notice of project western university facilities management

10
Notice of Project Western University Facilities Management Customer Service Centre 519-661-3304 ([email protected]) Project Number: Project Name: Asbestos Type 3 Type 2 Type 1 Contractor In House Team Other Shutdowns/Interruptions(Approximate Schedule): Electrical Power Domestic Water Steam Hot Water Heating Chilled Water Elevators Fire Alarms Roads / Lots ITS Other Issued By: Miniature Attached Date/Schedule: Contractor: Attached To Follow Special Conditions ( Noise, Odors, Asbestos, Etc.) Comments: Date: Date: Date: Date: Date: Date: Date: Date: Date: Date: Date: Date: Areas/Rooms Affected, Alternate Route/Service: Description/Reason for Project: Service to be interrupted: Building(s) Affected: Information Sheet Sent To Client #1 #3 #2 #4 #1 #2 #3 #4 Phone # Cell # Client Contact: Phone # Designer Consultant: Emergency Phone List: (to CCPS Only) Project Manager/ Co-ordinator: Signature/ Stamp: Cell # Note: Signature/ Stamp: Time: Dave Ostrom 9C4304 Perth Drive Traffic Signals and Street Lighting Print Form Submit by E-mail 5/5/14 to 8/30/14 Southwold Deversified Wayne Kennedy This contractor will have heavy equipment on site throughout the project. Work area protection measures will be in affect during time when heavy equipment poses a risk to the public. The public must obey the contractors signs, fencing/guarding and in some cases flagmen in place in order to remain safe during this work. TBA As Required Feb 27, 2013 Feb 27, 2014 The area of work is predominately exterior work and will affect pedestrian and vehicular traffic throughout the area of work. Traffic and pedestrian control measures will be in place and provided by the Contractor. Please observe signs and barriers placed on site to direct both pedestrian and vehicular traffic as a component of the Contractors Work Area Protection Measures. This project will replace the existing Crosswalk on Perth Drive at Visual Arts with new traffic signals located at the laneway between Visual Arts and North Campus Building. The project will also remove and replace the roadway light on Perth Drive south from these traffic to the next set of traffic signals on Perth Drive. Pathway lights adjacent to the road will also be replaced. Temp. lane restrictions ( Obey Road Signs and Flagmen ) North Campus Building Temp sidewalk restrictions for work area protection 88745 519-606-3548 N/A N/A N/A Dave Ostrom +1 (519) 640-9191 7 am to 5 pm daily. Delaware Hall Residence, Staging Building Visual Arts Centre Middlesex College

Upload: others

Post on 20-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Notice of Project Western University

Facilities ManagementCustomer Service Centre 519-661-3304 ([email protected])

Project Number:

Project Name:

Asbestos Type 3 Type 2 Type 1 Contractor In House Team Other

Shutdowns/Interruptions(Approximate Schedule):Electrical Power Domestic Water Steam Hot Water Heating

Chilled Water

Elevators

Fire Alarms

Roads / Lots

ITS Other

Issued By:

Miniature Attached Date/Schedule:

Contractor:

Attached To Follow

Special Conditions ( Noise, Odors, Asbestos, Etc.)

Comments:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Areas/Rooms Affected, Alternate Route/Service:

Description/Reason for Project:

Service to be interrupted:

Building(s) Affected:

Information Sheet Sent To Client

#1

#3

#2

#4

#1 #2

#3 #4

Phone # Cell #

Client Contact: Phone #

Designer Consultant:

Emergency Phone List: (to CCPS Only)

Project Manager/ Co-ordinator:

Signature/ Stamp:

Cell #

Note:

Signature/ Stamp:

Time:

Dave Ostrom

9C4304

Perth Drive Traffic Signals and Street Lighting

Print FormSubmit by E-mail

5/5/14 to 8/30/14

Southwold Deversified Wayne Kennedy

This contractor will have heavy equipment on site throughout the project. Work area protection measures will be in affect during time when heavy equipment poses a risk to the public. The public must obey the contractors signs, fencing/guarding and in some cases flagmen in place in order to remain safe during this work.

TBA

As Required

Feb 27, 2013

Feb 27, 2014

The area of work is predominately exterior work and will affect pedestrian and vehicular traffic throughout the area of work. Traffic and pedestrian control measures will be in place and provided by the Contractor. Please observe signs and barriers placed on site to direct both pedestrian and vehicular traffic as a component of the Contractors Work Area Protection Measures.

This project will replace the existing Crosswalk on Perth Drive at Visual Arts with new traffic signals located at the laneway between Visual Arts and North Campus Building. The project will also remove and replace the roadway light on Perth Drive south from these traffic to the next set of traffic signals on Perth Drive. Pathway lights adjacent to the road will also be replaced.

Temp. lane restrictions ( Obey Road Signs and Flagmen )

North Campus Building

Temp sidewalk restrictions for work area protection

88745 519-606-3548

N/A N/A

N/A

Dave Ostrom

+1 (519) 640-9191

7 am to 5 pm daily.

Delaware Hall Residence, Staging Building Visual Arts Centre

Middlesex College

amerucci
Approved