Sub:ChangeinspecificationofMultistageCentrifugalpumpwithmotorfortheprojectHFCV/BARC/12
Reg: ItemswithtagNos:P1HFTF01
P2HFTF01
M1HFTF
01
M2HFTF01
TheSpecificationofmultistagecentrifugalpumpwithmotorhasbeenrevisedasfollows.
Specification RevisedValue originalValue
MaximumFlowRate 60m3/hr 70m3/hr
MaximumHead 75bar 80bar
Thedetailedrevisedspecificationisattachedherewith(Encl1).
ThesechangeshavebeenapprovedbyBARC.Therelevantcommunicationdocumentsalsoattached
(Encl2).
MPRforthisitemwasalreadyissuedbasedonanearlierdesignrevision.Thedetailsareasfollows.
MPRNo:139
MPRDate:04.09.2012
ItisintendedtorefloatthisMPRformultistagecentrifugalpumpbyamendingitwithrevised
specification.
DirectormaykindlyapprovetorefloattheMPRwithnecessarychanges.
JameshBabuM,JE Dr.SRammohan,CRE
Director
Encl1:DetailedSpecificationforMultistageCentrifugalpumpwithMotor
Encl2:CopiesofrelevantemailCommunicationheldwithBARC
-
8/12/2019 Note to Revise Spec
2/6
(Encl1)Sl No
TAG number : P1-HFTF-01 &P2-HFTF-01
Type : Multi Stage Centrifugal Pump
Shaft Orientation : Horizontal
Head developed by the pump/ shut off head: To be specified
Flow at maximum required pressure : 60 m3/hr
Operating flow and pressure range : 60 m3/hr and 75 bar
Temperature : 80C
Fluid medium : DM Water
Speed : 3000 rpm
Sealing : Gland Packing
Details for gland packing and other s tatic seals : To be provided
Noise level : Noise Level Less than 85 dB
Lubricating system for the pump : To be specified
Details of base plate, foundation requirements and anchoring : To be provided
Details of suction and NPSH : Flooded suction
Hydraulic performance Acceptance tests1:
Hydrostatic test :
Dynamic balance test :
Set of special erecting and commissioning tools : To be specified
Nominal Suction Size : 2 (65 mm) #150(ANSI B16.5)
Nominal Delivery Size : 2 (50 mm) #600(ANSI B16.5)
Casing :
Impeller :
Diffuser :
Acoustic enclosures : If required
Name plate : As per the tag number Specified
START-UP SPARES :
List and Quantity to be specified separately
for 1 year operation
Electric motor: Tag No.(M1-HFTF-01 & M2-HFTF-01)
Type : 3Induction motor
Power : 250kW (or suitable for above pump)
Voltage : 415 10V
Frequency: 50Hz
Insulation : Class F
Number of poles : 2
Full load speed: 3000rpm
Mounting : Horizontal foot mounting
1: Tests will be witnessed by FCRI or its representatives
Item description
Testing and Supply of Pump with Motor:
1
ASTM A351 CF8 /CF8M or equivalent
Spares
Note: Complete catalogue, brochures and technical specifications has to be specified and supplied alongwith each items.
Please Quote seperately for each items
Required as per ISO 9906 or ANSI/HI 14.6
or any other relevant standards
MOC : (SS304/SS316)
-
8/12/2019 Note to Revise Spec
3/6
From: Ram Mohan S
To: jamesh Babu M
Subject: Fwd: RE: HFCV - Main pump procurement = reg.
Date: 13 March 2014 14:53:56
Regards,
Dr. Rammohan S,
Fluid Control Research Institute,
Kanjikode West, Palakkad - 678623
0491-2566120/206/ extn. 1119 ; 09446346850
9446346850Rammohan13-03-2014
--- Original message follows ---
Subject: RE: HFCV - Main pump procurement = reg.From: "N L SONI"
To: "'Ram Mohan S'"
CC: "[email protected]"
Date: 13-03-2014 15:34
DEAR SHRI RAMMOHAN S.,
A MEETING WAS HELD TODAY AT BARC AND ACCEPTED YOUR PROPOSAL FOR TWO MAIN
PUMPS OF HFTF. FORMAL LETTERS FOLLOWS.
