north central lihtc phase 3 - city of … north central lihtc phase 3 civic design review submission...
TRANSCRIPT
![Page 1: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/1.jpg)
1
NORTH CENTRAL LIHTCPHASE 3
CIVIC DESIGN REVIEW SUBMISSION
TABLE OF CONTENTS:
COVER SHEET 1CDR APPLICATION FORM 2PHOTOGRAPHS 3AERIAL PHOTOGRAPHS 5EXISTING SITE SURVEY 6STREETS CHECKLIST 7PROPOSED GROUND PLAN 15LANDSCAPE PLAN 16PROPOSED ELEVATIONS 17PROPOSED SITE SECTIONS 21PERSPECTIVE RENDERINGS 223D DIGITAL CONTEXT MODEL 26SUSTAINABILITY QUESTIONNAIRE 27SUSTAINABLE DESIGN ELEMENTS 28BUILDING MATERIALS NARRATIVE 28
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 1CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 1 7/14/2017 5:26:05 PM7/14/2017 5:26:05 PM
![Page 2: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/2.jpg)
2
CDR PROJECT APPLICATION FORM
L&I APPLICATION NUMBER:
What is the trigger causing the project to require CDR Review? Explain briefly.
PROJECT LOCATION
CONTACT INFORMATION
Planning District: Council District:
Address:
Is this parcel within a Master Plan District? Yes No
Applicant Name: Primary Phone:
Email: Address:
Property Owner: Developer
Architect:
SITE CONDITIONS
SITE USES
COMMUNITY MEETING
ZONING BOARD OF ADJUSTMENT HEARING
Community meeting held: Yes No
If yes, please provide written documentation as proof.
If no, indicate the date and time the community meeting will be held:
Date:
Present Use:
Proposed Use:
Area of Proposed Uses, Broken Out by Program (Include Square Footage and # of Units):
Proposed # of Parking Units:
Site Area:
Existing Zoning: Are Zoning Variances required? Yes No
ZBA hearing scheduled: Yes No NA______
If yes, indicate the date hearing will be held:
Date:
:
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 2CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 2 7/14/2017 5:26:12 PM7/14/2017 5:26:12 PM
![Page 3: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/3.jpg)
3
CONER OF NORRIS ST AND MARVINE ST MARVINE STREET MARVINE STREET
MARVINE STREET LOOKING AT W NORRIS STMARVINE STREET LOOKING AT W NORRIS ST CORNER OF 11TH AND NORRIS ST
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 3CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 3 7/14/2017 5:26:12 PM7/14/2017 5:26:12 PM
![Page 4: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/4.jpg)
4
CORNER OF 11TH AND DIAMOND ST
CORNER OF 11TH AND DIAMOND ST
NORRIS ST LOOKING NORTH
CORNER OF 11TH AND NORRIS ST
11TH STREET
11TH STREET
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 4CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 4 7/14/2017 5:26:15 PM7/14/2017 5:26:15 PM
![Page 5: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/5.jpg)
5
DIAMOND STREET
11TH STREET
MARVIN
E STREET
NORRIS STREET
OBLIQUE AERIAL OF SITE
AERIAL OF SITE
AERIAL OF SITE
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 5CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 5 7/14/2017 5:26:18 PM7/14/2017 5:26:18 PM
![Page 6: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/6.jpg)
66
1. SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT..
2. THE PROPERTY DESCRIBED ON THIS SURVEY DOES NOT LIE WITHIN A SPECIAL FLOOD HAZARDAREA (“SFHA”) AS DEFINED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY; THEPROPERTY LIES WITHIN ZONE X OF THE FLOOD INSURANCE RATE MAP, (PANEL NOT PRINTED)DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN AS IDENTIFIED ASCOMMUNITY NO. 420757 PANEL 0182G, BEARING AN EFFECTIVE DATE OF JANUARY 17, 2007.
3. UTILITIES ENTER THE PREMISES FROM PUBLIC STREETS OR RIGHTS OF WAY. UTILITYINFORMATION TAKEN FROM THE INFORMATION FURNISHED BY THE OWNER AND FIELDLOCATION OF VENTS, VALVES, MANHOLES, ETC.
4. ALL DIMENSIONS SHOWN ON THE PLAN ARE PHILADELPHIA DISTRICT STANDARD, THE LEGALSTANDARD OF MEASURE WITHIN THE CITY OF PHILADELPHIA, EXCEPT BUILDING DIMENSIONSWHICH ARE IN UNITED STATES STANDARD MEASURE (US).
