  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    1/40

    Assignment/Project Front Sheet

    CIM MembershipNumber

    Unit Title

    Level/Award

    Accredited StudyCentre

    Candidate Declaration: I confirm that in forwarding this assignment/project formarking, I understand and have applied the CIM policies relating to word count,

    plagiarism and collusion for all tasks. This assignment/project is the result of myown independent work/investigation except where otherwise stated. Othersources are acknowledged in the body of the text/and a bibliography is appended.The work that I have submitted has not been previously accepted in substance forany other award. I further confirm that I have not shared my work with othercandidates.

    I hereby give consent for my assignment/project, if accepted, to be available forCIM use in relation to dissemination of best practice and, or, other appropriate

    purposes. It is on the understanding that all studying member numbers would beremoved prior to use for the purposes of full anonymity.

    Tick here to opt out

    Project Management in Marketing

    12998007

    Level 6

    Oxford College of Marketing

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    2/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 1of 39

    Option 2- Sponsorship

    CIM membership no: 70889221

    To: XXXXXXXXMarketing Manager

    From: XXXXXXSr. Marketing Specialist

    Total word count: 6,540 words (From task 1 to 4)

    3 sides of for A4 tables

    I confirm that in forwarding this assessment for marking, I understand and have

    applied the CIM policies relating to word count, plagiarism and collusion for all

    tasks. This assessment is the result of my own independent work except where

    otherwise stated. Other sources are acknowledged in the body of the text, a

    bibliography has been appended and Harvard referencing has been used. I have not

    shared my work with other candidates. I further confirm that I have submitted an

    electronic copy of this assessment to CIM in accordance with the regulations.

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    3/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 2of 39

    ContentExecutive Summary 3

    1.0

    Task one : Context 51.1 Introduction 5

    1.2 Information needs, requirement and sources 5

    1.3 Relevant organizational data 6

    1.4 Key Issues Summary 9

    1.5 Information Gap analysis 9

    2.0 Task two: The business Case 10

    2.1 Critical Evaluation of findings 10

    2.2 Alternative Project evaluation 10

    2.3 Selected approach financial justification. 11

    2.4 Selected approach non-financial justification. 11

    2.5 Corporate Culture 12

    2.6

    Budget time-scale and deliverables 122.7 Project resources for LECSB 12

    2.8 Risk identification 13

    2.9 Reporting and decision making 13

    3.0 Task three: Risk 14

    3.1 Risk Assessment and potential impact 14

    3.2 Impact/probability Matrix 14

    3.3 Risk response and control program 15

    3.4 Risk management culture 17

    4.0 Task four: the project Plan 18

    4.1 Project Initiation 18

    4.1.1

    Project objective 184.1.2 Project Scope 18

    4.1.3 Beginning and ending dates 18

    4.1.4 Key/core deliverables 18

    4.1.5 Methodology adaption 19

    4.1.6 Risk management 20

    4.1.7 Outline Budget 20

    4.2 Project implementation 20

    4.2.1 Schedule and work breakdown structure WBS 20

    4.2.2 Resources review 23

    4.2.3 Personal Requirements 24

    4.3 Project termination 24

    4.4

    Project Evaluation 244.4.1 Objective evaluation 24

    4.4.2 Post-completion Audit 24

    4.4.3 Evaluation report 25

    Bibliography 27

    Appendix 1 : Organization Background 29

    Appendix 2 : Project Proposal 31

    Appendix 3 : Lewis (2007) metrics 34

    Appendix 4 : Microsoft Project Snapshot. 35

    Appendix 5 : Project Gantt chart 36

    Appendix 6 : Resources overview report 39

    Appendix 7 : Resources sheet 39

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    4/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 3of 39

    Executive Summary

    Elsewedy Cables is a wires and cables manufacturer in Egypt who suffers from sales revenues

    due to counterfeited products that cannibalize its market share, and decreasing direct

    marketing activity due to budget cuts as a result of current tough Egypt's economy situation.

    Management set a direction to acquire a cause-related sponsorship program that will be

    integrated as a cost effective communication tool (Doyle,2008). But it recommended running

    a project that list and evaluate cause-related sponsorships' benefits LECSB.

    Information Gathering

    An information range about needs and requirements has been gathered to as a business case

    basic foundation about several aspects from different internal and external resources as;

    Elsewedy current corporate social responsibility and its stage (Meenaghan,1991), Elsewedy

    general requirements for policy, strategy and selection criteria (Benedetti,2012), and current

    delivered customer values. Then key issues has been identified, later market information

    system MkIS's information GAP analysis has been conducted.

    Business Case

    A critical analysis for the gathered information has conducted to direct the project's course,where a project screening matrix (Gray and Larson,2011) analysis recommended a combined

    approach between in-house project and an outsourced one, furthermore a financial

    justification through Cost Benefit Analysis CBA backed-up with implication of the approach

    on: Segmentation, targeting and positioning, marketing mix and corporate culture has been

    illustrated. Afterward a general statement for project's budget, schedule, deliverables and

    required resources has been stated. Finally A range of strategic, financial, and operational and

    project risks have been identified as a base for the risk assessment process.

    Risk assessment and control program

    After the risk identification Elsewedy conducted a risk assessment investigation to identify

    different risk impacts' sensitivity, risk probability and detectability (Lewis,2007), where 17

    risks has been identified 3 of them consider having a high impact on the project. Then a

    control program has been conducted with several preventive and corrective actions, taking in

    consideration there are three risks could terminate the project. Afterward an analysis has been

    conducted to estimate the benefits of introducing risk culture to Elsewedy corporate culture

    and how it could be an asset in the future market programs.

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    5/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 4of 39

    The Project Plan

    LECSB's project plan illustrated that the project requires 232 working days with budget

    200,000 Egyptian Pounds 'EGP', and it will start at 1st September 2014 and ends in 3rd

    August 2015 taking in consideration all vacations and employees leaves, also it detailed its

    scope and limitation. The project plan stated different methodologies pros and cons and

    suggested agile (light) methodology (Charvat J.,2003) to be the project's methodology where

    it will be conducted using Microsoft project 2013 'MsP-2013', where Work breakdown

    structure has been identified with allocated cost and work force and task has been leveled to

    avoid resources over-allocation, and schedule has been developed with all holidays and staff

    vacations, that resulted a Gantt chart that could be a base for processes' progress monitor and

    control. Later LECSB's termination condition has been identified.

    Finally Project several evaluating techniques has been stated with post-evaluation techniques

    as the recommended technique in order to get the utmost experience of conducting the

    project.

    (Word count: 510 words)

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    6/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 5of 39

    1.0Task 1

    1.1Introduction

    Elsewedy Cables Elsewedy is the market leader in wires and cables market in EgyptSince2011 Elsewedy stopped most of its communication activities due to Egypt politicalturbulence, which negatively affected its customer perception, loyalty and market share. In2014 Elsewedy is studying to adopt sponsorship as a cost effective strategic communicationtool (Doyle,2008) to integrate it with its current marketing activities to sustain its leadingposition in Egypts, but management recommended to run a project that list and evaluatecause-related sponsorshipsbenefits LECSB, in order to choose the most appropriatesponsorships for Elsewedysbusiness performance.

    1.2Information needs requirements and sources.

    There is a lack in sponsorship decision making academic studies (Wierenga,2011), so in orderto develop an integrated sponsorship decision making guidance to evaluate different

    sponsorships, an information range is needed to about several aspects which could beillustrated as follows:

    Aspects Information needs/requirements

    Source

    Internal External

    Marketreports

    Salesreports

    Secondaryresearches

    Descriptiveresearches

    Causalresearches

    Corporate socialresponsibilityCSR and

    communityrelations

    Elsewedy is in the first stage of sponsorship (Meenaghan,1991 ), where Ahmed Elsewedy CEOlabel it as charity donations and philanthropy acts without any sophisticated goals or selectioncriteria or direct investment in communication activities to leverage its effect, where severalcause-related donation within Egyptian society has been made with limited endorsements; as for

    Resala, Egyptian Food Bank and Dar Al-Orman, as a result Elsewedys customers has lowawareness about its community relation activities. It is required to:

    Define Elsewedysissuesas social and consumer dimensions (Jobber,2012), which will help

    in defining Elsewedyssponsorship objectives, policy and selecting criteria strategically thatmutually benefit Elsewedy and society.

    X

    Communication plans to communicate the selected sponsorship followed by a competitiveanalysis for other industrial and multinational companies sponsorships communication plans.

    X X X X

    SponsorshipCategoryevaluation via

    transferred value

    The International Event Group IEG categorize sponsorship into areas: sport, art/culture,

    entertainment and cause (Ukman, 2010, cited in Benedetti, 2012), in order to select thesponsorship category and it transferred value, It is required to define:

    Elsewedy sponsorships policy and strategy, which will be the base for selection criteria. X X XCommunicationopportunityaround direct

    marketing,public relation

    and positioning

    Each sponsorship will provide different communication opportunities which are affected by thesponsorship decision making basic criteria (Benedetti, 2012). It is required to

    Profile several sponsorships and its generated communication opportunities around enhancing;

    direct marketing, public perception, positioning using and delivered customer value and loyaltyusing Johnston and Paulsen (2007) and McCook et al. (1997) selection criteria.

    X X

    Evaluation metrics Development for different sponsorship using Meenaghans model(1993) X X

    Customer

    relationmanagementand lifetime

    value

    In-house Researches IHRresults state that there are two channel to reach end customers, and the

    main transferred customer value is high quality electric wires through operational excellence,taking in consideration during the counterfeited wires awareness communication seminars(CWACS)period in 2009-2010 customer care index and sales revenues increased table A.2,

    since CWACS helped to target untargeted segments as retailers and electricians. It is required to

    Define the sponsorships abilitiesto target distributors, retailers and electrician segments X X

    Table 1.2: Required and needed information

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    7/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 6of 39

    1.3Relevant data for the required benefits.

