ocean beach master plan key moves
TRANSCRIPT
V-9with AECOM | ESA PWA | Nelson\Nygaard | Sherwood Design Engineers | Phil G King PhD
Recon gure and signalize Sloat–Great Highway and Sloat–Skyline intersections.
Maintain one-lane driveway from Skyline to treatment plant for trucks.
Recon gure Sloat with two lanes each way, angle parking along zoo boundary, integrated stormwater management, bikeway and coastal access amenities.
Extend Muni L Taraval south across Sloat, with terminus at zoo entrance.
Introduce coastal trail to Fort Funston and Lake Merced, including a crosswalk at Skyline.
Integrate with California Coastal Trail, linking Lake Merced all the way to Marin County.
Replace beach/zoo parking along Armory Road and at Skyline trailhead.
Reopen Armory Road from Zoo Road to zoo parking lot to provide zoo access.
Key Move 1:
Reroute the Great Highway behind the zoo via Sloat and Skyline Boulevards.
Master Plan Recommendations: Six Key Moves | Key Move 1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
0 250 ft 500 ftScale
North
1.7
1.1
San Francisco Zoo
Fort Funston
Lake Merced
(new
) Sl
oat
Bou
leva
rd
Skyline Blvd
PPPPPPPPPPAAAAAAAAAA CCCCCCCC IIIIIIII FFFFFFFFF IIIIII CCCCCCCCCC OOOOOOO CCCCCCC EEEEEEEEE AAAAAAAAAAA NNNNNNNNNNNN
42th Ave
Arm
ory
Rd
The Great Highway
Fleishhacker PoolWarming Hut
47th Ave
43th Ave
Zoo Parking Lot
New Zoo Entry
Ocean Beach See Figure V-5
1.1
1.4
(( ((((( (( ((((((( (((( (( ((((((((((((neneneneneneneneneneeneneeneneneneeneeneeneneeenenennnnnnnnnw
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)w
)wwwwwwwwwwwwwwwwwwwwwwwwwwwww
SSSSS SS SS SS SSSS S S SSSSS S SSSSSS S SSSSSSSS SSSS S SSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSS S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSllolololooolololoololoolooloolloooolololoolololololoolollllllllllllll
tttatatatatatatatatattttatatatattttattatttttttatttattattatttttttttttttttttttaaaaaaaaaaaaBB B BBBBB BBBBB BBBBBBBBBBB BBBBBB B BBBBBB BBB BBBB BBBB BBBBBBB
ououououououououuouuouououououououououououououuuououououuuuuououououuuoooooooooooooooooleleleelelelelelelelelelellleeelelelleeellelelellll
vavavavavaaaaaavavaaaaaaavaaaaaaaavaaaaaaaaaavaaaaaaaaaaaavavaavaavavavaaavavavavvvvvvvvvvvvvvvvvvvvvvrdrdrdrdrdrddrdrdrdrdrdrdrdrdrdrdrddrdddrdrdrdrddrdddddrdddrdrddrddrdrdrrrrrrrrrrr
47t47t47t47t47t47t447t474747t47t47t47t47t47747t47t47t4474747474747447747t44474747t7t4744477t474447t7t7t47447t47t7t4474777t47477t7t4474477t4747tttt77t7thh Ah Ah Ah AAAh Ahhh Ah Ah Ah Ah Ah Ah Ah Ah Ah Ahhh h AAh Ahh Ah Ahh AAh Ah h AAAAAAhhhh h AAAAhhh AAhh vevevevevevevevevevevvveveveveveveveeevevevvevvvvvvevvvveveeevvvvvevvvNewNewNewNewNewNewNewNewNewNewNewNewNewNewNewNewNewNewwewNewNewNNewNewNewNeNewNewNewNNewNewNewNewNewNewNewNew ZoZ Z Z Zo Z Z ZoZZoZoZoZoZoZoZoZoZoZoZo Z ZZZZoZoZo ZoZoZoZZ ZoZoZoZoZoZZZoZoZoZZooZoZoo Z ZZo ZZ ZZZoo Eo Eo Eo Eo Eo Eo o o E Eo EEo Eo Eoo o Eo Eo Eo o EEo EEEEoo EEo Eoo EEEEEo EEEEEEEEEo Eooo o oo EEEEo EEEEEEEnntntnntntrntrntrntrtntrtntntntrtntntrntrnntntrntntrntrntrntntrttttrntrntrntrtntrrntntntrntrnttrrnntrnntrtnttntntrnttttntrtnttrrttttrtn yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyOceanside Water
Pollution Control Plant(OWPCP)
V-15with AECOM | ESA PWA | Nelson\Nygaard | Sherwood Design Engineers | Phil G King PhD
Withdraw from bluff edge; incrementally demolish roadway, parking and restroom at Sloat
Reinforce the Lake Merced Tunnel in place with a low-pro le structure or internal ballast; remove revetments and ll
Develop and pursue best practices for beach nourishment, including sand placement by Army Corps of Engineers
Place cobble berm over Lake Merced Tunnel structure, covered with sand, to serve as wave dissipation zone; allow severe storm surges to wash over tunnel
Place additional cobble to protect pump station and other wastewater infrastructure
Construct terraced, vegetated seawall with cobble toe along Oceanside Treatment Plant, incorporating tunnel structure, coastal trail, erodable bluff (Bank Swallow habitat) and plant driveway
Create detention swale and constructed wetland through the zoo to passively clean and in ltrate stormwater runoff from Sloat and adjacent parking lot
Renovate Fleishhacker Pool house as a warming hut and interpretive center
Pump station and force mains remain, interpretive elements explain the system to visitors; beautify pump station and recon gure to maximize adjacent coastal access
Conduct pilot studies of dynamic coastal protection
Key Move 2:
Introduce a multipurpose coastal protection/restoration/access system.
