NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel K. Inouye Solar Telescope (DKIST)

Upload: others

Post on 19-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel K. Inouye Solar Telescope (DKIST)

Page 2: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

AST Budget within MPS and NSF

FY 2017 Request Released on February 9, 2016

DKIST Construction from MREFC line

NSO/DKIST Operations funding from AST line

10/5/2016 CSSP Meeting 2

$M FY15

Actual

FY16

Request

FY16

Approp.

FY17

Request

Total

FY17

Request

Disc.

NSF Total 7344 7724 7463 7964 7564

NSF R&RA 5934 6186 6034 6425 6079

MPS 1337 1366 1349 1436 1355

AST 245.2 246.5 246.7 262.6 247.7

MREFC 200.8 200.3 200.3 193.1 193.1

Page 3: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Research Support Within AST

10/5/2016 CSSP Meeting 3

61%

4%

8%

21%

5%

1%

Modes of Support FY 2016

Facilities

Instrumentation Programs

Midscale Innovations

Individual Investigators & Small

Teams

Education and Workforce

Development

Special Projects

Page 4: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Hypothetical Budget Run-outs

10/5/2016 CSSP Meeting 4 10/5/2016 4

0

50

100

150

200

250

300

350

$M

1995 2008 2023 2010 2000 2005 2015 2020

GBO+VLBA EVLA

2009 ARRA

The sand chart shows the 2017-2023 budget

distribution under assumptions that (1) no facility

reductions occur beyond collaborations already in

place, and (2) the Mid-Scale + Individual

Investigator Programs grow by 2.5%/yr. Red lines

show the upper budget envelope under the

assumptions of overall flat budgets or 2.5%/yr

increases.

ALMA

NSO

NRAO AO

LSST

Gemini

DKIST

NOAO+NSO

NOAO

AST=0.0%/yr

Mid-scale+IIA

CSSP Meeting

Page 5: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

NSO Transition to DKIST Era

10/5/2016 CSSP Meeting 5

We are here

Page 6: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

NSO Operations & Maintenance

10/5/2016 CSSP Meeting 6

FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

NSO Base $8.0 $8.0 $7.0 $6.0 $5.0 $4.0 $4.12 $4.24 $4.37 $4.50 $4.64

DKIST Ops. $0.0 $5.0 $9.0 $11.5 $14.5 $17.0 $17.51 $18.04 $18.58 $19.13 $19.71

Total, NSO $8.0 $13.0 $16.0 $17.5 $19.5 $21.0 $21.63 $22.28 $22.95 $23.64 $24.34

$0.0

$5.0

$10.0

$15.0

$20.0

$25.0

$30.0

$M

Projected NSO Funding Profile

FY16 = $16M

Total R&RA through FY 2024 = $201.84M

FY 2016 appropriation = $16M + $2.5M (GONG refurb.)

Page 7: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

NSO Facilities on Sacramento Peak

Recommended for divestment by the 2012 AST Portfolio Review

NSF funding to NSO for Sac Peak operations projected to ramp down to the end of 2017

Engineering feasibility study (CH2M Hill) completed May 19, 2016

Environmental Impact Statement (EIS)/Section 106 process started

◦ Notice of Intent, July 5, 2016

◦ Public scoping meeting, July 21, 2016

◦ End of public comment, Aug. 5, 2016

◦ Draft EIS expected Dec. 2016

10/5/2016 CSSP Meeting 7

Page 8: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Bridge to the Sunspot Solar Observatory

Consortium (SSOC)

Met with National Solar Observatory (NSO) and representatives of universities seeking to create a consortium to operate Sac Peak, May 2015

NM State Legislature failed to fund highly rated NMSU request for funds to enable consortium, Feb. 2016

NMSU submitted a proposal to AST for funding to bridge the gap between NSO and SSOC, May 2016

Proposal awarded Sept. 2016

Still looking for SSOC members

10/5/2016 CSSP Meeting 8

Page 9: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

NSO Facilities on Kitt Peak Recommended for divestment by

the 2012 AST Portfolio Review

NSF minimal operations funding

ramping down to 2017

NSF engineering feasibility study

(CH2M Hill) completed July 2016

Recent negative developments

◦ Tohono O’odham Community

College voted against any

participation

◦ Northrop-Grumman StarShade

proposal not funded by JPL

Still open to collaborations

10/5/2016 CSSP Meeting 9

Page 10: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

NSO Integrated Synoptic Program

Consists of SOLIS and GONG

Recommended for 50% ($2M/year) divestment by the 2012 AST Portfolio Review

External Federal stakeholders: NOAA-SWPC, AFWA, NASA

Increased Federal awareness (i.e. NSWS and NSWAP) of space weather assets like GONG

Result: program to “operationalize” GONG in the FY2016 appropriation

◦ $2.5M addition to NSF (through AST) for refurbishment

◦ $1M/year addition to NOAA for operations

August 2016: Interagency Agreement NSF-NOAA signed!

