The northbound and southbound
approaches on US 61 (Airline Highway) consist of one (1) shared through/right lane, one (1) through lane, and
one (1) exclusive left turn lane. The proposed intersection geometry is included in the base and the future build
conditions analysis.
All approaches for the future build condition are anticipated to operate at a LOS equal to that of the base
conditions during the AM & PM peak hours (with the exception of the minimally increased LOS in the
northbound direction). During AM peak hour, the eastbound will remain at an F, westbound will remain at an
E, northbound increases from LOS B (19.5 s/veh) to LOS C (20.9 s/veh), southbound will remain at a B, and
overall intersection will remain at a LOS C. During PM peak hour, eastbound will remain at an F, westbound
will remain at an F, northbound will remain at a C, southbound will remain at a C, and overall intersection will
remain at a LOS D. No additional roadway improvements were recommended by the consultant at this
location.
The following items should be considered by the Planning Commission in their analysis of the case:
• No additional comments
Should you have any questions or comments, please do not hesitate to contact me at (225) 769-0546.
Sincerely,
Engineer Review Agency for the Ascension Parish Planning Commission
Shaun Sherrow, P.E.
![Page 50: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/50.jpg)
WWW.CSRSONL INE .COM
CC: Joe Labbé, PLA, CLARB, Quality Engineering & Surveying, LLC
![Page 51: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/51.jpg)
50'±
304'±
313'±
103'±
495'±
221'± 666'±
415'±
897'±
99'±
435'±
L=54'±
L=54'±
49'±
365'±
366'±
49'±117'±
565'±12'±
304'±
VICINITY MAP:
PRELIMINARY PLAT
GENERAL NOTES:
PUBLIC DEDICATION:
SEWAGE DISPOSAL NOTE:
GENERAL SUBDIVISION INFORMATION:
GERMANY RD
MULBERRY STHICKORY ST
B
LAC
K
SHE
RE
E D
R
WO
OD
RU
N
DARVILLE RD
CIR
PRAIRIEVILLE DAME DR
HWY 929
JAMES DR
SILV
ER
OA
K D
R
PA
LOM
INO
LN
BR
AU
D R
D
HOLLY ST
CED
AR ST
CAUSEY RD
WOODLAND AVE
N WOODRUN
BUD BROUSSARD RD
AC
AD
IA D
R
SHIR
LEY D
R
ROY'S DR
FO
RE
ST O
AK
RD
ME
AD
OW
LN
BR
AU
D R
DB
RA
UD
RD
LOC
UST
ST
LORENA DR
AIK
EN
S R
D
BLV
D
ELI
SE C
ATH
ER
INE
DR
FAIRGROUND RD
W L
AK
EP
OIN
T C
T
TIG
ER
HE
IGH
TS
RD
LN
DUPLESSIS RD
SWE
ET P
EC
AN
AV
E
VIR
GIL
DU
PLE
SSIS
RD
RO
Y R
OG
ER
S R
D
PA
LME
TTO
LN
SWE
ET L
EA
F R
D
COTTON FIELD AVE
LOS
AR
BO
LES
ST
BR
EN
TW
OO
D C
T
GERMANY RD
BAYRIDGE DR
P'V
ILLE
IND
AV
E
J LEE STEVENS
GAUTREAU RD
COUNTRY DR
DA
IGLE
RD
EU
GE
NE
RD
JESS
IE J
OH
NSO
N R
D
AIRLIN
E HW
Y
SITE
LEGEND:TYPICAL LOT DETAIL:
N.T.S.
SIDEWALK SECTION:
N.T.S.
DECEMBER 14, 201616-212 DHM
LOCATED IN
SECTION 6, TOWNSHIP 9 SOUTH, RANGE 3 EAST,
SOUTHEASTERN LAND DISTRICT EAST OF THE MISSISSIPPI RIVER,
ASCENSION PARISH, LOUISIANA
DWG Path:
CLIENT:
DESCRIPTION:
Project No.: Date: Drawn By:
PROJECT:
TITLE:
GERMANY OAKS - PHASE 2
KELLY C. SILLS4825 JAMESTOWN AVENUE
BATON ROUGE, LOUSIANA 70808
PRELIMINARY PLAT
TYPICAL STREET SECTION (50' RIGHT-OF-WAY):
N.T.S.