    1.3.1 Elsewedy Key issues

    Issue Details/Reason

    Sales Revenue Sales revenues have been falling since 2011 and market is shrinking due to Egypt economic and political instability.

    Counterfeited products Counterfeited product is cannibalizing Elsewedy apparent market share, also they affect the consumers safety dueto low quality manufacturing material which most of the time lead to fire. Noting that fires rate has been doubling

    since 2007.

    Public perception Post-evolution, Egyptians human development index has moved from low to medium ( HDRO, 2014), whichdeveloped a sense of awareness to corporates social responsibility.

    Table 1.3.1:Elsewedy social and customers dimension key issues.

    1.3.2 Industrial B2B Companies and sponsorship category

    Company Category Event Year DetailsCommunication

    channels

    ABB

    Cause

    Baja Hu

    Helwanuniversity

    2014

    ABB in Egypt participated as one of the main sponsors of the

    Baja Helwan University racing team BAJA-HU who are

    manufacturing a baja off-road car to take part in theinternational competition organized by SAE organization whichwas held from 24 April to 27 April in University of Texas

    Sponsored/ABB

    sites.

    Art/Culture

    SwedishEmbassyNational Day

    2013ABB in Egypt participated as one of the main sponsors of theSwedish Embassy National Day celebrating the long andhistoric relations between the two countries.

    ABB website

    Art/

    Culture

    Arab digitalexpression camp

    Gaza

    2007

    The Arab Digital Expression Foundation aims at giving Arabyouth a free and constructive environment and the opportunity

    to produce their own ideas using this technology in an attemptto improve and add to the content of this world of media

    Sponsored/ABB

    sites.

    Schneider

    Cause

    MECAAin

    Shamsuniversity

    2009

    MECA is a non-profit student to student activity founded in

    2006 providing professional trainings conducted bymultinational companies and certified trainers.

    Sponsored/

    Schneiderwebsites.

    Cause

    Galal Fahmy

    SpecializedTechnicalSchool

    2010

    Schneider Electric Egypt took the initiative to sponsor one of

    Egypts renovations of oldest technical schools. Galal FahmySpecialized Technical Advanced School.

    Schneider website/ Newspapers

    CauseGo GreenExhibition

    2013Go green Expo prepared an event for the energy saving andrecycling exhibition in the presence of minister of electricity

    Schneider website/ Newspapers

    Siemens

    Cause

    Technology of

    automationExhibition

    2011Official sponsor for Fifth International Conference & Exhibitionof Technology of Automatic Control

    Siemens website

    Cause

    MECAAin

    Shamsuniversity

    2012

    MECA is a non-profit student to student activity founded in

    2006 providing professional trainings conducted bymultinational companies and certified trainers.

    Sponsored/

    Siemens website

    SportEnppi football

    club2011 Sponsorship for a football club

    Televisionmatches/ Siemens

    website

    CauseCancer HospitalEgypt 2010 Donation to Children's Cancer Hospital Egypt

    Siemens website/magazines

    Art/culture

    Siemens and theLibrary ofAlexandria

    It is experimental trainings session about controlling energyconsumption

    Siemens website

    Causelectures at theUniversity of

    Helwan

    2011Siemens conducted a lecture about research and developmentmethodologies and how to develop our society. Siemens website

    Philips

    Cause Stent For Life 2014It is a collaboration to bring in awareness and innovations toaddress cardiovascular diseases (CVDs), specifically coronaryheart disease.

    Philips website

    CauseRuralcommunitylightings

    2014

    Philips solar home-lighting systems have provided light to 15

    houses, accommodating over 30 families, and one school inHaqfet Elgallas, a village that previously lived on gas-lit lightbulbs.

    Philips website/newspaper

    Table 1.3.2:Industrial companies sponsorships programs history initial survey.

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    8/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 7of 39

    1.3.3 Egypts International Companies current database.

    # Company # Company # Company # Company

    1 Agility Logistics 17 Danone 33 IBM 52 Pfizer

    2 Alcatel 18 Dell 34 Intel 53 Philips3 Alstom 19 DHL 35 Ipsos 54 Plan International

    4 AMIDEAST 20 Etisalat 36 ITWorx 55 PWC

    5 Aramex 21 Fedex 37 Kharafi National 56 Sanofi Aventis

    6 Archirodon 22 Flag Telecome 38 KPMG 57 Shell

    7 ATAC Wirless 23 Fujitsu 39 Lenovo 58 SNC Lavalin

    8 Atlas Copco 24 Gac 40 LG 59 Sony Ericsson

    9 Bavarian Auto Group 25 GE Global 42 Maersk 60 SQS

    10 Bel Group 26 General Motors 43 Methanex 61 Tenaris

    11 CEMEX 27 Giesecke & Devrient 44 Metra 62 TNS Global

    12 Cemex 28 Google 45 Microsoft 63 Toyota

    13 Cisco 29 Halliburton 46 Motorola 64 Unilever

    14 CMA CGM 30 Henkel 47 Nissan Motor 65 Vodafone

    15 D&B 31 HESS 48 Oracle 66 Xceed

    16 Dale Carnegie 32 Hilti 49 Orange 67 Xerox

    Table 1.3.3: Elsewedys international companies in Egypt current database

    1.3.4 Elsewedy Sponsorship policy, strategy and selecting criteria.

    The following table is based on Collet and Fenton (2011) strategy recommendation, Grey and

    Skildum-reid (2014) communicated parts of strategy that defines sponsorship policy, alsoJohnston and Paulsen(2007), McCook et al (1997), and Brassington and Pettit (2000)selection criteria SC.

    # Aspect

    Type

    Details

    Strategy

    Po

    licy

    SC

    1Sponsorship linked market /

    marketing possibilitiesX X

    It should communicate Elsewedy community contribution through conveying emotionand express attributes authentically (collet & Fenton, 2011), also it should be integrated

    to communication activities to develop:

    A direct communication channel with targeted segments.

    Enhance the public perception and awareness about Elsewedy social

    contribution and CSR activities.

    2 Objectives X

    Grey and skildum-reid (2014) recommended having multiple sponsorship objective,where management defined it to be; increase Sales revenues, market share, loyalty, directsales opportunities and Database building which consider to be commercial objectives as

    per Collect & Fenton, (2011).

    3Fit to brand objective /compatibility

    X The sponsorship should help in developing Egypts social quality standards.

    4Target Audience/ exposurelevel/ relevance

    X X XAbility to reach targeted market (Pope, 1998) and achieve high exposure level (Johnstonand Paulsen,2007) for Distributors, retailers and electricians segments with higheremphasis on electricians.

    5 Type X X X Cause related, which could be in education, cultural or charity (Mack,1999).

    6 Number of sponsorships X X X Up to 3 sponsorship/annum.

    7 Geographical coverage X X X The 28 governorates of Egypt

    8 Rights/benefits X X XExclusivity, where Elsewedy is the sole sponsor to avoid being lost in the shuffle (Kotlarand Keller, 2009)

    9Management, control andcommunication

    X X X Quarter/semi-annual timely based plan with monthly progress report

    10Sponsorship Budget and costeffectiveness

    X X X 65,000 EGP/sponsorship

    11 Duration / length of impact X X X A year, with an opportunity to renew upon evaluation

    12 Payment terms X X X Quarterly settlements.

    13 Popularity and Image X X X Sponsored should possess a clean ethical image with no past legal or public disputes.Table 1.3.4: Elsewedys sponsorship policy, strategy and selection criteria.

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    9/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 8of 39

    1.3.5 Customer Channels within residential market

    Channel 1

    Channel 2

    Table 1.3.5: Elsewedy residential market channels

    1.3.6 Egypt market positioning

    Sponsorship should enhance the customersperception of the following values and attributes,which emphasis the need to re-measure them, the following is a result of IHR conducted inlate 2010 illustrating each attributes and its weight from customers' perspective and the ratingof several competitors within the market as per these attributes to identify the deliveredcustomer value.

    Importance

    WeightQuality attributes

    Competitors

    Elsewedy Sewedix ECC Generics Counterfeited

    30 Durability 6.00 5.50 5.50 3.00 1.00

    30 Reliability 6.00 6.00 6.00 3.00 1.00

    10 Precision 5.00 5.00 5.00 2.00 1.00

    10 Delivery 2.00 3.00 3.00 5.00 6.00

    10 Availability 4.00 3.00 1.00 5.00 6.00

    10 Customer care 5.00 3.00 3.00 - -

    DCV Weight Score

    (calculated)5.20 4.85 4.65 3.00 1.90

    Actual Prices 6 5.88 5.76 5.1 3.3

    Actual Market share 65 20 10 5 -

    Apparent market share 30 20 10 5 35

    Table: 1.3.6illustrate the positioning attributes as per the IHR conducted in late 2010, taking in

    consideration the Delivered customer care fall to 3.00 in IHR conducted in late 2013.

    1.3.7 Sponsorship evaluation model

    The following table will help to base and evaluation model for sponsorship

    # Aspect Details

    1 Sales effectiveness

    Since all other communication activates isceteris paribus 'constant', hence

    Elsewedy should measure the sales revenues during the sponsorshipconduction year and define the sponsorship effectiveness on sales revenues.

    2 Communication effectiveness

    Post sponsorship conduction, marketing research should be conducted to

    test customers recall for Elsewedy brand and attitude toward CSR, also

    psychological metrics to measure the loyalty. And its effect on deliveredcustomer value.

