note: this rdp 2017-2022 midterm update chapter is still...
TRANSCRIPT
Note: This RDP 2017-2022 Midterm Update Chapter is still preliminary and subject to further review and RDC approval. This draft is NOT official and no part of this document may be cited or quoted. This is being circulated for public consultation purposes.
1
1
Note: This RDP 2017-2022 Midterm Update Chapter is still preliminary and subject to further review and RDC approval. This draft is NOT official and no part of this document may be cited or quoted. This is being circulated for public consultation purposes.
2
2
Note: This RDP 2017-2022 Midterm Update Chapter is still preliminary and subject to further review and RDC approval. This draft is NOT official and no part of this document may be cited or quoted. This is being circulated for public consultation purposes.
3
Chapter 19 3
4
Accelerating Infrastructure 5
Development 6
7
In order to achieve the national goal of inclusive growth, accelerated and strategic infrastructure 8
development will be pursued. The Region will implement infrastructure projects in transportation, 9
flood control, water resources, power and energy, social welfare, and information and communication 10
technology. These infrastructures aim to support economic development, safe environment, and 11
mobility of people, goods and services. 12
13
Assessment and Challenges 14
15
Land Transport 16
17
Roads and Bridges 18
19
The national road in CALABARZON increased by 25.2 kilometers from 2016 to 2018. As of June 2018, 20
the total national road length in the region is 2,542.32 kilometers. The increase in road length was 21
attributed to the newly completed and converted national roads. Quezon has the longest length of 22
national roads constructed as it has the biggest land area. No new additional road was constructed in 23
2017 because DPWH focused on its road widening projects. 24
25
As of 2018, a total of 52.77 kilometers of road are undergoing road conversion based from the online 26
2018 DPWH Atlas. The completed roads awaiting conversion are the Tiaong Bypass Road and 27
Candelaria Bypass Road in Quezon. Ongoing bypass and diversion roads that are being constructed 28
are the Lipa City-Padre Garcia Diversion Road, Batangas City-San Pascual-Bauan Bypass Road, Sta. 29
Rosa Tagaytay-Ulat Bypass Road, Alaminos-San Pablo City Bypass Road, Sariaya Bypass Road among 30
others. These projects are expected to decongest the existing roads and improve interconnectivity in 31
the region. A map of the existing national road network is shown in Figure 19.1. 32
33
Existing national roads in priority corridors were continuously widened in order to increase vehicle 34
capacity and decongest the urban centers. From 2016 to 2018, a total of 47.88 kilometers of priority 35
national roads were widened. But in spite of these improvements, increased vehicle capacity has yet to 36
be realized due to obstructions along the RROW. Only 50.48 percent of the national roads are in good 37
condition as of 2018 (Table 19.2). The targets for national roads in good condition for 2017 and 2018 38
Note: This RDP 2017-2022 Midterm Update Chapter is still preliminary and subject to further review and RDC approval. This draft is NOT official and no part of this document may be cited or quoted. This is being circulated for public consultation purposes.
4
were not met as the budgets for some road rehabilitation projects was not included in the GAA 39
of 2018. 40
Another issue observed in the Region is the lack of a road plan for congressional districts making 41
prioritization of budgets more difficult. 42
43
Table 19.1 National Road Length Increased, By Province, Calabarzon, 2018 44 PROVINCE 2016 TOTAL LENGTH (KM) 2018 TOTAL LENGTH (KM) INCREASE
Cavite 438.84 438.84 -
Laguna 349.49 349.49 -
Batangas 536.39 555.48 -
Rizal 232.57 232.49 -
Quezon 941.00 966.02 25.2
Calabarzon 2,517.30 2,542.32 25.2
Source: DPWH IV-A 45
46
Table 19.2 National Road Condition, Calabarzon, 2018 47 CONDITION LENGTH (IN KM)
Good 1,283.42 km (50.48%)
Fair 632.73 km (24.89%)
Poor 209.46 km (8.24%)
Bad 74.72 km (2.94%)
No assessment 342.00 km (13.45%)
Source: DPWH IV-A 48
49
Figure 19.1 Calabarzon National Road Network 2017 50
51 Source: DPWH 52
53
Note: This RDP 2017-2022 Midterm Update Chapter is still preliminary and subject to further review and RDC approval. This draft is NOT official and no part of this document may be cited or quoted. This is being circulated for public consultation purposes.
5
The length of permanent bridges increased from 18,547 linear meters in 2016 to 18,575.17 l.m. in 2018, 54
while the number of permanent bridges in Calabarzon decreased to 651 in 2018 from 654 in 2017 due 55
to the undergoing rehabilitation of these bridges. 56
57
Expressway 58
59
The total length of expressways or toll roads in the Region is 105.87 kilometers (Table 19.3). The 60
South Luzon Expressway (SLEX) in Metro Manila extends to Calamba City (Toll Road 2) and Sto. 61
Tomas Batangas (Toll Road 3). The Southern Tagalog Arterial Road or STAR Tollway also connects 62
the SLEX in Sto. Tomas, Batangas. The north bound section of the STAR Tollway was completed in 63
May 2015, eight years after the south bound section from Lipa City to Batangas City was opened to 64
traffic in 2007. The Manila-Cavite Expressway or Cavitex and the Muntinlupa-Cavite Expressway 65
(MCX) connect Metro Manila to Cavite. The Cavitex and MCX were opened to traffic in April 2011 66
and July 2015, respectively. 67
68
There are two ongoing expressway projects in the region the SLEX Toll Road 4 (TR4) and the Cavite-69
Laguna Expressway (CALAEX). The SLEX TR4, a four-lane 66.74 kilometers toll road from Sto. Tomas 70
City, Batangas to Mayao, Lucena City, will reduce travel time from 4 hours to 1 hour. That will allow 71
faster travel from Laguna, Batangas and Quezon Provinces, and Bicol Region. On the other hand, the 72
CALAEX is a 4-lane 45.29 kilometers closed-system toll expressway connecting Cavite Expressway 73
(CAVITEX) and SLEX. The project will start from the CAVITEX in Kawit, Cavite and end at the 74
SLEX-Mamplasan interchange in Biñan, Laguna. Both projects are expected to be completed by 2022. 75
76
Both projects are part of the Duterte 77
The Plan envisions a 1,000 km series of expressways connecting the North and South Luzon Provinces. 78
79
Table 19.3 Length of Existing Expressways, Calabarzon, 2016 80 EXPRESSWAY LENGTH (KILOMETERS)
Southern Tagalog Arterial Road 42.00
SLEX Toll Road 2 27.29*
SLEX Toll Road 3 7.60
Manila-Cavite Expressway/Cavitex 24.98
Muntinlupa-Cavite Expressway 4.00*
*including sections in Metro Manila 81 82 83 84 85 86 87 88 89 90 91 92 93
Note: This RDP 2017-2022 Midterm Update Chapter is still preliminary and subject to further review and RDC approval. This draft is NOT official and no part of this document may be cited or quoted. This is being circulated for public consultation purposes.