LOT COUNT: PHASE 2
GERMANY RD. (LA HWY 931)(EX. RIGHT-OF-WAY)
GE
RM
AN
Y O
AK
S B
LVD
.(E
X. 5
0' R
IGH
T-O
F-W
AY
)
WATER OAK AVE.(EX. 50' RIGHT-OF-WAY)
TRACT "CA3"
LOT "CA5"
TRACT "PK"
98
99
100
101
102
103
104
105
106
107 108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126127
128
129
130
131
132
133
134
135
136
137
138 139
140141
142
143
144
145
14614
7
148
149
150
151
172
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
N
SHUMARD OAK DRIVE
PAR
K O
AK
AV
EN
UE
EXIST
ROADW
AY
WIDTH
± 35'
PROPOS
ED ROA
DWAY
WIDTH
± 27'
PROPOS
ED ROA
DWAY
WIDTH
± 27'
PROP
OSED ROADW
AY
WIDTH ± 27'
PROPOS
ED ROA
DWAY
WIDTH
± 27'
PROPOS
ED ROA
DWAY
WIDTH
± 27'
PARK OAK AVENUE
EXIST R
OADWAY
WIDTH
± 20'
Required Provided
Number of Lots
Park Stage
Park Space (Acres) - 8 ac./1000 population
Upland Park Space (Acres) - Not less than 50% of total
Class A trees
Total Caliper Inches of Class A trees (2.5" min. per tree)
Ornamental trees
Total Caliper Inches of Ornamental trees (2.5" min. per tree)
172
3.4
1.7
41
102.5
82
205
3.4
3.4
0
0
19
45.5
102.5
159.5
1
Total Caliper Inches of all trees 307.545.5
Tree Credits
Caliper Inches x 2
TREES AND PARKS REQUIREMENTS:
SHU
MA
RD
OA
K D
RIV
E
PHASE 1 & 2
TRACT "CA2"TRACT "CA1"
TRACT "CA4"
REMAINDER OFTRACT "CA2"
PARK OAK AVENUE
TRACT "CA6"
![Page 52: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/52.jpg)
Description: Silver Oaks PUD -Phase IQuality Engineering & Surveying, LLC(Council District 9)
ATTACHMENTS:Description Upload Date TypeSilver Oaks PUD-Phase I 2/1/2017 Cover MemoSilver Oaks PUD-Phase I Final Inspection Punch List 2/1/2017 Cover MemoSilver Oaks PUD-Phase 1 Final Plat Review Letter 2/1/2017 Cover MemoSilver Oaks PUD-Phase 1 - Final Plat 2/1/2017 Cover Memo
![Page 53: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/53.jpg)
February 8, 2017
MAJOR SUBDIVISON FINAL PLAT
A) Silver Oaks PUD – Phase I, Final Plat
The subject property is located on the south side of Germany Road approximately 1500 feet east
of Airline Hwy in Council District 9 and is currently zoned as planned unit development (PUD).
The application is on behalf of Silver Oaks Development, LLC by Quality Engineering &
Surveying, LLC.
The concept plan was approved by council on January 22, 2015. The applicant is requesting
approval of the phase 1 final plat. The phase consists of 10 acres developed as single family
residential lots (34 lots), with typical widths being 50 and 70 feet, and having a minimum size of
6,250 square feet. Phases 2 and 3 are 17.96 acres are proposed multifamily residential, consisting
of 336 units. Within the development 5.3 acres are being reserved as park/green space and 3.3
acres as ponds.
The intent of the developer is to secure a performance bond for the value of the Water utility, the
sewer treatment plant and lift station, 6” sewer force main, the 6 foot wood fence along the
eastern boundary and the swimming pool and pool house to have the final plat signed prior to
completion of these construction items. Should the use of a performance bond be acceptable to
the Commission, the final plat will be held for signing and recordation until the bond is approved
and executed and any remaining punch list items have been completed. Once all bonded
construction items have been completed to the satisfaction of the Parish with proper paperwork
and documentation, the bond will be released.
