Introduction

The A52 is the key east-west link across the East Midlands. The route is subject to congestion at its junctions due to capacity issues, resulting in significant queuing and delays. Several junctions have been identified as requiring improvements to cope with the existing problems, as well as to provide capacity for the increase in traffic anticipated when the local developments are completed.

The A52 Nottingham Junctions scheme, announced in the Autumn Statement 2014 and included in the government’s first Road Investment Strategy (RIS1), consists of a 2-phase package of measures to improve the junctions along the length of the A52 in Nottingham, including signalisation and junction reconstruction.

The first phase will address the eastern junctions, from Gamston to Bingham Road, and the second phase will address the western junctions, from QMC Island to Wheatcroft. We plan to start work on 2 of the eastern junctions in January 2017.

The junctions that form the A52 Nottingham Junctions scheme

Key

Eastern junctions (Gamston to Bingham Road junction)

Western junctions (QMC Island to Wheatcroft)

West Bridgford

WilfordBeeston

University ofNottingham

Ruddington

Clipston

Gamston Bassingfield

Saxondale

Radcliffeon Trent

EdwaltonTollerton

Clifton

Nottingham

A52

A60

A52

A52

A52

A52

A46

N

HolmePierrepont

The junctions that form the eastern junctions phase of the A52 Nottingham Junctions scheme

Key

Construction starts in early January 2017 and lasts for approximately 13 weeks

Construction programmed for 2017/2018

Scheme objectives

By improving these junctions, we aim to:

Reduce queuing and delays.

Ease congestion by increasing capacity at the junctions.

Ensure journey times are more reliable.

Improve pedestrian and cycle routes at the junctions.

Make the road safer for all users.

Harlequin

SpellowFarm

HolmeLane

Gamston

Bassingfield

Saxondale

UpperSaxondale

HolmePierrepont

NottinghamAirport

A52

A52

A52

A52

A46

N

Radcliffeon Trent

Colwick

Stragglethorpe

Starting construction in January 2017

We plan to start construction on the Nottingham Road junction – also known as the RSPCA junction – and the Cropwell Road junction in early January 2017.

Nottingham Road junction proposalTo upgrade the Nottingham Road junction, we will be installing new traffic signals on all approaches to the junction, which will be programmed to improve the flow of traffic.

The road will be widened on the north side of the junction and a new lane will be added. This will allow drivers to make a u-turn movement, which is being removed from Stragglethorpe junction.

We will make improvements to the existing pedestrian crossing point on Nottingham Road and provide a new pedestrian crossing point on the A52. We will also provide a new footpath on the southern side of the junction to connect to the public rights of way network, and a new 3 metre wide footpath on the northern side to replace the existing footpath that is removed as part of the works.

We will upgrade the existing drainage system, provide new street lighting and road signs, resurface the road and renew road markings. The resurfacing work will extend from the railway bridge (on the A52 western side) through to Lees Barn Road (on the eastern side). This combines resurfacing required as part of the junction scheme with longer term highway maintenance work on the A52.

Proposed layout at A52/Nottingham Road junction

IC

TSC

RS

RS

LP

RS

RS

IC

CTV

AVSV

FH

BT

IC

KO

IC

GU

KO

LP

LP

LP

LP

LP

LP

LP

TL

TL

RS

RS

TSC

RS

SI

BOL

BOL

BOL

BOL

KO

KO

TSC

ICIC

TSC

TSC

IC

FP

FP

FP

FP

FP

FP

FP

ICIC

IC

BT

CTV

SVIC

Gas Mkr

EB

IC

TSC

BOL

BOL

RS

RS

RS

RS

LP

SI

TL

TL

TL

TL

TL

TLTL

TL

TL

TL

TL

LP

LP

RS

LP

TP

GP

IC

IC

GU

GU

CCTV

RS

LP

TSC

TSC

GU

GU

GU

GU

IC

BT

TSC

GU

GU

TSC

TSC

ICGU

GU

TSC

TSC

TSC

TSC

BT

TSC GU

GU

LP

LP

LP

LP

BOL

RS

RS LP

BT

GU

GU

SV

LP

TP

CCTV

LP

LP

GU

RS

A52NR4

A52N

R5

Lowest O

verhead Electric Cables

Lowest O

verhead Electric Cables

Ove

rhea

d Te

leco

m W

ires

Top of TCB Barrier

Top of TCB Barrier

Top of TCB Barrier

Top of TCB Barrier

RS

RS

RS

RS

RS

RS

RS

Steps

Loop

s

Traffic Loops

Traffic Loops

Top of TCB Barrier

Grass

Grass

GrassDitch

Ditch

Ditch

Ditch

Grass

Grass

Grass

Grass

Private Entrance

Wall

Stream (Not Shown)