6
Figure 19.2 Map of Existing and Proposed Calabarzon Expressways 94
95 Source: TRB 96
97
Railway 98
99
The Philippine National Railways (PNR) used to operate a commuter line from Tutuban, Manila to 100
Calamba City and long-haul to Quezon and up to the Bicol Region. The long-haul from Manila to 101
Bicol resumed operation in 2010 after a long time of suspension. However, the operation was again 102
stopped in 2012 due to a damaged bridge in Sariaya, Quezon in 2012. The DOTr is currently 103
preparing a feasibility study for the PNR South Long Haul Project which will be a 592-km railway from 104
Sucat, Parañaque City to Legazpi to Matnog, Sorsogon with a Batangas branch line from Calamba 105
Station going to Batangas Port. For the ongoing project, Figure 19.6 shows the existing railway network 106
and proposed spur line. The DOTr is currently implementing the North South Commuter Railway 107
Project which is a 147 kilometer elevated railway that will run from New Clark City in Capas, Tarlac to 108
Calamba, Laguna, with a total of 36 stations. The construction of the Calabarzon component is 109
expected to start in 2019. 110
111
112
113
114
115
116
117
118
119
0
Figure 19.3 Map of PNR Railway Network 120 121
122 Source: DOTr 123 124 The following are the major challenges in land transportation: 125
126
Traffic congestions along major roads. Road in the cities and urban areas of CALABARZON have 127
exceeded their volume capacities, thus, creating traffic congestions. Mass transportation facilities that 128
can help ease traffic congestion such as the Light Rail Transit Extension in Cavite and PNR South, and 129
the bypass roads in every province are yet to be completed. 130
131
Obstructions on Road Widening Projects. The posts located within the road-right-of-way are traffic 132
hazards and cause delay in road widening projects. Coordination meetings with the DPWH and 133
concerned stakeholders are being undertaken to resolve the issue. Problems on road right-of-way 134
acquisition remained as one of the reasons in project delay. 135
136
Deterioration of road condition (see Table 19.2). Among the causes of road deterioration are water 137
seeping in road pavements and over loading of trucks. Load limits are not monitored due to the non-138
operation of the weighing station in Turbina, Calamba City. Another issue identified was the budget 139
constraints on road maintenance. 140 141
Safety concerns on the roads. Flooded roads are experienced particularly in urban areas. Motorists and 142
commuters also complain the roads that do not have sufficient lightings and signages. 143 144
1
Access to tourist destinations, industrial areas, and agricultural and far-flung areas. While 145
CALABARZON has a relatively high road density, access to tourist destinations, industrial areas and 146
geographically isolated areas is still a concern. The DOT-DPWH Convergence Program, which will 147
improve access to tourist destinations now has 28 projects completed while 11 are still ongoing as of 148
December 2018. These projects improved the accessibility of various tourist spots in the region. For the 149
improvement in access to industries, the DTI in partnership with the DPWH is currently 150
implementing the Roads Leveraging Linkages of Industry and Trade (ROLL-IT). On the other hand, 151
more farm-to-market roads are being requested especially by geographically-isolated and 152
disadvantaged LGUs in CALABARZON. 153
154
Water Transport, Power and Energy (Power Generation and 155
Electrification) and ICT 156
157
Continuous rehabilitation and repair projects in existing ports are being undertaken. Rehabilitation and 158
repair projects in Batangas Port were completed in 2018 to improve port operations and services. 159
Projects include construction of multi-level parking and crane rail extension in Batangas Port Phase I. 160
Repair projects in ports in Quezon included repair of RoRo Terminal Fee Facility in Gate 2 and 161
reblocking of damaged concrete pavement in Port of Lucena City. A new passenger terminal building 162
with modern facilities will be constructed in Batangas Port to cater the increasing number of 163
passengers of the Port. The improved facility will accommodate an estimated of 3,200 to 3,600 people 164
in the passenger lounge. 165
Connectivity improved through utilization of existing ports. The existing ports in Batangas and Quezon 166
Provinces are important transport facilities that connect CALABARZON to island regions of 167
MIMAROPA and Western Visayas. These port facilities are vital mode of transport for tourism, 168
manufacturing and agriculture-based industries. 169
170
In terms of cargo, the combined performance of the two major ports improved from 2016 to 2018, and 171
targets were exceeded. The non-containerized cargo grew by 17 percent while the containerized cargo 172
throughput grew by 105.4 percent from 2016. The containerized cargoes increase by 63.6 percent 173
increase from the previous year brought by the shift in direct shipment from Metro Manila to South 174
Luzon gateway. The increase can also be attributed to bigger ships and higher frequency of vessel trips 175
to Batangas Container Terminal. Batangas Container Terminal recorded a 248,609 TEU containerized 176
cargoes in 2018 from 197,534 TEU recorded in 2017. 177
178
179
180
181
182
183
184
185
2
Table 19.4 Throughput of Batangas and Lucena Ports in 2016, 2017 and 2018 186
187
Indicator
Accomplishment Growth
Rate
(%)
2018
Target
% of
Target
Attained 2016 2017 2018
Non-containerized
cargo throughput
(MT)
25,896,467 28,272,003 30,300,309.41 17.0 28,597,374 106
Containerized
cargoes (TEU) 157,319 197,534 323,135 105.4 189,313 171
Number of
passengers 7,831,396 8,693,410 8,631,540 10.2 8,437,382 102
Number of vessels 47,189 54,574 55,453 17.5 48,989 113
Source: Philippine Ports Authority Port Management Office of Batangas and Marquez 188
189
The number of passengers using Batangas Port and ports in Quezon grew by 11 percent from 2016 to 190
2018, however, this declined by 0.71 percent from 2017 to 2018. The decline in the passenger traffic 191
was the result of the six-month closure of Boracay Island for rehabilitation. Strict implementation of 192
the carrying capacity of the island led to less passengers using the Batangas Port. Since Boracay Island 193
is a 194
195
Furthermore, MARINA, has recently opened and is proposing new routes for passenger vessels and 196
RoRo from the Region. Among the new routes in Calabarzon are the Batangas City San Jose, 197
Occidental Mindoro, San Juan, Batangas Abra de Ilog, Occidental Mindoro, Real, Quezon Polillo 198
Island, Quezon, Lucena, Quezon Odiongan, Romblon, Lucena, Quezon Buyabod, Marinduque, 199
Lucena, Quezon Romblon, Romblon, Lucena, Quezon Masbate City and San Narciso, Quezon 200
San Pascual, Masbate. 201
202
The number of vessels which passed through the ports grew by 15.6 percent from 2016 to 2017, and a 203
moderate growth of 1.61 percent was noted from 2017 to 2018. However, the number of vessels grew at 204
17.5 in 2018 from 2016 which can be attributed to the continuous improvement in the port facilities. 205
206
Early in 2019, the Asian Terminal Inc. inaugurated the expanded berthing facilities in the Batangas 207
capacity to 500,000 TEUs, which is 208
double of its previous capacity. 209
210
On-going rehabilitation of Sangley Airport to decongest NAIA. The Sangley Airport in Cavite, under the 211
Sangley Airport Development Project, has been undergoing rehabilitation since 2018. The 212
rehabilitation is 50.26 percent complete as of June 30, 2019 and is expected to be completed within 213
the year. 214
215
3
Rural electrification remains a challenge. The proportion of sitios served with electric connections to 216
potential sitios increased slightly from 92.53 percent in 2017 to 92.68 percent in 2018. Falling short of 217
the target of energizing 95.58 percent of sitios. The inclement weather and difficulty in reaching 218
remote areas hindered installation of electrical lines. 219
220
In 2017, the reported household electrification level in Region IV-A was at 96.1percent. The decrease 221
in the percentage level from the 96.7 percent in 2016 was attributed to the adoption of the 2015 PSA 222
Census, which has a higher number of households compared to the 2010 PSA Census which was the 223
previous baseline of potential household count. 224
225
On the other hand, the proportion of households with electric connections to potential households 226
