October 2012 Air Quality Report Berry Lane Park Attached is a technical summary of airquality data for September 2012 at the Berry Lane Park cleanup site submitted by Jersey City Redevelopment Agency’s air monitoring consultant. This report provides information about conditions at the fenceline and along the edge of cleanup work areas. Also, this document notes any deviations from the monitoring plan and work schedule caused by factors beyond the control of cleanup contractors, such as inclement weather and malfunctioning equipment.

Upload: nguyennhu

Post on 21-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

October 2012 Air Quality Report

Berry Lane Park

Attached is a technical summary of air‐quality data for September 2012 at the Berry Lane Park cleanup site submitted by Jersey City Redevelopment Agency’s air monitoring consultant.

This report provides information about conditions at the fenceline and along the edge of cleanup work areas.

Also, this document notes any deviations from the monitoring plan and work schedule caused

by factors beyond the control of cleanup contractors, such as inclement weather and

malfunctioning equipment.

Submitted to: Submitted by: JCRA Emilcott Jersey City, NJ 190 Park Avenue Morristown, NJ 07960

Monthly Air Monitoring Report Berry Lane Park, Sites 121 & 207 Jersey City, New Jersey

Reporting Period: October 2012

October: Monthly Air Monitoring Report

Monthly Air Monitoring Report Berry Lane Park, Sites 121 & 207 Jersey City, New Jersey

Reporting Period: October 2012

_

Prepared By: David Tomsey

_ Reviewed By: Bruce Groves September 19, 2012

ii

Contents 1.0 Introduction ................................................................................................................ 1-1

2.0 Air Monitoring............................................................................................................. 2-1

2.1 Integrated Air Sampling.............................................................................................. . 2-3

2.1.1 Integrated Cr6 Sampling................................................................................ 2-3

2.1.2 Integrated PM10 Sampling ............................................................................ . 2-3

2.2 Real-Time Continuous Air Monitoring........................................................................... 2-4

2.2.1 Fenceline...................................................................................................... 2-4

2.2.2 Exclusion Zone Perimeter ............................................................................. 2-4

2.2.3 Meteorological Measurements....................................................................... 2-4 3.0 Site Specific Acceptable Air Concentration and Real-Time Action Levels.............. 3-1

3.1 Integrated Cr6 Acceptable Air Concentration................................................................ 3-1

3.2 Real-Time Alert and Action Levels............................................................................... 3-2 4.0 Air Sampling and Monitoring Results ....................................................................... 4-1

4.1 Integrated Air Sampling Results .................................................................................. 4-1

4.1.1 Cr6 Sampling Results ................................................................................... 4-1

4.1.2 PM10 Sampling Results ................................................................................ . 4-3

4.1.3 Integrated Air Sampling Results Summary ..................................................... 4-3

4.2 Real-Time Air Monitoring Results ................................................................................ 4-3

4.2.1 PM10 Monitoring Results............................................................................... . 4-3

4.3 Meteorological Monitoring Results ............................................................................... 4-4 4.4 Site Activities .............................................................................................................. 4-4

4.5 Site Map(s) ................................................................................................................. 4-4 5.0 Conc lus ions ............................................................................................................5-1

5

List of Appendices

Appendix A Monthly Results Summaries

Appendix B Program to Date Result Summaries

6

List of Tables

Table 2-1: Air Monitoring Approach ............................................................................................ 2-3

Table 3-1: Running Cr6 Metrics.................................................................................................. 3-2

Table 3-2: Site-Specific Alert and Action Levels .......................................................................... 3-2

Table 4-1: Short Term Average 8 Hour Integrated Cr6 Metrics ............................ ........................ 4-2

List of Figures

Figure 2-1: Site Overview............................................................................................................ 2-2

7

List of Acronyms

AAC – Acceptable Air Concentration

AMP – Air Monitoring Plan

AMS – Air Monitoring Station

Cr6 – Hexavalent Chromium

FAM – Fixed Air Monitoring

LPM – Liters per Minute

ng/m3

– Nanograms per Cubic Meter of Air

NJDEP – New Jersey Department of Environmental Protection

PAM – Portable Air Monitoring

PM10 – Particulate Matter 10 Microns or less in Diameter

PPG – PPG Industries, Inc.

ppb – Parts per Billion

ppm – Parts per Million

TSP – Total Suspended Particulate

µg/m

3 – Micrograms per Cubic Meter of Air

ES-1

Executive Summary

Air monitoring conducted at the Berry Lane Park, Sites 121 and 207, was completed in accordance with

the Site Specific Air Monitoring Plan (AMP), and included sampling and analysis for 8 hour integrated

hexavalent chromium (Cr6) and total dust, as well as real-time continuous monitoring for PM10 at nine (9)

Air Monitoring Stations (AMS) (5 at the Site perimeter and 4 at the perimeter of the exclusion zone). In

addition to the air monitoring conducted in accordance with the AMP, 24 hour Cr6 sampling with lab

analysis was also conducted at two fenceline stations. This program is designed to measure various

aspects of air quality at the Site to ensure that remedial activities at the Site do not have an adverse effect

on Site workers and the surrounding community.