Culvert Under Road

Stream (Not Shown)

Grass

Grass

Grass

Grass

Footway / Cycleway

Footway / Cycleway

Grass

Grass

Grass

Grass

W/M Fence

Gat

e

Gate

P/R Fence

P/R Fence

Loops

Loop

s

Traffic Loops

Anti-Skid

Anti-Skid

Ditch

Ditch

Ditch

Stream Wall

SIGNALS ATJUNCTION

WIDENED

RSPCA ANIMALSHELTER

A52A52

A52

NOTTINGHAM ROAD

A52

A52

New signalisedpedestrian crossings

Widenedcarriageway

Widenedcarriageway

RSPCAanimal shelter

New lane to allowu-turn movement

New footpath

Nottingham Road

New trafficsignals at junction

New trafficsignals at junction

Signalisedpedestriancrossings

New trafficsignals at junction

N

Key

Traffic island

Footpath

Proposed layout at A52/Cropwell Road junction

Cropwell Road junction proposalTo upgrade the Cropwell Road junction, we will be installing new traffic signals on all approaches to the junction, which will be programmed to improve the flow of traffic.

The A52 will be widened through the junction in both directions to improve capacity and safety for vehicles making right turns into Cropwell Road.

The existing bus stops will be moved to be on the approaches to the junction instead of on the exits where vehicles will be accelerating.

We will make improvements to the existing crossing points, improving safety for pedestrians. Footpaths will provide safe access to the new bus stop locations. The north side footpath will be widened to 3 metres.

We will upgrade the existing drainage system, provide new street lighting and road signs, resurface the road and renew road markings.

