north power corporation electric network project ... · evn electric of viet nam em(s) ......

34
NORTH POWER CORPORATION Electric Network Project Management Board ------------------------------- ETHNIC MINORITY DEVELOPMENT PLAN (EMDP) SUBPROJECT : DISTRIBUTION EFFICIENCY PROJECT PROVING MEDIUM, LOW GRID LANG SON PROVINCE REPRESENTATIVE INVESTOR REPRESENTATIVE CONSULTING Hanoi, 1 st June, 2012 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: hoangbao

Post on 30-Jun-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

NORTH POWER CORPORATION

Electric Network Project Management Board

-------------------------------

ETHNIC MINORITY DEVELOPMENT PLAN

(EMDP)

SUBPROJECT:

DISTRIBUTION EFFICIENCY PROJECT

PROVING MEDIUM, LOW GRID – LANG SON PROVINCE

REPRESENTATIVE INVESTOR

REPRESENTATIVE CONSULTING

Hanoi, 1st

June, 2012

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

wb406484
Typewritten Text
IPP573 v2
Page 2: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

2

TABLE OF CONTENTS

1. INTRODUCTION ............................................................................................................. 4

2. Ethnic Minorities in the subproject areas........................................................................... 4

2.1. General information about the project areas ................................................................... 4

2.2. The characteristic of ethnic minority people in the subproject areas: ............................ 5

2.2.1. The Nung:................................................................................................................ 5

2.2.2 The Tay.................................................................................................................... 6

2.2.3. Other ethnic minority groups: ................................................................................. 6

2.3. The project affected ethnic minority people ................................................................... 8

3. Policy framework ........................................................................................................... 11

4. Project impacts on EMs and the mitigating measures ......................................................... 13

4.1. The project impacts ....................................................................................................... 13

4.1.1. Temporary impacts on farm land ........................................................................... 13

4.1.2. Temporary impacts to crops .................................................................................. 14

4.1.3. Permanent acquired land ....................................................................................... 16

4.2. The mitigation measures ............................................................................................... 17

4.2.1. Public consultation ................................................................................................ 17

4.2.2. Training and development supporting activities.................................................... 19

5. Implementation .................................................................................................................... 19

5.1. Electricity of Vietnam ................................................................................................... 19

5.2. Network PMU ............................................................................................................... 20

5.3. Provincial People’s Committee ..................................................................................... 20

5.4. District/Commune People's Committee ........................................................................ 20

6. Implementation Plan ............................................................................................................ 20

7. Monitoring and evaluation ................................................................................................... 20

8. Budget and costs .................................................................................................................. 20

ANNEX.................................................................................................................................... 22

Page 3: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

3

Abbreviation

Consultant

Company

Investment Electrical and construction joint stock company

CPC Commune People’s Committee

DPC District People’s Committee

NPC North Power Corporation

EVN Electric of Viet Nam

EM(s) Ethnic minority

GOV Government

HH(s) Household

OP4.10 Operation Policy of the World Bank 4.10

PPC Provincial People’s Committee

EMDP Ethnic Minority Development Plan

ROW Row of Right

WB World Bank

MV Medium voltage

Page 4: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

4

1. INTRODUCTION

According to surveys, there is currently power shortage in Lang Son Province,

especially in the communal areas, the number of households are connected to the power

grid has not reached 100%. Even in some places, there are always overload of

electric, large electrical energy losses and low electric quality. From the shortcoming of the

power grid in the communes as mentioned above, it is necessary to implement additional

construction investment in substations and to improve medium, low voltage grid in Lang

province. These create infrastructure for economic development and improving culture-

economy-social life of local citizen.

Recognizing the necessary of this work, Lang Son People’s Committee asked the

World Bank (WB) for subproject financing. The subproject “Improving medium, low voltage

grid-Lang Son Province” is one of subprojects which will be implemented in Phase I of the

Distribution Efficiency Project (DEP) of Viet Nam Electricity. This DEP was funded by the

WB. Subproject will be implemented in 13 communes of 10 districts in Lang Son Province.

The activities of subproject include: (i) newly constructing 3.34 km for a medium

voltage transmission line, (ii) new construction of two substations and (iii) rehabilitating and

upgrading of additional 70,157 km of low voltage transmission line in 13 communes of 10

districts in Lang Son Province, including: Binh Xa commune-Dinh Lap District, Hung Vu

commune and Bac Son-Bac Son district, Lang Nang commune-Van Quan district, Hoang

Viet commune and Hoang Van Thu commune-Van Lang district, Dong Quang commune and

Dong Buc commune- Loc Binh district, Tri Phuong commune-Trang Dinh district, Hoang

Van Thu commune-Trang Dinh district, Hoang Van Thu commune-Binh Gia district, Hoa Cu

commune-Cao Loc district, Dong Tien commune-Huu Lung district, Mai Sao commune-Chi

Lang district. These activities as mentioned above may affect to ethnic minorities who are

living in the subproject areas.

This document is built according to the requirements of policy OP4.10 of the World

Bank on ethnic minority and policies of Viet Nam Government on ethnic minority. Ethnic

Minority Development Plan (EMDP) is developed and implemented in order to: (a)

Protecting tradition and culture of the ethnic minority, (b) Mitigate the subproject impact over

ethnic minority groups, and (c) the ethnic minority groups will get the socio-economic rights.

This guideline ensures that the ethnic minorities are well informed, consulted and mobilized

to participate in the subprojects. Their participation can either provide those benefits with

more certainty, or protect them from any potential adverse impacts of subprojects in the

subproject implementation process.

2. Ethnic Minorities in the subproject areas

2.1. General information about the project areas

Lang Son is a border province in the Northeast of Viet Nam. Its west borders Cao

Bang province, its east borders Quang Ninh province, its south borders Bac Giang province,

its west borders Thai Nguyen and Bac Kan province, its Northeast borders the ethnic

autonomous region of the Choang-Guangxi (China).

There are 10 districts and 1 type 3-city with 212 communes and 14 towns. There are

also 5 border districts, including: Trang Dinh, Van lang, Cao Loc, Loc Binh, Dinh Lap and 5

interior districts, including: Van Quan, Binh Gia, Bac Son, Chi Lang, Huu Lung. The Lang

Son city is the political-social-economic center of this province.

Page 5: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

5

The population of the province is 757.6 thousand people (in which, the city dweller

accounts 22%). There are 9 main ethnic groups (the Nung: 43.8%, the Tay: 35.2%, the Kinh:

15.2%, the Dao: 3.5%, the rest are the Hoa, the Mong, and the San chay.

2.2. The characteristic of ethnic minority people in the subproject areas:

2.2.1. The Nung:

The Nung have about 706,000 inhabitants living

in the provinces of Lang Son, Cao Bang, Bac Thai, Ha

Bac and Tuyen Quang. They have other names such as

Xuong, Giang, Nung An, Nung Coi, Phan Sinh, Nung

Chao, Nung lnh, Qui Rin, Nung Din and Khen Lai.