increased by 4.86 percent and the target for 2018 was exceeded. The overachievement of the target was 227
attributed to the intensified electrification and cooperation of the provincial and local officials. 228
Table 19.5 Household and sitio electrification in 2016, 2017 and 2018 229
Indicator
Accomplishment Percentage
Difference
2018
Target
% of
Target
Attained 2016 2017 2018
Proportion of sitios with electric
connections against potential sitios
increased (%)
91.86 92.53 92.68 0.82 95.58 -2.9
Proportion of households with electric
connections against potential
households increased (%)
96.7 96.1 100 3.3 97.95 2.05
Source: Department of Energy 230
231
Power sources will increase. CALABARZON contributed 7,605 megawatts in total dependable capacity 232
in 2018 or approximately 50 percent of the 14,973 megawatts of total dependable capacity of the Luzon 233
Grid and off-grid system. The Region is the main contributor in the country's total power generation. 234
An expansion in the coal-fired power plant Pagbilao Unit 3 with a dependable capacity of 420 235
megawatts to the Luzon Grid while the Modular Gas Turbine Units 3 and 4 in Calaca, Batangas will 236
contribute about 2 by 23 megawatts. 237
Slowdown in provision of public internet facilities. Establishment of additional powered-up sites with 238
free Wi-Fi internet access in the Region grew at 110.7 percent from 2016. However, there was a 239
decrease on established powered-up sites in 2018. On the other hand, there was one Point of Presence 240
established in Batangas in 2018. The Points of Presence are essential network elements where 241
equipment that route, store or transmit internet data are housed. 242
243
244
4
Table 19.3 Number of powered-up sites with free Wi-Fi internet access and Pop established in 245
CALABARZON, 2016, 2017 and 2018 246
Indicator 2016 2017 2018 Growth Rate (%)
Number of powered-up sites with free
Wi-Fi internet access 28 75 59 110.7
Number of Point of Presence established 1 1 1 0
Source: Department of Information and Communications Technology Luzon Cluster_2 247
248
Water Resources 249
250
Access to water and availability of water is a primary or necessary condition for economic 251
development. Hence, efficient management of water resources is fundamental to achieve the 252
Sustainable Development Goal of ensuring availability of clean water and sanitation. Access to 253
information, investment in infrastructure and strengthening of policies are necessary to improve 254
management of water resources. 255
256
Irrigation targets not met 257
258
The indicators of irrigation performance are: a) irrigated areas (new, restored and rehabilitated); 259
b) length of canal lining; c) number of structures; d) ratio of actual irrigated area to the total potential 260
area; and e) cropping intensity. 261
262
Irrigation service improved in CALABARZON. The targeted 825 hectares of newly-irrigated areas 263
were achieved in 2017 while 817 hectares or 83 percent have been completed from the 988 hectares 264
target in 2018. In addition, the Matataja Small Impounding Project (SIP) was converted to four SIPs 265
with a total of120 hectares service area. The SIPs are expected to contribute to the 336 hectares of 266
newly-irrigated areas in 2019. Likewise, the targeted restored irrigation area of 279 and 364 hectares in 267
2017 and 2018 were achieved while the remaining 133 from 240 hectares target will be attained by the 268
end of 2019. 269
270
On the other hand, a total of 48.03 and 56.82 kilometers of canal lining were achieved in 2017 and 271
2018, exceeding the targets by 8 and 37 percent, respectively. For 2019, only 2.59 or 3 percent has been 272
attained which is expected to increase by the end of December 2019. 273
274
In addition, 384 units or 68 percent of the 561 units targeted for 2017-2022 were already achieved. The 275
majority or 173 and 196 units were established in 2017 and 2018, respectively. Meanwhile, the 15 units 276
or 5 percent accomplishment in 2019 is expected to increase before the end of the year. 277
278
279
5
Table 19.4 Performance of Irrigated Areas (in hectares), 2016 to 2018 280
Source: NIA 281
282
Ratio of actual irrigated area to total potential irrigable area increased 283
284
The ratio of actual irrigated area increased every year from 2016 to 2019. From 57.36 percent actual 285
accomplishment in 2016, the total potential irrigated area increased to 71.76 percent in 2017, an 286
increase of 14.4 percent. Moreover, the actual irrigated area of 74.15 percent in 2018 and 77.8 percent 287
in 2019 exceeded their targets by 1.96 and 1.87 percentage points, respectively. As a result, cropping 288
intensity increased at an average of 2.4 percent per year from 2016 to 2019. From 147 percent actual 289
accomplishment in 2016, the cropping intensity increased to 151 percent in 2017, 154 percent in 2018 290
and 156 percent by 2019. 291
292
293
294
295
296
297
298
299
300
301
302
303
2016 2017 2018 2019
New Irrigated Areas (ha)
Target N/A 825 988 1,835
Actual 617 825 817 336
Variance N/A 0 -171 -1,499
Restored Irrigated Areas (ha)
Target N/A 279 364 240
Actual 749 279 364 107
Variance N/A 0 0 -133
Length of canal lining (km)
Target N/A 44.27 41.53 96.82
Actual 26.84 48.03 56.82 2.59
Variance N/A 3.76 15.29 -94.23
Number of structures
Target N/A 58 134 313
Actual 109 173 196 15
Variance N/A 115 62 -298
6
Table 19.5 Ratio of actual irrigated area, and cropping intensity, 2016 to 2018 304
2016 2017 2018 2019
Ratio of actual irrigated area to total potential irrigable area increased (% cumulative)
Target N/A 69.09 72.19 75.31
Actual 57.36 71.76 74.15 77.8
Variance N/A 2.67 1.96 2.49
Cropping intensity increased (% cumulative)
Target N/A 148 151 156
Actual 147 151 154 156
Variance N/A 3 3 0
Source: NIA 305
306
Households with access to safe water supply increased 307
308
Households with access to safe water supply increased from 66 percent in 2016 to 95 percent in 2017. 309
However, the 95 percent target for 2018 was not achieved. Similarly, though the proportion of 310
households with access to basic sanitation to total number of households increased from 65 percent in 311
2016 to 77 percent in 2017, the 95 percent target for 2018 was not met. Nonetheless, the overall 312
achievement on access to sanitation and safe water supply improved from 2016 to 2018. This can be 313
attributed to Zero Open Defecation Program of the Department of Health. 314
315
Table 19.6 Access to sanitation and safe water supply, 2016 to 2018 316
2016 2017 2018
Percentage of households with access to safe water supply
Target N/A 95 95
Actual 66 95 91
Variance N/A 0 -4
Proportion of households with access to basic sanitation to total number of households
Target N/A 95 95
Actual 65 77 82
Variance N/A 0 -13
Source: DOH 317
318
Groundwater Management Plans and Monitoring Wells established 319
320
The National Water Resources Board initiated the development of Groundwater Management Plans in 321
groundwater of highly urbanized areas. The Plan provides recommendations to address water 322
constraints and monitor effectiveness of groundwater policies in the area through establishment of 323
groundwater monitoring wells, and serve as basis for protection and conservation efforts. Among the 324
target cities in Calabarzon were Batangas, Cavite, Santa Rosa, Binan, Cabuyao, San Pedro and 325
Calamba. 326
7
The development of the Ground Management Plan for Batangas City was completed as scheduled in 327
2018 while three monitoring wells were already installed in Bacoor, Cavite. 328
329
Delayed Implementation of Water Infrastructure Projects 330
331
Water Supply 332
333
In March 2019, numerous areas in Metro Manila, Cavite and Rizal began experiencing inadequate 334
potable water supply. This can be attributed to limited sources of water coupled with growing demand 335
for potable water. The implementation of the New Centennial Water Source Project (NCWSP) can 336
augment the source for potable water. NCWSP is expected to provide water security, reliability and 337
additional water supply for Metro Manila, and Cavite and Rizal provinces, and reduce pressure and 338
dependency on Angat Dam Reservoir. 339
340
Growing water demand 341
342
The population of CALABARZON is projected to reach 16.7 million by 2025, 2.6 million higher than 343
2015. The increase in population means increase in demand for water. Also, the warming effect of the 344
global climate change increases our water needs for drinking and bathing. Therefore, water resources 345