Project Timeline:
November 12, 2014 – Planning Commission approves the concept plan
January 22, 2015 – Parish Council approves the concept plan and rezones the property to PUD
March 15, 2016 – Revision to the Development Agreement approved.
January 19, 2017 – Final Inspection was performed.
STAFF/ERA FINAL PLAT REVIEW COMMENTS (see attached Final Plat Comments)
ENGINEERING DEPT/ERA OUTSTANDING ITEMS: See attached punch list from final
inspection.
STAFF RECOMMENDATIONS
Should the Commission agree, the Staff recommends approval contingent upon satisfactory
execution of the Performance Bonds and completion of any outstanding punch list items.
Note: Signature by the Planning Commission Chairman shall be withheld until all necessary
items have been completed as noted.
![Page 54: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/54.jpg)
CSRS, INC.
6767 Perkins Road, Suite 200
Baton Rouge, LA 70808 Phone. (225) 769-0546
Fax. (225) 767-0060
WWW.CSRSONL INE .COM
January 24, 2017
Mr. Jerome Fournier
Ascension Parish Planning Commission
P.O. Box 1659
Gonzales, La 70707
RE: Silver Oaks Phase 1
Final Inspection Punch List
Dear Mr. Fournier:
The final inspection for the above referenced project was held on 1/19/2017 at 9:00 am. The contractor, the
project engineer, inspection department, and DPW were present. By electronic copy of this letter, we are
transmitting our comments to the engineer. The engineer or contractor will contact subdivision inspection
department when these items are ready for a re-inspection:
Project Closeout
1. Provide the following closeout items if not already provided.
a. Provide as-builts that satisfy section 17-4010C of the UDC.
b. Provide engineering and testing certifications.
c. Provide all testing reports if not already submitted.
d. Provide maintenance bond agreement.
Drainage
1. Provide rip rap at the end of pond outfall swale ditches that empty into the pond.
2. The pond normal pool appears to be about 1 ft higher than invert of control pipe. Provide as-
built survey to confirm that control pipe and outfall ditch are constructed per plans.
3. Regrade and clean up swale dich along the back side of lots 29-34
4. Regrade and clean up swale dich along the back side of lots 17-18
5. Provide as-built shots of the ditch behind lots 20-28 and common area to confirm ditch invert
was installed at proper grade. It appears that ditch is lower than plans which will result in higher
frequency of pond backing up into ditches.
6. Regrade swale ditch behind lots 4-17 to prevent holding water. Lowering top of inlet B5 may be
necessary to achieve desired depth.
Sanitary Sewer
1. There is evidence of water infiltrating the sanitary sewer system upstream from manhole S6.
Find source of leak, repair, and re-pressure test line.
2. Complete installation of treatment plant.
3. Complete installation of sewer force main.
4. Provide DHH approval for pump station and discharge location.
![Page 55: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/55.jpg)
CSRS, INC.
6767 Perkins Road, Suite 200
Baton Rouge, LA 70808 Phone. (225) 769-0546
Fax. (225) 767-0060
WWW.CSRSONL INE .COM
5. Complete electric tie-in to pump station and provide a start-up test for inspector.
Landscape Requirements
1. Install fence along east property line.
2. Complete construction of pool house.
Roadway
1. No comments.
Lots/grading
1. None.
Utilities
1. Complete installation of water
Erosion Control
1. Complete seeding disturbed areas that are to be regraded.
2. The developer/owner must continue to maintain erosion control measures as stipulated by the
owner’s SWPPP.
Do not hesitate to contact me should you have any questions.
Sincerely,
Engineering Review Agency for the Ascension Parish Planning Commission
Shaun Sherrow, P.E., PMP
cc: (via email) William Purser, PE, QES, LLC
![Page 56: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/56.jpg)
WWW.CSRSONL INE .COM
CSRS, INC.