Nung language is close to that of the Tay and

belongs to the Tay-Thai Group. Nung has writings called

Nom Nung (Nung demonic scripts) which has prevailed

since the 17th century.

The Nung mainly worship their ancestors. The

altar is placed in a bay of the house and above it hungs the altar to deities, genies, saints,

Confucian and Kwan Yin.

The Nung live on rice and corn. They cultivate rice either in submerged fields along

the ravines and in terraced fields on the hillsides. They grow cash crops and fruit trees such as

tangerines and persimmons. Anise is the most valuable trees of the Nung which has brought

them high profit every year. Handicrafts are a continuing activity, particularly weaving cloth

to supply local needs, then come carpentry, blacksmithing, basketry and ceramicware-making.

The Nung villages are often set up on the hillsides, in front of them are the submerged

fields and behind are burnt- over land and gardens. The Nung houses are built on stilts made

by wood structure and the roof are covered with tiles or thatch. The Nung wear indigo attire.

Deeply in the Vietnamese people's memory, President Ho Chi Minh often wore indigo vest of

Nung style to keep him warm in the cold days when he lived in Pac Bo cave in 1941 to be

active in national revolution after he turned back from abroad.

In certain regions, ancient stories retrace about indigo

color and a faithful love of a woman who persistently waits for

her husband back from the battle- field. The Nung consider

indigo a symbol of loyalty. The Nung prefer fried dishes with

pig fat. A unique and luxurious dish of the Nung is “khau nhuc”.

Cross-drink became a long-standing custom of the Nung.

The Nung preserve an abundant treasury of folk arts and

culture including folksongs. Smooth melodies of sli in harmony

with natural sound of the forests and mountains are deeply

impressive to those who once came to Lang region. Then is a

folksong combined by elements: verses, music, decoration and

performance style. This folksong melody makes the Nung men

have sensation of excitement when they are away from their

home.

“Lung tung” (going to the fields) ceremony is very well-

known and attractive to people of all ages. It is always

organized on the first month of the lunar year.

Page 6: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

6

2.2.2 The Tay

With a population of about 1,200,000 inhabitants,

the Tay is the largest group in the community of ethnic

minorities in Vietnam. Tay language belongs to the Tay-

Thai Group.

The Tay have other names such as Tho, Ngan, Phen,

Thu Lao and Pa Di. The Tay inhabits along the valleys and

lower slopes of mountains in Cao Bang, Lang Son, Bac Thai,

Quang Ninh provinces and in some regions of Bac Giang

province.

The Tay preserves a traditional and fairly developed

agriculture with a cultivation of all kinds of plants including

rice, maize, sweet potato, etc.and seasonable fruits and

vegetables.

The Tay villages are always set up at the foot of a

mountain or along a stream and are named after a mountain,

a field or a river. Each village contains about 15-20

households. A large village is divided into many small hamlets. The houses are built on stilts

or level with the ground. The houses in frontier region are called defense houses which are

often protected against interlopers by a stone wall along with a ditch. The interior is divided

into two rooms, the front one reserve for men and the rear one serves as women's bedroom.

The Tay clothes are generally dyed with indigo. Women wear a below knee-length dress split

at the right side up to the armpit with five buttons and narrow sleeves.

The Tay prefers sons to daughters. Prescriptions in relationship between members of

the family are obviously dictated. The couples live in harmony. Divorce is rare. Matrilocate is

no longer observed.

Ancestor worship is the religious rite of the Tay. The ancestor altar is placed in a

central and grand place of the house. Strange guests are not allowed to sit on the bed in front

of the altar. Moreover, they ought to refrain from stepping on a fired firewood in the

kitchener or on the latter’s side. Those who are back from a funeral ceremony abstain from

watching cattle and poultry if they have not taken a bath. After giving birth, the women are

not permitted to come near the ancestor altar.

The Tay possess a rich traditional folklore with all kinds of poems, songs, dances,

music and puppetry also. Proverbs and folksongs are numerous. Tay folksongs have the turn

(a kind of duet between lovers), wedding songs and lullabies.

The Tay are hospitable, open-familiar and talkative. They have respect for the same-

aged people. Once they have fraternized with other persons-they consider the laters their next

of kin.

2.2.3. Other ethnic minority groups:

The Dao have many other names such as Dao quan trang (Dao with white trousers),

Dao quan chet (Dao with tight trousers), Dao Tien (Dao with coins), Dao Thanh Y (Dao with

blue dress), Lu Gang, Dao Do (Red Dao) and Man, Dong, Trai, Dai Ban, Tieu Ban. Dao

population is over 470,000 inhabitants living together with other ethnic groups along the Sino

Page 7: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

7

-Vietnamese and Vietnamese-Lao borders and in some midland provinces and provinces

along the coastline of northern Vietnam. Dao language belongs to the Mong-Dao Group. The

Dao worship their ancestors called Ban Ho.

The Dao mainly live from rice cultivation ether on burnt-over land and in submerged

fields. They also grow subsidiary crops. They still use rudimentary farm tools but apply many

progressive techniques in cultivation. Sideline occupations are developed including weaving,

carpentry, black smiting, paper-making and vegetable oil-pressure…

Their meals are mainly cooked with bamboo shoots and vegetable, sometimes added

with fish and meat. The Dao rear plenty of pigs and poultry, but mainly use for rituals and

offerings. The houses are built either on stilts, level with the ground or half on stilts and half

on beaten earth.

Dao men wear their hair long tied in a chignon at the nape of the neck or on top of the

head. Nowadays, all have their hair cut short. Dao male attire comprises trousers and short

vest. Female attire is more diversified and is decorated with many traditional motifs. Dao

women arrange their hair long. In the wedding, the bride often wears a hat. In the past,

marriage included many complex rituals and two forms of matrilocate existed: temporary

matrilocate and forever matrilocate. Funerals also reflect many ancient customs. In some

regions, the dead persons from 12 years-old upward are cremated. The Dao believe in the

existence of the souls and demons, so have to hold a number of complicated and expensive

rituals every year.

Relationships among members of the same lineage are always very close and the Dao

can definite people of the same lineage by their middleman's and his or her position in that

lineage.

The Dao possess a long-standing culture and history. Though their material life is still

hard, their folk intellectual lives are enriched, especially the legacy of traditional medicine.

The Dao have long used Chinese writings (but pronounced in the Dao way) called Nom Dao

(Dao demonic script).

The San Chay is also called Cao Lan, San Chi, Man Cao Lan and Hon Ban, the San

chay number more than 114,000 persons. They mainly concentrate in Tuyen Quang, Bac Can,

Thai Nguyen, Bac Giang provinces and are found in scattered groups in Quang Ninh, Yen

Bai, Lang Son and Phu Tho provinces. The San chay comprise two groups which speak

different languages. The language of the Cao Lan is close to that of the Tay and the Nung and

that of the San Chi to the Han dialect. The language of the San chay is classified in the Tay -

Thai Group.