10/5/2016 CSSP Meeting 10

Page 11: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

DKIST Will Replace Current National

Solar O/IR Facilities

10/5/2016 CSSP Meeting 11

Dunn Solar Telescope

Evans Solar Facility

Sacramento Peak, NM

McMath-Pierce, Kitt Peak, AZ

Page 12: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

DKIST Construction Funding

DKIST Re-baselined Total Project Cost = $344.13M

ARRA $146M awarded FY 2010

MREFC FY 2016 = $20M awarded

10/5/2016 CSSP Meeting 12

FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019

Original $20.00 $17.00 $20.00 $25.00 $20.00 $20.00 $20.00 $9.93 $0.00 $0.00

Updated $20.00 $5.00 $10.00 $25.00 $36.88 $25.12 $20.00 $20.00 $20.00 $16.13

$0.00

$5.00

$10.00

$15.00

$20.00

$25.00

$30.00

$35.00

$40.00

$M

MREFC Funding Profile for DKIST

FY16 = $20M

Page 13: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Planned Construction

10/5/2016 CSSP Meeting 13

Page 14: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Enclosure: CSSP, October 2015

CSSP Meeting 10/5/2016 14

Page 15: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Enclosure: CSSP, March 2016

CSSP Meeting 10/5/2016 15

Page 16: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Enclosure: CSSP, October 2016

CSSP Meeting 10/5/2016 16

Page 17: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

DKIST Cutaway View

10/5/2016 CSSP Meeting 17

Page 18: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Coudé Rotator: CSSP, March 2016

10/5/2016 CSSP Meeting 18

Page 19: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Coudé Rotator: July 2016

10/5/2016 CSSP Meeting 19

Page 20: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Coudé Rotator, CSSP October 2016

10/5/2016 CSSP Meeting 20

Page 21: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

TMA Base Ring: September 2016

10/5/2016 CSSP Meeting 21

Page 22: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

DKIST Summary Schedule

CSSP Meeting 10/5/2016 22

Page 23: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

DKIST Site Construction

10/5/2016 CSSP Meeting 23

Page 24: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

DKIST Critical Science Plan (CSP)

http://dkist.nso.edu/CSP

The CSP aims to define

critical science goals for the

first year of DKIST

operations

DKIST Science Working

Group (SWG) headed by

Mark Rast (CU)

Next SWG meeting Oct. 11-

13, 2016 at NMSU

10/5/2016 CSSP Meeting 24

Page 25: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

CSP Research Areas

10/5/2016 CSSP Meeting 25

Page 26: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

DKIST Instrumentation

10/5/2016 CSSP Meeting 26

Page 27: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Science Use Cases

10/5/2016 CSSP Meeting 27

Page 28: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Transformation of NSO

10/5/2016 CSSP Meeting 28

2010 2020 2030 2040

You are here

SOLIS relocation

& DKIST support

GONG & SOLIS replaced

by SPRING network

DKIST Operations & data

distribution

GONG

Refurbishment

Synoptic Heliospheric

mission at L5

Solar Cycle

Page 29: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Individual Investigator Opportunities

AST runs several grants programs

Workforce Development:

CAREER and AAPF

Instrumentation: ATI and MRI

(NSF-wide)

Midscale Innovations: MSIP

Research: Astronomy and

Astrophysics Grants (AAG)

◦ AST’s largest program ($48.4M

FY2015)