RS

IC

IC

FP

KO

IC

Gas Mkr

IC

KO

IC

IC

CTVFP

FP

GU

BT

GU

GU

FH

GU

LP

LP

LP

LP

LP

CTV

IC

ICSV

SV

FP

FP

IC

IC

IC

CTV

FP

IC BT BT

BT

CTVIC

IC

SV

SV

WO

WO

WOSV

IC

WOSV

SV

SV

FH

MKR

ICSV

SV SV

GU

GV

IC

SV

CTV IC

IC

IC

GU

CTV

IC IC

IC

IC

IC

IC

LP

LP

LP

LP

LP

LP

LP

TL

TL

TL

TL

TL

RS

RS

RS

RS

TL

TL

TL

LP

PO

RS

SNP

SNP

SNP

SNP

BOL

BOL

BOL

BOL

BS

BT

TSC

FP

BT

GU

CTV

FP

IC

IC

LP

LP

LP

LP

LP

BS

LP

IC

GU

IC

CTV

GU

LP

RS

RS

LP

RS

RS

CTV

TSC

BT

GU

GU

MH

IC

BT

SNP

MH

SV

GU

IC

IC

CTV

GU

GU

IC

SV

MH

IC

KO

IC

IC

CTV

CTV

FH

SV

LP

LP

LP

LP

TP

TP

RS

IC

SV

CTVCTV

KO

KO

SV

IC

IC

BT

BT

KO

SV

EC

SV

IC

SV

SV

CTV

CTV

SV

SV

SVCTV

FP

GV

TP

LP

LP

SNP

PO

PO

TP

Camera

Camera

A52CWJ2

A52CWJ3

A52CWJ1

A52CWJ2A

A52CWJ2B

Bus Shelter

Gas Mkr's

RS

Loops

Loops

Loops

Loops

Loops

Loops

Loops

Loops

Loops

Loops

Loops

Loops

Loop

s

Loops

Loops

Loops

Anti-Skid

Tarmac

Tarmac

Anti-Skid

Ditch

Ditch

Ditch

Ditch

Ditch

Ditch

Ditch

Ditch

Private Building

C/B Fence

C/B Fence

C/B Fence

P/R Fence

Footway

Grass

Grass

Grass

Gate

Footway

Footway

Grass

Drive

way

Drivew

ay

C/B Fence

Grass

Grass

Drivew

ay

Drivew

ay

Grass

Grass

Footway

Footway

Grass

P/R Fence

Drivew

ay

P/R Fence

Wall

Footway

Drivew

ay

Footway

Grass

Grass

Gra

ss

Grass

Grass

Grass

Grass

Grass

P/W Fen

ce

P/W Fen

ce

Tarmac Entrance

GateAllo

tmen

ts

Palisa

de Fen

ce

C/B Fence

C/B Fence

C/B Fence

C/B Fence

Footway

Footway

Wall

Wall

Footway

Footway

Footway

Footway

Footway

Footway

Footway

Footw

ay

Footway

Footway

Grass

Footw

ay

Grass

Grass

Conc

Conc

Driveway

Conc

Grass

Footw

ay

Footway

CROPWELL ROAD

CROPWELL ROAD

A52

A52

BUSSTOP

BUSSTOP

A52

A52

New signalisedpedestriancrossings

Bus stopremoved

Bus stopremoved

Newfootway

New bus stoplocation

Widenedcarriageway

Widenedcarriageway

New trafficsignals atjunction

New bus stoplocation

Cropwell Road

Cropwell Road

N

Key

Traffic island

Footpath

Environment

We have carried out environmental surveys at all junctions, and we have put measures in place to reduce environmental impact:

We will keep hedgerow pruning to a minimum during construction, to help reduce the residents’ view of the works.

We will ensure any noisy work takes place before midnight.

We will use methods to reduce the amount of noise and dust produced during construction.

We will return all grass verges affected by the work to their original condition.

We will ensure that the new street lights match the current lighting so that local residents and nocturnal animals will not be affected by an increase in brightness at night.

Minimising the impact of constructionThe construction of the Nottingham Road and Cropwell Road junctions has been carefully planned to ensure minimal disruption to local residents and members of the public travelling through the junctions. In addition to the environmental measures mentioned above, other measures that will be in place include:

Construction work will mainly take place overnight between 8pm and 6am. Any works carried out during the day will be carefully managed to reduce impact and delay for road users.

School buses will remain unaffected and all public bus services will continue to run. Any temporary bus stop closures or diversions will be advertised by the bus companies.

All turning movements at Nottingham Road junction will be possible during the busy day time hours for the majority of construction.

Some turning movements at Cropwell Road junction will be limited during the works, but clearly signed diversion routes will be in place.

Next steps

Construction will commence at the Nottingham Road and Cropwell Road junctions in early January 2017. Preferred layouts have been developed for Gamston roundabout, Stragglethorpe Road and Bingham Road junctions and construction will begin in 2017/18, subject to funding. Further details on these three junctions are shown below.

The remaining junctions along the A52 Nottingham corridor will be investigated and, where necessary, we will develop options to be assessed.

Eastern junction proposalsGamston roundabout junction

We plan to add additional lanes on the A52 approaches to the roundabout to increase the number of vehicles that can use the junction and to reduce queuing. We also plan to install new traffic signals and lighting on the roundabout, as well as providing new pedestrian crossing across both of the A52 roundabout arms to improve safety for road users.

Stragglethorpe Road junction

We plan to prohibit the existing u-turn movement (from the A52 eastbound carriageway to the A52 westbound carriageway) to help traffic flow better at the junction. Drivers will be able to make this movement at the Nottingham Road junction instead. We will also install new traffic signals and lighting to improve safety.

Bingham Road junction (also known as Harlequin junction)

We plan to add new carriageway to provide new right-turn lanes for vehicles turning into Bingham Road and Carter Avenue. This will improve the flow of traffic on the A52 as drivers will not become stuck behind the right-turning vehicles. Two left turns will be prohibited at the new junction, and road users will be required to use the local road network for alternative routes to their destination. We also plan to improve the pedestrian crossing points and install new traffic signals and lighting to improve safety.

If you need help accessing this or any other Highways England information,please call 0300 123 5000 and we will help you.

© Crown copyright 2016.You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence: visit www.nationalarchives.gov.uk/doc/open-government-licence/write to the Information Policy Team, The National Archives, Kew, London TW9 4DU,or email [email protected].

This document is also available on our website at www.highways.gov.uk

If you have any enquiries about this publication email [email protected] or call 0300 123 5000*. Please quote the Highways England publications code PR139/16.

Highways England Creative job number M160322

*Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count towards any inclusive minutes in the same way as 01 and 02 calls. These rules apply to calls from any type of line including mobile, BT, other fixed line or payphone. Calls may be recorded or monitored.Printed on paper from well-managed forests and other controlled sources.

Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZHighways England Company Limited registered in England and Wales number 09346363

Further information

Website: www.highways.gov.uk/roads/road-projects/a52-nottingham-junctions Email: [email protected]: @HighwaysEMIDSPost: A52 Nottingham Junctions Team, Highways England Major Projects, The Cube, 199 Wharfside Street, Birmingham, B1 1RN