    3 Media coverage

    Measuring to different media coverage as television, newspapers, radios,

    magazines, public press etc.

    4 AppropriatenessThe actual Fit of the sponsorship with corporate, effectiveness in targeting

    audiences, and achieving companysobjectives.

    Table 1.3.7: Meenghan (1993) evaluation models aspects cited in Banti and Rogers (2012)

    Elsewedy Distributor Electrician End customer

    Elsewedy Distributor Retailer Electrician End customer

    http://en.wikipedia.org/wiki/Ceteris_paribushttp://en.wikipedia.org/wiki/Ceteris_paribus
  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    10/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 9of 39

    1.4Key issues summary

    There are key issues that should be highlighted:1- Communication means that could be used to communicate the sponsorship.

    2-

    Elsewedy social and consumer dimensions that define its key issues, which will bethe base for sponsorships requirements.

    3- Sponsorships policy, strategy and selection criteria based on the Key issues.

    4- Cause sponsorship different types and its effect on; direct marketing, public relation,market position, delivered customer value and customer loyalty.

    5- Sponsorships ability to target distributors, retailers and electricians.6- Development of evaluation criteria using Meenaghans model (1993).

    1.5 information gap analysis

    After analysis of the MkIS data flow to evaluate sponsorships benefits to assist Elsewedy

    sponsorship decision making process, the following gaps had appeared.

    Gap # Description

    GAP 1 Performance gap in sponsorship communication that resulted public low awareness about Elsewedy community

    contributions.

    GAP 2

    Information gap about current sales revenues and corporate performance from sales department.

    GAP 3 Due to Elsewedy internal squirrel society culture, Information gap about Elsewedy social and consumer dimensions should

    be investigated further, to develop a full details key issues including all departments insights.

    Sponsorship policy, strategy and selection criteria are based from management perception, even it should be discussed with

    salesmen and tactical managers.

    GAP 4 Management perception gap that sponsorship is a charity donation, which define Elsewedy in the first sponsorship

    adoption level (Meenaghan, 1991).

    Customer perception about Elsewedy CSR activities.

    Different cause-related sponsorship alternatives DCRSAthat could benefit Elsewedy, and how information will begathered about it.

    DCRSA ability to reach and target distributors, retailers and electricians, and achieving other objectives.

    DCRSAseffect on direct marketing, public perception, market positioning and delivered customer value.

    Sponsorship evaluation criteria as per Meenghan (1993)

    Table 1.5

    : Information gap

    Customer needs and

    expectation

    Marketing Information System

    Internal Records

    Market Research

    Market Intelligence

    Decision Making

    Marketing Executing

    Analysis, Planning,

    execution and

    control

    Marketing activities

    Market Environment

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    11/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 10of 39

    2.0Task 2

    2.1Critical Evaluation of findings

    Elsewedy key issues identified in table 1.3.1 justify the managementscause relatedsponsorship selection (Jobber, 2012), since Elsewedy problems isproduct safety through

    facing counterfeited products, and it will support the avoidance of commercialization via

    charity donations (Cornwell, 2008), also the sponsorships success is directly related to

    communication activity investment which could leverage the sponsorships potential (Nickell

    et al, 2011), which illustrate the need for further research for communication channels for

    sponsorship leveraging, after final definition of key issues.

    The cause should be affecting more than 200,000 and not too popular to dont get lost in the

    shuffle (Kotler and Keller, 2009), beside it should coincide with Elsewedy policy, strategy

    and selecting criteria, where a research should be conducted to list several sponsorships and

    their benefits then be evaluated by professionals, with distribution teams involvement for

    successful implementation (Farrelly et al., 1997).

    Sponsorship is a cost effective market communication tool compared to direct marketing and

    advertising (Doyle, 2008), which in many circumstances leads to sales increase (Arens et al.,

    2012), the research should question sponsorshipspotential effect on sales and other

    objectives table1.3.4.

    Meenaghans (1993) sponsorships evaluation model is crucial for sponsorship evaluation, but

    measuring sales and communication effectiveness is difficult, the project should include

    testing to current sales and communication efficiency to facilitate the measure.

    2.2Alternative project option

    The Project will investigate Elsewedy Key issues then develop a final policy, strategy and

    selection criteria to sponsorship, then list several cause sponsorships potentialbenefits,

    further conduct a descriptive and causal research to investigate different sponsorship potential

    benefits and evaluation measures for Elsewedy based on top marketings professionals and

    academics perspectives in Egypt.

    To conduct such a project there are three alternatives listed in the following project screening

    matrix (Gray and Larson,2011):

    Total

    Cost

    Paybackperiod

    Experiencegained

    Scheduleduration

    Questionnaire

    design

    Insightsdeveloped

    Neededworkforce

    Unbiasedresults

    Information

    security

    Controlover

    process

    database

    development

    Total

    Weight 3 3 3 2 3 3 3 2 2 2 1 3

    In-House 7 10 6 3 3 3 3 5 10 10 10 1.80

    Agency 3 3 3 10 10 10 10 10 4 2 3 1.91

    Combination 6 6 10 6 10 6 6 7 10 10 10 2.31

    Table 2.2Project screening matrix

    Which illustrate why the most appropriate approach is a combination approach highlighted

    where most of the project will be in house since it is a lower cost, and has lower payback

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    12/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 11of 39

    period, also it will help in developing the marketing team experience, and it will provide more

    security to Elsewedy customers' database. At mean while Elsewedy will get advantage of

    consultantsprofessional design for proposal form, descriptive and qualitative design.

    2.3Selected approach financial justification

    2.3.1 Cost benefits analysis CBA

    Cost-benefit analysis is as follows since it is a main tool for economic appraisal (Cooper et

    al.,2005):

    Benefits Costs

    Update customer database 25,000.00 Consultancy proposal form design 15,000.00

    Increase in brand exposure 80,000.002 half page ads. In Ahram newspaper

    (Friday issue)125,000.00

    Communication channels as;Newspapers ads. Radio ads,

    Researches phase and Proposalphase

    175,000.00 Radio ad. On Nile FM 50,000.00

    Consultancy Descriptive questionnairedesign

    5,000.00

    Consultancy Causal questionnaire design 5,000.00

    Total EGP 280,000.00 Total EGP 200,000.00

    2.3.2 Forecasted Return on marketing investment

    Elsewedy could calculate Return on market investment ROMI as follows:

    - Just cost benefit analysis to the benefit stated above to be:

    ROMI=

    .

    - Farris et.al (2010) stated to calculate the ROMI you should estimate the contribution

    margin of marketing activity in forecasted incremental sales, which estimated to

    reach 10,000,000 EGP/annum, since the project is just the initial phase its

    contribution is estimated 10%, so it will be

    ROMI=

    .

    2.4Selected approach non-financial justification

    2.4.1 Segmentation, targeting and positioning

    LECSB project will complement Elsewedy STP strategy in several points, since it's

    preparation market researches target 20% of the current database including distributors,

    retailers and electricians. Also these visits and conducted survey will develop the perceived

    customer care which develop an emotional attachment that increase the customer care index

    leading to increase the positioning as per tables 1.3.2. In addition to the sponsorship benefits

    itself, after it is conducted will increase investors interest, employees retention and

    suppliers cooperation due to Elsewedy contribution to the society.

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    13/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 12of 39

    2.4.2 Marketing Mix

    Preparations market researches, enrollment ads and enrollment phaseTable4.2.1willdevelop a lot of two-way communication that could be considered as a strategic integration to

    marketing and communication as per ESA (2007), which enhance the overall Elsewedyscommunication strategy and product placement in Egypt. Also it will develop deepercustomers issues and values understanding, and it laterally increases the customers

    awareness about Elsewedy CSR activities that could enhance the customer loyalty, sincepeople want information about companies social (Kotler and Keller, 2009).

    2.5Corporate culture.

    LECSB project will develop a positive image associated to quality and transparency and a

    portfolio of future potential sponsorship (Benedetti,2012), also it will craft the sponsorship

    policy, strategy and selection criteria for a greater quality sponsorship programme that could

    mutually benefit Elsewedy and society (Ukman,2010), which coincide with Elsewedy current

    mission statement and business history.

    2.6Budget, timescale and deliverables

    Time scalewill be detailed within task 4, although the research is expected to take 7.5

    months and schedule varies according to the available required resources.

    Budgetis stated in CBA a total budget EGP 200,000.00with a variation +/- 10 % would be

    required to complete the project.

    Key deliverablesare listed here; also check point 4.1.4 for further detailed deliverables list.

    # Deliverables1 Possible communication channel

    2 Market research database

    3 Market situation findings

    4 Internal report findings

    5 Elsewedy policy, strategy and selection criteria

    6 Proposal Guidelines

    7 Sponsorship list

    8 Descriptive and causal questionnaire design

    9 Descriptive and causal research findings

    10 Final report and summary

    Table 2.6: Key/core deliverables.

    2.7Project Resources for LECSB

    Resource Name Details

    Human Resources

    Elsewedy marketing team consists of- Marketing director- Marketing manager for Egypt

    - senior marketing specialist (Project manager PM)

    - two marketing specialist- internal designer

    There is no need for further work force for that project.

    Skills and Experience

    - Sr. marketing specialist has 4 years experience in managing similar project, but he lacks the

    experience of designing descriptive and causal questionnaire, which illustrate the need for aconsultant within that field.

    -

    Marketing specialists have 3 years experience conducting surveys, questionnaire and developeda good relationship with Elsewedy customers over the previous years. But they need a Microsoft

    project 2013 essential training which could be provided by the Sr. marketing specialist.