need to be efficiently managed to satisfy household water demand and support productive economies 346
in agriculture, industry and energy. 347
348
As shown in Table 19.7, MWSS expects increase in water demand in Cavite and Rizal Provinces 349
from 2018 to 2021. 350
351
Table 19.7 Projected Water Supply Demand in Cavite and Rizal Province, 2018-2021 352
Province
Population
2018 2019 2020 2021
Cavite 897,656 1,516,033 1,554,915 1,589,932
Rizal 2,385,471 2,728,120 2,826,388 2,934,553
Source: MWSS 353
354
Social Infrastructure 355
356
By 2023, strategic social infrastructures will be in place. All school buildings will have functional water 357
and electricity connection, while health facilities will be accessible even in far-flung areas in the Region. 358
All of these will be made possible through increased public spending and various convergence projects 359
between private and government sectors. The intensification of the Electrification and the Water, 360
Sanitation and Hygiene in Schools (WINS) program will equip the additional classrooms that will be 361
constructed under the School Building Program. 362
363
364
8
Education 365
366
Additional classrooms are needed. Classroom to pupil ratio improved from its baseline data of 1:42 in 367
2017 to 1:41 in 2018 for primary grades. However, classroom-sharing targets for the same year were 368
not met in both junior and senior high school even for schools that offer shifting classes. The ideal 369
classroom to student ratio of 1:40 is yet to be attained. 370
371
Table 19.8 School Infrastructure and Facilities, Calabarzon, 2016-201 372
373
Note: (-) no data provided 374 Source: DepEd Region IV-A 375 376 Despite increased funding from various convergence projects, construction of additional classrooms 377
was hindered by the lack of land. Other issues identified during project implementation were the 378
shortage of manpower and equipment, unstable soil condition, poor quality of constructed buildings, 379
and contractual concerns. 380
381
The low accomplishment in 2018 for projects funded under the School Building Program also 382
contributed to the non-achievement of the targets, with only four projects completed out of 387. 383
384
INDICATOR BASELINE
2016
ANNUAL PLAN
TARGETS ACCOMPLISHMENT
END OF
PLAN
TARGET 2017 2018 2019 2017 2018 2019
Classroom to pupil ratio improved
a. Kindergarten 1:35 1:30 1:25 1:25 1:25 - - 1:25
b. Primary (Grade 1-
3)
1:45 1:45 1:35 1:35 1:42 1:41 - 1:30
c. Primary (Grade 4-
6)
1:45 1:45 1:45 1:45 1:42 1:41 - 1:40
d. Junior High School 1:35 1:45 1:45 1:45 1:41 1:62 - 1:40
e. Senior High School 1:40 1:40 1:40 1:40 1:41 1:62 - 1:40
Proportion of public schools with adequate water and sanitation facilities to total number of public schools
increased (% cumulative)
a. Primary (K to 6) 74.31 78.58 82.85 87.12 74.31 - - 100
b. Junior High School 66.62 72.19 77.75 83.31 66.62 - - 100
c. Senior High School - - - - 66.62 - - -
Proportion of public schools with connection to electricity to total number of public schools increased (%
cumulative)
a. Primary (K to 6) 95.44 96.2 96.96 97.72 95.44 98.33 - -
b. Junior High School 95.44 96.2 96.96 97.72 95.44 98.15 - -
c. Senior High School - - 99.56 99.65 95.44 99.56 - -
9
Table 19.9 No. of Schools and Classrooms under School Building Program, 2017-2018 385
PARTICULARS 2017 2018
Schools Classrooms Schools Classrooms
Targets 1,412 7,698 387 2,855
No. Of Projects
Completed 876 2,913 4 28
Ongoing 527 4,770 353 2,634
NYS /Procurement 100 580 24 193
Accomplishment (%) 62.04 37.84 1.03 0.98
Source: DepEd Region IV-A 386
387
(For verification w/ DOH in Dec. 2) 388
Health 389
390
Amidst the increase of health facilities in the region, target for hospital bed capacity was not met. The 391
number of health facilities increased from 2,340 in 2016 to 2,576 in 2018. The Health Facilities 392
Enhancement Program (HFEP) which covers the construction, repair, rehabilitation, and renovation 393
of rural health units (RHUs) and barangay health stations (BHS) was instrumental in increasing the 394
number of health facilities. 395
396
Table 19.10 Number of Barangay Health Station, 2016-2018 397
PROVINCES 2016 2017 2018
Cavite 353 353 341
Laguna 196 214 215
Batangas 495 571 579
Rizal 205 238 227
Quezon 364 511 438
Total 2,340 2,689 2,576
Source: DOH Region IV-A 398
399
However, even with HFEP the targets for established BHS and RHUs per barangay were not achieved. 400
401
402
403
404
405
10
Table 19.11 Heath Care Facilities, Calabarzon, 2015-2019 406
INDICATOR
BASELINE
2015
ANNUAL PLAN TARGETS ACCOMPLISHMENT
END OF
PLAN
TARGET
2016 2017 2018 2019 2016 2017 2018 2019
Access to health services improved
Number of
established
Barangay Health
Stations (BHS),
Rural Health
Units (RHUs), or
Urban health
Centers (UHC) to
total number of
barangays
increased (%,
cumulative)
14 - 78 141 tbd - 75 135 ongoing
construc
tion
tbd
Established Rural
Health
Unit/Urban
Health Center
increased
1 - 24 11 tbd - 16 10 ongoing
construc
tion
tbd
Hospital bed to
population ratio
improved
- - 1:1,309 1:1,100 1:1,100 - 1:1,153 1:1,135 1:1,151 1:1,100
Note: tbd - to be determined 407 (-) no data provided 408 Source: DOH Region IV-A 409
410
The number of government hospitals decreased over the course of three years while the number of 411
private hospitals increased from 156 to 164. Even though total bed capacity improved for four 412
provinces, the target bed to population ratio of 1:1000 was not achieved because most hospitals are first 413
level and primary care. 414
415
Table 19.12 No. of Government and Private Hospitals, Authorized Bed Capacity, 2016-2018 416
PROVINCE
S
2016 2017 2018
GOVERNMENT PRIVATE GOVERNMENT PRIVATE GOVERNMENT PRIVATE
NO. BED
CAPACITY NO.
BED
CAPACITY NO.
BED
CAPACITY NO.
BED
CAPACITY NO.
BED
CAPACITY NO.
BED
CAPACITY
Cavite 8 455 41 2,432 7 455 28 2,432 6 588 43 2,559
Laguna 14 762 37 2,216 13 762 16 2,253 14 762 41 2,652
Batangas 14 804 41 2,116 12 804 23 2,167 14 954 42 2,432
Rizal 8 397 21 992 6 397 17 992 9 488 23 1,201
Quezon 14 580 16 960 16 580 8 977 13 570 15 945
Total 58 2,998 156 8,716 54 2,998 92 8,821 56 3,362 164 9,789
Source: DOH Region IV-A 417 418
11
Also, the HFEP implementation for 2017 and 2018 were 83.87 percent and 44.44 percent of target 419
projects, respectively. Unavailability of site for construction and delays in procurement hindered the 420
timely completion of health facilities under the program. 421
Table 19.13 HFEP Implementation, 2016-2018 422
PARTICULARS 2016 2017
2018
Allocation (in pesos) 153,408,000.00 214,600,000.00
74,600,000.00
No. Of Projects 45 31
18
Completed 41 26
8
Ongoing - 3
10
Funds Reverted 4 2
-
Accomplishment (%) 91.46 83.87
44.44
Source: DOH Region IV-A 423
424
Social Welfare/Protection Facilities 425
426
Social welfare/protection facilities extend residential care to individuals with needs that cannot be 427
provided by their own families. As of 2019, there were five social welfare/protection facilities operated 428
by DSWD in the Region. 429
Table 19.14 Social Welfare/Protection Facilities, CALABARZON, 2019 430
NAME OF
FACILITIES/LOCATION DESCRIPTION
BahayTuluyan ng mga Bata
(Home for Girls Bagong Bayan,
Dasmariñas, Cavite
A residential institution established to provide care, protection
and rehabilitation to girls ages 5 to 17 years old who are victims
of sexual abuse (rape, incest, acts of lasciviousness, sexual
exploitation, abandonment, negligence and physical abuse and
maltreatment)
Regional Haven for Women and
Girls Agriculture Compound,
Rosario, Batangas
An alternative form of family care providing 24 hour group
living on temporary basis to disadvantaged abused women and
their qualified dependent whose needs cannot be adequately
met by their own families and relative over a period of time. It
was established in 1997 with the partnership with the
Congressional Spouses Foundation Inc. (CSFI)
National Training School for Boys
Barangay Sampaloc, Tanay, Rizal
Provides protection and parental care to CICL. It enables the
CICLs who cannot undergo rehabilitation in the community to
12
NAME OF
FACILITIES/LOCATION DESCRIPTION
benefit from an intensive treatment of their deviant behavior
and anti-social attitudes in a residential setting and prepare
them for a successful adjustment with their family and
community after discharge.
Haven for the Elderly Barangay
Sampaloc, Tanay, Rizal
A residential facility established on September 30, 1969 that
provides care to male and female senior citizens ages 60 years
old and above who are abandoned, neglected and in need. It has
a bed capacity of 300.
