Phase of Construction

1,2,34456677

Tools/EquipmentSetup of JobUnload Material & Equi{!mentExcavationPlacement of RebarForms RemovalPouring ConcreteApplying Curing CompoundsCoveri n g/Protecti ng_-BackfillYard Piping

7

7

7

j JOb Safety AnalysisPrepa~ By -

DateJob No.Phase Of Construction T ools/Eouipment

Job Task I Assoc. Ha~s~

PPE R~quired Safety Precauti~nsWork Area'Scotch bloCks'level Accessible ~Falling or rolling

!nffjack.rwo rk glOveSL rool Trailer

Page 1 of 7

j JOb Safety AnalysisPrepared By

Dat~Job No.Phase Of Construction T oots/Eouipment

Work Area I Job Task

Grinding metal1 Assoc. Hazards I PPE R~quired Safety Precautions-~ ~

Grinding dust,electrical shock

Know where grinder particles areflying, know whereabouts of extra,cord, guard in place.

!Grinder Safety glasses,Iface shield, gloves

Grinding dust andparticles, electricshock

j Safety glasses,,face shield, glovesdust mask.

I Know where grinder partICles areflying, know whereabouts of extraI cord. guard in place.

IGrinding concrete

Manual labor !Stress to muscles I Be careful how task is perfonned

IiSatety

jsatetywork g

:uel for equipment IFlammabie spillage I Lab cans, use OSHA ap~ved cansonly

:uel cans

l Ope-ration ofbackhoe.

Refer to operating technique inoperator's manual, operate at safespeed for conditions, wear seatbelt, review operator's manual,

.~se onIY9~~!!~~~OP~!~t~!:,,""".',"

"lackhoe Safety glasses,,seatbelt.

Un-level site,conditions,inexperiencedoperator

Dozer IOperation of Dozer I seat belt, safety

Qlasses.

Un-level siteconditions,inexperiencedoperator, workingwith rocks, workingwith falling trees.

'Refer to operating technique in -

operator's manual, operate at safespeed for conditions, wear seatbelt, review operator's manual,use only qualified operator.! know limits of material being moved.

Page 2 of 7

cans,

glasseslasses

IJob Safety AnalysisPrepared By

DateJob No.Pha~~ Of Construction T ools/EauiDment-

PPE RequiredWork Area Job Task Assoc. Hazards~

Safety Precautions

Isafety glasses,,work gloves,proper footwear.

I Removal of clutter, trip hazards,combustibles. This is to be done onan ongoing basic during wholeprogress.

eneral work area [Clutter, tliphazards,combustibles

!Housekeeping,keeping trash andscrap picked up.Keeping joborganized, toolspicked up.

IWelding in generalI Electrical. eyesburning

Gloves, hood, dartisafety glasses.

Ground equipment, cover ends withboots, be aware of who is around,warn co-workers of arch's.

I Be aware of hot spots and stayclear.

Welding

Hot metal I Gloves, longsleeves

, T arch !CUtting metal I Hot metal, gases

storage fire

Da~ glassesIQloves

Check hose and gauges for leaksI Be aware of direction of cutting.

Rock Noise, flying rockdebris, loosingcontrol ofequipment.

!Wear earplugs, do not stand aroundarea while not operating equipmentBe firmly planted and have control ofequipment before operating

I.J=I~ hammer Glasses, gloves,

Ifootwear, earplugs

~~i~i~~:~~f~

Page 3 of 7

\ JOb Safety AnalysisPrepared By

Date~ Start Up/Unl~ Mat.& Ea.

Job No.Phase Of Construction

Work Area Job Task '~OC. Haza"rds!-PP-E Reauired Safety Pre~utions

I Cutting unknown

lines

IJOb Start Up UndergroundI Utilities

Traffic

Familiarize yourself with job andsurrounding area, One-callFlag-man, construction area warningsigns or required signs. Don't cross the lines.

jmit of property Doing costly

l~~~;;;to~~.~,~~

I Backhoe I Trailer shifting,winch cab shifting

ISafety glasses,. proper footwear

work gloves

j DroP trailer on solid level ground,brake set on equipment, operator

I

on equipment before unhooking allchains.