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    14/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 13of 39

    Financial resource the budget estimated to that project is 200,000

    Table 2.7: Project resources

    2.8Risks Identification

    Identify risks is an iterative process since as project progress more risk evolve (Heldman,

    2007), also it has been documented and assigned with a number for further referencing, in

    order to be assessed as in table 3.1.

    Risk

    Type/code

    Cause type/ source

    Poor customers or marketing professional and academics attitude S01 External - interviewee

    Economic recession. S02 External - market turbulence

    Civil war due to political instability S03 External - Political instability

    Unclear roles and responsibilities O01 InternalOperational management and team understanding

    Lack of management support O02 InternalOperational management

    Budget reduced F01 InternalFinancial

    Budget withdrawal F02 InternalFinancial

    Inadequate orientation and briefing to consultancies at proposalform and questionnaire design

    K01Internal/consultant Consultant Knowledge aboutrequirements.

    Team conflict P01 InternalHuman resource/team dynamics

    Inefficient Preparation secondary research database. P02InternalInefficient work/task understanding/data

    availability

    Inefficient communication or market research. P03InternalInefficient work/task understanding/data

    availability

    Unclear customer issue P04 InternalInefficient analysis/communication lack

    Un clear proposal P05 ExternalConsultant unclear understanding

    Poor questionnaire design or analysis P06 ExternalConsultant unclear understandingProject team staff loss/ leave P07 Internalweak retention/uncontrolled event

    Qualitative analysis with too much insights P08 Internalinefficient analysis tool

    Poor runner productivity/day P09 InternalInefficient analysis

    Type: Risk codes: S=Strategic, O=operational, F=Financial, P=Project

    Table 2.8: Risk identification;

    2.9Reporting and decision points

    The Sr. marketing specialist will be the PM and the stagestransitions will need to be

    approved from the marketing manager, and the project sponsor is the marketing director,

    while the team hierarchy is as follows.

    Marketing Director MD

    Marketing manager MM

    Internal

    Designer

    Sr.Marketing Specialist SMS

    Marketing Specialist MS1 Marketing specialist MS2

    Distribution manager DM

    Distribution team DT

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    15/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 14of 39

    3.0Task 3

    3.1Risk Assessment and potential impact

    Risk probability assessment investigate the like hood that a specific risk will occur(Heldman, 2007, P. 291), Elsewedy needs to assess the identified risk based appendix 3quantification measures for impact s sensitivity, risks probability and detectability, thendevelop riskprobability score(Lewis, 2007) as follows:

    Type/code Risk

    Quantification

    Owner

    Scope/Potential Impact

    Probability2

    Impact

    Detectability

    Riskprobability#

    PIDscore

    F01 Budget reduced 4 6 1 24 24 MDWill lengthen the schedule and may affect the

    deliverables.

    F02 Budget withdrawal 2 9 1 18 18 MD Will stop the project and change its deliverables

    K01Inadequate orientation and briefing toconsultancies at proposal form and

    questionnaire design

    3 7 8 168 21 SMSWill deliver an inaccurate policy, strategy andselection criteria leading to bad sponsorship

    selection

    O01 Unclear roles and responsibilities 4 6 4 96 24 SMSWill decrease teams members' productivity through

    constant rising conflicts.

    O02 Lack of management support 7 5 3 105 35 MMWill hinder the cooperation between departmentsdue to Elsewedy squirrel society corporate culture.

    P01 Team conflict 7 6 7 294 42 MD Same as O01

    P02Inefficient Preparation secondaryresearch database.

    3 7 2 42 21 SMSWill limit the database of the descriptive and causalresearch leading to inefficient insights

    P03 Inefficient communication or marketresearch. 3 6 2 36 18 SMS

    Will lead to inaccurate information that could affect

    the sponsorship conduction and evaluationmeasures.

    P04 Unclear customer issue 2 8 9 144 16 SMS As K01

    P05 Un clear proposal 3 7 4 84 21 SMSWill lead to out of scope proposals that willlengthen the time of screening.

    P06 Poor questionnaire design or analysis 6 6 1 36 36 SMS Will result poor insights

    P07 Project team staff loss/ leave 3 5 3 45 15 MD Will lengthen the schedule

    P08Qualitative analysis with too muchinsights

    3 6 4 72 18 SMSWill be parallelized with analysis that will lead tofailure to develop adequate insight.

    P09 Poor runner productivity/day 3 3 4 36 9 SMS Will Lengthen the schedule.

    S01Poor customers or marketingprofessional and academics attitude

    2 8 3 48 16MS/SMS

    Will deliver poor insights.

    S02 Economic recession. 4 9 1 36 36 MD

    Economical unbalance or recession leads to

    shrinking market opportunities and decrease marketsize leading to cut in marketing activities.

    S03 Civil war due to political instability 1 9 1 9 9 MDWith Egypt on the brink of a civil war (Alaswany,

    2013), it will be difficult to conduct field research.

    Table 3.1: Risk Probability score and potential impact

    3.1.1 Probability/Impact Matrix

    The combination of probability and impact results in a classification usually expressed as

    high, medium, or low (Heldman,2007,P.198), the following is a numerical visual illustration

    for the matrix, while the impact they could do is mentioned in table 2.8.

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    16/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 15of 39

    Impact

    H

    igh

    9 S03 F02 S02

    8

    S01

    P04

    7

    K01

    P02P05

    Medium

    6P03

    P08

    O01

    F01 P06 P01

    5 P07 O02

    4

    Low

    3 P09

    2

    1

    1 2 3 4 5 6 7 8 9

    Low Medium High

    Probability

    3.2Risk Response and control program

    After risk assessment, all techniques to manage the risk fall into one or more of four major

    categories (Dorfman,2007); avoidance, transfer, mitigate and acceptance, where risk ownershould monitor his risks (Chapman and wards,2003),also PM should has a risk response for

    emerging risks in the process of developing actions to reduce their threats on the projects

    objective (Heldman,2007).

    Type/code Risk

    Riskprobability#

    Response

    Treatment, Control and Improvements

    Owner

    Preventive

    actions

    Corrective

    actions

    P01 Team conflict 294Avoid/Control

    1.Open clear and effectivecommunication by articulate projectobjectives and task clearly.

    2.Encourage problem and solutionsownership not blaming culture.

    3.Keeping team issue impersonal andwithin the team.

    1.Solution preparation throughconflicts acknowledgment,impact discussion, and agreement

    to communicate.2.Understand situation as a team

    through clarifying positions andanalysis.

    3.Reach an agreement.

    MD

    K01

    Inadequate

    orientation andbriefing to

    consultancies atproposal form and

    questionnaire design

    168Avoid/

    Control

    1.Proper deduction through cross-functional meetings for Elsewedy

    requirements for proposals andquestionnaire.

    2.Proper requirements' documentationfor summary briefing.

    3.Asking for requirements

    paraphrasing, proposal draft and

    1. Meeting to re-illustrate themissing point and Re-briefing

    the requirements.2. Asking for draft and

    conduction of a test.SMS

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    17/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 16of 39

    conduction of a test.

    P04Unclear customerissue

    144Avoid/Control

    1.Effective cross functional analysis topreparation market researches.

    2.Effective situational analysis for salesrevenues and market situation.

    3.Clear definition for customers

    indices.

    1.Re-analysis to preparationmeetings and situational

    analysis of sales revenues andmarket situation.

    2.Deliver clearer over all report

    after consultation of marketingdirector.

    SMS

    O02Lack ofmanagement support

    105Control/Accept

    1.Constant achieved objectivesProgress reporting.

    1.Meeting in case problem orconflict occur.

    2.Following schedule and usediplomacy for projectobjectives achievement.

    MM

    O01Unclear roles and

    responsibilities96

    Avoid/

    Control

    1.Clear individuals job description,tasks and objectives documentation.

    2.Asking individual for reports

    paraphrasing their tasks.

    1.Understand the exact role thatthe individual dont understand.

    2. Illustrate the role and

    responsibility.

    3.Find a solution

    SMS

    P05 Un clear proposal 84Avoid/

    Transfer

    1.Identification for proposal main

    requirements.In addition to K01 preventive actions

    1.Asking for new proposal form.

    SMS

    P08

    Qualitative analysis

    with too muchinsights

    72Avoid/Control

    1.Assure proper questionnaires designthrough a run test.

    2.Check list with testedinsights/question withinquestionnaire.

    1.Use statistical analysis toremove extreme results.

    SMS

    S01

    Poor customers ormarketing

    professional andacademics attitude

    48Avoid/

    Accept

    1.Prepare a valuable giveaway.2.Taking an appointment with briefing

    for objective.3.Keep the meeting short, straight and

    simple.

    1.Use different communicationtechniques to get information as

    possible.2.Flag the interview form to be

    considered during analysis.

    MS

    P07Project team staffloss/ leave

    45Avoid/Accept

    1.Employees retention plans

    2.Scheduling leaves to be impededwithin the project schedule.

    1.Reschedule work on the rest ofthe team. MD

    P02

    InefficientPreparationsecondary research

    database.

    42Avoid/Control

    1.Define information resources.2.Clear definition toprojects

    deliverables and documentation

    formats.

    1.Reschedule project and re-conduct the task.

    SMS

    P03Inefficientcommunication or

    market research.

    36Avoid/Control

    1.Clear definition to projectsdeliverables and documentationformats.

    2.Proper questionnaire design.

    1.Reschedule project and re-conduct the task.

    SMS

    P06Poor questionnaire

    design or analysis36

    Avoid/

    Transfer

    1.Identification for questionnaire main

    requirements.

    2.Test questionnaire on a sample beforeconduction.

    3.Contract includes conduction of asample test.

    In addition to K01 preventive actions

    1.Asking for new questionnaire.

