NYC ICAP Forecast Inputs for Class Year 2011 Date Published: July 17, 2013 Summer Summer Summer Winter Winter Winter Demand Curve Units 2014 2015 2016 2014/16 2015/16 2015/16 Document Abbrev. NYC ICAP Reference Point $/kW-mo, ICAP 20.19 20.53 20.88 20.19 20.53 20.88 (1) Summer 2013 reference point of $19.85, escalated at 1.7% RP_ICAP ICAP/UCAP Translation Factor % 5.59% 5.59% 5.59% 5.59% 5.59% 5.59% (2) NYC derating factor percent for Summer 2013 EFORd NYC UCAP Reference Point $/kW-mo, UCAP 21.38 21.74 22.11 21.38 21.74 22.11 =RP_ICAP * (1-EFORd) RP_UCAP Load Forecast MW, ICAP 11,795.0 12,012.0 12,237.0 11,795.0 12,012.0 12,237.0 (3) Table I-3b LF NYC Locational Minimum ICAP Requirement % 86.0% 86.0% 86.0% 86.0% 86.0% 86.0% (5) Pg. 2 LCR UCAP Requirement MW, UCAP 9,576.7 9,752.9 9,935.5 9,576.7 9,752.9 9,935.5 = LF * LCR * (1-EFORd) UCAP Req Demand Curve Length none 1.18 1.18 1.18 1.18 1.18 1.18 MST Sec. 5.14.1.2 DCL Zero Crossing Point MW, UCAP 11,300.5 11,508.4 11,723.9 11,300.5 11,508.4 11,723.9 =UCAP Req * DCL ZCP Demand Curve Slope per 100 MW $/kW-mo (1.2403) (1.2384) (1.2363) (1.2403) (1.2384) (1.2363) =(-100) * RP_UCAP / (ZCP - UCAP Req) DCS Escalation Factor (Inflation Rate) % 1.7% 1.7% 1.7% (1) Pp. 1-2, specifying the 1.7% escalation factor EF Inflation Rate % 1.7% 1.7% 1.7% (1) Currently equal to the escalation factor IR Supply Generation Capacity MW, ICAP 9,508.3 9,508.3 9,508.3 10,416.5 10,416.5 10,416.5 (3) Table III-2 (Summer, CRIS-adjusted) and Table III-3B (Winter) Plus Mothballed Units Removed from Gen Table MW, ICAP 618.2 618.2 618.2 660.4 660.4 660.4 (3) Table IV-3a-1 and Table IV-3a-2, (4) Table IV-3a Less Expected Retirements MW, ICAP 0.0 0.0 0.0 0.0 0.0 0.0 MST Sec. 23.4.5.7.3.2, definition of "Expected Retirements" Total Assumed Generation ICAP MW, ICAP 10,126.5 10,126.5 10,126.5 11,076.9 11,076.9 11,076.9 =Subtotal Total Assumed Generation UCAP MW, UCAP 9,560.4 9,560.4 9,560.4 10,457.7 10,457.7 10,457.7 =Total Assumed Generation ICAP * (1-EFORd) UDRs and Transmission Capacity MW, UCAP 957.3 957.3 957.3 957.3 957.3 957.3 Special Case Resources MW, UCAP 384.4 384.4 384.4 226.5 226.5 226.5 (3) Zone J values underlying totals in Table V-2a and Table V-2b Unoffered MW MW, UCAP (38.1) (38.1) (38.1) (26.0) (26.0) (26.0) Historic average from previous corresponding Capability Periods Total Supply, before Examined Facilities MW, UCAP 10,864.0 10,864.0 10,864.0 11,615.5 11,615.5 11,615.5 =Sum of UCAP values Examined Facilities Berrians GT/GT II (Interconnection Queue positions 201 & 224) Table Notes: The Part A Test uses forecast prices for the first year of the Mitigation Study Period, i.e. Capability Year 2014 for Class Year 2011. The Part B Test uses all three years of the Mitigation Study Period, i.e. Capability Years 2014/15-2016/17 for Class Year 2011. This posting pertains to Examined Facilities in NYC. The Services Tariff has a separate timeline for evaluating and posting information for New Capacity Zone Examined Projects. See Services Tariff Att. H Sec. 23.4.5.7.2.4. Source Documents: (1) 2011-2014 Demand Curve Parameters and Demand Curves, elements as accepted in New York Independent System Operator, Inc. , 134 FERC ¶ 61,058 (2011) at P 150. http://www.nyiso.com/public/webdocs/markets_operations/market_data/icap/Reference_Documents/2011-2014_Demand_Curve_Reset/Demand_Curve_Reset/2011-2014_Demand_Curves_and_Parameters.pdf (2) ICAP Automated Market System, View ICAP and UCAP Calculations http://icap.nyiso.com/ucap/public/ldf_view_icap_calc_selection.do (3) 2013 Load & Capacity Data "Gold Book" http://www.nyiso.com/public/webdocs/markets_operations/services/planning/Documents_and_Resources/Planning_Data_and_Reference_Docs/Data_and_Reference_Docs/2013_GoldBook.pdf (4) 2012 Gold Book http://www.nyiso.com/public/webdocs/markets_operations/services/planning/Documents_and_Resources/Planning_Data_and_Reference_Docs/Data_and_Reference_Docs/2012_GoldBook_V3.pdf (5) Locational Installed Capacity Requirements Study for the 2013-2014 Capability Year http://www.nyiso.com/public/webdocs/markets_operations/services/planning/Documents_and_Resources/Resource_Adequacy/Resource_Adequacy_Documents/Locational_Capacity_Report_2013.pdf

