o m p a n y p r o f - linkco

73
C O M P A N Y P R O F I L E STRETCH PVC CEILING COMPLETE INTERIOR FIT OUT SOLUTIONS GENERAL CONTRACTING BUILDING REFURBISHMENT & MAINTENANCE BUILDING & INSULATION MATERIALS DEMOUNTABLE & MOVABLE PARTITION SYSTEMS QUALITY PRODUCTS & SERVICES CUSTOMIZED TO MEET YOUR NEEDS… www.linkco.com.qa

Upload: others

Post on 16-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: O M P A N Y P R O F - Linkco

C O M P A N Y P R O F I L E

❖ STRETCH PVC CEILING ❖ COMPLETE INTERIOR FIT OUT SOLUTIONS

❖ GENERAL CONTRACTING ❖ BUILDING REFURBISHMENT & MAINTENANCE

❖ BUILDING & INSULATION MATERIALS ❖ DEMOUNTABLE & MOVABLE PARTITION SYSTEMS

QUALITY PRODUCTS & SERVICES CUSTOMIZED TO MEET YOUR NEEDS…

www.linkco.com.qa

Page 2: O M P A N Y P R O F - Linkco

Company Profile

1. MANAGING DIRECTOR’S MESSAGE .............................................................. 1

2. VISION & MISSION ........................................................................................... 2

3. COMPANY BRIEF .............................................................................................. 3

4. KEY PERSONNEL .............................................................................................. 4

5. ORGANIZATIONAL STRUCTURES .................................................................. 5

5.1 COMPANY ORGANIZATION CHART ...................................................................... 5

5.2 PROJECT ORGANIZATION CHART ........................................................................ 6

6. CLIENTS ............................................................................................................ 7

7. SUPPLIERS ........................................................................................................ 9

8. SERVICES ........................................................................................................ 11

9. CAPABILITIES ................................................................................................. 12

10. PROJECTS PORTFOLIO ................................................................................. 14

11. SELECTED PROJECTS ................................................................................... 19

12. RESOURCES ................................................................................................... 46

13. CERTIFICATIONS ........................................................................................... 50

13.1 I.S.O. CERTIFICATION ............................................................................................. 50

13.2 BUSINESS ACTIVITIES ........................................................................................... 52

14. SPECIAL AWARDS.......................................................................................... 55

15. COMPANY REGISTRATIONS ......................................................................... 60

15.1 CR (COMPANY REGISTRATION) .......................................................................... 60

15.2 TRADE LICENSE ....................................................................................................... 65

15.3 COMPUTER CARD ................................................................................................... 67

15.4 TAX CARD ................................................................................................................. 69

TABLE OF CONTENTS

Page 3: O M P A N Y P R O F - Linkco

Company Profile 1 | P a g e

BACK TO CONTENTS

1. MANAGING DIRECTOR’S MESSAGE

I take this opportunity to thank our valued customers, whose continued patronage and confidence

inspires us to provide the best services and value for their money.

Our TEAM are firmly committed to Quality, Health, Safety, and the Environment. We continue to

invest in qualified team to undertake and manage complex projects to achieve our partner’s

satisfaction and targets.

Our TEAM are working together to support LINKCO’s Mission to deliver projects for the benefit of

our clients, partners, employees, and the society.

IZZAT FAYIZ ABDULRAHIM

Managing Director

Al Rawabet Commercial Services & Contracting Co. W.L.L.

MANAGING DIRECTOR’S MESSAGE

Page 4: O M P A N Y P R O F - Linkco

Company Profile 2 | P a g e

BACK TO CONTENTS

2. VISION & MISSION

VISION

LINKCO have a vision to become the leading provider of unique solutions, imposing its presence

day after day on the local industry as one of the most reputed names in the market.

MISSION

LINKCO’s flexibility will enable it to provide optimal solutions to the most of project and partners.

VISION & MISSION

Page 5: O M P A N Y P R O F - Linkco

Company Profile 3 | P a g e

BACK TO CONTENTS

3. COMPANY BRIEF

Al Rawabet Commercial Services and Contracting Company (LINKCO) is a registered company

with C.R. No. 32942 in the State of Qatar since 2006, and office is located at Building No.16/159, B

- Ring Road, Street 220, Zone 24, P.O. Box 32282 - Doha, Qatar.

LINKCO highly considers functionality with investment value by providing quality products &

services which are solution based:

➢ General Contracting

➢ Air Conditioning Systems (MITSUBISHI)

➢ Heritage Coating System

➢ Building Refurbishment & Maintenance

➢ Complete Interior Fit Out Solutions

➢ Complete Flooring Solutions – Carpet Vinyl, Parquet, and Raised Floor

➢ Stretch PVC Ceiling Systems

➢ Supply of Building & Insulation Materials

➢ Demountable and Operable Partition Systems – Glass, Wood, and Aluminum

➢ Office Furniture Solutions

➢ Compact Archiving Systems (Filing Systems)

➢ Roll-up Sunscreen Curtains – Motorized and Manual

➢ Electromechanical Works

➢ Bathroom and Cubicles

➢ Supply of Sanitary Wares

LINKCO manage all project entities, ensuring quality without compromising time and budget. We

offer the best service for the best Return on Investment. We choose superior quality products and

qualified personnel to provide the best results and solutions.