◦ Four major categories: EXC,

GAL, SAA and PLA

10/5/2016 CSSP Meeting 29

Page 30: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

AAG Proposals, 1990-2015

10/5/2016 30

18 12 13 19 41 33 36 43 41 38 32 40 31 48 64 44 60 66 57 58 52 54 60 90

135 136 80 89 126 134 108 126 96

112 104 119 113 104 100 112 105

115 113

135 148 160 200

227 274 239 145 159

62 59

49 58 50 52

73 82

58 48 41

76 107 72 74 91 122

124 91 96

91

107

102 118

144 157

78 88 78

87 76 72 96

119 134 128

131 124

122 138 136 170

219 223 259 242

243

270

280 311

307

319

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

2015 1990

238

770

CSSP Meeting

Page 31: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

AAG Funding History, 1990-2015

10/5/2016 31

16.2 17.0 18.2 17.1 20.2 18.6 17.5 19.3 19.7 18.8 20.9 22.7

29.4 32.4 30.7

34.0 38.9

41.5 42.1

79.6

49.4 48.1 44.5 42.4 43.7

48.4

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

AAG Budget, $M

50.4 48.0

45.1

29.5

45.1

29.3

24.9

31.2 27.6 26.7

31.2 34.3

38.1 36.8

28.8 28.5

24.4 23.9 20.7

36.3

22.4 19.9

14.8 15.4 16.7 18.0

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Proposal Funding Rate, %

CSSP Meeting

Page 32: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Solar Research Opportunities

AAG open to all astronomical research including solar,

however AST not a traditional home for solar research

Getting the word out in advance of DKIST

◦ Multiple talks in 2015: TESS/SPD, IRIS 4 workshop, IAU, etc.

◦ Mark Rast (CU) on behalf of DKIST SWG: Coordinated

submission of solar proposals to FY 2016 AAG program

Results:

◦ Critical mass (21 proposals) for panel

◦ More proposals with DKIST in the title than ALMA

◦ First-ever solar physics panel (SAA-SUN) in AST!

◦ 19% success rate consistent with the rest of AAG

10/5/2016 CSSP Meeting 32

Page 33: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

NSF/GEO Pilot Program Eliminating

Proposal Deadlines

10/5/2016 CSSP Meeting 33

Page 34: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

AST No-deadline SPG Pilot Program

10/5/2016 CSSP Meeting 34

Page 35: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Summary

DKIST will transform the ground-based solar community

NSF (through AST) investing in ground-based solar physics via NSO, DKIST and SPG Program

AST supported the NSO move to the campus of the University of Colorado, Boulder

AST will continue to work with our colleagues in GEO/AGS to find synergies and potential projects for co-funding

AST will continue its involvement in Federal space weather forums (NSWS, NSWAP)

AST encourages conversations and proposals from the solar physics community

10/5/2016 CSSP Meeting 35

Page 36: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

Back-up Slides

10/5/2016 CSSP Meeting 36

Page 37: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

NSO and the NSWS/SWAP

NSF’s National Solar Observatory can

contribute to the National Space

Weather Strategy and Action Plan

through:

◦ space weather observations (5.3)

◦ forecasting improvement (5.4)

◦ enhancing fundamental

understanding of space weather (5.5)

◦ international cooperation (6.2)

See NSO White Paper at:

◦ http://www.nso.edu/node/1290

10/5/2016 CSSP Meeting 37

Page 38: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

DKIST: SWAP 5.3.9, 5.4.2, 5.5.2, 6.2.2

The Daniel K. Inouye Solar Telescope (DKIST) will host new sensor technologies (5.3.9, 5.4.2) and support basic research opportunities (5.5.2) through international partnerships (6.2.2)

Key challenges:

◦ Construction completion

◦ Transition to operations

◦ Big Data

10/5/2016 CSSP Meeting 38

Page 39: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

NISP: SWAP 5.3.4 The NSO Integrated Synoptic Program

(NISP) contributes to a sustained or enhanced ground-based solar imaging including solar magnetic field and H-alpha data (5.3.4)

Key challenges:

◦ 2012 Portfolio Review recommended partial divestment

◦ U.S. Air Force withdrawal of support for GONG operations

◦ Need to integrate SOLIS vector-magnetograms into space weather models

NSF – NOAA partnership for robust GONG operations

10/5/2016 CSSP Meeting 39

Page 40: NSF Astronomy Update: The National Solar Observatory (NSO ... · NSF Astronomy Update: The National Solar Observatory (NSO) and the Daniel ... NSF Total 7344 7724 7463 7964 7564 NSF

SPRING: SWAP 5.3.9, 5.4.2, 6.2.2 NSO will contribute to the development and deployment of new

operational space weather assets (5.3.9) and novel sensor technologies (5.4.2) leveraging international partnerships (6.2.2).

Key challenges:

◦ The Solar Physics Research Integrated Network Group (SPRING) is an international project currently led by the Kiepenheuer Institut für Sonnenphysik (KIS) in Germany, where science requirements are being written and instrument concepts being developed

◦ The U.S. participation is through the NSO as a consultant on the European-led project

◦ SPRING is in the conceptual stage and currently has no Federal funding.

10/5/2016 CSSP Meeting 40