February 28, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of ) ) Docket No. 72-10-ISFSI-2 Northern States Power Co. ) ) (Prairie Island Nuclear Generating Plant, ) ASLBP No. 12-922-01-ISFSI-MLR- Independent Spent Fuel Storage Installation) ) BRD01 NORTHERN STATES POWER COMPANY’S INITIAL DISCLOSURES Pursuant to 10 C.F.R. § 2.336(a), Northern States Power Company – a Minnesota Corporation (“NSPM”) hereby makes the following initial disclosures. 1. Testifying Witnesses NSPM has not yet identified the persons upon whom it will rely as witnesses with respect to the admitted contentions. In accordance with 10 C.F.R. § 2.336(b), NSPM will supplement this disclosure after testifying witnesses are identified. 2. Documents and Data Compilations Documents and data compilations relevant to each of the admitted contentions, other than those for which a claim of privilege or protected status is being made, are available for review and copying at (1) the Prairie Island Nuclear Generating Plant Training Center, 1660 Wakonade Drive West, Welch, MN; and (2) the Offices of Pillsbury Winthrop Shaw Pittman LLP, 2300 N Street N.W., Washington D.C. Arrangements for reviewing these documents at the Training Center can be made by contacting Mr. Brian Zelenak at 612-330-5641. Arrangements for reviewing these documents in Washington D.C. can be made by contacting Ms. Kimberly

Upload: others

Post on 30-Aug-2019

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

February 28, 2013

UNITED STATES OF AMERICA

NUCLEAR REGULATORY COMMISSION

Before the Atomic Safety and Licensing Board

In the Matter of )

) Docket No. 72-10-ISFSI-2

Northern States Power Co. )

)

(Prairie Island Nuclear Generating Plant, ) ASLBP No. 12-922-01-ISFSI-MLR-

Independent Spent Fuel Storage Installation) ) BRD01

NORTHERN STATES POWER COMPANY’S INITIAL DISCLOSURES

Pursuant to 10 C.F.R. § 2.336(a), Northern States Power Company – a Minnesota

Corporation (“NSPM”) hereby makes the following initial disclosures.

1. Testifying Witnesses

NSPM has not yet identified the persons upon whom it will rely as witnesses with respect

to the admitted contentions. In accordance with 10 C.F.R. § 2.336(b), NSPM will supplement

this disclosure after testifying witnesses are identified.

2. Documents and Data Compilations

Documents and data compilations relevant to each of the admitted contentions, other than

those for which a claim of privilege or protected status is being made, are available for review

and copying at (1) the Prairie Island Nuclear Generating Plant Training Center, 1660 Wakonade

Drive West, Welch, MN; and (2) the Offices of Pillsbury Winthrop Shaw Pittman LLP, 2300 N

Street N.W., Washington D.C. Arrangements for reviewing these documents at the Training

Center can be made by contacting Mr. Brian Zelenak at 612-330-5641. Arrangements for

reviewing these documents in Washington D.C. can be made by contacting Ms. Kimberly

Page 2: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

- 2 -

Harshaw at 202-663-9410. A listing of these documents and data compilations is provided as

Attachment 1.

A listing of documents that are proprietary is provided in Attachment 2.

3. Tangible Things

Other than documents and data compilations provided or listed, no relevant tangible

things have been identified.

Respectfully Submitted,

/Signed electronically by Kimberly A. Harshaw/

_________________________________

Jay E. Silberg

Kimberly A. Harshaw

PILLSBURY WINTHROP SHAW PITTMAN LLP

2300 N Street, NW

Washington, DC 20037-1128

Tel. (202) 663-9410

Counsel for Northern States Power Co.

Dated: February 28, 2013

Page 3: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

1

ATTACHMENT 1

Northern States Power Co. Prairie Island Independent Spent Fuel Storage Installation License Renewal Proceeding

Docket No. 72-10-ISFSI-2; ASLBP No. 12-922-01-ISFSI-MLR-BRD01 Production Log for NSPM’s Initial Disclosures (February 28, 2013)

Document I.D. Description Contention

PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention 6

PROD00000002 Email from B. Zelenak to O. Nelson re: High Burnup Fuel dated 11/15/2012 Contention 6

PROD00000003 Notes prepared by Gene Eckholt re: to cultural surveys and surveys previously done on site Contention 4

PROD00000004 7/29/2011 Commitment Tracking Table for PINGP Settlement Agreement with PIIC and NSPC re: Contentions 1, 6 and 11

Contention 4

PROD00000005 8/6/2008 Letter from PIIC Legal Department re: PINGP and failure to Communicate with PIIC re: Tribes concerns related to excavation of burial grounds

Contention 4

PROD00000006 8/7/ 2008 Discovery Hold Letter from David Aafedt Contention 4

PROD00000007 8/14/2008 Letter from Mike Wadley to Ronald Johnson of PIIC attaching draft report entitled "Literature Search and Assessment of Historical and Archaeological Resources Impacted by Construction and Operations Activities at the Prairie Island Nuclear Generating Plant

Contention 4

PROD00000008 8/15/2008 Letter from Xcel Legal Department to Philip Mahowald and David Aafedt re: frustrations with communications between Xcel Energy and PIIC and concerns related to cultural resource assessment

Contention 4

PROD00000009 4/15/2008 Letter from PIIC regarding agreement between Xcel and PIIC Contention 2 Contention 4

PROD00000010 5/1/2008 Letter from Xcel to PIIC regarding agreement between Xcel and PIIC Contention 2 Contention 4

PROD00000011 Settlement Agreement among the Prairie Island Indian Community and NSP Contention 2 Contention 4

PROD00000012 3/17/2011 Xcel Energy "Prairie Island ISFSI License Renewal Pre-Submittal Meeting" Contention 6

PROD00000013 3/17/2011 "Summary of Discussion with NRC" regarding PINGP ISFSI LRA Contention 6

PROD00000014 11/18/2011 Post-Submittal Meeting Notes Contention 6

PROD00000015 Meeting Notes Prepared by Oley Nelson re: Behavior of High Burn-up Fuel and Proposed Testing Contention 6

Page 4: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

2

Document I.D. Description Contention

PROD00000016 A Plan for Testing and Evaluating Long-Term Behavior of Stored Used Nuclear Fuel Contention 6

PROD00000017 4/30/2012 Concept Plan for a High Burn-Up Fuel Storage and Transportation Confirmatory Data Project Contention 6

PROD00000018 4/16/2012 High Burn-up Fuel Confirmatory Demonstration Project Contention 6

PROD00000019 Email from Samson to Morrison re: Concept Plan for High Burnup Confirmatory Data Project Contention 6

PROD00000020 4/4/2011 License Renewal Scoping and Screening Report re: PINGP ISFSI Contention 4

PROD00000021 1/26/2012 PowerPoint Presentation prepared by Argonne re: Hydride Reorientation Testing of High-Burnup Cladding

Contention 6

PROD00000022 ANL High Burnup Spent Nuclear Fuel Transport Project (NRC-sponsored with EPRI involvement) Contention 6

PROD00000023 6/30/2010 Article by Argonne National Laboratory re: Radial-Hydride-Induced Embrittlement of High-Burnup ZIRLO Cladding Exposed to Simulated Drying Conditions

Contention 6

PROD00000024 Engineering Evaluation 19430 TN-40HT Dry Storage Cask Contention 4

PROD00000025 July 2011 Technical Report by EPRI re: Hydride Crack Considerations Relevant to Spent Nuclear Fuel Storage Contention 6

PROD00000026 December 2008 Technical Update by EPRI Project Manager A. Machiels re: Structural Integrity of Advanced Claddings During Spent Nuclear Fuel Transportation and Storage

Contention 6

PROD00000027 September 2003 Final Report by EPRI re: Dry Storage Demonstration for High-Burnup Spent Nuclear Fuel Feasibility Study

Contention 6

PROD00000028 December 2011 Report re: Development and Evaluation of Cask Demonstration Programs Contention 6

PROD00000029 Excerpt from May 16, 2008 Certificate of Need Application for PINGP Contention 4

PROD00000030 7/15/1998 Report re: Neutron Skyshine Analysis for the Northern States Power Company Prairie Island Independent Spent Fuel Storage Installation by J.K. Shultis and R.E. Faw

Contention 4

PROD00000031 10/2001 Interim Progress Report by EPRI re: Dry Cask Storage Characterization Project Contention 6

PROD00000032 Executive Summary of Prairie Island ISFSI Study prepared by Shaw Stone and Webster, Inc. Contention 4

PROD00000033 Introduction to Prairie Island ISFSI Study Contention 4

PROD00000034 Prairie Island ISFSI Study by Shaw Stone and Webster Contention 4

PROD00000035 Excerpt for Prairie Island ISFSI Study at Prairie Island Nuclear Generating Plan re: Cask Locations and Radiological Effects

Contention 4

Page 5: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

3

Document I.D. Description Contention

PROD00000036 Chapter 5 of the Prairie Island ISFSI Study prepared by Shaw Stone & Webster, Inc. Contention 4

PROD00000037 11/1/2011 Powerpoint Presentation by David Tang and Shian Li of the NRC re: Fuel Reconfiguration - Implications to Criticality and Radiation Safety

Contention 6

PROD00000038 June 2012 ISFSI Tour Electronic Photos Contention 2 Contention 4

PROD00000039 November 2012 ISFSI Tour Electronic Photos Contention 2 Contention 4

PROD00000040 ISFSI Construction Photos in Photo album Contention 2 Contention 4

PROD00000041 ISFSI Construction Electronic Photos Contention 2 Contention 4

PROD00000042 Summary of ALJ Decision Regarding ISFSI Expansion Contention 2 Contention 4

PROD00000043 PI Certificate of Need Recommendation from ALJ Contention 2 Contention 4

PROD00000044 5/8/2009 RE: Certificates of Need for the Prairie Island Nuclear Generating Plant for Extended Power Uprate, Additional Dry Cask Storage and Site Permit Applications- Comments- Draft EIS

Contention 4

PROD00000045 Letter from B. Zelenak to B. Storm re: Comments on Final Environmental Impact Statement Contention 4

PROD00000046 Information Request- Xcel energy Prairie Island EIS Chapter 2, Section 5- Radiological Impacts Contention 4

PROD00000047 4/30/2009 Direct Testimony of Gordon Thompson on behalf of Red Wing, MN re: Application of NSPM for a Certificate of Need Authorizing EPU and Additional Dry Cask Storage at PINGP

Contention 4

PROD00000048 5/14/2009 Public Hearing Testimony of Brian R. Zelenak re: the Application of NSPM Authorizing an Extended Power Uprate and Additional Dry Cask Storage at PINGP

Contention 2 Contention 4

PROD00000049 10/15/2008 publication on Epidemiological Studies of Leukemia in Children and Young Adults Around Nuclear Facilities: A Critical Review, by D. Laurier et al; Radiation Protection Dosimetry (2008), Vol. 132, No. 2. pp. 182-190

Contention 4

PROD00000050 list of studies reflecting on potential of high burnup spent nuclear fuel under dry storage conditions Contention 6

PROD00000051 5/8/2008 CON Comments from Terry Pickens Contention 2 Contention 4

PROD00000052 8/21/2008 email from Cynthia Harrington to John Chow re RE: 2008 AAA Report Contention 2 Contention 4

Page 6: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

4

Document I.D. Description Contention

PROD00000053 Internal Correspondence re: ALJ Richard Luis Recommendations on CON Contention 2 Contention 4

PROD00000054 10/26/2009 email from James Holthaus to Brian Zelenak re: Procedures Contention 2 Contention 4

PROD00000055 FP-IH-EXC-01 Excavation & Trenching Controls Contention 2 Contention 4

PROD00000056 FP-CY-ENV-01 Archaeological, Cultural & Historical Resources Contention 2 Contention 4

PROD00000057 PUC Staff Briefing Papers re: EPU and CON Contention 4

PROD00000058 24 Aug 2009, Letter from Anderson, ATTY AG office to ALJ Luis, forwarding PUBLIC Copy - re: Initial Post Hearing Brief of the Minnesota Dept of Commerce, Office of Energy Security

Contention 2 Contention 4

PROD00000059 08/24/2009 Filing by David Aafedt, Winthrop and Weinstine, - Prairie Island Indian Community Inital Brief Contention 2 Contention 4

PROD00000060 01 Sep 2009, Ltr by James Voss, re: real time monitoring of 4 areas of emissions Air, Water, and Gama Radiation

Contention 4

PROD00000061 Xcel Energy's Reply Brief in the MPUC Proceedings Regarding EPU and Additional Dry Cask Storage Contention 4

PROD00000062 Proposed Findings of Fact from Xcel Contention 2 Contention 4

PROD00000063 Submissions Regarding the Applications for the EPU and Additional Dry Cask Storage Contention 4

PROD00000064 OES Reply Brief re: CON Contention 4

PROD00000065 02/09/2009 e-mail from K. Eide-Tollefson to E. Onawa, et al. re PI Study Group Follow Up Contention 4 Contention 6

PROD00000066 Minnesota Dept of Commerce Initial Brief Regarding ISFSI Expansion Contention 2 Contention 4

PROD00000067 Dept of Commerce Initial Brief Regarding EPU Contention 2 Contention 4

PROD00000068 Notice Xcel Energy Certificate of Need Application and Site Permit for Prairie Island Nuclear Facility Upgrade Contention 2 Contention 4

PROD00000069 11/10/2009 E-mail from Terry A. Pickens to Mary Sandok and Brian Zelenak re RE: questions on PI Contention 4

PROD00000070 12/01/2009 Talking points for public meeting Dec 1, 2009 re: CON and EPU Contention 4

PROD00000071 Radioactivity per Cask for High Burnup Fuel Contention 4

PROD00000072 Data for Radioactive Decay Chart Contention 6

PROD00000073 Comments and Recommendations of MN Dept of Commerce Contention 2 Contention 4

Page 7: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

5

Document I.D. Description Contention

PROD00000074 IR from the Minnesota Office of Energy Security Contention 4

PROD00000075 02/18/2009 E-mail from Raymond Kirsch to Cynthia Harrington re FW: Request Concerning Cask Loading Rate - Prairie Island ISFSI EIS

Contention 4 Contention 6

PROD00000076 State of Minnesota Utility Information Request Contention 4

PROD00000077 Production request from State of MN re: CON for EPU and ISFSI Expansion Contention 6

PROD00000078 Responses to IRs from Dept of Commerce re: CON for EPU Contention 4

PROD00000079 02/20/2009 Response to MN Department of Commerce Information Request by H. Oley Nelson re: Impact on annual dose to public from ISFSI

Contention 4

PROD00000080 PIIC Information Request Log Contention 4

PROD00000081 PINGP Site Layout Contention 2 Contention 4

PROD00000082 Map of PINGP Contention 2 Contention 4

PROD00000083 PINGP elevation map Contention 2 Contention 4

PROD00000084 PIIC response to information request regarding EIS Contention 2 Contention 4

PROD00000085 History from MN PUC regarding intitial proceedings for ISFSI Contention 2 Contention 4

PROD00000086 MN PUC Att A. regarding initial proceeding for ISFSI Contention 2 Contention 4

PROD00000087 Chapter 7 of CON Application for Prairie Island Spent Fuel Storage re ISFSI Contention 2 Contention 4

PROD00000088 2/24/09 Clarification Request Response No. 4.3 re: Radiological Impacts Contention 4

PROD00000089 02/24/09 Clarification Request Response No. 4.4 RE: Radiological Impacts Contention 4 Contention 6

PROD00000090 07/14/09 Email from Brian Zelenak to Pamela Gorman, et. al. re: Request from OES re: ceremonial grounds Contention 2 Contention 4

PROD00000091 7/14/09 Email from Pamela Gorman to Asah, Raelynn et. al. re Request from OES re: ceremonial grounds Contention 2 Contention 4

PROD00000092 1/16/2009 Response to Informal Request for Information No. 1 related to Certificate of Need for ISFSI Contention 4

PROD00000093 1/16/2009 Response to Information Request No. 2 re: Certificate of Need re: Non-Radiological Impacts Contention 4

PROD00000094 1/16/2009 Response to Informal Request for Information No. 5 re: Certificate of Need re: Spent Fuel Storage Alternatives

Contention 4

Page 8: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

6

Document I.D. Description Contention

PROD00000095 Xcel Energy's Response to Clarification - Request No. 4.1 Re: Radiological Impacts Contention 4

PROD00000096 2/04/2009 email from Cynthia Harrington to Brian Zelenak re FW: EIS - OES Informal IR No. 4.1 Clarification Q 5.7 Re: ISFSI Expansion

Contention 4

PROD00000097 02/13/2009 Email from Raymond Kirsch to Cynthia Harrington re Request Concerning Fuel Enrichment - Prairie Island ISFSI EIS

Contention 4 Contention 6

PROD00000098 02/06/2009 Response to MN Dept. of Comm. Info. Request No. 15 (Requester Steve Rakow) RE: Off Site Radiation Dose

Contention 4

PROD00000099 Minnesota Department of Commerce Information Request No. 12 Re: Annual Dose to the Public Contention 4

PROD00000100 Response to MN Dept. Comm. mentioning dry casks and dose to nearest residents Contention 4 Contention 6

PROD00000101 08/24/2009 Initial Post Hearing Brief of the Minnesota Department of Commerce, Office of Energy Security (MPUC Docket No. E002/CN-08-510)

Contention 4

PROD00000102 08/24/2009 Initial Post Hearing Brief of the Minnesota Department of Commerce, Office of Energy Security (MPUC Docket No. E002/CN-08-509)

Contention 4

PROD00000103 Order Accepting Environmental Impact Statement, and Granting Certificates of Need and Site Permit with conditions

Contention 2 Contention 4

PROD00000104 4/22/2009 Direct Testimony of Dr. Steve Rakow Contention 2 Contention 4

PROD00000105 Attachments of Dr. Steve Rakow on behalf of MN OES re: CON for ISFSI Expansion Contention 4

PROD00000106 Epidemiological studies of leukemia in children around nuclear facilities Contention 4

PROD00000107 04/03/2011 Email from Britta Bergland to David Gauger et. al. re Prairie Island ISFSI License Renewal: Environmental Report for Review

Contention 2 Contention 4 Contention 6

PROD00000108 07/11/2011 e-mail from Pickens to Bergland et al. re P.I. ISFSI License Renewal: Environmental Rept. for Review

Contention 2 Contention 4 Contention 6

PROD00000109 07/19/2011 e-mail from B. Zelenak to Bergland et al. re P.I. ISFSI License Renewal: Environmental Rept. for Review

Contention 2 Contention 4 Contention 6

PROD00000110 08/10/2012 Email from Terry Pickens to S.L. Samson et. al. re Effort to do research on high burnup fuel at Idaho NL

Contention 6

PROD00000111 08/28/2012 e-mail from T. Morrison to B. Zelenak et al. re HBU Fuel White Paper Contention 6

PROD00000112 11/09/2012 E-mail from T. Morrison to Albert Machiels, et. al re Recent RAI on HBF and CISCC Contention 6

Page 9: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

7

Document I.D. Description Contention

PROD00000113 10/31/2012 Communications from ONMSS/DSFST to Calvert Cliffs NPP re RAI on HBF and CISCC Contention 6

PROD00000114 08/23/2012 e-mail from T. Morrison to Oley Nelson et. al. re High Burnup Fuel Demo Presentations Contention 6

PROD00000115 8/22/2012 "Critical Data to Obtain" PPT Presentation by Used Fuels Disp. Campaign (Pacific NW Nat'l Lab) Contention 6

PROD00000116 EPRI PowerPoint re HBF Demo Logistics Contention 6

PROD00000117 08/23/2012 PowerPoint Presentation NRC Licensing Overview, Spent Nuclear Fuel Storage & Transp., Mtg of HBU Dry Cask Storage Demo

Contention 6

PROD00000118 High Burn-up Used Nuclear Fuel Extended Storage and Transportation Demo Industry Perspectives Rod McCullum, NEI, INL High Burn-up Used Fuel Demonstration Workshop

Contention 6

PROD00000119 PowerPoint Presentation August 23, 2012, Programmatic Topics for Discussion, Ken Sorenson (Sandia Lab) Contention 6