    SMS

    P09Poor runnerproductivity/day

    36Avoid/control

    1. Setting a daily quota for work and itsquality.

    2. Prepare a visit plan

    1. Reminding of the goal of theproject and importance ofschedule.

    2. Then reprimands theperformance and praising forthe individual personalquality.

    SMS

    S02 Economic recession. 36 Accept - Hold project MD

    F01 Budget reduced 24 Accept - Reschedule project MD

    F02 Budget withdrawal 18 Accept - Hold project MD

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    18/40

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    19/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 18of 39

    4.0Task 4

    4.1Project Initiation

    4.1.1

    Project objectiveThe LECSB project objectives to deliver a list and evaluation for several cause related

    sponsorships and its benefits for Elsewedys business performanceto be conducted in 2016,

    the project will take 232 working dayswith a cost 351,937.58 EGP Egyptian pounds,

    while most of this cost will be overhead on marketing and distribution department, where the

    actual budget is200,000.00 EGP , taking in consideration the sponsorship should conform to

    Elsewedy policy, strategy and selection criteria mentioned in table 1.3.4.

    4.1.2 Project Scope and limitation.

    The project scope should be adequately documented during the planning process and PM

    should take steps to monitor and control changes to scope so it doesnt get out of hand(Heldman, 2002), the following is a clarification for the projectsscope to avoid any creeping.

    Aspect Scope Outside of the scope

    Times scale 232 working days Beyond 232 working days

    Budget allocated 200,000.00 EGP Over 200,000.00 EGP

    Variance -/+ 10,000 EGP -

    Customer database Distributors, retailers and electricians Contractors and utilities

    Focus Sponsorship benefits Marketing campaign benefits

    Research tools Open, closed questions surveys and In-Depth interview

    focus group

    Reporting Summary and insights with

    recommendations

    Full market campaign evaluation

    Geographical Egypt Other operations

    Segment Residential sector Project sector

    Project team Mentioned in point 2.9 Outside mentioned work force

    Resources Mentioned in point 2.7 Beyond mentioned resources

    Table 4.1.2: Scope and limitation

    4.1.3 Beginning and end dates

    Start Date: 1stSeptember 2014

    End Date: 3rd August 2015

    All vacations and employees leaves has been calculated within the project schedule

    4.1.4 Key and core deliverables

    # Deliverables Description

    1Possible communicationchannel

    A list of alternative communication channels and activities that could leverage the sponsorshipeffect.

    2 Market research databaseA marketing professionals' list in large national and multinational companies, and marketingacademics in Egypt.

    3 Market situation findings

    Current customers' awareness about Elsewedy CSR.

    Communication effectiveness through techniques as recall, attitude and sort and count.

    Customer satisfaction.

    4 Internal report findings Sales effectiveness using current sales channels and activities.

    Elsewedy Current customer issues

    5Elsewedy policy, strategyand selection criteria

    Table includes amendments to requirements mentioned in table 1.3.4

    6 Proposal GuidelinesIt is a document that outlines Elsewedy policy for causal sponsorship that will be published on the

    website for the applicants.

    7 Sponsorship list It is a list that include filtered sponsorship, with:

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    20/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 19of 39

    Cause categorization as; educational, health, wealth, safety etc.

    Efficiency targeting audience.

    Communication opportunities around direct marketing.

    Ability to achieve objective.

    8 Descriptive and causalquestionnaire design

    Questionnaire list to be used in the research

    9Descriptive and causalresearch findings

    The findings of the research that will be conducted to identify the different cause sponsorshipsbenefits.

    10 Final report and summary A report outlines different sponsorship benefits evaluation for Elsewedy.

    Table 4.1.4:Key and core deliverables

    4.1.5 Methodology adaption

    With the incorrect methodology, discovering, designing, building, testing, and deploying

    projects can be chaotic (Charvat, J., 2003), there are two methodologies categories have

    different requirements as follows;

    Requirements Heavy Methodology Light (Agile) Methodology

    Budget High Low

    Team size Big Small

    Duration Long Short

    Project management ability Manage complex resources andmaterials.

    Manage simple resources andmaterials.

    Experience Need extended training Doesnt need extended training

    Software Require software Doesnt require software

    Documentation Require a lot Documentation Require few documentation andrules

    change Flexibility Inflexible Flexible

    Characteristics Bureaucratic and predictive

    Mostly unsuccessful

    Great product details

    Demand a lot of information

    Resist change

    A lot of rules and coordination

    Work well with change

    People oriented

    Depend on check lists

    Examples PRINCE/PRINCE2

    Waterfall

    Spiral

    Scrum

    Crystal

    Dynamic system methodology

    Lean development

    Future-driven methodology

    Table 4.1.5:Project Management Methodologies (Charvat J., 2003)

    Taking in consideration Elsewedy small team, limited budget, simple marketing project scope

    and heavy methodologies experiences absence that will recommend extra learning, it is better

    to use Agile methodology.

    Even though the agile methodology could be conducted without a software, The project could

    use Microsoft project MsP-2013 licenses availability in Elsewedysplanning department,

    and the extended experience of the Sr. marketing specialist experience in MsP, since it is

    flexible and can take care of the projects unique aspects and can be customized for marketing

    project (McKee et al.,2012). Where MsP is an excellent planning tools that prevent resource

    over allocations, also it will keep task leveled to avoid tasks overlap, more over it provide

    progress, resource usage and several tailored reports that could provide a firm grip monitoring

    and control (Biafore,2013).

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    21/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 20of 39

    4.1.6 Risk management

    Risks is identified in point 2.4 where it has been assessed in point 3.1 and a proper response

    and contingency action has been defined in point 3.2, after work monitor and control inputs,

    tools and techniques has been defined in 3.3.

    4.1.7 Outline budget

    Even though Elsewedys project cost is 351,937.58 EGP, it will be allocated as overheads

    cost on Elsewedy sales and marketing operation that is why it will not be considered within

    the budget calculations.

    Costs incurred EGP

    Consultancy proposal form design 15,000.00

    2 half page ads. In Ahram newspaper (Friday issue) 125,000.00

    Radio ad. On Nile FM 50,000.00

    Consultancy Descriptive questionnaire design 5,000.00

    Consultancy Causal questionnaire design 5,000.00

    Total 200,000.00

    Benefits EGP

    Update customer database 25,000.00

    Increase in brand exposure 80,000.00

    Communication channels as; Newspapers ads. Radio ads, Researches phase and Proposalphase

    175,000.00

    %margin in sales increase 1,000,000

    Total 1,280,000.00

    4.2Project implementation

    4.2.1 Schedules and Work breakdown structure 'WBS'

    The WBS defines the scope of the project and the work down into components that could be

    scheduled and budgeted, as well as easily monitored and controlled (Heldman,2007), the

    following table is a WBS extracted from the Gantt chart of MsP-2013, while Gantt chart is

    attached within appendix 5.

    WBSListing and Evaluating Sponsorship benefits

    ProjectStart Finish

    Predecessors

    RASCI matrix

    MarketingDirector

    MarketingManager

    Sr.Marketingspecialist

    marketingSpecialist1

    Marketingspecialist2

    Distributionmanager

    Internaldesigner

    Marketingconsultant

    Elsewedy Sponsorships' Benefit Project 09/01/14 08/03/15

    PRE Preparation phase 09/01/14 10/30/14

    PRE.1 Kick-off meeting 09/01/14 09/01/14 I S A S S S

    PRE.1.1 Objective and WBS illustration 09/01/14 09/01/14

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    22/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 21of 39

    PRE.1.2 Scope Briefing 09/01/14 09/01/14 3

    PRE.1.3 Individual and team responsibilities 09/01/14 09/01/14 4,3

    PRE.1.4 WBS 09/01/14 09/01/14 5

    PRE.1.5 Performance Baseline Measurement 09/01/14 09/01/14 6

    PRE.1.6 Resources allocation 09/01/14 09/01/14 7

    PRE.1.7 Milestones and Scheduling 09/01/14 09/01/14 8

    PRE.1.8Risk management plan and responsibility

    allocation09/01/14 09/01/14 9

    PRE.1.9 Initial phase approval 09/01/14 09/01/14 10RA I I I I I

    PRE.2Secondary research to build research

    database09/01/14 09/10/14

    PRE.2.1Large Local, Multinational companies,

    Marketing consultancies and colleges09/01/14 09/02/14

    PRE.2.1.

    1Yellow pages research 09/01/14 09/02/14 10,3

    R A

    PRE.2.1.2 Telephone Directory research 09/01/14 09/02/14 10,3 R A

    PRE.2.2Marketing managers contacts for the above

    companies through:09/02/14 09/10/14

    PRE.2.3 Local and Multinational companies list 09/02/14 09/02/14 13RA

    PRE.2.4Marketing professional and academics contactswithin multinationals list

    09/10/14 09/10/14 16 R

    A

    PRE.3 Communication channel secondary research 09/02/14 09/18/14

    PRE.3.1 Sponsorship history of defined companies 09/02/14 09/04/14 13 R A S

    PRE.3.3Sponsorship communication of the defined

    above sponsorship09/08/14 09/15/14 23

    R A S

    PRE.3.5 Sponsorship potential channel list 09/10/14 09/11/14 21R

    A

    PRE.3.2 Sponsorship Form 09/14/14 09/15/14 23RA

    PRE.3.4 Potential communication channels and its cost 09/15/14 09/18/14 23RA S S

    PRE.4 Market situation Research 09/15/14 10/26/14

    PRE.4.4 Market share research 09/15/14 09/25/14

    PRE.4.4

    .1

    Market size calculation (Market size =

    Manufactured + Import - Export)09/15/14 09/25/14

    PRE.4.4.