Ancestral worship is the main practice but is influenced by Buddhism, Taoism and

Confucianism.

The San chay mainly cultivate wet rice but agriculture as a whole plays an important

role, Dozens of families form a village and live in a close association. Formerly, houses were

almost built on stilts but now those built level with the ground are very popular. The house is

imagined as "the Buffalo Genie", its four pillars symbolizing the four legs, the laths

representing the ribs and the roof understood as the backbone. One of the two corners of the

penthouse is a bay for the altar to ancestors, regarded as the holiest section in each family.

The San Chay inhabitants belong to various family lineages, each lineage having

several branches and peculiar habits and customs, and worshipping a definite genie. The

father is the head of the family, The family of the young man organizes the marriage but after

Page 8: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

8

wedding, the wife lives again with her parents and only visits her husband's family now and

then, She settles definitively at the husband's house only after child-bearing.

The San chay possess many old tales, folksongs, proverbs and sayings Particularly,

sinh ca (alternating love song chants) is the most attractive form of cultural activity. They

also have many dances like the drum dance, bird dance, harpoon-fishing dance, shrimp-

catching dance, and lamp dance. The most popular musical instruments are castanets, small

copper bells, cymbals, wind instruments and drums...

At ceremonies and festivals, there are many forms of entertainment such as top

spinning, con throwing and standing on the head.

2.3. The project affected ethnic minority people

The project affected areas include 13 communes of 10 districts in Lang Son province.

The ethnic minority groups in the project affected areas include the Tay and the Nung. The

total of ethnic minority households in the project areas is 6,433 households with 27, 914

people (in which: male: 13,604 people, female: 14,309 people).

Table 1: The preliminary research on the ethnic minority in the project areas

No.

Name of

district/commune

Name of

the

ethnic

minority

groups

in the

project

affected

areas

Name of the

hamlet

The

quan

tity

of

ethni

c

mino

rity

hous

ehol

ds in

the

proje

ct

areas

Total number

of people

Distri

ct

C

o

m

m

un

e

Fema

le Male

1 Dinh Lap

1 Binh Xa

The Tay Hamlet 1; Hamlet

2 6 15 12

2 Bac Son

2 Hung Vu

The

Nung Mo Nhai 7 17 13

3 Bac Son

The

Nung Bac Son 8 18 14

3 Van Quan

Page 9: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

9

No.

Name of

district/commune

Name of

the

ethnic

minority

groups

in the

project

affected

areas

Name of the

hamlet

The

quan

tity

of

ethni

c

mino

rity

hous

ehol

ds in

the

proje

ct

areas

Total number

of people

Distri

ct

C

o

m

m

un

e

Fema

le Male

4 Luong Nang

The

Nung

Hamlet 4; Hamlet

7; Hamlet 9. 7 14 17

4 Van Lang

5 Hoang Viet

The Tay Hamlet 1; Hamlet

6 8 18 18

6 Hoang Van Thu

The

Nung Hamlet 2 6 16 14

5 Loc Binh

7 Dong Quan

The

Nung Hamlet 1 5 10 10

8 Dong Buc

The

Nung

Dong Buc, Khon

Nguyen 7 17 18

6 Trang Dinh

9 Tri Phuong The Tay Ban Soc 6 15 16

7 Binh Gia

10 Hoang Van Thu

The

Nung Hamlet 1 9 19 23

8 Cao Loc

11 Hoa Cu The Tay Hamlet 1 7 15 13

9 Chi Lang

12 Mai Sao The Hamlet 3; Hamlet 5 8 11

Page 10: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

10

No.

Name of

district/commune

Name of

the

ethnic

minority

groups

in the

project

affected

areas

Name of the

hamlet

The

quan

tity

of

ethni

c

mino

rity

hous

ehol

ds in

the

proje

ct

areas

Total number

of people

Distri

ct

C

o

m

m

un

e

Fema

le Male

Nung 4

10 Huu Lung

13 Dong Tien

The

Nung Hamlet 3 9 18 17

Total: 90 193 203

The characteristic of ethnic minority households:

The average people number in a household 4.4 people

Male 48.74%

Female 51.26%

Age groups

1 - 17 years old 35.4%

18 - 60 years old 56.2%

over 60 years old 8.4%

Head of household

Male 85.7%

Female 14.3%

Occupation Agriculture

The average annual income 15.225.000 VND/HH/year

3.500.000 VND/HH/year

Page 11: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

11

Facilities 97%

HHs with television 68%

HHs with motorbike 28%

HHs with bicycle 85%

HHs with fridge 3.2%

HHs with washing machine 0%

Other facilities 0.2%

Most of EMs lands in the project area are farmland, forest hilly land and fruit

plantation land. A small portion of the remaining land is residential land and garden land.

Rice cultivation and afforestation are two agricultural activities of Ems in the project area.

EM farmers often hire tractors to plow rice fields and hire threshing machines to thresh rice.

The EM farmers also use the bio-fertilizers available locally for their rice fields. The garden

land is used by the EMs for multi purposes: planting of the long term trees, mixed up with

short term crops and rising livestock, poultry. The crop land is used by the EM farmers for

planting of peanut, corn, bean, sugarcane and pineapple.

3. Policy framework

This plan is developed based on OD 4.10 on EM People of the World Bank and Policies for

EM of Viet Nam government. According to OD 4.10 “The Bank’s overall objective for EMs,

as well as for all residents of the member countries, is to ensure that the development process

fosters full respect for their dignity, human rights, and cultural uniqueness. Particularly the

object at the center of this directive is to ensure that EM people do not suffer adverse effects

during the development process, particularly from Bank-financed projects, and that they

receive culturally compatible social and economic benefits”, and “The Bank’s policy is that

the strategy for addressing the issues pertaining to EM people must be based on the informed

participation of the indigenous people themselves. Thus, identifying local preferences

through direct consultation, incorporation of indigenous knowledge into project approaches

early use of experienced specialists are core activities for any project that affected indigenous

people and their rights to natural and economic resources”.

In Viet Nam regulations, the equality right of ethnic people was stipulated clearly in

the Viet Nam Law. Article 5 in the Vietnam Constitution (1992 and 2001) stipulated as

follows:

The Socialist Republic of Vietnam is an united nation with many nationalities. The Stage

implements an equality and united policy and supports spiritually all nationalities and

prohibits race discrimination and separation. Each nationality has the right to use its own

language and ways of living to preserve their characteristics and to improve its own good

traditional and cultural customs. The Stage carries out a policy to develop thoroughly and

gradually improve the quality of life of ethnic minorities in Vietnam physically and

spiritually”. Since 1968, the GOV has promulgated resettlement policy for ethnic groups,

reducing migration trends of the ethnic people. In recent years, government has been paid

attention to activities for supporting the development of EM communities, particularly the

programs/policies such as:

Page 12: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

12

On 31 June, 1998, the Prime Minister signed Decision No. 135/1998/QD-TTg to

approve the program on socio-economic development mountainous, deep-lying and

remote communes with special difficulties (usually known as Program 135). The

program is aim to promote the material and spiritual life of people living in

disadvantaged areas. The program has helped areas as mentioned above escaping

poverty and backwardness situation and these areas could catch up with the

development of the country. The program has also contributed to ensure social safety

order, security and defense The main objective of the program is to build

infrastructure, housing, to develop agriculture, to plant forest and to train breeding

activities in program areas.

