NSW Health Infrastructure
Solutions Team
Josie Gabrielli
Process of Facility Planning NSW Health Process of
Facility Planning
NSW Infrastructure
Investor Assurance Framework
HI Delivery Standard
Stage 1 Services Procurement Plan
Stage 2 Project
Definition Plan
Stage 3 Project Implementation
Stage 4 Post Occupancy Evaluation (POE)
Part 0
Project Initiation
Part 1
Master Planning
Phase 1 Planning
Phase 2 Services Procurement Plan
Part 2
Feasibility Development
Part 3
Schematic Development
Part 4
Design Development
Part 5
Contract Development
Part 6
Tender, Evaluate and
Award
Part 7
Construction Administration
Part 8
Commissioning and Handover
Part 9
Post Completion Warranty Period
Part 10
Post Occupancy Evaluation
Phase 3 Post Occupancy Evaluation (POE)
Gat
e 0:
Pro
ject
Ju
stifi
catio
n
Gat
e 1:
Stra
tegi
c R
evie
w &
Bus
ines
s C
ase
with
ETC
<$5
0m
For
Gat
e 2:
Bus
ines
s C
ase
Gat
e 3:
Pre
-tend
er
Gat
e 4:
Ten
der e
valu
atio
n
Gat
e 5:
Pre
-Com
mis
sion
ing
Gat
e 6:
Pos
t Im
plem
enta
tion
Solutions
• Health Planning
• Clinical Advisory
• Change Management
• Specialist Advisory: ICU & Operating Theatre Groups
• Blacktown Stage 2 • Dubbo ¾ • Parkes • Forbes • Gosford • Hornsby • Kempsey • Lismore • Nepean • New Maitland • Prince of Wales
• Sutherland • Westmead /Sydney
Childrens Westmead • Tamworth • Wagga Wagga • Wyong
ED Projects - Planning and Delivery
St George
RNSH
Wollongong
Port Macquarie
Bega
PPP - Northern Beaches
ED Projects completed
Emergency Entrance
ED Waiting
ED Waiting
ED Waiting
ED Paediatric Waiting
Triage
Resus Bay
Fast Track Staff Station
Fast Track
Fast Track Bay
Acute Area Staff Station
Acute Bays
Acute Bays
EMU Bays
Safe Assessment Room
SSU Staff Station
Short Stay Unit
Do your Research before planning begins
Understand the MoC and its application
Understand your workload and the pinch points including before a patient reaches your service and after the patient leaves your service
Contribute actively to planning and utilize resources from HI.
Word of caution: A redevelopment will not fix process and staff issues
Preparation
Site Visits ? Concord Implementation of EMMS
Discourage visits to brand new, sparkling facilities
Advise caution, as no demonstrated success with design over period of time
Look at flow design success, not only new construction
Research departments who have successful management - these are typically older units
Opportunity is to understand how flows have been set up and not how the building was built
Challenges in ED
Increasing number of violent patients
Staff risk and safety management balanced against patient satisfaction
Meeting KPI’s
Changing volume and presentation type to ED’s
Regional ED v’s Metro Ed’s
How security services interact and support service
Challenges in ED
Recurring Issues PECC
Sexual/Forensic Medicine
Implementation of MoC
Ambulance management/ Block
Learning's to Date Paediatrics
Understanding Fast Track Models
Challenging current practice against contemporary care models
Increase in floor plate and impact on practices
Operationalization of new departments
Front of House – Reception/Triage
EMR
Consumer Engagement Hi advocates – consumer engagement in design and
development of new projects
This can be viewed as an unwelcome inclusion in the process
HI have had proven success with the contribution of consumers in designing great ED’s.
Please consider their inclusion
Summary Take homes;
– HI are here to work with you as a resources and as a guide
– You are the experts in the field of Emergency Medicine, HI provides the experts in the design and delivery of projects
– Working together with ECI, HI and you, the users, will deliver the best result for all.