north flatbush avenue capital project scoping, 9/28/10

Upload: norman-oder

Post on 10-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    1/21

    North Flatbush Avenue

    Photo care of North Flatbush Avenue BID

    ap a ro ec cop ngSeptember 28, 2010

    Presentation to Community Boards 6 & 8 Transportation Committees

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    2/21

    Project Area

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    3/21

    Recent Area ImprovementsNYCDOT with input from BID and community stakeholders

    May 2009 Resurfaced Flatbush Ave

    May 2009 New crosswalks and pedestrian

    April 2010 Increased left turn restrictions

    congestion

    -Flatbush Ave signal timing; slows speeds andincreases pedestrian crossing time

    August 2010 DOT selects Flatbush Avefor pedestrian countdown signals

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    4/21

    Capital Project HistoryJune 2008 North Flatbush BID

    public planning charrette

    June 2009 $200,000 streetscapeimprovement earmark from Borough

    President added to previous earmarks

    Summer 2009 W ArchitectureNorth Flatbush Streetscape Master

    Plan

    Januar 2010 DOT commits 2million to corridor; begins project

    scoping

    February and June 2010 Community stakeholder meetings

    Image: NFBID Avenue Master Plan

    Summer 2010 DOT draftsproject scope and conceptual designs

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    5/21

    Funding Summary

    Source Amount Notes

    City Council $200,000 Allocation for StreetscapeImprovements

    Borough PresidentMarkowitz

    $447,000 Allocation for StreetscapeImprovements and Big

    Belly Solar Trash

    Congressman Weiner $2,000,000 Federal Earmark

    y un s , e es r an a e yImprovements

    , ,

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    6/21

    Community Stakeholders

    North Flatbush Avenue Borough President

    ar ow z

    Community Board 8

    Neighborhood

    Development Council

    Council Member James Park Slope Civic

    Council Member Levin

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    7/21

    Stakeholder Input

    Sidewalk extensions at

    triangles and otherlocations to increasepedestrian safety

    is to Engagethe Triangles;

    unique designfor each

    Use standard materials to

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    8/21

    Issues and Opportunities

    6th

    Avenue Triangle

    Underutilized interior planting space

    Limited people space, lack of seating

    Inade uate sidewalks

    Opportunity to expand triangle intoroadway

    Historic clock

    Photos source: NFBID Avenue Master Plan

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    9/21

    Issues and Opportunities

    7th

    Avenue Triangle

    Adjacent restaurants and retail

    Lack of seating

    Inadequate sidewalks

    Opportunity expand triangleinto roadway

    Photos source: NFBID Avenue Master Plan

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    10/21

    Issues and Opportunities

    Carlton Avenue Triangle

    u s an ar pe es r an ramps

    Hi-speed turns from Flatbush

    Opportunity to expand -implemented markings

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    11/21

    Issues and Opportunities

    8th

    Avenue Triangle

    Non-standard sidewalk paving treatments;inconsistent and difficult to maintain

    Current St. Johns Pl and Flatbush Aveintersection problematic for motorists andpedestrians

    Opportunities for additional greening

    Opportunity for expanding triangle into roadway

    Photo source: NFBID Avenue Master Plan

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    12/21

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    13/21

    6thAvenue Triangle

    Proposed

    Expand triangle

    Use standardsidewalk materials

    e oca eclock

    Add bike racksEnhance

    landscaping

    Create usablepublic space

    Install additionalseating

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    14/21

    7thAvenue Triangle

    Proposed

    Add bike racks

    Enhancelandscaping

    Widen andstandardize sidewalks

    Install seatingExpand triangle

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    15/21

    Carlton Triangle

    Pro osedInstall new

    pedestrian ramps

    Add bike racks

    Expand triangle

    Expand sidewalks to

    calm traffic and slowturning vehicles

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    16/21

    8thAvenue TriangleOriginal Proposal

    One Plaza Streetdrop-offs

    Redirect eastboundSt. Johns traffic

    Dramaticallyexpand plaza

    space

    Closure of St.

    Eliminate

    Plant additionalStreet Trees

    o n s e weenFlatbush and 8th

    Avenue

    problematicintersection

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    17/21

    8thAvenue TriangleRevised Proposal

    Plant additionalStreet Trees

    Expand plaza

    space

    Improve problematicintersection

    Add bike racks

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    18/21

    Side Street SafetyProposed

    Installation ofcurb extensions

    Typical curb extension

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    19/21

    Streetscape ElementsUntinted Concrete

    Steel-face

    Curb

    Standard Bike Rack

    Photo care of ispynyc.wordpress.com

    Big Belly Solar Trash Compactors

    Additional Amenities (tobe maintained by BID):Movable Tables and

    Reduce trash collection by 4 timesor more

    Eliminate overflowing binsIncluded in DOT Capital Plan Type B Poles

    Benches

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    20/21

    Next Steps

    Estimated Timeline

    1 - 3 months DOT: Final Scope; Transferto Department of Design and Construction

    3 - 6 months DDC: Bidding Process

    - mon s DDC: Project Design

    12 - 18 months DDC: ConstructionComplete

  • 8/8/2019 North Flatbush Avenue Capital Project Scoping, 9/28/10

    21/21

    Questions and Feedback