    1.1ITC Import and Export report for 2013 09/15/14 09/15/14 27 R

    A

    PRE.4.4.1.3

    Manufacturing capacities calculations 09/15/14 09/15/14 27R A

    PRE.4.4.1.2

    Estimating using mathematical regression andfield indicators the counterfeited market share

    09/24/14 09/25/14 27R A

    PRE.4.1 Questionnaire design phase 09/18/14 09/22/14

    PRE.4.1.

    1

    Customer satisfaction and CSR awareness

    questionnaire09/18/14 09/21/14 27 R

    A S S

    PRE.4.1.

    2

    Communication activities effectiveness and

    positioning questionnaire09/21/14 09/22/14 27 R

    A S S

    PRE.4.1.

    3

    Counterfeited perceived percentage of the

    market questionnaire09/22/14 09/22/14 27 R

    A S S

    PRE.4.1 Questionnaire sample test 09/22/14 09/24/1430,31,32

    RA S S

    PRE.4.2 Questionnaire approval 09/24/14 09/25/1430,31,32,

    33

    R

    A I I I I I

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    23/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 22of 39

    PRE.4.3Questionnaire conduction on 20% of the

    customer database09/25/14 10/21/14

    PRE.4.3.1

    Customer satisfaction and CSR Researchquestionnaire

    09/25/14 10/21/14 34I C R A

    PRE.4.3.2

    Communication activities effectives andPositioning questionnaire

    09/25/14 10/21/14 34I C R A

    PRE.4.3.3

    Counterfeited perceived percentage of themarket questionnaire

    09/25/14 10/21/14 34I C

    RA

    PRE.4.5 Summary and report 10/21/14 10/26/14

    PRE.4.5.1

    Report preparation 10/21/14 10/26/1436,37,38

    R

    A S S

    PRE.4.5.

    2Presentation of result 10/26/14 10/26/14 45 R

    A S S

    PRE.4.6 Market share and positioning 10/26/14 10/26/14 45RA S S

    PRE.4.7 Counterfeited wires estimated market share 10/26/14 10/26/14 45R

    A S SPRE.4.8 Customer CSR awareness index 10/26/14 10/26/14 45

    R

    A S S

    PRE.4.9 Customer satisfaction index 10/26/14 10/26/14 45RA S S

    PRE.5 Current performance meeting 10/26/14 10/30/14

    PRE.5.1 Sales effectives through current channels 10/26/14 10/28/14 50S S S

    RA

    PRE.5.2Current customer issues discussion andsolutions

    10/28/14 10/30/14 52C

    RA S S S

    PRE.6 Customer issues identification report 10/30/14 10/30/14 53RA S S

    PRE.7 Progress meeting 10/30/14 10/30/14 54 S S A S S S

    INI Initiation phase 10/30/14 03/19/15

    INI.1Meeting to formulate the final policy, strategyand selection criteria

    10/30/14 11/02/1454,55 A S

    RA S S S

    INI.2Sponsorship's policy, strategy and selectioncriteria has been defined

    11/09/14 11/09/14 57 RA

    INI.3 Proposal draft from Agency 11/09/14 11/09/14 58C

    R

    A S S

    INI.4 Final proposal form receipt 11/09/14 11/18/14 59 R A

    INI.5 Elsewedy Announcement to Enrollment 11/09/14 12/30/14

    INI.5.1 Ad artwork 11/09/14 11/10/14 58 R A

    INI.5.2 Ad. Art work approval 11/18/14 11/18/14 62 A R A

    INI.5.6 Progress meeting 11/18/14 11/18/14 63 S S A S S S

    INI.5.5 Enrollment period 11/18/14 12/30/14 63 R A A

    INI.5.3 2 half page ads. In Ahram newspaper (Fridayissue)

    11/18/14 12/09/14 63,64 R

    INI.5.4 Radio ad. On Nile FM 11/18/14 12/09/1463,64 R

    INI.6 Selection and filtration 12/30/14 03/19/15 61

    INI.6.1 Initial screening 12/30/14 02/18/15 63RA A A

    INI.6.2 Cause categorization as per 03/01/15 03/17/15

    INI.6.2.1

    Audience targeting efficiency, communicationopportunities, objective achievements

    03/01/15 03/17/15 69 RA A A

    INI.6.2.

    4Progress meeting 03/17/15 03/17/15 71

    INI.6.3 Different sponsorship potential benefits report 03/17/15 03/19/15 72R

    A

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    24/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 23of 39

    IMP Implementation phase 03/19/15 08/03/15

    IMP.1 Questionnaire design 03/19/15 03/25/15

    IMP.1.1 Descriptive questionnaire 03/19/15 03/23/15 73 R A

    IMP.1.2 Causal questionnaire 03/19/15 03/25/15 73R A

    IMP.8 Questionnaire sample test 03/30/15 04/02/1576,77

    RA A A

    IMP.5 Progress Research report 05/17/15 07/12/15 S S A S S S

    IMP.5.1 Progress Research report 1 05/17/15 05/17/15

    IMP.5.2 Progress Research report 2 05/31/15 05/31/15

    IMP.5.3 Progress Research report 3 06/14/15 06/14/15

    IMP.5.4 Progress Research report 4 06/28/15 06/28/15

    IMP.5.5 Progress Research report 5 07/12/15 07/12/15

    IMP.2Research conduction based on professionaldatabase

    05/25/15 07/27/15 79RA A A

    IMP.3 Sponsorship benefits report preparation 07/27/15 08/02/15 78R

    A A A

    IMP.4 Project findings presentation 08/02/15 08/03/15 86 I C R S S ITable 4.2.1: work break down and responsibility matrix

    4.2.2 Resource reviews

    The PMBOK guide defines resources as people, equipments and materials, while the list goes

    on depending on the project (Heldman,2007). While the MsP-2013 define three types of

    resources; cost type which include financial resources as payments which dont accumulate

    with time as consultancy fees and questionnaire design fees, also material type which

    accumulate per unit, and work type which is any resource accumulate with time as

    employees work (Biafore,2013). The following table illustrate these different types of

    resources and in appendix 7 there are a snap shot from the program.

    Resource Name TypeCost

    (EGP)

    Details

    Marketing Consultant Cost 25,000.00Consultancy for Proposal form preparation, Descriptiveand causal research questionnaire design.

    Newspaper Ad Cost 125,000.002 half page ads. In Ahram daily newspaper (Fridaysissue)

    Radio Ad. Cost 50,000.00 3 min ad. On Nile FM for 30 days on 5:00 pm

    Giveaways Material 250.00/unitGiveaways for market professional and academics

    descriptive and causal research.

    Marketing director Work 170.00/hr.

    Marketing Manager Work 85.00/hr.Distribution Manager Work 85.00/hr.

    Sr. Marketing Specialist Work 40.00/hr.

    Marketing Specialist 1 Work 17.00/hr.

    Marketing Specialist 2 Work 17.00/hr.

    Internal designer Work 40.00/hr.

    Table 4.2.2: Resources review

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    25/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 24of 39

    4.2.3 Personal requirement

    The project team is mainly the Sr. Marketing specialist, marketing specialist 1 and 2, inaddition to minor roles for internal designer, marketing and distribution manager, also the

    marketing director as a sponsor for the project, check appendix 6&7.

    4.3Project termination

    Meredith and Mentell (2003) stated that the primary criterion for project continence or

    termination is whether or not the organization is willing to invest the remaining estimatedtime and cost to complete the project, given the projects current status and expectedoutcomes. Taking in consideration Egypt current political and economic state the projectcould be terminated or put on hold for undefined time period in case of risk number F03,S02and S03. Also management could terminate the project in case they found in progress

    meetings that the project will fail to deliver a clear sponsorship benefits evaluation. Else theproject will be terminated after delivering the researchs findings with sponsorship benefits

    and recommendation to the main criteria to select the appropriate sponsorship program and

    benefits with each category.

    4.4Project Evaluation

    Evaluation techniques are two main types; Formative evaluation, which PM should conduct to

    guide the project to successful implementation, while there summative it is a post completion

    evaluation (Harvey,1998), where there are several types for summative evaluation (McKee et

    al.,2012) as;

    Outcome matrix which is a simple listing of deliverables on the right hand and

    achievement on the left hand.

    Post-completion audit which looks at all aspects of the project with regarding twoquestions, did the end result meet the objective? And was the management of the

    project as it might be, or were there bottlenecks or problems ?

    Benefits realization it is a summary of basic findings about projects performance,

    organization, team and management, but usually a more formal audit is undertook

    From illustration it is obvious that the most effective evaluation technique for the project with

    deep insight is the Post completion audit which could be applied as follows;

    4.4.1 Objective Evaluation

    The evaluations main reason for the project is to illustrate the cause related sponsorshipbenefits on Elsewedy business performance, it is supposed to deliver different causesponsorship categories effect on delivered customer value, customer perception of ElsewedyCSR, brand exposure, generated promotional opportunity and customer loyalty, effect onmarket share and sales revenues as a result Elsewedy could select the most appropriatesponsorship to its objective and strategy, also to base the foundation for a post-implementation evaluation.

    4.4.2 Post-Completion Audit

    The project is a great opportunity to learn how to manage future project more effectively,where a LECSBsformal review should examine all projects input to deliver an insightfullearning outcomes through asking what went well (and why) and what went bad (and why)

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    26/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 25of 39

    then it delivers its recommendation. This could be achieved through simple reviewquestionnaire about the following aspects.

    Meetings:

    Kick-off meeting, briefing sessions, agency questionnaire appraisal meetings and progress

    meetings effectiveness and efficiency should be reviewed through asking simple questionsas:

    o Was the meeting effective?o Was meetings number appropriate or it should increase?o Did the meeting succeeded in delivering its agenda?o Is it effective communication tools to what extent?o How future meetings could be enhanced?