Field Office Resource Operations
Center Barangay San Jose, GMA,
Cavite
This serves as the resource operation center of DSWD -
CALABARZON during disaster and has 30,000 family food
packs as stockpile at any given time. Source: DSWD Region IV-A 431
432
Another poverty alleviation program designed to deliver need-responsive social services is the Kapit-433
Bisig Laban sa Kahirapan-Comprehensive and Integrated Delivery of Social Services (KALAHI-434
CIDSS). A total of 2,165 sub-projects which include farm-to-market roads and bridges, school 435
building, health centers, post-harvest facilities and water supply systems were identified by the 436
beneficiary communities. Similar to the Bottom-Up Budgeting, the program use participatory 437
planning process in the selection and implementation of projects. 438
439
Housing 440
441
The non-completion of projects under the Resettlement Program pulled down the overall status of the 442
housing programs. The number of completed projects for 2016 did not even reach half of the target 443
housing units. Thus, there is a need to fast-track the implementation of these programs in order to 444
meet the increasing demand in the Region. 445
446
Table 19.15 Housing Units, CALABARZON, 2016-2018 447
Program
Annual Target Accomplishment
2016 2017 2018 2016 2017 2018
Housing Program for ISFs Living Along Danger
Areas in Metro Manila
7,311 832 9,660 3,341 - -
Resettlement Program 643 125 10,121 361 - -
AFP/PNP Housing Program 665 1,123 - 400 - -
Total 8,619 2,080 19,781 4,102 - -
Source: NHA 2016-2018 Annual Report 448
449
450
451
452
13
Prison and Jail Facilities 453
454
Prison facilities are extremely overcrowded and the number of inmates continues to rise. The Region 455
was identified as one with congested jails in the country. Overcrowding of these facilities continues due 456
to the intensified campaign of the current administration against illegal drugs and the plea bargaining 457
system, which expedites court proceedings and put more offenders in prisons. 458
459
Emerging Gaps and New Challenges 460
461
Despite government efforts to meet the need for social infrastructure in CALABARZON, new 462
challenges will be encountered in attaining the targets by 2022. The change in local chief executives is a 463
double-edged sword in the selection of programs and projects. On a positive note, incoming officials 464
can bring new ideas and initiatives into the table. 465
466
Other challenges that can increase demand for social services are natural threats, such as, 467
or the rise of highly-communicable airborne diseases. 468
469
In general, the demand for social infrastructures will increase for the next three years with the R470
growing population. However, the decreasing amount of buildable space is a critical factor that needs 471
to be addressed. 472
473
Strategic Framework 474
475
The Region shall adopt the strategic framework of the PDP 2017-2022 on Infrastructure development 476
with the following subsector outcomes: a) increase spending on public infrastructure; b) implement 477
strategic infrastructure for the various infrastructure subsectors; c) ensure asset preservation; and d) 478
intensify R&D on technologies that are cost-effective over the whole project life cycle (Figure 19.4). 479
480
481
482
483
484
485
486
487
14
Figure 19.4 Strategic Framework for Accelerating Infrastructure Development 488
489
490
0
Targets 491
492
Table 19.16 Plan Targets to Accelerate Infrastructure Development, 2017-2022 493
494
INDICATOR BASELINE
2015
ANNUAL PLAN TARGETS END OF PLAN
TARGET
2022
RESPONSIBLE
AGENCY 2016 2017 2018 2019 2020 2021
Public infrastructure
spending increased (% share
to GDP)
4.6 Increasing Increasing Increasing Increasing Increasing Increasing PSA
Land Transport
Length of national roads
increased (km) 2,507.76 2,517.30 2,542.13 2,542.13 2,542.15 2,542.20 2,542.25 2,542.30
DPWH
Length of existing paved
national roads increased
(km)
2,402.53 2,461.95 2,471.07 2,475.14 2,487.23 2,509.14 2,510.00 2,511.50
Length of permanent
bridges along national roads
increased (lm)
18,447.31 18,547.00 18,823.00 19,294.00 19,294.00 19,294.00 19,294.00 19,294.00
Number of permanent
bridges along national roads
increased (cumulative)
650 654 658 662 664 666 667 669
Percentage of national roads
in good condition increased
(%)
42.75 50.25 55.25 60 65.75 70.50 75.25 80.50
Kilometers of national roads
along priority corridors
widened with complete
features to at least 4 lanes
(cumulative)
- 99.255 125.873 155.29 167.403 208.95 262.753 262.753
Number of bypass/diversion
road and grade separation
projects completed along
priority corridors with
complete features to at least
4 lanes (cumulative)
- 4 14 22 31 38 48 48
Kilometers of new roads
constructed to close gaps in
the national road network
- 10.31 24.95 35.1 44.69 53.88 56.38 56.53
1
INDICATOR BASELINE
2015
ANNUAL PLAN TARGETS END OF PLAN
TARGET
2022
RESPONSIBLE
AGENCY 2016 2017 2018 2019 2020 2021
(cumulative)
Number of bridges
retrofitted 18 73 129 140 145 150 155 160
Number of bridges widened 38 73 129 269 316 384 528 654
Travel time
(decreased)/Speed increased
via land per key corridor
- - - - - - - -
Road traffic accident rate
reduced (based on PNP
Accident Data)
- 10,907 2 Decreasing 2 2 2 2
DOTr, DPWH,
LGUs, DOH, PNP
Rail Transport
Length of standard gauge
increased (km) - 0 2.2 2.2 2.2 4.2 137.2 214.2
DOTr, PNR
Number of railway bridges
repaired/reconstructed - 8 6 3 71 72 72 72
PNR
Total length of standard rail
gauge rail tracks increased
(km, cumulative)
0 - 2.2 2.2 46.6 93 137.4 214.4
DOTr, PNR
Number of passenger service
routes traversing the region - 1 2 3 3 4 5 7
PNR
Number of freight service
routes traversing the region - 0 0 0 1 2 2 2
Passenger trips via rail (in
Metro Manila ) increased (in
% share of total passenger
trips via rail,
cumulative)/Passenger
service routes
- - - - - - - -
Air Transport
Number of airport
rehabilitated - - - 1 (Sangley)
DOTr-CAAP
Water Transport
Cargo Throughput (MT)
Non-containerized 25,252,085 25,896,467 27,542,197 28,597,374 29,671,218 30,787,818 31,913,616 33,048,797
PPA Batangas and
MarQuez
Containerized cargoes in
TEUs 133,261.75 157,319 185,601 189,313 194,992 202,792 212,932 225,708
Passengers transported by
sea increased (in number of 6,939,463 7,831,396 15,929,667 8,437,382 8,779,354 9,124,245 9,472,112 9,823,015
2
INDICATOR BASELINE
2015
ANNUAL PLAN TARGETS END OF PLAN
TARGET
2022
RESPONSIBLE
AGENCY 2016 2017 2018 2019 2020 2021
passengers, cumulative)
No. of vessels increased 44,525 47,189 48,989 50,778 52,593 54,404 56,220 58,041
Cargo shipped increased
(international and
domestic), (MT, cumulative)
- - - - - - - -
Water Supply
Percentage of HHs with
access to safe water supply
increased (%)
93 66 95 95 95 95 95 95 Water districts/
LGUs
Percentage of HHs with
access to basic sanitation
increased (%)
97 65 95 95 95 95 95 95
Water districts/
LGUs
Water districts/
LGUs
Proportion of households
with access to basic
sanitation to total number of
households increased (%
cumulative)
- 65 95 95 95 95 95 95
Households served with
level three water supply
system increased/
Proportion of
cities/municipalities served
by water districts with 24/7
water supply increased (%,
cumulative)
- - - - - - - -
Irrigation Projects/Systems Construction/Restoration/ Rehabilitation
a. New Area (ha.) 216 617 825 988 1,835 33 1,037 776
NIA
b. Restore Area (ha.) 248 749 279 364 240 302 428 922
Length of canal lining (km) - 26.84 44.27 42.71 96.82 56.3 - -
Number of structures - 109 58 134 313 306 - -
Ratio of actual irrigated area
to the total potential
irrigable area increased (%
cumulative)
- 57.36 69.09 72.19 75.31 78.54 78.97 82.37
Cropping intensity
increased (% cumulative) - 147 148 151 156 156 157 160
Information & Communication Technology
3
INDICATOR BASELINE
2015
ANNUAL PLAN TARGETS END OF PLAN
TARGET
2022
RESPONSIBLE
AGENCY 2016 2017 2018 2019 2020 2021
Proportion of public schools with internet access to total number of public schools increased (% cumulative)
a. Primary (K to 6) - 24.53 37.11 49.69 62.67 74.85 87.43 100
DepEd b. Junior High School - 77.88 81.57 85.26 88.95 92.64 96.33 100
c. Senior High School - - - 35.26 38.945 42.63 46.32 50
Proportion of public schools with computer packages to total number of public schools increased (% cumulative)
a. Primary (K to 6) - 92.09 93.41 94.73 96.05 97.37 96.69 100
DepEd b. Junior High School - 69.41 74.51 79.61 84.71 89.81 94.91 100
Average broadband
download speed increased
(Mbps)
- - - - - - - -
Power and Energy
Proportion of households
with electricity to total
number of households
increased (% cumulative)
- 96.67 Increasing Increasing Increasing Increasing Increasing 100% DOE
Proportion of sitios with
electric connections against
potential sitios increased
(%)
- 91.86 94.17 95.58 96.74 97.85 98.93 100 NEA
Proportion of households
with electric connections
against potential households
increased (%)
- 96.14 97.3 97.95 98.46 99.01 99.51 100 NEA
Social Infrastructure
Classroom to pupil ratio improved
f. Kindergarten 1:35 1:35 1:30 1:25 1:25 1:25 1:25 1:25
DepEd, DPWH
g. Primary (Grade 1-3) 1:42
-
1:45 1:45 1:35 1:35 1:35 1:35 1:30
h. Primary (Grade 4-6) 1:42
-
1:45 1:45 1:45 1:45 1:45 1:45 1:40
i. Junior High School 1:60
-
1:35 1:45 1:45 1:45 1:45 1:45 1:40
4
INDICATOR BASELINE
2015
