PNT Adv Board 10/16/ Work Plan Status EXCOM approved Work Plan in Aug 07 –Has a total of 61 action items 44 Original Actions; 17 Action Items added since Aug 07 –Status reported monthly to Executive Steering Group Will review: –Accomplishments since Mar 08 Advisory Board –Actions to be completed by end of year 2008 Work Plan provides the foundation for a smooth transition to the next administration 2008 Work Plan provides the foundation for a smooth transition to the next administration

TRANSCRIPT

Page 1: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

October 16, 2008

Mr. Michael ShawDirector

National Coordination Office

National Space-Based PNTAdvisory Board

Page 2: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

PNT Adv Board 10/16/08

Overview

• 2008 EXCOM Work Plan

• Advisory Board Tasking – Mar 07

• Way Ahead

2

Page 3: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

PNT Adv Board 10/16/083

2008 Work Plan Status• EXCOM approved Work Plan in Aug 07

– Has a total of 61 action items• 44 Original Actions; 17 Action Items added since Aug

07– Status reported monthly to Executive Steering Group

• Will review: – Accomplishments since Mar 08 Advisory Board– Actions to be completed by end of year

2008 Work Plan provides the foundation for a

smooth transition to the next administration

Page 4: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

PNT Adv Board 10/16/08

• 2008 Work Plan has a total of 61 action items42 Completed (69% Closed)

19 Remaining (31% To Go)-- 11 Overdue -- 2 At Risk -- 6 On Schedule

4

2008 Work Plan Status

Y

G

R

Page 5: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

PNT Adv Board 10/16/085

Key Accomplishments since last Advisory Board meeting in Mar 08

• Released DHS public fact sheet on Interference Detection and Mitigation (IDM) Plan – Apr 08

• Held Joint Staff/DOT GPS Requirements Summit -- Apr 08• AF awarded GPS III-A Contract – May 08• Held Asia Pacific Economic Cooperation (APEC) GNSS

Innovation Summit in Bangkok, Thailand – May 08• DOC solicited and received public comments on proposed

semi-codeless transition plan – Jun 08• USCG renewed USG GPS commitment letter to IMO – Jul 08• DOT completed transfer of $7.2M FAA and FHWA FY08

funding to AF for civil contributions to GPS III – Aug 08

Page 6: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

PNT Adv Board 10/16/086

Key Accomplishments since last Advisory Board meeting in Mar 08

• DoD/DOT completed National PNT Architecture Report – Sep 08

• Introduced Legislation to authorize/institutionalize DOC support to NCO/EXCOM (H.R. 6935/§3504) – Sep 08

• DoD published final Federal Register Notice on civil access to Semi-Codeless – Sep 08

• Announced plan to put CNAV Data on L2C in 2009– Sep 08• NASA and NOAA Agreements signed with Japan to support

QZSS monitoring sites in Hawaii and Guam – Sep 08• Released updated 4th Edition of the GPS Standard

Positioning Service Performance Standard – Sep 08

Page 7: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

PNT Adv Board 10/16/087

GPS SPS PS UPDATECOMPARISON OF GPS SPS PERFORMANCE PARAMETERS

GPS Performance Standard Metric

SPS Signal Specification August 1998

(user performance)

SPS Performance Standard

October 2001(signal in space)

SPS Performance Standard

September 2008 *

(signal in space)

1

Global Accuracy All-in-View Horizontal 95% All-in-View Vertical 95%

≤ 100 meters≤ 156 meters

≤ 13 meters≤ 22 meters

≤ 9 meters≤ 15 meters

2

Worst Site Accuracy All-in-View Horizontal 95% All-in-View Vertical 95%

≤ 100 meters≤ 156 meters

≤ 36 meters≤ 77 meters

≤ 17 meters≤ 37 meters

3 User Range Error (URE) NONE

≤ 6 meters RMS(Constellation RMS

URE)

