nrc drop-in visit · 2012. 11. 30. · - white finding for ia dg pending" component design...

17
NRC Drop-in Visit August 31, 2006 Mayo Shattuck, CEO, Constellation Energy Michael Wallace, President, Constellation Generation Group The way energy works$: I1 ,

Upload: others

Post on 25-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

NRC Drop-in Visit

August 31, 2006

Mayo Shattuck, CEO, Constellation EnergyMichael Wallace, President, Constellation Generation Group

The way energy works$:

I1 ,

Page 2: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

"-~ ~

Agenda

* CEG/CGG Overview- Constellation nuclear plants- Regulatory and Licensing issues

(existing plants)* New Nuclear

- UniStar Nuclear- Regulatory and Licensing issues

(new plants)

2

Page 3: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

ý T *,••j• : .:• V, "".

Constellation Energy: An Overview

Constellation Energy(NYSE: CEG)

Competitive Supply I I Generation IRegulated TransmissionlDistribution

De-Reggulated Regulated

* Innovative customer-centric business model focused oncompetitive energy marketplace

* Largest Wholesale Competitive Supplier of electricity in theU.S.

* Largest competitive supplier of electricity to large commercialand industrial customers in the U.S.

" Parent company of Baltimore Gas and Electric (BGE) - oldestgas utility in the U.S. (~186 years)

* 8th largest nuclear power plant owner in the U.S. (3rd largestpost-FPL merger)

3

Page 4: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

Constellation Generation

" Diverse fuel mix totaling 11,856megawatts- Nuclear, coal, oil, natural gas, waste

coal, geothermal, biomass, solar,hydro, and municipal solid waste

* Expertise:

Nuclear power plants, natural gassteam plants, combustion turbinesand QF/IPP facilities

" Strong at managing partnerships andoperating partnership plants

" Fuel processing and managementcapabilities

4

Page 5: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

II Constellation Generation Group Asset Portfolio(11,856 MW as of December 2005)

7r

16 MW, Hydr..

Sods Lake (OF)

7 MW, Geothe¶ ai

*IR°cklin (PF)12 ,iomass

*Chlnese Station (OF)10 MW, Biomass

A6 Mammoth Lakes G-1,2,3 (OF)15 MW, Geothermal

'*•Fresno (F12 MW,BasS

Pogo 01(F}

17 MW, o.M Coa lfJasmln ((iF * ESllVV1716 MW F Coa ,SEGSIV, Y.IA(QF),

8 MW, SolerHIg esrt830 Ce GCombined Cycle, Gas

I

~ I'2

Sunyslde (OF)26IVNCWaste Coal

Rio Nogales'800 MW

Combined CYcl!

tates' Electric Retail Access Status Legen,

[I Restructuring Active

m Restructuring Delayed

m-Restructuring Suspended

m Restructuring Not Active

Restructuring Repealed

Source: EEl Website5

Page 6: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

Calvert Cliffs

" ROP- Currently in Licensee Response Band- White Finding for IA DG pending

" Component Design Basis Inspection- Completed 7/06 - 8/06- No findings

" Containment sump modification- U2 Spring '07; U1 Spring '08- Changed from active to passive design

6

Page 7: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

~- -~w--

Calvert Cliffs

• INPO- Rating

- Index" Unit 1: 93.8%" Unit 2: 94.4%

- Plant Evaluation scheduled Oct. '06- Technical Training Programs Accreditation Board

scheduled Feb. '07

7

Page 8: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

Calvert Cliffs

* Business Plan

- Capacity Factor

" Unit 1: 75.3%

* Unit 2: 99.2%

- Forced Loss Rate: 0.15%

- RFO duration (Unit 1): 49 days

- OSHA Recordable Rate: 0.19

- Site staffing study implementation: target 821

8

Page 9: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

Nine Mile Point

eROP- CurrentLy in Licensee Response Band

" Triennial Fire Inspection- CompLeted 6/06- No findings

" Component Design Basis Inspection- ScheduLed 9/06 - 10/06

* License renewal on-track for Oct. '06 issuance" WiLL need dry fuel storage project by 2011

9

Page 10: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

Nine Mile Point

• INPO- Rating

- Index* Unit 1:84.9

--Unit 2: 98.7- Plant Evaluation scheduled Oct.-Nov. '06

- Technical Training Programs Accreditation Boardscheduled Feb. '07

10

Page 11: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

Nine Mile Point

• Business Plan

- Capacity Factor

" Unit 1: 97.2%

* Unit 2: 83.3%- Forced Loss Rate: 1.41%

- RFO duration (Unit 2): 25 days

- OSHA Recordable Rate: 0.0- Site staffing study implementation: target 917- Successful negotiation of new 5 year contract with IBEW

11

Page 12: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

Ginna

•ROP

- Currently in Licensee Response Band" Triennial Fire Inspection

- Completed 6/06- One finding of low significance (Green)

" Extended power uprate approved 7/06• Containment sump modification

- Extension request to Spring '08 submitted- Changed from active to passive design

" Will need dry fuel storage project by 2010

12

Page 13: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

Ginna

* INPO

- Rating

- Index

U 99.7- Operations & Engineering Programs Accreditation

scheduled 1st quarter '07

13

Page 14: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

i

- . 0 gy$

Ginna

• Business Plan- Capacity Factor: 99.38%- Forced Loss Rate: 0%- RFO: scheduled start October 8- OSHA Recordable Rate: 0.36- Site staffing study implementation: at 426

14

Page 15: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

Regulatory Stability is Needed

• Security- Focus on solid implementation of existing Orders- Leverage off DHS incident response- Focus on State relationships as 9/11

officeincumbents leave

* Other areas- PWR Sump

- Digital IEtC

15

Page 16: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

New Nuclear: UniStar

• Constellation Energy and AREVA have formed UniStar NuclearDeployment of at least 4 U.S. EPR'sTeamed with Bechtel as the architect, engineer and constructor of thefleet

* Objective: Deploy a fleet of at least four identical U.S. EPRs throughproject companies

- Standardization of fleet yields efficiencies in project cost, licensing, andoperationsProjects jointly developed with Constellation EnergyConstellation Energy and its partners will form "UniStar Nuclear

Operating Company" to act as licensee and operator for the fleet- AREVA is Prime Contractor for project companies- Bechtel is AREVA's Constructor / Architect Engineer

UniStarNUCLEAR 16

Page 17: NRC Drop-in Visit · 2012. 11. 30. · - White Finding for IA DG pending" Component Design Basis Inspection - Completed 7/06 -8/06-No findings" Containment sump modification - U2

Regulatory Stability for New Nuclear is Critical

* Keys to Success- Design Centered Approach

n Facilitates maximum standardizationa Allows effective utilization of resources

- Minimize new rules and ensure timely" Provides regulatory certainty" Reduces burden on NRC staff" Minimizes COL application rework

- Use of policy guidance with NRC Sr. Mgmt. oversight* Provides clear and expeditious review process

UniStarNUCLEAR 17