PROD00000120 "Welcome" PowerPoint Slide for High Burnup Used Fuel Demonstration Workshop held 08/22/2012 Contention 6

PROD00000121 "Workshop" Overview PowerPoint Presentation August 22, 2012, HB Used Fuel Demo Workshop Contention 6

PROD00000122 August 22, 2012, PowerPoint Presentation, HB Used Fuel Demo Workshop, Idaho Nat'l Lab (Dave Hill, presenter)

Contention 6

PROD00000123 11/15/2012 e-mail from B. Zelenak to Oley Nelson re High Burn Up Fuel Contention 6

PROD00000124 12/14/2010 Email from Pamela Gorman to Laura McCarten et. al. re PIIC/Xcel Energy meeting minutes Contention 2 Contention 4

PROD00000125 Comments and Recommendations of the MN Dept of Commerce PINGP EPU Contention 2 Contention 4

PROD00000126 Xcel Answer to Requests for Rehearing for EPU and Additional Dry Cask Storage Dockets Contention 4

PROD00000127 1/16/2007 E-mail from S. Lee Sampson to Kenneth Albrecht et. al. re: Total Number of Casks Needed for Operation of PI to 2034

Contention 4

PROD00000128 4/8/2008 E-mail from Oley Nelson to Brian Zelenak re: Radiation Exposure to Public Contention 4

PROD00000129 5/6/2008 E-mail from Brian Zelenak to Brian Zelenak re casks Contention 4

PROD00000130 8/15/2008 Final Environmental Assessment Worksheet from Xcel Energy to State of Minnesota Contention 4

PROD00000131 8/15/2008 Final Draft EAW submitted from Xcel Energy to State of Minnesota Contention 4

PROD00000132 8/15/2008 Final Draft EAW submitted to State of Minnesota by Brian Zelenak of Xcel Energy Contention 4

PROD00000133 8/15/2008 Final Draft EAW submitted by Brian Zelenak to State of Minnesota Contention 4

Page 10: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

8

Document I.D. Description Contention

PROD00000134 8/15/2008 Site Plan of Prairie Island Plant and ISFSI submitted with Final Draft EAW to State of Minnesota Contention 4

PROD00000135 8/15/2008 USGS Project Boundary submitted with Final EAW to State of Minnesota Contention 4

PROD00000136 Supplement to CON for EPU and add'l dry cask storage Contention 4

PROD00000137 07/14/2008 Supplemental filing--Application to the MN PUC for CON for PI Nuclear Generating Plant for EPU and add'l dry cask storage

Contention 4

PROD00000138 Supplemental Filing - Application to the MPUC for a Certificates of Need for the PINGP for Extended Power Uprate and Additional Dry Cask Storage

Contention 4

PROD00000139 Diagram of berm around ISFSI Contention 2 Contention 4

PROD00000140 Diagram of ISFSI Contention 2 Contention 4

PROD00000141 PINGP Map Contention 2 Contention 4

PROD00000142 05/18/2011 Letter to Fish and Wildlife Service re: threatened or endangered species Contention 2 Contention 4

PROD00000143 05/18/2011 Letter to MN Dept. Natural Resources re: protected species and habitats Contention 2 Contention 4

PROD00000144 05/18/2011 Request for Information re: cultural and historic resources Contention 2 Contention 4

PROD00000145 05/18/2011 Request for Information re: cultural and historic resources Contention 2 Contention 4

PROD00000146 01/20/2009 Comments on Archaeological, Cultural, and Historic Resources and Excavation and Trenching Controls

Contention 2 Contention 4

PROD00000147 03/21/2012 Excavation & Trenching Controls Contention 2 Contention 4

PROD00000148 04/08/2009 Letter to Minnesota Historical Society re: project to expand holding pond for dredged material Contention 2 Contention 4

PROD00000149 12/11/2009 Email from Heather Westra to Britta Bergland et. al. RE: NRC and CRMP Contention 2 Contention 4

PROD00000150 08/04/2010 Letter from Bureau of Indian Affairs re: comments on Cultural Resources Management Plan Contention 2 Contention 4

PROD00000151 01/20/2009 Comments on Archaeological, Cultural, and Historic Resources and Excavation and Trenching Controls

Contention 2 Contention 4

PROD00000152 03/21/2012 Excavation & Trenching Controls Contention 2 Contention 4

PROD00000153 Letter from James Holthaus to Heather Westra RE: CRMP Actions from March 26 Meeting (04-05-2010) Contention 2 Contention 4

Page 11: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

9

Document I.D. Description Contention

PROD00000154 03/30/2010 E-mail from J. Holthaus to H. Westra, et al re ACH and Excavation Procedures Contention 2 Contention 4

PROD00000155 1/8/2010 Excavation & Trenching Controls, Revision 7 Contention 2 Contention 4

PROD00000156 09/21/2009 e-mail from James Holthaus to Britta Bergland re FW: CRMP comments, suggested changes Contention 2 Contention 4

PROD00000157 Activity Flow Chart for Excavation Work at PINGP Contention 2 Contention 4

PROD00000158 Activity Flow Chart for External Section 106 Compliance at PINGP Contention 2 Contention 4

PROD00000159 8/25/2008 J SCHARR Action Request Report RE: Excavation Procedures Contention 2 Contention 4

PROD00000160 5/16/2008 Xcel Energy "Application to the MN Public Utilities Commission for Certificates of Need for the PINGP for Additional Dry Cask Storage and Extended Power Uprate"

Contention 2 Contention 4 Contention 6

PROD00000161 4/15/2008 PIIC Letter from PIIC to Xcel Energy and NSP regarding the re-licensing of the PINGP Contention 2 Contention 4

PROD00000162 3/31/2008 Prairie Island Nuclear Generating Plant Lic Renewal Letter from XCEL to PIIC Contention 2 Contention 4

PROD00000163 Summary of Communications with Prairie Island Indian Community October 2008 to March 2009 Contention 2 Contention 4

PROD00000164 Safety Evaluation of Changes to Chapter 7 of the ISFSI SAR Contention 2 Contention 4

PROD00000165 Storage of High Burnup Fuel Beyond 20 Years (Xcel Energy Presentation at 2012 NEI Used Fuel Mgmt Conf., 05/09/2012)

Contention 6

PROD00000166 Storage of High Burnup Fuel Beyond 20 Years (Xcel Energy Presentation at NEI Used Fuel Mgmt Conf., 05/09/2012)

Contention 6

PROD00000167 Storage of High Burnup Fuel Beyond 20 years Contention 6

PROD00000168 Extended Storage (RAI 2-9) (TN/Areva) Contention 6

PROD00000169 ACTION: RSI Response date Contention 6

PROD00000170 High-Burnup Spent Nuclear Fuel Transport Project Contention 6

PROD00000171 Extended Dry Storage of Used Nuclear Fuel [Report] Contention 6

PROD00000172 EPRI Report on Dry Storage of High-Burnup Spent Fuel Contention 6

PROD00000173 Nuclear Waste Technical Review Board Fall 2011 Board Meeting Contention 6

PROD00000174 IAEA Impact of High Burnup Uranium Oxide and Mixed Uranium- Plutonium Oxide Water Reactor Fuel on Spent Fuel Management

Contention 6

PROD00000175 Delayed Hydride Cracking Consideration Relevant to Spent Nuclear Fuel Storage Contention 6

Page 12: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

10

Document I.D. Description Contention

PROD00000176 EPRI- Interfaces between storage & transportation casks Contention 6

PROD00000177 11/10/11 PI ISFSI License Renewal Post-Submittal Meeting Contention 2 Contention 4

PROD00000178 03/17/2011 Summary of Discussion with NRC Contention 6

PROD00000179 03/17/2011 Summary of Discussion with NRC Contention 6

PROD00000180 03/17/2011 Pre-Submittal Meeting powerpoint with ISFSI Photo Contention 2 Contention 4

PROD00000181 11/04/2011 DSTF Annual Meeting Notes Contention 6

PROD00000182 05/2011 NEI Spent Fuel Storage Conference Notes Contention 6

PROD00000183 Structures Monitoring Program Procedures, REV: 8 Contention 4

PROD00000184 07/30/2012 e-mail from B. Zelenak to NRC re Response for Add'l Info during 6/2012 ISFSI Tour Contention 4

PROD00000185 07/27/2012 letter to PIIC from OFSMEMP re Review of LRA for PI ISFSI Contention 4

PROD00000186 Prairie Island Independent Spent Fuel Storage Installation License Renewal Post-Submittal Meeting Contention 6

PROD00000187 10/21/09 ALJ Findings of Fact Contention 2 Contention 4 Contention 6

PROD00000188 PINGP Site Map Contention 2 Contention 4

PROD00000189 02/29/2012 Responses to Requests for Supplemental Information - LRA (TAC No. L24592) Contention 6

PROD00000190 Why Risk Assessment in long-Term Storage of Spent Nuclear Fuel? Contention 6

PROD00000191 10/28/2011 document: Dry Cask Storage and Transportation Issues List Contention 6

PROD00000192 Summary of Discussion with NRC (January 24, 2014) Contention 6

PROD00000193 5/4/2011 email from Oley Nelson to Steven Skoyen, et. al. re: QF0504 7248 Eval Draft Contention 4 Contention 6

PROD00000194 EPRI Interfaces Between Storage and Transportation Casks Panel on High Burnup Fuel Contention 6

PROD00000195 1/24/12 Notes from conference call with NRC Contention 6

PROD00000196 Structures Monitoring Program Revision 8 Contention 4

PROD00000197 Chapter 6 Environmental Information Contention 2 Contention 4

PROD00000198 Chapter 7 Wastes and Emissions Contention 4

Page 13: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

11

Document I.D. Description Contention

PROD00000199 Draft Scoping Study Prairie Island Nuclear Generating Plant Extended Power Uprate and Additional Dry Cask Storage

Contention 2 Contention 4

PROD00000200 07/31/2009 Final Environmental Impact Statement Contention 2 Contention 4

PROD00000201 Activity Flow Chart for External Section 106 Compliance at Prairie Island Nuclear Generating Plant Contention 2 Contention 4

PROD00000202 03/30/2012 2011 PINGP Excavation Activity Annual Report Contention 2 Contention 4

PROD00000203 04/09/2010 Dredging Project Status Contention 2 Contention 4

PROD00000204 04/27/2010 Excavation Permit filed by Joseph Lynch Contention 2 Contention 4

PROD00000205 11/10/2010 Excavation Permit filed by Joseph Lynch Contention 2 Contention 4

PROD00000206 Decision Key/Flowchart of Excavation Procedures Contention 2 Contention 4

PROD00000207 Decision key/flowchart of undertaking procedures Contention 2 Contention 4

PROD00000208 Decision key/flowchart of undertaking procedures Contention 2 Contention 4

PROD00000209 Historical Area Map with Facility Overlay Contention 2 Contention 4

PROD00000210 05/06/10 Letter from State Hist Society Contention 2 Contention 4

PROD00000211 LETTER from Xcel to Min Hist Soc 11/19/09 Contention 2 Contention 4

PROD00000212 Requests for Information Regarding Cultural and Historic Resources Contention 2 Contention 4

PROD00000213 8/20/2010 PI ISFSI Amendment to Materials License Contention 6

PROD00000214 (5/1/2008) Letter to PIIC reaffirming the commitment to work together on issues regarding historic and cultural impacts.

Contention 2 Contention 4

PROD00000215 Picture of Prairie Island Including the ISFSI Contention 2 Contention 4

PROD00000216 Picture of Prairie Island ISFSI Contention 2 Contention 4

PROD00000217 Picture of Prairie Island ISFSI Contention 2 Contention 4

PROD00000218 Picture of the Prairie Island ISFSI and Surrounding Area Contention 2 Contention 4

PROD00000219 Picture of Prairie Island ISFSI and Surrounding Area Contention 2 Contention 4

Page 14: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

12

Document I.D. Description Contention

PROD00000220 Project Site Plan Contention 2 Contention 4

PROD00000221 11/24/2008 Letter from J. Holthaus to PIIC [re construction in resurveyed area] Contention 2 Contention 4

PROD00000222 11/24/2008 letter from J. Holthaus to MN Office of Hist. Preservation re PINGP project to expand holding pond for dredged material

Contention 2 Contention 4

PROD00000223 03/12/2009 letter from R. Asah (Xcel) to MN Office of Hist. Preservation re PINGP project to expand holding pond for dredged material

Contention 2 Contention 4

PROD00000224 Circa 1960 Archaeologists to survey Prairie Island Contention 2 Contention 4

PROD00000225 5/29/67 Letter From Bjorn Bjornson to Prof. Johnson U of M re: press release Contention 2 Contention 4

PROD00000226 7/17/67 Letter from McElroy to PINGP re: Progress on Archaeological Investigations Contention 2 Contention 4

PROD00000227 8/29/67 letter to Prof. Johnson From Dienhart re: archaeological survey Contention 2 Contention 4

PROD00000228 9/8/67 Letter from Johnson to Dienhart re: Archaeological Survey Contention 2 Contention 4

PROD00000229 9/11/67 Letter from Dienhart to Simandl re: Archaeological Survey Contention 2 Contention 4

PROD00000230 2/10/68- Excavation Project Estimate PINGP Contention 2 Contention 4

PROD00000231 9/12/68 Letter From Johnson to Dienhart re: archaeological digging Contention 2 Contention 4

PROD00000232 1/12/1971 Letter from Arthur V. Dienhart (NSP) to Elden Johnson (State Archaeologist) regarding additional undiscovered archaeological resources

Contention 2 Contention 4

PROD00000233 5/12/1971 PINGP Environmental Report that includes archaeological information Contention 2 Contention 4

PROD00000234 2/28/1972 Correspondence from A.V. Dienhart (NSP) to Russell W. Fridley (MN Historical Society) regarding archaeological excavations at Prairie Island

Contention 2 Contention 4

PROD00000235 3/29/1972 Correspondence from Elden Johnson (State Archeologist) to Arthur V. Dienhart (NSP) regarding archaeological excavations at Prairie Island

Contention 2 Contention 4

PROD00000236 5/30/1972 Memorandum regarding Goodhue County Historical Society's request to display archaeological findings

Contention 2 Contention 4

PROD00000237 (9-28-1972) Safety Evaluation by the US Directorate of Licensing US Atomic Energy Commission in the matter of NSP PI NGP Units 1 & 2

Contention 2 Contention 4

PROD00000238 4/23/73 Letter from US Dep. of the Interior re: Environmental Impact Contention 2 Contention 4

Page 15: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

13

Document I.D. Description Contention

PROD00000239 5/1973 NSP Final Environment Statement related to the PINGP Contention 2 Contention 4

PROD00000240 11/30/1973 NSP Internal Correspondence from D.W. McCarthy to W.W. Larkin regarding the Bartron site Contention 2 Contention 4

PROD00000241 12/11/1973 NSP Internal Correspondence from Wade Larkin to A.V. Dienhart regarding the Bartron site Contention 2 Contention 4

PROD00000242 10/28/1974 Letter from John S. Wozniak (Saint Mary's College) to Richard O. Johndahl (NSP) regarding Prairie Island plat maps

Contention 2 Contention 4

PROD00000243 10/30/1974 NSP Memorandum regarding Saint Mary's request to review Prairie Island plat maps Contention 2 Contention 4

PROD00000244 1979 Minnesota Historical Society text: The Mississipian Occupation of the Red Wing Area by Guy E. Gibbon Contention 2 Contention 4

PROD00000245 11/21/1980 NSP Memorandum regarding Prairie Island Archeological Dig Contention 2 Contention 4

PROD00000246 02/02/1981 Memo from E. Johnson [UMN Dept. Anthro] to 21GD148 Intensive Test Rept. Recipients Contention 2 Contention 4

PROD00000247 (9/17/1991) Letter from the Minnesota Historical Society to NSPC RE: Prairie Island Independent Spent Fuel Storage Installation; Goodhue County

Contention 2 Contention 4

PROD00000248 6/7/2007 Letter from Dennis A. Gimmestad (MN Historical Society) to James Holthaus (PINGP) regarding cultural resource issues

Contention 2 Contention 4

PROD00000249 04/2008 PIING License Renewal Application Appendix E - Environmental Report Contention 2 Contention 4

PROD00000250 5/28/2010 Email communication from Ronald C. Schirmer to Heather Westra et al. regarding archaeological site

Contention 2 Contention 4

PROD00000251 Cover Letter transmitting Literature Search and Assessment of Historical and Archaeological Resources Impacted by Construction

Contention 2 Contention 4

PROD00000252 Xcel Cover letter to MN Historical Society transmitting literature survey Contention 2 Contention 4

PROD00000253 Xcel letter to office of the State Archaeologist Contention 2 Contention 4

PROD00000254 Xcel letter to MN Historical Society Contention 2 Contention 4

PROD00000255 PINGP planned Archaeological, & Historical Resources Activities Contention 2 Contention 4

PROD00000256 Material Spoils Site Disposal Area Archaeological Survey Contention 2 Contention 4

PROD00000257 Task Archeological Investigation 2008 Contention 2 Contention 4

PROD00000258 10/27/2008 PINGP Plant Location Map Contention 2 Contention 4

Page 16: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

14

Document I.D. Description Contention

PROD00000259 PI Training Center Attendance Sheet from Cultural Resources Seminar Contention 2 Contention 4

PROD00000260 01/10/2008 Email from James Holthaus to Gene Eckholt re December Monthly report input Contention 2 Contention 4

PROD00000261 05/16/2008 Email from Ronald Schirmer to Emily Hildebrandt et. al. re Bartron site research plan.doc Contention 2 Contention 4

PROD00000262 05/16/2008 Email from Ronald Schirmer to Emily K. Hildebrandt re Draft for Xcel/PIIC Contention 2 Contention 4

PROD00000263 PINGP Site Audit Needs List Contention 2 Contention 4

PROD00000264 FP-RP-ENV-01 Rev. 0 Archaeological, Cultural & Historic Resource 02/06/06 Contention 2 Contention 4

PROD00000265 FP-IH-EXC-01, Rev. 3 Excavation & Trenching Controls 10/17/07 Contention 2 Contention 4

PROD00000266 8/22/08 Email from Emily Hildebrant to James Holthaus re Summary of Internship Work Contention 2 Contention 4

PROD00000267 8/26/2008 email from Brent Kuhl to Raelynn Jones-loss and Emily Hildebrant re Archaeological maps of PI site

Contention 2 Contention 4

PROD00000268 9/5/2008 email from Brent Kuhl to James Holthaus et. al. Re: PI Dredge material storage area Contention 2 Contention 4

PROD00000269 11/15/2007 email from Kathy Roxlau to Emily McRee re: PINGP Draft Cultural Resources Assessment Report Contention 2 Contention 4

PROD00000270 11/17/2008 email from James Holthaus to Peg Boden re: Small jobs at PINGP Contention 2 Contention 4

PROD00000271 Map of small jobs at PINGP Contention 2 Contention 4

PROD00000272 Map of New Road Proposal for removing Dredging material Contention 2 Contention 4

PROD00000273 12/10/2007 email from Kathy Roxlau to Emily McRee re: PINGP figure and information Contention 2 Contention 4

PROD00000274 12/15/2008 email Sven Borgersen C Hudak re: Dredge material storage pond proposed road Contention 2 Contention 4

PROD00000275 12/15/2008 email from Roth Trulson to C Hudak et. al. re: dredge material storage pond proposed road Contention 2 Contention 4

PROD00000276 12/17/2008 email from Emily Hildebrant to James Holthaus, et al, re Consultation with Indian Tribes in Section 106 Process Handbook

Contention 2 Contention 4

PROD00000277 12/22/2008 email from Emily Hildebrant to Raelynn Asah re FW: Initial Trust Map Contention 2 Contention 4

PROD00000278 1/16/2009 Email from Brian Zelenek to Oley Nelson et. al. re 4.6 mrem/year dose to average employee in Appendix f

Contention 4

Page 17: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

15

Document I.D. Description Contention

PROD00000279 18 Feb 2009 - Clarification - Request No 4.4 - Response to EIS Chapter 2, Section 5, -- Radiological Impacts Contention 6

PROD00000280 02/13/2009 Email from Raymond Kirsch to Cynthia Harrington re Request Concerning Fuel Enrichment - Prairie Island ISFSI EIS

Contention 6

PROD00000281 4 Feb 2009 - Clarification - Request No. 4.2 - response EIS Chapter 2, Section 5 - Radiological Impacts Contention 2 Contention 4

PROD00000282 2/4/2009 Email from Raymond Kirsch to Cynthia Harrington re EIS - OES Informal IR No. 4.1 Clarification Q 5.7 Radiological Impacts

Contention 4

PROD00000283 2/26/09 Email from Stephen Rakow to Brian Zelanak re IR 15 re: incremental dose Contention 4

PROD00000284 02/17/2009 Email from O. Nelson to B. Zelenak et al. re: OES IR's 19-23 re: License renewal, ALARA Contention 2 Contention 4

PROD00000285 PINGP Spent Fuel Dry Cask Storage and Transportation Systems Study Contention 6

PROD00000286 4/1/09 Direct Testimony of 4 witnesses RE: CON for ISFSI Expansion Contention 2 Contention 4

PROD00000287 4/09/2009 email from Roy Waterman to SL Samson, et al, re FW: Cask Fuel Status Contention 6

PROD00000288 04/22/2009 Direct Testimony of Dr. Steve Rakow RE: EPU Contention 4

PROD00000289 04/22/2009 Direct Testimony of Gregg S. Wilkinson Contention 4

PROD00000290 04/22/2009 Attachments of Dr. Steve Rakow Contention 4

PROD00000291 04/22/2009 Direct Attachments of Dr. Steve Rakow RE: EPU Contention 4

PROD00000292 26 May 2009 - doc - Handout of M8 M10 and A8.1 response for NRC meeting Contention 6

PROD00000293 Testimony of Gordon R. Thompson RE: EPU and ISFSI Contention 4

PROD00000294 06/01/09 Major Projects- Prairie Island Contention 6

PROD00000295 Draft notes of response to RAIs regarding TN-40HT specifications. Contention 6

PROD00000296 7/7/09 Prairie Island Communication Group Meeting Agenda Contention 4

PROD00000297 07/10/2009 Surrebuttal Testimony of Dr. David G. Hoel Contention 4

PROD00000298 (8/24/2009) Initial Post Hearing Brief of the Minnesota Department of Commerce, Office of Energy Security re: CON Proceedings

Contention 4

PROD00000299 (8/24/2009) RE: In the Matter of the Application of Northern States Power Company d/b/a Xcel Energy for a certificate of Need for the Prairie Island Nuclear Generating Plant for an Extended Power Uprate.