Master Plan Recommendations: Six Key Moves | Key Move 2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
0 250 ft 500 ftScale
North
2.9
2.10
2.1
2.2
2.3
2.4 2.5
2.6
2.7
2.8
2.9
2.10
2.7
0 100 ft 200 ftInsert Scale
See InsertSee InsertSee Insert
See Figure V-8See Figure V-9 See Figure V-10
San Francisco Zoo
Oceanside Water Pollution Control Plant(OWPCP)
Fort Funston
Lake Merced
(new
) Sl
oat
Bou
leva
rd
Skyline Blvd
PPPPPPPPPPPPPPPPPPPPPAAAAAAAAAAAAAAAAAA CCCCCCCCCCCCCCCCCCCCCCC IIIIIIIIIIIII FFFFFFFFFFFFFFFFFF IIIIIIIIIIIIIIIIIII CCCCCCCCCCCCCCCCC OOOOOOOO CCCCCCCCCCCCCCC EEEEEEEEEEEEEEE AAAAAAAAAAAAAAAAA NNNNNNNNNN
42th Ave
Arm
ory
Rd
The Great
HighwayFleishhacker PoolWarming Hut
47th Ave
43th Ave
Zoo Parking Lot
Vegetated Swaleand Detention Areas
Ocean Beach
Waw
ona
St
Zoo Parking Lot
San Francisco Zoo
Fleishhacker PoolWarming Hut
Detention PondPump Station
New Coastal Trail
(new
) Sl
oat
Bou
leva
rd
Cobble Berm
Insert: New Ocean Beach South Gateway Area, Plan Detail
Review of RecommendationsOcean Beach Master Plan
key move 1
key move 2
ocea
n be
ach
mas
ter p
lan
- 201
2
ocea
n be
ach
mas
ter p
lan
- 201
2
ocean beach master planV-24 | May 2012
Figure V-16: Middle Reach | Key Move 3
Illustrative Plan
The third key move of the master plan proposes the narrowing of the Great Highway between Lincoln and
Sloat, the improvement of the bike lanes and pedestrian promenades, and the introduction of small pockets of
distributed parking.
0 250 ft 500 ftScale
North
0 100 ft 200 ftInsert Scale
3.13.2
3.3
3.4
3.4
3.3
3.5
3.7
See InsertSee InsertSee Insert
See Figure V-17
PPPPPPPPPPPPPPPPPAAAAAAAAA CCCCCCCCCC IIIIII FFFFFFFFFFFFFF IIIIIIIII CCCCCCCCCCCCC OOOOOOOOOOOOOOOOO CCCCCCCCCCCCCCCC EEEEEEEEEE AAAAAAAAAAAAAAAAA NNNNNNNNNNNNNN
The (New) Great Highway
Ocean Beach
Outfall
(new
) Sl
oat
Bou
leva
rd
The (New) Great Highway
Promenade / Coastal Trail
Bike LaneParking Pocket
Ocean Beach
Restored Dune
Lower Great Highway
Tara
val S
tree
t
Improved Restroom
Existing Median Trail
See Figure V-18
Insert: Parking and Amenity “Pocket”, Plan Detail
Waw
ona
St
Ullo
a St
Sant
iago
St
V-25with AECOM | ESA PWA | Nelson\Nygaard | Sherwood Design Engineers | Phil G King PhD Master Plan Recommendations: Six Key Moves | Key Move 3
Narrow the Great Highway between Lincoln and Sloat from four lanes to two; include a wide shoulder for cycling and emergency access; use current southbound lanes and median for dune restoration and amenities
Recon gure the Great Highway–Sloat intersection slightly inland to avoid existing erosion hot spot
Introduce small pockets of parking distributed at key access points
Restore existing restrooms; introduce three new off-the-grid restrooms powered by wind and solar energy
Key Move 3:
Reduce the width of the Great Highway to provide amenities and facilitate managed retreat.
