office goes office terneuzen · a storm flood barrier ... 640 vacuum cleaners from malaysia a ......
TRANSCRIPT
1
KOCH CONSULTANCY, ENGINEERS & ARCHITECTS
Office Goes Office Terneuzen
WWW.KOCHADVIESGROEP.NL
23-03-2016
2
CONSULT – DESIGN – ENGINEERING – PROJECT MANAGEMENT
ARCHITECTURAL &
STRUCTURAL DESIGN
CIVIL & MARITIME
CLIMATE
ELECTRIC
LOGISTIC
GREEN ENERGY
INDEPENDENT - ONLY CUSTOMER COUNTS !
23-03-2016
KOCH CONSULTANCY, ENGINEERS & ARCHITECTS
3
CONSULT – DESIGN – ENGINEERING – PROJECT MANAGEMENT
PORTS & INDUSTRY
ALL SECTORS OF INDUSTRY
GOVERNMENT
CARE & ACCOMODATION / HOUSING
RECREATION / LEISURE
EDUCATION
RETAIL & INTERIOR DESIGN
INDEPENDENT - ONLY CUSTOMER COUNTS !
23-03-2016
KOCH CONSULTANCY, ENGINEERS & ARCHITECTS
4
MY MESSAGE:
- IN THE WESTERN SCHELDT THERE WILL EVER BE
A STORM FLOOD BARRIER
- THE WESTERN SCHELDT WILL SOON NOT BE ABLE
TO COPE WITH THE PRESSURE OF MEGA SHIPS
HOW CAN ANTWERP REMAIN A WORLD HARBOUR?
WE HAVE THE ANSWER FOR THAT AND WILL EXPLAIN IT
5
• THE SEA LEVEL RISES…………
• NASA PREDICTS 3,00 UNTIL 2065 M
• THE CLIMATE CHANGES….……..
• STILL WEAK LINKS
• THUS COMPLETION DELTAPLAN
• SHORTENING COASTLINE
• SWEET WATER BUFFER
Afsluitdijk
Hondsbosse Zeewering
Zeesluis IJmuiden
Zandmotor
2e Maasvlakte
Maaslandkering
Haringvlietdam
FUTURE SEA LOCK IN NIEUWE
WATERWEG (SPAARGAREN)
Brouwersdam
Oosterscheldekering
Waterdunen
Vlaamse Baaien
Veerse Gatdam
6
STORM BARRIER IN WESTERN SCHELDT BEFORE 2050?
7
SAFETY AGAINST FLOOD
STORM BARRIER IN WESTERN SCHELDT BEFORE 2050 ?
BECAUSE OF FLOOD SAFETY
HISTORICAL AND POLITICAL TURNING POINT !
23-03-2016
8
PRESENT SITUATION
SCHELDT BOARD
OFFICIAL COUNCIL MEETS 3X PER YEAR
REPRESENTATIVES FROM BELGIUM AND THE NETHERLANDS
TASKS / SUBJECTS
LONG TERM VISION UNTIL 2050
CLIMATE CHANGE
DEVELOPMENT MORPHOLOGY
ACCESS TO HARBOURS
NATURE DEVELOPMENT
SAIL SAFETY: NUMBER AND DIMENSIONS OF SHIPS
FLOOD SAFETY
RECREATION
AGRICULTURE
23-03-2016
9
PRESENT SITUATION
CONTAINER HABOURS OF ANTWERP
throughput 9,5 million TEU / YEAR
regular services: - North-Atlantic route - South-Atlantic route and Mexico vessels 4.500, 8.500, 15.000, 18.000 TEU - American East coast - Montreal
23-03-2016
10
PRESENT SITUATION
REDUCTION OF
TRANSPORT COSTS BY:
- BIGGER VESSELS
- VESSEL SHARING
CONSEQUENCES:
- BERTHING TIME IN
HARBOUR BECOMES
MORE EXPENSIVE
CHOICE FOR WESTERN
SCHELDT MADE BY:
- MANOEUVRE ABILITY
- DRAFT
- LOGISTIC COSTS
DEVELOPMENT OF SHIPS
23-03-2016
11
PRESENT SITUATION
From Triple-E (18.340 teu)
to ‘Barzan’ (19.870 teu)
23-03-2016
12
PRESENT SITUATION
BIGGER VESSELS LOWER TRANSPORT COSTS
IN 1970 SEA TRANSPORT COSTED STILL ± 10% OF THE
PRODUCT PRICE
YET ONLY ± 3%
EXAMPLES IN 40’ CONTAINERS TO ROTTERDAM
350 BICYCLES FROM THAILAND a € 7,50 / PIECE
640 VACUUM CLEANERS FROM MALAYSIA a € 4,50 / PIECE
500 JEANS FROM HONG KONG a € 0,55 / PIECE
9.000 PAIR OF SHOES FROM ASIA a € 0,99 / PIECE
23-03-2016
13
PRESENT SITUATION
80/100m 70m 70m EVOLUTION OF
CONTAINER SHIPS
LEADS TO
BIGGER CRANES
23-03-2016
14
PRESENT SITUATION
PROBLEMS FOR HARBOURS
FORCED TO HIGH INVESTMENTS FOR
− BIGGER SHIP TO SHORE CRANES
− MORE AUTOMATION
− STRENGTHENING QUAY WALL
− EXTENSION TERMINAL AREA
− CONGESTION TRANSPORT ROUTES
IN ORDER TO BE PERMITTED TO RECEIVE MEGA VESSELS
− ANTWERP FOLLOWED ALL REQUIREMENT WITHOUT BRINGING
IN OWN INNOVATIONS
− ANTWERP MOVES MSC TERMINAL FROM DELWAIDEDOK
TO DEURGANCKDOK
SHIPPING COMPANIES ARE CHOOSING HARBOURS !