COMPANY BRIEF

Page 6: O M P A N Y P R O F - Linkco

Company Profile 4 | P a g e

BACK TO CONTENTS

4. KEY PERSONNEL

MANAGING DIRECTOR : MR. IZZAT FAYIZ ABDULRAHIM

PROJECTS COORDINATION : MR. REDENTOR CELESTINO

SALES : MR. ACHRAF ERTAL

TECHNICAL : MR. REDENTOR CELESTINO

PROCUREMENT : MR. ACHRAF ERTAL

ACCOUNTS : MR. MOHAMMAD SARWAR

: MR. AKBAR KALAM

DESIGN : MR. MUBASHIR HUSSAIN

DOCUMENT CONTROL : MR. JIBAN SHRESTHA

HR & ADMINISTRATION : MR. AKBAR KALAM

MR. AHSAN MIYA

PUBLIC RELATION OFFICER (PRO) : MR. AHSAN MIYA

: MR. OMER OSMAN SERAJ

HSE : MR. JIBAN SHRESTHA

: MR. GERRY CANLAPAN

SUPERVISION : MR. AHMED OSMAN

: MR. LABIN DANGOL

: MR. DALJIT SINGH

: MR. REYNALDO TUNGPALAN

: MR. BHOGENDRA THAKUR

: MR. ROGER C. GENTEROLISO

WAREHOUSE / STOREKEEPER : MR. SAJAD ALI T.K.

KEY PERSONNEL

Page 7: O M P A N Y P R O F - Linkco

Company Profile 5 | P a g e

BACK TO CONTENTS

5. ORGANIZATIONAL STRUCTURES

COMPANY ORGANIZATION CHART

COMPANY ORGANIZATION CHART

Page 8: O M P A N Y P R O F - Linkco

Company Profile 6 | P a g e

BACK TO CONTENTS

PROJECT ORGANIZATION CHART

PROJECT ORGANIZATION CHART

Page 9: O M P A N Y P R O F - Linkco

Company Profile 7 | P a g e

BACK TO CONTENTS

6. CLIENTS

LINKCO has successfully associated with some major companies from different industries in Qatar such as:

CLIENTS

Page 10: O M P A N Y P R O F - Linkco

Company Profile 8 | P a g e

BACK TO CONTENTS

➢ AAMAL

➢ AAMAL TRADING & DISTRIBUTION

➢ AL FAISAL HOLDING

➢ AL FARAZDAQ PRINTING PRESS

➢ AL HUDAIFI GROUP

➢ AL JABER ENGINEERING CO. (W.L.L.)

➢ AL JABER & MAKHLOUF W.L.L.

➢ AL JAZI REAL ESTATE

➢ AL RAYYAN TOURISM & INVESTMENT CO.

➢ AL WAHA CONTRACTING & TRADING CO.

➢ ARABIAN SPECIALIZED MATERIAL (ASMA).

➢ ARABIAN SUPPLY CENTER

➢ BOOJAMHOOR CONT. CO.

➢ BOOM CONSTRUCTION CO.

➢ BROOKINGS DOHA CENTER

➢ CEC CONTRACTING CO.

➢ CHALLENGE TRADING & CONTRACTING

➢ DERWIND TRADING & CONTRACTING

➢ DOHA CABLES

➢ EBN SINA MEDICAL

➢ EDUTECH M.E.

➢ EMCO – QATAR FOUNDATION & QATAR

SCIENCE RESEARCH & TECHNOLOGY

CENTER

➢ GET – GENERAL ENGINEERING

TECHNOLOGIES W.L.L.

➢ HKH CONTRACTING CO.

➢ IMAR ISTANBUL CONTRACTING & TRADING CO.

➢ INNOVATIVE LIGHTING

➢ JOHNSON CONTROLS

➢ JNP

➢ LUFTHANSA CITY CENTER – AAMAL TRAVEL

➢ MARRIOTT MARQUIS

➢ MIDMAC CONTRACTING CO.

➢ MOWASALAT

➢ NSCC INTERNATIONAL L.L.C.

➢ OPTIMIZED TRADING

➢ QATAR EMIRI AIR DÉFENSE FORCE (QEADF)

➢ QATAR INDEPENDENT TECHNICAL SCHOOL

➢ QDVC LRT

➢ QMMC

➢ RAYTHEON

➢ REDCO CONSTRUCTION – ALMANA

➢ REGZA CONTRACTING

➢ RETRO TECHNICAL SERVICES

➢ TRIMLINE INTERIORS

➢ TEKFEN CONSTRUCTION

➢ UNITED ELECTRONICS CO. L.L.C.

➢ UDC – UNITED DEVELOPMENT COMPANY

CLIENTS

Page 11: O M P A N Y P R O F - Linkco

Company Profile 9 | P a g e

BACK TO CONTENTS

7. SUPPLIERS

SUPPLIERS

Page 12: O M P A N Y P R O F - Linkco

Company Profile 10 | P a g e

BACK TO CONTENTS

➢ 4K QATAR

➢ ADAWALL WALLPAPER FACTORY

➢ AL MASHRIQ FURNITURE

MANUFACTURING L.L.C.

➢ AL WAFA TRADING CO.

➢ BUROART – TURKEY

➢ BUTEM METALS - TURKEY

➢ DOMA TEXTILE – CURTAINS

➢ DOOR HOUSE/SANAT KAPI – TURKEY

➢ EGGER - GERMANY

➢ ERCELIK - TURKEY.

➢ FICO FURNITURE CO. - TURKEY

➢ GENWEC - SPAIN

➢ GOODWAY TRADE – CANADA.

➢ HARO WOOD FLOORING – GERMANY

➢ HEPER - TURKEY

➢ HNSING – KOREA.

➢ JOTUN PAINTS

➢ JVP – ITALY.

➢ KE - ITALY

➢ KNAUF – QATAR

➢ MAICA LAMINATES – MALAYSIA

➢ MANNINGTON – USA

➢ MAXI TOWA – KOREA

➢ MOBILINEA – COSTA RICA

➢ MOHAWK CARPET - USA

➢ NATIONAL PAINTS FACTORIES QATAR.

➢ ODDICINI – ITALY.

➢ POLY GLASS FIBRE (INSULATION) -

MALAYSIA

➢ SARDUNYA TURKEY.