ANNUAL PLAN TARGETS END OF PLAN
TARGET
2022
RESPONSIBLE
AGENCY 2016 2017 2018 2019 2020 2021
j. Senior High School - 1:40 1:40 1:40 1:40 1:40 1:40 1:40
Water and sanitation to pupil ratio improved
a. Primary (K to 6) - - - - - - - -
DepEd b. Junior High School - - - - - - - -
c. Senior High School - - - - - - - -
Proportion of public schools with adequate water and sanitation facilities to total number of public schools increased (% cumulative)
a. Primary (K to 6) - 74.31 78.58 82.85 87.12 91.39 95.66 100
DepEd b. Junior High School - 66.62 72.19 77.75 83.31 88.87 94.44 100
c. Senior High School - - - - - - - -
Proportion of public schools with connection to electricity to total number of public schools increased (% cumulative)
a. Primary (K to 6) - 95.44 96.2 96.96 97.72 98.48 99.24 100 DepEd
b. Junior High School - 95.44 96.2 96.96 97.72 98.48 99.24 100
c. Senior High School - 99.56 99.65 99.74 99.82 100
Access to health services improved
Number of established
Barangay Health Stations
(BHS), Rural Health Units
(RHUs), or Urban health
Centers (UHC) to total
number of barangays
increased (%, cumulative)
14 - 78 141 tbd tbd tbd tbd
DOH,
LGUs
Established Rural Health
Unit/Urban Health Center
increased
1 - 24 11 tbd tbd tbd Tbd
Hospital bed to population
ratio improved
- - 1:1,309 1:1,100 1:1,100 1:1,100 1:1,100 1:1,100 LGUs, DOH
Waste Management
Number of sanitary landfills
increased
- 23 23 23 25 25 25 25 LGUs, DENR-EMB
Number of LGUs served by
STP (Volume of desludged
and/or treated septage in
WDs increased, m3)
45,596 29,710 32,411 69,323 69,323 69,323 -
MWSS
SDG Indicators
Passenger and freight
volumes, by mode of
transport
- - - - - - - - DOTr, PNR,
DPWH, PPA
5
INDICATOR BASELINE
2015
ANNUAL PLAN TARGETS END OF PLAN
TARGET
2022
RESPONSIBLE
AGENCY 2016 2017 2018 2019 2020 2021
Proportion of population
with access to electricity
- - - - - - - - NEA. DOE
Proportion of population
with primary reliance on
clean fuels and technology
- - - - - - - - DOE, DICT
Renewable energy share in
the total final energy
consumption
- - - - - - - - DOE
Energy intensity measured
in terms of primary energy
and GDP
- - - - - - - - DOE, PSA
Note: tbd-to be determined 495
0
Strategies 496
497
Enhance the linkage of planning, programming, and budgeting processes of the government. Regional 498
agencies, GOCCs, SUCs and LGUs have to identify priority programs, projects and activities (PPAs) 499
that are consistent with the objectives of the Regional Development Plan. The Three-Year Rolling 500
Infrastructure Program (TRIP) will be adopted to optimize the utilization of agency budget allocations 501
for the implementation of priority PPAs. 502
503
Encourage private sector participation. Private sector participation shall continue to be encouraged in 504
the construction and or maintenance of transportation, water resources, and social and 505
ICT infrastructures. 506
507
Formulate and implement infrastructure development plans. Plans are necessary to ensure harmonized 508
and well-coordinated implementation of PPAs. Infrastructure development plans to be implemented 509
include roadmaps approved at the national and regional levels. Participation and consultation with key 510
stakeholders shall be observed in the preparation of new development plans. 511
512
Improve government administrative systems and procedures on project implementation. The 513
implementing agencies and LGUs shall be capacitated in project proposal preparation. This will ensure 514
the quality of project proposals and their inclusion in investment program and budget allocation. 515
516
Subsector Outcome 2: Strategic infrastructure implemented 517
518
Transport 519
520
The efficiency of the transport sector needs to be improved to sustain economic growth and 521
competitiveness by providing adequate, accessible, reliable, affordable and safe access for people, goods, 522
and services in Calabarzon and neighboring regions. The Region shall support national transport 523
policies that could contribute to the efficient and effective implementation of transport projects. 524
Roadmaps and other evidenced-based studies will be considered in transport planning. 525
526
To improve mobility and accessibility, development of local public transport route plans and multi-527
modal transport terminals have to be established to provide a smooth transfer of passengers and 528
cargoes. Integrated or electronic fare collection systems will be encouraged for the convenience 529
of passengers. 530
531
Implementing Agencies will be encouraged to facilitate the finalization of project alignments, settle 532
RROW acquisition and secure ECC to avoid project implementation delays. The DPWH should 533
consider a higher construction standard to maintain good road conditions all over the region. A 534
congressional district road plan should also be considered by DPWH to improve prioritization of 535
projects and better harmonize district and regional road projects. 536
537
1
Major programs and projects shall be closely monitored to ensure the quality and timely delivery of 538
outputs at the regional and local levels. The Regional Project Monitoring Committee shall strengthen 539
the Local Project Monitoring Committees in monitoring and evaluation of PPAs. 540
541
Convergence programs of agencies have to be promoted. The DOT-DPWH Convergence Program 542
shall be continued in the improvement and construction of access roads leading to tourism 543
destinations. The DTI-DPWH Roads Leveraging Linkages of Industry and Trade (ROLL-IT) Program 544
have to be rolled out to facilitate the identification, prioritization and implementation of roads leading 545
to various industries and economic zones. Agricultural areas have to be supported with farm-to-546
market roads. Additionally, communities in far-flung areas shall be provided with access roads 547
and bridges. 548
549
Policy coordination mechanisms among agencies, LGUs, and private sector have to put in place to 550
resolve transport issues in road widening, right-of-way acquisition, lot acquisition, removal of road 551
obstructions (utility poles/water lines) and traffic management, among others. 552
553
The design of transport facilities has to ensure gender responsiveness for men and women, elderly, 554
children and persons with disabilities. 555
556
Traffic management measures shall be implemented together with the improvement/construction of 557
transport infrastructures to the highest quality standards. The CALABARZON RDC have to continue 558
implementing the CALABARZON Traffic Management Plan to guide the concerned agencies and 559
LGUs in addressing traffic congestion. The Traffic Management Plan will guide all key agencies and 560
LGUs in planning, investment programming, budgeting, and implementing PPAs in traffic 561
management. Intelligent transport systems, such as signalized road intersections, detection systems, 562
and variable messaging system have to be installed in the appropriate road sections. A study may be 563
pursued on the non-approval of franchise for tricycle and jeepney with no proper parking areas. The 564
LTFRB should assist the LGUs in preparation of local public transport route to harmonize transport 565
routes in the region. 566
567
Transport infrastructures have to be improved to meet the highest quality standards and to enhance 568
mobility. Anti-overloading policies shall be implemented through the operation of weighing bridges to 569
avoid deterioration of roads. The Motor Vehicle Inspection System has to be implemented to comply 570
with the international standards on vehicle safety and environmental impact. The construction of 571
expressways, bypasses, diversion roads, flyovers, and underpasses as well as road widening shall be 572
prioritized. Such as the STAR Tollway Northbound bridges that will help in decongesting the 573
expressway and connecting roads leading to Batangas Port. 574
575
The implementation of mass transport system shall be promoted. The modernization of the commuter 576
line and long railway syst577
prioritized. Support of the LGUs shall be encouraged particularly in the clearing of right-of-way. 578
579
2
Continuous improvement and development of port facilities. Port facilities should be continuously 580
developed and improved in the Region to ensure that RoRo shipping transport remains a viable mode 581
for transporting people and goods particularly in the island municipalities of Quezon and Batangas. 582
Furthermore, possible alternate ports should be further studied. For instance, the Calatagan Port is 583
being considered as an alternate port to decongest the Port of Batangas. In preparation, the site 584
development plan of the port shall be put in place and the port delineation shall be extended to 585
connect to the proposed road going to the Calatagan Port. 586
587
Improvements of port facilities will encourage locators and contribute to optimized port utilization. 588
This will create economic opportunities for the Region while decongesting the container terminals in 589
Metro Manila. 590
591
The Philippine Ports Authority have to conduct intensive marketing campaigns on the port services to 592
locators in CALABARZON and shipping companies. Modernized facilities and services such as online 593
booking features will contribute to attracting more users. 594
