oain ˜ off
TRANSCRIPT
9 ST
ALL
S12
STA
LLS
12 S
TALL
S9
STA
LLS
9 ST
ALL
S
9 ST
ALL
S
10 STALLS
10 S
TALL
S
8 STALLS
8 STALLS
4 STA
LLS
7 STALLS
7 STALLS
5 STALLS
4 STALLS
3 STALLS
11 STALLS
9 STALLS
9 ST
ALL
S
6 ST
ALL
S
9 STALLS
10 STALLS
5 STALLS
7 STALLS
6 ST
ALL
S7
STA
LLS
4 ST
ALL
S
8 ST
ALL
S9
STA
LLS
9 ST
ALL
S9
STA
LLS
10 S
TALL
S8
STA
LLS
10 STALLS 9 STALLS 9 STALLS 8 STALLS 6 STALLS
8 STALLS
8 STALLS
8 STALLS
8 STALLS
8 STALLS
8 STALLS
9 STALLS
9 STALLS
6 STALLS
6 STALLS
10 STALLS9 STALLS
8 STALLS 6 STALLS
9 STALLS
9 STALLS
9 STALLS
9 STALLS
7 STALLS
7 STALLS
9 STALLS
9 STALLS 7 STALLS
7 STALLS
5 STALLS
8 STALLS
6 STALLS
9 ST
ALL
S9
STA
LLS
9 ST
ALL
S
9 ST
ALL
S9
STA
LLS
7 ST
ALL
S
4 STALLS 9 STALLS 9 STALLS 9 STALLS 9 STALLS 9 STALLS 3 STALLS3 STALLS
10 S
TALL
S6
STA
LLS
7 ST
ALL
S6
STA
LLS
10 S
TALL
S
6 STALLS
6 STALLS
9 STALLS
9 STALLS
9 STALLS
9 STALLS
9 STALLS
9 STALLS
9 STALLS
9 STALLS
8 STALLS
8 STALLS
7 STALLS 8 STALLS7 STALLS9 STALLS
7 ST
ALL
S5
STA
LLS
7 ST
ALL
S12
STA
LLS
5 ST
ALL
S
PROP. BUILDING #2OFFICE/WAREHOUSE BLDG99,072 SQ. FT. FOOTPRINT217 STALLS(2.2 PER 1000)
PROP. BUILDING #1OFFICE/WAREHOUSE BLDG99,072 SQ. FT. FOOTPRINT313 STALLS(3.2 PER 1000)
PROP. BUILDING #35 STORY OFFICE31,673 SQ. FT. FOOTPRINT158,366 SQ. FT. GROSS AREA985 STALLS (6.2 PER 1000)
13 STALLS
13 STALLS
6 ST
ALL
S
12 S
TALL
S
3 STORY PARKING GARAGE:TOTAL: 673 STALLS
6 STALLS
4 ST
ALL
S
FORLEASE
PROPERTY FEATURES• First floor: 2,986 RSF available• Second floor: 18,117 RSF available• Extraordinary 7/1,000 office parking ratio!• Immediate access right off exit 275 (Pleasant Grove/Lindon)• Building crown signage• Lindon Tech Center features unobstructed mountain views, with lake
views to the south - with immediate freeway access and visibility
15 80 84215
89US US US
189
200 South200 South
2000 West
2000 West
Master Planned Retail Development• Upscale Lifestyle Retail Center• Bank & Restaurant Pad Sites
Planned Hotel & Convention
Center
21,000 cars/day21,000 cars/day
24,000 cars/day
24,000 cars/day
700 North700 NorthPROPOSED
Plea
sant
Gro
ve B
oulevard
Plea
sant
Gro
ve B
oulevard
32,00
0 car
s/day
32,00
0 car
s/day
180,000 cars/day
180,000 cars/day
205,000 cars/day
205,000 cars/day
14,000 cars/day14,000 cars/day
30,000 cars/day
30,000 cars/day
Belle Monet Belle Monet CondominiumsCondominiums
North Pointe North Pointe Business ParkBusiness Park
Future Vineyard Connector Alignment
Future Vineyard Connector Alignment
MOUNTAIN TECH EAST — OFFICE1971 W. 700 N., LINDON, UT 84042
MOUNTAIN TECH EAST — OFFICE1971 W. 700 N., LINDON, UT 84042
This document has been prepared by Newmark Knight Frank for advertising and general information purposes only. While the information contained herein has been obtained from what are believed to be reliable sources, the same has not been verified for accuracy or completeness. Newmark Knight Frank accepts no responsibility or liability for the information contained in this document. Any interested party should conduct an independent investigation to verify the information contained herein.