➢ SELLEX - SPAIN

➢ SOGEGA - ITALY

➢ SUNG IL - KOREA.

➢ TACER – TURKEY – CEILING TILES

➢ TEAM FURNITURE INDUSTRY L.L.C.

➢ TRIMLINE – TURKEY

➢ TUBLER MOTORS – TAIWAN

➢ TUNA AHSAP - TURKEY

➢ UNITED ELECTRONICS – UAE / QATAR.

➢ VECTA DESIGN - ESTONIA

➢ VIRAG SRL – ITALY

➢ X-MET – METAL SUSPENSION SYSTEM

SUPPLIERS

Page 13: O M P A N Y P R O F - Linkco

Company Profile 11 | P a g e

BACK TO CONTENTS

8. SERVICES

➢ ACOUSTICAL SYSTEMS / WALL &

CEILING PANELS / CEILING TILES

➢ AIR CONDITION SYSTEMS

➢ ALUMINIUM FIXTURE WORKS

➢ ALUMINIUM STREET LIGHTING POLES

➢ CONTENT MANAGEMENT SOLUTION &

DIGITAL SIGNAGE

➢ CONTROL ROOMS AND VIDEO WALLS

➢ CUSTOMER RELATION MANAGEMENT

➢ DATA CENTRES SOLUTION (SERVERS &

STORAGES)

➢ DEMOUNTABLE & OPERABLE PARTITION

SYSTEMS

➢ FILING ARCHIVE SYSTEMS

➢ FIRE RATED METAL AND WOODEN

DOORS

➢ FLOORING SOLUTIONS (CARPET, VINYL,

PARQUET, RAISED FLOORS)

➢ GLASS & WOOD PARTITIONS SYSTEM

➢ GLASS WOOL INSULATION MATERIALS

➢ HPL TOILET CUBICLES & LOCKERS

➢ INTERACTIVE EDUCATION SYSTEM

➢ LED SCREEN SOLUTION (INDOOR &

OUTDOOR)

➢ LIGHT FIXTURES SOLUTION

➢ MARBLES, CERAMIC & PORCELAIN TILES

➢ MECHANICAL, ELECTRICAL AND

PLUMBING (MEP) WORKS

➢ METAL FENCE SYSTEM

➢ OFFICE FURNITURE SOLUTIONS

➢ OUTDOOR IP65 LCD SCREENS

➢ RFID SOLUTION

➢ SANITARY WARES, ACCESSORIES AND

FITTINGS

➢ SMART PODIUMS, INTERACTIVE BOARD

SYSTEM

➢ STRETCH PVC CEILING

➢ STRUCTURED CABLING SYSTEM

➢ SUNSCREEN CURTAINS

➢ TRACKING SYSTEM

➢ WIRELESS SOLUTION

➢ WOODEN DOOR

SERVICES

Page 14: O M P A N Y P R O F - Linkco

Company Profile 12 | P a g e

BACK TO CONTENTS

9. CAPABILITIES

1. EXTERIOR HERITAGE COATING SYSTEM

➢ Abu Nakhla Emergency Medical Service Station and Health Centre

➢ Al Dafna Medical Service Station.

➢ Al Ghwayriah Emergency Medical Service Station

➢ Al Khor Emergency Medical Service station

➢ Al Rayan Quran Women’s Centre

➢ Industrial Area Medical Service Station

2. DEMOUNTABLE, FOLDING PARTITION, CUBICLE PARTTION,

GYPSUM BOARD PARTITION SYSTEMS AND OFFICEFURNITURE

➢ AAMAL (Marriott Marquis 20th Floor)

➢ Al Faisal Holding (Marriott Marquis 21st and 22nd Floor)

➢ Al Jaber & Makhlouf

➢ Al Jaber Engineering

➢ ARTIC – Al Rayyan Tourism & Investment Co. (Marriott Marquis 15th Floor)

➢ Doha Oasis – MCR Areas – REDCO Construction-Almana

➢ EBN SINA Medical New Office (Aamal - Golden Tower Flr. 9th – 15th)

➢ EDUTEC Middle East – Qatar Petroleum

➢ El Sewedy - Doha Cables

➢ Lufthansa City Centre – Aamal Travel

➢ Midmac New Office Building

➢ NUZUL – Qatar (Barwa)

➢ Optimized Trading (Marriott Marquis 19th Floor)

➢ Sidra North Gate Mall Office Premises

➢ United Electronic.

3. FITOUT PROJECTS

➢ AAMAL (Marriott Marquis 20th Floor)

➢ Al Faisal Holding (Marriott Marquis 21st and 22nd Floor)

➢ Al Farazdaq Printing – City Centre

➢ Al Jaber Engineering

CAPABILITIES

Page 15: O M P A N Y P R O F - Linkco

Company Profile 13 | P a g e

BACK TO CONTENTS

➢ Al Jaber & TEKFEN Construction J.V. – Al Thumama Stadium

➢ Al Jazi Garden – Maintenance and Refurbishment of Villas

➢ Al Rayan Tourism Investment Co. (ARTIC) – 15th Floor Marriott Marquis

➢ Brookings Centre

➢ CCTV Room – Ground Floor Marriott Marquis

➢ Challenge Trading and Contracting

➢ Derwind Trading & Contracting Co.

