North Surrey Truck Parking – Highway 17 South Fraser Perimeter Road: Stormwater Management Plan
North Surrey Truck Parking Phase One and Phase Two Stormwater Management Plan
Prepared for: Derek Drummond Owner’s Representative Project Manager to MOTI
Prepared by: Stantec Consulting Ltd.
Project No. 115815025
October 31, 2016
Sign-off Sheet
This document entitled North Surrey Truck Parking – Highway 17 South Fraser Perimeter Road: Stormwater Management Plan was prepared by Stantec Consulting Ltd. (“Stantec”) for the account of The Ministry of Transportation and Infrastructure. (the “Client”). Any reliance on this document by any third party is strictly prohibited. The material in it reflects Stantec’s professional judgment in light of the scope, schedule and other limitations stated in the document and in the contract between Stantec and the Client. The opinions in the document are based on conditions and information existing at the time the document was published and do not take into account any subsequent changes. In preparing the document, Stantec did not verify information supplied to it by others. Any use which a third party makes of this document is the responsibility of such third party. Such third party agrees that Stantec shall not be responsible for costs or damages of any kind, if any, suffered by it or any other third party as a result of decisions made or actions taken based on this document.
Prepared by
(signature) Houman Hoseini, EIT
Reviewed by (signature)
Carter Chan, P.Eng.
Approved by (signature)
Ivano Biagioni
NORTH SURREY TRUCK PARKING – HIGHWAY 17 SOUTH FRASER PERIMETER ROAD: STORMWATER MANAGEMENT PLAN
i
Table of Contents
1.0 PRE-CONSTRUCTION CONDITIONS .............................................................................. 1
2.0 MODELING SOFTWARE AND PARAMETERS ................................................................... 1
3.0 DESIGN CRITERIA .......................................................................................................... 2 3.1 ON-SITE PIPE SIZING ........................................................................................................... 2 3.2 STORM WATER ATTENUATION .......................................................................................... 3 3.3 STORM WATER TREATMENT ............................................................................................... 3 3.4 FRASER RIVER FLOOD PROTECTION ................................................................................ 3
4.0 MODELING RESULTS ....................................................................................................... 3
5.0 PROPOSED DRAINAGE SYSTEMS ................................................................................... 6 5.1 ON-SITE PIPE NETWORK ..................................................................................................... 7 5.2 STORM WATER ATTENUATION .......................................................................................... 7 5.3 STORM WATER TREATMENT ............................................................................................... 7 5.4 LOCAL CULVERTS .............................................................................................................. 7 5.5 FLOOD PROTECTION ......................................................................................................... 7
6.0 SUMMARY ...................................................................................................................... 8
APPENDIX A LIST OF FIGURES
NORTH SURREY TRUCK PARKING – HIGHWAY 17 SOUTH FRASER PERIMETER ROAD: STORMWATER MANAGEMENT PLAN
October 31, 2016
hh \\cd1049-f01\workgroup\1158\1158-15025\230 port man\transportation\report\storm water management plan\nstp_swmp_final.docx 1
1.0 PRE-CONSTRUCTION CONDITIONS
The area designated for the purposes of the North Surrey Truck Parking project encompass approximately 7.2 ha in Surrey, BC located east of the Port Mann Bridge and bounded by the South Fraser Perimeter Road to the south and the CN Railway to the North. Figure 1.0 illustrates the site location and catchment areas. The overall site sits on the Remainder of Parcel ‘A’ Plan BCP16539.
Currently the site is vegetated and treed in sections. The drainage profile of the local ditches is flat with minimal grade; however, surplus fill was placed on the site during construction of the South Fraser Perimeter Road (SFPR) project creating topographic relief.
The subcatchments are defined based on outfall locations. Subcatchments will be maintained in the design process. Specific subcatchment configurations are highlighted on Figures 1.1 and 1.2.
1. Subcatchment S1: The central catchment drains to an existing un-named stream, originating from the east perimeter of the Port Mann Landfill, which then flows west along the north perimeter of the property, and the SFPR ditch on the south. These features drain to a common outlet at approximately 151 Street draining north across the CN Railway.
2. Subcatchment S2: A local ditch, on the north side of the property, collects runoff from the subcatchment and drains east to a closed pipe system along SFPR which directs flows to the 157 Street Ravine outfall to the Fraser River. This outfall crosses north through the CN Railway Yard.
3. Subcatchment S3: A local ditch on the north side of the property and the SFPR ditch on the south side of the property, collect runoff and flow west to Landfill Creek. Landfill Creek drains north to Bon Accord Creek and discharges to the Fraser River under the CN Railway east of the Port Mann Bridge.