Results of the integrated Cr6 sampling and analysis indicate that program to date average airborne Cr6

concentrations are significantly below the Acceptable Air Concentration (AAC) at each of the AMS

locations. The results and calculations document continuing compliance with the current AAC set by the

New Jersey Department of Environmental Protection (NJDEP), confirming that dust control measures

continue to be effective, and indicate that the levels of Cr6 in dust generated at the Site do not generate

an emission source of Cr6 sufficient to create potential offsite exposure to Cr6 at or exceeding the AAC.

1.0 Introduction

This monthly air monitoring report update includes both tabular information and written discussions

summarizing the ambient air quality data collected in accordance with the Air Monitoring Plan (AMP) at

the Berry Lane Park, Sites 121 and 207 (referred herein as Site), in Jersey City, New Jersey.

This monthly report is designed to provide a summary of the air monitoring data collected between the

baseline period and the end of the reporting period, while focusing on the latest month of data collection

results. This monthly report includes both monthly and program to date summaries of the following:

Integrated hexavalent chromium (Cr6) analytical results;

Integrated total dust analytical results;

Real-time 15 minute average PM10 concentrations; and

Meteorological conditions.

Results have been evaluated and compared to the Site specific Acceptable Air Concentration (AAC) and

the Action Levels in accordance with the AMP.

1-1

2.0 Air Monitoring

This report summarizes air monitoring at the Site performed between the baseline period and the end of

the reporting period, with a focus on data collected during the recent month of activities. The baseline

period includes data measured between July 12, 2012 and July 16, 2012. Routine sampling began on

July 23, 2012 with the start of ground intrusive activities on Site.

Nine Air Monitoring Stations (AMS) installed at the Site provide two layers of protection in terms of air

monitoring. The first level of air monitoring (used as an early warning indicator) includes 4 portable air

monitoring (PAM) stations located at the boundary of the exclusion zone (active work area). The

second level of air monitoring is conducted at 5 fixed air monitoring (FAM) stations at the fenceline of

the Site. Figure 2-1 provides an overview of the Site and a typical configuration of the AMS. Table 2-1

provides an overview of the air monitoring approach at each of the AMS.

Air monitoring results to date have confirmed protection of the community, and the overall effectiveness

of the program will be evaluated on a continuous basis. Success will ultimately be determined at the

end of the remediation program when the average Cr6 concentrations at each AMS location are

compared to the AAC. This monthly report has been designed to evaluate the program’s effectiveness

on a monthly basis. The Cr6 average concentrations measured at each AMS will continually be

compared to the Site specific AAC for Cr6 to confirm the effectiveness of the program. Thus, the

monthly reports will focus largely on the integrated analytical results collected as part of the Cr6

fenceline air monitoring.

Air monitoring data collected at the Site includes:

8 hour integrated Cr6 and total dust sample collection at the fenceline and the perimeter

of the exclusion zone and associated laboratory analysis;

24 hour and 72 hour integrated Cr6 samples collection at the fenceline and laboratory analysis;

and

Real-time 15 minute average PM10, readings measured at the perimeter of the exclusion

zone and fenceline;

This section outlines the types of data collected, frequency of collection, and the corresponding locations.

2-1

Figure 2-1: Site Overview

2-2

Table 2-1: Air Monitoring Approach

Integrated Air Monitoring Real Time Air Monitoring

Fencelin

e

FAM 1,2,3,4,5

Integrated 8 hour Cr6 and total dust sampling and analysis during work days (Typically Monday – Friday).

24 hour and 72 hour Cr6 sampling and analysis at 2 of the FAM stations (FAM 2 and FAM 4) 7 days per week.

15 minute average PM10

readings measured during a typical work day.

Exclu

sio

n Z

on

e

PAM 1,2,3,4

Integrated 8 hour Cr6 and total dust sampling and analysis during work

days (Typically Monday – Friday).