➢ EBN SINA Medical New Office (Aamal Golden Tower Flr. 9th – 15th)

➢ HKH

➢ Innovative Lighting

➢ Lufthansa City Centre – Aamal Travel

➢ Midmac New Office Building

➢ Optimized Trading – 19th Floor Marriott Marquis

➢ Qatar Independent Technical School

➢ QDVC LRT Lusail Underground Station

➢ TEKFEN Construction – Offices

➢ REDCO – Doha Oasis Project

➢ RAYTHEON – Event Preparation

4. BUILDINGS REFURBISHMENT & MAINTENANCE SERVICES

➢ Al Jazi Garden – Villa Refurbishment

➢ QEADF - Al Udeid Air Base

➢ QEADF – Training Facility

➢ QEADF – HQ Building

➢ UDC – Refurbishment of Units and Villas

5. SUPPLY OF SANITARY WARES

➢ GET – New TBZ Camp

➢ GET – Al Majida Farm Building

Page 16: O M P A N Y P R O F - Linkco

Company Profile 14 | P a g e

BACK TO CONTENTS

10. PROJECTS PORTFOLIO

PROJECTS PORTFOLIO

Page 17: O M P A N Y P R O F - Linkco

Company Profile 15 | P a g e

BACK TO CONTENTS

S/N. JOB DESCRIPTION DATE OF

COMPLETION CLIENT REMARKS

1. Painting - Heritage Coating System 15-Oct-2007 Bojamhoor Trad. & Cont. Co. Office Project

2. GRP & Ceiling Works 02-Dec-2007 Arabian Specialized Material Office Project

3. Painting - Heritage Coating System 08-Feb-2008 CEC, Qatar Office Project

4. Fit Out & Furnitures Works 16-Jun-2008 Brookings Doha Centre Office Project

5. Fit Out & Furnitures Works 09-Jul-2008 Midmac Contracting Office Project

6. Fit Out & Furnitures Works 27-Aug-2008 Edutech Middle East Co. Office Project

7. Fit Out & Furnitures Works 08-Jan-2009 Al Faisal Holding Office Project

8. Fit Out & Furnitures Works 08-Jan-2009 Al Faisal Aamal Office Project

9. Fit Out & Furnitures Works 08-Jan-2009 Al Faisal Arctic Office Project

10. Fit Out & Furnitures Works 25-Jun-2009 Edutech Middle East Co. Office Project

11. Supply GRP Tanks 24-Oct-2009 Arabian Specialised Mat’l. Co. Supplies Only

12. Fit Out Works 19-Nov-2009 Al Habtoor Engineering Office Project

13. Fit Out Works 20-Dec-2009 Industrial Development & Trad. Office Interior

14. Refurbishment Work 07-Feb-2010 United Electronics Co. L.L.C. Office Project

15. Fit Out & Furnitures Works 14-Jul-2010 EBN SINA Medical Office Project

16. Fit Out & Furnitures Works 05-Aug-2010 Doha Cables Office Project

17. Fit Out Works 21-May-2011 Challenge Trad. & Cont. Co. Office Project

18. Fit Out & Furnitures Works 15-Jul-2011 Challenge Trading Office Project

19. Refurbishment Work 05-Oct-2011 Al Jaber & Makhlouf W.L.L. Office Project

20. Refurbishment Work 30-Dec-2011 Al Jazi Real Estate Co. Al Jazi Garden Compound 10 Villas

21. Fit Out Works 31-Dec-2011 NSCC International Office Project

22. Fit Out Works 05-May-2012 Darwin Trad. & Cont. Co. W.L.L. Office Project

23. Fit Out & Furniture Works 04-Jun-2012 MOWASALAT (KARWA) Office Project

24. Fit Out Works 07-Jun-2012 Johnson Controls, Qatar Office Project

25. Fit Out Works 09-Jun-2012 Al Jaber Engineering Office Project

26. Refurbishment Work 27-Jul-2012 Al Jazi Real Estate Co. Al Jazi Garden Compound 15 Villas

27. Fit Out & Furniture Works 12-Sep-2012 Johnson Controls, Qatar Office Project

28. Fit Out & Furniture Works 10-Oct-2012 EBN SINA Medical Office Project

29. Fit Out Works 26-Dec-2012 Al Jazi Real Estate Co Office Project

30. Fit Out & Furniture Works 31-Dec-2012 NSCC International Office & Classrooms Project