6767 Perkins Road, Suite 200 Baton Rouge, Louisiana 70808
Phone. (225) 769-0546
Fax. (225) 767-0060
January 30, 2017
Mr. Jerome Fournier
Ascension Parish Planning Commission
P.O. Box 1659
Gonzales, La 70707
RE: Silver Oaks PUD (1st
Filing)
Final Plat Review
Mr. Fournier:
As the Engineering Review Agency for the Ascension Parish Planning Commission, we have reviewed the Final
Plat submitted for the above referenced development for compliance with the Ascension Parish Subdivision
Regulations and the Ascension Parish Development Code. Shown below are the comments made to the
Consulting Engineer for the project as a result of our review of their submittals, as well as a description of their
correction or response made to our comments (shown in bold print).
1. Add north arrow to vicinity map. Consultant provided.
2. Instrument number for reference 1 will need to be added once recorded. Consultant
acknowledged.
3. Add Instrument No. 655334 to Reference No. 4. Consultant provided.
4. Add Instrument No. 897071 to Reference No. 2 Consultant provided.
5. A median is shown on the revised Final Development Plan and listed as Common Area. This must
be shown on the Final Plat as such. Consultant provided.
6. Developer is stating that $0.00 in Sewer Development Fees are due at issuance of Building
Permits. Please provide documentation from Carl Ladmirault in the Utilities Dept. for credits based
on materials installed to verify this. This is required to be verified prior to the final plat being
signed. Please provide statement acknowledging this requirement. Consultant did not
acknowledge.
7. Silver Oaks Drive as a road name is already in use. In previous discussions, the road name
STERLING OAKS DRIVE was selected for use. Revise on Final Plat. Consultant revised road name.
8. Add lot area notation to each lot label. Consultant provided.
![Page 57: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/57.jpg)
WWW.CSRSONL INE .COM
9. Add note stating “THE SEWER SYSTEM, INCLUDING BUT NOT LIMITED TO, ALL TREATMENT
SYSTEM(S), PUMP(S), LIFT STATION(S), COLLECTION LINES TO THE SYSTEM, BOTH ONSITE AND
OFFSITE, AND THE USER OF SAID IMPROVEMENTS, ARE HEREBY DEDICATED TO THE PARISH OF
ASCENSION. THE PARISH OF ASCENSION IS ALSO HEREBY GRANTED A PERMANENT SERVITUDE OF
ACCESS AND USE OVER THE IMMOVABLE PROPERTY UPON WHICH ANY PORTION OF THE
TREATMENT SYSTEM(S), PUMP(S), LIFT STATION(S), AND COLLECTION LINES DEDICATED ABOVE
ARE LOCATED FOR NECESSARY MAINTENANCE OR IMPROVEMENTS. SAID SERVITUDE IS TO BE
CONSIDERED TRANSFERABLE AND HERITABLE AND SHALL BE ENFORCEABLE AGAINST ANY AND ALL
SUCCESSORS OR ASSIGNS OF THE PROPERTY OWNER.” Consultant provided.
10. Add a note stating that all Park and Landscape elements shall be installed according to the
recorded Development Agreement and any approved revisions. The swimming pool and pool
house to be constructed once 50% of the building C.O.’s have been issued. Consultant provided.
11. Add statement to PARK note stating that developer shall install a sign identifying private park
space as such and that park is under the ownership/maintenance of the HOA. Consultant
provided.
12. Add note: “All structures shall be constructed a minimum of one foot above FEMA BFE and top
elevation of nearest adjacent sanitary sewer manhole on the sewer collection system servicing the
proposed structure.” Consultant provided.
13. Add note: “One class ‘A’ tree must be planted prior to C.O. being issued for each lot.” Consultant
provided.
14. Provide permanent Benchmark on final plat as required by Section 17-4012-A-15 of the
Subdivision Regulations. Consultant stated this item is to be added prior to final approval.
15. According to Section 17-4012-C of the Subdivision Regulations: “Restrictive covenants or
trusteeships and their periods of existence to apply to lots in the subdivision shall be signed by the
owner or his agent and recorded in the office of the parish recorder, and references to such
instrument shall be made on the plat and a copy shall be furnished to the planning commission.”