This document has been prepared by Newmark Knight Frank for advertising and general information purposes only. While the information contained herein has been obtained from what are believed to be reliable sources, the same has not been verified for accuracy or completeness. Newmark Knight Frank accepts no responsibility or liability for the information contained in this document. Any interested party should conduct an independent investigation to verify the information contained herein.
376 E. 400 S., Suite 120 l Salt Lake City, UT 84111 l t 801-578-5555 l nmrk.com376 E. 400 S., Suite 120 l Salt Lake City, UT 84111 l t 801-578-5555 l nmrk.com
BEN RICHARDSONt 801-746-4733m [email protected]
FOR MOREINFORMATION
CONTACT
TRIGGER REITALt 801-578-5507m [email protected]
KOLBY LONGt 801-727-4413m [email protected]
SKYE GALLEYt 801-578-5526m [email protected]
DN
DN
G G
DN
DN
103.1
101.1
R5
R4
R3
R2
R1
R6
R8
R9
R10
R11
E1
101.2
103.2
107.1
114.1
104.1
105.1
106.1
110.1
110.2
CORRIDOR
102
VEST. NORTH
101
MENS RESTROOM
104
WOMENS RESTROOM
105
VEST. SOUTH
103
FUTURE TI SPACE
110
FIRE RISER
107
FUTURE TI SPACE
111
ELECTRICAL ROOM
106
ELEVATOR
108
JAN.
114
10' - 7"
15' - 5 7/8"
16' - 6 1/2"
7' - 2"
14' - 0 7/8"
6' - 10 1/2"
10' - 4 7/8"
10' - 4 7/8"
35' - 7 5/8"
UP
UP
FLOOR PLAN GENERAL NOTESReferences to sheets below are provided to aid in navigating the drawings.
RE: G200 for Fixture Mounting Heights.
RE: G400 for Floor, Roof and Exterior Wall Types.
RE: G500 for Interior Wall Types.
RE: G600 for typical details.
RE: AXXX for slab edges, recesses and other transitions.
RE: A600 for the Door Schedule.
RE: A620 drawings for Window Types.
RE: Structural for slab recesses.
RE: Structural for concrete scoring, except where decorative scoring is shown.
Rated Construction: Provide as shown on the plans, the Life Safety Plans and elsewhere in the documents. Seal penetrations with systems applicable to the application and that have UL or other testing agency certifications.
Keynotes: Not all keynotes apply to this sheet.CONFERENCE
A111
OFFICEA113
OFFICEA120
RECEPTIONA143
OPEN OFFICEA144
OFFICEA165
OFFICEA166
OFFICEA167 OFFICE
A168
B.O.A169
BREAK ROOMA170
OFFICEA171OFFICE
A172
OFFICEA173
OFFICEA174
EDITTING ROOMA175
OFFICEA176
OFFICEA177
SHEET NUMBER
1
E
D D
C
B
A
E
C
B
A
2 3 4 5
1 2 3 4 5
MHTN PROJECT NO.
SEAL
SHEET NAME
REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.
DESCRIPTIONDATE
MHTN Architects, Inc.280 South 400 West Suite 250 Salt Lake City, Utah 84101Telephone (801) 595-6700www.mhtn.com
NO.
ISSUE
Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.
Original drawing is 30 x 42. Do not scale contents of this drawing.