2.0 MODELING SOFTWARE AND PARAMETERS
PCSWMM Professional 2013 was used for storm water modeling. PCSWMM has the ability to perform dynamic routing for various channel and pipe configurations. The modeling program is ideally suited for detailed hydraulic (conduit), hydraulic control and hydraulic backwater analysis. The model was used to generate hydrographs, peak flows, and runoff volumes.
Modeling parameters for this site were based on information attained from the report entitled “Drainage Basin Report for West of 152nd Watershed” by Hatch Mott MacDonald. Table 1 shows
NORTH SURREY TRUCK PARKING – HIGHWAY 17 SOUTH FRASER PERIMETER ROAD: STORMWATER MANAGEMENT PLAN
October 31, 2016
hh \\cd1049-f01\workgroup\1158\1158-15025\230 port man\transportation\report\storm water management plan\nstp_swmp_final.docx 2
the pre and post development subcatchment parameters which were used in the model. The estimated depth of depression storage was reduced for the post development conditions. This is due to the fact that the proposed parking area will be well graded and therefore provide less surface depression storage.
Table 1: Subcatchment Parameters
Subcatchment Names
Area (ha)
Average Slope
(%)
Imperv (%)
N Perv
Dstore Perv (mm)
Max. Infil. Rate
(mm/hr)
Min. Infil. Rate
(mm/hr)
Decay Constant
(1/hr)
Pre Development S1 4.33 2.3 0 0.3 6 7 1.5 5.4 S2 0.91 4.0 0 0.3 6 7 1.5 5.4 S3 1.97 2.6 0 0.3 6 7 1.5 5.4
Post Development S1 4.33 2.0 100 0.3 1 7 1.5 5.4 S2 0.91 2.0 100 0.3 1 7 1.5 5.4 S3 1.97 2.0 100 0.3 1 7 1.5 5.4
The design storms used for the calculation of the pre and post development peak flows include the Kwantlen Park 1 in 2 year, 1 in 5 year, and 1 in 100 year design storm for the 24 hour duration as per the City of Surrey 2016 Design Criteria Manual.
3.0 DESIGN CRITERIA
The Stormwater catchment boundaries will be maintained from post development to pre development. The project will be designed to meet City of Surrey 2016 design criteria and bylaws and follow the Ministry of Highways and Infrastructure construction specifications. The site will be graded to insure all onsite drainage is contained and directed to the appropriate attenuation and treatment facilities.
3.1 ON-SITE PIPE SIZING
Following the City of Surrey design criteria, the storm water drainage pipes will be designed to accommodate the 5 year 24 hour minor storm event. Rainfalls with a higher intensity than the 5 year storm event may cause surcharging of the pipes with potential short term overland flow. Safe overland conveyance will be provided to the outlet locations for the 100 year major storm event.
NORTH SURREY TRUCK PARKING – HIGHWAY 17 SOUTH FRASER PERIMETER ROAD: STORMWATER MANAGEMENT PLAN
October 31, 2016
hh \\cd1049-f01\workgroup\1158\1158-15025\230 port man\transportation\report\storm water management plan\nstp_swmp_final.docx 3
3.2 STORM WATER ATTENUATION
Storm water attenuation is proposed for the 5 year 24 hour minor storm event to minimize impact on the downstream drainage infrastructure. Detention to mitigate the 5 year 24 hour post development peak flows to pre development peak flows will be provided in each of the subcatchments.
3.3 STORM WATER TREATMENT
Storm water treatment will be achieved through the use of hydrodynamic separators downstream of the proposed detention storage. Hydrodynamic separators use cyclonic separation to control water pollution. They are designed as flow-through structures with a settling or separation unit to screen, separate and trap trash, debris, sediment, and hydrocarbons from stormwater runoff.
3.4 FRASER RIVER FLOOD PROTECTION
Due to the proximity of the Fraser River the current Local Dyke Authority map for Surrey produced for Ministry of Environment was reviewed. The current flood profile along the river including freeboard varies from 5.3m to 5.4m. These values are based on the Fraser River Hydraulic Model Update Report, March 2008, by Northwest Hydraulic Consultants (NHC).
Since this time, additional studies have been completed to anticipate the effect of climate change to the river levels. The NHC report entitled “Simulating the Effects of Sea Level Rise and Climate Change”, dated 2014, estimates that the current flood level will represent the 1:50 year level of service by the end of the century.
4.0 MODELING RESULTS
The following tables summarize the results from the PCSWMM model for the three subcatchments.