31. Fit Out & Furniture Works 09-May-2013 Innovative Lighting Office Project

32. Fit Out & Carpet Installation Works 11-Jul-2013 EMCO Qatar Office Project

33. Furniture Works 22-Aug-2013 British Cleaning and Maintenance Office Project

34. Fit Out & Furniture Works 10-Oct-2013 EBN SINA Medical Office Project

Page 18: O M P A N Y P R O F - Linkco

Company Profile 16 | P a g e

BACK TO CONTENTS

S/N. JOB DESCRIPTION DATE OF

COMPLETION CLIENT REMARKS

35. Refurbishment Work 29-Oct-2013 Al Rayyan Tourism & Investment Co. Marriott Marquis Rebranding

36. Fit Out & CCTV Works 15-Dec-2013 Al Rayyan Tourism & Investment Co. Marriott Marquis CCTV Room

37. Fit out & Furniture Works 26-Dec-2013 Al Jazi Real Estate Co. Office Project

38. Fit out & Furniture Works 21-Jan-2014 Optimized Trading Office at 19th Floor Marriott

39. Fit Out & Furniture Works 26-Feb-2014 Al Farazdaq Printing Press Office Project

40. Fit Out & Furniture Works 31-Mar-2014 Lufthansa Travel Agency Office at City Centre Doha

41. Refurbishment Work 01-Apr-2014 Al Farazdaq Co. Office Project

42. Fit Out & Furniture Works 15-Apr-2014 Al Jaber Engineering Co. Office Project

43. Fit Out & Furniture Works 06-Nov-2014 Al Rayyan Tourism & Investment Co. Office Project at 15th Floor Marriott

44. Furniture Works 30-Mar-2015 EBN SINA Medical Office Project

45. Fit Out & Furniture 23-May-2015 JNP Trading Co. Office & Showroom Project

46. Supply of Backfilling Materials 08-Sep-2015 Boom Construction Co. Logistic Services

47. Fit Out & Refurbishment Works 11-Dec-2015 Arabian Supply Centre Office Project

48. Refurbishment Works 06-Apr-2016 Al Jazi Garden Compounds 3 Clubhouse & Swimming Pools

49. Refurbishment Works 06-Apr-2016 Al Jaber Trading Co. 6 Villas

50. Fit Out & Refurbishment Works 10-Apr-2016 Al Sawari - 18th Floor Marriott Office Project

51. Fit Out & Refurbishment Works 07-May-2016 QMMC Office at 12th Floor AAMAL Tower

52. Fit Out & Refurbishment Works 16-Jul-2016 Al Faisal for Int’l Investment Office at 17th Floor Marriott

53. Renovation & Refurbishment Work 20-Dec-2016 RAYTHEON QEADF Training Facility

54. Renovation & Refurbishment Work 2016 - 2017 Qatar Emiri Air Défense Force HQ Building – Sailiya Camp

55. Fit Out Works 03-May-2017 Salam Enterprises Office Project

56. Refurbishment Work 08-Jun-2017 Arabian Supply Office Project

57. Fit Out & Refurbishment Works 04-Jul-2017 TEKFEN Office Project

58. Facility Maintenance Works 2017 QEADF (Qatar Emiri Air Défense Force) QEADF Training Facility

59. Furnitures Works 10-Jul-2017 EBN SINA Office Project

60. Fit Out & Refurbishment Works 28-Nov-2017 Al Jaber & TEKFEN J.V. Office at Al Thumama Stadium

61. Carpentry & Furniture Works 20-Dec-2017 ALURAYS Customized Exhibition Booth

62. Demountable Glass Partition 09-Apr-2018 BLUU Qatar SIDRA North Gate Offices

63. Refurbishment of COT Room,

LABS & PMT 01-Jul-2018 RAYTHEON Al Udeid Air Base

64. Furnitures Works 09-Sep-2018 QDVC Office at Lusail LRT

65. Sanitary Wares & Accessories

Supply & Installation 24-Sep-2018 GET – General Eng. Tech. W.L.L. New TBZ Camp

66. Sanitary Wares & Accessories

Supply & Installation 13-Oct-2018 GET – General Eng. Tech. W.L.L. Al Majida Farm Building