≤ 7.8 meters 95%, (Worst Satellite

URE) equivalent to 4 m RMS

4 Geometry (PDOP ≤ 6)

≥ 95.87% global ≥ 83.92% worst site

≥ 98% global ≥ 88% worst site

≥ 98% global ≥ 88% worst site

5 Constellation Availability NONE

≥ 98% Probability of 21 Healthy Satellites

in 24 primary slots

≥ 98% Probability of 21 Healthy

Satellites in 24 primary slots;

≥ 99.999% Probability of 20

Healthy Satellites in 24 primary slots;

* Green color indicates improvement in U.S. Government commitment to GPS civil service

Page 8: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

PNT Adv Board 10/16/08

Actions to be completed by End of 2008

• NASA to renew Charter for Advisory Board – Oct 08• DoD/DOT to sign updated MOA on Civil Use of GPS – Oct

08• FAA to publish Wide Area Augmentation Performance

Standard – Nov 08 • DOT/DoD/DHS to publish the 2008 Federal

Radionavigation Plan (FRP) – Nov 08• State/NASA to host meeting of International Committee

on GNSS at NASA JPL in Pasadena – Dec 08• DHS to complete update to Vulnerability Studies – Dec 08

8

Page 9: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

PNT Adv Board 10/16/08

Overview

• 2008 EXCOM Work Plan

• Advisory Board Tasking – Mar 07

• Way Ahead

9

Page 10: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

PNT Adv Board 10/16/08

2007 Advisory Board Topics

• Leadership

• Strategic Engagement and Communication

• Future Challenges

10

Page 11: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

PNT Adv Board 10/16/08

Leadership: Recommend areas where GPS and its augmentations can be made more competitive a) Near Term: Examine navigation-communications services for

civil applications, including the issues related to safety critical certification requirements, the overall business case, technical feasibility, and analyses of potential alternatives

b) Medium Term: Review and prioritize future GPS III satellite capabilities, expanded ground segment capabilities, and/or regional augmentations that would provide the greatest improvement and value relative to increased benefits to the global user community at reduced risk and cost

c) Long Term: Identify actions that would enhance long-term economic and regulatory stability for the development of GNSS capabilities and services in the national and international arenas

2007 Advisory Board – Topic 1

11

Page 12: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

PNT Adv Board 10/16/08

Strategic Engagement and Communication: Recommend ways to promote and demonstrate current and future capabilities of GPS and its augmentations to the US and international communitiesa) Near Term: Develop options for promoting GNSS capabilities

for domestic and foreign audiencesb) Mid Term: Identify actions the USG could take in

international organizations, standards setting bodies, and/or foreign capitals to prevent attempts to mandate the exclusive use of any one GNSS system in specific geographic areas

c) Long Term: Propose approaches for maintenance and improvement of GPS's leadership and acceptance around the world

2007 Advisory Board – Topic 2

12

Page 13: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

PNT Adv Board 10/16/08

Future Challenges: Assess technology and market trends as the number of worldwide GNSS providers increasea) Near Term: Recommend steps agencies should take to

achieve spatial interoperability– Including harmonization of common grid

operations that would be used to identify locations and coordinate time-critical operations

b) Mid Term: Assess the implications to the USG public sector and overall U.S. economy of multiple GNSS providers

c) Long Term: Propose approaches on commercial trade issues to ensure a level playing field in the space-based PNT market place (i.e. prevent adverse restrictions)

2007 Advisory Board – Topic 3

13

Page 14: October 16, 2008 Mr. Michael Shaw Director National Coordination Office National Space-Based PNT Advisory Board

PNT Adv Board 10/16/0814

Way Ahead

• Work continuing on EXCOM 2008 Work Plan

• Future EXCOM Meeting – 5 Nov 08– Advisory Board Report

– Last EXCOM of this Administration

• NCO completing Administration Transition Book– If desired, Advisory Board can contribute input