15 minute average PM10 readings measured during a

typical work day.

2.1 Integrated Air Sampling

Integrated Cr6 and total dust samples are collected at each of the fenceline and exclusion zone perimeter AMS for an 8 hour to 10 hour duration each working day (Typically Monday – Friday) at each of the nine AMS. Samples are collected on a preweighed polyvinyl chloride (PVC) 37mm filter cassette for both Cr6 and total dust. Sampling pumps operate at 2 liters per minute and are calibrated at the beginning and end of each sampling run.

2.1.1 Integrated Cr6 Sampling

The exposed Cr6 filters are shipped to an American Industrial Hygiene Association (AIHA) Industrial Hygiene Laboratory Accreditation Program (IHLAP) certified analytical laboratory for Cr6 analysis using Modified OSHA ID 215. The sample weights are provided by the laboratory with a laboratory detection limit of 20.0 ng. The sample weights and flow information (carefully documented in the field) are utilized to calculate 8 hour to 10 hour integrated Cr6 air concentrations in nanograms per cubic meter of air

(ng/m3). Filter weights reported as non-detect are included in the concentration calculation at one half

the laboratory detection limit for data reporting purposes.

In addition to sampling performed during working hours, 24 hour and 72 hour Cr6 sampling and analysis are also performed at 2 fenceline AMS. These longer duration samples show Cr6 concentrations during overnight and weekend periods. The 24 hour samples are typically collected daily from 6AM to 6AM Monday through Thursday, and a single 72 hour sample is collected from 6AM Friday through 6AM Monday from each of the 2 AMS (FAM 2 and FAM 4).

2.1.2 Integrated Total Dust Sampling

The exposed total dust filters are shipped to an American Industrial Hygiene Association (AIHA) Industrial Hygiene Laboratory Accreditation Program (IHLAP) certified analytical laboratory for total particulate analysis using NIOSH method 0500. The sample weights are provided by the laboratory with a laboratory detection limit of 100 ug. The sample weights and flow information (carefully documented in the field) are utilized to calculate 8 hour to 10 hour integrated Cr6 air concentrations in micrograms per cubic meter

2-3

of air (µg/m3). Filter weights reported as non-detect are included in the concentration calculation at one

half the laboratory detection limit for data reporting purposes.

2.2 Real Time Air Monitoring

Real time air monitoring is divided into three types of monitoring including: fenceline air monitoring (at the Site property fenceline), exclusion zone monitoring (at the perimeter of the exclusion zone), and meteorological monitoring (at multiple fenceline locations). Each monitoring type is described in more detail in the following sections.

2.2.1 Fenceline

Fenceline air monitoring is currently performed at 5 FAM stations. Fenceline monitoring includes the following:

Real time 15 minute average PM10 readings at each of the five fenceline locations (All

FAM stations operate 8 10 hours during remedial activities, Monday through Friday);

2.2.2 Exclusion Zone Perimeter

Exclusion zone perimeter air monitoring is performed at 4 PAM stations. Exclusion zone perimeter air monitoring includes the following:

Real time 15 minute average PM10 readings at each of the 4 exclusion zone perimeter locations (PAM stations operate 8 10 hours during remedial activities, Monday through Friday);

2.2.3 Meteorological Measurements

Meteorological measurements of 15 minute average wind speed and direction, relative humidity, pressure, and temperature are recorded onsite at FAM 2.

2-4

3-1

3.0 Site Specific Acceptable Air Concentration and Real Time Action Levels

Site specific AAC and real time Action Levels have been developed for Cr6 and real time PM10 concentrations by NJDEP as part of the approved AMP, in compliance with risk assessment procedures. The AAC and real time Action Levels have been developed to protect off site receptors from potential adverse health impacts from Cr6 and particulates over the duration of the intrusive remediation activities.

Real time monitoring and integrated results are compared against the AAC and the real time Action Levels to alert Site management of the potential need to enhance control of emissions and curtail operations to maintain concentrations at levels below the specified criteria. The AAC and real time Action Levels for integrated Cr6 concentrations and real-time PM10 are outlined in the following

sections.

3.1 Integrated Cr6 Acceptable Air Concentration

A Site specific Cr6 AAC has been developed by NJDEP to protect off site receptors from potential adverse health impacts due to potential exposure to Cr6 in dust. The AAC for Cr6 was developed to represent the maximum allowable average concentration of Cr6 in dust at each AMS over the project duration. In accordance with New Jersey regulatory requirements, the AAC represents a maximum level corresponding to a one in one million (1E-06) excess cancer risk to nearby residents due to potential exposure to Cr6 emanating from the Site.