Contention 4

PROD00000300 (8/24/2009) Re: Applications to the Minnesota Public Utilities Commission for Two Certificates of Need and Site Permit for the Prairie Island Nuclear Generating Plant for Extended Power Uprate and Additional Dry Cask Storage

Contention 4

Page 18: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

16

Document I.D. Description Contention

PROD00000301 NEI DSTF 10 CFR matrix Contention 6

PROD00000302 2/26/1993 Order Approving Radiation Monitoring Plan in Part and Requiring further filings Contention 4

PROD00000303 9/9/1994 Order Modifying Radiation Monitoring Plan Contention 4

PROD00000304 EPRI Long-Term Dry Storage Workshop Contention 6

PROD00000305 NSP Application to State of MN for Certificates of Need for EPU and Add'l Dry Cask Storage Contention 2 Contention 4

PROD00000306 Holtec Highlights Newsletter re HBF Contention 6

PROD00000307 10/29/2009 Email from Oley Nelson to Brian Zelanak et. al. re dose to nearest resident as function of proposed loading schedule

Contention 4

PROD00000308 10/30/2009 email from Oley Nelson to Brian Zelenak, et al, re dose rate vs time.xls Contention 4

PROD00000309 process used to develop dose rate trend to nearest resident Contention 4

PROD00000310 Determining Total ISFSI Source Strength Corresponding to Dose Rates Determined TN40HT-0511 Contention 4

PROD00000311 TN-40 Transportation Packaging SAR Contention 4 Contention 6

PROD00000312 10/29/2009 Email from Oley Nelson to Brian Zelanak re dose to naest (sic) resident as function of proposed loading schedule

Contention 4

PROD00000313 dose to nearest resident Contention 4

PROD00000314 TN40HT Neutron Source Distribution Table Contention 4

PROD00000315 NEI Dry Storage Task Force Issues Matrix 11/12/2009 Contention 6

PROD00000316 18 Nov 2009 - EPRI Long-term Dry Storage Workshop Purpose and Draft Agenda Contention 6

PROD00000317 11/20/2009 draft power point presentation: NEI Dry Storage Task Force Meeting with NRC by Everett L. Redmond II, Ph.D., Nuclear Energy Institute

Contention 6

PROD00000318 01/07/2010 Petition for Reconsideration by PIIC RE: CON for EPU Contention 4

PROD00000319 4 Jan 2010 - Dose Limits SECY-07-0148 Enclosure 2(2).pdf Contention 4

PROD00000320 02/04/2010 Status Report - Submitted by: Tim MorrisonXcel Spent fuel Storage Report Contention 6

PROD00000321 02/11/2010 Status report Submitted by: Tim Morrison Xcel Energy Spent Fuel Storage Projects Contention 6

PROD00000322 02/25/2010 Status Report Submitted by: Tim Morrison Spent Fuel Storage Project Report Contention 6

Page 19: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

17

Document I.D. Description Contention

PROD00000323 2/19/10, Conference Call with Transnuclear to Discuss Their Responses to the Staff's Second Round Request for Additional Information Concerning Model No. TN-40 Transportation Package

Contention 4

PROD00000324 3/22/2010 Prairie Island Nuclear Plant 2010 Dry Fuel Storage Management Update Contention 2 Contention 4

PROD00000325 Prairie Island Nuclear Plant 2010 Dry Fuel Storage Management Update Contention 2 Contention 4

PROD00000326 3/17/2010 Xcel Energy "Prairie Island Nuclear Plant 2010 Dry Fuel Storage Management Update" Contention 2 Contention 4 Contention 6

PROD00000327 3/19/2010 Xcel Energy "Prairie Island Nuclear Plant 2010 Dry Fuel Storage Management Update" Contention 2 Contention 4

PROD00000328 3/18/2010 Xcel Energy "Prairie Island Nuclear Plant 2010 Dry Fuel Storage Management Update" Contention 2 Contention 4 Contention 6

PROD00000329 3/20/2010 Email from Oley Nelson to S.L. Samson regarding "TN-40HT implementation kick-off meeting" Contention 4 Contention 6

PROD00000330 03/08/2010 Email from Everett Redmond to Everett Redmond re NEI DSTF: Updates and actions Contention 6

PROD00000331 2010 Mutual Goals- Prairie Island Contention 2 Contention 4

PROD00000332 Fuel storage guidelines mentioning ISG-11 Contention 6

PROD00000333 Corrective Action report from Areva re: Fuel Thermal Conductivity Degradation Contention 6

PROD00000334 06/09/2010 Email from Jeff Gagne to Oley Nelson re FW: TN40HT SER and TS comments Contention 6

PROD00000335 06/07/2010 AT-0085 Supervisors Report Contention 2 Contention 4

PROD00000336 06/14/2010 AT-0085 Supervisors Report Contention 2 Contention 4

PROD00000337 06/21/2010 AT-0085 Supervisors Report Contention 2 Contention 4

PROD00000338 06/28/2010 AT-0085 Supervisors Report Contention 2 Contention 4

PROD00000339 6/06/2010 Photo taken by Merjent of PINGP Upcoming Construction Projects Contention 2 Contention 4

PROD00000340 Action Items List for Prairie Island Contention 2 Contention 4

PROD00000341 6/11/2010 email from Curtis Hudak to Tim Morrison re: Water Treatment Survey Area Contention 2 Contention 4

Page 20: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

18

Document I.D. Description Contention

PROD00000342 6/11/2010 Email From Tim Morrison to Oley Nelson re: FW: water treatment survey area Contention 2 Contention 4

PROD00000343 06/10 Project Plan for the Extended Storage and Transportation Regulatory Program Review Contention 6

PROD00000344 Design Bases for the PI ISFSI Contention 4

PROD00000345 Preliminary Safety Evaluation Report for the PI ISFSI Contention 4

PROD00000346 PI ISFSI Amendment to Materials License Contention 4

PROD00000347 Draft Shared Between Parties RE: PI ISFSI Dose Rates Contention 4

PROD00000348 Summary of TN40HT Changes re: Dose Rates Contention 4

PROD00000349 10/04/2010 e-mail from James Holthaus to Mary Sandok, et al, re FW: Notification to the PIIC? Contention 2 Contention 4

PROD00000350 10/6/2010 e-mail from M Sandok to J. Holthaus et al. re Notification to PIIC re soil tests for security, warehouse projects [and included prior e-mails]

Contention 2 Contention 4

PROD00000351 10/05/2010 e-mail form M Sandok to R. Trulson et al. re Notification to the PIIC? Contention 2 Contention 4

PROD00000352 09/30/2010 e-mail from J. Holthaus to M. Sandok re Notification to the PIIC? [and included prior e-mails] Contention 2 Contention 4

PROD00000353 10/05/2010 e-mail from R. Trulson to P. Gorman et al. re 010410 DRAFT courtesy [and included prior e-mails]

Contention 2 Contention 4

PROD00000354 10/05/2010 e-mail from D. Warner to J. Holthaus et al. re Notification to the PIIC? [and included prior e-mails]

Contention 2 Contention 4

PROD00000355 12/13/2010 Major Projects - Nuclear - weekly status report Contention 2 Contention 4

PROD00000356 12/20/2010 Major Projects - Nuclear - weekly status report Contention 2 Contention 4

PROD00000357 12/06/2010: Major Projects - Nuclear Contention 2 Contention 4

PROD00000358 12/27/2010 AT-0191 Non-CAP Report Contention 2 Contention 4

PROD00000359 12/20/2010 Letter to Lee Samson from Areva re: Submittal of TN responses regarding Tech specs Contention 6

PROD00000360 12/19/2010 email from James Hill to SL Samson and Oley Nelson re EPRI Report: Transportation of Commercial Spent Nuclear Fuel

Contention 6

PROD00000361 12/30/2010 email from James Holthaus to S L. Samson RE: Archaeologist Review of ISFSI EIS Contention 2 Contention 4

PROD00000362 12/27/2010 AT-0085 Supervisors Report Contention 2 Contention 4

Page 21: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

19

Document I.D. Description Contention

PROD00000363 12/13/2010 Major Projects - Nuclear - Weekly Status Report Contention 2 Contention 4

PROD00000364 12/14/2010 AT-0085 Supervisors Report Contention 2 Contention 4

PROD00000365 12/27/2010: Major Projects - Nuclear - weekly status update Contention 2 Contention 4

PROD00000366 1/3/2011: Major Projects - Nuclear - weekly status report Contention 2 Contention 4

PROD00000367 12/01/2010 AT-0085 Supervisors Report Contention 2 Contention 4

PROD00000368 9/28/2010 E-mail from Derek Warner to Svenn Borgerson re notification to PIIC? Contention 4

PROD00000369 9/28/2010 Email from Derek Warner to Svenn Borgerson re Notification to PIIC Contention 4

PROD00000370 Arial Photo of PING and ISFSI Pad Contention 4

PROD00000371 9/3/2010 E-mail from ACI Nuclear Solutions to Bill Herwig, et. al. re Top Nozzle Issue Update Contention 6

PROD00000372 June 25, 2010, SpentFUEL: The Latest Developments in Spent Fuel Management and Transportation Contention 6

PROD00000373 12/22/2011 email from Pamela Longmire to Jennie Eckholt re ACTION RSI response due Contention 4 Contention 6

PROD00000374 12/22/2011 Email from Jennie Eckholt to SL Samson, et al, re FW: ACTION: RSI response date Contention 4 Contention 6

PROD00000375 12/22/2011 Email from Jennie Eckholt to SL Samson re FW: ACTION: RSI response date Contention 4 Contention 6

PROD00000376 12/22/2011 Email from Jennie Eckholt to Paula Anderson and SL Samson re FW: ACTION: RSI response date Contention 4 Contention 6

PROD00000377 12/22/2011 Email from Jennie Eckholt to SL Samson, et al, re FW: ACTION: RSI response date Contention 4 Contention 6

PROD00000378 12/22/2011 email from Pamela Longmire to Jennie Eckholt re ACTION RSI response date Contention 4 Contention 6

PROD00000379 DFS projects log entry form re Neutron Shielding Resin Installation Procedure Contention 4

PROD00000380 12/2011 Xcel PowerPoint Presentation re: Prairie Island Nuclear Plant 2011 Dry Fuel Storage PRG Update Contention 2 Contention 4

PROD00000381 01/07/2011 Email from J. Holthaus to P. Gorman et al. RE: PIIC/XE Environmental Meeting Agenda for the Jan. 14 Meeting

Contention 2 Contention 4

PROD00000382 EPRI Transportation of Commercial Spent Fuel: Regulatory Issues Resolution, 2010 Technical Report Contention 6

PROD00000383 3/17/2011 Summary of Pre-Submittal Meeting Discussion with NRC in Rockville, MD Contention 6

Page 22: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

20

Document I.D. Description Contention

PROD00000384 3/17/2011 Summary of Pre-Submittal Meeting Discussion with NRC Contention 6

PROD00000385 Email chain from T. Morrison to J. Gagne, AREVA re: Helium Environment/Thermal Analysis Calculations Contention 6

PROD00000386 ISFSI License Renewal Technical Report PINGP Material Aging Effects Report Contention 6

PROD00000387 3/24/11 Fact checking for the Star Tribune Contention 2 Contention 4

PROD00000388 Technical information for ISFSI cask Service Platform Contention 2 Contention 4

PROD00000389 3/3/2011 ISFSI Cask Layout Contention 2 Contention 4

PROD00000390 Aging Management Activities by Item and AERM Contention 6

PROD00000391 StoreFUEL and Decommissioning Report, Vol 12, No. 153 (May 3, 2011) Contention 6

PROD00000392 6/29/2011 email from Marcus Nichol to Adam Levin et. al. re SRNL (DOE) requests for information and material

Contention 6

PROD00000393 Information Needed for Research and Development Effort of the DOE-NE UFD Campaign Contention 6

PROD00000394 Materials Needed for Research and Development Effort of the DOE-NE UFD Campaign Contention 6

PROD00000395 Materials Needed for Research and Development Effort of the DOE-NE UFD Campaign Contention 6

PROD00000396 7/25/2011 Major Projects - Nuclear weekly status report Contention 2 Contention 4

PROD00000397 ISFSI LRA RAI Database spreadsheet Contention 6

PROD00000398 StoreFUEL and Decommissioning Report Contention 6

PROD00000399 11/16/2011 from Donald Wayne Lewis to Oley Nelson, et al, re DOE NE Program for Testing and Evaluating the Long-Term Behavior of High Burnup Used Nuclear Fuel - Notes of Interview

Contention 6

PROD00000400 email from Oley Nelson to Ken Mossman, et al, re 04FS03-A210-139 Nearest resident dose values to be used for risk assessment

Contention 4

PROD00000401 email from Oley Nelson to Terry Pickens, et al, re Project ISFSI nearest neighbor dose Contention 4

PROD00000402 email from Oley Nelson to Marie-Anne Brudieu, et al, re 04FS03-A210-166 Transmittal of DIT 04FS03-02 Population estimates for Dose evaluation

Contention 4

PROD00000403 email from Glenn Adams to Pamela Longmire, et al, re MS Word Files for TN-40HT Amendment Technical Specifications

Contention 4

PROD00000404 email from Marie-Anne Brudieu to Oley Nelson, et al, re TN40HT NCR meeting questions summary Contention 6

Page 23: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

21

Document I.D. Description Contention

PROD00000405 email from Kenneth Albrecht to Oley Nelson and SL Samson re Notes from 1/24/08 TN40HT NRC Meeting Contention 6

PROD00000406 5/16/2008 Application to MNPUC for CoN, PI Nuclear Plant for additional dry cask storage and extended power uprate - NRC Docket E002/CN-08-509 & 510

Contention 2 Contention 4

PROD00000407 10/21/2009 Findings of Fact, Conclusions of Law and Recommendations from PUC proceedings Contention 2 Contention 4

PROD00000408 email from Mike Mason to Lee Samson and Oley Nelson re TN-40 Addendum Contention 4

PROD00000409 letter from Michael Mason to Oley Nelson re TN-40 Transportation Project -04FS03 Contention 6

PROD00000410 letter from Joe Schmidberger (Transnuclear) to Oley Nelson re TN-40 Transport Project -04FS02 Contention 6

PROD00000411 email from Steven Streutker to Oley Nelson and Don Shaw re TN40HT 0500 Fuel Qualification Tables and Design Basis Radiological Source Terms calc

Contention 4

PROD00000412 email from Steven Streutker to Oley Nelson and Don Shaw re TN40HT-408 Effective Properties WE 14x14 Contention 6

PROD00000413 email from Steven Streutker to Oley Nelson and Don Shaw re TN40HT-404 Thermal Analysis of TN40HT Cask for Vacuum Drying Conditions

Contention 6

PROD00000414 email from Steven Streutker to Oley Nelson and Don Shaw re TN40HT-0501, TN40HT-503 Nuclear Calculations

Contention 4

PROD00000415 email from Steven Streutker to Oley Nelson and Don Shaw re TN40HT-0214 Fuel Cladding End Drop Analysis Contention 6

PROD00000416 email from Steven Streutker to Oley Nelson, et al, re Resubmittal of TN-40HT-0501 calc Contention 4

PROD00000417 letter from Joe Schmidberger to Lee Samson re Transmittal of Dose Calcs Requested in 04FS03-A210-059 Contention 4

PROD00000418 Letter from Wesley Jacobs to Lee Samson re PI ISFSI CON Sections and Attachments Contention 2 Contention 4

PROD00000419 Letter from Jack Boshoven to Mark McKeown re Final RIS 2007-09 and ISG Review Reports Contention 6

PROD00000420 letter from Marie-Anne Brudieu to Lee Samson re Submittal of TN-40HB design criteria document Contention 6

PROD00000421 letter from Marie-Anne Brudieu to Lee Samson re Project 10421 TN40HT: Submittal of calculations TN40HT-0512 Revision 0

Contention 4

PROD00000422 ISFSI Activity in Curies Contention 4

PROD00000423 PINGP 279, Rev. 15: Safety Evaluation Contention 4

PROD00000424 Goodhue County Spent Fuel Storage Facility Environmental Report Contention 2 Contention 4

Page 24: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

22

Document I.D. Description Contention

PROD00000425 01/8/2013 Email from Marcus Nichol to Brian Gutherman re NRCS request for input on Retrievability - FRN 2013

Contention 6

PROD00000426 Spent Fuel Storage Projects Status Report 1/02/2013 Contention 6

PROD00000427 Nuclear Capital Projects status report 10/8/2012 Contention 6

PROD00000428 10/10/2012 Email from Rodney McCullum to Zita Martin et. al. re Used Fuel Storage Demonstration Project Utility Group call Follow-up

Contention 6

PROD00000429 Industry Meeting with Pete Lyons re: Used Fuel Confirmatory Demonstration Project Contention 6

PROD00000430 High Burn-up Fuel Storage and Transportation Confirmatory Data Project Contention 6

PROD00000431 Spent Fuel Storage Projects Status Report 11/22/2012 Contention 6

PROD00000432 10/26/2012 email from SL Samson to Michael Baumann re FW: Demo Contention 6

PROD00000433 Sources Sought Notice for High Burn-up Dry Storage Cask Demonstration Contention 6

PROD00000434 11/30/2012 email from SL Samson to Terry Pickens re FW: Cladding materials Contention 6

PROD00000435 11/30/12 email from Bradley Allen to SL Samson re: DOE posts sources sought notice for high burn-up dry storage cask demonstration project

Contention 6

PROD00000436 11/28/2012 Email from SL Samson to Michael Bauman re Document1 Contention 6

PROD00000437 11/28/2012 Email from SL Samson to Michael Baumann re Document1 Contention 6

PROD00000438 11/28/2012 email from SL Samson to Michael Baumann re Document1 Contention 6

PROD00000439 11/26/2012 email from Donald Wayne Lewis to SL Samson, et al, re FW: DOE Posts Sources Sought Notice for High Burn-up Dry Storage Cask Demonstration Project