Upload: phamnhu

Post on 28-Apr-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

NYC ICAP Forecast Inputs for Class Year 2011Date Published: July 17, 2013

Summer Summer Summer Winter Winter WinterDemand Curve Units 2014 2015 2016 2014/16 2015/16 2015/16 Document Abbrev.

NYC ICAP Reference Point $/kW-mo, ICAP 20.19 20.53 20.88 20.19 20.53 20.88 (1) Summer 2013 reference point of $19.85, escalated at 1.7% RP_ICAPICAP/UCAP Translation Factor % 5.59% 5.59% 5.59% 5.59% 5.59% 5.59% (2) NYC derating factor percent for Summer 2013 EFORdNYC UCAP Reference Point $/kW-mo, UCAP 21.38 21.74 22.11 21.38 21.74 22.11 =RP_ICAP * (1-EFORd) RP_UCAPLoad Forecast MW, ICAP 11,795.0 12,012.0 12,237.0 11,795.0 12,012.0 12,237.0 (3) Table I-3b LF NYC Locational Minimum ICAP Requirement % 86.0% 86.0% 86.0% 86.0% 86.0% 86.0% (5) Pg. 2 LCRUCAP Requirement MW, UCAP 9,576.7 9,752.9 9,935.5 9,576.7 9,752.9 9,935.5 = LF * LCR * (1-EFORd) UCAP ReqDemand Curve Length none 1.18 1.18 1.18 1.18 1.18 1.18 MST Sec. 5.14.1.2 DCLZero Crossing Point MW, UCAP 11,300.5 11,508.4 11,723.9 11,300.5 11,508.4 11,723.9 =UCAP Req * DCL ZCPDemand Curve Slope per 100 MW $/kW-mo (1.2403) (1.2384) (1.2363) (1.2403) (1.2384) (1.2363) =(-100) * RP_UCAP / (ZCP - UCAP Req) DCSEscalation Factor (Inflation Rate) % 1.7% 1.7% 1.7% (1) Pp. 1-2, specifying the 1.7% escalation factor EFInflation Rate % 1.7% 1.7% 1.7% (1) Currently equal to the escalation factor IR

SupplyGeneration Capacity MW, ICAP 9,508.3 9,508.3 9,508.3 10,416.5 10,416.5 10,416.5 (3) Table III-2 (Summer, CRIS-adjusted) and Table III-3B (Winter)

Plus Mothballed Units Removed from Gen Table MW, ICAP 618.2 618.2 618.2 660.4 660.4 660.4 (3) Table IV-3a-1 and Table IV-3a-2, (4) Table IV-3aLess Expected Retirements MW, ICAP 0.0 0.0 0.0 0.0 0.0 0.0 MST Sec. 23.4.5.7.3.2, definition of "Expected Retirements"

Total Assumed Generation ICAP MW, ICAP 10,126.5 10,126.5 10,126.5 11,076.9 11,076.9 11,076.9 =SubtotalTotal Assumed Generation UCAP MW, UCAP 9,560.4 9,560.4 9,560.4 10,457.7 10,457.7 10,457.7 =Total Assumed Generation ICAP * (1-EFORd)

UDRs and Transmission Capacity MW, UCAP 957.3 957.3 957.3 957.3 957.3 957.3Special Case Resources MW, UCAP 384.4 384.4 384.4 226.5 226.5 226.5 (3) Zone J values underlying totals in Table V-2a and Table V-2bUnoffered MW MW, UCAP (38.1) (38.1) (38.1) (26.0) (26.0) (26.0) Historic average from previous corresponding Capability Periods

Total Supply, before Examined Facilities MW, UCAP 10,864.0 10,864.0 10,864.0 11,615.5 11,615.5 11,615.5 =Sum of UCAP values

Examined FacilitiesBerrians GT/GT II (Interconnection Queue positions 201 & 224)

Table Notes: The Part A Test uses forecast prices for the first year of the Mitigation Study Period, i.e. Capability Year 2014 for Class Year 2011.

The Part B Test uses all three years of the Mitigation Study Period, i.e. Capability Years 2014/15-2016/17 for Class Year 2011.

