North I-25 Express Lanes,

Johnstown to Fort Collins DB Project

Page 2: North I-25 Express Lanes, Johnstown to Fort Collins DB Project · 22.09.2016 · Johnstown to Fort Collins DB Project. Region 4 Region Transportation Director Johnny Olson ... $5M

Region 4 Region Transportation Director

Johnny Olson

Opening Remarks

Page 3: North I-25 Express Lanes, Johnstown to Fort Collins DB Project · 22.09.2016 · Johnstown to Fort Collins DB Project. Region 4 Region Transportation Director Johnny Olson ... $5M

Growth Since 1990

Colorado Actual and Projected Growth: 1990–2035

Actual Projecte

d

Page 4: North I-25 Express Lanes, Johnstown to Fort Collins DB Project · 22.09.2016 · Johnstown to Fort Collins DB Project. Region 4 Region Transportation Director Johnny Olson ... $5M

Increased population = Increased traffic

Traffic volumes are

expected to increase

Weld and Larimer County

population is expected to

increase

0 50,000 100,000 150,000 200,000

Harmony Road

SH 402

SH 66

SH 7

2035

2012

The Future of Northern Colorado

0 500,000 1,000,000

Larimer

County

Weld

County

316,000

268,839

481,000

567,000

2040

2012

Page 5: North I-25 Express Lanes, Johnstown to Fort Collins DB Project · 22.09.2016 · Johnstown to Fort Collins DB Project. Region 4 Region Transportation Director Johnny Olson ... $5M

• An EIS was completed in 2011.

• Purpose of the EIS

• Meet the long-term travel needs between the Denver

Metro Area and the rapidly growing population centers

along the I-25 corridor north to the Fort Collins-Wellington

area.

• Need for the Project

• Increased frequency and severity of crashes

• Increasing traffic congestion leading to mobility and

accessibility problems

• Aging and functionally obsolete infrastructure

• Lack of modal alternatives

Environmental Impact Statement

Page 6: North I-25 Express Lanes, Johnstown to Fort Collins DB Project · 22.09.2016 · Johnstown to Fort Collins DB Project. Region 4 Region Transportation Director Johnny Olson ... $5M

I-25 DB Funding

Millions Source Type

$15M TIGER (Transportation Investment Generating Economic

Recovery) Federal

Federal

$25M Local (Larimer Co., Weld Co., Timnath, Berthoud, Loveland,

Ft. Collins, Johnstown, Windsor, McWhinney)

Local

$30M Formula Freight (FAST Act) Federal

$110M Transportation Commission State

$50M Construction Loan (Express Lane Toll Revenue) State

$5M DTR (Division of Transit and Rail) State

$2M Road X State

$237M

Page 7: North I-25 Express Lanes, Johnstown to Fort Collins DB Project · 22.09.2016 · Johnstown to Fort Collins DB Project. Region 4 Region Transportation Director Johnny Olson ... $5M

Project Director – Scott Rees, Single point of contact.

Design Manager – Rich Christy

Construction Manager – Chris Boespflug

Consultant Team – Anthony Pisano, Alan Eckman, Matt Aguirre, and Corey Lang

Project Team

Page 8: North I-25 Express Lanes, Johnstown to Fort Collins DB Project · 22.09.2016 · Johnstown to Fort Collins DB Project. Region 4 Region Transportation Director Johnny Olson ... $5M

Project Description

Page 9: North I-25 Express Lanes, Johnstown to Fort Collins DB Project · 22.09.2016 · Johnstown to Fort Collins DB Project. Region 4 Region Transportation Director Johnny Olson ... $5M

• CLOMR/LOMR

• Environmental Schedule

• ROW Acquisition

• Utility Relocation

• RR Coordination

• High Volume Interstate construction

• Other major regional projects

• Process Control (PC) and Independent Contractor Quality Control (ICQC)

• Owner Controlled Insurance Program (OCIP)

• DBE/OJT Participation

Contract Issues

Page 10: North I-25 Express Lanes, Johnstown to Fort Collins DB Project · 22.09.2016 · Johnstown to Fort Collins DB Project. Region 4 Region Transportation Director Johnny Olson ... $5M

LOI: Sept 22, 2016

RFQ: Nov 07, 2016

SOQ’s Due: Dec 19, 2016

Short List: Jan 27, 2017

Draft RFP: Jan 27, 2017

ROD: March 2017

Final RFP: March 17, 2017

Submit RFP: ~June 30, 2017

Selection: ~Aug 03, 2017

NTP1: Oct 2017

NTP2: Dec 2017

Project Schedule

Page 11: North I-25 Express Lanes, Johnstown to Fort Collins DB Project · 22.09.2016 · Johnstown to Fort Collins DB Project. Region 4 Region Transportation Director Johnny Olson ... $5M

Base Mapping: Dec, 2016

As-Builts: Dec, 2016

Draft Base Configuration: Dec

2016

Upcoming Information

for DB Teams (Draft)

RS2

Page 12: North I-25 Express Lanes, Johnstown to Fort Collins DB Project · 22.09.2016 · Johnstown to Fort Collins DB Project. Region 4 Region Transportation Director Johnny Olson ... $5M

Questions