Contention 6

PROD00000440 12/02/2012 Email from SL Samson to Michael Baumann re document1 Contention 6

PROD00000441 10/24/2012 email from SL Samson to Tim Morrison re FW: Discussion Paper for 10/25/DSTF SG Meeting - Role of Retrievability and Clad Integrity

Contention 6

PROD00000442 10/30/12 EPRI Paper: Industry Position on Paradigm for Retreivability and Clad Integrity Contention 6

PROD00000443 draft letter from John Kessler (EPRI) to Jeff Fogg Response to Source Sought Notice High Burnup DCS Demo Contention 6

PROD00000444 10/24/12 email from Terry Pickens to Miachel Baumann re Tim O'Connor's report to Mr. Fowke on Oct 12 Contention 6

PROD00000445 11/30/12 Spent Fuel: The Latest Developments in Spent Fuel Management and Transportation Contention 6

PROD00000446 Store Fuel: ... and Decommissioning Report (December 4, 2012) Contention 6

Page 25: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

23

Document I.D. Description Contention

PROD00000447 Nuclear Capital Projects weekly status report 8/27/2012 Contention 6

PROD00000448 9/09/2012 email from SL Samson to Jack Phelps re FW: Dry Storage Planned Update Contention 6

PROD00000449 06/27/2012 Email from Brian Gutherman to Alan Keary re Semi-annual NEI Dry storage update Contention 6

PROD00000450 Trip Report of Lee Samson and Mike Staley: 2012 Transnuclear NUHOMS User Group Meeting Contention 6

PROD00000451 SpentFuel: The Latest Developments in Spend Fuel Management and Transportation (Aug. 17, 2012) Contention 6

PROD00000452 StoreFUEL... and Decommissioning Report [Sept. 4, 2012] Contention 6

PROD00000453 StoreFUEL:... and Decommissioning Report (Aug. 7, 2012) Contention 6

PROD00000454 Technical Information for ISFSI Cask Service Platform Contention 2 Contention 4

PROD00000455 Figure 1: ISFSI Cask Layout Contention 2 Contention 4

PROD00000456 10/12/2010 Email from T. Morrison to J. Holthaus. re:regarding WR 6123 Contention 2 Contention 4

PROD00000457 6/11/2010 Email from C. Hudak to J. Holthaus et al. re: water treatment survey area Contention 2 Contention 4

PROD00000458 08/31/2010 Email from J. Holthaus to R. Trulson. re: Westwood Subsurface Disturbance Investigation for Various Projects

Contention 2 Contention 4

PROD00000459 1/12/2012 Email from O. Nelson to Lewis Donald et. al re: cladding materials Contention 6

PROD00000460 03/02/2012 Email from Marcus Nichol to Albert Machiels re Data to support High BU fuel storage renewal Contention 6

PROD00000461 Spreadsheet: PINGP TN40HT Cask Design and Licensing Contention 6

PROD00000462 05/01/2012 email from Marcus Nichol to Adam Levin, et al, re Concept Plan for High Burnup Confirmatory Data Project

Contention 6

PROD00000463 CONCEPT PLAN for a High Burn-up Fuel Storage and Transportation Confirmation Data Project, NEI org Contention 6

PROD00000464 High Burn-up Fuel Confirmatory Demonstration Project Contention 6

PROD00000465 04/4/2012 Email from Marcus Nichol to Adam Levin et. al. re NEI Dry Cask Storage and transportation related meetings - March update.docx

Contention 6

PROD00000466 5/01/2012 email from SL Samson to Tim Morrison and Oley Nelson re FW: Concept Plan for High Burnup Confirmatory Data Project

Contention 6

PROD00000467 Concept Plan for a High Burn-Up Fuel Storage and Transportation Confirmatory Data Project Contention 6

PROD00000468 High Burn-Up Fuel Confirmatory Demonstration Project Contention 6

Page 26: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

24

Document I.D. Description Contention

PROD00000469 New Radiation Monitoring Plan Development Prairie Island Independent Spent Fuel Storage Installation Contention 2 Contention 4

PROD00000470 Status of Prairie Island ISFSI Monitor Replacement Contention 2 Contention 4

PROD00000471 PowerPoint: Storage of High Burnup Fuel Beyond 20 Years Contention 6

PROD00000472 Major Projects - Nuclear weekly status report Contention 6

PROD00000473 6/8/2012 Site Tour Topics & NRC PING ISFSI walk through Contention 2 Contention 4

PROD00000474 6/11/2012 Email from Gene Eckholt to Jean Trefethen re Prairie Island ISFSI Call Information Contention 2 Contention 4 Contention 6

PROD00000475 Used Fuel Disposition Campaign - EPRI Extended Storage Collaboration Program Contention 6

PROD00000476 2012 - Used Fuel Storage and Transportation Related Meetings and Events Contention 6

PROD00000477 06/18/2012 e-mail from Gutherman Tech Serv. to Marcus Nichol, et al., re draft presentation on HBF storage Contention 6

PROD00000478 Managing Aging Effects on Used Fuel Dry Cask For Extended Long-Term Storage Contention 6

PROD00000479 Advanced Surveillance Technologies for Used Fuel Long Term Storage and Transportation Contention 6

PROD00000480 08/07/2012 email from Daniel Hayes to Tim Morrison, et al, re TN-40HT Calculations Contention 4

PROD00000481 PowerPoint: High Burnup Used Fuel Demonstration Workshop Contention 6

PROD00000482 Power Point: Used Fuel Disposition Campaign - High Burnup Used Fuel Demonstration Workshop Contention 6

PROD00000483 Power Point: High Burnup Used Fuel, Full-Scale, Long Term Demonstration: Logistics Contention 6

PROD00000484 PowerPoint: Idaho National Laboratory: Workshop Overvierw Contention 6

PROD00000485 PowerPoint: Critical Data to Obtain from a Demonstration - submitted by Brady Hanson, R&D Investigations Lab Used Fuel Disposition Campaign

Contention 6

PROD00000486 Power Point: High Burnup Used Fuel Demonstration Workshop: Programmatic Topics for Discussion Contention 6

PROD00000487 8/9/2012 Email from Rodney McCullum to Zita Martin et. al. re Used Fuel Storage Demonstration Project - Utility Group Call

Contention 6

PROD00000488 PowerPoint: High Burn-up Used Nuclear Fuel Extended Storage and Transportation Demo: Industry Perspectives

Contention 6

Page 27: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

25

Document I.D. Description Contention

PROD00000489 8/15/2012 Email from Tim Morrison to Oley Nelson et. al. re Planned Fuel to load next year Contention 6

PROD00000490 8/9/2012 Email from Rodney McCullum to Martin Zita re Used Fuel storage Demonstration project - Utility group call

Contention 6

PROD00000491 8/10/2012 Email from Terry Pickens to SL Samson re Efford to do research on high burnup fuel at Idaho NL Contention 6

PROD00000492 Spent Fuel Storage Projects Status Report 8/22/2012 Contention 6

PROD00000493 Spent Fuel Storage Projects Status Report 8/29/2012 Contention 6

PROD00000494 8/9/2012 Email from Rodney McCullum to Zita Martin et. al. re Used fuel storage Demonstration project - utility group call

Contention 6

PROD00000495 8/22-23/2012 Draft Presentation by Rod McCullum of the NEI re: High Burn-up Used Nuclear Fuel Extended Storage and Transportation Demo

Contention 6

PROD00000496 9/18/2012 E-mail from John Kessler of EPRI to Michelle Baumann re: high burn-up fuel demonstration program

Contention 6

PROD00000497 Spent Fuel Storage Projects Status Report (09/05/2012) Contention 6

PROD00000498 Spent Fuel Storage Projects Status Report (09/12/2012) Contention 6

PROD00000499 Spent Fuel Storage Projects Status Report (09/19/2012) Contention 6

PROD00000500 High Burnup Used Fuel Extended Storage Demo: Potential technical talking point for the November 8th meeting with Pete Lyons

Contention 6

PROD00000501 10/29/2012 Email from Steve Marschman to Harold Adkins et. al. re High Burnup Used Fuel Demonstration Workshop

Contention 6

PROD00000502 10/11/12 High Burnup Fuel Storage and Transportation Confirmatory Data Project Contention 6

PROD00000503 Spent Fuel Storage Projects Status Report 10/3/2012 Contention 6

PROD00000504 Spent Fuel Storage Projects Status Report 10/10/2012 Contention 6

PROD00000505 Spent Fuel Storage Projects Status Report 10/17/2012 Contention 6

PROD00000506 Spent Fuel Storage Projects Status Report 10/24/2012 Contention 6

PROD00000507 Spent Fuel Storage Projects Status Report 10/31/2012 Contention 6

PROD00000508 Spent Fuel Storage Projects Status Report 11/07/2012 Contention 6

PROD00000509 Spent Fuel Storage Projects Status Report 11/15/2012 Contention 6

PROD00000510 Spent Fuel Storage Projects Status Report 11/21/2012 Contention 6

PROD00000511 Spent Fuel Storage Projects Status Report 11/01/2012 Contention 6

PROD00000512 1/17/2013 Email from SL Samson to Jim Becka et al. re:NRC's FRN on Retrievability, Cladding Integrity,and Fuel Handling Published 1/17/13

Contention 6

Page 28: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

26

Document I.D. Description Contention

PROD00000513 4/04/2012 email from SL Samson to Jim Becka and Tim Morrison re FW: NEI Dry Cask Storage Task Force - March Update

Contention 6

PROD00000514 05/2012 Handwritten Notes from NEI Used Fuel Conference Contention 6

PROD00000515 07/23/2012 email from James Holthaus to Brian Zelenak, et al, re RE: Follow Up Information on NRC ISFSI Visit

Contention 2 Contention 4 Contention 6

PROD00000516 Used Fuel Disposition Campaign: High Burnup Used Fuel Demonstration Workshop Contention 6

PROD00000517 08/16/2012 email from Tim Morrison to Nelson Oley, et al, re FW: TN-40HT Calculations Contention 4

PROD00000518 Aug 23 2012 EPRI High Burnup Used Fuel, Full-Scale, Long-Term Demonstration: Logistics Contention 6

PROD00000519 High Burnup Used Nuclear Fuel Extended Storage and Transportation Demo: Industry Perspectives Contention 6

PROD00000520 PowerPoint: High Burnup Used Fuel Demonstration Workshop Contention 6

PROD00000521 Spent Fuel Storage Projects Status Report Contention 6

PROD00000522 10/22/2012 Email from Tim Morrison to Jeff Gagne (Areva) re RE: DISCUSSION ITEMS FOR WEDNESDAY Contention 4

PROD00000523 10/25/2012 email from Tim Morrison to SL Samson re FW: Demo Contention 6

PROD00000524 Spent Fuel Storage Projects Status Report Contention 6

PROD00000525 Spent Fuel Storage Projects Status Report Contention 6

PROD00000526 12/4/2012 email from Tim Morrison to Oley Nelson and Michael Staley re FW: Response to Sources Sought Notice - High Burnup Cask Demonstration Project

Contention 6

PROD00000527 draft letter from John Kessler (EPRI) to Jeff Fogg (DOE) re Response to Source Sought Notice - High Burnup Dry Cask Storage Demonstration

Contention 6

PROD00000528 Spent Fuel Storage Projects Status Report 11/28/2012 Contention 6

PROD00000529 72.48 Screening: Addition of survey and elevation marking to TN-40HT Casks Contention 6

PROD00000530 72.48 Screening: Additional lifting lugs on the Protective Cover of TN-40HT Casks Contention 6

PROD00000531 Spent Fuel Storage Projects Status Report (12/12/12) Contention 6

PROD00000532 PI ISFSI License Renewal Pre-Submittal Meeting (Rockville, MD 03/17/2011) [Presentation by Xcel] Contention 4

PROD00000533 3/12/1991 MN Environmental Quality Board "Prairie Island Spent Fuel Storage Expansion Project" Agreement Contention 4

PROD00000534 02/12/1999 Safety Evaluation (Non-Design Change) ISFSI Neutron Skyshine Dose Rates Contention 4

Page 29: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

27

Document I.D. Description Contention

PROD00000535 Excel Spreadsheet: Review of TN Calculations for TLAA Contention 4

PROD00000536 Table DADDSA from ISFSI License Renewal documents Contention 4

PROD00000537 Response to RAI A7A.3 exponential function Contention 4

PROD00000538 2 mile dose section Contention 4

PROD00000539 U.S. D.O.E. "Gap Analysis to Support Extended Storage of Used Nuclear Fuel" (Presentation by Brady Hanson to Nuclear Waste Tech. Rev. Bd 09/13/2011)

Contention 6

PROD00000540 Development and Evaluation of Cask Demonstration Programs 12/2011 Contention 6

PROD00000541 01/17/2012 Summary of conversation with Wayne Lewis Contention 6

PROD00000542 Outline for meeting with upper management re cask demonstration project with high-burnup fuel Contention 6

PROD00000543 1/17/07 Arial Photograph of PINGP ISFSI Site Contention 2 Contention 4

PROD00000544 Chapter 7 of MN Certificate Of Need Application: Wastes and Emissions Contention 6

PROD00000545 Word document: List of TN-40HT Calculations Contention 4

PROD00000546 Appendices to Application for Certificates of Need for the Prairie Island Nuclear Generating Plant Contention 4

PROD00000547 Xcel's Response to Clarification Request No. 4.4 (EIS Chap. 2, Sect. 5 - Radiological Impacts) Contention 4

PROD00000548 EPRI Report: Structural Integrity of Advanced Claddings During Spent Nuclear Fuel Transportation and Storage: Creep Testing and Characterization of ZIRLO (TM) and LK3 Cladding Tubes

Contention 6

PROD00000549 EPRI Article: Used Fuel Extended Storage Contention 6

PROD00000550 PowerPoint: Hydride Reorientation Testing of High-Burnup Cladding Contention 6

PROD00000551 Research Paper Prepared by Various NRC Staff re: Why Risk Assessment in Long-Term Storage of Spent Nuclear Fuel?

Contention 6

PROD00000552 6/1/2012 NEI Comments on DOE Used Fuel Disposition Campaign Draft Used Nuclear Fuel Storage and Transportation Data Gap Prioritization dated April 30, 2012

Contention 6

PROD00000553 3/2010 ASTM Standard Guide for Evaluation of Materials Used in Spent Nuclear Fuel Dry Storage Systems Contention 6

PROD00000554 EPRI: Technical Bases for Extended Dry Storage of Spent Nuclear Fuel Contention 6

PROD00000555 Battelle’s Pacific NW Division "Data Needs for Long-Term Dry Storage of LWR Fuel" (Interim Report) Contention 6

PROD00000556 Standard Review Plan for Renewal of Spent Fuel DCSS Licenses and Certificates of Compliance-- Draft for Review

Contention 6

Page 30: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

28

Document I.D. Description Contention

PROD00000557 Radiation Protection Implementing Procedure Radiological Environmental Monitoring Program Contention 4

PROD00000558 5/1/1995 PINGP ISFSI Berm Construction diagrams Contention 2 Contention 4

PROD00000559 Summary of Discussion with NRC [Prepared by Xcel for internal use following 11/18/2011 Rockville, MD, public mtg with NRC]

Contention 6

PROD00000560 Cross Reference Matrix Current Technical Specifications to Revised Technical Specifications Contention 4

PROD00000561 PINGP ISFSI Record of technical specifrication (sic) changes and license amendments Contention 6

PROD00000562 email from Michael Baumann to SL Samson re Demo Contention 6

PROD00000563 Industry Position on Paradigm for Retrievability and Clad Integrity (Draft for Discussion) Contention 6

PROD00000564 Nuclear Capital Projects Status Report 10/15/2012 Contention 6

PROD00000565 Nuclear Capital Projects Status Report Contention 6

PROD00000566 10/24/2012 email from Marcus Nichol to Bob M. Mitchell et al re Discussion Paper for 10/25 DSTF SG Meeting - Role of Retrievability and Clad Integrity

Contention 6

PROD00000567 Industry Position on Paradigm for Retrievability and Clad Integrity Contention 6

PROD00000568 Dry Storage Task Force - Steering Group: 10/25/2012 Meeting Summary Contention 6

PROD00000569 2012 Dry Storage Task Force Goals (10/25/2012) Contention 6

PROD00000570 Spent Fuel Storage and Transportation: Licensing Program Improvements Contention 6

PROD00000571 email from Raymond Termini to John Kessler RE: Discussion Paper for 10/25 DSTF SG Meeting - Role of Retrievability and Clad Integrity

Contention 6

PROD00000572 Email from Raymond Termini to Marcus Nichol RE: Discussion Paper for 10/25 DSTF SG Meeting - Role of Retrievability and Clad Integrity

Contention 6

PROD00000573 PowerPoint: Xcel 2012 Project Accomplishments Contention 6

PROD00000574 email from Donald Wayne Lewis to SL Samson re High Burn-up Dry Storage Cask Demonstration Project Contention 6

PROD00000575 email from Oley Nelson to SL Samson re FW: Cladding materials Contention 6

PROD00000576 email from Terry Pickens to SL Samson and Michael Baumann re Summary of High Burnup Issue Contention 6

PROD00000577 PowerPoint: Xcel 2012 Project Accomplishments Contention 6

PROD00000578 PowerPoint: Xcel 2012 Project Accomplishments Contention 6

Page 31: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

29

Document I.D. Description Contention

PROD00000579 NRC Question response form Request # 9 re: on-site dose rates and worker classifications Contention 4

PROD00000580 NRC Question response form Request # 3 re: TLD doses in REMP report Contention 4

PROD00000581 Report from Tim O'Connor to Executive Committee re Nuclear Report - Week ending December 7, 2012 Contention 6

PROD00000582 11/29/2012 DOE Notice re: High Burn-up Fuel Demonstration Project Contention 6

PROD00000583 PowerPoint: Storage of High Burnup Fuel Beyond 20 Years Contention 6

PROD00000584 Major Projects Status Report April 23, 2012 Contention 6

PROD00000585 Major Projects Status Report April 30,2012 Contention 6

PROD00000586 Email from Marcus Nichol to Albert Machiels, et al, re draft Talking Points on High Burnup Storage Renewal Contention 6

PROD00000587 High Burn-up Fuel Storage Renewal Contention 6

PROD00000588 email from Carlyn Greene to Jennie Eckholt and SL Samson re RE: article on your NEI presentation Contention 6

PROD00000589 Email from Jennie K. Eckholt to Marcus Nichol and Oley Nelson regarding "High BU storage renewal" Contention 6

PROD00000590 Major Projects - Nuclear Status Report 5/14/2012 Contention 6

PROD00000591 Major Projects - Nuclear Status Report Contention 6

PROD00000592 Major Projects - Nuclear Status Report Contention 6

PROD00000593 5/17/2012 Email from Oley Nelson to S.L. Samson and "[email protected]" regarding "High BU storage renewal" Contention 6

PROD00000594 PowerPoint: Storage of High Burnup Fuel Beyond 20 Years Contention 6

PROD00000595 Stipulation Agreement of Minnesota Dept of Health, the PIIC and NSP Modifying NSP's Radiation Monitoring Plan

Contention 4

PROD00000596 In the Matter of an Application for a Certificate of Need of an ISFSI: Order Granting Limited Certificate of Need

Contention 2 Contention 4

PROD00000597 Letter from Paul Zerby to Richard Lancaster re: Minnesota Department of Health Comments Prairie Island ISFSI Monitoring Plan

Contention 4

PROD00000598 MN Public Utilities Commission Order Approving Radiation Monitoring Plan in Part and Requiring Further Filings Contention 4

PROD00000599 Document New Radiation Monitoring Plan Development Prairie Island ISFSI Contention 4

PROD00000600 Status of Prairie Island ISFSI Monitor Replacement Contention 4

PROD00000601 Travel Authorization Form for Brian Zelenak to attend NRC Public Meeting on High Burn-Up Fuel Contention 6

PROD00000602 Dry Storage Task Force Steering Group 07/26/12 Meeting Summary Contention 6

Page 32: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

30

Document I.D. Description Contention

PROD00000603 7/27/2012 Prairie Island Dry Fuel Storage power point presentation for Transnuclear Users Group Meeting re: Prairie Island Dry Fuel Storage