This posting pertains to Examined Facilities in NYC. The Services Tariff has a separate timeline for evaluating and posting information for New Capacity Zone Examined Projects. See Services Tariff Att. H Sec. 23.4.5.7.2.4.

Source Documents:(1) 2011-2014 Demand Curve Parameters and Demand Curves, elements as accepted in New York Independent System Operator, Inc. , 134 FERC ¶ 61,058 (2011) at P 150.

http://www.nyiso.com/public/webdocs/markets_operations/market_data/icap/Reference_Documents/2011-2014_Demand_Curve_Reset/Demand_Curve_Reset/2011-2014_Demand_Curves_and_Parameters.pdf

(2) ICAP Automated Market System, View ICAP and UCAP Calculations

http://icap.nyiso.com/ucap/public/ldf_view_icap_calc_selection.do

(3) 2013 Load & Capacity Data "Gold Book"

http://www.nyiso.com/public/webdocs/markets_operations/services/planning/Documents_and_Resources/Planning_Data_and_Reference_Docs/Data_and_Reference_Docs/2013_GoldBook.pdf

(4) 2012 Gold Book

http://www.nyiso.com/public/webdocs/markets_operations/services/planning/Documents_and_Resources/Planning_Data_and_Reference_Docs/Data_and_Reference_Docs/2012_GoldBook_V3.pdf

(5) Locational Installed Capacity Requirements Study for the 2013-2014 Capability Year

http://www.nyiso.com/public/webdocs/markets_operations/services/planning/Documents_and_Resources/Resource_Adequacy/Resource_Adequacy_Documents/Locational_Capacity_Report_2013.pdf

Default Net CONE ShapingDate Published: July 17, 2013

Input Abbrev. Source Calculation Units 2013 2014

Annual ICAP Revenue Requirement ARR (1) For 2014: ARR2013 * (1+IR) $/kW-yr, ICAP 191.02 194.27DMNC at 90 degrees Fahrenheit ("ICAP conditions") Qi (1) -- MW, ICAP 180.5 180.5Summer DMNC Qs (1) -- MW, ICAP 190.4 190.4Winter DMNC Qw (1) -- MW, ICAP 196.0 196.0Ratio of Winter to Summer DMNCs for Locality R (1) -- none 1.089 1.089Demand Curve Length DCL (1) -- none 1.18 1.18Escalation Factor EF (1) -- % 1.7% 1.7%Inflation Rate IR Notes -- % 1.7% 1.7%Excess Exc (2) -- % 2.3% 2.3%EFORd EFORd (3) -- % 5.59% 5.59%

Mitigation Net CONE MNC Calc. ARR*(1-Exc/(DCL-1)) $/kW-yr, ICAP 166.61 169.45Annual Default Net CONE, UCAP AOF Calc. MNC*0.75/(1-EFORd) $/kW-yr, UCAP 132.36 134.61Summer Monthly Offer Floor SOF Calc. AOF*Qi/(6*(Qs+Qw((DCL-R)/(DCL-1)))) $/kW-mo, UCAP 13.75 13.99Winter Monthly Offer Floor WOF Calc. SOF*((DCL-R)/(DCL-1)) $/kW-mo, UCAP 6.95 7.07

Notes:

- For Class Year 2011, the Default Net CONE is calculated based on Capability Year 2014, the first year of the Mitigation Study Period.

- This example shows the seasonal shaping of the Demand Curve proxy unit. When applied to Examined Facilities, unit-specific values for Qi , Qw , and Qs will be utilized.

- The inflation rate is equal to the escalation factor of 1.7% in the currently-accepted ICAP Demand Curves.

- The term “Mitigation Net CONE” is currently pending before the Commission in Docket No. ER10-2371. See New York Independent System Operator, Inc.,

Resubmittal of August 12, 2010 Filing, Docket No. ER10-2371-000 (filed Aug. 24, 2010).

Source Documents:(1) 2011-2014 Demand Curve Parameters and Demand Curves, elements as accepted in New York Independent System Operator, Inc. , 134 FERC ¶ 61,058 (2011) at P 150.

http://www.nyiso.com/public/webdocs/markets_operations/market_data/icap/Reference_Documents/2011-2014_Demand_Curve_Reset/Demand_Curve_Reset/2011-2014_Demand_Curves_and_Parameters.pdf

(2) FERC Order on Compliance Filings , 136 FERC ¶ 61,192 (2011) at P 55

http://www.nyiso.com/public/webdocs/markets_operations/documents/Legal_and_Regulatory/FERC_Orders/2011-2001/2011/Sep/FERC_Ordr_Dmnd_Crv_Rst_Cmplnc_9_15_11.pdf

(3) ICAP Automated Market System, View ICAP and UCAP Calculations, NYC Derating Factor Percent for Summer 2013

http://icap.nyiso.com/ucap/public/ldf_view_icap_calc_selection.do

Capability Year