The applicant is reminded that any Restrictive Covenants are to be referenced on the final plat
with a copy made available to the Commission after recording of the final plat as required.
Consultant acknowledged.
16. According to Paragraph 17-4012.G of the Subdivision Regulations: “Jurisdictional Wetlands
Determination including any associated maps and other related data including the official dated
letter from the Army Corps of Engineers.” Please provide the official determination as required.
Consultant provided.
17. Add “Phase 1” to the final plat project title. Consultant provided.
18. Add landowner name under certification line. Consultant provided.
![Page 58: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/58.jpg)
WWW.CSRSONL INE .COM
19. The final plat shows a 12’ existing utility servitude along Germany Oaks Rd, but this is noted as
12.5’ in the construction plans. Consultant revised.
20. Note all servitudes as public or private. Consultant provided.
21. Provide subdivision name in reference map list for lots to the south of the site as applicable.
Consultant provided.
22. Note the future Silver Oaks Phases 2 & 3 to the west of the site. Consultant provided.
23. Remove “Concept” from the Zoning information. This should just be “PUD.” Consultant revised.
24. Add note: “All street signs and posts shall be owned, maintained, repaired, and/or replaced by the
developer or subdivision homeowner’s association. Both the developer and the homeowner’s
association shall hold Ascension Parish harmless for any and all work pertaining to the
replacement and upkeep of the street signs and/or posts within this development. The developer
and/or homeowner’s association also hereby agrees to maintain said street signs and posts as
required by law.” Consultant did not revise plat.
The following items should be considered by the Planning Commission in their analysis of the case:
• No comments.
If you have any questions or comments, please do not hesitate to contact me at (225) 769-0546.
Sincerely,
Engineer Review Agency for the Ascension Parish Planning Commission
Shaun Sherrow, P.E.
CC: Deric Murphy, P.E., L.S.I., Quality Engineering & Surveying, LLC
![Page 59: OFFICE OF PLANNING AND DEVELOPMENT …...PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Planning Commission February 8, 2017 - 6:00 PM Courthouse East,](https://reader030.vdocuments.site/reader030/viewer/2022041004/5ea780ee2d1813324f799b24/html5/thumbnails/59.jpg)
N01°08'28"W 1325.29'
N89°07'18"E 327.70'
S01°08'18"E 1329.88'
S89°55'28"W 327.69'
TRACT "CA3"
SITE
VICINITY MAP
N
(50' RIGHT-OF-WAY)
1
34
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18
TRACT "CA4"
TRACT"FA"
TRACT "CA1"
TRACT "CA2"
TRACT"STP"
FLOOD CERTIFICATION
DWG Path:
CLIENT:
DESCRIPTION:
Project No.: Date: Drawn By:
PROJECT:
TITLE:
FINAL PLAT
SILVER OAKS DEVELOPMENT, LLC9191 SIEGEN LANE, SUITE 3-B
BATON ROUGE, LOUISIANA 7081623
LOCATED IN NW
1
4
SECTION 7,
