Northern Umbrella Plan & Projects- Update November 29, 2007 Jane Petras, ATC General Manager

Upload: doduong

Post on 25-Mar-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Northern Umbrella Plan & Projects- Update

November 29, 2007Jane Petras, ATC General Manager

Page 2: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Agenda

• Overall Northern Umbrella Plan Update

• Cranberry-Conover-Plains Project: Underground Transmission Line Construction

• Aspen Substation Project: Demolition of Brule Substation Equipment (as time permits)

Page 3: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Northern Umbrella Plan

• 9 network projects in Northern Wisconsin and Upper Michigan

• Addresses various system issues and needs

Page 4: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

NUP: Goals & Objectives

– Increase reliability throughout the U.P.– Provide adequate voltage support to portions of

Michigan and Wisconsin.– Increase transfer capacity across the MI/WI border

from 220 MVA to 525 MVA.– Reduce or eliminate certain “Binding Constraints”

under MISO Day 2.– Provide for additional redundant service paths.– Serve existing Transmission Service Requests.– Create a more robust transmission grid.

Page 5: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

System Prior to NUP Projects

Page 6: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Northern Umbrella Plan Projects

A: Plains – Stiles 138 kV RebuildB: Indian Lake – Hiawatha 69 kV to 138 kV RebuildC: Morgan – Stiles 138 kV RebuildD: Morgan – White Clay 138 kV Up-rateE: Add 2nd Plains TransformerF: New Werner West 345/138 kV Substation G: Cranberry – Conover – Plains ProjectH: Morgan – Werner West 345 kV Line (including

Clintonville – Werner West 138 kV)I: New Weston – Central Wisconsin 345 kV Line (for

generator interconnection)

Page 7: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Northern Umbrella Plan

CHIPPEWA

MACKINAC

SCHOOLCRAFT

LUCE

Arnett Rd.

MARQUETTE

BARAGA

MARINETTE

FLORENCE

VILAS

HOUGHTON

LANGLADE

FOREST

MENOMINEEOCONTO

DICKINSON

IRONGOGEBIC

ONTONAGON

MENOMINEE

DELTA

ALGER

DOOR

WAUPACAOUTAGAMIE

BROWN

KEWAUNEE

Plains

LAKE SUPERIOR

Victoria Dam

Nordic

Champion

Niagara Paper

Amberg

Way DamHemlock Falls

Pine

Twin Fls

Big Q

Brule

Michigamme

PeavyFalls

Chalk HillsWhite Rapids

GrandRapids

Escanaba

Mead

White Pine Prickett

Warden

AuTrain

Presque Isle

Cataract

Hoist

McClure

Perch Lake

M-38

OntonagonWinona

Dead River

Forsyth

ArnoldPerkins

Chandler

SeeInsert

A

Marquette

Crivitz

Stiles

West Marinette

Morgan

PioneerFalls

Canal

Cauldron Falls

Sandstone

High Falls

JohnsonFalls

Cornell

Powers

Harris

Alger-Delta Nathan

Felch

DeltaWest Side

Sagola

Randville

GwinnKI Sawyer

Chatham

GreenstoneHumboldt

Ropes

Foundry

Twin LakesStone

UPSCO

Mass

Bruce Crossing

Watersmeet

Land O Lakes

Conover Twin Lakes

Iron RiverStrawberry Hill

Lakehead

Lincoln

Lena

Pound

Thunder

Fox HillSilver Cliff

Goodman

Mountain

Daves Falls

Bay De Noc

Menominee30th Ave.

2nd St.Roosevelt Rd.

Florence

Crystal Falls

Bass LkArmory

GredePull

iam

HintzNorth

Appleton

Ellington

Caroline

White Clay

BadgerW. Shawano

E. Shawano

Roselawn

Skygen Highway VMyst. Hills

VelpHowardMason St.

Glory Rd.

James St.Liberty

Preble

Eastman

Tower

Dr.

EastKrokRed

Maple

Lost Dauphin

GRE

EN B

AY

Rosiere

Harrison

PORTAGE

WOODRocky

RunArnott

Hoover

WhitingAve.

PloverCoyne

Jackpine

Sigel

ArpinHume

McMillan

MARATHON

LINCOLN

ONEIDA

Wien

Weston

Sherman St.

BunkerHill

Morrison Ave.

Northpoint

Kelly

Pine

BlackBrook

Hilltop

Aurora St.

Venus

Eastom

Highway 8 Hodag

RPC

Clear Lake

St. GermainCranberry

ThreeLakes

Du Bay

Wausau

Alexander

Tomahawk

GrandfatherFalls

SHAWANO

Waupaca White Lake

Gladstone

Crandon Laona

Antigo

Boulder Jct.