Table 2: Subcatchment S1 Model Results
Stor
m E
vent
Pre
Deve
lopm
ent
Volu
me
(m3 )
Pre
Deve
lopm
ent Q
(m
3 /s)
Post
Dev
elop
men
t M
itiga
ted
Volu
me
(m3 )
Post
Q M
itiga
ted
(m3 /
s) (v
ia
atte
nuat
ion)
Volu
me
Diffe
renc
e (m
3 )
2-year 24-hour 843 0.021 2727 0.031 1884
NORTH SURREY TRUCK PARKING – HIGHWAY 17 SOUTH FRASER PERIMETER ROAD: STORMWATER MANAGEMENT PLAN
October 31, 2016
hh \\cd1049-f01\workgroup\1158\1158-15025\230 port man\transportation\report\storm water management plan\nstp_swmp_final.docx 4
5-year 24-hour 1563 0.037 3556 0.037 1993
100-year 24-hour 3674 0.085 5559 0.049 1885
Table 3: Subcatchment S2 Model Results
Stor
m E
vent
Pre
Deve
lopm
ent
Volu
me
(m3 )
Pre
Deve
lopm
ent Q
(m
3 /s)
Post
Dev
elop
men
t M
itiga
ted
Volu
me
(m3 )
Post
Q M
itiga
ted
(m3 /
s) (v
ia
atte
nuat
ion)
Volu
me
Diffe
renc
e (m
3 )
2-year 24-hour 221 0.009 572 0.013 351
5-year 24-hour 382 0.015 747 0.015 365
100-year 24-hour 841 0.030 1224 0.019 383
Table 4: Subcatchment S3 Model Results
Stor
m E
vent
Pre
Deve
lopm
ent
Volu
me
(m3 )
Pre
Deve
lopm
ent Q
(m
3 /s)
Post
Dev
elop
men
t M
itiga
ted
Volu
me
(m3 )
Post
Q M
itiga
ted
(m3 /
s) (v
ia
atte
nuat
ion)
Volu
me
Diffe
renc
e (m
3 )
2-year 24-hour 445 0.014 1241 0.019 796
5-year 24-hour 786 0.023 1618 0.023 832
100-year 24-hour 1768 0.051 2653 0.032 885
Pre and post development hydrographs are shown below in Figures 1, 2, and 3 for the 1 in 5 year 24 hour design storm for Subcatchments S1, S2, and S3, respectively.
NORTH SURREY TRUCK PARKING – HIGHWAY 17 SOUTH FRASER PERIMETER ROAD: STORMWATER MANAGEMENT PLAN
October 31, 2016
hh \\cd1049-f01\workgroup\1158\1158-15025\230 port man\transportation\report\storm water management plan\nstp_swmp_final.docx 5
Figure 1: Subcatchment S1 Pre and Post Development Hydrographs
Figure 2: Subcatchment S2 Pre and Post Development Hydrographs
0.000
0.005
0.010
0.015
0.020
0.025
0.030
0.035
0.040Q
(m3 /
s)
Time (Hours)
Subcatchment S1
Pre Development
Post Development
0.000
0.002
0.004
0.006
0.008
0.010
0.012
0.014
0.016
Q (m
3 /s)
Time (Hours)
Subcatchment S2
Pre Development
Post Development
NORTH SURREY TRUCK PARKING – HIGHWAY 17 SOUTH FRASER PERIMETER ROAD: STORMWATER MANAGEMENT PLAN
October 31, 2016
hh \\cd1049-f01\workgroup\1158\1158-15025\230 port man\transportation\report\storm water management plan\nstp_swmp_final.docx 6
Figure 3: Subcatchment S3 Pre and Post Development Hydrographs
As illustrated in the hydrographs, the peak flows for the pre and post development conditions are similar. However, the total volume for the post development condition has increased. The volumes identified above are based on utilizing an orifice flow control manhole and an onsite detention storage system. Table 5 below outlines the estimated diameter of the main control orifice required to ensure that the post development runoff is limited to the existing conditions.
Table 5: Estimated Control Orifice
Subcatchment Name
Estimated Diameter of Main Control Orifice
(mm)
S1 120
S2 100
S3 125
5.0 PROPOSED DRAINAGE SYSTEMS
The following section outlines the proposed storm drainage features which will be incorporated during detailed design to meet the required design objectives.