    Performance

    The teamsmembers should be evaluated as groups as well as individuals, where feedback

    should be collected using 360 review questionnaire, assessing aspects as productivity withrespect to assigned tasks, cooperation, after word an interview should be conducted with the

    teamsmember to positively share the results.

    Budget

    A comparison should be conducted between the forecasted costs and benefits and the actualcost and benefits, through a reviewed CBA. Also the reason for the variance should be stated

    through asking the following questions:o Why did LECSB project come over/under budget?o Were additional/less resources should have been allocated?

    Schedule and tasks

    Tasks effectiveness in achieving deliverables should be examined, also its conductionsduration, and its allocated resources.

    o Was the quantitative and qualitative questionnaire design effective?o Was the sampling for quantitative and qualitative questionnaire test task

    effective to evaluate the questionnaire effectiveness?o Could the research be conducted on smaller sample with appropriate

    accuracy?o Did the analysis was effective?o Why LECSB schedule exceeded its deadline?o Which part went well?o How to improve future task conduction?o Was the project managed effectively?o

    Was risk management plan effective?o Which task needed more/less time?

    4.4.3 Evaluation Report

    After words the gathered information should be formalized in a report. With the following

    outline (McKee et al.,2012,P.283)

    Summary emphasizing areas that found to be unsatisfactory.

    Review of the end result compared to the expected result

    Reviewed CBA comparing forecasted costs and benefits to actual cost and benefits.

    Reviewed schedule briefing illustrating tasks took longer than planned and reason

    Recommendations should be made to improve future conduction

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    27/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 26of 39

    Bibliography:

    Arens, W., Weiglod, M., and Arens, C. (2012) Contemporary Advertising: And Integrated

    Marketing Communications. 14

    th

    edition, New York, McGraw-Hill/Irwin

    Brassington, F and Pettit, S (2000)Principals of marketing. 2ndedition. UK, Pearson

    education Ltd.

    Chapman, C. and Ward, S. (2003)Project risk management: Process, techniques and

    insights. 2nd

    edition. UK, John wily and sons.

    Charvat, J. (2003)Project Management MethodologiesSelecting, Implementing, and

    Supporting Methodologies and Processes for Projects. USA, John Wiley.

    Collett, P & Fenton, W (2011), the sponsorship handbook: Essential tools tips and techniques

    for sponsor and sponsorship seekers, USA, Jossey-bass.

    Cooper, D. Grey, S. Raymond, J. and Walker P. (2005)Project Risk management Guidelines:

    managing risk in large projects and complex procurement. UK, John Wily Ltd.

    Dorfman, M. (2007)Introduction to Risk Management and Insurance. 9th edition, New York:

    Prentice Hall

    Doyle, P (2008) Value Based Marketing: marketing strategies for corporate growth and

    shareholder value. 2nd edition, UK, John wiley & sons, Ltd.

    Farris,P. Bendle,N Pfeifer,P. and Reibstein, D (2010)Marketing Metrics: the definitive guideto measure marketing performance. 2ndedition. USA, Pearson education Inc.

    Gray, C. and Larson, E. (2011)Project Management: the material process. 5thedition. USA,

    McGraw-hill/Irwin.

    Grey, A-M & Skildum-Reid, K (2014) The sponsors toolkit. 4thedition, USA, McGraw hill

    Harvey, J (1998).Evaluation cookbook. Scotland, Heriot-watt university.

    Heldman, L (2002).PMP: project management professional exam. Canada, SYBEX Inc.

    Heldman, L (2007).PMP: project management professional exam. 4thedition. Indianapolis,Wiley publishing Inc.

    Jobber, D (2013)Principles and Practice of Marketing. 7thedition. UK, McGraw-Hill

    Education.

    Kotlar, P. and Keller, K (2009),Marketing management. 13thedition. USA, Pearson

    education

    Lewis, J.P (2007)Mastering Project management. 2nd

    edition. New York, McGraw-Hill.

    Meredith, J. R. and Mantell, S.J (2003)Project management: A managerial Approach. New

    York, McGraw-Hill.

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    28/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 27of 39

    McKee, F. et al. (2012)Project management in marketing. UK, BPP learning media Ltd.

    Miles, R. and Snow, S (2003) Organization Strategy, structure and process, Stanford,

    Stanford business classics.

    Pearn, M., Mulrooney, C. and Payne, T. (1998).Ending the blame Culture. UK, Gower

    Publishing limited.

    PMI (2008),A guide to the project management body of knowledge (PMBOK Guide). 4th

    edition. USA, Project management institute, Inc.

    Ukman, L. (2010)Ieg's Complete Guide to Sponsorship : Everything you need to know about

    sports, arts, event, entertainment and cause marketing. Chicago: IEG, LLC.

    Journals:

    Cornwell, .T (2008). State of the art and science in sponsorship-linked marketing.Journal of

    advertising, Vol37(3), pp41-55

    Farrelly, F.J., Quester, P.G. and Burton, R. (1997) Integrating sports sponsorship intothe

    corporate marketing function: an international comparative study.InternationalMarketing

    Review, Vol14(3), pp170182.

    Johnston , M. and Paulsen, N. (2007). The relative importance of sponsorship selection

    criteria: A choice-based conjoint experiment using hierarchical Bayes analysis. In: Thyne, M.,

    Deans, K. R. and Gnoth, J., ANZMAC 2007 Reputation, Responsibility,Relevance:Conference Proceedings. Australian and New Zealand Marketing Academy (ANZMAC)

    Conference 2007, Dunedin, New Zealand, 3-5 December 2007, pp468-475.

    Mack, W.R. (1999), Event Sponsorship: An Exploratory Study of Small BusinessObjectives,

    Practices, and Perceptions.Journal of Small Business Management, Vol37(3).pp 2530.

    McCook, K., Turco, D. & Riley, R. (1997) A look at the corporate sponsorship decision-

    making process. Cyber-Journal of Sport Marketing, Vol1(3)

    http://fulltext.ausport.gov.au/fulltext/1997/cjsm/v1n2/mcook.htm [Accessed on 20 august

    2014]

    Meenaghan, T. (1991) The Role of Sponsorship in the Marketing Communication Mix,

    International Journal of Advertising, Vol10(1), pp35-47.

    Meenaghan, T. (1993) Commercial Sponsorship.European Journal of Marketing. Vol17(7),

    pp5-73.

    Nickell,D. Cornwell,T. Johnston, W(2011) Sponsorshiplinked marketing: a set of research

    propositions.Journal of Business & Industrial Marketing, Vol.26(8), pp577589.

    Pope, N. (1998), Overview of current sponsorshipthought, The Cyber-Journal of Sport

    Sponsorshipvol.2(1). Available online:

    http://fulltext.ausport.gov.au/fulltext/1997/cjsm/v1n2/mcook.htmhttp://fulltext.ausport.gov.au/fulltext/1997/cjsm/v1n2/mcook.htm
  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    29/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 28of 39

    http://fulltext.ausport.gov.au/fulltext/1998/cjsm/v2n1/pope21.htm[Accessed on 20 august

    2014]

    Wierenga, B (2011). Managerial decision making in marketing: The next research frontier.international Journal of Research in Marketing, Volume 28(2), pp89- 101

    Electronic resources

    AlAswany, A. (2013),http://www.nytimes.com/2013/11/11/opinion/aswani-egypts-two-front-

    war-for-democracy.html [Accessed on 29 July 2014]

    Banti, E and Rogers, A. (2012). Sponsorship Portfolio: Empirical study of the decision

    process. Master programme degree spring 2012,http://www.diva-

    portal.org/smash/get/diva2:528739/FULLTEXT01.pdf [Accessed on 20 august 2014]

    Benedetti, L (2012),Decision making process in corporate sponsorship: open call as a

    strategy to attract, screen access, and select sponsorship proposals,

    http://www.blogacesso.com.br/wp-content/uploads/2013/05/L%C3%A1rcio-Benedetti-

    Sponsorship-D-ecision-Making-Thesis-Work.pdf , [Accessed on 20 august 2014]

    Biafore, B (2013) Project 2013 Essential training,http://www.lynda.com/Office-

    tutorials/Project-2013-Essential-Training/115433-2.html Accessed [7 august 2014]

    EMSD (2014) Electrical and mechanical department the government of honk-Kong special

    administration region,IEC color Code

    http://www.emsd.gov.hk/emsd/eng/pps/electricity_new_8.shtml [Accessed on 29 July 2014]

    ESA (2007) EuropeanSponsorship Association. ESA European sponsorship survey 2007.

    http://www.sponsorship.org/content/downloads_public/resInfo_DL/ESA_European_Sponsors

    hip_Survey_2007_SMS_final_1.pdf [Accessed on 20 august 2014]

    HDRO (2014),Human development report 2014: sustain human development, reducing

    vulnerabilities and building resilience. USA, the united nation development programme.

    http://hdr.undp.org/sites/default/files/hdr14-report-en-1.pdfAccessed [20 august 2014]