Contention 2 Contention 4

PROD00000604 8/15/2012 email From: Zita Martin To: Tom Brookmire et. al. re: Used Fuel Storage Demonstration Project Contention 6

PROD00000605 8/2/2012 email From William Slagle To: Lee Samson and Oley Nelson re: Summary of Separate Discussion with Robert Einziger during 7/25/2012 NRC/NEI/Industry Meeting on DCS

Contention 6

PROD00000606 Nuclear Capital Projects 8/27/2012 Contention 6

PROD00000607 Spent Fuel Storage Projects Status Report 9/26/2012 Contention 6

PROD00000608 ASTM: Standard Guide for Drying Behavior of Spent Nuclear Fuel Contention 6

PROD00000609 Email From John Kessler to Marcus Nichol et. al. RE: Dry Cask Storage Issues List Item 3 (DPC transportability and criticality): Relevant EPRI work

Contention 6

PROD00000610 Email From Tim Morrison to Lee Samson and Oley Nelson RE: ASTM Workshop on Extended Dry Storage of Used Nuclear Fuel

Contention 6

PROD00000611 1/3/2012 Email From Jennie Eckholt To: Oley Nelson et. al. re: Cask Demonstration for Long Term Storage Contention 6

PROD00000612 20 Feb 2012 - email - From Jennie Eckholt to Lee Samson- EPRI Contact - re: Kessler's pdf re HBF Contention 6

PROD00000613 20 Feb 2012 - pdf - EPRI Extended Storage Research Perspective - kessler[1] Contention 6

PROD00000614 22 Feb 2012 - email from [email protected] - to Samson Recent PI RAIs involving highburnup fuel Contention 6

PROD00000615 Operational Challenges of Extended Dry Storage of Spent Nuclear Fuel (Conference from 02/26/12 to 03/01/12)

Contention 6

PROD00000616 Design Criteria for the TN-40 High Burnup Spent Fuel Storage/Transportation Cask Contention 6

PROD00000617 4/13/2012 Email from Marcus Nichol (NEI) to Jennie K. Eckholt and Oley Nelson re FW: Data to support High BU Fuel Storage Renewal

Contention 6

PROD00000618 ANL High-Burnup Spent Nuclear Fuel Transport Project Contention 6

PROD00000619 6/26/2012 Argonne National Laboratory document entitled "Hydride Reorientation Testing of High-Burnup Cladding"

Contention 6

PROD00000620 10/18/2012 Email from Jennie K. Eckholt to Oley Nelson regarding "Partial Acceptance of Proposed Rulemaking" re HBU

Contention 6

PROD00000621 Draft paper WM2013 Conference February 24-28, 2013, Phoenix, Arizona USA Contention 6

PROD00000622 EPRI December 2010 DOE Question to US Industry: "What do you want? Contention 6

Page 33: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

31

Document I.D. Description Contention

PROD00000623 Specific Comments on the NRC Draft Report on Identification and Prioritization of the Technical Information Needs Affecting Potential Regulation of Extended Storage and Transportation of Spent Nuclear Fuel

Contention 6

PROD00000624 NEI Comments on DOE Used Fuel Disposition Campaign DRAFT "Used Nuclear Fuel Storage and Transportation Data Gap Prioritization" dated April 30, 2012

Contention 6

PROD00000625 4/30/2012 Used Fuel Disposition Campaign- Used Nuclear Fuel Storage and Transportation Data Gap Prioritization DRAFT

Contention 6

PROD00000626 Email from R. McCullum [email protected] to Integrated Used Nuclear Fuel Management Working Group re: Follow up From Yesterday's Integrated Used Nuclear Fuel Management Working Group Meeting

Contention 6

PROD00000627 11/04/12 High Burn-Up Fuel Storage and Transportation Confirmatory Data Project Contention 6

PROD00000628 4/28/11 EPRI Impacts Associated with Transfer of Spent Nuclear Fuel from Spent Fuel Storage Pools to Dry Storage After Five Years of Cooling

Contention 6

PROD00000629 Transportation and Storage Subcommittee Report to the Full Commission (Draft): Blue Ribbon Commission on America's Nuclear Future

Contention 6

PROD00000630 Disposal Subcommittee Report to the Full Commission (Draft): Blue Ribbon Commission on America's Nuclear Future

Contention 6

PROD00000631 NEI Integrated Used Nuclear Fuel Management Working Group Agenda Contention 6

PROD00000632 The Future of the Nuclear Fuel Cycle: An Interdisciplinary MIT Study Contention 6

PROD00000633 EPRI: Used Fuel Extended Storage : what the US Industry wants from DOE (Draft for industry comment) Contention 6

PROD00000634 CNO talking Points for NRC Interactions Industry Commitment to a High Burn-up Used Nuclear Fuel Demonstration Project

Contention 6

PROD00000635 EPRI: Used Fuel Extended Storage : what the US Industry wants from DOE (Draft for industry comment) Contention 6

PROD00000636 Blue Ribbon Commission On America's Nuclear Future Contention 6

PROD00000637 EPRI Used Fuel Extended Storage Projects Contention 6

PROD00000638 RE: Supplemental Filing -- Application to the Minnesota Public Utilities Commission for a Certificates of Need for the Prairie Island Nuclear Generating Plant for Extended Power Uprate and Additional Dry Cask Storage

Contention 4

Page 34: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

32

Document I.D. Description Contention

PROD00000639 State of Minnesota Office of Administrative Hearings For the Public Utilities Commission RE: Prairie Island Nuclear Generating Plant Certificates of Need for Extended Power Uprate and Additional Dry Cask Storage

Contention 2 Contention 4

PROD00000640 MN OES Brief in support of approval of Xcel CON Contention 2 Contention 4

PROD00000641 Comments on EIS from Just Change Contention 2 Contention 4

PROD00000642 Appendices to Application for Certificates of Need for the Prairie Island Nuclear Generating Plant Contention 4

PROD00000643 Application to the Minnesota Public Utilities Commission for a Generating Plant Site Permit Prairie Island Nuclear Generating Plant Extended Power Uprate Project submitted by Xcel Energy

Contention 4

PROD00000644 Application to the Minnesota Public Utilities Commission for Certificates of Need for the Prairie Island Nuclear Generating Plant for Additional Dry Cask Storage Docket No. E002/CN-08-510 and Extended Power Uprate Docket No. E002/CN-08-509

Contention 2 Contention 4

PROD00000645 Prairie Island Indian Community Response to Information Request No 29 Contention 4

PROD00000646 Prairie Island Indian Community Response to Information Request No. 30 Contention 4

PROD00000647 PIIC Response to Information Request re: Radiation to public Contention 4

PROD00000648 Comments and Recommendations of the Minnesota Office of Energy Security Energy Facility Permitting Staff Contention 2 Contention 4

PROD00000649 Surrebuttal Testimony of Gregg S. Wilkinson on behalf of the Prairie Island Indian Community before the Minnesota Public Utility Commission

Contention 4

PROD00000650 MN Public Utilities Commission Office of Administrative Hearings: Findings of Fact, Conclusions of Law, and Recommendations

Contention 2 Contention 4

PROD00000651 Initial Comments of the Prairie Island Indian Community in Response to Xcel Energy's Petition and Notice of Changed Circumstances

Contention 4

PROD00000652 04/08/2009 Offsite Dose Calculation Manual Contention 4

PROD00000653 Direct Testimony of Dr. Steve Rakow on behalf of OES RE: CON for EPU and PINGP Contention 4

PROD00000654 03/17/2009 State of Minnesota, Minnesota Department of Commerce Notice of Availability DEIS Notice of Public Meeting

Contention 2 Contention 4

PROD00000655 Testimony of Gregg S. Wilkinson on behalf of PIIC re: Radiation dose to the public Contention 4

PROD00000656 Direct Attachments of Dr. Steve Rakow on behalf of OES re: Dose to public Contention 4

Page 35: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

33

Document I.D. Description Contention

PROD00000657 11/12/2009 Minnesota Public Utilities Commission Staff Briefing Papers Contention 2 Contention 4

PROD00000658 Order Accepting Stipulation between PIIC, MN Dept of Health, and Xcel Contention 4

PROD00000659 Order Approving Radiation Monitoring Plan in Part and Requiring Further Filings Contention 4

PROD00000660 Order Modifying Radiation Monitoring Plan Contention 4

PROD00000661 Order Granting Limited Certificate of Need Contention 4

PROD00000662 PINGP Study Group DEIS Comments Contention 2 Contention 4

PROD00000663 Used Fuel and HLW Management Program Funding and Priorities Contention 6

PROD00000664 Extended Used Fuel and HLW Storage Contention 6

PROD00000665 High Burn-up Fuel Transportation Contention 6

PROD00000666 email J. Kessler (EPRI) to T. Pickens, et al. re: Source Sought - High Burnup Dry Cask Storage Demonstration Project - Kessler draft Rev 2.docx

Contention 6

PROD00000667 Response to Source Sought Notice - High Burnup Dry Cask Storage Demonstration Project Contention 6

PROD00000668 Email from John Kessler to Terry Pickens RE: Comments on Source Sought HBU Dry Cask Storage Demonstration Project

Contention 6

PROD00000669 2012 ANS Annual Meeting Official Program Contention 6

PROD00000670 ANS Conference Summary Notes Contention 6

PROD00000671 Managing Aging Effects on Used Fuel Dry Cask For Extended Long Term Storage Contention 6

PROD00000672 Advanced Surveillance Technologies for Used Fuel Long Term Storage and Transportation Contention 6

PROD00000673 EPRI Structural Integrity of Advanced Claddings During Spent Nuclear Fuel Transportation and Storage Contention 6

PROD00000674 High Burnup Used Fuel Demonstration Workshop Slides Contention 6

PROD00000675 White Paper High Burnup Used Fuel Demonstration Project Support Contention 6

PROD00000676 EPRI High Burnup Used Fuel, Full-Scale, Long-Term Demonstration: Logistics Contention 6

PROD00000677 High Burn-up Used Nuclear Fuel Extended Storage and Transportation Demo Industry Perspectives Contention 6

PROD00000678 High Burnup Used fuel Demonstration Workshop: Programmatic Topics for Discussion Contention 6

PROD00000679 Used Fuel Disposition Campaign Contention 6

Page 36: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

34

Document I.D. Description Contention

PROD00000680 DOE Action to Support a Demonstration Contention 6

PROD00000681 HBF Demo Workshop Welcome Contention 6

PROD00000682 HBF Demo Workshop Overview Contention 6

PROD00000683 2012 Transnuclear NUHOMS User Group Meeting Trip Notes Contention 6

PROD00000684 Spent fuel Storage Projects Status Report Contention 6

PROD00000685 Store Fuel... and Decommissioning Report Vol. 13 No. 163 Contention 6

PROD00000686 Store Fuel... and Decommissioning Report Vol 13 No. 164 Contention 6

PROD00000687 Response to Clarification Request No 4.4 Contention 4

PROD00000688 Response to Information Request No. 4 Contention 4

PROD00000689 Response to Clarification Request No. 4.1 Contention 4

PROD00000690 Response to Clarification Request No. 4.2 Contention 4

PROD00000691 Response to Clarification Request No. 4.3 Contention 4

Page 37: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

1

ATTACHMENT 2

Northern States Power Co. Prairie Island Independent Spent Fuel Storage Installation License Renewal Proceeding

Docket No. 72-10-ISFSI-2; ASLBP No. 12-922-01-ISFSI-MLR-BRD01 Proprietary Log for NSPM’s Initial Disclosures (February 28, 2013)

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000001 4-Dec-12 EPRI Xcel

Response to Source Sought Notice-High Burnup Dry Cask Storage Demonstration Project

Contention 6

PROP00000002 2-Jul-10 Westwood Proposal to examine ISFSI site Contention 2 Contention 4

PROP00000003 7-Feb-08 Xcel 2/7/2008 Letter from Shelley Buck-Yeager of PIIC to Mike Wadley of NMC re: Draft Environmental Report

Contention 4

PROP00000004 5-May-08 Xcel Proposal for Geo physical Investigations Contention 2 Contention 4

PROP00000005 1-Mar-05 Westinghouse Xcel

10/2004 Prairie Island High Burnup LTA Inspection Report Contention 6

PROP00000006 1-Dec-03 Westinghouse Electric Company LLC Xcel

12/2003 Final Report re: Hot Cell Examination of ZIRLO PWR Fuel Contention 6

PROP00000007 Unknown Xcel Prairie Island ISFSI Study prepared by Shaw Stone and Webster, Inc.

Contention 4

PROP00000008 Unknown Xcel Blueprint of ISFSI Storage Arrangement with 65 TN40-Casks Contention 4

PROP00000009 Unknown Xcel ISFSI Diagram Contention 2 Contention 4

PROP00000010 15-Dec-09 Xcel PowerPoint: Literature Search and Assessment of Historical and Archaeological Resources

Contention 2 Contention 4

PROP00000011 22-Sep-08 PIIC Xcel

9/22/2008 letter from PIIC to NRC Re: Environmental scoping for the relicensing of the Prairie Island Nuclear Generating Plant, Units 1 and 2

Contention 2 Contention 4

PROP00000012 16-Sep-09 XCEL 11 Sept 2009 - Proposed Findings of Fact, Conclusions and Recommendations of the Office of Energy Security MPUC Docket ..Cn-08-510

Contention 2 Contention 4

PROP00000013 11-Sep-09 XCEL Proposed Findings of Fact, Conclusions and Recommendation of Office Energy Security - MPUC Docket ....CN-08-509.

Contention 2 Contention 4

Page 38: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

2

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000014 11-Sep-09 Xcel The PIIC Filing to the ALJ incl. Reply Brief and Proposed FoF Contention 2 Contention 4

PROP00000015 4-Dec-12 EPRI Xcel

12/4/2012 Letter to DOE (Idaho Office) from J. Kessler (EPRI) re Response to Source Sought Notice -- High Burnup Dry Cask Storage Demo Proj.

Contention 6

PROP00000016 10-Nov-94 Stone and Webster Xcel

Diagram of ISFSI Contention 2 Contention 4

PROP00000017 11-May-95 Stone and Webster Xcel

ISFSI site map Contention 2 Contention 4

PROP00000018 11-May-95 Stone & Webster Xcel

ISFSI site map Contention 2 Contention 4

PROP00000019 24-Apr-91 Stone & Webster Xcel

PINGP Map Contention 2 Contention 4

PROP00000020 24-Sep-10 Xcel 09/24/2010 2009 PINGP Excavation Activity Annual Report Contention 2 Contention 4

PROP00000021 1-Apr-11 Xcel 04/01/2011 2010 PINGP Excavation Activity Annual Report Contention 2 Contention 4

PROP00000022 16-Apr-12 Xcel 04/16/2012 2011 PINGP Excavation Activity Annual Report Contention 2 Contention 4

PROP00000023 19-Jun-09 Merjent Xcel

06/19/2009 Letter from Merjent re: Phase I Reconnaissance Survey

Contention 2 Contention 4

PROP00000024 29-Jul-09 Xcel 07/29/2009 Letter to PIIC Tribal Council re: Environmental Assessment Worksheet

Contention 2 Contention 4

PROP00000025 23-Mar-11 Xcel 03/23/2011 FP-CY-ENV-01 Rev 1 Archaeological, Cultural & Historic Resources

Contention 2 Contention 4

PROP00000026 29-Oct-12 Westwood Xcel

ISFSI Investigation Methodology Contention 2 Contention 4

PROP00000027 19-Mar-12 Xcel 03/19/2012 Email from David Gauger to Pamela Gorman, et al, re Artifacts collected during excavation activities

Contention 2 Contention 4

PROP00000028 24-Oct-11 Xcel Prairie Island Indian Community Repatriation Ceremony, Oct. 24, 2011

Contention 2 Contention 4

PROP00000029 17-Oct-11 Xcel 10-17-2011 e-mail from J. Holthaus to P. Gorman re PIIC Repatriation

Contention 2 Contention 4

PROP00000030 17-Oct-11 Xcel 10/17/2011 e-mail from P. Gorman to P. Cline re Repatriation of PIIC remains

Contention 2 Contention 4

PROP00000031 28-Oct-11 Westwood Xcel

10/28/2011 Westwood Phase I Arch. Reconn. Survey Rept for Proposed Improvements to Monitoring Well Locations at ... PINGP

Contention 2 Contention 4

PROP00000032 6-Oct-09 Xcel Meeting Notes: EMF, Botanical Survey, and Archaeological Reconn. Survey Mtg: Oct. 6, 2009

Contention 2 Contention 4

Page 39: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

3

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000033 24-Jun-08 Xcel 6/24/2008 Emily Hildebrandt "Preliminary Field Activities Report Bartron Site (21GD02) May 19th - June 20th, 2008"

Contention 2 Contention 4

PROP00000034 4-Jul-08 Xcel 7/4/2008 Letter from Ronald C. Schirmer (MSU-Mankato) and Emily Hildebrandt (MSU-Mankato) to Ron Johnson (PIIC) and Mike Wadley (PINGP) "Update on Progress in Bartron village site (21GD02) excavations"

Contention 2 Contention 4

PROP00000035 14-Aug-08 Xcel 8/14/2008 Letter from Mike Wadley (Xcel Energy) to Ronald Johnson (PIIC) regarding "Literature Search and Assessment of Historical and Archaeological Resources Impacted by Construction and Operation of the PINGP"

Contention 2 Contention 4

PROP00000036 3-Jan-08 Xcel 1/2008 The 106 Group Ltd "Cultural Resources Assessment for the PINGP, Goodhue County, Minnesota"

Contention 2 Contention 4

PROP00000037 1-Jun-08 Xcel 6/2008 Donald W. Johnson "Report Geophysical Investigation Bartron Site (21GD02) Goodhue County, MN"

Contention 2 Contention 4

PROP00000038 3-Oct-11 Transnuclear Xcel

10/3/11 Proprietary Affidavit Pursuant to 10 CFR 2.390 Contention 6

PROP00000039 Unknown Xcel Voicemail describing proposal for involvement in DOE pilot program

Contention 6

PROP00000040 1-May-07 Areva/Transnuclear Xcel

Areva Confinement Analysis Contention 6

PROP00000041 29-May-08 Xcel (5-29-2008) Excavation Test Trench Bartron Site Contention 2 Contention 4

PROP00000042 29-May-08 Xcel (5-29-2008) Excavation Test Trenches at the Bartron Site Contention 2 Contention 4

PROP00000043 20-Jun-08 Xcel (6-20-2008) Excavation Units 1-5 and Features 1,2,4,5 at the Bartron Site

Contention 2 Contention 4

PROP00000044 17-Jun-08 Xcel (6-17-2008) Excavation Units 1-5 and Features 2 and 6 Bartron Site

Contention 2 Contention 4

PROP00000045 20-Jun-08 Xcel (6-20-2008) Excavation Units 3-5 and Features 2 and 5 at the Bartron Site

Contention 2 Contention 4

PROP00000046 17-Jun-08 Xcel (6-17-2008) Excavation Units 6-12 and Features 6 and 7 at the Bartron Site

Contention 2 Contention 4

PROP00000047 12-Jun-08 Xcel (6-12-2008) Excavation Units 6-9 and Feature 7 at the Bartron Site

Contention 2 Contention 4

PROP00000048 30-May-08 Xcel (5-30-2008) Explaining and Mapping Test Trenches at the Bartron Site

Contention 2 Contention 4

PROP00000049 12-Jun-08 Xcel (6-13-2008) Bartron Site Project Contention 2 Contention 4

Page 40: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

4

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000050 17-Jun-08 Xcel (6-17-2008) Bartron Project Contention 2 Contention 4

PROP00000051 22-May-08 Xcel (5-22-2008) Geophysical Survey of the Bartron Site Contention 2 Contention 4

PROP00000052 22-May-08 Xcel (5-24-2008) Magnetometry at the Bartron Site Excavation Contention 2 Contention 4

PROP00000053 3-Jun-08 Xcel (6-3-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000054 3-Jun-08 Xcel (6-3-2008) Screening for Artifacts at Bartron Site Contention 2 Contention 4

PROP00000055 9-Jun-08 Xcel (6-9-2008) Screening at Bartron Site Contention 2 Contention 4