5/12
/202
1 9:
04:1
6 AM
C:\U
sers
\Sie
rraM
\Doc
umen
ts\A
21_X
XXXX
_Blo
od_L
ab_S
ierra
moo
re.rv
t
FIRST FLOORPLAN
A101
ISSUE DATESTATUS
PROJ #
LIN
DO
N T
ECH
5PR
OJE
CT
ADD
RES
SPR
OJE
CT
CIT
Y, S
TATE
AN
D Z
IP
PHLE
BOTO
MY
TRAI
NIN
GSP
ECIA
LIST
S
©2021 MHTN ARCHITECTS, INC.
SCALE: 1/8" = 1'-0"1
FIRST FLOOR PLAN
E1
DW
E1
DW
WD1 - RESILIENT WOOD FLOOR 1
SC1 - SEALED CONCRETE
LEGEND - FLOOR PATTERN
CT2 - CARPET TILE 2
RE: A640 for the Finish Schedule
RE: Axxx for typical floor finish transition details
RE: Structural drawings for recessed slabs.
Floor Finish Transitions at Doors: Locate floor finish material transitions that occur at doors under the center of the door, UNO.
Floor Drains: Coordinate location of floor drains with Plumbing drawings.
PATTERN PLAN GENERAL NOTES
COPY101
STORAGE102
LOBBY100
CONFERENCE112
OFFICE111
BREAK ROOM110
OPEN OFFICE109
OPEN OFFICE108
OFFICE107
OFFICE106
OFFICE105
CONFERENCE103
OFFICEA134
LOBBY100
COPY101
STORAGE102
CONFERENCE103
OFFICEA134
OFFICE105
OFFICE106
OFFICE107
OPEN OFFICE109
OPEN OFFICE108
CONFERENCE112
OFFICE111
BREAK ROOM110
SHEET NUMBER
1
E
D D
C
B
A
E
C
B
A
2 3 4 5
1 2 3 4 5
MHTN PROJECT NO.
SEAL
SHEET NAME
REVISIONSCONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST REVISION DATE.
DESCRIPTIONDATE
MHTN Architects, Inc.280 South 400 West Suite 250 Salt Lake City, Utah 84101Telephone (801) 595-6700www.mhtn.com
NO.
VIEW AND PRINT THIS DRAWING IN COLOR
ISSUE
Confidentiality Notice: This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only. Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.
Original drawing is 30 x 42. Do not scale contents of this drawing.
7/9/
2021
8:4
5:13
AM
C:\U
sers
\Sie
rraM
\Doc
umen
ts\A
21_2
0215
55_L
indo
n_Te
ch_S
pecu
lativ
e_TI
_CEN
TRAL
_Sie
rram
oore
.rvt
FIRST FLOORPATTERN PLANAND FURNITUREPLAN
A651
12 JULY 2021PERMIT SET
PROJ #
LIN
DO
N T
ECH
519
71 W
700
NLI
ND
ON
, UT
8404
2
SPEC
ULA
TIVE
TI
©2021 MHTN ARCHITECTS, INC.
0SCALE:
4' - 0" 8' - 0" 16' - 0"1/8" = 1'-0"
FIRST FLOOR FURNITURE PLAN
0SCALE:
4' - 0" 8' - 0" 16' - 0"1/8" = 1'-0"
FIRST FLOOR FINISH PLANN N
SECOND FLOOR18,117 RSF Available
700 North700 North
500 North500 North
2000
Wes
t20
00 W
est
1700
Wes
t17
00 W
est
BUILDING 1
LEASED
LEASED
LEASEDLEASED
BUILDING 2 BUILDING 4
MAIN FLOOR2,986 RSF Available
LEASED
LEASED
SUITE 1092,986 SF
LEASED
MOUNTAIN TECH EAST — OFFICE1971 W. 700 N., LINDON, UT 84042
This document has been prepared by Newmark Knight Frank for advertising and general information purposes only. While the information contained herein has been obtained from what are believed to be reliable sources, the same has not been verified for accuracy or completeness. Newmark Knight Frank accepts no responsibility or liability for the information contained in this document. Any interested party should conduct an independent investigation to verify the information contained herein.
376 E. 400 S., Suite 120 l Salt Lake City, UT 84111 l t 801-578-5555 l nmrk.com