    IEG (2012) Economic Uncertainty to Slow Sponsorship Growth In

    2012http://www.sponsorship.com/iegsr/2012/01/03/economic-uncertainty-to-slow-

    sponsorship-growth-in.aspx

    http://fulltext.ausport.gov.au/fulltext/1998/cjsm/v2n1/pope21.htmhttp://fulltext.ausport.gov.au/fulltext/1998/cjsm/v2n1/pope21.htmhttp://www.nytimes.com/2013/11/11/opinion/aswani-egypts-two-front-war-for-democracy.htmlhttp://www.nytimes.com/2013/11/11/opinion/aswani-egypts-two-front-war-for-democracy.htmlhttp://www.diva-portal.org/smash/get/diva2:528739/FULLTEXT01.pdfhttp://www.diva-portal.org/smash/get/diva2:528739/FULLTEXT01.pdfhttp://www.blogacesso.com.br/wp-content/uploads/2013/05/L%C3%A1rcio-Benedetti-Sponsorship-D-ecision-Making-Thesis-Work.pdfhttp://www.blogacesso.com.br/wp-content/uploads/2013/05/L%C3%A1rcio-Benedetti-Sponsorship-D-ecision-Making-Thesis-Work.pdfhttp://www.lynda.com/Office-tutorials/Project-2013-Essential-Training/115433-2.htmlhttp://www.lynda.com/Office-tutorials/Project-2013-Essential-Training/115433-2.htmlhttp://www.emsd.gov.hk/emsd/eng/pps/electricity_new_8.shtmlhttp://www.sponsorship.org/content/downloads_public/resInfo_DL/ESA_European_Sponsorship_Survey_2007_SMS_final_1.pdfhttp://www.sponsorship.org/content/downloads_public/resInfo_DL/ESA_European_Sponsorship_Survey_2007_SMS_final_1.pdfhttp://hdr.undp.org/sites/default/files/hdr14-report-en-1.pdfhttp://www.sponsorship.com/iegsr/2012/01/03/economic-uncertainty-to-slow-sponsorship-growth-in.aspxhttp://www.sponsorship.com/iegsr/2012/01/03/economic-uncertainty-to-slow-sponsorship-growth-in.aspxhttp://www.sponsorship.com/iegsr/2012/01/03/economic-uncertainty-to-slow-sponsorship-growth-in.aspxhttp://www.sponsorship.com/iegsr/2012/01/03/economic-uncertainty-to-slow-sponsorship-growth-in.aspxhttp://hdr.undp.org/sites/default/files/hdr14-report-en-1.pdfhttp://www.sponsorship.org/content/downloads_public/resInfo_DL/ESA_European_Sponsorship_Survey_2007_SMS_final_1.pdfhttp://www.sponsorship.org/content/downloads_public/resInfo_DL/ESA_European_Sponsorship_Survey_2007_SMS_final_1.pdfhttp://www.emsd.gov.hk/emsd/eng/pps/electricity_new_8.shtmlhttp://www.lynda.com/Office-tutorials/Project-2013-Essential-Training/115433-2.htmlhttp://www.lynda.com/Office-tutorials/Project-2013-Essential-Training/115433-2.htmlhttp://www.blogacesso.com.br/wp-content/uploads/2013/05/L%C3%A1rcio-Benedetti-Sponsorship-D-ecision-Making-Thesis-Work.pdfhttp://www.blogacesso.com.br/wp-content/uploads/2013/05/L%C3%A1rcio-Benedetti-Sponsorship-D-ecision-Making-Thesis-Work.pdfhttp://www.diva-portal.org/smash/get/diva2:528739/FULLTEXT01.pdfhttp://www.diva-portal.org/smash/get/diva2:528739/FULLTEXT01.pdfhttp://www.nytimes.com/2013/11/11/opinion/aswani-egypts-two-front-war-for-democracy.htmlhttp://www.nytimes.com/2013/11/11/opinion/aswani-egypts-two-front-war-for-democracy.htmlhttp://fulltext.ausport.gov.au/fulltext/1998/cjsm/v2n1/pope21.htm
  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    30/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 29of 39

    Appendix 1: Organization Background

    1.0Organization

    Elsewedy is an Egyptian company, it was founded in 1938 by the Elsewedy family as a

    trading company, and In 1986 Elsewedy built its cables factory under the name of Elsewedy

    cables. In 2008 Elsewedy changed its name into Elsewedy Electric, Now Elsewedy Electric

    manufactures and sells integrated energy products and services in seven energy segments:

    electrical wires and cables, electrical products, telecommunications, transformers, wind

    energy generation, energy measurement and management, engineering, procurement and

    contracting.

    Elsewedy electricturnover has been rapidly rising during the past few years to reach 15.1

    billion EGP in 2013; taking in consideration, Elsewedy Cablesproduction capacity is the

    highest one in the region, with 282 thousand tons/annum in 2013 and the 5th

    worldwide.

    Elsewedy Cablesis accountable to 78% of Elsewedy Electric revenues (11.8 Billion EGP) in

    2013, and Egyptian wires and cables market is accountable to 46% of the total wires and

    cables sector (5.52 Billion EGP), distributed as 60% and 40% for project and residential

    sector respectively.

    2.0Residential Market Products

    Elsewedy manufactures Electrical wires, which are a copperconductors insulated with a material, also it could be several wireswith over all white sheath, to conduct electricity in buildings onvoltage up to 1000 volts, usually range from 1.5 SQ.MM to 25

    SQ.MM. It has 5 main colors according to old International electricalcommittee standards ' IEC ' which are red, yellow, blue, black andyellow green, since Egypt market still using the old IEC colors. Itspackaging is 100 M rolls, and usually it is sold directly in hugequantity (>1000 rolls) directly or through distributor or retail inmedium and small quantities.

    3.0Residential Market Product Range:

    In the following is wires percentage distribution among sizes and colorsSize % Red Yellow Blue Black Yellow green

    1.5 SQ.MM 60 22.46 8.12 7.75 20.11 41.52 1002.5 SQ.MM 23 22.84 10.21 11.07 37.89 17.96 100

    4.0 SQ.MM 11 26.26 13.37 12.99 40.68 6.67 100

    6.0 SQ.MM 1.9 16.73 17.98 24.05 30.044 11.17 100

    10 SQ.MM 0.1 5.64 2.82 2.82 0 88.70 100

    16 SQ.MM 2 18.90 11.08 13.43 18.36 38.21 100

    25 SQ.MM 2 28.20 21.81 18.09 31.88 0 100

    Total 100

    Table A.1: Product Mix

    4.0Customers and Sales revenues

    Elsewedy Cableshas two main distributors located in Cairo, whom has sub distributor andretailers covering 28 Egyptian governorates, during 2009-2010 Elsewedy developed a

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    31/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 30of 39

    detailed database for different Egyptian territories, through inviting distributors, retailers and

    electricians to counterfeited wires awareness communication seminars (CWACS).

    CWACS developed several promotional opportunities that enhanced the sales revenues

    volume highlighted in table A.1, in the following is a table illustrates the customer retentionand acquisition vs. sales revenues.

    Year Period Customer Retention Customer Acquisition Sales

    Distributors

    lost

    Distributors at

    start of periodRate

    Distributors

    acquired

    Distributors atthe start of the

    period

    RateAnnualBillion

    EGP

    2009January-June 0 13 0% 48 13 369%

    1.8July-December 26 61 43% 250 61 410%

    2010January-June 47 285 16% 150 285 53%

    2.42July-December 39 388 10% 128 388 33%

    2011January-June 32 477 7% 0 477 0%

    1.19

    July-December 325 445 73% 0 445 0%

    2012January-June 25 120 21% 47 120 39%

    0.7July-December 50 142 35% 26 142 18%

    2013January-June 13 118 11% 50 118 42%

    1.6July-December 79 155 51% 120 155 77%

    2014 January-June 93 196 47% 21 196 11%

    Table A.2: Sales revenues with

    5.0Market position and competition

    Researchers conducted in-house estimate the Egyptian wires market as follows;

    Egyptian wires market is an oligopoly market and until 2008 it used to be duopoly, as a result,

    even Elsewedy is the highest prices wires in the market yet it has apparently 65% market

    share, while actually it has 30% actual market share. Noting that, Elsewedy actual market

    share increased from 30% to 39% by 2010s end as a result of CWACS and fall again after its

    termination in 2011. Main competitors are as follows:

    Brands Details

    Sewedix A Saudi Arabian Jeddah Cables' brands, with 40,000 ton/annum manufacturing capacity, which is owned by a

    member of Elsewedy Family, it has been introduced in the market in 2008.

    ECC A brand for public local manufacture with 24,000 ton/annum manufacturing capacity.

    Generics They are a range of several factorieswith capacities less than 1,000 ton/annum and very low quality wires.

    Counterfeited It is manufactured by Generic factories as Elsewedy counterfeited product.

    Table A.3: competitors

    65%

    20%

    10%5%

    Apparent Residential Wires Market

    Elsewedy

    Sewedix

    ECC

    Generics

    30%

    20%

    10%5%

    35%

    Actual Residential Wires Market

    Elsewedy

    Sewedix

    ECC

    Generics

    Counterfieted

  • 8/10/2019 OCOM PMiM SEP14 12998007 Final Correct Version

    32/40

    CIM Professional Diploma in Marketing

    Project Management in Marketing: Option 2

    :70889221Candidate Number

    :September 2014

    Board

    Page 31of 39

    Appendix 2: Project Proposal

    Option Chosen: Option two - Sponsorship

    Candidate Number: 70889221Name of Tutor:

    Date: 2 July 2014

    Assignment Option Selected and Why

    Option twoSponsorship is selected since it suits my business field, and there are a currentproject in Elsewedy Cables related to sponsorship.

    Confirmation of employer/organization co-operation

    Marketing Director.Marketing Manager.

    Project Objectives and Scope

    The project objectives to deliver a list and evaluation for several cause related sponsorshipsand its benefits for Elsewedys business performance to be conducted in 2015-2016

    Brief description of what is to be covered for each aspect of the brief

    Product

    Electrical wires are a copper conductors insulated with a material to conduct electricity in

    buildings usually range from 1.5 SQ.MM to 25 SQ.MM. It has 5