0.000
0.005
0.010
0.015
0.020
0.025Q
(m3 /
s)
Time (Hours)
Subcatchment S3
Pre Development
Post Development
NORTH SURREY TRUCK PARKING – HIGHWAY 17 SOUTH FRASER PERIMETER ROAD: STORMWATER MANAGEMENT PLAN
October 31, 2016
hh \\cd1049-f01\workgroup\1158\1158-15025\230 port man\transportation\report\storm water management plan\nstp_swmp_final.docx 7
5.1 ON-SITE PIPE NETWORK
The parking area will be graded towards catch basins that will direct flows to the collection system which will be located in the middle of the parking area. This collection system will convey flows to the designated outlet locations.
5.2 STORM WATER ATTENUATION
Stormwater attenuation will be provided by a combination of oversized collection pipes and detention pond. Subcatchments S1 and S3 will utilize oversized collection pipes to detain stormwater while Subcatchment S2 will use a combination of oversized collection pipes and a local detention pond to achieve sufficient detention capacity to attenuate peak flows. A control manhole will be provided downstream of the detention storage to control the post development discharge to the 5 year 24 hour pre development peak flow rates.
5.3 STORM WATER TREATMENT
Stormwater treatment will begin at the catch basins, which will be provided with trapping hoods, allowing for containment of some debris and hydrocarbons. Following the catch basins, the detention storage will allow for the settlement and removal of grit. Finally, hydrodynamic separators downstream of the stormwater control manholes will provide the final level of treatment with additional removal of debris, sediment, and hydrocarbons.
5.4 LOCAL CULVERTS
Existing local culverts crossing the SFPR will be extended through the site, as required. This includes the culverts carrying the Unnamed Creek on the east side of Subcatchment S1. Both the 1400mm diameter and 1000mm diameter CSP culverts will be extended at a slope of approximately 0.6%.
5.5 FLOOD PROTECTION
The parking lot area will be designed to an elevation greater than 5.4m elevation. This will match the estimated flood level of the Fraser River including the 600mm of freeboard. However, the level of service can be expected to decrease in time due to climate change affects. By the year 2100 the site may be impacted by the 1 in 50 year Fraser River Flood. This will need to be confirmed by future Fraser River Flood Profile Modeling to be completed by the Ministry of Environment.
NORTH SURREY TRUCK PARKING – HIGHWAY 17 SOUTH FRASER PERIMETER ROAD: STORMWATER MANAGEMENT PLAN
October 31, 2016
hh \\cd1049-f01\workgroup\1158\1158-15025\230 port man\transportation\report\storm water management plan\nstp_swmp_final.docx 8
6.0 SUMMARY
Based on the PCSWMM model and the proposed drainage infrastructure it will be possible to meet the stated design criteria. The on-site collection system will direct flows to detention storage. Discharge will be attenuated by a control structure and treated by a hydrodynamic separator prior to discharge into the local drainage system. This integrated system will allow for the control of pollutants that may come off of the project site and insure that there is no impact to the downstream drainage system from an increase in peak flow rates.
NORTH SURREY TRUCK PARKING – HIGHWAY 17 SOUTH FRASER PERIMETER ROAD: STORMWATER MANAGEMENT PLAN
October 31, 2016
APPENDIX A LIST OF FIGURES
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
53 54 55 56 57
58 59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76 77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103104
105106
107
108109
110111
112
113114
115116117
118119
120121
12212
312
412
512
612
712
812
9
130
131
132
133
134
135
136
137
138139
140
141
142
14314
4
145
146
147
14814
9
150
151
152
153
15415
5156
157
158
1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
SANI DUMP STATION ONLYNO PARKING
24m MAX.23m MAX.
21m MAX.20m MAX.
18m MAX.
20mM
AX.22mM
AX.
23m MAX.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL.
& G
R.
CL. & GR.CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.CL. & GR.
CL. & GR.CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.CL. & GR.
CL. & GR.
G-104 km 38
ASPHALT FLUME
ASPHALT FLUMEASPHALT FLUME
ASPHALT FLUMEASPHALT FLUMES
600 mm Ø CSPL = 10.29 m
OUTLET INV=
6.23 m
INLET INV=
6.21 m
600 mm Ø
CSP
L = 10.43 m
OUTLET INV=6.33 m
INLET INV=
6.23 m
GOOD
OUTLET INV=
5.05 m
CSP1400 mm Ø
OUTLET INV=4.81 m
GR
EEN PVC
600 mm
Ø
600 mm ØCSP
L = 10.63 mOUTLET INV=
5.08 m INLET INV=5.08 m
GOOD
600 mm Ø
CSP
L = 19.27 m
OUTLET INV=5.83 m
INLET INV=4.68 m
600 mm ØCSP
L = 19.27 m
INLET INV=4.91 m
OUTLET INV=4.73 m
GOOD
150 mm ØABS
L = 5.72 m
OUTLET INV=8.44 m
INLET INV=10.64 m
2 POST SIGN
G-050-1
G-050-5
2000 mm WIDE
CONCRETE ARCH
L = 21.99 m
OUTLET INV=3.05 m
INLET INV=
2.92 m
PARTIALLY FULL
1200 mm Ø
CSP
L = 20.65 mOUTLET INV=
0.14 m
INLET INV=
0.24 m (APPROX.)