Improve access at Judah, Taraval, Rivera and Noriega with trailheads, signage, bike parking, landscape improvements
Add traf c-calming and mitigation measures to lessen neighborhood traf c impacts
Implement Low-Impact Design (LID) measures throughout adjacent neighborhoods to address stormwater management
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.13.4
3.5
3.6
3.7
3.3
The (New) Great HighwayNoriega Seawall and Promenade
Outfall
Nor
iega
St Li
ncol
n W
ay
Ort
ega
St
Mor
aga
St
47th Ave
45th Ave
La Playa St
48th Ave
key move 3
key move 3
mat
ch li
nem
atch
line
match line
match line
Review of RecommendationsOcean Beach Master Plan
ocean beach master planV-30 | May 2012
Figure V-21: Middle Reach | Key Move 4
Illustrative Plan
The fourth key move of the master plan focuses on the restoration of the beach dunes.
0 100 ft 200 ftInsert Scale
4.1
4.3 4.2
4.1
4.34.2
4.2
PPPPPPPPPPPPPPPPPAAAAAAAAA CCCCCCCCCC IIIIII FFFFFFFFFFFFFF IIIIIIIII CCCCCCCCCCCCC OOOOOOOOOOOOOOOOO CCCCCCCCCCCCCCCC EEEEEEEEEE AAAAAAAAAAAAAAAAA NNNNNNNNNNNNNN
The (New) Great Highway
Ocean Beach
Outfall
(new
) Sl
oat
Bou
leva
rd
The (New) Great HighwayPromenade / Coastal Trail
Bike Lane
Sand Ladder
Ocean Beach
Restored Dune
Lower Great HighwayExisting Median Trail
Insert: Dune Restoration Area, Plan Detail
Waw
ona
St
Ullo
a St
V-31with AECOM | ESA PWA | Nelson\Nygaard | Sherwood Design Engineers | Phil G King PhD
Implement beach nourishment by Army Corps of Engineers along southern end of middle reach
Phase in native dune restoration in key locations, especially at Lincoln and Vicente
Add sand ladders and modular boardwalks to provide access while limiting environmental impact
Key Move 4:
Restore the dunes along the middle reach.
4.3
4.2
Master Plan Recommendations: Six Key Moves | Key Move 4
4.1
4.2
4.3
See Insert (opposite page)See Insert (opposite page)See Insert (opposite page)
The (New) Great HighwayNoriega Seawall and Promenade
TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT
See Figure V-23
Outfall
Nor
iega
St Li
ncol
n W
ay
Ort
ega
St
Mor
aga
St
47th Ave
45th Ave
48th Ave
key move 4
key move 4
ocea
n be
ach
mas
ter p
lan
- 201
2
mat
ch li
nem
atch
line
match line
match line
Review of RecommendationsOcean Beach Master Plan
V-35with AECOM | ESA PWA | Nelson\Nygaard | Sherwood Design Engineers | Phil G King PhD Master Plan Recommendations: Six Key Moves | Key Move 5
Tighten and renovate parking lot; add permeable paving; preserve exible use and event capacity
Maintain row of “watching the water” parking spots
Modify parking entrances and improve pedestrian crossings at JFK and Beach Chalet
Use landscape features to mark the oceanfront termination of Lincoln and Fulton
Add a two-way, physically separated bikeway on the east side of the Great Highway north of Fulton, integrated with existing multiuse trail
Add abundant bike parking
Develop a joint city-federal parking management plan; consider some fee parking on peak days
Introduce landscape site elements and seating appropriate to rugged conditions; introduce and restore climate-appropriate/native landscape planting
Key Move 5:
Create a better connection between Golden Gate Park and Ocean Beach.