Resolution of the Viet Nam National Assembly dated 7 July, 1993 on provisions for

ethnic council

Directive of the Prime Minister No. 393/TTg dated 10 June, 1996 on planning for

population, strengthening infrastructure and production arrangements in ethnic and

mountainous areas.

Resolution of the Party Central Committee No.22-NQ/TW dated 11 November, 2003

on policies of social and economic development in mountainous areas

Resolution of Party Central Committee No.24-NQ/TW dated 12 March,2003 on

works on ethnic minorities

Decrees of the Government No.51/2003/ND-CP dated 15 May, 2003 regulating

functions, duties, powers and organizational structure of the Ethnic Committee

Decision of the Prime Minister No.143/2004/QD-TTg dated 20 July, 2004 regulation

some policies on supporting production land, residential land, housing and clean

water for poor EM households and EM households which have hard life.

Decision of the Prime Minister No.32/2007/QD-TTg dated 5 March, 2007 on giving

loans for extremely hard EM households to develop production

Decision of the Prime Minister No.33/2007/QD-TTg dated 5 March, 2007 on

immigration policy to support sedentary farming and resettlement for EMs from

2007-2010

In the agency system, organizations and agencies in charge of particular EMs include:

The EM committee of the Government, the Ethnic Council of National Assembly. The

EM committee is ministerial level agency under the Government performers, its functions

of state management on ethnic minority affairs nationwide, and on public services within

its authorities as prescribed by the law.

The Ethnic Council is responsible for examine the bills, drafts of legal documents and

other projects relating to ethnic issues. The council also monitors the implementation of

laws and National Assembly resolutions, ordinances and resolutions of the National

Assembly Standing Committee in the field of ethnic. The ethnic council supervises all

activities of the Government, ministries, and ministerial-level agencies in the

implementation of socio-economic development programs and plans in mountainous

areas, EM areas. The ethnic council also proposes the National Assembly on ethnic

policies of the State, organization and operation issues of related agencies. The ethnic

council proposes to the Government, the Prime Minister, Ministers, heads of ministerial-

level agencies and other State agencies on ethnic issues.

Page 13: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

13

4. Project impacts on EMs and the mitigating measures

The project impacts are determined through the consultation process with people

(including EMs) in the preparation of project documentation. In this subproject, the

impacts (positive and negative) were identified as follow:

- Improve and expand the electricity network coverage in the project area

- Impact (temporarily and permanently) to land in the building process

- Impact on crops

- The risk of electrical accidents.

The influence level in the HHs is not significantly affected and not localized in a certain

area (spreading over 10 districts). At the community level, people and local government

expressed their support for the project in the local area.

4.1. The project impacts

4.1.1. Temporary impacts on farm land

Most of EMs lands in the project area are farmland, forest hilly land and fruit plantation

land. Other land is residential land and garden land. Area of land which is lost due to the

project impact, is very small in comparison with the land area of affected EM people. The

land will be occupied during implementation phase in two cases: when columns,

materials be transported to foundation site, when foundation be digged to put up poles

and when cord be stretched, deflections be gotten. According to estimates, the total

numbers of affected EMs are 56 HHs with 227 people, as follows:

Table 2: Temporary impacts on farm land

No. Name of

district/commune Name of hamlet HHs People Area (m2)

Distric

t

Commu

ne

1 Dinh Lap

1 Binh Xa Hamlet 1; Hamlet 2 6 27 132

2 Bac Son

2 Hung Vu Mo Nhai 7 30 107

3 Bac Son Bac Son 8 32 200

3 Van Quan

4 Luong Nang

Hamlet 4; Hamlet 7;

Hamlet 9. 7 31 150

4 Van Lang

5 Hoang Viet Hamlet 1; Hamlet 6 8 36 134

Page 14: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

14

No. Name of

district/commune Name of hamlet HHs People Area (m2)

Distric

t

Commu

ne

6 Hoang Van Thu Hamlet 2 6 30 99

5 Loc Binh

7 Dong Quan Hamlet 1 5 20 53

8 Dong Buc

Dong Buc, Khon

Nguyen 7 35 89

6 Trang Dinh

9 Tri Phuong Ban Soc 6 31 80

7 Binh Gia

10 Hoang Van Thu Hamlet 1 9 42 159

8 Cao Loc

11 Hoa Cu Hamlet 1 7 28 135

9 Chi Lang

12 Mai Sao Hamlet 3; Hamlet 4 5 19 58

10 Huu Lung

13 Dong Tien Hamlet 3 9 35 124

4.1.2. Temporary impacts to crops

Due to the investment scale for each commune is not large, the work items can be

implemented from 3-6 months. So the land could be occupied during a crop. For the part of

line which will go through agricultural lands, the line can be arranged to stretch after

finishing the annual harvest. This will help to mitigate significantly affect to crops of local

people.

Page 15: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

15

Table 3: Temporary impacts to crops

No.

Name of

District/Commune

Name of

hamlet HHs People

Crop

Distr

ict

C

o

m

m

u

ne

Tree

(m2)

Rice

(m2)

Oth

er

(in

det

ail)

1 Dinh Lap

1 Binh Xa

Hamlet 1;

Hamlet 2 6 27 29 132

2 Bac Son

2 Hung Vu Mo Nhai 7 30 48 107

3 Bac Son Bac Son 8 32 25 200

3 Van Quan

4

Luong Nang

Hamlet 4;

Hamlet 7;

Hamlet 9. 7 31 26 150

4 Van Lang

5 Hoang Viet

Hamlet 1;

Hamlet 6 8 36 41 134

6 Hoang Van Thu Hamlet 2 6 30 24 99

5 Loc Binh

7 Dong Quan Hamlet 1 5 20 28 53

8 Dong Buc

Dong Buc,

Khon Nguyen 7 35 25 89

6 Trang Dinh

9 Tri Phuong Ban Soc 6 31 30 80

7 Binh Gia

10 Hoang Van Thu Hamlet 1 9 42 38 159

Page 16: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

16

No.

Name of

District/Commune

Name of

hamlet HHs People

Crop

Distr

ict

C

o

m

m

u

ne

Tree

(m2)

Rice

(m2)

Oth

er

(in

det

ail)

8 Cao Loc

11 Hoa Cu Hamlet 1 7 28 22 135

9 Chi Lang

12 Mai Sao

Hamlet 3;

Hamlet 4 5 19 24 58

10 Huu Lung

13 Dong Tien Hamlet 3 9 35 40 124

4.1.3. Permanent acquired land

The affect of permanent accquired land is not great and this kind of land will evenly

locate over the line.

