Project Requirements1
2
Demo3
FS Project Experiences4
Structure of Project
Project Support & Sponsor5
LOGO
Requirement of FS project
HQ in BKK
• Assembly the F/G• Purchase Parts• Get Orders from customer• Send F/G to customer
Warehouse in Chiang Mai
Warehouse in Chon Buri
ABC Factory Headquarter is located in BKK. Its Warehouses are located in Chiang Mai & Chon Buri provinces. The HQ gets Order, Purchase Part & assembly. Each warehouse has its own inventory.
Customer Story
LOGO
Requirement of FS project Current Problem
o Inventory Sites
• Difficult to manage inventory data
• Item data is always stored in wrong places and incomplete
• Difficult to find inventory items
• Information is not CENTRALIZED!o Headquarter
• Cannot obtain information from inventory properly
• Report creation takes a long time
• Overhead cost in communication between sites is too expensive
LOGO
Requirement of FS project Customer Need
o Web-based Shared Inventory Information System• Prefer to implement with ASP.NET with MS-SQL server
2005.• Use MVC
o Support Basic Operations• Received Purchase Item from Vendor• Delivery Order item to Customer• Move Stock between Warehouse• Able to adjust stock QTY
LOGO
Structure of FS project Tools &Knowledge for Project
Understand on following topics: C# Programming ( connect with NHibernate ) R-DMBS (Prefer MS-SQL server 2005 or higher) OOP (Object Oriented Programming) MVC (Model-View-Controller) UML (Unified Modeling Language)
Required Software for Workshop Visual Studio 2005 (with Framework 2.0) MS-SQL server 2005 Crystal Report/MS-Reporting
Challenges
o Member lacked of strong technical and soft skill Know only about C# Programming
(connect DB with Query String) Concept about OOP (Object Oriented Programming)
o Required to finish within 1 month!o Working hours are limited
www.themegallery.comLOGO
LOGO
Structure of FS project Method to Solve Problem
What is MVC?
LOGO
Item Master
Zone Master
Category
Goods Receiving
Goods Receiving Entry
Shelf-In Entry
Goods Receiving List
Transfer-In Entry
Shipment
Shipment Entry
Shelf-Out Entry
Shipment List
Transfer-Out Entry
Inventory
In & Out Adjustment
Supplier Customer
Inventory By Category
Solution for Project
Structure Flow of Project
Structure of FS project
Team 1(4 people)
Team 1(4 people)
Team 2(4 people)
Team 2(4 people)
Team 3(4 people)
Team 3(4 people)
LOGO
Structure of FS project Method to Solve Problem
Team Organization
Project Project LeaderLeader
TesterTester
ProgrammerProgrammer
SystemSystemAnalysisAnalysis
Project ScheduleSDLC
ID Task Name Start Duration?.?. 2552 ¤.?. 2553
329 30 21 4
1 5d03/12/200929/11/2552Get user requirement
2 7d05/12/200929/11/2009Analysis and Design UML
3 7d5/12/255229/11/2552Design ER Diagram
4 7d5/12/255229/11/2552Design GUI
9 1d09/01/201009/01/2010Presentation
7
6
5 5d09/12/20095/12/2552Design and Create Database
24d29/12/200906/12/2009Coding Program
18d06/01/201020/12/2009Testing Program
8 3d08/01/201006/01/2010Implement Program
Finish5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9
INVENTORYExample
Analysis Artifacts
Use Case Diagram
Analysis Artifacts
Activity DiagramE-R Diagram
Class Diagram
Analysis ArtifactsSequence Diagram
LOGO
Demo Project
LOGO
ExperiencesExperiences from FS Project
Lesson Learnedo Technical skill
Stronger knowledge in OOP Know more about C# Programming and NHibernate Know how to use MVC concept in web application Know how to use Crystal Report/MS-Reporting Important to design before coding Testing is very important Integration is not easy to be done if interface is not
determined ahead Increase knowledge in Business skills
o Soft skill Improving Soft skills such as time management,
communication, team work, problem solving, etc. Improving English presentation skills
Team Members
โครงการ นี้� เยี่��ยี่มไปเลยี่คร�บ
โครงการ นี้� เยี่��ยี่มไปเลยี่คร�บ
พี่��เต้�วิ�ทยี่ากรอบรม
โครงการนี้�
พี่��เต้�วิ�ทยี่ากรอบรม
โครงการนี้�
โครงการนี้�พี่วิกหนี้�ได้�ร�บควิามร� �มาก
มายี่เลยี่ค�ะขอบค ณมากค�ะ
โครงการนี้�พี่วิกหนี้�ได้�ร�บควิามร� �มาก
มายี่เลยี่ค�ะขอบค ณมากค�ะ
LOGO
Supports&Sponsers FS ProjectThank you
LOGO