FAIR
2250 mm WIDTH
CEMENT BOX CULVERT
L = 13.04 m
INLET INV=
2.21 m
OUTLET INV=
1.93 m
2500 mm WIDTH
CEMENT BOX CULVERT
L = 16.49 m
INLET INV=
2.19 m
OUTLET INV=
2.78 m
TAG 9084C-12
PLUGGED WITH SAND
450 mm WIDTH
ABSL = 11.36 m
INLET INV=4.75 m
OUTLET INV=
4.60 m
INLET ELEVATIONS FROM IFC DRAWINGS
OUTLET INV=2.95 m
CSP1000 mm Ø
GOOD
600 mm ØCSP
L = 10.18 m
INLET INV=5.72 m
OUTLET INV=5.69 m
600 mm Ø
CSP
L = 15.50 m
OUTLET INV=
1.90 m
INLET INV=
2.02 m
POOR
INLET INV=
2.94 m
CSP600 mm Ø
GOOD
L = 15.24 m
SOUTH FRASER PERIMETER ROAD
SOUTH FRASER PERIMETER ROAD
SOUTH FRASER PERIMETER ROAD (HWY 17)
SOUTH FRASER PERIMETER ROAD
TRANS CANADA HIGHW
AY #1
SOUTH FRASER PERIMETER ROAD
OIP
OIP
OIP
OIP
OIP
OIP
OIP
OIP
OIP
OIP
MHSan
DELTA
GOOD
INLETS ACROSS HIGHWAY
1350 mm Ø SP FORCE1350 mm Ø SP FORCE
1350 mm Ø SP FORCE
200
mm
Ø P
E
200
mm
Ø P
VC
MHStorm
MHSan
MHStorm
GOOD
GOOD
INLET INV=3.38 m
INLET INV=
5.30 m
INLET ELEVATION FROM IFC DRAWING
INLET INV=5.807m
P 4
BLACK PLASTIC
OUTLET INV=6.284m300MMØ
GOODOUTLET INV=7.041m
600mmØ CSP
W-054R
P 3
METAL
P-001
PLAS
TIC
LID
1TRNSP 3
INLE
T INV
=5.771m
INLET INV=5.729m
P-001
W-064-1
GVS&DD
INLET INV=5.778m
BLACK PVC
450mmØ
P-001
SMALL .35
INLET INV=5.095m
200mmØ PVC
R-019 / R-019-T
SAN
OUTLET INV=6.913m
600mm Ø CSP
R-009-1 / R-019-T
R-009-2 / R-019-T
R-009-1
6FT BOX
DIAMETER 1830 MM INSIDE
B-G-001
R-009-1
INLET INV=5.844m
B-G-001
OU
TLET IN
V=5.400m
MO
TI PW
ER
INLET INV=6.948m
GREEN PVC INLET INV=5.357m
670mm Ø
200mm
Ø PVC
B-G-001
R-019 / R-019-T
DEPTH SAN WATER
????????
MO
TI C
OM
W-054R
OUTLET INV=5.209m
P-001
INLET INV=7.141m
P001P001
R-004-80
P-001
GVS&DD
ON SURFACE GOES WEST
BLACK PLAST
OUTLET INV=5.623m
400MM Ø
8FT CHAINLINK
R-009-1 / R-019-T
R-009-1 / R-019-T
APPROX
168Ø PE METHANE GAS (ABAND.)
168Ø PE METHANE GAS
150Ø HDPE
150Ø HDPE
250Ø HDPE 250Ø HDPE
250Ø HDPE
3TRNS 3P / GOES UG
GAS COLLECTION LINES
SURREY
LEACHATE PUMP STATION AND
METHANE COLLECTION PLANT
HABITAT BOUNDARY HABITAT BOUNDARY
GRATE=6.652m
GRATE=6.615m
GRATE=4.865m
GRATE=6.297m
GRATE=6.537m GRATE=6.521 GRATE= 5.274m
GRATE= 5.753m
150Ø HDPE (ABAND.)