Table 4: Permanent acquired land of EMs

No.

Name of

district/commune Name of Hamlet

Area of

permanent

affected land

(m2)

The ratio of

permanent

acquired land

(%)

Distri

ct

Com

mune

1 Dinh Lap

1 Binh Xa Hamlet 1; Hamlet 2 23.4 0.32%

2 Bac Son

2 Hung Vu Mo Nhai 18.9 0.26%

3 Bac Son Bac Son 35.5 0.40%

3 Van Quan

Page 17: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

17

No. Name of

district/commune Name of Hamlet

Area of

permanent

affected land

(m2)

The ratio of

permanent

acquired land

(%)

Distri

ct

Com

mune

4 Luong Nang

Hamlet 4; Hamlet

7;

Hamlet 9.

26.5 0.38%

4 Van Lang

5 Hoang Viet Hamlet 1; Hamlet 6 24 0.27%

6 Hoang Van Thu Hamlet 2 17.4 0.24%

5 Loc Binh

7 Dong Quan Hamlet 1 9.4 0.17%

8 Dong Buc Dong Buc, Khon

Nguyen 15.9 0.22%

6 Trang Dinh

9 Tri Phuong Ban Soc 14.1 0.39%

7 Binh Gia

10 Hoang Van Thu Hamlet 1 28.2 0.31%

8 Cao Loc

11 Hoa Cu Hamlet 1 24 0.33%

9 Chi Lang

12 Mai Sao Hamlet 3; Hamlet 4 10.4 0.19%

10 Huu Lung

13 Dong Tien Hamlet 3 22 0.24%

4.2. The mitigation measures

4.2.1. Public consultation

The affected EM people, the relevant agencies in the project areas will be

disseminated information and advised to minimize the risks of conflict and minimize risks

that caused by the project. From that, their needs will be found out in order to bring the socio-

economic best suited benefits to EMs.

The goals of the information dissemination campaign to affected EMs as follows:

Page 18: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

18

- Report on project objectivities, project scale, the proposed activities to affected EM

HHs.

- Gather information about the needs and give priorities to affected EM HHs as well as

gather information about their suggestions for policy and the works.

- Obtain the cooperation and participation of affected HHs, affected people and local

communities in order to build EMDP

- Public consultation and information dissemination campaign has two stages: the

EMDP preparation process and the EMDP implementation process.

a. Phase 1:

- Step 1: Communicating and discussing with local authorities on the power line, plans to

mitigate impacts. This phase includes the following activities: Selecting the line;

conducting a census and a statistic on effects on people, property; identifying mitigation

measures for the project, compensation works, rehabilitation works and new construction

works; consulting the affected EM people for EMDP.

- Step 2: Conducting statistics and surveys the effects: Based on the line agreement, the

survey team will identify the line location and coordinate with local agencies to make the

lists of affected HHs to land, buildings and crops. According to socio-economic surveys,

there is 10% HHs be affected.

- Step 3: Meetings with local authorities and the affected HHs. The survey team asked

local governments and affected HHs for comments on lines, the possibility of project

disadvantages, the proposed compensation unit price for housing, buildings and land.

During the survey, the survey staffs must meet and discuss directly the project affected

HHs and EMs on the compensation plan, the possibility of the project advantages and

mitigation measures. The feedback will be noticed and mentioned in the EMDP. The

consultation unit has also prepared the socio-economic statistical investigation forms,

questions about the compensation works of the affected HHs. The local authorities are

also consulted about the benefits of land in case of using public land into land

compensation process. NPC has held meetings with the authorities in all provinces,

districts and communes where the project goes through. In the meetings, NPC asked the

project affected EM HHs and the local government representatives to discuss and

comment on project plans, mitigation plans, the EMDP policy drafts. Representatives of

the Women Association, Farmer Association, Department of Science and Technology and

Environment, the affected HHs and local authorities attended the meeting.

EMDP draft was also sent to the competent authorities of the Provincial People’s

Committee and WB representative in Viet Nam.

b. Stage 2:

- Step 1: Disseminating information to EMs. Disseminating information to ethnic

minority on the project.

- Step 2: Consulting public on the EMDP activities, training and rehabilitation programs.

During the consultations, the affected ethnic minority households can contribute ideas for

activities. The activities which are designed to fit the interests of ethnic minorities will be

recorded. Besides, those affected people will be notified of time and place, the process of

EMDP activities. Ethnic minority groups will be consulted on training programs and

other programs: the training plans, time and training method that they may need. The

Page 19: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

19

consultation with ethnic minorities will have the participation of indigenous people and

content of the consultation meeting will be translated into ethnic languages.

- Step 3 - Phase 2: Additional information for local government on the EMDP

implementation process. NPC shall notify the commune authorities and the affected

ethnic minority people on the process and procedures of construction as well as the

EMDP process. Local government and DPC must ensure that all project affected ethnic

minority HHs have received adequate information about the EMDP implementation

process and project.

4.2.2. Training and development supporting activities

In addition, to mitigate the negative impacts and to enhance positive impacts of the

project, some communication activities will be implemented as follows:

Table 5. Implementation programs

No. Program Responsible agency Action required/schedule

1 Training for

agriculture:

NPC, Network PMU, local

government, PPC and

Association of agricultural

Extension

Network PMU –NPC is

responsible

+ Training on new rice

varieties, new plants

+ Name of project communes

+ Training on livestock + Training plans ( within one or

half day)

+ Training on use of

fertilizer

+ Time and location in each

commune

2 Training for electricity NPC, Power company in

project provinces

Network PMU –NPC is

responsible

5. Implementation

NPC is responsible for implementating the project, including: design survey, project

development and EMDP implementation. The EMDP implementation requires a close

coordination of relevant agencies and local governments. The agencies and organizations are

responsible for preparing, implementating and monitoring the EMDP implementation are:

- Electricity of Vietnam.

- North Power Corporation

- Network PMU.

- People’s Committee of project provinces

- People's Committees of project districts (communes)

5.1. Electricity of Vietnam

As the investor works, EVN is responsible for the whole of the entire operating activities

on investment policy, survey design, construction as well as supervising compensation and

resettlement works. EVN is also responsible to prepare, implement project, and evaluate

Page 20: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

20

EMDP through specialized agencies. It also approves the decision regarding to resettlement

works done by Network PMU. NPC is assigned directly to manage the entire process of

project implementation process.

5.2. Network PMU

Network PMU is responsible to manage the project, including the EMDP preparation and

implementation, submit EMDP to EVN and WB for approval.

- Supervising the EMDP implementation process by hiring independent consultants to

monitor EMDP implementation.

- Reporting on the EMDP implementation process for the World Bank.

To accomplish these tasks, in Network PMU, it is necessary to have a division or a group

of people who have professional experience to monitor and implement EMDP work.

5.3. Provincial People’s Committee

Directing the coordination between departments in implementing EMDP

5.4. District/Commune People's Committee

- Coordinating with PMU to implement EMDP.