23-03-2016
15
LIFE CYCLE
LIFE CYCLE OF HARBOURS DETERMINED BY:
INDUSTRIAL ACTIVITIES
HINTERLAND CONNECTIONS
BALANCE BETWEEN IMPORT AND EXPORT
HANDLING SPEED
COSTS
NAUTICAL ACCESS
DEVELOPMENT OF THE SHIPS
PORT PLANNING / CITY PLANNING
NATURE AIMS
Example: HAMBURG
ROTTERDAM INNER HARBOUR
VENICE
23-03-2016
16
LIFE CYCLE
NOWADAYS IS ANTWERP MOST SUCCESSFUL:
GATEWAY TO EUROPE 80 KM INLAND
11TH IN THE 20 LARGEST PORTS IN THE WORLD
MOST CENTRALLY LOCATED IN EUROPE
CONTAINERS – RO / RO – DRY BULK – LIQUID BULK
CARGO HANDLING – INDUSTRY – LOGISTICS
ROAD, BARGE, RAIL TO HINTERLAND
PIPELINE, SHORT SEA
JOBS: DIRECT 61.500; INDIRECT 88.000; TOTAL 150.000.
23-03-2016
17
NEW HEADOFFICE AS LANDMARK
LIFE CYCLE
ANTWERP CAN BE
THE FIRST HARBOUR
IN THE WORLD WITH
NGICT STACK
OPERATIONS
world famous architect
unique in the world
23-03-2016
18
LIFE CYCLE
ANTWERP “PLANS”
THE UNIVERSE’S PLANS FOR ANTWERP
SAEFTINGHEDOK
KIELDRECHT LOCK
FROM RIGHT BANK TO
LEFT BANK
INDUSTRY ON
DELWAIDEDOK
EXTENSION DRY
INFRA STRUCTURE
EXPERIENCES FROM THE PAST …… OFFERS NO GUARANTEES FOR
THE FUTURE
23-03-2016
19
LIFE CYCLE
THE DEAFNESS BEFORE THE STORM …… BLACK SWANS ……
PREVIOUS BLACK SWAN WAS THE 3TH DEEPENING!
THERE WILL OVERFLY OTHER BLACK SWANS LIKE:
− PRODUCTION OF ELECTRICITY (AS VESTING CONDITION)
− SAIL SAFETY - TIDAL ACCESSIBLE
− PILOT STRIKES
− 4TH DEEPENING
− TOTAL CONGESTION TRANSPORT ROUTES
− FLOOD SAFETY (ANTWERP)
− COMPETITION SOUTHERN EUROPEAN HARBOURS
− PROTEST DEMONSTRATIONS / FRUSTRATION OF PROCEDURES
23-03-2016
20
LIFE CYCLE
NEW REQUIREMENTS TO LENGTHEN LIFE CYCLE
INNOVATION, INNOVATION, INNOVATION
NO LONGER TRENDFOLLOWER BUT TRENDSETTER
CREATIVITY AND VISION
COOPERATION WITH COUNTER PARTIES
INTEGRATION WESTERN-EUROPEAN VISION
A.S.A.P. INVESTIGATION CONTAINER TRANSFERIUM IN
SCHELDT MOUTH
23-03-2016
21
LIFE CYCLE
WHAT KIND OF STORM BARRIER?