N.L. SONIHEAD, FLUID POWER & TRIBOLOGY SECTION,
BHABHA ATOMIC RESEARCH CENTRE,
R.T.D., HALL-3, TROMBAY, MUMBAI, 400085, INDIA
PHONE (0) 022 25593980
PHONE (RES) 022 64522965
MOBILE 09224293690
FAX - 022 25505151
E MAIL - [email protected];[email protected]
From:Ram Mohan S [mailto:[email protected]]Sent:Thursday, March 06, 2014 11:35 AMTo:N L SONICc:[email protected]:Fwd: HFCV - Main pump procurement = reg.
4
--- Original message follows ---
Subject: HFCV - Main pump procurement = reg.
From: Ram Mohan S
To: "N L SONI"
(Encl 2)
mailto:[email protected]:[email protected]:[email protected]:[email protected] -
8/12/2019 Note to Revise Spec
4/6
CC: "[email protected]" , "customer care"
Date: 05-03-2014 9:29
sir,
Please find attached request for changing the operating paramter specification ofthe Main pump of HFTF.
Kindly inform your consent at the earliest.
Regards,
Dr. Rammohan S,
Fluid Control Research Institute,
Kanjikode West, Palakkad - 6786230491-2566120/206/ extn. 1119 ; 09446346850
9446346850Rammohan05-03-2014
(Encl 2)
-
8/12/2019 Note to Revise Spec
5/6
FCRI/BARC/HFCV SRM/Shri. N. L. Son i,Head, Fluid Power & Tribology Section,Bhabha Atomic Research Centre,R.T.D., Hall-3, Trombay, Mumbai, 400085, India
Sub. Main Pump specification - HFTFIn the HFTF facility two pumps connected in parallel, provide the required flow at the operatingpressure. A booster pump is also provided at the inlet of the main pumps. The booster pump is providedwith a flow rate of 140 m3/h at 3 bar pressure. The Main pump generate the required flow and_pressurefor the smooth operation of the loop during testing. The maximum pressure and flow rate requirements for HFCV, for flow capacity testsas per theprocedures are 62.9 bar@ 22m3/hand 110m3/h @ 58.7 bar(for both valves together). The permanentpressure drop due to all components other than HFCV, CVl & CV2 at rated flow is less than2 bar (ref:Design Basis Report-High Pressure High Flow Test Facility HFTF) Rev 14.). The control valves CV2 andCVl are provided to create the required pressure at the upstream of the HFCV under test.Considering these factors, two identical pumps having a delivery pressure of 70bar@60m3/h shouldsuffice the test requirement. As per the specification approved by BARC, the pressure and flowrequirements of the pumps are 75 bar@ 70m3/hTwo separate attempts were made to procure pumps with the above specification (75 bar.@ 70m3/h).Unfortunately only one party has quoted with the above specification with all wetted parts in Stainlesssteel with a delivery time of 7 months as these pumps are not in their standard range.It is requested that the operating parameters of the pumps may be modified as 60m3/h @ 75 barinstead of 7Sm 3/h @75 bar. All these pumps have a delivery period exceeding 5 months as they are notstandard models.The HQ curve of the second party quoted for both the above tenders is also attached here with. Thispump can develop 60m3/h @ 75 bar. This can develop 70m3h @ 72 bar (please refer attached pumpcurve) and will operate at best efficiency point BEP). Also the Booster pump is capable of delivering 3bar line pressure. Thus testing of an HFCV can be done with a single pump itself as anticipated in theMOU.It is requested that you may consider the above case and intimate the modification in the pumpspecification so as to proceed with tendering with modified specifications.~r. Rammohan S -Chief Research Engineer.
M MT SYS.RvAC49