PROP00000056 5-Jan-10 Xcel 01/05/2010 Radiocarbon Dating Results Contention 2 Contention 4

PROP00000057 1-Dec-09 Xcel 12/01/2009 Letter to Beta Analytic, Inc. re: Radiocarbon Dating for 21GD02

Contention 2 Contention 4

PROP00000058 29-Mar-10 Xcel 03/2010 Summary of Radiocarbon results by Emily Hildebrant Iffert

Contention 2 Contention 4

PROP00000059 25-Mar-10 Xcel 03/25/2010 Presentation on Past Behaviors at the Bartron Site by Emily Hildebrant Iffert

Contention 2 Contention 4

PROP00000060 1-Apr-10 Xcel 04/2010 Examination of Past Behaviors at Bartron Site paper by Emily Hildebrant Iffert

Contention 2 Contention 4

PROP00000061 1-Jun-08 Xcel 06/2008 Geophysical Investigation Bartron Site Contention 2 Contention 4

PROP00000062 19-May-08 Xcel (5-19-2008) Bartron Site Project Contention 2 Contention 4

PROP00000063 19-May-08 Xcel (5-19-2008) Bartron Site Project Contention 2 Contention 4

PROP00000064 19-May-08 Xcel (5-19-2008) Bartron Site Project Contention 2 Contention 4

PROP00000065 19-May-08 Xcel (5-19-2008) Bartron Site Project Contention 2 Contention 4

PROP00000066 19-May-08 Xcel (5-19-2008) Bartron Site Project Contention 2 Contention 4

PROP00000067 19-May-08 Xcel (5-19-2008) Bartron Site Project Contention 2 Contention 4

PROP00000068 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

Page 41: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

5

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000069 19-May-08 Xcel (5-19-2008) Bartron Site Project Contention 2 Contention 4

PROP00000070 19-May-08 Xcel (5-19-2008) Bartron Site Project Contention 2 Contention 4

PROP00000071 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000072 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000073 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000074 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000075 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000076 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000077 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000078 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000079 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000080 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000081 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000082 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000083 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000084 19-May-08 Xcel (5/19/2008) Bartron Site Project Picture Contention 2 Contention 4

PROP00000085 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000086 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000087 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000088 30-May-08 Xcel (5-30-2008) Bartron Project Contention 2 Contention 4

Page 42: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

6

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000089 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000090 30-May-08 Xcel (5-30-2008) Bartron Site Project Contention 2 Contention 4

PROP00000091 30-May-08 Xcel (5-30-2008) Bartron Site Project Contention 2 Contention 4

PROP00000092 30-May-08 Xcel (5-30-2008) Bartron Site Project Contention 2 Contention 4

PROP00000093 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000094 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000095 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000096 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000097 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000098 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000099 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000100 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000101 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000102 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000103 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000104 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000105 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000106 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000107 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000108 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

Page 43: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

7

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000109 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000110 9-Jun-08 Xcel (6-9-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000111 9-Jun-08 Xcel (6-9-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000112 9-Jun-08 Xcel (6-9-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000113 9-Jun-08 Xcel (6-9-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000114 9-Jun-08 Xcel (6-9-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000115 9-Jun-08 Xcel Bartron Site Excavation Contention 2 Contention 4

PROP00000116 9-Jun-08 Xcel (6-9-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000117 9-Jun-08 Xcel (6-9-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000118 9-Jun-08 Xcel (6-9-2008) Bartron site Excavation Contention 2 Contention 4

PROP00000119 9-Jun-08 Xcel (6-9-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000120 9-Jun-08 Xcel (6-9-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000121 9-Jun-08 Xcel (6-9-2008) Bartron Site Project Contention 2 Contention 4

PROP00000122 18-Jun-08 Xcel (6-18-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000123 18-Jun-08 Xcel (6-18-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000124 18-Jun-08 Xcel (6-18-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000125 18-Jun-08 Xcel (6-18-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000126 18-Jun-08 Xcel (6-18-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000127 18-Jun-08 Xcel (6-18-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000128 18-Jun-08 Xcel (6-18-2008) Bartron Site Excavation Contention 2 Contention 4

Page 44: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

8

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000129 30-May-08 Xcel (5-30-2008) Bartron Site Excavation Contention 2 Contention 4

PROP00000130 Unknown Xcel Barton map showing area of excavation Contention 2 Contention 4

PROP00000131 Unknown Xcel photograph depicting Barton site Contention 2 Contention 4

PROP00000132 5-Feb-71 Xcel PINGP - Area Reserved for Archaeological Studies Contention 2 Contention 4

PROP00000133 Unknown Xcel Photo of ISFSI pg. 7-31 Contention 2 Contention 4

PROP00000134 10-Nov-08 Merjent Xcel

11/10/2008 Documentation of Ground Disturbance Contention 2 Contention 4

PROP00000135 27-Jan-10 Xcel 2009 Cultural Resources Management Map Contention 2 Contention 4

PROP00000136 23-Sep-11 Westwood Xcel

09/23/2011 Phase I Archaeological Reconnaissance Survey Report Contention 2 Contention 4

PROP00000137 1-Mar-09 Xcel 03/2009 Geological Testing in Support of a Phase I Archaeological Investigation

Contention 2 Contention 4

PROP00000138 14-Oct-10 Westwood Xcel

10/14/2010 Letter from Dean Sather to James J. Holthaus re Phase I Archaeological Reconnaissance Survey Letter Report for the Proposed New Security Building Area at the Xcel Energy Prairie Island Nuclear Generating Plant, Goodhue County, Minnesota

Contention 2 Contention 4

PROP00000139 17-May-10 Xcel (5-17-2010) Letter regarding environmental survey Contention 2 Contention 4

PROP00000140 1-Jan-10 Xcel Burial Site Info Contention 2 Contention 4

PROP00000141 Unknown Xcel Limited Archaeological Reconnaissance Survey photos Contention 2 Contention 4

PROP00000142 15-Sep-10 Xcel Cultural Resources Management Plan Contention 2 Contention 4

PROP00000143 21-Apr-10 Merjent Xcel

21GD00602 Resource Map Contention 2 Contention 4

PROP00000144 21-Apr-10 Merjent Xcel

Resource Maps Contention 2 Contention 4

PROP00000145 21-Apr-10 Merjent Xcel

Figure 16 21GD/Resource Map Contention 2 Contention 4

PROP00000146 25-Jan-10 Merjent Xcel

Figure 20 Prior Survey Map Contention 2 Contention 4

PROP00000147 27-Jan-10 Merjent Xcel

Figure 7: Land Disturbance and Known Resource Map Prairie Island Nuclear Generating Plant

Contention 2 Contention 4

Page 45: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

9

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000148 2-Apr-10 Merjent Xcel

Figures 8-10: archaeological site maps Contention 2 Contention 4

PROP00000149 1-Jan-10 Emily Hildebrant Iffert Xcel

Literature Search and Assessment of Historical and Archaeological Resources Impacted by Construction and Operations Activities at the Prairie Island Nuclear Generating Plant, Goodhue County, Minnesota

Contention 2 Contention 4

PROP00000150 1-Jan-10 Merjent Xcel

A Limited Archaeological Reconnaissance Survey of the Grounds of the Prairie Island Nuclear Generating Plant, Red Wing, Goodhue County, Minnesota

Contention 2 Contention 4

PROP00000151 10-Jun-09 Xcel Minnesota Archaeological Site Form Contention 2 Contention 4

PROP00000152 4-Jun-09 Xcel Minnesota Archaeological Site Form Contention 2 Contention 4

PROP00000153 14-Jul-09 Xcel Minnesota Archaeological Site Form Contention 2 Contention 4

PROP00000154 12-Jun-09 Xcel Minnesota Archaeological Site Form Contention 2 Contention 4

PROP00000155 16-Jun-09 Xcel Minnesota Archaeological Site Form Contention 2 Contention 4

PROP00000156 14-Jul-09 Xcel Minnesota Archaeological Site Form Contention 2 Contention 4

PROP00000157 18-Jun-09 Xcel Minnesota Archaeological Site Form Contention 2 Contention 4

PROP00000158 23-Jun-09 Xcel Minnesota Archaeological Site Form Contention 2 Contention 4

PROP00000159 15-Jul-09 Xcel Minnesota Archaeological Site Form Contention 2 Contention 4

PROP00000160 29-Jul-11 Merjent Xcel

Appendix C: GPS Metadata Survey of Findings Contention 2 Contention 4

PROP00000161 4-Jun-09 Xcel Letter to Philip R. Mahowald re June 1, 2009 letter providing comments on Work Plan for a Modified Phase I Reconnaissance Survey

Contention 2 Contention 4

PROP00000162 13-Nov-09 Merjent Xcel

Appendix E: Comments Received and Project Responses Contention 2 Contention 4

PROP00000163 Ronald Schirmer Xcel

Comment/Response for Boden, Maki and Jones Draft Report, A Modified Archaeological Reconnaissance Survey of the Grounds of the Prairie Island Nuclear Generating Plant, Welch, Goodhue County, Minnesota

Contention 2 Contention 4

Page 46: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

10

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000164 29-May-08 Dr. Ronald Schirmer Xcel

(5-19 through 6-20 2008) Field Research Project at the Bartron Site (21GD02) Archaeological Procedures

Contention 2 Contention 4

PROP00000165 27-Jan-10 Merjent Xcel

Historical and Land Disturbance Maps Contention 2 Contention 4

PROP00000166 22-Aug-11 Xcel Prairie Island Nuclear Generating Plant Site Map Contention 2 Contention 4

PROP00000167 24-Mar-08 Xcel Letter to Minnesota Historical Society re Prairie Island Nuclear Generating Plant License Renewal Project

Contention 2 Contention 4

PROP00000168 19-Oct-07 The 106 Group Ltd Xcel

(10-19-2007) Letter from 106 Group Ltd to PINGP Phase I Archaeological Survey Proposal

Contention 2 Contention 4

PROP00000169 7-May-08 Xcel (5-7-2008) Prairie Island ISFSI with Security Fence Contention 2 Contention 4

PROP00000170 7-May-08 Xcel (5-7-2008) Prairie Island ISFSI With Security Fence Contention 2 Contention 4

PROP00000171 7-May-08 Xcel (5-7-2008) Prairie Island ISFSI with Security Fence Contention 2 Contention 4

PROP00000172 7-May-08 Xcel (5-7-2008) Prairie Island ISFSI with Security Fence Contention 2 Contention 4

PROP00000173 7-Feb-08 Xcel 2/7/2008 PIIC letter to NMC Contention 2 Contention 4

PROP00000174 30-Jun-68 Eldon Johnson Xcel

State Archaeologist Annual Report 7-1-1967 through 6-30-1968 Contention 2 Contention 4

PROP00000175 17-May-10 Xcel 05/17/2010 Letter from C. Hudak [Foth env. consulting firm] re Security Access Facility construction

Contention 2 Contention 4

PROP00000176 17-Nov-08 Merjent Xcel

11/17/2008 letter from Merjent to J. Holthaus re Phase I Cultural Resources Reconn. Survey for Holding Pond Expansion, PINGP

Contention 2 Contention 4

PROP00000177 10-Nov-08 Xcel (1-2-2008) Cultural Resources Assessment Figure 2 Contention 2 Contention 4

PROP00000178 22-Jul-08 Xcel (7-22-2008) Comments to Cultural Resource Assessment for the PINGP; Table of Arch. Sites; List of References

Contention 2 Contention 4

PROP00000179 12-Aug-08 Xcel 08/12/2008 Errata to Cultural Resources Assessment for PINGP, Tables 2 and 3

Contention 2 Contention 4

PROP00000180 18-May-48 Xcel Memo on Goodhue May 17-18, 1948 Contention 2 Contention 4

Page 47: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

11

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000181 26-May-54 Xcel 5/26/54 Memo on Goodhue County Contention 2 Contention 4

PROP00000182 20-May-57 Xcel 5/20/67 Memo on Goodhue County Contention 2 Contention 4

PROP00000183 20-Mar-67 Minnesota Historical Society and University of Minnesota Xcel

03/20/67 proposal for salvage archaeology Contention 2 Contention 4

PROP00000184 3-Apr-67 XCEL 04/03/67 Memo on NSP Prairie Island Salvage Archaeology Contention 2 Contention 4

PROP00000185 26-Apr-67 Xcel 04/26/67 Letter re: archaeological dig- Contention 2 Contention 4

PROP00000186 8-May-67 Xcel 5/8/67 Letter to Elden Johnson Re: Archaeological Investigations During Summer of 1967

Contention 2 Contention 4

PROP00000187 8-Dec-67 Xcel 12/8/67 Letter from Minnesota Historical Society re: archaeological salvage

Contention 2 Contention 4

PROP00000188 18-Jan-68 Xcel 1/18/68 - Memo for file re PINGP Discussion Concerning Archaeological Investigations

Contention 2 Contention 4

PROP00000189 15-Feb-68 Xcel (2-15-1968) Budget Proposal for PI archaeological work Contention 2 Contention 4

PROP00000190 16-May-68 Elden Johnson Xcel

5/16/68 Letter re Salvage Archaeology on Prairie Island Contention 2 Contention 4

PROP00000191 9-Apr-70 Xcel 04/09/70 National Register of Historic Places Inventory- Nomination Form

Contention 2 Contention 4

PROP00000192 9-Dec-70 Xcel 12/9/1970 Letter from Elden Johnson (State Archeologist) to Arthur A. Dienhart (NSP) regarding archaeological sites within PINGP

Contention 2 Contention 4

PROP00000193 Xcel 1970 The Minnesota Trunk Highway Reconnaissance Survey Contention 2 Contention 4

PROP00000194 24-Apr-81 Stone & Webster Engineering Xcel

1970 PINGP Historical Survey Contention 2 Contention 4

PROP00000195 5-Feb-71 Xcel 2/5/1971 Map of Prairie Island burial mounds and Bartron site Contention 2 Contention 4

PROP00000196 26-Feb-71 Xcel 2/26/71 Letter from Russell W. Fridley (MN Historical Society) to R.H. Engels (NSP) regarding Bartron site

Contention 2 Contention 4

PROP00000197 3-Mar-71 Xcel 3/3/1971 Map of Bartron site ("Area Reserved for Archaeological Studies")

Contention 2 Contention 4

Page 48: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

12

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000198 13-May-71 Xcel 5/12/1971 Letter from D.D. Bohn (NSP) to Peter A. Morris (US AEC) regarding PINGP Environmental Report (that includes archaeological information)

Contention 2 Contention 4

PROP00000199 4-May-72 Xcel 5/4/1972 Correspondence from MN Historical Society regarding information on the Prairie Island area.

Contention 2 Contention 4

PROP00000200 6-Jun-90 Xcel MnSHPO Archaeological Database Site Form Contention 2 Contention 4

PROP00000201 21-Mar-73 Xcel 5/21/73 Advisory Council on Historic Preservation Letter Contention 2 Contention 4

PROP00000202 8-Nov-73 Xcel 11/8/1973 NSP Memorandum regarding the Bartron site Contention 2 Contention 4

PROP00000203 14-Nov-73 Xcel 11/14/1973 Letter from Elden Johnson (State Archaeologist) to William Fredericks (NSP) regarding Prairie Island

Contention 2 Contention 4

PROP00000204 27-Nov-73 Xcel 11/27/1973 NSP Internal Correspondence from M.L. Anderson to W.W. Larkin regarding the Bartron site

Contention 2 Contention 4

PROP00000205 28-Nov-73 Xcel 11/28/1973 NSP Internal Correspondence from Wade Larkin to D.W. McCarthy regarding the Bartron site

Contention 2 Contention 4

PROP00000206 17-Dec-73 Xcel 12/17/1973 Letter from M.L. Anderson (NSP) to Russell W. Findley (MN Historical Society) regarding the Bartron site

Contention 2 Contention 4

PROP00000207 Unknown PIIC Xcel

Location of Bartron site (page 2) Contention 2 Contention 4

PROP00000208 1-Nov-73 Xcel 11/1/1978 Letter from Russell W. Fridley (MN historical Society) to David McElroy (NSP) regarding the Bartron site

Contention 2 Contention 4

PROP00000209 11-Nov-74 Xcel 11/11/1974 Letter from R.O. Jondahl (NSP) to John S. Wozniak (Saint Mary's College) regarding Prairie Island historical information

Contention 2 Contention 4

PROP00000210 11-Mar-80 Xcel 3/11/1980 Letter from Russell W. Fridley (State Historic Preservation Officer) to Robert F. Post (U.S. Army Corps of Engineers) regarding potential undiscovered archaeological resources in Prairie Island area

Contention 2 Contention 4

Page 49: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

13

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000211 24-Mar-80 Xcel 3/24/1980 Letter from Christy A.H. Caine (State Archeologist) to Robert F. Post (U.S. Army Corps of Engineers) regarding potential for undiscovered archeological resources in Prairie Island area

Contention 2 Contention 4

PROP00000212 30-Jun-80 Xcel 6/30/1980 Letter from Russell W. Fridley (State Historic Preservation Officer) to William W. Badger (U.S. Army Corps of Engineers) regarding potential for undiscovered archaeological resources at Prairie Island

Contention 2 Contention 4

PROP00000213 26-Sep-80 Xcel 9/26/1980 Letter from Elden Johnson (U of MN) to Richard S. McGinnis (NSP) regarding Phase I Archaeological Survey

Contention 2 Contention 4

PROP00000214 8-Oct-80 Xcel 10/8/1980 Letter from Elden Johnson (U of M) to Richard McGinnis (NSP) regarding Phase I Archaeological Survey

Contention 2 Contention 4

PROP00000215 1-Dec-80 Xcel 12/1980 Elden Johnson "Intensive [Archaeological] Survey Report for PINGP property

Contention 2 Contention 4

PROP00000216 29-Dec-80 Xcel 12/29/1980 Letter from D.L. Stephenson (NSP) to Elden Johnson (State Archaeologist) regarding Final Archaeological Survey Report

Contention 2 Contention 4

PROP00000217 18-Dec-80 Xcel 12/18/1980 memo from D. Stephenson to Distribution re PINGP E-78Y073 [Archaeological Survey]

Contention 2 Contention 4

PROP00000218 30-Dec-80 Xcel 12/30/1980 Nat'l Register of Hist. Places Inventory -- Nomination Form

Contention 2 Contention 4

PROP00000219 10-Apr-81 Xcel 04/10/1981 letter from J. Tannenbaum [Advisory Council on Historic Preservation] to U.S. Army Corp. Engrs [re PING discharge system archeological issue]

Contention 2 Contention 4

PROP00000220 Unknown University of Minnesota Xcel

4/22/1981 Archaeological Investig'n of Site 21GD148; NSPC Nuclear Gen. Plant; Goodhue Co., MN [Rept to NSPC from UMN Anthro. Chair E. Johnson]

Contention 2 Contention 4

PROP00000221 12-Aug-08 Xcel 8/12/2008 The 106 Group Ltd.'s "Cultural Resources Assessment for the PINGP, Goodhue County, Minnesota"

Contention 2 Contention 4

PROP00000222 Unknown Xcel 1948 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000223 Unknown Xcel 1948 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000224 Unknown Xcel 1948 Field Notes regarding Bartron Site Contention 2 Contention 4

Page 50: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

14

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000225 Unknown Xcel 1948 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000226 30-Jun-67 Xcel Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000227 Unknown Xcel Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000228 Unknown Xcel 1948 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000229 Unknown Xcel 1948 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000230 Unknown Xcel 1948 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000231 Unknown Xcel 1948 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000232 Unknown Xcel 1948 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000233 30-Jun-67 Xcel 1967 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000234 30-Jun-67 Xcel 1967 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000235 30-Jun-67 Xcel 1967 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000236 1968 Xcel (7-1 through 7-15 of 1968) Field Notes from 1968 Bartron Site Study

Contention 2 Contention 4

PROP00000237 1-Jul-68 Xcel (7/1/1968) Universal Data form Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 1 of 16

Contention 2 Contention 4

PROP00000238 1-Jul-68 Xcel (7/1/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 2 of 16

Contention 2 Contention 4

PROP00000239 1-Jul-68 Xcel (7/1/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 3 of 16

Contention 2 Contention 4

PROP00000240 1-Jul-68 Xcel (7/1/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 4 of 16