Summit Lk.

Clintonville

Manistique

Indian Lake

Hiawatha Lakehead

Brevort

Straits

Munising

Seney

Lake

head

Glen Jenks

Valley Blaney ParkCurtis Lakehead

Gould City

Roberts

Engadine

NewberryCorr.

FacilityNewberry

Village

Lou-Pac

Hulbert

Newberry

Eckerman

Brimley

PineRiverRexton Trout Lake

Oden

Emmet

To Livingston

McGulpin

LAKE MICHIGAN

G

Werner West

F

HCWIS

B

I

A1

A2A3

KEY

345 kV Substation

Generation

115 or 138 kV Substation

345 kV Transmission

115 or 138 kV Transmission

69 kV Transmission

<=69 kV Substation

Proposed Projects

C

D

E

Empire

National Tilden

CEDAR LINECLARKSBURG LINE

Insert A

Page 8: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Completed Projects

A: Plains – Stiles 138 kV Rebuild• Placed in-service October 2006 • Cost = $94.3 millionB: Indian Lake – Hiawatha 69 kV to 138 kV Rebuild• Placed in-service March 2006• Cost = $52.3 millionC: Morgan – Stiles 138 kV Rebuild• Placed in-service May 2006• Cost = $8.0 millionD: Morgan – White Clay 138 kV Up-rate• Placed in-service March 2005• Cost = $0.4 millionF: New Werner West 345/138 kV Substation • Placed In-service December 2006• Cost = $12.4 million

Page 9: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

In-progress Projects

E: Add 2nd Plains Transformer

G: Cranberry – Conover – Plains Project

H: Morgan – Werner West 345 kV Line (including Clintonville – Werner West 138 kV)

I: Gardner Park – Central Wisconsin 345 kV Line (for generator interconnection)

Page 10: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Second Transformer at Plains Substation

• Scope– Add a second 345/138 kV, 250MVA

transformer

• Schedule/Status– Project planning in progress (scoping,

estimating, etc.)– New transformer has been ordered– Planned in-service December 2009

Page 11: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Cranberry-Conover-Plains: Scope

– Phase 1: New 15 miles of 115kV line (overhead and underground) from Cranberry to new Lakota Road Substation with modifications at various substations including Conover SS

– Phase 2: Rebuild 69kV line from Conover SS to Iron River SS to 138kV including new Iron Grove SS

– Phases 3 and 4: Rebuild 69kV line from Iron River SS to Plains SS to 138kV (single, double and triple circuit configurations) with modifications at various substations including Aspen SS

Page 12: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Cranberry – Conover – Plains Project

Page 13: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Cranberry-Conover-Plains: Schedule/Status

• PSCW approval received November 2006, design/construction in phases• Phase 1

– OH line, UG line and substation design/procurement activities essential complete

– New easement acquisition complete except for 3 parcels– Construction started Aug. ’07 on UG line and in Oct. ’07 on SS and OH line– Planned in-service June 2008

• Phase 2 – OH and SS design and procurement activities underway– Partial construction (Twin Lakes crossing) 1Q08– Remainder of construction 3Q08 to 1Q09 (with construction complete to

Twin Lakes SS in 3Q08)• Phase 3 & 4

– OH line and substation design/procurement activities will start 1Q08– Construction start 2Q09– Planned in-service June 2010

Page 14: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Gardner Park-Central Wisconsin & Morgan- Werner West (GCMW): Scope

– Gardner Park – Central Wisconsin: New approximately 50 miles 345 kV line, new Central Wisconsin 345kV switching station, expansion of Gardner Park substation

– Morgan – Werner West: New 345 kV line approximately 51 miles of 345kV line, expansion work at Morgan, Werner West and Clintonville Substations

Page 15: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

GCMW Area Map

Page 16: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

GCMW: Schedule/Status

– PSCW approval received June 2006

– Project being designed/constructed in phases

– Construction started January 2007

– Actual physical work complete = 32%

– Overall planned in-service date is December 2009

Page 17: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

NUP: Project Status Summary (Slide 1/2)

StatusProjected

CostProjected

In-Service DateKey Need DriversProject Name

Complete$8.0MMay 2006Transfer capability C: Morgan – Stiles 138 kV Rebuild as double circuit

Not part of the Northern Umbrella Plan

N/AN/A•Phase 3 – Convert to 138 kV operation

Complete$46.2MMarch 2006•Phase 2 – Rebuild as double circuit 138 kV, operate at 69 kV