67. Demountable Glass Partition

System 16-Oct-2018 REDCO Construction – Almana Doha Oasis Mixed Use Development

Page 19: O M P A N Y P R O F - Linkco

Company Profile 17 | P a g e

BACK TO CONTENTS

S/N. JOB DESCRIPTION DATE OF

COMPLETION CLIENT REMARKS

68. Commissioning Works (Manpower

& Equipment Support) 10-Jan-2019 RAYTHEON Al Udeid Air Base

69. Furnitures Works 18-Feb-2019 Arabian Supply Office Project

70. Sanitary Wares & Accessories

Supply & Installation 24-Feb-2019 GET – General Eng. Tech. W.L.L. New TBZ Camp

71. Furnitures & Pantry Cabinet Works 26-Feb-2019 QDVC Office Project

72. Deep Cleaning of the CMW Facility

Services 14-Mar-2019 RAYTHEON Al Udeid Air Base

73. Open-Cell & Secondary Ceiling

System 16-Apr-2019 REDCO Construction – Almana Doha Oasis Mixed Use Development

74. Delivery, Supply & Installation of

Event Preparation Hall 17-Aug-2019 RAYTHEON QEADF Event Preparation Hall

75. Fit Out & Refurbishment Works 11-Nov-2019 RAYTHEON Al Udeid Air Base HQ Building

76. Fit Out of Pantry Cabinet, Shoe

Rack, and Toilet Cubicle 12-Jan-2020 QDVC Office at Lusail LRT

77. Redesign and Fit-Out Works 31-Jan-2020 UDC - The Pearl Qatar ITTISAL Call Centre Office

78. Refurbishment Work 02-Feb-2020 UDC - The Pearl Qatar Apartment – MC B14 U319

79. Refurbishment Work 02-Feb-2020 UDC - The Pearl Qatar Apartment – MC QQ2 B5S U213

80. Refurbishment Work 02-Feb-2020 UDC - The Pearl Qatar Apartment – MC QQ6B B23A U405

81. Refurbishment Work 18-Feb-2020 UDC - The Pearl Qatar Apartment – MC B14 U301

82. Refurbishment Work 20-Feb-2020 UDC - The Pearl Qatar Apartment – QQ14 Casa 105

83. Refurbishment Work 23-Feb-2020 UDC - The Pearl Qatar Apt. – MC B5 U101, 110, 114 & 118

84. Retiling Work 23-Feb-2020 UDC - The Pearl Qatar QQ2 Building 5

85. Waterproofing Works 05-Mar-2020 UDC - The Pearl Qatar QQ Multiple Buildings

86. Refurbishment & Rectification 26-Mar-2020 UDC - The Pearl Qatar Common Area MC B8 & B14

87. Refurbishment Work 29-Mar-2020 UDC - The Pearl Qatar Apartment – MC B4 Unit 612

88. Refurbishment Work 03-Apr-2020 UDC - The Pearl Qatar Apartment – MC B12 Unit 302

89. Refurbishment Work 05-Apr-2020 UDC - The Pearl Qatar Apt. – MC B12 Unit 106, 404 305

90. Refurbishment & Rectification 30-Apr-2020 UDC - The Pearl Qatar MC B3 Common Area

91. Refurbishment Work 15-Jun-2020 UDC - The Pearl Qatar Parking Admin Storage MC B12 P3

92. Entire Unit Re-Painting Work 20-Jun-2020 UDC - The Pearl Qatar Apartment – TH17-102

93. Civil / MEP Refurbishment Work 20-Jun-2020 UDC - The Pearl Qatar Apartment – TH17 Unit 402 - WZ

94. Expansion Joint Rectification Work 15-Jul-2020 UDC - The Pearl Qatar Apartment – MC B5 Unit 406

95. Light Fixture and Granite Siding 15-Jul-2020 UDC - The Pearl Qatar Apartment – MC B8 Unit 305

96. Civil / MEP Refurbishment Work 25-Jul-2020 UDC - The Pearl Qatar Apartment – QQ8 CASA 17

97. Fit Out Works 25-Aug-2020 UDC - The Pearl Qatar Closed Office at Oyster Building

98. Fit Out at New Male Prayer Room 07-Sep-2020 UDC - The Pearl Qatar Medina Centrale, Building 5, Unit 41

99. Retiling Work 27-Sep-2020 UDC - The Pearl Qatar Apartment – QQ24 Unit 405

100. Damaged wall Repair 30-Sep-2020 UDC - The Pearl Qatar Apartment – QQ2 CASA 16

Page 20: O M P A N Y P R O F - Linkco

Company Profile 18 | P a g e

BACK TO CONTENTS

S/N. JOB DESCRIPTION DATE OF

COMPLETION CLIENT REMARKS

101. Rainwater Gully Repair 14-Oct-2020 GENERAL RASHID Occupied Residential Building

102. Refurbishment Work 19-Oct-2020 UDC - The Pearl Qatar Apartment – MC B3 Unit 412 & 512

103. Refurbishment Work 02-Nov-2020 UDC - The Pearl Qatar Apartment – TH 7 Unit 118

104. Fit Out & Refurbishment Works 18-Nov-2020 UDC - The Pearl Qatar

Proposed one (1) additional closed

office for MOI & MOJ Representative

at Mezzanine Floor, Oyster Building

105. Replacement of door lock

mechanism of push bar with keys 19-Nov-2020 UDC - The Pearl Qatar

MC Building 5, 8, 12 & 14 Parking,

Staircase and Corridor Door

106. Re-Installation of Waterproofing

Tiles and Filing Balcony Area 19-Nov-2020 UDC - The Pearl Qatar

Apartment – QQ6B B26 Unit 201 &

202

107. Civil / MEP Refurbishment 29-Nov-2020 UDC - The Pearl Qatar Apartment – QQ8 CASA 36

108. Furnitures & Fit Out Works 30-Nov-2020 TRIMline Interiors

(Pentagram Design – UCC)

TRIMline Partition System at

Pentagram Qatar, Al Shareef Office

109. Civil / MEP Refurbishment Work 01-Dec-2020 UDC - The Pearl Qatar Apartment – QQ 21B unit 108

110. Furniture, Fit Out & Refurbishment 01-Dec-2020 UDC - The Pearl Qatar Apartment – TH 2 Apt. 115 & TH16

Apt. 110

111. Furniture, Fit Out & Refurbishment 10-Dec-2020 UDC - The Pearl Qatar Apartment – QQ Nobili Palazzo 1B

Unit 102

112. Supply & Installation TRIMLINE

MW Movable Wall Partition System 27- Dec-2020 MDS - Modern Défense Solutions

Administrative Building – Burooq

Training Centre for Qatar Navy

Special Forces

113. Fit Out & Refurbishment Work 12-Jan-2021 UDC - The Pearl Qatar Apartment – TH 17 Apt 109

114. Fit Out & Refurbishment Work 14-Jan-2021 UDC - The Pearl Qatar Apartment – QQ2 Bldg. 5 Unit 201

115. Electrical Facility Modification 04-Feb-2021 RAYTHEON QEADF Site 7, Building # 805

116. Audio Video Room Installation 16-Feb-2021 Pentagram Design Al Shareef HQ Energy City - F07

117. Fit Out & Refurbishment Work 25-Feb-2021 AAMAL Company Q.P.S.C. Marriot Marquis

118. Civil / MEP Refurbishment Work 18-Mar-2021 UDC - The Pearl Qatar Apartment – QQ1 Unit 311 & 312

119. NASAMS Interim Office Space

(Design & Build) 01-Jul-2021 RAYTHEON QEADF Site 7, Depot Building # 801

120. Refurbishment Works (3 Years)

CALL-OFF CONTRACTS

ON-GOING

[10-Jan-2021 to

9-Jan-2024]

UDC - The Pearl Qatar Residential Apartments, Units &

Common Areas at The Pearl Qatar

121. Dehumidifier Supply & Installation ON-GOING RAYTHEON QEADF Site 7, Building # 805

122. Refurbishment Services (RT3 Lab,

COT Room & PMT Bldg.) ON-GOING RAYTHEON QEADF Patriot Qatar Site 7

124.