The AAC of 49 ng/m3

is applicable at the Site fenceline and represents the maximum allowable average concentration measured over the project duration and was developed to ensure the protection of human health. This AAC also provides a value to evaluate the effectiveness of dust control.

To ensure ongoing compliance with the AAC, shorter duration rolling averages are utilized to provide for the early and regular assessment of performance trends and, if necessary, allow for responsive corrective measures to be implemented to ensure that emissions of Cr6 are maintained well below the AAC over the duration of the project, and are minimized to the greatest extent practical. These shorter duration average concentrations metrics include: program to date, 90 day, 60 day, and 30 day running averages where the average Cr6 concentration over the previous 90 day, 60 day, and 30 day periods are calculated for each sample day. Sampling days are considered days where routine sampling was conducted (typically Monday – Friday). The shorter term average concentrations are compared against the list of metrics provided in Table 3-1 which also depicts respective response actions. Due to the short duration of the project to date and limited sample days, a 90 day metric is not available for reporting.

Table 3-1: Running Cr6 Metrics

Metric Observation Response Action

30 day1 Cr6 average concentration greater than or equal to 45 ng/m3

External meeting to review

levels, evaluate activities each

day when elevated

concentrations were observed,

and trigger corrective action if

required.

60 day1 Cr6 average concentration greater than or equal to 40 ng/m3

90 day1 Cr6 average concentration greater than or equal to 35 ng/m3

1 Sampling days.

3.2 Real-Time Alert and Action Levels

Real-time Alert and Action Levels were designed to monitor and assist in control of Site emissions to

ensure protection of human health, and represent an important aspect of the remedial program at the

Site. The real-time Alert and Action Levels used on Site are shown in Table 3-2.

Table 3-2: Site Specific Alert and Action Levels

Parameter Alert Level (15 min TWA) Action Level (15 min TWA)

PM10 250 µg/m3 333 µg/m

3

3-2

4.0 Air Sampling and Monitoring Results

Results of air sampling and monitoring conducted between July 23, 2012 and October 31, 2012

are summarized herein. The following sections present both tabular and written discussions of the

air sampling and monitoring results for the reporting period including:

Monthly integrated and real time results;

Program to date integrated and real time statistics;

Evaluation of program success versus the Site specific AAC and Action Levels; and

Meteorological results.

Air sampling and monitoring results are presented in detail in the Appendices of this report. Appendix A

includes summary of the air sampling and monitoring results for the reporting period. Appendix B

includes program to date statistics and monthly comparison of results.

4.1 Integrated Air Sampling Results

Results of the integrated Cr6 and total dust sampling and analysis are presented in the following sections.

4.1.1 Cr6 Sampling Results

Results of the Cr6 sampling from the reporting period and a program to date evaluation are discussed in

the following sections.

Reporting Period

Individual integrated 8 hour Cr6 concentrations measured at the fenceline and exclusion zone perimeter

during the reporting period are presented in Table A-1. If an individual sample result exceeds 80% of

the project duration AAC, additional evaluation and review of relevant Site conditions and activities were

performed to potentially modify procedures if necessary to reduce the potential for increasing Cr6

concentration trends. Any elevated concentration data during the reporting period are listed and

discussed in Table A-3.

Program-to Date

Sampling and analytical statistics for integrated 8 hour Cr6 results are shown in Table B-1 and include

various programs to date metrics relative to Cr6 analytical data. Monthly average 8 hour Cr6

concentration results are shown in Table B-2 for each AMS location.

A snapshot of the program to date, 30 and 60 day running Cr6 average concentrations at the end of the

reporting period are shown in Table 4-1 and indicate that the Cr6 concentrations were well below the

maximum acceptable Cr6 metrics for the reporting period.