595
Water Resources 596
597
Match available water to water usage 598
599
There is a need to match available water to water usage (i.e. potable and non-potable) and explore 600
alternative sources of water to reduce pressure on the use of groundwater. Among the possible sources of 601
non-potable water are surface water, rainwater from roofs, storm water and reclaimed wastewater 602
while desalination may be considered to produce potable water. 603
604
Continue Managing Water Resources in a Changing Climate 605
606
Climate change poses negative impacts on water resources. The changing temperature, evaporation, and 607
precipitation brought by climate change increase the frequency of floods and droughts, and reduce 608
river flows. There is a need to mitigate these negative impacts of climate change to build a 609
resilient community. 610
611
El Niño. The Department of Science and Technology, through the Philippine Atmospheric, 612
Geophysical and Astronomical Services Administration, observed El Niño in several provinces of 613
Luzon and Mindanao from September 2018 to mid-January 2019. El Niño, triggered by periodic 614
warming in the eastern Pacific Ocean, could last from 5 months to 2 years. This climate phenomenon 615
generally results in reduced rainfall, and erratic tropical cyclones. The country is expected to 616
experience severe El Niño in 2022 and weak El Niño in 2025. Thus, a Regional El Niño Task Force may 617
be created to oversee communities that will be affected by droughts and water shortages. 618
619
Flood Control. There is a need to mitigate the negative impacts of flooding in the region. Existing flood 620
control initiatives should be continued. The CALABARZON RDC created the Flood Control-621
Technical Working Group to prepare the terms of reference for the conduct of the Calabarzon Flood 622
3
Risk Assessment Study. The Study will consider a holistic and high level of economic, social and 623
environmental impacts which could result from flooding. The final output of the Study will be a list of 624
priority river basins in Calabarzon for master planning. 625
626
Full implementation of existing water policies and programs 627
628
Republic Act No. 9275 or the Philippine Clean Water Act of 2004 mandated the DPWH to prepare a 629
National Sewerage and Septage Management Program (NSSMP). The DPWH in coordination with 630
local government units shall formulate a framework plan to address various issues on sanitation, and 631
treatment and disposal of wastewater. The NSSMP provides 50 percent subsidy for the total project 632
cost of sewerage and septage projects. The target beneficiaries of Program include all cities and first 633
class municipalities. However, disinterest and lack of technical and financial capability of local 634
government units to implement sanitation projects remain an issue on the implementation of the 635
Program. 636
637
Likewise, Republic Act No. 6716 or the Rainwater Collector and Springs Development Act of 1989 may 638
be reinforced to help alleviate water scarcity and drought down to barangay level. 639
640
641
Irrigation 642
643
Expedite implementation of Major Irrigation Projects 644
645
The implementation of major irrigation projects such as the Quipot Irrigation and Macalelon Small 646
Water Reservoir should be fast tracked to ensure adequate irrigation water supply and sustain 647
agricultural development in the Region. The Quipot Irrigation Project is expected to irrigate over 648
2,800 hectares of paddy fields during wet and dry season. The Project is estimated to benefit a total of 649
1,327 and 828 farmers in Quezon and Batangas, respectively. On the other hand, the Macalelon Small 650
Water Reservoir will provide reliable and timely irrigation water supply to 830 hectares in 12 651
barangays of Macalelon and Lopez in Quezon. The Reservoir is estimated to benefit 700 farmers. 652
653
Energy 654
655
Promotion of clean energy and energy conservation. With the increasing population and demand for 656
electricity, it is necessary for the Region to harness its renewable energy potential. Thus, the 657
development and promotion of renewable energy, thru the Renewable Energy Act of 2008, as source of 658
clean energy in the region will be pursued. 659
660
The Energy Efficiency and Conservation Law was enacted to standardize energy efficiency and 661
conservation measures. The law will regulate use of energy efficient technologies in buildings and will 662
require the Energy Conserving Design and mandate the crafting of Local Energy Efficiency and 663
Conservation Plan before issuance of building permits. 664
665
4
666
Intensify household and sitio electrification. Despite the increasing number of sitios and households 667
electrified since 2016, there are still households in rural areas which were not reached. The LGU 668
utilization of ER 1-94 Regional Share Fund must be reviewed to see the projects contribution on 669
electrification. The RDC may assist in the identification of unenergized areas within the Region and 670
endorse the same to the concern Distribution Utilities. The Distribution Utilities shall utilize the 671
available Electrification Fund remitted to them by the Generation Companies pursuant to DOE 672
DC2018-08-0021. The RDC should also review its guidelines for allocation and project identification of 673
ER 1-94 DLF & RWMHEEF Regional Share given the policy guidelines of the direct remittance of said 674
financial benefits to support the development of the non-host communities in the region. 675
676
Promote investments in power and energy facilities. To realize the potentials of the government's vision 677
for the energy sector, there is a need to level up on infrastructure development. For this, President 678
Duterte signed Executive Order 30 "Creating the Energy Investment Coordinating Council (EICC) to 679
Streamline Regulatory Procedures Affecting Energy Projects". The EICC is tasked to spearhead and 680
coordinate efforts to expedite and streamline the implementation of major energy projects in the 681
country, now identified as Energy Projects of National Significance (EPNS). To ensure transparency 682
and accountability in the process of issuing permits or certificates involving power generation, 683
transmission, or distribution projects, Republic Act No. 11234 or the Energy Virtual One-Stop Shop 684
Act (EVOSS) was promulgated on 08 March 2019. It is an online system that allows the coordinated 685
submission and synchronous processing of all required data and information, and provides a single 686
decision-making portal for actions on applications for permits or certifications necessary for, or related 687
to new power generation, transmission, or distribution projects. 688
689
Cyber resilient energy sector. The profound technological advances in the energy sector, ranging from 690
interconnection and digitization, to the emergence of smart grids and the growing internet of things 691
showed the interdependence of energy and information and communications technologies (ICT). 692
These advances have significantly changed the landscape of the energy industry and energy 693
infrastructure while exposing the energy sector to cyber threats and risks and making it a susceptible 694
target to cyber-attacks. Faced with diverse range of threats and potential cyber incident scenarios that 695
may lead to devastating effects, (e.g. disruptions in the energy supply and Page 1 of 2 distribution, 696
power outages and infrastructure shut down), monitoring and protection of critical energy 697
infrastructures shall be a central concern. Real time detection and response to cyber-attacks and 698
computer security incidents are critically important to energy security and shall be ensured at all costs. 699
The main objective of the government is to formulate cyber security policies and a roadmap leading to 700
the creation of the Energy Sector-Computer Emergency Response Team (ES-CERT) and establishment 701
of a Security Operations Center (SOC). Capacity building in all levels of the required expertise shall 702
form part of the overall objective. 703
704
Related Innovations for disaster resiliency. The continuous implementation of the SMARTER 705
Philippines Program of DOST aims to leverage smart technologies and innovation, and promote 706
development of the country in the sector of governance, jobs, industries, micro-small and medium 707
enterprises, farming, healthcare, scientists and engineers, and climate change adaptations. The projects 708
5
under this Program are Project Noah (Nationwide Operational Assessment of Hazards) disaster 709
warning system and its biggest component, the Disaster Risk Exposure and Assessment for Mitigation-710
Light Detection and Ranging (Dream-Lidar) flood forecasting system; the Integrated Government 711
Phlippine (iGovPhil) project, which was rolled out in June and seeks to integrate and interconnect the 712
government's ICT systems, Smarter Farms, and Smart Healthcare. 713
714
715
ICT Infrastructure 716
717
Improve local ICT capacities to support knowledge-intensive industries. With the creation of the 718
Department of Information, Communication and Technology (DICT), roll-out of ICT infrastructure is 719