250
Ø H
DP
E
TO 136th STREET DELTA
withDrain Lid with
Drain Lid withDrain Lid with
Drain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
OilInterceptor
withDrain Lid
OilInterceptor
51
52
53
54 55 56 57
58
59
60
61
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
50REPLACE CB
TIE TO EXISTING PIPE
REPLACE CB
TIE TO EXISTING PIPE
REPLACE CBTIE TO EXISTING PIPE
Var.Depth Var.Depth Var.Depth
MH27MH26
MH25
MH24
MH4
MH5
MH6
MH7
MH8
MH9
MH10
MH11
MH12MH13
MH14MH15MH16
MH17MH18
MH19
MH20
MH1MH2
MH3
MH21MH22 MH23
CB33
CB34CB35CB36CB37
CB2CB1
CB15CB16
CB3CB4CB5CB6CB7CB8CB9CB10CB11CB12CB13
CB14CB17
CB19
CB20
CB21
CB22
CB23
CB24CB25CB26CB27CB28
CB29CB30CB31
CB32
CB18
CB38
CB39
CB40
CB41
CB42
CB43
CB44
CB45
CB46 CB47 CB48CB49 CB50
CB51
CB52 CB53 CB54
CB55
CB56 CB57 CB58 CB59 CB60CB61
TRANS CANADAHIGHWAY #1PORT MANN
BRIDGE
CN RAILWAY
FRASER RIVER
POND P2
POND P1
POND P3
HIGHWAY 17 HIGHWAY 17
SUBCATCHMENT S1SUBCATCHMENT S2SUBCATCHMENT S3
FIGURE 1.0NORTH SURREY TRUCK PARKING
STORMWATER MANAGEMENT PLAN OVERVIEW
LOCATION MAP
PROJECTLOCATION
Sea Island
WesthamIsland
Lulu Island
BarnstonIsland
DouglasIsland
TilburyIsland
Boundary BayAirport
99
99
99
91
91
17
17
17
17
1
1 7
77BKingsway
Fraser Hwy.
96 Ave. Golden Ears Way
15
15
17A
1010
Marine Way
SW Marine Way
99
97A
Kni
ght S
t.
Nordel
Way North SurreyTruck Parking
LEGEND:
S3 S1S2
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.CL. & GR.
CL. & GR.
CONCRETE VAULT
ASPHALT FLUME
ASPHALT FLUME
ASPHALT FLUME
ASPHALT FLUMEASPHALT FLUME
ASPHALT FLUMEASPHALT FLUMES
COM
PRESSED GAS TANKS IN AREA
2 POST SIGN
G-050-1
G-050-5
2000 mm WIDE
CONCRETE ARCH
L = 21.99 m
OUTLET INV=3.05 m
INLET INV=
2.92 m
PARTIALLY FULL
ST
STEEL SHEET PILE
1200 mm Ø
CSP
L = 20.65 mOUTLET INV=
0.14 m
INLET INV=
0.24 m (APPROX.)
FAIR
2250 mm WIDTH
CEMENT BOX CULVERT
L = 13.04 m
INLET INV=
2.21 m
OUTLET INV=
1.93 m
2500 mm WIDTH
CEMENT BOX CULVERT
L = 16.49 m
INLET INV=2.19 m
OUTLET INV=
2.78 m
TAG 9084C-12
PLUGGED WITH SAND
450 mm WIDTH
ABSL = 11.36 m
INLET INV=4.75 m
OUTLET INV=
4.60 m250 mm WIDTH
ABSL = 20.36 m
INLET INV=4.80 m
OUTLET INV=
4.82 m
INLET ELEVATIONS FROM IFC DRAWINGS
OUTLET INV=2.95 m
CSP1000 mm Ø
GOOD
INLET INV=
2.94 m
CSP600 mm Ø
GOOD
L = 15.24 m
PLAN BCP16539
REM PCL A
PID 026-242-991
PLAN BCP16538REM PCL B
PID 026-242-940
PLAN NWP78366REM PCL A
PID 013-296-868
SRW PLAN BCP41925 (BB801623)
SRW PLAN BCP44536PT PCL B PLAN BCP16538
PID 028-211-588
PLAN NWP79479REM PCL B
PID 014-014-343
SOUTH FRASER PERIMETER ROAD
(SRW BV531374 & 75)
TRANS CANADA HIGHW
AY #1
SRW PLAN NW
P21734
SRW PLAN NWP3379
PLAN NWP79479
REM PCL B
PID 014-014-343(SRW BV531374 & 75)
NWD
ARTERIAL HIGHWAY PER
UNREGISTERED PLAN EPP30093
SOUTH FRASER PERIMETER ROAD
APPRO
XIMATE BO
UN
DAR
Y
SRW PLAN NWP3379CN RR
CN RR
OIP
OIP
OIP
OIP
PLAN BCP16538REM PCL B
PID 026-242-940
NWD
NWD
NWD
PLAN BCP16539REM PCL A
PID 026-242-991
ARTERIAL HIGHWAY PER
UNREGISTERED PLAN EPP30093
DELTA
TO HWY#1
1350 mm Ø SP FORCE
GOOD
GOOD
INLET INV=3.38 m
P 4
P 3
1TRNSP 3
P-001
W-064-1
GVS&DD
INLET INV=5.778m
BLACK PVC
450mmØ
P-001
SMALL .35
R-009-2 / R-019-T
6FT BOX
DIAMETER 1830 MM INSIDE
B-G-001
MO
TI PW
ERGREEN PVC INLET INV=5.357m
670mm Ø
MO
TI C
OM
OUTLET INV=5.209m
P001P001
R-004-80
GVS&DD
APPROX
168Ø PE METHANE GAS (ABAND.)