5. ATTENTION IS CALLED TO THE CITY OF PHILADELPHIA ZONING CODE AS AMENDED.PROPERTIES ARE ZONED RM-2 (RESIDENTIAL MULTI-FAMILY-2).
6. EXCEPT AS SHOWN ON PLAN, ALL STREETS ADJACENT TO PROPERTY ARE LEGALLY OPEN ASPUBLIC RIGHTS OF WAYS.
7. THE INFORMATION SHOWN ON THIS PLAN IS FOR THE ULTIMATE USER NAMED HERON AND ISNOT VALID TO ANY OTHER PARTIES.
8. COPYRIGHT 2016 - ALL RIGHTS RESERVED - STANTEC NO PART OF THIS PLAN MAY BEREPRODUCED, STORED IN AN INFORMATION STORAGE AND RETRIEVAL SYSTEM, ORTRANSMITTED IN ANY FORM, OR BY ANY MEANS, ELECTRICAL, MECHANICAL, PHOTOCOPYINGRECORDING OR OTHERWISE WITHOUT PRIOR WRITTEN PERMISSION OF STANTEC.
PRELIMINARYNOT FOR
CONSTRUCTION05-13-2016
To:Philadelphia Housing Development Corportation (PHDC)City of PhiladelphiaPhiladelphia Redevelopment AuthoritySurety Abstract Services, LLC :
This is to certify that this map or plat and the survey on which it is based were made in accordance withThe 2011 Minimum Standard Detail Requirements for ALTA/ACSM Land Title Surveys jointlyestablished and adopted by ALTA and NSPS, and includes Items 1,2,3,4,5,6(a),6(b),7(a),7(b)(1),7(c),9,10,11(b),12 and 13 of Table A thereof. The field work was completed on May 5, 2016.
Date of map or plat May 13, 2016Charles KaratProfessional Land Surveyor SU-53802-ECommonwealth of Pennsylvania
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 6CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 6 7/14/2017 5:26:22 PM7/14/2017 5:26:22 PM
![Page 7: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/7.jpg)
7
o o o o
•
o
o
o
o
o
•
o
o
o
o
o
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 7CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 7 7/14/2017 5:26:24 PM7/14/2017 5:26:24 PM
![Page 8: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/8.jpg)
8
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 8CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 8 7/14/2017 5:26:24 PM7/14/2017 5:26:24 PM
![Page 9: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/9.jpg)
9
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 9CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 9 7/14/2017 5:26:24 PM7/14/2017 5:26:24 PM
![Page 10: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/10.jpg)
10
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 10CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 10 7/14/2017 5:26:24 PM7/14/2017 5:26:24 PM
![Page 11: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/11.jpg)
11
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 11CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 11 7/14/2017 5:26:25 PM7/14/2017 5:26:25 PM
![Page 12: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/12.jpg)
12
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 12CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 12 7/14/2017 5:26:25 PM7/14/2017 5:26:25 PM
![Page 13: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/13.jpg)
13
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 13CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 13 7/14/2017 5:26:25 PM7/14/2017 5:26:25 PM
![Page 14: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/14.jpg)
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 14CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 14 7/14/2017 5:26:25 PM7/14/2017 5:26:25 PM
![Page 15: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/15.jpg)
1515
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 15CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 15 7/14/2017 5:26:25 PM7/14/2017 5:26:25 PM
![Page 16: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/16.jpg)
16
(COMMUNITYBUILDING)
FUTURE
UNIT TYPES:A6R: (6) 1 BEDROOM APTS ELEVATORA6W: (6) 1 BEDROOM APTS WALK-UPB: (2) 2 BEDROOM BI-LEVEL OVER (1) 3 BEDROOM APARTMENTSC1: (2) 2 BEDROOM BI-LEVEL OVER (1) 2 BEDROOM APARTMENTSD2: 2 BEDROOM SINGLE FAMILYD3: 3 BEDROOM SINGLE FAMILYD4: 4 BEDROOM SINGLE FAMILYD5: 5 BEDROOM SINGLE FAMILYG: COMMUNITY BUILDING
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 16CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 16 7/14/2017 5:26:29 PM7/14/2017 5:26:29 PM
![Page 17: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/17.jpg)
17
COMMUNITY BUILDING C1 D5 D4 D4 D4 D4D4 D4 D3 D3D3 D3 D3 D3D3 C1
COMMUNITY BUILDING C1 D5 D4
BRICK
METAL PANEL CAST STONEBLOCK