- Helping local people to overcome difficulties in the construction process. Holding

meetings with local people to disseminate information to help implement EMDP well.

6. Implementation Plan

As soon as the project capital is approved, EMs will be fully informed once again about

their rights. This information will be provided to every EM HHs by NPC minority (at the

request of the Bank information disclosure policy). Project plan as follows:

No. Works Schedule

1 EMDP preparation Quarter1/2012

2 EMDP approval Quarter 1/2012

3 EMDP implementation Quarter 3/2012

4 Payment Quarter 4/2012

7. Monitoring and evaluation

NPC will check and monitor the EMDP implementation. Also, an independent consulting

agency will conduct independent monitoring activities. This monitoring can be done in

conjunction with monitoring of the project Resettlement Plan. Scope of Work (SOW) and

Terms of Reference (TOR) for this works will be prepared and submitted later by NPC.

8. Budget and costs

The EMDP activities will positively affect all EM people in the project area. The budget

is taken from the reciprocal capital of the EVN. The cost of EMDP implementation as

follows:

Table 6: Estimated EMDP implementation costs

Page 21: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

21

No. Item Type

Unit

(class)

Unit price

(VND/class

)

Total

(VND)

1 Preparation

expenses, create

EMDP program

cost

One day training course

will be organize in

communes (13 communes)

13 5,000,000 65,000,000

2 Training in

agriculture, the safe

use of electricity to

the local people

and local pupils

One day training course

will be organized in

communes (13

communes), these training

courses are expected to be

held at the local schools

13 10,000,000 130,000,000

3 Meetings and

manuals, training

materials on

agriculture and

electrical safe

- Use electric safely

- Training in agriculture...

13 5,000,000 65,000,000

Total 260,000,000

Provision for 10% 26,000,000

Total 286,000,000

Page 22: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

22

ANNEX

Annex 1: Map of project area

Annex 2: Social Assessment

Annex 3: Minutes of the meeting on EMDP and EM screening table

Annex 4: EMDP Policy Framework

Annex 5: List of project districts and communes

Page 23: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

23

Annex 1: Map of project area

Page 24: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

24

Annex 2: Social Assessment

1. The breadth, depth, and type of analysis required for the social assessment are

proportional to the nature and scale of the proposed project’s potential effects on the ethnic

minorities.

2. The social assessment includes the following elements:

(a) A review, on a scale appropriate to the project, of the legal and institutional

framework applicable to ethnic minorities.

(b) Gathering of baseline information on the demographic, social, cultural, and

political characteristics of the affected ethnic minority communities, the land that they have

traditionally owned or customarily used or occupied, and the natural resources on which they

depend.

(c) Taking the review and baseline information into account, the identification of

key project stakeholders and the elaboration of a culturally appropriate process for consulting

with the ethnic minorities at each stage of project preparation and implementation.

(d) An assessment based on free, prior, and informed consultation, with the

affected ethnic minority communities, of the potential adverse and positive effects of the

project. Critical to the determination of potential adverse impacts is an analysis of the relative

vulnerability of, and risk to, the affected ethnic minority communities given their distinct

circumstances and close ties to land and natural resources, as well as their lack of access to

opportunities relative to other social groups in the communities, regions, or national societies

in which they live.

(e) The identification and evaluation, based on free, prior, an informed

consultation with the affected ethnic minority communities, of measures necessary to avoid

adverse effects, or if such measures are not feasible, the identification of measures to

minimize, mitigate, or compensate for such effects, and to ensure that the ethnic minority

groups receive culturally appropriate benefits under the project.

Page 25: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

25

Annex 3: Minutes of the meeting on EMDP and EM screening table

3.1. Minutes of the meeting on EMDP (attached)

Page 26: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

3.2. Ethnic Minorities Screening of Village Province: Lang Son

District/

commune with Ems

Village in

the project

area

Total

EM

HHs

Total

perso

ns

EM Groups in

project area Person

Person/

HH

average

rate of

EM in

the

Commu

nity

village

with

90-

100%

EM

village

with

50-90%

EM

Remark

s EM

groups HHs Total Male Female

Female

%

Đình Lập District

Bình Xá commune Xóm 1;

xóm 2 350 1,505 Tày 350 1,505 745 760 50.50% 4.30 82%

x

Bắc Sơn District

Hưng Vũ commune Mỗ Nhai 89 392 Nùng 89 392 192 200 51.02% 4.40 78%

x

Bắc Sơn commune Bắc Sơn 120 492 Nùng 120 492 242 250 50.81% 4.10 88%

x

Văn Quan District

Lương Năng

commune

Xóm 4;

xóm 7;

xóm 9.

387 1,742 Nùng 387 1,742 865 877 50.34% 4.50 72%

x

Văn Lãng District

Hoàng Việt

commune

Xóm 1;

xóm 6 210 903 Tày 210 903 444 459 50.83% 4.30 68%

x

Page 27: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

27

District/

commune with Ems

Village in

the project

area

Total

EM

HHs

Total

perso

ns

EM Groups in

project area Person

Person/

HH

average

rate of

EM in

the

Commu

nity

village

with

90-

100%

EM

village

with

50-90%

EM

Remark

s EM

groups HHs Total Male Female

Female

%

Hoàng Văn Thụ

commune xóm 2 104 426 Nùng 104 426 206 220 51.64% 4.10 84%

x

Lộc Bình District

Đông Quan

commune xóm 1 97 398 Nùng 97 398 188 210 52.76% 4.10 75%

x

Đồng Bục

commune

Đồng Bục;

Khôn

Nguyên

254 1,168 Nùng 254 1,168 577 591 50.60% 4.60 79%

x

Tràng Định

District

Tri Phương

commune Bản Sóc 113 475 Tày 113 475 233 242 50.95% 4.20 88%

x

Bình Gia District

Hoàng Văn Thụ

commune Xóm 1 78 320 Nùng 78 320 149 171 53.44% 4.10 80%

x

Cao Lộc District

Page 28: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

28

District/

commune with Ems

Village in

the project

area

Total

EM

HHs

Total

perso

ns

EM Groups in

project area Person

Person/

HH

average

rate of

EM in

the

Commu

nity

village

with

90-

100%

EM

village

with

50-90%

EM

Remark

s EM

groups HHs Total Male Female

Female

%

Hoa Cư commune Xóm 1 159 684 Tày 159 684 333 351 51.32% 4.30 78% x

Chi Lăng District

Mai Sao commune Xóm 3;

xóm 4 187 748 Nùng 187 748 378 370 49.47% 4.00 64% x

Hữu Lũng District

Đồng Tiến

commune Xóm 3 66 285 Nùng 66 285 127 158 55.44% 4.32 73% x

Page 29: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

Annex 4: ETHNIC MINORITY PLANNING FRAMWORK

1. INTRDUCTION

1- EVN is preparing a Distribution Efficiency Project with World Bank

financing. The objective of the project is to improve efficiency, availability and reliability of

power supply and as well the efficiency of its utilization. This would be achieved through

components (a) System Expansion and Reinforcement. This component will cover

construction and reinforcement of 110kV, medium voltage (MV) and LV networks, including

substations of the PCs. (b) Introduction of Smart Grid Technologies in Distribution. This

component will focus on the automation of distribution network operations and introduction

of advanced metering systems (AMS) at key substations and electricity consumers of PCs;

and (c) Technical Assistance and Capacity Building. This component will include technical

assistance and capacity building for the five PCs. In line with the World Bank’s Operational

Policies on Indigenous People (OP 4.10), the Ethnic Minority Planning Framework (EMPF)1

is developed to guide the preparation an implementation of Ethnic Minority Development

Plans (EMDPs) as the proposed project involves the preparation and implementation of

annual investment programs or multiple subprojects. When the presence or collective

attachment of ethnic minority people is confirmed in a give subproject, an EMDP will be

developed and implemented in order to mitigate the project impact over this vulnerable

groups. Are the components mentioned as a) an b) in this is the case please say so in this is

the case.