168Ø PE METHANE GAS
150Ø HDPE
250Ø HDPE
250Ø HDPE
3P / GOES UG
HABITAT BOUNDARY HABITAT BOUNDARY
GRATE=6.615m
GRATE=4.865m
GRATE=6.297m
GRATE= 5.274m
GRATE= 5.753m
150Ø HDPE (ABAND.)
TO 136th STREET DELTA
NE453418.706514403.982
NE453399.290514481.591
R
∆
AD
ARC
Ec
"
25.00
0 LT
90°2
5'44
25.18
8
39.45
7
10.48
8
NE
4534
14.51
0
5145
79.28
5
PO
T 50+00.000
104°02'44"
PI 50+55.000
104°42'45"
51
BC
51+20.718
EC 51+60.175
PI 51+
74.52
0
50
CB34CB35CB36CB37
CB38
CB39
CB40
CB41
CB42
CB43
CB44
CB45
CB46 CB47 CB48
CB55
TRANS CANADAHIGHWAY #1PORT MANN
BRIDGE
CN RAILWAY
HIGHWAY 17
FIGURE 1.1NORTH SURREY TRUCK PARKING
STORMWATER MANAGEMENT PLAN
MA
TCH
LIN
E F
IGU
RE
1.2
S3
SUBCATCHMENT S1SUBCATCHMENT S2SUBCATCHMENT S3
LEGEND:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
53 54 55 56 57
58 59
60 61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76 77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103104
105106
107
108109
110111
112
113114
115116117
118119
120121
12212
312
412
512
612
712
812
913
0
131
132
133
134
135
136
137
138139
140
141
142
14314
4
145
146
147
14814
9
150
151
152
153
15415
5156
157
158
1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
SANI DUMP STATION ONLYNO PARKING
24m MAX.23m MAX.
21m MAX.20m MAX.
18m MAX.
20mM
AX.22mM
AX.
23m MAX.
CL.
& G
R.