CONTINUOUS DIKE WITH SEA LOCKS AND SLUICES
OPEN BARRIER WITH SLIDES
NORTH-SOUTH ROAD CONNECTION
SALT-SWEET WATER OVERFLOW
NATIONAL WATER BUFFER
SWEET WATER STORAGE
FISH MIGRATION
TIDAL RANGE
23-03-2016
22
NGICT
NGICT
(NEW GENERATION INTEGRATED CONTAINER TERMINALS)
WILL SAVE THE CONTAINERFLOW
TO
ANTWERP
WWW.NGIGT.EU
CONTAINER TRANSFERIUM ACCORDING TO:
23-03-2016
23
NGICT
WESTERN SCHELDT CONTAINER TRANSFERIUM
WITHOUT LOCKING CONTAINERS FROM SEA TO RIVER !
23-03-2016
24
NGICT
23-03-2016
WESTERN SCHELDT CONTAINER TRANSFERIUM
WITHOUT LOCKING CONTAINERS FROM SEA TO RIVER !
25
WHY NGICT?
TEU FACTOR 1,6
MAXIMUM TERMINAL PERFORMANCE NOW: 150 - 200 TEU / HOUR / SHIP
SHIPPING COMPANY MINIMAL REQUIRES:
- 10.000 TEU WITHIN 24 HOURS (6.000 MOVES)
- 400 a 600 TEU PER HOUR / SHIP (250 – 375 MOVES)
- 6 - 9 STS-CRANES ON A SHIP
23-03-2016
26
1970-…… SCs
1990-…… AGV+RMG/RTG
2015-…….. NGICT
150 TEU/HOUR/CS
350 TEU/HOUR/ULCS
650 TEU/HOUR/ULCS
750 TEU/HA
1100 TEU/HA
1500 TEU/HA
NGICT – DEVELOPMENT OF THE CONTAINER TERMINALS
Productivity challenges Stack density
23-03-2016
27
WHAT IS NGICT?
NEW CONCEPT FOR CONTAINER TERMINALS
FOR DEEP SEA + INLAND
- MUCH FASTER
- LESS SPACE OCCUPATION
- LOWER INVESTMENTS
- MUCH LOWER OPERATIONAL COSTS
- ENVIRONMENT PROFITS
- MAXIMUM FLEXIBILITY
PROFITABLE FOR ALL PARTNERS IN THE CHAIN
23-03-2016
28
NGICT
ZOOM IN ON THE TECHNIC AND LOGISTIC
OF THE OFFSHORE TERMINAL
AS PART OF THE STORM BARRIER
TECHNIC AND LOGISTIC NGICT – SCHELDT TERMINAL TRANSFERIUM
23-03-2016
29
TECHNIC AND LOGISTIC SCHELDT TERMINAL
23-03-2016
30
Stack capacity: max. 140.000 TEU Dwell time: 4 days (60% occupation) Throughput: ± 8,0 million TEU “Quay”length deep sea: ± 1.300 M “Quay”length inland: ± 1.300 M Terminal surface: ± 100 hectare
NGICT TECHNIC AND LOGISTIC SCHELDT TERMINAL
23-03-2016
31
- PROFITABLE CLUSTERING AND / OR SPLITTING UP
- CUSTOM MADE DISTRIBUTION; NO EXTRA HANDLING
TECHNIC AND LOGISTIC SCHELDT TERMINAL
23-03-2016
32
shuttle
cofferdam
floating stack area sea side Scheldt side
road tunnel
AGV lane Truck lane
OHC
OHC
TECHNIC AND LOGISTIC SCHELDT TERMINAL
23-03-2016
33
shuttle
cofferdam sea side Scheldt side
road tunnel
AGV lane truck lane
OHC
OHC
TECHNIC AND LOGISTIC SCHELDT TERMINAL
23-03-2016
34
PER SHUTTLE MAX. 2.016 TEU
SHUTTLE 40 X 180 M CARGO HOLD
MEASUREMENTS ADJUSTED ON NGICT
TECHNIC AND LOGISTIC SCHELDT TERMINAL
23-03-2016
35
Electrical propel engine
- OUTSIDE DIMENSION 46 X 200 M
- 2.016 TEU CAPACITY
- MAX DRAFT 5 M
- 4 POWERFULL ELECTRIC ENGINES (PODS) 360° TURNABLE
- ABILITY TO MOOR
- FUTURE UNMANNED REMOTE CONTROL
- SPECIAL HULL FOR MINIMAL WATER MOVEMENT
SHUTTLE
TECHNIC AND LOGISTIC SCHELDT TERMINAL
23-03-2016
36
Shuttle basin
Tug TUG FOR EXTRA SPEED
SHUTTLE