Contention 2 Contention 4

Page 51: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

15

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000241 3-Jul-68 Xcel (7/3/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 5 of 16

Contention 2 Contention 4

PROP00000242 8-Jul-68 Xcel (7/8/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 6 of 16

Contention 2 Contention 4

PROP00000243 8-Jul-68 Xcel (7/8/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 7 of 16

Contention 2 Contention 4

PROP00000244 9-Jul-68 Xcel (7/9/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 8 of 16

Contention 2 Contention 4

PROP00000245 9-Jul-68 Xcel (7/9/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 9 of 16

Contention 2 Contention 4

PROP00000246 9-Jul-68 Xcel (7/9/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 10 of 16

Contention 2 Contention 4

PROP00000247 10-Jul-68 Xcel (7/10/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 11 of 16

Contention 2 Contention 4

PROP00000248 11-Jul-68 Xcel (7/11/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 12 of 16

Contention 2 Contention 4

PROP00000249 15-Jul-68 Xcel (7/15/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 13 of 16

Contention 2 Contention 4

PROP00000250 17-Jul-68 Xcel (7/17/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 14 of 16

Contention 2 Contention 4

PROP00000251 17-Jul-68 Xcel (7/17/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 15 of 16

Contention 2 Contention 4

Page 52: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

16

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000252 18-Jul-68 Xcel (7/18/1968) Universal Data Form Continuation Sheet Archaeological Survey Department of Anthropology University of Minnesota: Bartron Site Excavation Pg. 16 of 16

Contention 2 Contention 4

PROP00000253 3-Jul-68 Xcel 1968 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000254 8-Jul-68 Xcel 1968 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000255 8-Jul-68 Xcel 1968 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000256 3-Jul-68 Xcel 1968 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000257 11-Jul-68 Xcel 1968 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000258 8-Jul-68 Xcel 1968 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000259 8-Jul-68 Xcel 1968 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000260 11-Jul-68 Xcel 1968 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000261 10-Jul-68 Xcel 1968 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000262 10-Jul-68 Xcel 1968 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000263 8-Jul-68 Xcel 1968 Field Notes regarding Bartron Site Contention 2 Contention 4

PROP00000264 9-Jul-68 Xcel Handwritten notes of archeological survey Contention 2 Contention 4

PROP00000265 18-Jul-68 Xcel Handwritten map of survey Contention 2 Contention 4

PROP00000266 18-Jul-68 Xcel Handwritten notes of arch survey Contention 2 Contention 4

PROP00000267 10-Jul-68 Xcel Handwritten notes of UMN field survey Contention 2 Contention 4

PROP00000268 12-Jul-68 Xcel Notes of UMN survey Contention 2 Contention 4

PROP00000269 16-Jul-68 Xcel Notes of UMN survey Contention 2 Contention 4

PROP00000270 15-Jul-68 Xcel Notes of Archaeological survey Contention 2 Contention 4

PROP00000271 Unknown Xcel Notes of arch survey Contention 2 Contention 4

Page 53: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

17

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000272 Unknown Xcel Index of specimens recovered in archaeological survey Contention 2 Contention 4

PROP00000273 15-Jul-68 Xcel Index of items recovered Contention 2 Contention 4

PROP00000274 15-Jul-68 Xcel Notes of archeological survey Contention 2 Contention 4

PROP00000275 15-Jul-68 Xcel Notes of Archeological survey Contention 2 Contention 4

PROP00000276 11-Jul-68 Xcel Notes of Archeological survey Contention 2 Contention 4

PROP00000277 16-Jul-68 Xcel University of Minnesota, Department of Anthropology, Notes of Archeological survey

Contention 2 Contention 4

PROP00000278 15-Jul-68 Xcel University of Minnesota, Department of Anthropology, Handwritten notes of Archeological survey

Contention 2 Contention 4

PROP00000279 15-Jul-68 Xcel University of Minnesota, Department of Anthropology, Index of Archeological Survey

Contention 2 Contention 4

PROP00000280 10-Jul-68 Xcel July 1968, University of Minnesota, Department of Anthropology Index of Archeological Survey

Contention 2 Contention 4

PROP00000281 16-Jun-69 Xcel (6-16-1969) Bartron Site Field Season Notes Contention 2 Contention 4

PROP00000282 Unknown Xcel 1969 - Archeological Notes Contention 2 Contention 4

PROP00000283 Unknown Xcel 1969- Archeological Notes Contention 2 Contention 4

PROP00000284 Unknown Xcel Notes of archeological survey Contention 2 Contention 4

PROP00000285 11-Jul-69 Xcel Handwritten description and map of archeological survey Contention 2 Contention 4

PROP00000286 11-Jul-69 Xcel Handwritten notes of archaeological survey Contention 2 Contention 4

PROP00000287 Unknown Xcel Longitude/latitude of excavation sites Contention 2 Contention 4

PROP00000288 Unknown Xcel Longitude/latitude of excavation sites Contention 2 Contention 4

PROP00000289 Unknown Xcel Longitude/Latitude of excavation sites Contention 2 Contention 4

Page 54: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

18

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000290 Unknown Xcel Longitude/Latitude of excavation sites Contention 2 Contention 4

PROP00000291 Unknown Xcel Excavation notes with longitude and latitude Contention 2 Contention 4

PROP00000292 17-Jun-69 Xcel Notes of archaeological survey Contention 2 Contention 4

PROP00000293 Unknown Xcel Notes of archaeological survey Contention 2 Contention 4

PROP00000294 Unknown Xcel archaeological Survey Notes Contention 2 Contention 4

PROP00000295 20-Jun-69 Xcel Handwritten notes of archaeological survey with indication of longitude latitude

Contention 2 Contention 4

PROP00000296 23-Jun-69 Xcel archaeological survey handwritten notes Contention 2 Contention 4

PROP00000297 24-Jun-69 Xcel Handwritten notes of archaeological survey Contention 2 Contention 4

PROP00000298 27-Jun-69 Xcel Hand written notes of archaeological survey Contention 2 Contention 4

PROP00000299 27-Jun-69 Xcel Notes of archaeological survey Contention 2 Contention 4

PROP00000300 30-Jun-69 Xcel Notes of excavation with locations Contention 2 Contention 4

PROP00000301 2-Jul-69 Xcel Notes of archaeological survey Contention 2 Contention 4

PROP00000302 20-Jun-08 Blake Frink Xcel

Bartron field notes 6/20/2008 Contention 2 Contention 4

PROP00000303 20-Jun-08 Emily Hildebrant Xcel

05/19/2008-06/20/2008 Field Notes by Emily Hildebrant Contention 2 Contention 4

PROP00000304 20-Jun-08 Jared Langseth Xcel

05/19/2008-06/20/2008 Field Notes by Jared Langseth Contention 2 Contention 4

PROP00000305 20-Jun-08 Jeff Gerlach Xcel

05/19/2008-06/20/2008 Field Notes by Jeff Gerlach Contention 2 Contention 4

PROP00000306 20-Jun-08 John Lawler Xcel

05/19/2008-06/20/2008 Field Notes by John Lawler Contention 2 Contention 4

PROP00000307 Unknown Xcel 05/19/2008-06/20/2008 Field Notes by Joseph Leistner Contention 2 Contention 4

PROP00000308 20-Jun-08 Kelli Damlo Xcel

05/19/2008-06/20/2008 Field Notes by Kelli Damlo Contention 2 Contention 4

PROP00000309 20-Jun-08 Kyle Harvey Xcel

05/19/2008-06/20/2008 Field Notes by Kyle Harvey Contention 2 Contention 4

Page 55: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

19

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000310 20-Jun-08 Ty Warmka Xcel

21 GD02 bartron site field notes Ty Warmka Contention 2 Contention 4

PROP00000311 20-Jun-08 Tyler Gilbert Xcel

21 GD02 bartron site field notes tyler Gilbert Contention 2 Contention 4

PROP00000312 Unknown Xcel Archeological Notes Contention 2 Contention 4

PROP00000313 6-Jun-90 Xcel MNSHPO Archaeological Database site form Contention 2 Contention 4

PROP00000314 6-Jun-90 Xcel MNSHPO Archaeological Database site form Contention 2 Contention 4

PROP00000315 12-Feb-96 Xcel MNSHPO Archaeological Database site form Contention 2 Contention 4

PROP00000316 6-Jun-90 Xcel MNSHPO Archaeological Database site form Contention 2 Contention 4

PROP00000317 6-Jun-90 Xcel MNSHPO Archaeological Database site form Contention 2 Contention 4

PROP00000318 30-Mar-99 Xcel MNSHPO Archaeological Database Site Form Contention 2 Contention 4

PROP00000319 1-Jun-08 Donald Johnson Xcel

Report Geophysical Investigation Bartron site Contention 2 Contention 4

PROP00000320 Unknown Xcel The Bartron Village Site Contention 2 Contention 4

PROP00000321 24-Apr-92 John Redmann, et al Xcel

A Phase I Archaeological Survey on Prairie Island, Goodhue County, Minnesota

Contention 2 Contention 4

PROP00000322 Unknown Xcel Archival Document List Contention 2 Contention 4

PROP00000323 Unknown Xcel Bartron Site University of Minnesota Collection Inventory Contention 2 Contention 4

PROP00000324 30-Oct-08 Xcel Literature Search and Assessment of Historical and Archaeological Resources PINGP

Contention 2 Contention 4

PROP00000325 21-Nov-08 Xcel 11/21/2008 power point titled "Literature Search and Assessment of Historical and Archaeological Resources PINGP"

Contention 2 Contention 4

PROP00000326 Unknown Xcel PIIC

Area of Proposed Geophysical Investigation Contention 2 Contention 4

PROP00000327 Unknown Xcel Bartron site Extreme Zoomed in View Contention 2 Contention 4

PROP00000328 Unknown Xcel Bartron Site Zoomed In View Contention 2 Contention 4

Page 56: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

20

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000329 Unknown Xcel Bartron Site Zoomed Out View Contention 2 Contention 4

PROP00000330 Unknown Xcel Bartron Site Zoomed Out View Contention 2 Contention 4

PROP00000331 Unknown Xcel Proposal for Geophysical investigation at Bartron Site Contention 2 Contention 4

PROP00000332 19-May-08 Dr. Ron Schirmer Xcel

Layers of History: Precontact and Contact Era Prairie Island Contention 2 Contention 4

PROP00000333 10-Jun-09 Xcel PIIC

Recognizing Cultural Resources Contention 2 Contention 4

PROP00000334 10-Jun-09 Xcel Recognizing Cultural Resources Contention 2 Contention 4

PROP00000335 10-Nov-08 Xcel 11/10/2008 Documentation of Ground Disturbance Near 21GD0058 and 21GD0062, Goodhue County, by Peggy J. Boden

Contention 2 Contention 4

PROP00000336 5-Dec-08 Xcel Archaeological, Cultural & Historic Resources Nuclear Department Fleet Procedure

Contention 2 Contention 4

PROP00000337 17-May-10 Foth 3/17/2010 Letter from Foth to Xcel regarding proposal for Geologist to help determine whether site had been previously disturbed

Contention 2 Contention 4

PROP00000338 21-Jul-11 Westwood Xcel

Westwood Presentation Cultural Resources and Property Development

Contention 2 Contention 4

PROP00000339 4-Jul-08 Dr. Ronald Schirmer Xcel

7/4/2008 Letter from Ronald Schirmer and Emily Hildebrant to PIIC and PINGP re update on progress in Bartron village site (21GD02) excavations

Contention 2 Contention 4

PROP00000340 Unknown Xcel Bartron Archeological Investigation Preliminary Findings Contention 2 Contention 4

PROP00000341 4-Jul-08 Minnesota State University Xcel

7/4/2008 update on progress in Bartron village site excavations Contention 2 Contention 4

PROP00000342 24-Jun-08 Xcel 6/24/2008 Preliminary Field Activities Report Bartron Site Contention 2 Contention 4

PROP00000343 24-Jun-08 Xcel 6/24/2008 Preliminary Field Activities Report Bartron Site Contention 2 Contention 4

PROP00000344 24-Jun-08 Xcel 6/24/2008 Preliminary Field Activities Report Bartron Site Contention 2 Contention 4

PROP00000345 24-Jun-08 Xcel 6/24/2008 Preliminary Field Activities Report Bartron Site Contention 2 Contention 4

Page 57: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

21

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000346 24-Jun-08 Xcel 6/24/2008 Preliminary Field Activities Report Bartron Site Contention 2 Contention 4

PROP00000347 20-Jun-08 Xcel 6/20/2008 Backfilling during Barton Site Excavation Contention 2 Contention 4

PROP00000348 29-May-08 Xcel 5/29/2008 Bartron Site Project Contention 2 Contention 4

PROP00000349 22-May-08 Xcel 5/22/2008 Electrical Resistivity Survey of Bartron Site Contention 2 Contention 4

PROP00000350 20-May-08 Xcel 5/20/2008 Electrical Resistivity Survey Contention 2 Contention 4

PROP00000351 19-Jun-08 Xcel 6/19/2008 Excavating Bartron Site Contention 2 Contention 4

PROP00000352 16-Jun-08 Xcel 6/16/2008 Excavating a Crushed Vessel at Bartron Site Contention 2 Contention 4

PROP00000353 9-Jun-08 Xcel 6/9/2008 Excavating Bartron Site Contention 2 Contention 4

PROP00000354 5-Jun-08 Xcel 6/5/2008 Excavating Bartron Site Contention 2 Contention 4

PROP00000355 3-Jun-08 Xcel 6/3/2008 Excavating Bartron Site Contention 2 Contention 4

PROP00000356 5-Jun-08 Xcel 6/5/2008 Excavating Bartron Site Contention 2 Contention 4

PROP00000357 Unknown Hildebrandt, Emily Langseth, Jared Schirmer, Ron Xcel

3rd DRAFT: Archaeological Procedures for the May 19th - June 20th, 2008 Field Research Project at the Bartron Site (21GD02)

Contention 2 Contention 4

PROP00000358 24-Nov-08 Merjent Xcel

11/24/2008 email from Peg Boden to James Holthaus and Raelynn Asah re FW: consultation for possible mound disturbance

Contention 2 Contention 4

PROP00000359 25-Nov-08 Merjent Xcel

11/25/2008 email from Peg Boden to James Holthaus et. al. re: work around birch lake mounds

Contention 2 Contention 4

PROP00000360 3-Dec-08 Merjent Xcel

12/3/2008 email from Peg Boden to James Holthaus et. al. re: work around birch lake mounds

Contention 2 Contention 4

PROP00000361 1-Jan-09 Xcel 01/2009 Project Status Report: PINGP TN-40HT Cask Design and Licensing

Contention 4

PROP00000362 1-Jan-09 Xcel 01/09 Project Status Report Contention 6

PROP00000363 1-Mar-09 Xcel 03/09 Project Status Report Contention 6

Page 58: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

22

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000364 19-May-09 Transnuclear Xcel

5/19/2009 TN40HT Fuel Cladding thermal Stresses Due to Quenching

Contention 6

PROP00000365 8-May-09 Transnuclear Xcel

5/8/2009 TN40HT Additional Fuel Qualification Evaluation Contention 6

PROP00000366 25-Feb-13 Transnuclear Xcel

TN40HT Fuel End Drop Analysis Using LS-DYNA Contention 6

PROP00000367 17-Sep-09 Xcel Xcel Transnuclear

9/22/2009 Transnuclear handout for 10/7/2009 Public Meeting containing Draft SAR changed pages

Contention 6

PROP00000368 1-Oct-09 Xcel October 1, 2009 Project Status Report Contention 6

PROP00000369 Unknown Transnuclear Xcel

4/1/2004 TN-40HT High Burn-Up Cask Design Contention 6

PROP00000370 1-Apr-04 Transnuclear Xcel

4/1/2004 Proposal to Provide a TN-40HT High Burn-Up Cask Design

Contention 6

PROP00000371 16-Apr-09 Transnuclear Xcel

16 Apr 2009 - Letter from Areva to PING Lee Samson re: T&M Support Proposal for TN-40 Transport RAI and for TN40HT Storage RAI

Contention 6

PROP00000372 Unknown Transnuclear Xcel

04 Dec 2009 - 01 Apr 2004 - TN-40H High Burn-Up Cask Design Contention 6

PROP00000373 Unknown Transnuclear Xcel

TN-40H High Burn-Up Cask Design Contention 6

PROP00000374 Unknown Xcel 3/4/2010 Xcel Energy project entitled "Transnuclear TN-40 Transport License"

Contention 6

PROP00000375 23-Feb-10 Xcel 3/4/2010 Xcel Energy project entitled "Transnuclear TN-40 Transport License"

Contention 6

PROP00000376 Unknown Xcel Xcel Energy Nuclear project entitled "TN-40HT Spent Fuel Storage Cask Design and Licensing, Rev. 1"

Contention 6

PROP00000377 1-Mar-10 Xcel 03/10 Project Status Report Contention 4 Contention 6

PROP00000378 27-May-10 Merjent Xcel

5/27/2010 Letter Proposal from Merjent to Xcel to Assist with Preparation of ER in Support of License Renewal and Expansion of PINGP ISFSI

Contention 2 Contention 4

PROP00000379 20-May-10 PPL Susquehanna Xcel

05/20/2010 Email from Brian Voss to Adam Sparks et. al. re Question (from OPPD)

Contention 6

PROP00000380 20-May-10 PPL Susquehanna Xcel

05/20/2010 Email from Brian Voss to Adams Sparks et. al. re Question (from OPPD)

Contention 6

Page 59: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

23

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000381 11-Jun-10 Xcel 6/10/2010 Map of Boring Locations Prepared by Foth Contention 2 Contention 4

PROP00000382 1-May-10 Xcel 05/2010 Project Status Report: PINGP TN-40HT Cask Design and Licensing

Contention 4

PROP00000383 2-Jul-10 Westwood Xcel

7/2/2012 Scope of Work and Fee Proposal for Phase 1 Cultural Resources Reconnaissance Survey for PINGP prepared by Westwood

Contention 2 Contention 4

PROP00000384 Unknown Xcel Archeological and security fence information. Contention 2 Contention 4

PROP00000385 1-Nov-10 Xcel 11/2010 Project Status Report re: PINGP TN-40HT Cask Design and Licensing

Contention 4

PROP00000386 31-Jan-11 TransNuclear/Areva Xcel

1/31/2011 Submittal of TN Proprietary Calculation in Support of NRC Questions

Contention 4

PROP00000387 18-Jan-11 Xcel 1/18/2011 Invoice for Cultural Resources Reconnaissance Survey for the ISFSI

Contention 2 Contention 4

PROP00000388 12-Jun-09 Xcel 6/10/2009 - 6/12/2009 Minnesota Archaeological Site Form Contention 2 Contention 4

PROP00000389 4-Jun-09 Xcel 6/4/2009 Minnesota Archaeological Site Form Contention 2 Contention 4

PROP00000390 14-Jul-09 Xcel 6/4/2009 - 7/14/2009 MN Archaeological Site Form Contention 2 Contention 4

PROP00000391 12-Jun-09 Xcel 6/12/2009 MN Archaeological Site Form Contention 2 Contention 4

PROP00000392 16-Jun-09 Xcel 6/16/2009 MN Archaeological Site Form Contention 2 Contention 4

PROP00000393 14-Jul-09 Xcel 6/9/2009 - 7/14/2009 MN Archaeological Site Form Contention 2 Contention 4

PROP00000394 18-Jun-09 Xcel 6/18/2009 MN Archaeological Site Form Contention 2 Contention 4

PROP00000395 23-Jun-09 Xcel MN Archaeological Site Form Contention 2 Contention 4

PROP00000396 15-Jul-09 Xcel MN Archaeological Site Form Contention 2 Contention 4

PROP00000397 Unknown Xcel Appendix C: GPS Metadata of Survey Findings Contention 2 Contention 4

PROP00000398 4-Jun-09 Xcel 6/1/2009 letter providing comments on Work Plan for a Modified Phase I Reconnaissance Survey

Contention 2 Contention 4

Page 60: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

24

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000399 Unknown Xcel Comment/Response for Boden, Maki and Jones Draft Report, A Modified Archaeological Reconnaissance Survey of the Grounds of the Prairie Island Nuclear Generating Plant, Welch, Goodhue County, Minnesota