JnloadingI t:QUiPment

Materials

I Rebar I Pinch area, looseends uncontrollec'

I Safety glasses,proper footwearwork gloves

I Don' stand close to rebar while

picking up.

Safety glasses,proper footwearworX gloves

Level trailer before unchaining, storeon level blocking, keep hands clearof pinch areas.

:onns

Safety glasses,proper footwearworK gloves

I AnchorbQlt Pinch area, shiftingmaterial, sharpends.

I Keep han"dsandfeet clear while

picking up load, level trailer.

I Piping I Pinch area, shifting

materia~

Safety glasses,proper footwearwork gloves

I Keep hand and feet clear while

picking up load, level trailer

Page 4 of 7

DateExcavation

~ty Precautions

Job No.Phase Of Construction

PPE RequiredI Assoc. HazardsJob Task

Job Safety AnalysisPrepared By .

Work Area ,-~

Use procedures outlined in owner'smanual, don't let anyone stand inworking limits of equipment.

Seat belt, safetyglasses, workgloves, ownermanuali Possible cave-in

IUnlevel jobsite,rocky, muddy

Excavating~cavation inI"dneral backhoe!Trackhoe

Keep all excavated material 3' fromedge of trenches, follow companyexcavation guidelines.

Traffic

~

~~

~;.

.~m11ft~;:ijii!:

:~~!~~~!~~~~~~:~~:~~~~:

Page 5 of 7

Use warning signs or flag man asrequired when working in or alongroadways.

[ Job Safety Analysis

Prepared'--

DateJob No.Phase Of Construction Placement of Reb~r

Job Task PPE RequiredWork Area I Assoc. Hazards ~-- ~

Safety Precautions~

WorK gloves,safety glasses,proper worK boots

I Placement of

"barPinch area, sharpAncis

-I Keep hands or feet clear of possiblepinch ares.

I Sharp edges fromcut wires

ISafety glasseswork gloves

Tying rebar I Bend wire our of way when possible

"Vert. Rebar Trip and fall Put rebar caps on vertical rebar andI horizontal rebar where trip and fallconditions exist.

I Caps

! walking across

top of rebar

Trip areas Caution when walking on rebar

I Placement of

forms

IPinch areasorms IKeep hand clear and use cautionwhen installing wedge bolts

Safety glasses,work gloves,proper workboots

I Breakage ot tonns IWo~ glovesIinstall cable Put at least 2 cables around all formsand safety line on each in place withcome a long.

Page 6 of 7

IJob Safety Analysis DateJob No.Pouring Concrete

Coverinq/ProtectinqPhase Of Construction-PPE Required

~pared By -Job Taskling com

I Assoc. Hazards- -

Safety PrecautionsrPOO jconcrete in eyes

concrete onexpose skin

Safetyrubberrubber

-Try to stay out of splatter area whenpossible. wear gloves.When having to walk in concrete, userubber boots, wash any concreteoff ASAP.

IWind Work gloves,

safety glasses,proper work boots

jSpray compound so wind will no!1 blow back onto operator

ICuri

I Cleaning upsprayer

Strong chemicals jWOrk gloves,safety glasses,proper work boots

l use caution, make sure the sprayeris not under pressure.

IWind. trip hazards I Proper foot wearICovering concrete Use caution when unrolling outbecause of wind catching and pullingemployee over areas they can notsee.

I Backfill IR~c:kfili ! Operatlng tooclose to openchipping ofI concrete edges

I Seat belt, owner!manual

I Stay clear of open trenches, know

the limits of the equipment.

IYard Piping IPinch areas, dustcave off of ~rench

Iisafety glasses.proper footwear

IKeep clear of pinch area, windyconditions may cause dust to be'blown into eyes, beware of soilconditions before, while in ditch linekeep rocks and clods clear of ditch

edges.

Iinstall pipe/valves

etc.

IHan ISlippage I Strap I Use straps when possible to

minimize slippa,qe.

Page7of7

:rete glassesgloves,boots

compound

119 material