4-1

October 2012

Table 4-1: Short Term Average 8 Hour Integrated Cr6 Metrics

Running Cr6 Metrics

1 Fenceline Exclusion Zone Perimeter

Metric

(ng/m3)

FAM 1

(ng/m3)

FAM 2

(ng/m3)

FAM 3

(ng/m3)

FAM 4

(ng/m3)

FAM 5

(ng/m3)

PAM 1

(ng/m3)

PAM 2

(ng/m3)

PAM 3

(ng/m3)

PAM 4

(ng/m3)

30 day2

45 8.5 6.1 6.6 6.0 6.3 6.5 6.7 6.9 7.0

60 day2

40 8.5 4.7 8.0 4.1 9.6 9.4 7.4 8.6 8.1

90 day2

35 NA NA NA NA NA NA NA NA NA

PTD3 49 8.8 4.5 8.4 4.2 9.6 9.2 8.5 8.8 8.8

ng/m3

– nanograms per cubic meter

1

Running Cr6 metrics are utilized to provide for the early and regular assessment of performance trends and, if necessary, allow for responsive corrective measures to be implemented ensuring that emissions of Cr6 are maintained well below the AAC over the duration of the project, and are minimized to the greatest extent practical. The running Cr6 metrics are designed to evaluate the program success on short duration intervals (monthly) and do not represent the long term (program) ending success.

2

Running Cr6 metrics are valid on the last day in the report period and include the previous 30, 60, or 90 days of sample results if available. 3

Program to Date - Air monitoring conducted from July 23, 2012 through the end of the reporting period.

4-2

4.1.2 Total Dust Sampling Results

Results of the 8 hour integrated total particulate sampling and analysis from the reporting period and

program to date results are discussed in the following sections.

Reporting Period

Individual integrated 8 hour total particulate concentrations measured at the fenceline and exclusion zone perimeter during the reporting period are presented in Table A-2.

Program to date

Sampling and analytical statistics for integrated total particulate are shown in Table B-3 and include various

metrics relative to PM10 analytical data. Monthly average PM10 concentration results are shown in Table B-4 for each AMS.

4.1.3 Integrated Air Sampling Results Summary

There have been 70 sample days between July 23, 2012 and the end of the reporting period. The

results of the sample analysis for the fenceline and the exclusion zone perimeter are summarized in the

following sections.

Fenceline Air Monitoring

The program through this reporting period shows the 8 hour Cr6 average concentrations, based upon

lab analytical results at each fenceline AMS, were less than 13% of the AAC, demonstrating that the

dust control measures continue to be effective.

Exclusion Zone Perimeter Ai r Monitoring

The program, through this reporting period, shows the 8 hour Cr6 average results at each exclusion

zone perimeter AMS were less than 12% of the AAC. None of the exclusion zone Cr6 concentrations

were shown to be greater than the project duration based AAC.

4.2 Real Time Air Monitoring Results

Real time air monitoring for PM10 is conducted at the fenceline (15 minute averages) and exclusion zone

perimeter (15 minute averages) during remedial activities. The results of the real-time air monitoring are presented in the following sections.

4.2.1 PM10 Monitoring Results

Results of the real-time PM10 sampling for the reporting period and the start of intrusive activities are

discussed in the following sections.

Reporting Period

Real-time fenceline and exclusion zone perimeter 15 minute PM10 averages measured during the

reporting period are presented in Figure A-1 and Figure A-2, respectively. Real-time 15 minute PM10

averages were compared directly to the PM10 Action Level (333 µg/m3) and averages greater than the

Action Level are subject to additional evaluation. If applicable, elevated PM10 averages are listed and

discussed in Table A-3. PAM 1 was not in use until October 11th due to its close proximity to FAM 2, a

fixed location. Superstorm Sandy reached the New Jersey area on October 29, 2012. The site was

shut down on the 29th and 30

th with cleanup operations on the 31

st and November 1

st. November 2

nd

was the first day of air monitoring after the storm.

Program to Date

Real-time monthly PM10 averages are shown in Table B-5 for each AMS. Dust readings collected

during the reporting period are similar or slightly elevated compared to those during the baseline period

(when no intrusive activities were occurring). This indicates that dust control measures during intrusive

activities has been effective.

4-3

4-4

4.3 Meteorological Monitoring Results

Time series plots for wind speed, temperature, and relative humidity for the reporting period are show in

Figure A-3 through Figure A-5, respectively.

4.4 Site Activities

Backfill of cell 3 was completed with sheets being reused for cell 1 with associated pre trenching. Excavation, mixing, and load out of cell 4 was ongoing during the month. Non impacted soils were graded with drainage and a sprinkler system installed. Some fill was imported along with additional crushing of concrete. 4.5 Site Map(s)

Site maps during the reporting period are documented and included in Figure A-6 and Figure A-7.