2. ETHNIC MINORITIES IN VIETNAM

2- Vietnamese, known as Kinh, with about 85 percent of total population, dominate the

political, economic, and social affairs of the socialist Republic of Viet Nam. There are

officially another 53 ethnic groups in Viet Nam who constitute the category of ethnic

minorities. Most of ethnic minorities population live in the uplands. Population of ethnic

minority groups range from over a million to only a few hundred. The only ethnic minority

groups who live mainly in the lowlands are Hoa (Chinese), Cham and Khmer.

3- Ethnic minorities in Viet Nam are diverse origin. A majority (39) as well as

Kinh speak languages in the Austro – Asiatic language family. But others speak

Austronesian and Sino –Tibetan languages. They differ greatly in ways of livelihood, social

organization. Some have had relationship with Kinh society for a long time, while others

have lived in relative isolation until recent decades. Some groups have lived in their present

locations for many centuries, while others have migrated into their present location within the

past hundred years.

4- In the past fifty years, many ethnic minorities communities have shifted

residence because of war, governmental settlement programs, or a depleted resource base. As

many as five million Kinh have been relocated from the lowlands into upland areas. The

biophysical, social, and political context of the lives for most ethnic minorities has changed

drastically in the past fifty years.

5- Equality right of ethnic people was stipulated clearly in the Vietnam Law.

Article 5 in the Vietnam Constitution (1992) stipulated as follows: The Socialist Republic of

Vietnam is an united nation having many nationalities. The State implements a policy of

equality and unity and supports the cultures of all nationalities and prohibits discrimination

and separation. Each nationality has the right to use its own language and characters to

preserve their culture and to improve its own traditions and customs. The State carries out a

policy to develop thoroughly and gradually improve the quality of life of ethnic minorities in

Vietnam physically and culturally.

Page 30: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

30

6- Since 1968, the Government has promulgated sedenterization policy for ethnic

groups, reducing migration trends of the ethnic people. One of the most important policies on

relation with ethnic groups is the Government Guidance No.525/TTG on 2/11/1993 regarding

in detail on implementation guiding of development in high land areas and ethnic areas with

the main following points:

Develop infrastructure especially transportation road system and fresh water

supplying;

Gradual increase food security;

Consolidate of education system; adjust education program based on the

characteristics of provinces; create favor conditions and support the non-formal education

programs and develop the internal economy.

7- Ethnic minorities in Vietnam have enjoyed better legal and political status

than minority groups have in many other countries in the region, or around the world. They

have received many benefits as a result of government policies. For example, they have

received preferential treatment in college admission processes. Cooking oil, kerosene, and

iodized salt have been provided to them at heavily subsidized rates. The government, along

with foreign donor agencies, and many NGOs have supported development and special

assistance programs/projects that target ethnic minorities. The GOV has invested and

supported uplands and ethnic minorities development aim at “catching up” the standard of

lowland areas development.

8- While many-probably most-ethnic minority households might have improved

their living standards if compared with ten of fifteen years ago, there is still a need for

catching up with the rest of the country. Indeed, they are in many ways falling further behind.

There are many reasons for the pervasive poverty of ethnic minority groups in Vietnam. The

EM peoples are struggling and confronting challenged when having to deal with severe

stresses placed upon them from population growth, natural resources depletion, and cultural

dislocation resulting from decades of externally imposed change.

3. POLLICY FRAMEWORK 9- The main objective of the ethnic minority policy framework is to ensure that

the development process fosters full respect for their dignity, human rights, cultural

uniqueness and that ethnic minorities do not suffer adverse impacts during the development

process and they will receive culturally-compatible social and economic benefits. The Bank’s

OP 4.10 on Indigenous Peoples indicates that the strategy for addressing the issues pertaining

to indigenous people must be based on the free, prior and informed consultation with the

indigenous people themselves. Thus, identifying local preferences through direct

consultation, incorporation of indigenous knowledge into project approaches, and appropriate

early use of experienced specialists are core activities for any project that affects indigenous

peoples and their rights to natural and economic resources.

10- The State of Viet Nam has the policy of not discriminating against Ethnic

Minority Peoples as showed by the presence of Ethnic People Council in the National

Assembly and Ethnic People Committee in the Government. Article 94 in the Constitution,

1992 states that the Ethnic People Committee has the right to submit proposals, plans or

related issues of indigenous peoples to the Assembly, monitor, control the implementation of

national policies, development programs on various areas such as, education, health care, etc.

Article 5 of the Constitution also indicates that ethnic minority people could us their own

languages to reserves its cultural distinctions. In the Government of Viet Nam, Committee of

Ethnic Minorities Affairs (CEMA), a ministry level governmental agency, is in charge of

management functions for ethnic minorities and mountainous areas.

Page 31: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

31

11- According to the Government of Viet Nam, ethnic minorities have the

following characteristics:

An intimate understanding and long stay in the territory, land or area of their

ancestors closed attachment to the natural resources;

Self-identification and recognized by neigh boring members by their distinctive

culture

A language different from the national language

A long traditional social and institutional system

A self-provided production system

12- This planning framework will applied to all of the sub-projects of Distribution

Efficiency Project where applicable.

4. GUIDELINES FOR ETHNIC MINORITY DEVELOPMENT PLAN

(EMPD) 13- The guidelines seek to ensure that ethnic minorities are informed, consulted

and mobilized to participate in the sub-projects to be supported by DEP. Their participation

can either provide them benefits with more certainty, or protect them from any potential

adverse impacts of sub-projects to be financed by the Project. The main features/process of

the EMDP will be a preliminary screening process, a social assessment to determine the

degree and nature of impact of each work under the sub-project, and a plan will be developed

if warranted. Detail requirements for screening and social impact assessment are described in

the annexes. The Project will provide a series of training to all implementers and local

agencies preparing and implementing EMDPs. Free, Prior and Informed consultations (FPIC)

with and participation of the ethnic minority population, their leaders and local government

officials will be an integral part during the EMDP’s preparation and implementation. The

EMDP’s consist of the following sections:

a) Preliminary screening

b) Social impact assessment

c) Mitigation measures

d) Development assistance

e) Project monitoring

f) Budget

5. SCREENING 14- All communes which are candidates for sub-Projects will be visited (at the

time of first consultation with communes) by a teams made up of Project Management

Boards of Electricity of Viet Nam (EVN) or of the respective Power Company (PC), relevant

local authorities and consultants. Prior to the visit, responsible agency with inform the

commune leaders about the visit and the subproject related discussion as well. Based on the

letter, the local authority will organize a meetings with the participation of representatives

from farmers and women associations, village leaders, and key staff of commune. If there are

ethnic minorities in the commune, their leaders should be invited to the meeting as well.