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
0 250 ft 500 ftScale
North
5.1
5.2
5.35.4
5.5
5.6 5.65.8
Beach/Park Chalet
Golden Gate Park
Fulto
n St
reet
PPPPPPPPPPPPAAAAAAAAAAAAAA CCCCCCCCC IIIIIIIIIII FFFFFFFFFFFFFFFFFFF IIIIIIIIIIIIIIIII CCCCCCCCCCCCCCCCCCCCC OOOOOOOOOOOOOOOOOOO CCCCCCC EEEEEEEEEEEEEEEEEEEE AAAAAAAAAAAAAAAA NNNNNNNNNNNNNNN
44th Ave
StormwaterOutfall
48th Ave
Parking Lot
Ocean Beach
See Figure V-27
5.3
5.6
BeBeBeBBeBeBeBeBeBeBeBeBBeBeBeeeeBBeBeBeBeBeBBBeBeBeBeBBeBeBeBeBeBBeBeBeeeBBeBeBeBeBeBeBeBeBeBBBeBeBBBBeeBeeBeBeBeeeBBBBBeBeBeBeBeBeBBBBeBeBBeBBeeeBeeBeBBBBeBBBBBeacacacacacacacacacacaacaaacacaacacccccccacaaaacacacacaccacacacacaccacacacacacacacacacacacacacacacacaacaaaacacacacacacacacaaaaaacaacaccacchh/h/h/h/h/hh/hh/h/h/h/h/h/h//h/h/h/h/h/h/h/h/h//h/h/h/h/h/h//h/h/h/h/h/h/h/h/h/h/h//hh/hhhhhh/h//hhhh/h/h/h/h/h///h/h/h//h/hh/h/h//h////h////PaPaPaPPaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPaPPaPaPaaPPaPaPPaPaPPaPaPPPPPaPaPPPPPPPPPPaPPaPPPaPaPaPaPPaPPaPaPPPPaPPPPPPPPaarrrrrkrrrrrrkrkrkrkrkrkrkrkrkrkrrrkrkkrkrkrkrrrrrrkrkrrkkkrkrrkrrkrrrkkkrrrkrrrkkkrrkrrrrrrrrrrr C C C CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCChhhhahahahahahahahahahahahahahahahahahahhahahahahahahahhhhhhahahahhahahahahhahahaahahahaahaahaahahaahahhahahhahhahhahhaahhhhhhh lleleleleleleleleleleleleleleleleleleleleelelelelleleleeleleleleelelelelellellleeeeeeetttttttttttttttttttttttttttttttt
Linc
oln
Way
the Great HighwayNew GatewayPedestrian CrossingAmenity Pod tttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttt
See Figure V-25
O’Shaughnessy Seawall and Promenade
O’Shaughnessy Seawall and Promenade
See Figure V-262
V-39with AECOM | ESA PWA | Nelson\Nygaard | Sherwood Design Engineers | Phil G King PhD Master Plan Recommendations: Six Key Moves | Key Move 6
Narrow Great Highway North of Balboa ( from four lanes to two)
Keep diagonal Cliff House parking
Narrow Point Lobos Avenue from four lanes to two; add two-way separated bikeway on inland side and separated bikeway along cliff to prevent bicycle–vehicular con ict on steep slope
Connect bike lane to bike trail to Lands End and add “bicycle box” at Point Lobos and 49th Avenue
Key Move 6:
Introduce bicycle and pedestrian improvements north of Balboa Street.
6.1
6.2
6.3
6.4
0 250 ft 500 ftScale
North
6.1
6.2
6.3
6.4
BikewaySutro Heights
Poin
t Lo
bos
Ave
PPPPPPPPPPPPPPPPPPPPAAAAAAAAAAAAAAAAAAA CCCCCCCCCCCCCCCCCCCCC IIIIIIII FFFFFFFFFFFFFFFFFFFFFFF IIIIIIIIIIIIIIIII CCCCCCCCCCC OOOOOOOOOOOO CCCCCCCCCCCCCCCCCCC EEEEEEEEEEEEEEEE AAAAAAAAAAAAAAAAAAAAAAAAAA NNNNNNNNNNNNNNNNNNNNNNNNNNN
44th Ave
48th Ave
Street Parking
Ocean Beach
See Figure V-30
the Great Highway
New GatewayPedestrian Crossing
Cliff House
Sutro Baths
to Land’s End
Bal
boa
St
Anz
a St
Gea
ry B
lvd
O’Shaughnessy SeawallAmenity Pod
Amenity Pod
SeSeSeSeSeSeSeSeSeSSeSeSeSSSeSSeSeSeSeSSSSeSeSSSSeS eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
key move 5
key move 6
ocea
n be
ach
mas
ter p
lan
- 201
2 Review of RecommendationsOcean Beach Master Plan