expected to continually increase coverage and reach rural areas and communities. A competitive ICT 720
market will also be promoted at the local level to improve service quality and reduce operating costs. 721
722
723
to adopt technological innovations in their operations to boost their productivity and competitiveness. 724
SETUP provides fund for technology acquisition, equipment, technical assistance and consultancy 725
services, packaging and label design, database information systems, and support for establishment of 726
product standards i.e. testing, and calibration of equipment. 727
728
Social Infrastructure 729
730
Convergence in implementing infrastructure programs shall be strengthened. DepEd, DOH, DPWH, 731
DSWD and other stakeholders should work together to allow ease of access to complementary facilities 732
such as water and sanitation, electricity and internet connection. The government must be able to 733
construct quality social infrastructure facilities not only through the collaboration of the national 734
government and local government units but also with the participation and partnerships from civic 735
organizations and the private sector. To ensure that this is observed, a database or a checklist of all 736
related policies and guidelines should be established consistent with existing standards. Timeliness of 737
project monitoring is also crucial in the early identification of issues that will appear during 738
implementation period. 739
740
Social infrastructure in remote and rural areas shall be prioritized. The government should still 741
prioritize investments in remote and rural areas, more specifically in conflict-affected areas in the 742
region because social infrastructure facilities tend to cluster in urban areas. 743
744
Social infrastructure deficit shall continue to be addressed. With social infrastructures effectively in 745
place, the community can produce more proactive and satisfied citizens. 746
747
To address the lack of buildable space for the construction of additional school buildings and hospitals, 748
use of idle lands must be considered and coursed through the DAR. Local government units (LGUs) 749
should be enjoined in the identification and donation of available public spaces. Developments around 750
6
economic housing units shall include at least primary schools to make education more accessible to the 751
residents of the community. 752
753
Expand existing plans and programs on the implementation of health facilities in the Philippine Health 754
Safety Development Plan. Under the Philippine Health Facilities Development Plan (PHFDP) 2017 to 755
2022, the delivery of affordable, accessible and quality health care facilities will be continuously 756
provided to the public. Upgrading of government hospitals and health facilities will also be prioritized. 757
In support to the operations and maintenance of completed HFEP projects, LGUs will have another 758
source of funds with the passage of the Universal Health Care (UHC) law or Republic Act No. 1123. 759
Construction of Disaster-Resilient Infrastructure. Constructions of social infrastructure should always 760
-back- ization of high rise designs and upgraded 761
classification levels, timely conduct of audit will be helpful as a precautionary measure. 762
763
Subsector Outcome 3: Asset preservation ensured 764
765
Greater emphasis shall be given on the sustainability, safety and resilience of infrastructure facilities in 766
the Region. Existing infrastructure assets need to be preserved to ensure efficient delivery of services to 767
the people. 768
769
Climate change adaptation and disaster resilience of infrastructure facilities have to be observed. The 770
government needs to ensure that critical infrastructures such as roads, bridges, ports and 771
communication can withstand disaster. 772
773
Security of infrastructure facilities shall be ensured. Security of critical infrastructures from threats, such 774
as, terrorist attacks must be ensured. Coordinated efforts among agencies and private sector are 775
encouraged to enhance the safety and security of infrastructure facilities. The use of state-of-the art 776
technologies will be explored and used for security purposes. 777
778
Sector Outcome 4: Intensify infrastructure-related research and development (R&D) 779
780
The government and the private sector will pursue programs on R&D to improve the development of 781
infrastructure facilities. The R&D initiatives will include, among others, renewable energy, waste water 782
treatment, solid waste management, modern transportation systems, disaster-resilient infrastructures, 783
and ICT applications. 784
785
786
787
788
789
790
0
Major Programs and Projects 791
792
Transport 793
794
Road and Bridge Widening Projects 795
Bypass, Diversion and Tunnel Road Projects 796
Road improvement projects 797
STAR Tollway-Pinamucan Bypass Road Project 798
Sto. Tomas Flyover 799
Taal Lake Circumferential Road 800
East-West Road 801
Atimonan-Mauban Road 802
General Nakar-Dingalan Road 803
Bataan-Cavite Interlink Bridge 804
Mindoro-Batangas Super Bridge 805
East-West Bank Bridge 806
DOT-DPWH Convergence Program 807
DTI-DPWH ROLL-IT Program 808
Traffic Management Projects 809
Motor Vehicle Inspection Centers 810
Cavite-Laguna Expressway Project 811
SLEX Toll Road 4 Project 812
STAR Tollway Northbound Bridges 813
Quezon-Bicol Expressway 814
Laguna Lakeshore Road Network 815
Calamba-Los Baños-Bay Expressway Project 816
C6 Expressway Project 817
LRT 1 Cavite Extension Project 818
LRT Line 2 East Extension 819
LRT 6 Project 820
East-West Rail Project 821
North South Commuter Railway Project 822
PNR South Long Haul Project 823
Drainage and Flood Control Projects 824
Farm-to-Market Road Projects 825
Local/Barangay Roads Projects 826
Improvement and Development of Port Facilities 827
Strict implementation of Quality Management System (QMS) and Port Safety, Health and 828
Environmental Management System (PSHEMS) 829
Calatagan Port Development 830
New RoRo Routes 831
1
o Cavite to Mariveles, Bataan 832
o Calatagan-Lubang-Coron 833
o San Andres, Quezon to Masbate, Bicol and Cebu 834
o San Juan, Batangas to Pola, Oriental Mindoro and Marinduque 835
836
Irrigation 837
838
Irrigation Dams 839
Rehabilitation and Restoration of Irrigation Systems 840
Development of Small Scale and Community-based Reservoir Irrigation Projects 841
842
Water Supply 843
844
New Centennial Water Source Project 845
Cardona Water Treatment Plant 846
Walwa-Calawis Project 847
Laguna Rivers Project 848
Cavite Water Source Project 849
East Bay Laguna Lake 850
Bulk Water Supply Projects 851
Establishment of Regional body for Water Supply Subsector 852
Rainwater Harvesting and Water Impounding Projects 853
Development of Water Management Plan 854
SALINTUBIG 855
Water supply Projects 856
857
Power and Energy 858
859
CW Home Depot Solar Power Project, Sta. Rosa City, Laguna 860
Asia Gas Biogas Power Plant Project, Batangas 861
Sitio Electrification Program 862
R&D for Pollution Control in Coal-Fired Power Plants 863
864
865
866
867
868
869
870
871
0
Legislative Agenda 872 873
Legislative Agenda Rationale
The proposed act aims to rationalize and streamline functions
of various state agencies in terms of water regulation. The Act
shall create a single agency to set policies on water supply,
sewerage and septage management, issue licenses, and set,
review or approve rates.
Water, Irrigation, Sewage and
Sanitation Resource Management
The act aims to consolidate the functions of the following
agencies: a) National Water Resources Board; b) Local Water
Utilities Administration; c) Metropolitan Waterworks and
Sewerage System; and d) National Irrigation Administration.
The Department shall protect, conserve, and manage water
resources including its ownership, appropriation, utilization
and development. It shall also develop policies to improve
universal access to safe, adequate, affordable and sustainable
water supply, irrigation, sewage and sanitation services.
On-line Network Establishment
Philippines Act up the setting up of a wireless communications technology in
the country. Under this act, the state shall provide for a
comprehensive policy for the creation and establishment of
Information and Communications Technology Centre or an
Information Communications Technology Hub, whichever is
applicable, in every legislative district in the country.
Open Access in Data
Transmission Act
The Open Access in Data Transmission Act aims to have
better access, more affordable, as well as quality data
transmission services by promoting the sharing of
infrastructure and resources among service providers.
Institutionalization of the 25%
Reserve Requirement for Power
Supply
Study the institutionalization of the 25% reserve requirement
which will ensure adequate supply of power and prevent
power outages.
Piso Para sa Kalikasan Act
The proposed act aims to implement carbon tax of 1 peso per
kilo of CO2 emission for household and residential
consumption to promote use of green energy and encourage
energy conservation.
House Bill 8730
An Act requiring SUCs to prepare and implement a land use
development and infrastructure plan. This will aid
implementing agencies to address concerns on the economic
cost of land and to increase available spaces for construction. 874