    CRISIS AT MARUTI

    SUZUKIS MANESARPLANT : AN HR INSIGHT

  • 8/13/2019 Ns - Maruti Manesar

    2/23

    COMPANY OVERVIEW2

    India's largest passenger car company, accounting for over 45% of thedomestic car marketFirst company in India to mass-produce and sell more than a millioncars

    Annually exports more than 50,000 carsManufacturing facilities are located at two facilities Gurgaon andManesarIt offers 14 brands and over 150 variants ranging from peoples carMaruti 800 to the stylish hatchback Ritz

  • 8/13/2019 Ns - Maruti Manesar

    3/23

    Damage Summary

    12/26/2013

    3

  • 8/13/2019 Ns - Maruti Manesar

    4/23

    12/26/2013

    4

  • 8/13/2019 Ns - Maruti Manesar

    5/23

    THE PROBLEM

    5

    Differences insalary pay

    Workingcondition

    Lack of propernegotiation

  • 8/13/2019 Ns - Maruti Manesar

    6/23

    FALL IN DEMAND

    6

    Expected fall in demand during crucial festive season, when car salestouch the peak.The Manesar plant is the hub for the key 'Swift' model, which runs ahuge backlog in the retail market.

    The bookings for the new Swift and waiting list of customers are veryhigh. Delay in production affect the delivery of cars resulting indisappointment among customers.

  • 8/13/2019 Ns - Maruti Manesar

    7/23

    LOSS IN OUTPUT

    7

    Estimated loss of more than 90 million dollar.On August 24, 1,230 cars were planned to be produced, but only 437 were assembled. Out of which, just 96 cars could pass quality check.Halt in production on the 5th September, around 4000 workers rallied

    till the highway to block it.Poor dispatch numbers with respect to meeting targets and qualitycontrol

  • 8/13/2019 Ns - Maruti Manesar

    8/23

    CONT .8

    With only around 20-25 of 950 workers agreed tosign the Good Conduct undertaking

    Production was stalled as the company barricaded various entrances to prohibit entry of those whorefused to sign the 'good conduct bond'.

  • 8/13/2019 Ns - Maruti Manesar

    9/23

    PROBLEM : WORKERS VIEW POINT

    9

    If the floor supervisor is rude and even slaps us, he

    is awarded with a promotion but in case a labourerdares to reply, he is issued a notice on grounds ofdisciplinary action," said Rajender Kumar, atechnician

  • 8/13/2019 Ns - Maruti Manesar

    10/23

    CONT.

    10

    Cockroaches and dead flies found in the food in the hurried lunch- break that workers earn in the canteen km from the workingstation.

    The tea was without tea leaves or sugar in the 7 minute breakThe company doctor give heavy doses of instant medicines evenon minor complaint so that disruption of work could be prevented.One day s wage cut of Rs.1500, two days Rs.2200, three days cut ofRs.7-8000 is implemented, so that almost the total month s wageis cut.

    One second late into punching-card entry is a day s wage cut, butthey have to give full production for that day too. Forced to fill an undertaking form, which means that in case ofany problem, workers cannot raise any objections againstmanagement.

  • 8/13/2019 Ns - Maruti Manesar

    11/23

  • 8/13/2019 Ns - Maruti Manesar

    12/23

    MANAGEMENT VIEW OF PROBLEM

    12

    Unhappy workers have found out a new way todisrupt ongoing work at the plant by creating seriousdefects in quality of the cars, so they would fail thecompulsory vehicle inspection quality test.

  • 8/13/2019 Ns - Maruti Manesar

    13/23

    CONT.

    13

    Workers indulging in deliberate attempts to reduceoutput and are compromising customer interests

    Revenge for the June strike.Refused to sign good conduct form which aims atensuring the production of good quality products.Employees are being charged with sabotage andcausing quality problems in the cars produced.

  • 8/13/2019 Ns - Maruti Manesar

    14/23

    CONT.

    14

    "In the last three days, a series of serious quality problems had beenobserved in the vehicles produced. For example, vehicle door was notproperly clamped leading to doors falling during production, wiringharnesses were found cut in produced vehicle, dents were noticed onthe body and critical components were not fitted on to vehicles. Suchdeliberate acts, if not detected during quality checks, would have led toserious implications and directly harmed customers," a senior companyofficial said.

  • 8/13/2019 Ns - Maruti Manesar

    15/23

    SITUATION ANALYSIS

    15

    Uninteresting nature of work..

    Political nature of unions..

    Poor wages.

    Occupational instability.

    Poor behavioural climate

  • 8/13/2019 Ns - Maruti Manesar

    16/23

    ACTION TAKEN AGAINST EMPLOYEES

    16

    Suspension of 10 workersDismissal of fiveDiscontinued the services of six trainees.

    Also suspended four workers for "instigatingindiscipline" a week before Another four suspended in late July for manhandlingsupervisors.Charges of sabotage and causing quality problems in

    the cars produced.On 14th August; police force of 500 sent to occupy thefactory to prevent violent activities

  • 8/13/2019 Ns - Maruti Manesar

    17/23

  • 8/13/2019 Ns - Maruti Manesar

    18/23

    Facts of Case

    18

    June 1) 13-days strike demanding the recognition of the MSEU at the Manesar plant2) Production loss of 12,600 cars, valued at about Rs 630 crore.

    July 1) Production stopped for a day at the same plant because of strike by some

    workers.

    August 1) Reported 12.74 per cent fall in sales for August to 91,442 as compared

    to the sale of 1,04,791 units in the same month last year

    September 71) Loss suffered is estimated at about 8,550 units, valued at about Rs 425 crore.

  • 8/13/2019 Ns - Maruti Manesar

    19/23

    Confirmed by company s spokesperson 19

    Production stopped at ManesarThird production halt in three months at Manesar.The company stopped operations for 10 working days in JuneThe firm lost Rs 425 crore because of the strike.

  • 8/13/2019 Ns - Maruti Manesar

    20/23

    According to Chairman R.C. Bhargava20

    Manesar labour problem is essentially a political issue and not aproblem which involves any significant demand from the workers

  • 8/13/2019 Ns - Maruti Manesar

    21/23

    Solution21

    Identify reasons of the conflict.1. Establishment of separate union for Manesar Plant2. Code of Conduct- Falling standards of manufacturing.3. Basic sanitary enhancements demanded by the workforce.

  • 8/13/2019 Ns - Maruti Manesar

    22/23

    Trade Union Establishment22

    Trade union would be established with prior conditions: -1. Members of the trade union to be nominated with consent of both

    workers and management.2. The leader of this union would be appointed by the management.