TOWNSHIP 9 SOUTH, RANGE 3 EAST,
SOUTHEASTERN LAND DISTRICT, EAST OF THE MISSISSIPPI RIVER,
ASCENSION PARISH, LOUISIANA
SILVER OAKSSUBDIVISION
PHASE I
ASCENSION PARISH PLANNING COMMISSION
APPROVED:
PUBLIC DEDICATION
SEWAGE DISPOSAL NOTE
LANDOWNER/OFFICER CERTIFICATION:
RESTRICTIONS NOTE:
BENCHMARK:
BASIS OF BEARING **
CERTIFICATION:
INSET "A" - TYPICAL SEWER SERVITUDE
TYPICAL LOT DETAIL: GENERAL NOTES:
LEGEND
”
SCALE 1" - 2000'GENERAL SUBDIVISION INFORMATION: REFERENCE MAPS: NOTES:
50 0 50 100
PARCEL LINE TABLE
Line #
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L16
L17
L18
L19
L20
L21
L22
Direction
S53°47'53"E
S36°12'07"W
N53°47'53"W
S01°08'28"E
S42°08'24"W
N47°51'36"W
N42°08'24"E
N42°08'24"E
S47°51'36"E
S42°08'24"W
S01°08'28"E
N88°51'32"E
N88°51'32"E
S01°08'28"E
N53°47'53"W
N36°12'07"E
S53°47'53"E
S01°08'28"E
S01°08'28"E
S01°08'28"E
S46°00'22"E
Distance
36.18'
7.50'
59.81'
225.37'
82.82'
7.50'
42.29'
26.41'
7.50'
70.94'
106.51'
60.25'
58.82'
62.11'
46.82'
7.50'
23.67'
28.81'
40.00'
40.00'
21.28'
L1 N01°08'28"W 10.40'
Line # Direction Distance
STERLING OAKS DRIVE
C14
L11
C39 N01°08'28"W 137.73'
L16
L17
L4
C5
C13
INSET "B" NOT TO SCALE INSET "C" NOT TO SCALE
CURVE TABLE
Curve #
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C11
C12
C13
C14
C15
C16
C17
C18
C19
C20
C21
C22
C23
C24
C25
C26
C27
C28
C29
C30
C31
C32
Length
128.49'
128.48'
144.80'
144.80'
130.62'
126.34'
142.38'
147.21'
142.38'
147.21'
130.62'
126.34'
53.04'
53.15'
4.97'
48.21'
53.06'
45.94'
22.93'
53.03'
53.13'
13.29'
39.91'
53.08'
53.01'
1.21'
20.06'
100.12'
10.45'
Radius
1500.00'
1500.00'
1500.00'
1500.00'
1525.00'
1475.00'
1475.00'
1525.00'
1475.00'
1525.00'
1525.00'
1475.00'
1475.00'
1475.00'
1475.00'
1525.00'
1525.00'
1525.00'
1475.00'
1475.00'
1475.00'
1475.00'
1525.00'
1525.00'
1525.00'
1525.00'
1525.00'
1525.00'
1525.00'
ChordBearing
N01°18'46"E
S01°18'46"W
S03°54'23"E
N03°54'23"W
N01°18'46"E
S01°18'46"W
S03°54'23"E
N03°54'23"W
N03°54'23"W
S03°54'23"E
S01°18'46"W
N01°18'46"E
S03°23'01"E
S05°26'47"E
S06°34'31"E
N05°45'58"W
N03°51'50"W
N02°00'15"W
N01°35'11"W
N03°03'43"W
N05°07'26"W
N06°24'50"W
S05°55'20"E
S04°10'31"E
S02°10'57"E
S01°09'50"E
S00°45'51"E
S01°29'36"W
S03°34'14"W
ChordDistance
128.45'
128.44'
144.74'
144.74'
130.59'
126.30'
142.33'
147.15'
142.33'
147.15'
130.59'
126.30'
53.04'
53.15'
4.97'
48.21'
53.06'
45.94'
22.93'
53.03'
53.13'
13.29'
39.91'
53.07'
53.01'
1.21'
20.06'
100.11'
10.45'
C33
C34
C35
C36
69.97'
41.10'
30.03'
55.21'
42.25'
8.38'
10.03'
1525.00'
1475.00'
1475.00'
1475.00'
1525.00'
1525.00'
1525.00'
N02°27'08"E
S02°58'06"W
S01°35'12"W
S00°04'08"E
N00°20'51"W
N00°36'13"E
N00°56'58"E
69.97'
41.10'
30.03'
55.20'
42.25'
8.38'
10.03'
Curve # Length RadiusChord
BearingChord
DistanceCurve # Length Radius
ChordBearing
ChordDistance
C37
C38
C39
11.43'
19.79'
31.21'
1475.00'
1475.00'
1475.00'
S01°21'47"E
S01°58'09"E
S01°44'50"E
11.43'
19.78'
31.21'
L2
C15 C33
L3
L18
L6
L7
L10
L9
L8
127.33' L1 C38 C37
TRACT "CA5"