Rectification and Repainting of

Existing Swimming Pool Pergola at

Tower 18

ON-GOING TPOC

(The Pearl Owners Corporation) Porto Arabia Tower 18

For more information kindly visit our website: www.linkco.com.qa

Page 21: O M P A N Y P R O F - Linkco

Company Profile 19 | P a g e

BACK TO CONTENTS

11. SELECTED PROJECTS

SELECTED PROJECT PHOTOS

Page 22: O M P A N Y P R O F - Linkco

Company Profile 20 | P a g e

BACK TO CONTENTS

QATAR EMERI AIR DEFENSE FORCE – TRAINING FACILITY

Page 23: O M P A N Y P R O F - Linkco

Company Profile 21 | P a g e

BACK TO CONTENTS

UNITED DEVELOPMENT CO. (UDC) - ITTISAL CALL CENTER OFFICE

Page 24: O M P A N Y P R O F - Linkco

Company Profile 22 | P a g e

BACK TO CONTENTS

UNITED DEVELOPMENT CO. (UDC) – FIT OUT CONSTRUCTION OF NEW MALE PRAYER

ROOM IN UNIT 41, BUILDING 5, MEDINA CENTRALE

Page 25: O M P A N Y P R O F - Linkco

Company Profile 23 | P a g e

BACK TO CONTENTS

UNITED DEVELOPMENT CO. (UDC) – CIVIL / MEP REFURBISHMENT

OF QQ8 CASA 17

Page 26: O M P A N Y P R O F - Linkco

Company Profile 24 | P a g e

BACK TO CONTENTS

UNITED DEVELOPMENT CO. (UDC) – FIT OUT WORKS

OF PROPOSED CLOSE OFFICE AT OYSTER BUILDING

Page 27: O M P A N Y P R O F - Linkco

Company Profile 25 | P a g e

BACK TO CONTENTS

UNITED DEVELOPMENT CO. (UDC) – RETILING WORK

OF QQ24 UNIT 405

Page 28: O M P A N Y P R O F - Linkco

Company Profile 26 | P a g e

BACK TO CONTENTS

ALURAYS EXHIBITION PRODUCT BOOTH

Page 29: O M P A N Y P R O F - Linkco

Company Profile 27 | P a g e

BACK TO CONTENTS

SIDRA NORTH GATE MALL OFFICE PREMISES

Page 30: O M P A N Y P R O F - Linkco

Company Profile 28 | P a g e

BACK TO CONTENTS

ABU NAKHLA EMERGENCY MEDICAL SERVICE STATION

& HEALTH CENTER

Page 31: O M P A N Y P R O F - Linkco

Company Profile 29 | P a g e

BACK TO CONTENTS

AL RAYAN QURAN WOMEN’S CENTER

Page 32: O M P A N Y P R O F - Linkco

Company Profile 30 | P a g e

BACK TO CONTENTS

MIDMAC NEW OFFICE BUILDING

Page 33: O M P A N Y P R O F - Linkco

Company Profile 31 | P a g e

BACK TO CONTENTS

AL FAISAL HOLDING (MARRIOTT RENAISSANCE)

Page 34: O M P A N Y P R O F - Linkco

Company Profile 32 | P a g e

BACK TO CONTENTS

QATAR INDEPENDENT TECHNICAL SCHOOL

Page 35: O M P A N Y P R O F - Linkco

Company Profile 33 | P a g e

BACK TO CONTENTS

EBN SINA MEDICAL NEW OFFICES

(AAMAL - GOLDEN TOWER FLR. 9TH - 15TH)

Page 36: O M P A N Y P R O F - Linkco

Company Profile 34 | P a g e

BACK TO CONTENTS

CHALLENGE TRADING & CONTRACTING

NEW OFFICE – DOHA, QATAR

Page 37: O M P A N Y P R O F - Linkco

Company Profile 35 | P a g e

BACK TO CONTENTS

AL JAZI GARDEN

VILLA REFURBISHMENT

Page 38: O M P A N Y P R O F - Linkco

Company Profile 36 | P a g e

BACK TO CONTENTS

AL RAYYAN TOURISM INVESTMENT CO.

(ARTIC) 15TH FLOOR MARRIOTT

Page 39: O M P A N Y P R O F - Linkco

Company Profile 37 | P a g e

BACK TO CONTENTS

LUFTHANSA

CITY CENTER

Page 40: O M P A N Y P R O F - Linkco

Company Profile 38 | P a g e

BACK TO CONTENTS

AL FARAZDAQ PRINTING PRESS

CITY CENTER

Page 41: O M P A N Y P R O F - Linkco

Company Profile 39 | P a g e

BACK TO CONTENTS

OPTIMIZED TRADING

19TH FLOOR MARRIOTT

Page 42: O M P A N Y P R O F - Linkco

Company Profile 40 | P a g e

BACK TO CONTENTS

CCTV ROOM - GROUND FLOOR MARRIOTT

Page 43: O M P A N Y P R O F - Linkco

Company Profile 41 | P a g e

BACK TO CONTENTS

17TH FLOOR MARRIOTT

AL FAISAL FOR INTERNATIONAL INVESTMENT

Page 44: O M P A N Y P R O F - Linkco

Company Profile 42 | P a g e

BACK TO CONTENTS

RE-BRANDING MARRIOTT MARQUIS

Page 45: O M P A N Y P R O F - Linkco

Company Profile 43 | P a g e

BACK TO CONTENTS

EXECUTIVE LOUNGE

MARRIOTT MARQUIS

Page 46: O M P A N Y P R O F - Linkco

Company Profile 44 | P a g e

BACK TO CONTENTS

TOILET CUBICLES & LOCKERS

Al Jaber Engineering New Head Quarters - Lusail Al Faisal Holdings – 22nd Floor Marriott Marquis

Al Rayyan Tourism & Investments Co. Optimized Trading

Page 47: O M P A N Y P R O F - Linkco

Company Profile 45 | P a g e

BACK TO CONTENTS

NSCC INTERNATIONAL

Page 48: O M P A N Y P R O F - Linkco

Company Profile 46 | P a g e

BACK TO CONTENTS

12. RESOURCES

RESOURCES

Page 49: O M P A N Y P R O F - Linkco

Company Profile 47 | P a g e

BACK TO CONTENTS

AL RAWABET COMMERCIAL SERVICES & CONTRACTING CO., W.L.L.