5-1

5.0 Conclusions Results of this projects reporting period show the air sampling and monitoring program at Berry Lane

Park, Sites 121 and 207, indicate that the average Cr6 concentrations for each fenceline and exclusion

zone AMS are well below the AAC of 49 ng/m3. The program through this reporting period shows the Cr6

concentrations, percent Cr6 in dust samples, and the short duration metrics demonstrate that the dust

control measures continue to be effective at maintaining concentrations of Cr6 in dust at the Site well

below the AAC. These results indicate that dust generated at the Site contains very small percentages of

Cr6 and do not generate an emission source of Cr6 sufficient to create potential offsite exposure to Cr6 at or

exceeding the AAC.

Appendix A

Monthly Results

Summaries Integrated 8 Hour Cr6

Concentrations

Integrated 8 Hour Total Dust Concentrations

Real-time PM10

Concentrations

Meteorological Data

Site Map(s)

October 2012

Table A- 1: Daily Integrated 8 Hour Cr6 Sampling Results

Highlighted cells indicate a detectable level of Cr6. All other values are below the laboratory method detection limit (MDL). Values below the MDL are shown in the table at

one half the MDL for data reporting purposes. This established practice is consistent with PPG’s site 114 reporting of non-detects by AECOM.

FAM 1

(ng/m3)

FAM 2

(ng/m3)

FAM 3

(ng/m3)

FAM 4

(ng/m3)

FAM 5

(ng/m3)

PAM 1

(ng/m3)

PAM 2

(ng/m3)

PAM 3

(ng/m3)

PAM 4

(ng/m3)

10/01/12 7 3.3 7.5 3.4 7.5 NA 7 7.5 7.5

10/02/12 8 3.25 8 3.52 7.5 NA 7.5 8 8

10/03/12 7 3 7.5 3.5 7.5 NA 7.5 8 7

10/04/12 8.5 3.51 9 2.4 8.5 NA 8.5 9 8.5

10/05/12 8 3.1 7.5 2 7.4 NA 7.4 7 7.4

10/08/12 7 3.25 16 6.2 16 NA 17 7.5 7.5

10/09/12 7.5 7.5 8.5 3.35 8 NA 8.5 8.5 20

10/10/12 7.5 9.4 8 12 7.5 NA 8 8 7.5

10/11/12 22 12 19 19 20 NA 43 21 23

10/12/12 24 2.8 17 5.1 7 9 7 6.5 19

10/15/12 8.5 3.35 8 3.15 8 8.5 8.5 8 8

10/16/12 7 3.7 7 3.55 7 7 7 7.5 18

10/17/12 8.5 3.3 7.5 3.25 8 8.5 10.5 8.5 8.5

10/18/12 8.5 3.4 8.5 3.35 8.5 8.5 8 5 7.5

10/19/12 17 1.1 2.7 1.05 27 16 13.5 27 15

10/22/12 6.5 3.4 7.5 3.2 7.5 7.5 7.5 7 8.5

10/23/12 7.5 2.25 8 3.35 8.5 8.5 8.5 NA 8

10/24/12 8 3.65 8 3.4 7.5 8 7.5 7.5 5.5

10/25/12 8 3.2 8 3.3 8.5 8 8.5 8 8

10/26/12 8 NA 8 NA 8 8 8 8 8

Date of Sample

Fenceline Exclusion Zone Perimeter

October 2012

Table A- 2: Daily Integrated 8 Hour Total Dust Sampling Results

Highlighted cells indicate a detectable level of total dust. All other values are below the laboratory method detection limit (MDL). Values below the MDL are shown in the table

at one half the MDL for data reporting purposes. This established practice is consistent with PPG’s site 114 reporting of non-detects by AECOM.

FAM 1

(µg/m3)

FAM 2

(µg/m3)

FAM 3

(µg/m3)

FAM 4

(µg/m3)

FAM 5

(µg/m3)

PAM 1

(µg/m3)

PAM 2

(µg/m3)

PAM 3

(µg/m3)

PAM 4

(µg/m3)