METALPANEL
BRICKMETALPANEL
METALPANELCAST STONE
METALPANEL
BRICKMETAL RAILING
CAST STONE BAND CONCRETE STEPS METAL RAILINGCAST STONE BASE BRICK METAL PANEL CAST STONE BLOCK
CAST STONE
METAL-WRAPPEDOVERHANG
D3
CAST STONE
METALPANEL
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 17CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 17 7/14/2017 5:26:30 PM7/14/2017 5:26:30 PM
![Page 18: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/18.jpg)
18
COMMUNITY BUILDINGBA6 : WALK-UP
METALPANEL
BRICK METALPANEL
METALPANEL
METALPANEL
BRICK METALPANEL
BRICK METALPANEL
CAST STONE
BRICK BRICK
CAST STONEBLOCK
METALPANEL
CAST STONE BASE BRICKCAST STONE BAND
BRICK METALRAILINGS
CAST STONE
CAST STONEMETALRAILINGS
METAL-WRAPPEDOVERHANG
METALOVERHANG
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 18CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 18 7/14/2017 5:26:31 PM7/14/2017 5:26:31 PM
![Page 19: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/19.jpg)
19
A6E D4 D2 D2 D2 D2 D2 D2 D2 D2 D4 D3 D3 B A6W
METALPANEL
METALPANEL
METALPANEL
BRICK BRICK
BRICK
CAST STONE
A6E D4 D2 D2
METALPANEL
BRICK
B
CAST STONE BAND
METALPANEL
BRICK
A6W
CAST STONE BAND
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 19CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 19 7/14/2017 5:26:31 PM7/14/2017 5:26:31 PM
![Page 20: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/20.jpg)
20
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 20CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 20 7/14/2017 5:26:33 PM7/14/2017 5:26:33 PM
![Page 21: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/21.jpg)
21
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 21CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 21 7/14/2017 5:26:33 PM7/14/2017 5:26:33 PM
![Page 22: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/22.jpg)
22
11TH STREET PROPOSED FACADES LOOKING SOUTH
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 22CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 22 7/14/2017 5:26:35 PM7/14/2017 5:26:35 PM
![Page 23: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/23.jpg)
23
MARVINE STREET PROPOSED FACADES LOOKING SOUTH
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 23CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 23 7/14/2017 5:26:35 PM7/14/2017 5:26:35 PM
![Page 24: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/24.jpg)
24
CORNER OF W NORRIS ST AND MARVINE STREET LOOKING NORTH EAST
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 24CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 24 7/14/2017 5:26:36 PM7/14/2017 5:26:36 PM
![Page 25: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/25.jpg)
25
CORNER OF W NORRIS ST AND 11TH STREET LOOKING NORTH EAST
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 25CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 25 7/14/2017 5:26:36 PM7/14/2017 5:26:36 PM
![Page 26: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/26.jpg)
26
PROPOSED BLOCK MASSING
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 26CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 26 7/14/2017 5:26:36 PM7/14/2017 5:26:36 PM
![Page 27: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/27.jpg)
27
Civic Design Review, Philadelphia Sustainability Questionnaire
Categories Benchmark
Meets or Exceeds the Benchmark (yes or no)?
If yes, please describe how or reference the applicable document in the CDR
submission.
Water Efficiency
Outdoor Water Use
Maintain on-site vegetation without irrigation. OR, reduce the watering requirements to at least 50% from the calculated baseline for the site's peak watering month.
Energy and Atmosphere
Energy Commissioning
Acquire a separate, independent commissioning service to insure that the energy related systems are installed, calibrated, and perform as intended.
Energy Performance
The project will reduce energy consumption by: Achieving 10% energy saving or more from an established baseline using ASHRAE standard 90.1-2010, OR by conforming to ASHRAE Advanced Energy Design Guide for Commercial Buildings.
On-Site Renewable Energy
Produce renewable energy on-site that will provide at least 3% of the project's anticipated energy usage.
Innovation
InnovationAny other sustainable measures that could positively impact the public realm.