P.O. BOX: 32282, DOHA – QATAR

TEL: +974 4437 2511

FAX: +974 4437 1009

EMAIL: [email protected]

WEB: www.linkco.com.qa

LOCATION

1. DOHA REGISTERED OFFICE:

B RING ROAD, STREET # 220, ZONE # 24

BLDG. # 159, FLOOR # 4, OFFICE # 4,

Google Map: LINKCO Office - Google Map

2. LINKCO WAREHOUSE / STORE

INDUSRIAL AREA (# 38)

STREET 591, ZONE 57, BLDG. 67

• ALUMINUM FABRICATION FACILITY

• CARPENTRY FACILITY

• WAREHOUSE

Google Map: LINKCO Warehouse - Google Map

QATARI REGISTRATION No. 32942

YEAR ESTABLISHED 2006

NUMBER OF YEARS IN THE BUSINESS 15 YEARS

CONTACT PERSONS

1. Mr. Redentor Celestino

Project Coordinator

Mob.: +974 5035 2165

Tel.: +974 4437 2511

Fax: +974 4437 1009

Email: [email protected]

OFFICE & WAREHOUSE

Page 50: O M P A N Y P R O F - Linkco

Company Profile 48 | P a g e

BACK TO CONTENTS

SN DESCRIPTION NUMBER OF UNIT / SET

1 COMPLETE FACILITY OF FABRICATING ALUMINUM 10

2 COMPLETE FACILITY OF CARPENTRY WORKSHOP 13

3 SETS OF POWER HAND TOOLS 30

4 MARBLE CUTTING AND FINISHING MACHINES 3

5 CARS, PICK UPS, LITE TRUCKS, VANS, AND BUSSES 9

6 AIR COMPRESSORS, 6

7 SCAFFOLDINGS & LADDERS 13

8 OTHER MACHINES, TOOLS & ACCESSORIES LOTS

PLANTS & EQUIPMENT

Page 51: O M P A N Y P R O F - Linkco

Company Profile 49 | P a g e

BACK TO CONTENTS

SN TITLE NOS.

1 MANAGING DIRECTOR 1

2 ADMINISTRATION 4

3 ACCOUNTS 2

4 HUMAN RESOURCE 2

5 ENGINEERING AND SAFTEY 5

6 SALES 2

7 OFFICE ASSISTANTS 2

8 FOREMEN / SUPERVISOR 5

9 STOREKEEPER 2

10 SKLILLED 20

11 HELPER 12

12 DRIVERS 4

STAFF & MANPOWER

Page 52: O M P A N Y P R O F - Linkco

Company Profile 50 | P a g e

BACK TO CONTENTS

13. CERTIFICATIONS

13.1 I.S.O. CERTIFICATION

I.S.O. CERTIFICATIONS

Page 53: O M P A N Y P R O F - Linkco

Company Profile 51 | P a g e

BACK TO CONTENTS

Page 54: O M P A N Y P R O F - Linkco

Company Profile 52 | P a g e

BACK TO CONTENTS

13.2 BUSINESS ACTIVITIES

BUSINESS ACTIVITIES

Page 55: O M P A N Y P R O F - Linkco

Company Profile 53 | P a g e

BACK TO CONTENTS

Page 56: O M P A N Y P R O F - Linkco

Company Profile 54 | P a g e

BACK TO CONTENTS

Page 57: O M P A N Y P R O F - Linkco

Company Profile 55 | P a g e

BACK TO CONTENTS

14. SPECIAL AWARDS

SPECIAL AWARDS

Page 58: O M P A N Y P R O F - Linkco

Company Profile 56 | P a g e

BACK TO CONTENTS

Awarded by QATAR EMIRI AIR DÉFENSE FORCE (QEADF) to LINKCO in Recognition of our

Achievements and Commitment to Supplier Excellence.

JULY – 2021

Page 59: O M P A N Y P R O F - Linkco

Company Profile 57 | P a g e

BACK TO CONTENTS

Awarded by M/s RAYTHEON to LINKCO in Recognition of our

Achievements and Commitment to Supplier Excellence.

JUNE – 2019

Page 60: O M P A N Y P R O F - Linkco

Company Profile 58 | P a g e

BACK TO CONTENTS

Awarded by RAYTHEON Company (Major U.S. Defence Contractor and Industrial Corporation) to

LINKCO for Outstanding dedication and recognition of exceptional accomplishments to QEADF

School Refurbishment.

AUGUST – 2016

Page 61: O M P A N Y P R O F - Linkco

Company Profile 59 | P a g e

BACK TO CONTENTS

Awarded by QATAR EMIRI AIR DÉFENSE FORCE (QEADF) to LINKCO for Completion of QEADF

School Refurbishment.

JULY – 2016

Page 62: O M P A N Y P R O F - Linkco

Company Profile 60 | P a g e

BACK TO CONTENTS

15. COMPANY REGISTRATIONS

15.1 CR (COMPANY REGISTRATION)

COMPANY REGISTRATION

Page 63: O M P A N Y P R O F - Linkco

Company Profile 61 | P a g e

BACK TO CONTENTS

Page 64: O M P A N Y P R O F - Linkco

Company Profile 62 | P a g e

BACK TO CONTENTS

Page 65: O M P A N Y P R O F - Linkco

Company Profile 63 | P a g e

BACK TO CONTENTS

Page 66: O M P A N Y P R O F - Linkco

Company Profile 64 | P a g e

BACK TO CONTENTS

Page 67: O M P A N Y P R O F - Linkco

Company Profile 65 | P a g e

BACK TO CONTENTS

15.2 TRADE LICENSE

TRADE LICENSE

Page 68: O M P A N Y P R O F - Linkco

Company Profile 66 | P a g e

BACK TO CONTENTS

Page 69: O M P A N Y P R O F - Linkco

Company Profile 67 | P a g e

BACK TO CONTENTS

15.3 COMPUTER CARD

COMPUTER CARD

Page 70: O M P A N Y P R O F - Linkco

Company Profile 68 | P a g e

BACK TO CONTENTS

Page 71: O M P A N Y P R O F - Linkco

Company Profile 69 | P a g e

BACK TO CONTENTS

15.4 TAX CARD

TAX CARD

Page 72: O M P A N Y P R O F - Linkco

Company Profile 70 | P a g e

BACK TO CONTENTS

Page 73: O M P A N Y P R O F - Linkco

THANK YOU!