10/01/12 36 41 37.5 45 36.5 NA 120 37.5 37.5

10/02/12 39 16 39 18.5 38 NA 36.5 40.5 110

10/03/12 35.5 52 37 49 37 NA 36.5 38.5 35

10/04/12 43.5 72 43.5 27 43 NA 43 110 42.5

10/05/12 38.5 37 37.5 24 37 NA 36.5 35.1 37

10/08/12 35.5 16.5 40.5 15.5 36.5 NA 39.5 38 36.5

10/09/12 36 16.5 42.5 16.5 36.5 NA 42.5 41.5 36.5

10/10/12 38.5 16 40.5 16.5 38.5 NA 40 40 38

10/11/12 42.5 16 41 18 41.5 NA 43.5 42 40.5

10/12/12 41.5 11 33 27 120 44.5 35.5 33.5 39.5

10/15/12 42.5 57 40 42 99 43 87 38.5 91

10/16/12 35.5 18.5 36 17.5 34.5 35 36 36 36

10/17/12 41 16.5 38 41 40 41.5 50 43 41

10/18/12 110 93 90 57 41.5 130 100 26 100

10/19/12 8.5 5.5 13.6 5 13.5 8 7 13.5 7.5

10/22/12 75 62 36 50 36.5 36.5 37 35.5 41

10/23/12 37 39 82 50 42 100 41.5 NA 40.5

10/24/12 40 60 41 17 37 79 38 38 28

10/25/12 94 15.5 39 16.5 41.5 110 41.5 40.5 40.5

10/26/12 93 NA 100 NA 39 83 89 82 210

Date of Sample

Fenceline Exclusion Zone Perimeter

October 2012

Figure A- 1: Real-Time Fenceline 15 Minute Average PM10 Monitoring Results

October 2012

Figure A-2: Real-Time Exclusion Zone Perimeter 15 Minute Average PM10 Monitoring Results

October 2012

Table A- 3: Elevated Concentration Summary

Parameter Date Time Location Wind Conditions Elevated Concentration

Explanation

Fenceline Air Monitoring

PM10 NA NA NA NA NA NA

Exclusion Zone Perimeter Air Monitoring

PM10 NA NA NA NA NA NA

FAM – Fixed Air Monitoring Station

PAM – Portable Air Monitoring Station

PM10 – Respirable Particulate Matter measured in micrograms per cubic meter (µg/m3)

ng/m3

– nanograms per cubic meter

µg/m3

– micrograms per cubic meter

NA – Not Applicable

ND –No Data

- FAM/PAM reported PM10 values represent 15 minute block averages at the fenceline and the perimeter of the exclusion zone, respectively. - FAM/PAM reported Cr6 concentrations represent 8 to 10 hour average concentrations.

October 2012

Figure A-3: Wind Speed

October 2012

Figure A-4: Temperature

Figure A-5: Relative Humidity

October 2012

Figure A–6: Site Map(s) 10.01.12 – 10.10.12

October 2012

Figure A–7: Site Map(s) 10.11.12 – 10.26.12

October 2012

Appendix B

Program to Date

Result Summaries Integrated 8 Hour Cr6

Concentration Summaries Integrated 8 Hour Total Dust

Concentration Summaries

Real-time PM10 Concentrations

Summaries

October 2012

Table B- 1: Program to Date Integrated 8 Hour Cr6 Sampling Results Statistics

Statistics1

Fenceline Exclusion Zone Perimeter

FAM 1 FAM 2 FAM 3 FAM 4 FAM 5 PAM 1 PAM 2 PAM 3 PAM 4

Total Number of Samples2 74 74 74 74 74 62 73 73 73

Rate of Data Collection 99% 97% 99% 95% 99% 98% 97% 98% 100%

Total Number of Detected

Samples3

7 18 5 10 6 5 2 6 9

% of Cr6 Samples Greater than Laboratory Detection Limit

9% 24% 7% 13% 8% 8% 3% 8% 12%

Total Number of Samples

Above the AAC (49 ng/m3)

0 0 0 0 0 0 0 0 0

Average % Cr6 in Dust4 0.0126% 0.0101% 0.0179% 0.0091% 0.0197% 0.0126% 0.0155% 0.0134% 0.0140%

Maximum % Cr6 in Dust4 0.10% 0.12% 0.06% 0.016% 0.59% 0.10% 0.03% 0.13% 0.11%

ng/m3

– nanograms per cubic meter

1

Statistics calculated based on the program start date of July 23, 2012.

2

Total number of samples collected since July 23, 2012. Variations in the number of samples collected are specifically identified in Table A-1 within the report month of the variation. In general variations are caused by sampler malfunctions, site activities, weather conditions, etc. 3

Total number of sample results since July 23, 2012 reported above the laboratory reporting limit.

4 The program to date average and maximum percent Cr6 in dust was calculated using all the integrated Total Dust and Cr6 sample results0 collected since July 23, 2012.

