OCL GROUP INC. PROJECT PROFILE
Client Project Location Project Title Project Value
Regional Municipality of Wood Buffalo
Hilldrive, McLeod Street/Fort McMurray
QU4211 UIRP 2017 Contract 4 $4.6M
Start Date: June 2017 Finish Date: November 2017
Project Description:
This project consisted of removing and installing a new sanitary sewer, water main and storm sewer system by using an open cut excavation; pipe depths ranged from 3 meters to 6 meters. Utilization of a manhole tap box shoring system was required. Furthermore, this project also included the tie ins of the new water main, valve and hydrant assembly installations, water main hot taps, hydro testing, chlorination, installing sanitary sewer & storm system piping. This included tying into to the existing system which required several critical bypass pumps with flows ranging from 50-1000 L/s. OCL also removed and replaced the concrete curb, sidewalk and installed temporary water for residents.
Project Statistics:
Pipe Installation (Open Cut) Sanitary ▪ 270 m of 250 mm dia. PVC DR35 Sanitary Sewer ▪ 100 m of 300 mm dia. PVC DR35 Sanitary Sewer ▪ 100 m of 200 mm dia. PVC DR35 Sanitary Sewer ▪ 76 ea of 100 mm dia. PVC DR35 Sanitary Sewer
Manhole Installation
▪ 31 vm of 1200 mm dia. Concrete Manhole ▪ 12 vm of 2400 mm dia. Concrete Manhole ▪ 8 vm of 3000 mm dia. Concrete Manhole ▪
Pipe Installation (Open Cut) Water Main ▪ 780 m of 300 mm dia. PVC DR18 Water Main ▪ 40 m of 150 mm dia. PVC DR18 Water Main ▪ 76 ea. of 19 mm dia. 19mm Copper ▪
Pipe Installation (Open Cut) Storm Sewer ▪ 52 m of 375 mm dia. PVC DR35 ▪ 260 m of 1500 mm dia. PVC DR35
Asphalt Construction – Residential Driveway ▪ 9438 m2 of 40mm Depth Hot Mix Asphaltic Concrete ▪ 9438 m2 of 60mm Depth Hot Mix Asphaltic Concrete ▪ 850 m2 of 100mm Depth Hot Mix Asphaltic Concrete
Civil Road Activities
▪ 1700 m2 of Topsoil ▪ 1700 m2 of Sod Installation ▪ 12,098 m2 600mm depth of Granular Sub Base 75mm ▪ 3025 m2 250mm depth of Granular Base 20mm
Concrete Activities
▪ 1500 m Rolled Face (RF) Monolithic Curb, Gutter and Sidewalk
▪ 1350 m2 120mm depth Residential Concrete Driveways ▪ 2 ea. New Concrete Pararamp
2
OCL GROUP INC. PROJECT PROFILE
Civil Stripping Asphalt & Concrete, Exposing Pipe
Installation of 300 mm Diameter DR 18 Water Main, Services, Hydrant, Valves
3
OCL GROUP INC. PROJECT PROFILE
Installation of 300 mm Diameter SDR 35 Sanitary, Services, Manhole
Road Construction
4
OCL GROUP INC. PROJECT PROFILE
Concrete Curb, Gutter & Sidewalk
Storm Sewer 1500 mm SDR 35
5
OCL GROUP INC. PROJECT PROFILE
Additional Photos