Contention 2 Contention 4

PROP00000400 1-Mar-09 Foth Xcel

3/2009 Geological Testing in Support of a Phase I Archaeological Investigation at the Xcel Energy Holding Area and Access Road, Prairie Island, Minnesota March 2009

Contention 2 Contention 4

PROP00000401 22-Mar-10 Xcel 8/9/1994 Quarterly Dry Cask Storage TLD Results Contention 4

PROP00000402 22-Mar-10 Xcel 11/4/1994 Quarterly ISFSI TLD Results Contention 4

PROP00000403 22-Mar-10 Xcel 2/3/1995 Quarterly ISFSI TLD Results Contention 4

PROP00000404 22-Mar-10 Xcel 5/2/1995 Quarterly ISFSI TLD Results Contention 4

PROP00000405 22-Mar-10 Xcel 8/7/1995 Quarterly ISFSI TLD Results Contention 4

PROP00000406 22-Mar-10 Xcel 11/7/1995 Quarterly ISFSI TLD Results Contention 4

PROP00000407 22-Mar-10 Xcel 2/13/1996 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000408 22-Mar-10 Xcel 5/9/1996 Quarterly ISFSI Contamination and TLD Monitoring Results

Contention 4

PROP00000409 22-Mar-10 Xcel 8/7/1996 Quarterly ISFSI Contamination and TLD Monitoring Results

Contention 4

PROP00000410 22-Mar-10 Xcel 11/6/1996 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000411 22-Mar-10 Xcel 2/10/1997 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000412 22-Mar-10 Xcel 5/7/1997 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000413 22-Mar-10 Xcel 8/18/1997 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000414 22-Mar-10 Xcel 11/7/1997 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000415 22-Mar-10 Xcel 2/16/1998 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000416 22-Mar-10 Xcel 5/7/1998 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000417 22-Mar-10 Xcel 8/7/1998 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

Page 61: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

25

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000418 22-Mar-10 Xcel 11/5/1998 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000419 22-Mar-10 Xcel 2/11/1999 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000420 22-Mar-10 Xcel 5/6/1999 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000421 22-Mar-10 Xcel 8/6/1999 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000422 22-Mar-10 Xcel 11/3/1999 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000423 22-Mar-10 Xcel 2/4/2000 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000424 22-Mar-10 Xcel 5/8/2000 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000425 22-Mar-10 Xcel 8/10/2000 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000426 22-Mar-10 Xcel 11/10/2000 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000427 22-Mar-10 Xcel 2/14/2001 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000428 22-Mar-10 Xcel 5/11/2001 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000429 22-Mar-10 Xcel 8/7/2001 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000430 22-Mar-10 Xcel 11/15/2001 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000431 22-Mar-10 Xcel 2/8/2002 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000432 22-Mar-10 Xcel 5/11/2002 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000433 22-Mar-10 Xcel 8/15/2002 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000434 22-Mar-10 Xcel 11/15/2002 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000435 22-Mar-10 Xcel 2/14/2003 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000436 19-Mar-10 Xcel 5/5/2003 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000437 19-Mar-10 Xcel 8/8/2003 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

Page 62: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

26

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000438 19-Mar-10 Xcel 11/18/2003 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000439 19-Mar-10 Xcel 2/19/2004 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000440 19-Mar-10 Xcel 5/7/2004 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000441 19-Mar-10 Xcel 8/23/2004 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

PROP00000442 19-Mar-10 Xcel 11/6/04 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000443 19-Mar-10 Xcel 2/11/05 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000444 19-Mar-10 Xcel 6/13/05 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000445 19-Mar-10 Xcel 8/18/05 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000446 19-Mar-10 Xcel 11/8/05 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000447 19-Mar-10 Xcel 2/6/06 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000448 19-Mar-10 Xcel 5/10/06 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000449 19-Mar-10 Xcel 8/16/06 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000450 19-Mar-10 Xcel 11/15/06 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000451 19-Mar-10 Xcel 2/15/07 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000452 19-Mar-10 Xcel 5/10/07 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000453 19-Mar-10 Xcel 8/29/07 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000454 19-Mar-10 Xcel 11/19/07 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000455 19-Mar-10 Xcel 2/12/08 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000456 19-Mar-10 Xcel 5/6/08 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000457 19-Mar-10 Xcel Aug 29 08 Quarterly ISFSI Contamination & TLD Monitoring Results

Contention 4

Page 63: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

27

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000458 19-Mar-10 Xcel 11/13/08 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000459 19-Mar-10 Xcel 3/11/09 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000460 19-Mar-10 Xcel 4/28/09 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000461 19-Mar-10 Xcel 8/6/09 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000462 19-Mar-10 Xcel 11/18/09 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000463 19-Mar-10 Xcel 3/8/10 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000464 6-Dec-10 Xcel 5/19/10 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000465 19-Jan-11 Xcel 8/17/10 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000466 19-Jan-11 Xcel 11/22/10 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000467 22-Feb-11 Xcel 2/17/11 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000468 23-May-11 Xcel 5/9/11 Quarterly ISFSI Contamination & TLD Monitoring Results Contention 4

PROP00000469 15-Feb-08 Xcel 2/15/2008 Letter from NMC Requesting Proposal from Transnuclear

Contention 4

PROP00000470 22-Jun-09 Transnuclear Xcel

TN-40HT LAR RAI Responses Contention 6

PROP00000471 26-Jun-08 Transnuclear Xcel

License Amendment Request to Modify TN-40 Cask Design (Designated as TN-40TH) (TAC No. L24203)

Contention 6

PROP00000472 29-Dec-06 Areva/Transnuclear Xcel

12/29/2006 TN40HT Far Shielding Calculations Contention 4

PROP00000473 9-Mar-07 Transnuclear Xcel

3/9/2007 Proposal to Prepare Initial Phase of PI ISFSI Offsite Dose Calculation

Contention 4

PROP00000474 7-Mar-08 Areva/Transnuclear Xcel

3/7/2008 Project 10421 TN40HT Submittal of calculations TN40HT-214 and TN40HT-235

Contention 6

PROP00000475 6-Mar-07 Xcel 3/6/2007 Request for Proposal for More Realistic PI ISFSI Offsite Dose Calc

Contention 4

PROP00000476 Unknown TransNuclear/Areva Xcel

04FS02 Incoming Correspond - 2 (correspondence received from TransNuclear)

Contention 4

Page 64: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

28

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000477 15-Nov-05 Transnuclear Xcel

TN-40 Transport Fuel Qualification and Source Terms Contention 4

PROP00000478 15-Nov-05 Transnuclear Xcel

TN-40 Transport Design Basis FQT and Source Terms Contention 4

PROP00000479 25-May-09 Transnuclear Xcel

TN40HT Additional Fuel Qualification Evaluation Contention 4 Contention 6

PROP00000480 7-Apr-95 Stone & Webster Xcel

4/7/95 Stone & Webster Letter No. S-N-05 Contention 2 Contention 4

PROP00000481 21-Apr-95 Stone & Webster Xcel

4/21/95 Stone & Webster Letter No. S-N-07 Contention 2 Contention 4

PROP00000482 Unknown EPRI Xcel

January 2013 DOE Solicitation No. DE-0005019- High Burnup Fuel Cask Research and Development Project: Initial Notes and Questions

Contention 6

PROP00000483 14-Jan-13 Transnuclear Xcel

TransNuclear Calculation TN40HT-0412: Thermal Evaluation of TN-40HT Cask with 1" Maximum Cutout Length on Each End of Aluminum/Poison Basket Plates and 0.2" Total Axial Thermal Expansion Gap

Contention 4

PROP00000484 9-Jan-13 Exelon Xcel

1/8/2013 Email chain from Raymond Termin to various recipients re: NRC's Request for Input on Retrievability

Contention 6

PROP00000485 27-Nov-12 Shaw Stone & Webster Xcel

11/27/2012 email from SL Samson to Michael Baumann re FW: DOE Posts Sources Sought Notice for High Burn-up Dry Storage Cask Demonstration Project

Contention 6

PROP00000486 1-Nov-12 EPRI Xcel

Response to Source Sought Notice High Burnup DCS Demo Contention 6

PROP00000487 4-Dec-12 EPRI Xcel

12/04/2012 Email from John Kessler to Fogg re Responses to Sources Sought Notice - High Burnup Cask Demonstration Project

Contention 6

PROP00000488 1-Nov-12 EPRI Xcel

Response to Source Sought Notice High Burnup DCS Demo Contention 6

PROP00000489 9-Dec-11 Shaw Stone & Webster 12/09/11 DOE: A plan for Testing and Evaluating Contention 6

PROP00000490 20-Jul-12 Westwood Xcel

7/20/2011 Westwood Invoice Contention 2 Contention 4

PROP00000491 27-May-10 Merjent Xcel

5/27/2010 Proposal to Assist with ER Contention 2 Contention 4

Page 65: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

29

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000492 1-Mar-12 Xcel March 1, 2012 Project Status Report: PINGP TN-40HT Cask Design and Licensing

Contention 6

PROP00000493 15-May-12 Xcel 5/15/2012 - Detailed PI site layout Contention 2 Contention 4

PROP00000494 15-May-12 Xcel 5/15/2012 Detailed PI site layout Contention 2 Contention 4

PROP00000495 11-May-95 Shaw Stone & Webster Xcel

Diagram of ISFSI Contention 2 Contention 4

PROP00000496 11-May-95 Shaw Stone & Webster Xcel

Diagram of ISFSI Contention 2 Contention 4

PROP00000497 11-May-95 Shaw Stone & Webster Xcel

ISFSI Site Grading Drawing Contention 2 Contention 4

PROP00000498 8-May-96 Shaw Stone & Webster Xcel

Diagram of ISFSI Contention 2 Contention 4

PROP00000499 24-Apr-81 Shaw Stonoe & Webster Xcel

Drawing of Plant Site Contention 2 Contention 4

PROP00000500 10-Dec-94 Stone & Webster Xcel

Diagram of ISFSI Contention 2 Contention 4

PROP00000501 26-Jul-10 Xcel 7/26/2010 Nuclear Project Authorization Form Contention 2 Contention 4

PROP00000502 Unknown Transnuclear Xcel

TN Contract Amendment 6 Items for discussions Contention 6

PROP00000503 30-Mar-07 Transnuclear 3/30/2007 Transnuclear "TN-40HT Fuel Cladding End Drop Analysis"

Contention 6

PROP00000504 29-Feb-08 Transnuclear Transnuclear Calculation No. TN40HT-0214: TN40HT Fuel Cladding End Drop Analysis

Contention 6

PROP00000505 22-May-09 Transnuclear Transnuclear Calculation No. TN40HT-0215: TN40HT Fuel Cladding Thermal Stresses Due to Quenching

Contention 6

PROP00000506 20-Apr-07 Transnuclear TransNuclear Calculation No. TN40HT-0402: TN40HT Normal & Off-Normal Storage Conditions, Thermal Analysis

Contention 4

PROP00000507 2-May-07 Transnuclear TransNuclear Calculation No. TN40HT-0402: TN40HT Normal & Off-Normal Storage Conditions, Thermal Analysis

Contention 4

PROP00000508 26-Apr-12 Transnuclear TransNuclear Calculation No. TN40HT-0402: TN40HT Normal & Off-Normal Storage Conditions, Thermal Analysis

Contention 4

Page 66: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

30

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000509 27-Oct-06 Transnuclear TransNuclear Calculation No. TN40HT-0402: TN40HT Normal & Off-Normal Storage Conditions, Thermal Analysis

Contention 4

PROP00000510 18-Apr-07 Transnuclear 4/18/2007 Transnuclear "TN40HT Accident Conditions Thermal Analysis - Fire and Buried Cask"

Contention 6

PROP00000511 18-Apr-07 Transnuclear 5/2/2007 Transnuclear "TN40HT Accident Conditions Thermal Analysis - Fire and Buried Cask"

Contention 6

PROP00000512 26-Apr-12 Transnuclear 4/26/2012 Trans Nuclear Calculation for TNT40HT Accident Conditions Thermal Analysis-Fire and Buried Cask

Contention 6

PROP00000513 18-Apr-07 Transnuclear 4/18/2007 Transnuclear "Thermal Analysis of TN-40HT Cask for Vacuum Drying Conditions"

Contention 6

PROP00000514 26-Apr-12 Transnuclear Transnuclear Calculation No. TN40HT-0404: Thermal Analysis of TN40HT Cask for Vacuum Drying Conditions

Contention 6

PROP00000515 18-Apr-07 Transnuclear 4/18/2007 Transnuclear "Effective Properties of WE14x14 Fuel Assembly within TN40HT Cask Fuel Compartment"

Contention 6

PROP00000516 27-Oct-06 Transnuclear TransNuclear Calculation No TN40HT-0408: Effective Properties of WE 14x14 Fuel Assembly within TN40HT Cask Fuel Compartment

Contention 4

PROP00000517 7-Nov-06 Transnuclear Transnuclear Calculation No. TN40HT.0500: High Burnup Fuel Qualification Tables and Design Basis Radiological Source Terms for TN40HT Storage System

Contention 6

PROP00000518 30-Mar-07 Transnuclear 3/30/2007 Transnuclear "High Burn-up Fuel Qualification Tables and Design Basis Radiological Source Terms for TN40HT Storage System"

Contention 4

PROP00000519 23-Feb-07 Shaw Stone & Webster 2/23/2007 Project Description Section 3.11 Shaw S&W Required Content- Submittal for Client Review

Contention 2 Contention 4

PROP00000520 23-Feb-07 Shaw Stone & Webster 2/23/2007 Spent Fuel Storage Alternatives for Prairie Island Section 4.8 Shaw S&W Required Content- Submittal for Client Review

Contention 4

PROP00000521 9-Feb-07 Stone & Webster 2/9/2007 Environmental Information Section 6 Shaw S&W Required Content- Submittal for Client Review

Contention 2 Contention 4

Page 67: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

31

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000522 23-Feb-07 Stone & Webster 2-23-2007 Wastes and Emissions Section 7 Shaw S&W Required Content Submittal for Client Review

Contention 4

PROP00000523 14-Feb-07 Stone & Webster 2/14/2007 Estimates of Induced Development Section 9 Shaw S&W Required content- Submittal for Client Review

Contention 2 Contention 4

PROP00000524 30-Mar-07 Transnuclear 3/30/2007 Areva "TN-40HT High Burnup Storage and Transport Cask Design"

Contention 4

PROP00000525 22-May-09 Transnuclear 5/22/09 TN40HT Additional Fuel Qualification Evaluation Contention 6

PROP00000526 15-Aug-07 Transnuclear Xcel

8/15/2007 Areva "High Capacity TN-40HT Storage System" Contention 4

PROP00000527 16-Aug-07 Xcel 8/16/2007 Areva "High Capacity TN40HT Storage System" Contention 4

PROP00000528 17-Mar-08 Transnuclear 03/17/2008 Areva/TN Calculation No. TN40HT.0512 Dose Rates and Occup'l Exposure Estimate for PI ISFSI Comprised with TN40HT Casks Loaded with WE 14x14 STD Fuel Assemblies

Contention 4

PROP00000529 30-Nov-12 Shaw Xcel

11/27/2012 email from Baumann to O'Connor - Re: DOE Posts Sources Sought Notice for High Burn-up Dry Storage Cask Demonstration Project

Contention 6

PROP00000530 30-Nov-12 Xcel Nuclear Report-Week ending November 30, 2012 Contention 6

PROP00000531 15-Dec-12 Transnuclear Xcel

2/12/2012 NRC Response Form, Request No. 20, Transnuclear Calculation TN40HT-0411-Rev 2 and Transnuclear Calculation TN40HT-0402-Rev 2

Contention 6

PROP00000532 26-Apr-12 Transnuclear TransNuclear Calculation No. TN40HT-0402: TN40HT Normal & Off-Normal Storage Conditions, Thermal Analysis

Contention 6

PROP00000533 19-Jan-12 SHAW

5/2/2012 Shaw Environmental & Infrastructure "A Plan for Testing and Evaluating Long-Term Behavior of Stored Used Nuclear Fuel"

Contention 6

PROP00000534 12-Jan-12 Shaw Group

Task Order No. 7 A Plan for Testing and Evaluating Long-Term Behavior of Stored Used Nuclear Fuel

Contention 6

PROP00000535 7-Dec-11 Shaw Group DOE Task 7 schedule Contention 6

PROP00000536 5-Jan-12 NEI Dry Cask Storage and Transport Issue List 1-5-2012 Contention 6

PROP00000537 Unknown Xcel Prairie Island ISFSI and Westwood 2010 Study Test Pits Contention 2 Contention 4

Page 68: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

32

Document ID Date Entity Claiming Protected Status Description Contention

PROP00000538 Unknown Xcel Select Prairie Island Archaeological Surveys Contention 2 Contention 4

PROP00000539 Unknown Xcel Prairie Island ISFSI and Westwood 2010 Study Test Pits Contention 2 Contention 4

PROP00000540 Unknown Xcel Select Prairie Island Archaeological Surveys Contention 2 Contention 4

PROP00000541 27-Aug-09 Prairie Island Indian Community Xcel

Letter from Philip Mahowald to Peter Glass re Confidential Settlement Communications

Contention 4

PROP00000542 2-Oct-08 Xcel Letter from Philip R. Mahowald on behalf of Prairie Island Indian Community to David Sparby et at. re: Literature Search and Assessment of Historical and Archeological Resources Impacted by the Construction and Operation of the Prairie Island Nuclear Gene

Contention 4

PROP00000543 14-Sep-09 Xcel Image of Archaeological & Historical Site Locations Prairie Island Red Wing, MN

Contention 2 Contention 4

PROP00000544 24-Jun-09 Xcel Archaeological Site Locations Contention 2 Contention 4

Page 69: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention
Page 70: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention
Page 71: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

UNITED STATES OF AMERICA

NUCLEAR REGULATORY COMMISSION

Before the Atomic Safety and Licensing Board

In the Matter of )

) Docket Nos. 72-10-ISFSI-LR

Northern States Power Co. )

)

(Prairie Island Nuclear Generating Plant, ) ASLBP No. 12-922-01-ISFSI-MLR-BRD01

Independent Spent Fuel Storage Installation) )

CERTIFICATE OF SERVICE

I hereby certify that a copy of “Northern States Power Company’s Initial Disclosures,”

dated February 28, 2013 was provided to the Electronic Information Exchange for service on the

individuals listed below, this 28th

day of February, 2013.

Administrative Judge

Michael M. Gibson, Chair

Atomic Safety and Licensing Board

Mail Stop T-3 F23

U.S. Nuclear Regulatory Commission

Washington, D.C. 20555-0001

E-mail: [email protected]

Administrative Judge

Dr. Gary S. Arnold

Atomic Safety and Licensing Board

Mail Stop T-3 F23

U.S. Nuclear Regulatory Commission

Washington, D.C. 20555-0001

Email: [email protected]

Administrative Judge

Nicholas G. Trikouros

Atomic Safety and Licensing Board

Mail Stop T-3 F23

U.S. Nuclear Regulatory Commission

Washington, D.C. 20555-0001

Email: [email protected]

Secretary

Att’n: Rulemakings and Adjudications Staff

Mail Stop O-16 C1

U.S. Nuclear Regulatory Commission

Washington, D.C. 20555-0001

[email protected]; [email protected]

Office of Commission Appellate Adjudication

Mail Stop O-16 C1

U.S. Nuclear Regulatory Commission

Washington, DC 20555-0001

E-mail: [email protected]

Mauri T. Lemoncelli, Esq.

Christopher C. Hair, Esq.

Office of the General Counsel

Mail Stop O-15 D21

U.S. Nuclear Regulatory Commission

Washington, DC 20555-0001

E-mail: [email protected]

[email protected]

Page 72: Northern States Power Company's Initial Disclosures ... · Document I.D. Description Contention PROD00000001 Draft Responses to Information Requests from NRC to Calvert Cliffs Contention

- 2 -

Philip R. Mahowald, Esq.

General Counsel, Prairie Island Indian Community

5636 Sturgeon Lake Road

Welch, MN 55089

[email protected]

/Signed electronically by Kimberly A Harshaw/

Kimberly A. Harshaw