October 2012

Table B- 2: Monthly Average Integrated 8 Hour Cr6 Sampling Results

Fenceline Exclusion Zone Perimeter

FAM 1

(ng/m3)

FAM 2

(ng/m3)

FAM 3

(ng/m3)

FAM 4

(ng/m3)

FAM 5

(ng/m3)

PAM 1

(ng/m3)

PAM 2

(ng/m3)

PAM 3

(ng/m3)

PAM 4

(ng/m3)

Baseline1 10.4 10.3 10.3 10.2 10.2 NA NA NA NA

July 2012 10.5 2.9 8.0 4.6 7.6 8.3 8.1 8.1 7.9

August 2012 7.8 3.9 7.7 3.7 7.3 7.9 7.1 8.2 8.1

September 2012 8.6 6.3 8.4 4.2 13.0 14.2 7.4 9.3 8.2

October 2012 9.7 4.1 9.1 4.6 9.8 8.9 10.4 9.3 10.5

PTD2 8.8 4.5 8.4 4.2 9.6 9.2 8.5 8.8 8.8

ng/m3

– nanograms per cubic meter

1

Baseline – Air monitoring conducted prior to the beginning of excavation activities. 2

Program to Date – Air monitoring conducted from July 23, 2012 through the end of the report period.

October 2012

Table B- 3: Program to Date Integrated Total Dust 8 Hour Sampling Results Statistics

Statistics

1

Fenceline Exclusion Zone Perimeter

FAM 1 FAM 2 FAM 3 FAM 4 FAM 5 PAM 1 PAM 2 PAM 3 PAM 4

Total Number of Samples2 74 74 74 74 74 62 73 73 73

Rate of Data Collection 99% 97% 99% 95% 99% 98% 97% 98% 100%

Total Number of Detected

Samples3

29 49 11 44 10 23 16 17 19

% Detection 39% 66% 15% 59% 13% 37% 22% 23% 26%

1 Statistics calculated based on the program start date of July 23, 2012.

2

Total number of sample collected since July 23, 2012. Variations in the number of samples collected are specifically identified in Table A-2 within the report month of the variation.

3 Total number of sample results since July 23, 2012 reported above the laboratory reporting limit.

October 2012

Table B- 4: Monthly Average Integrated 8 hour Total Dust Sampling Results

Fenceline Exclusion Zone Perimeter

FAM 1

(µg/m3)

FAM 2

(µg/m3)

FAM 3

(µg/m3)

FAM 4

(µg/m3)

FAM 5

(µg/m3)

PAM 1

(µg/m3)

PAM 2

(µg/m3)

PAM 3

(µg/m3)

PAM 4

(µg/m3)

Baseline1 201.1 277 184.5 214.8 200.1 NA NA NA NA

July 2012 51.4 32.9 44.1 42.5 37.9 36.4 48.8 50.6 38.4

August 2012 84.9 59.3 54.7 56.5 54.2 77.4 56.2 90.6 91.9

September 2012 76.4 43.3 40.2 54.9 51.4 95.8 56.5 67.5 44.3

October 2012 48.2 34.8 45.4 29.1 44.5 64.6 50.0 42.6 54.4

PTD2 70.0 34.8 45.4 29.1 44.5 64.6 50.0 42.6 54.4

µg/m3

– micrograms per cubic meter

1

Baseline – Air monitoring conducted prior to the beginning of excavation activities. 3

Program to Date – Air monitoring conducted from July 23, 2012 through the end of the report period.

October 2012

Table B- 5: Monthly Average Real-Time PM10 Monitoring Results

Fenceline Exclusion Zone Perimeter

FAM 1

(µg/m3)

FAM 2

(µg/m3)

FAM 3

(µg/m3)

FAM 4

(µg/m3)

FAM 5

(µg/m3)

PAM 1

(µg/m3)

PAM 2

(µg/m3)

PAM 3

(µg/m3)

PAM 4

(µg/m3)

Baseline1 12.4 16.4 16.0 17.9 13.5 NA NA NA NA

July 2012 13.5 15.9 15.3 15.6 13.9 47.2 37.9 36.5 87.1

August 2012 24.7 19.7 18.9 24.1 20.4 61.4 55.7 55.3 73.4

September 2012 23.0 31.5 15.1 19.3 14.1 42.4 42.8 34.1 49.8

October 2012 24.8 31.2 25.5 29.1 25.5 57.3 85.6 65.9 59.8

µg/m3

– micrograms per cubic meter

1

Baseline – Air monitoring conducted prior to the beginning of excavation activities (7.12.12 to 7.17.12) 3

Program to Date – Air monitoring conducted from July 23, 2012 through the end of the report period.