Civic Design Review, Philadelphia Sustainability Questionnaire
Categories Benchmark
Meets or Exceeds the Benchmark (yes or no)?
If yes, please describe how or reference the applicable document in the CDR
submission.
Location and Transportation
Access to Quality Transit
Locate a functional entry of the project within a ¼-mile (400-meter) walking distance of existing or planned bus, streetcar, or rideshare stops, bus rapid transit stops, light or heavy rail stations.
Reduced Parking Footprint
All new parking areas to be located in the rear yard of the property or under the building, and unenclosed or uncovered parking areas are 40% or less of the site area.
Green Vehicles
Designate 5% of all parking spaces used by the project as preferred parking for green vehicles or car share vehicles. Clearly identify and enforce for sole use by car share or green vehicles, which include plug-in electric vehicles and alternative fuel vehicles.
Bike Share StationIncorporate a bike share station in coordination with and conformance to the standards of Philadelphia Bike Share.
Sustainable Sites
Pervious Site Surfaces
Provides vegetated and/or pervious open space that is 30% or greater of the site's Open Area, as defined by the zoning code. Vegetated and/or green roofs can be included in this calculation.
Rainwater Management
Conform to the stormwater requirements of the Philadelphia Water Department(PWD) and either: A)Develop a green street and donate it to PWD, designed and constructed in accordance with the PWD Green Streets Design Manual, OR B) Manage additional runoff from adjacent streets on the development site, designed and constructed in accordance with specifications the PWD Stormwater Management Regulations
Heat Island Reduction (excluding roofs)
Reduce the heat island effect through either of the following strategies for 50% or more of all on-site hardscapes: A) Hardscapes that have a high reflectance, an SRI>29. B) Shading by trees, structures, or solar panels.
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 27CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 27 7/14/2017 5:26:37 PM7/14/2017 5:26:37 PM
![Page 28: NORTH CENTRAL LIHTC PHASE 3 - City of … NORTH CENTRAL LIHTC PHASE 3 CIVIC DESIGN REVIEW SUBMISSION TABLE OF CONTENTS: COVER SHEET 1 CDR APPLICATION FORM 2 PHOTOGRAPHS 3 AERIAL PHOTOGRAPHS](https://reader031.vdocuments.site/reader031/viewer/2022022603/5b5c6adf7f8b9a16498c081b/html5/thumbnails/28.jpg)
28
North Central Phase 3
Sustainable Design Elements
The development incorporates the following sustainable design features:
Meets Energy Star for Homes 3 Certification requirements with a HERS score of 50 or less
Meets requirements for Enterprise Green Communities Certification with a minimum of 35 optional points
Development density of over 30 units per acre, consistent with the traditional Philadelphia row house build-ing fabric
Location within half a mile of a full-service grocery store at 6th and Norris Streets
Location within a ¼ mile of SEPTA Temple Regional Commuter Rail Station
Development is served by the SEPTA Route 23 bus on 11th Street
All plantings are drought resistant and do not require irrigation
All plumbing fixtures are Water Sense labeled advanced water conserving fixtures
All appliances are Energy Star rated
A construction waste management plan will reduce nonhazardous construction waste
All buildings in the development will be smoke free
LEED for Neighborhood
LEED for Homes Certified minimum with LEED for Homes Silver Goal
North Central Phase 3
Building Materials Narrative
Front Facades and Street Facing Side Facades
Full depth smooth face modular brick masonry in through color red and gray hues, with gray mortar
Cast stone lintels, sills, bands and base at masonry facades
Flat smooth finish metal panels with reveal gap and concealed fastening system at wall plane and at projecting bays, in gray, tan and white hues
Energy Star compliant white casement and awning vinyl windows
Baked enamel finish insulated store front gazing system and community building entrance
Cast stone block facings in shades of gray at Community Building facade
Cast in place concrete entrance stoops, with painted solid steel railings at residential entrances
Painted solid steel railings at front planting strips
Painted steel tube picket fencing at street face of open yard areas
Rear Facades not visible from the street
Heavy duty vinyl siding, smooth finish, 3 colors
Energy Star compliant casement and awning white vinyl windows
Galvanized steel finish exterior rear stairs to multifamily triplex units
CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 28CIVIC DESIGN SUBMISSION_NORTH CENTRAL_7.14.2017.pdf 28 7/14/2017 5:26:37 PM7/14/2017 5:26:37 PM