During meetings, participants will be provided with opportunity to present their views with

regards to the sub-project (s)/

15- At this visit, the social scientists (social consultants) will undertake a

screening for ethnic minority population with the help of ethnic minority leaders and local

authorities. The screening will check for the following:

a) Names of ethnic groups in the commune

b) Total number of ethnic minority groups in the commune

c) Percentage of ethnic minority out of commune population

d) Number and percentage of ethnic minority household along the zone of

influence of the proposed sub-project.

Page 32: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

32

16- If the results show that there are ethnic minority communities in the zone of

influence of the proposed sub-project, a Social Assessment (SA) will need to be undertaken

by the Borrower for those project areas.

6. SOCIAL ASSESSMENT 17- The Social Assessment (SA) will be undertaken to evaluate the project’s

potential positive and adverse effects on the ethnic minority groups, and to examine project

alternatives where adverse effects may be significant. The breadth, depth, and type of

analysis in the social assessment are proportional to the nature and scale of the project’s

potential effects on the ethnic minorities, whether such effects are positive of adverse (see

annex 2 for details). The social assessment is carried out by the social scientists (consultants)

whose qualifications, experience, and TOR are cleared by the Bank.

18- The SA will include: baseline data, institutional analysis, it will determine the

framework for consultation during the project cycle. Information will be gathered from

several separate group meetings: ethnic minority leaders; ethnic minority men; and ethnic

minority women, especially those who live in the zone of influence of the proposed work

under sup-project. Discussions will focus on sub-project positive and negative impacts,

community support; and recommendations for design and implementation of sub-project. The

borrower will be responsible for analyzing the SA, and for leading the development of an

action plan with the ethnic minority communities, project engineers and other staff. Various

decisions on next steps will be described as follows

If the SA indicates that the potential impact of the proposed sub-project will be

significantly adverse and/or that the ethnic minority community rejects the project, the sub-

project will not be implemented in that locality. It is recommended to examine the

Project alternatives, no EMDP will need to be prepare. Impact not only in terms of land,

because in this case the RP will include it.

If the ethnic minority community supports the sub-project implementation an EMDP

will be developed to address the potential positive or negative impact of the subproject.

7. ETHNIC MINORITY DEVELOPMENT PLAN (EMDP)

20. The action plan will consists of a number of activities and will include

mitigation measures of potentially negative impacts, modification of sub-project design, and

development assistance. Where there is land acquisition in ethnic minority communities, the

Project will ensure that their rights will not be violated and that they be compensated for the

compensation will follow the Resettlement Policy Framework of the project. An Ethnic

Minorities Development Plan will include:

(1) Legal Framework

(2) Baseline data based on the SA and other pertinent sources

(3) Land tenure information;

(4) Local participation;

(5) Technical identification of development or mitigation activities;

(6) Institutional arrangement;

(7) Implementation schedule;

(8) Monitoring and evaluation; and

(9) Cost and financing plan.

Page 33: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

33

21. In case of a subproject which component which subproject in this case? Where

all or only few affected households are Ems, there is a potential possibility to discuss and get

Bank’s NOL before entering the official preparation of such document. All EMDPs are

subjects to public consultation an must be disclosed per requirements of the World Bank’s

policy.

8. IMPLEMENTATION ARRANGEMENT

22. Consultants will also be responsible for training respective PCs, and a similar

social organization to undertake the work of consultation, screening, social impact

assessment, analyses and preparing EMDPs.

23. PCs of EVN and local authorities (People’s Committees for Ethnic Minorities

and Mountainous Areas, Resettlement Committees, Women Union and Land Departments etc.

at different levels) are responsible for implementing EMDPs (arrange adequate staff and

budget).

9. MONITORING

24. Implementation of the EMDPs will be regularly supervised and monitored by

PCs of EVN and respective peoples’ Committees and Committees for Ethnic Minorities at

provincial and district levels. The findings and recommendations will be recorded in

quarterly reports and to be furnished EVN and World Bank office in Vietnam.

25. An independent agency or agencies will undertake external monitoring and

evaluation of the implementation of resettlement action plans for Project will also be tasked

with monitoring the activities for EMDP. The external monitoring agency will visit a sample

of affected households in each relevant province on an annual basis, on unless as required.

26. If possible, the (internal/external) monitoring activities of EMDPs could be

considered to be combined with similar action under RPs of the same subproject.

10. SCHEDULE

27. The EMDP should have an implementation schedule that is coordinated with

the sub-project implementation. Logically, social impact assessments and group meetings

should be undertaken before sub-project designs are prepared. Compensation for land

acquisition should be satisfactorily completed at least one month prior to start of civil work.

Monitoring should take place at the recommended and specified times by the EMDP during

project cycle.

11. BUDGET

28. The EMDP, while provides development activities, will include information

on detailed cost of mitigation measures and other rehabilitation entitlements for ethnic

minority in the affected areas. Sources of funding for the various activities and financing

plans will be clearly specified in the cost tables.

12. REPORTING/DOCUMENTATION

29. The EMDPs will be prepared and submitted by PCs to EVN and then World

Bank at the same time that respective PCs submit the final annual work programs of all the

provinces to the World Bank for approval, an integrated EMDP report for the provinces will

also be furnished.

Page 34: NORTH POWER CORPORATION Electric Network Project ... · EVN Electric of Viet Nam EM(s) ... Recognizing the necessary of this work, ... Qui Rin, Nung Din and Khen Lai. Nung language

34

Annex 5: List of project districts and communes

1. Đình Lập District (01 commune)

: Bình Xá

2. Bắc Sơn District (02 communes)

: Hưng Vũ & Bắc Sơn

3. Văn Quan District (01 commune)

: Lương Lăng

4. Văn Lãng District (02 communes)

: Hoàng Việt & Hoàng Văn Thụ

5. Lộc Bình District (02 communes)

: Đông Quan & Đồng Bục

6. Tràng Định District (01 commune)

: Tri Phương

7. Bình Gia District (01 commune) : Hoàng Văn Thụ

8. Cao Lộc District (01 communes)

: Hòa Cư

9. Hữu Lũng District (01 commune)

: Đồng Tiến

10. Chi Lăng District (01 commune)

: Mai Sao