TECHNIC AND LOGISTIC SCHELDT TERMINAL
23-03-2016
37
DUE TO SMALL DRAFT THE SHUTTLES
CAN TAKE THE SHORTEST ROUTE
SHUTTLE
TECHNIC AND LOGISTIC SCHELDT TERMINAL
23-03-2016
38
ANIMATION
23-03-2016
39
OPPORTUNITIES FOR ANTWERP
PHASED AND PARTIAL RECONSTRUCTION FROM DEEP SEA INLAND TERMINALS
BENEFITS NGICT:
- HIGHER DENSITY STACK AREA
- MUCH FASTER OPERATIONS
- DOUBLING THROUGHPUT ON THE
EQUAL AREA
- DUE TO REGULAR SHUTTLES
SERVICES NO PEAKS AND VALLEYS
IN SUPPLY AND DISCHARGE
- LESS RISK FOR EMERGENCIES
DURING THE WESTERNSCHELDT
ROUTE
- LOWER COSTS
- ENVIRONMENTAL BENEFIT
- OPTIMAL CONNECTION OF SEA TO
INLAND WATERWAY
- SAEFTINGHE DOK NOT REQUIRED
EXISTING TERMINALS
23-03-2016
40
PHASED AND PARTIAL RECONSTRUCTION FROM DEEP SEA INLAND TERMINALS
INCASE OF A FIXED WATER LEVEL
IN THE WESTERN SCHELDT THE
ZANDVLIET- AND BERENDRECHT
LOCK COULD BE TAKEN OUT OF
OPERATION AND THE
DELWAIDEDOK REMAINS
AVAILABLE FOR CONTAINERS
MOVING TO DEURGANCKDOK IS
NO LONGER A MUST
EXISTING TERMINALS
23-03-2016
OPPORTUNITIES FOR ANTWERP
41
PHASE 1:
- REDUCE DISTANCE BETWEEN STS AREA AND STACK
- ARRANGE STACK AREA ACCORDING TO NGICT-MODEL
- STS CRANES PRODUCTIVITY OF 40 80%! (TBA)
EXISTING STS CRANE
SHUTTLES
NGICT STACK
SPRINTERS
23-03-2016
OPPORTUNITIES FOR ANTWERP
42
PHASE 2:
- REPLACE EXISTING STS CRANES IN PHASES BY
STACK OVERHEAD CRANES
EXISTING STS CRANE
SPRINTERS
NGICT STACK
OHC
OHC
23-03-2016
OPPORTUNITIES FOR ANTWERP
43
PHASE 3a:
- COMPLETE NGICT ARRANGEMENT
OHC OHC
AGV TRACKS
23-03-2016
OPPORTUNITIES FOR ANTWERP
44
PHASE 3b:
- FOR COASTERS AND FEEDERS A HIGHER NGICT ARRANGEMENT
23-03-2016
OPPORTUNITIES FOR ANTWERP
45
SUPPLY AND
DISCHARGE
WITH SHUTTLES
SUPPLY AND DISCHARGE
SMALLER SEA VESSELS
AND COASTERS
23-03-2016
OPPORTUNITIES FOR ANTWERP
46
NO LONGER FORCED INVESTMENTS TO FOLLOW THE EVOLUTION
OF MEGA VESSELS
23-03-2016
OPPORTUNITIES FOR ANTWERP
47
ANIMATION
23-03-2016
48
UCLS
SHUTTLES
23-03-2016
OPPORTUNITIES FOR ANTWERP – COMPARISON OF COSTS
49
- SAFETY AGAINST FLOOD ECONOMIC IMPULS
- NGICT CAN BECOME THE NEW WORLD STANDARD
- BOOST FROM REGIONAL FABRICATION INDUSTRY
- FITS IN EUROPEAN REGION VISION
- DUTCH / BELGIUM EXPORT PRODUCT
- EXPORT KNOW-HOW / HIGH-TECH DESIGN
- EXAMPLE FOR HAMBURG, VENICE AND OTHER “INLAND PORTS”
23-03-2016
OPPORTUNITIES FOR SCHELDT REGION – OUR ADVICE
50
- STORM BARRIER ON THE AGENDA OF THE SCHELDT BOARD
- DESIGN A NEW MASTERPLAN AND BUSINESS MODEL FOR
SCHELDT REGION
ANTWERPEN – ZEEBRUGGE – GENT – VLISSINGEN – TERNEUZEN
- START WITH NGICT SYSTEM ON EXISTING TERMINAL IN
ANTWERP TO ATTRACK ALL SHIPPING COMPANIES
23-03-2016
OPPORTUNITIES FOR SCHELDT REGION – OUR ADVICE
51 51
FINALLY
Schelde regio
the smartest
China
the biggest
THANKS FOR YOUR ATTENTION! 23-03-2016