obrm locomotive #35 update · recent progress: locomotive #35’s #2 drive wheels are pressed off...
TRANSCRIPT
![Page 1: OBRM Locomotive #35 Update · Recent Progress: Locomotive #35’s #2 drive wheels are pressed off the axle for required machining and replacement as necessary. Locomotive #35 Update](https://reader035.vdocuments.site/reader035/viewer/2022062916/5eb73eaaa1369101f56160c0/html5/thumbnails/1.jpg)
Recent Progress: Locomotive #35’s #2 drive wheels are pressed off
the axle for required machining and replacement as necessary.
Locomotive #35 Update
Locomotive #35 drive wheels, axles and tires are sandblasted in
preparation for inspection and repair.