Complete$6.1MAugust 2004•Phase 1 – Rebuild Indian Lake – Glen Jenks

CompleteTLR mitigation; voltage support; physicalcondition; local load-serving in Manistique area; required operating guide that splits the U.P. system

B: Indian Lake – Hiawatha 69 kV to 138 kV Rebuild

Complete-October 2006•A3: Amberg – Stiles

Complete-November 2005•A2: Amberg – West Marinette

Complete-October 2005•A1: Plains – Amberg

Complete$94.3MPhysical condition; transfer capability; solution also results in a more robust parallel path for 2/3 of P-S corridor

A: Plains – Stiles 138 kV Rebuild

Page 18: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

NUP: Project Status Summary (Slide 2/2)

Project Complete.$0.4MMarch 2005Transfer capability D: Morgan – White Clay 138kV uprate (eventual rebuildas part of Element H)

StatusProjected

CostProjected In-Service DateKey Need DriversProject Name

Transformer ordered, project scope, schedule and cost being defined and planned.

$7.3M4Q09Transfer capabilityE: Add 2nd Plains transformer(250 MVA 345/138 kV)

Engineering and ROW activities continuing on Gardner Park –Whitcomb. Construction complete on Belle Plain Tap – Hwy 22. and complete on Caroline – BPT.

$131.5M2009Required for new Weston 4 generation

I: New Gardner Park –Central Wisconsin 345 kVline & Central Wisconsin345 kV switching station

Engineering and ROW activities continuing on Werner West –Hwy 22 and Hwy 22 – White Clay. Construction has begun on White Clay – Morgan with the temporary line complete..

$132.3M2009Transfer capability, reliability, and network service.

H: New Morgan – WernerWest 345 kV line &Clintonville – Werner West138 kV line

Design/procurement activities started. Will design/construct from west to east.

-June 2010• Phase 2, 3 & 4: Rebuild 69 kV Conover – Plains to 138 kV

Construction started in August 2007.

-June 2008• Phase 1: New 115 kV Cranberry – Conover

$134.6MSee belowTransfer capability; Transmission service; Reliability, physical condition

G: Cranberry – Conover –Plains Project

Project Complete.$14.2MDecember 2006TLR mitigation, system security F: New Werner WestSubstation with 345/138 kVtransformer

Page 19: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Northern Umbrella Plan Summary

• Current estimated cost for all projects is $575 million

• Total project spending to date is approximately $294 million (through October 2007)

• Of the 9 projects –– 5 are complete and in-service– 4 are in various stages of design and

construction

• Construction and completion of all projects is expected in mid-2010

Page 20: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

QUESTIONS ON NORTHERN UMBRELLA PLAN ???

Page 21: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

CCP Project (Phase 1): Underground 138kV Line Construction

• Location: approximately 2 miles of the new 15 mile line from Cranberry to Conover adjacent to the Eagle River Union Airport

• Design: XLPE (cross-linked polyethylene) cable in a concrete duct bank with manholes approximately every 1/3 of a mile, backfilled with sand

• Route: Mainly within a local paved road with other underground utilities (sewer, water, telephone, natural gas)

• Cost: $10.9 million

• Schedule:-- Duct bank/manhole construction started August ’07-- Expected ductbank/manhole finish December ’07 or spring of ’08-- Cable installation and testing planned March ‘08

Page 22: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint
Page 23: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint
Page 24: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Manholes

• Pre-cast concrete boxes constructed offsite

• Manhole inside dimensions are 24’ x 8’ x 8’

• Delivered in two sections on flatbed trucks

• Each section weighs approximately 71,000 pounds

• Manholes used for pulling and splicing cable

Page 25: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint
Page 26: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint
Page 27: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

71,000 pound manhole top

Page 28: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint
Page 29: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Lowering manhole bottom into hole

Page 30: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint
Page 31: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Applying waterproof seal

Page 32: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint
Page 33: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Lowering manhole top

Page 34: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Applying waterproof seal to manhole collar

Page 35: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Duct Bank

Page 36: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint
Page 37: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Shoring required due to depth and

sand

Page 38: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Steel plate required over trench for road crossings

Page 39: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint
Page 40: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint
Page 41: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Concrete is poured to encase conduit

Page 42: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint
Page 43: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Warning tape buried above concrete

Page 44: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Sand - granular material compacted over concrete for heat dissipation

Page 45: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint
Page 46: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

Shore box is removed for next location

Page 47: Northern Umbrella Plan & Projects- · PDF file · 2009-02-12Northern Umbrella Plan & Projects- Update November 29, 2007 ... New Werner West 345/138 kV Substation ... Microsoft PowerPoint

QUESTIONS ON CCP UG CONSTRUCTION ???