CL. & GR.CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.
CL. & GR.CL. & GR.
CL. & GR.CL. & GR.
CL. & GR.
CL. & GR.
G-104 km 38
600 mm Ø CSPL = 10.29 m
OUTLET INV=
6.23 m
INLET INV=
6.21 m
600 mm Ø
CSP
L = 10.43 m
OUTLET INV=6.33 m
INLET INV=
6.23 m
GOOD
OUTLET INV=
5.05 m
CSP1400 mm Ø
OUTLET INV=4.81 m
GR
EEN PVC
600 mm
Ø
600 mm ØCSP
L = 10.63 mOUTLET INV=
5.08 m INLET INV=5.08 m
GOOD
600 mm Ø
CSP
L = 19.27 m
OUTLET INV=5.83 m
INLET INV=4.68 m
600 mm ØCSP
L = 19.27 m
INLET INV=4.91 m
OUTLET INV=4.73 m
GOOD
150 mm ØABS
L = 5.72 m
OUTLET INV=8.44 m
INLET INV=10.64 m
600 mm ØCSP
L = 10.18 m
INLET INV=5.72 m
OUTLET INV=5.69 m
600 mm Ø
CSP
L = 15.50 m
OUTLET INV=
1.90 m
INLET INV=
2.02 m
POOR
SOUTH FRASER PERIMETER ROAD
NWD
PLAN BCP16539REM PCL A
PID 026-242-991
SRW
PLA
N B
CP8
867
(BV5
3137
3)
PLAN NWP79479
SRW PLAN BCP25773 (BA420207)
REM PCL B
PID 014-014-343
PLAN BCP16539REM PCL A
PID 026-242-991
SRW
PLA
N B
CP8
867
(SR
W B
V531
373)
NWD
NWD NWD
NWD
NWD
PLAN NWP79479REM PCL B
PID 014-014-343
PLAN BCP16539REM PCL A
PID 026-242-991
SOUTH FRASER PERIMETER ROAD
SOUTH FRASER PERIMETER ROAD (HWY 17)
(SRW BV531374 & 75)
(SRW BV531374 & 75)
OIP
OIP
OIP
OIP
OIP
OIP
OIP OIP
NWDMHSan
ARTERIAL HIGHWAY PER
UNREGISTERED PLAN EPP30093
ARTERIAL HIGHWAY PER
UNREGISTERED PLAN EPP30093
PLAN BCP16539REM PCL A
PID 026-242-991
GOOD
INLETS ACROSS HIGHWAY
1350 mm Ø SP FORCE
1350 mm Ø SP FORCE
200
mm
Ø P
E
200
mm
Ø P
VC
MHStorm
MHSan
MHStorm
GOOD
INLET INV=
5.30 m
INLET ELEVATION FROM IFC DRAWING
INLET INV=5.807m
BLACK PLASTIC
OUTLET INV=6.284m300MMØ
GOODOUTLET INV=7.041m
600mmØ CSP
W-054R
METAL
P-001
PLAS
TIC
LID
INLE
T INV
=5.771m
INLET INV=5.729m
BLACK PVC
450mmØ
P-001
INLET INV=5.095m
200mmØ PVC
R-019 / R-019-T
SAN
OUTLET INV=6.913m
600mm Ø CSP
R-009-1 / R-019-T
R-009-1
B-G-001
R-009-1
INLET INV=5.844m
OU
TLET IN
V=5.400m
INLET INV=6.948m
200mm
Ø PVC
B-G-001
R-019 / R-019-T
DEPTH SAN WATER
????????
W-054RP-001
INLET INV=7.141m
P-001
ON SURFACE GOES WEST
BLACK PLAST
OUTLET INV=5.623m
400MM Ø
8FT CHAINLINK
R-009-1 / R-019-T
R-009-1 / R-019-T
150Ø HDPE
250Ø HDPE
3TRNS 3P / GOES UG
GAS COLLECTION LINES
SURREY
LEACHATE PUMP STATION AND
METHANE COLLECTION PLANT
GRATE=6.652m
GRATE=6.537m GRATE=6.521
250
Ø H
DP
E
withDrain Lid with
Drain Lid withDrain Lid with
Drain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
OilInterceptor
withDrain Lid
OilInterceptor
NE
453376.199
514569.532
NE
453259.690
515165.680
R∆ADARCEc
"907.050 LT
18°29'31147.656292.744
11.940
N E45
3275
.832
5154
15.1
57
N E45
3257
.802
5154
48.5
96 N E45
3257
.627
5154
84.0
16
N E45
3243
.103
5155
06.3
32
PI 51+40.952
14°
17'0
1" 104°47'23"
52
53
54 55 56 57
58
59
BC
56+58.368
EC 59+51.113
PI 58+06.025
86°17'52"60
PI 6
0+53
.456
118°20'01"
PI 6
0+91
.445
90°17'01"61
PI 6
1+26
.866
136°11'06"
POT
61+5
3.49
2
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
withDrain Lid
Var.Depth Var.Depth Var.Depth
MH27MH26
MH25
MH24
MH4
MH5
MH6
MH7
MH8
MH9
MH10
MH11
MH12MH13
MH14MH15MH16
MH17MH18
MH19
MH20
MH1MH2
MH3
MH21MH22 MH23
CB33
CB2CB1
CB15CB16
CB3CB4CB5CB6CB7CB8CB9CB10CB11CB12CB13
CB14CB17
CB19
CB20
CB21
CB22
CB23
CB24CB25CB26CB27CB28
CB29CB30CB31
CB32
CB18
CB49 CB50
CB51
CB52 CB53 CB54
CB56 CB57 CB58 CB59 CB60CB61
FRASER RIVER
POND P2
POND P1
POND P3
HIGHWAY 17
MA
TCH
LIN
E F
IGU
RE
1.1
FIGURE 1.2NORTH SURREY TRUCK PARKING
STORMWATER MANAGEMENT PLAN
S1
S2SUBCATCHMENT S1SUBCATCHMENT S2SUBCATCHMENT S3
LEGEND: