1114 ENVIRONMENTAL PRODUCT DECLARATION In accordance with ISO 14025 ISO 21930 EN 15804 Owner of the declaration Norgips Norge AS Publisher The Norwegian EPD Foundation Declaration number NE3'EN, updated Issue date ..2 Valid to ..22 Product Owner of the declaration Norgips Norge AS Ver. 2:2014 Norgips Windliner-X/Utvendig-X type EH2 (GU-X) NEPD-109-177-EN, updated, Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

Upload: nguyenbao

Post on 13-Feb-2017

255 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

1114

ENVIRONMENTAL PRODUCT DECLARATIONIn accordance with ISO 14025 ISO 21930 EN 15804

Owner of the declaration Norgips Norge AS

Publisher The Norwegian EPD Foundation

Declaration number NEPD-109-177-EN, updated

Issue date 15.06.2015

Valid to 15.06.2020

Product

Owner of the declaration

Norgips Norge AS

Ver. 2:2014

Norgips Windliner-X/Utvendig-X

type EH2 (GU-X)

NEPD-109-177-EN, updated, Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

Page 2: Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

General information

Product Owner of the declaration

Norgips Norge AS

Contact person: Johan Arvidsson

Phone:

e-mail:

Program holder Manufacturer

Norgips Norge AS

Postboks 655 Strømsø

Phone: +47 23 08 82 92 3003 Drammen

e-mail: [email protected]

Declaration number: Place of production:

Management system:

EN 15804:2012+A1:2013 serve as core PCR

Declared unit: Org. No:

Declared unit with option: Issue date

Functional unit: Valid to

The EPD has been worked out by:

Mie Vold

Year of study:

Verification:

sign

Functional unit

kg CO2

*

-eq.

15.06.2020

Cradle to gate

A1-A3

Unit

*

Norgips Norge AS, Svelvik

Post Box 5250 Majorstuen, 0303 Oslo

Transport

Comparability:

EPD of construction products may not be comparable if

they not comply with EN 15804 and seen in a building

context.

Module

D

MND

Energy use

Dangerous substances

Approved

Global warming 1,8

34,6

internally

Independent verifier approved by EPD Norway

Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

The product contains no substances from the REACH Candidate list or the Norwegian priority list

This declaration is based on Product Category Rules:

externally

+4733784800

[email protected]

NEPD-109-177-EN, updated

NPCR 10:2013 rev 1, PCR for Building boards

97,9

The Norwegian EPD Foundation

kg

%

4,5

NO 986034757 MVA

1 m2 of installed plasterboard used for walls, during 60

years

Independent verification of data, other environmental

information and EPD has been carried out in accordance

with ISO14025, 8.1.3 and 8.1.4

2014

15.06.2015

0,29

A4

1 m2 of installed plasterboard used for walls, during 60 years

Key environmental indicators

<Title Name>

MJ

Recycled raw materials7,0

2/7 NEPD-109-177-EN, updated, Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

Page 3: Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

ProductTechnical data:

The product is in compliance with EN 520

www.norgips.no /

Market:

Product specification Reference service life:

Materials (excl water) kg %

Functional unit:

System boundary:

Scenarios for user phase (B1-B7) and end of life (C1-C4) are decribed in scenarios below

Data quality: Allocation:

Cut-off criteria:

Product description:

Div additives (total)

7,2 100

0,15 2,1

6,7

Glass fibre reinforcement

Totalt

Gypsum (REA)

For more information from the product data sheet, see

www.norgips.se

60 years

LCA: Calculation rules

Industrial gypsum and recycled gypsum are mixed and dried before the mixture is calcined. The calcined gypsum is transferred

to the mixer where water and additives are added. The slurry is distributed to a plasterboard liner where the edges are folded

and a new layer of plasterboard liner is glued on to form a sandwich. The board line is continuous transferred along the

production line, cut to suitable lengths and dried in a kiln. The dried boards are cut to the correct lengths and stacked in pallets.

Specific data for products and mass flows are from 2013. Data

sources: Ecoinvent 2.2/SimaPro software (generic). Ecoinvent

2.2 processes are created 2003-2007. Upstream data for raw

materials are significant for the LCA results in this study; these

are modelled using Ecoinvent processes. EcoInvent 2.2 is

used since EcoInvent 3 had important data gaps when the

assessment was completed.

Impact assessment methods are in accordance with EN

15804:2012 + A1:2013

0

4,9

93,0

0

0,4

Norway and Sweden

Gypsum plasterboard composed of a plaster core encased in

and firmly bonded to paper liners. The front and back paper

liners are overlapped and glued together on the backside of

the board. The front paper, colored in red, is impregnated with

a natural preservative that makes the surface water repellent.

For use as wind sheathing board and wind bracing.

Weight: 7,2 kg/m2 ± 2 %

Cardboard

Thickness: 9,5 mm ± 0,5 mm

The allocation is made in accordance with the provisions

of EN 15804. Incoming energy and water and waste

production in-house production is allocated equally

among all products through mass allocation. Effects of

primary production of recycled materials allocated to the

main product in which the material was used. The

recycling process and transportation of the material is

allocated to this analysis.

All major raw materials and all the essential energy is

included. Also production processes for raw materials

and energy flows that are included with very small

amounts (<1%) are included.

1 m2 of installed plasterboard used for walls, during 60 years

3/7 NEPD-109-177-EN, updated, Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

Page 4: Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

LCA: Scenarios and additional technical information

Transport from production place to user (A4)

Transport of building products from manufacturer to building site (distance estimated to 360 km)

l/tkm

Railway kWh/tkm

Boat l/tkm

Installation in the building (A5)

Value

Auxiliary

Water consumption

Electricity consumption

Other energy carriers

Material loss

Output materials from waste treatment

Dust in the air

User phase B1-B7

Replacement cycle*

Electricity consumption

Replacement of worn parts

* Number or RSL (Reference Service Life)

End of Life (C1, C3, C4)

Hazardous waste disposed

Collected as mixed construction waste

Reuse

Recycling

Energy recovery

To landfill

Transport to waste processing (C2)

Railway kWh/tkm

Boat l/tkm

Unit

Value

(l/t)

kg

kg

1,2

kg

Value

kWh

50

2,9

Unit

kg

kg

Value (l/t)

7,6

Type of vehicle

Fuel/Energy

consumption

kg

kWh

Data on energy consumption on the building site is based on lifting

the board into the building information given by Norgips Norge AS.

An average energy consumption value of 0,00121 MJ/m² (3*10-4

kWh/m2) shall be applied. It is assumed 5% loss in implementation.

All modules in user phase have been assessed, but the product will

not need maintenance, repair or replacement during the user phase.

Therfor the environmental impact for the user phase is zero.

Distance km

MJ

0,36

Unit

kg

When the product is discarded and its original function is lost,

it can be processed further in a waste management system.

The flows of the recycled material will then become inputs into

the production of the next product. For Norgips building boards

it has been assumed that 40 % of all materials from demolition

will be reused/recycled and the rest will be sent to disposal.

Capacity utilisation (incl. return)

%

Average European capacity

utilisationLorry >32 metric ton

1

kg

Type of vehicle

Truck 0,02 kg/tkm

Truck 0,02

The following information describe the scenarios in the different modules of the EPD.

3E-04

Fuel/Energy

consumption

kg

m3

Type

Lorry >32 metric ton 360

Value

Type

kg4,3

Distance kmCapacity utilisation (incl. return)

%

Average European capacity

utilisation

4/7 NEPD-109-177-EN, updated, Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

Page 5: Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

LCA: Results

System boundaries (X=included, MND=module not declared, MNR=module not relevant)

Environmental impact

Resource use

End of life - Waste

End of life - Output flow

Reading example: 9,0 E-03 = 9,0*10-3

= 0,009

x

Parameter

GWP

3,1E-04

8,7E-071,3E-06

0,052

A4

kg

0

1,1E-07

C1

0

4,3E-11

0,5832

x x

Unit

8,1E-03

0,59

0

1,7E-04

GWP Global warming potential; ODP Depletion potential of the stratospheric ozone layer; POCP Formation potential of tropospheric

photochemical oxidants; AP Acidification potential of land and water; EP Eutrophication potential; ADPM Abiotic depletion potential for

non fossil resources; ADPE Abiotic depletion potential for fossil resources

3,8E-05

0

6,3E-030

C1

1,2E-03

C2

4,3E-11 0

0

1,6E-080

0

3,9E-05 8,3E-040

C4

2,1E-04

A1-A3

ADPM

MJ

0

kg

Unit

CR Components for reuse; MR Materials for recycling; MER Materials for energy recovery; EEE Exported electric energy; ETE

Exported thermal energy

1,6E-08AP

EP kg PO43-

-eq.

kg Sb-eq.

kg CO2 -eq.

C4

RPEE Renewable primary energy resources used as energy carrier; RPEM Renewable primary energy resources used as raw

materials; TPE Total use of renewable primary energy resources; NRPE Non renewable primary energy resources used as energy

carrier; NRPM Non renewable primary energy resources used as materials; TRPE Total use of non renewable primary energy

resources; SM Use of secondary materials; RSF Use of renewable secondary fuels; NRSF Use of non renewable secondary fuels; W

Use of net fresh water

0,77

0

0 1,9E-07 1,8E-04 00

0 0 0 0

1,4E-03

B1-B7

POCP

0-4,0E-03 0

2,5

3,7E-08

1,2E-03

A5

1,6E-03

3,9E-05

1,7E-04

1,1E-03

RSF

0,061

A4

ADPE

kg

MJ

6,3E-03

32

4,3

RW

3,7E-03

x

C1

xx

C4

NRSF

0,25 0

kg C2H4 -eq.

kg SO2 -eq.

A1-A3

x

A5

A4

C1

A1

Use stage

B1

x

A3A2

x

D

Dis

posal

Reuse-R

ecovery

-

Recyclin

g-p

ote

ntial

xx

Refu

rbis

hm

ent

Repla

cem

ent

End of life stage

Beyond the

system

boundaries

B2

Opera

tional energ

y u

se

Repair

Main

tenance

Opera

tional w

ate

r use

x x

B7

x

W

4,4 1,7E-04

C2 C3

0

N/A

4,6E-10

1,5E-05

A5

9,1E-05

A1-A3

0

B1-B7

3,4E-05

A1-A3

0

N/A

2,3

HW

NHW

CR

kg

SM

3,1E-07

N/A

0

1,5E-05 0

00

0MR

4,3

0

0

0

0 00

0

N/AN/A N/A

C3 C4

N/A

5,1E-06

0

2,7 0,068

kg

0

7,6 0

0 0 0

4,4

1,3E-03

0

A4

33

0,49 0

m3

0,011

MJ

0

0

0

Unit

00

kg 0

ETE

Parameter Unit

RPEE MJ

RPEM

TPE

NRPE

NRPM

TRPE

MJ

MJ

MJ

MJ

MJ

1,3E-03

0

0

MJ

MJ 00

0

0EEE

0

0

1,4

01,3E-05 0 0

00

0

0

0

0 0

0

Parameter

0 0

0

0

0

0

0

MER

kg

0

0

2,90

A5

0

1,7E-04 0,59 0,77

C1

4,6E-10

HW Hazardous waste disposed; NHW Non hazardous waste disposed; RW Radioactive waste disposed

6,8E-07

C2

N/A

6,9E-03

0 0

0

0

0

6,3E-04

9,0E-03

1,8E-040

1,8E-09

0

C2

0,039

9,2E-09

3,3E-08

0,76

0

0

0 7,0E-03

0 0,031

C4

1,2E-05

6,3E-09

3,7E-08 1,2E-04

C3

9,0E-13

0

De-c

onstr

uction

dem

olit

ion

Tra

nsport

C2 C3

MNDx

B6

1,2E-05

B4 B5

1,8E-09

B1-B7

1,3E-04 1,3E-04

0

0

03,3E-05

5,0E-06 6,7E-06

4,5E-05

0

9,0E-13

All modules from rawmaterial production to end of life are included. The modules in user phase have no impacts since

nothing happens during user phase.

Manufa

ctu

ring

0,29

A4

x

B3

4,7E-08

Constr

uction insta

llation

sta

ge

Raw

mate

rials

Construction

installation

stage

Tra

nsport

Use

kg CFC11 -eq.

A5

Parameter

ODP

Product stage

Tra

nsport

C3

Waste

pro

cessin

g

1,2E-07

1,8

B1-B7

5/7 NEPD-109-177-EN, updated, Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

Page 6: Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

Additional Norwegian requirements

Electricity

g CO2 - eq./kWh

Dangerous substances

Transport

Transport to building site is inn accordance with scenario description A4

Indoor environment

* Emissions are measured for Norgips Plasterboard 13 Type A (STD), report from SP 23.01.2009

Carbon footprint

Carbon footprint has not been worked out for the product.

Bibliography

PCR

Vold, M, 2014

The following data from ecoinvent v2 for Norwegian production mix included import,Electricity, medium voltage, at grid/kWh/NO/s”.

import, production of transmission lines, in addition to direct emissions and loss in grid are included. Characterisation factors stated in

EN 15804:2012+A1:2013 are used.

km

None of the following substances have been added to the product: Substances on the REACH Candidate list (per

17.12.2014) of substances of very high concern or substances on the Norwegian Priority list (per 04.12.2014) or

substances that lead to the product being classified as hazardous waste. The chemical content of the product complies

with regulatory levels as given in the Norwegian Product Regulations.

Environmental labels and declarations - Type III environmental declarations - Principles and

procedures

Environmental management - Life cycle assessment - Requirements and guidelinesISO 14044:2006

36Greenhouse gas emissions:

EN 15804:2012 +

A1:2013

ISO 14025:2006

ISO 21930:2007

NPCR 10:2013 rev 1, PCR for Building boards, www.EPD-Norge.no

Livsløpsdata for Gipsplater fra Norgips, Bakgrunnsdata for miljødeklarasjon

(EPD),Østfoldforskning, OR 27.14, Fredrikstad

µg/m2h Measured after 3 days

µg/m2h

µg/m2h

Classification according to EN 15251:2007

Noise No information

TVOC

dB(A)

360

<2 µg/m2h

Classified as category M1

<10

Formaldehyde <10

Ammonia 22

Sustainability of construction works - Environmental product declaration - Core rules for the

product category of construction products

Sustainability in building construction - Environmental declaration of building products

Carcinogenic compounds

6/7 NEPD-109-177-EN, updated, Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

Page 7: Norgips Windliner-X/Utvendig-X type EH2 (GU-X)

Program holder and publisher Phone: +47 23 08 82 92The Norwegian EPD Foundation

Post Box 5250 Majorstuen, 0303 Oslo e-mail: [email protected]

Norway web www.epd-norge.no

Owner of the declaration Phone: +47 33 78 48 00

Norgips Norge AS Fax

Postboks 655 Strømsø e-mail:

3003 Drammen web

Author of the Life Cycle Assessment Phone: +47 414 69 800

Mie Vold Fax +47 69 34 24 94

Ostfoldforskning AS e-mail:

Stadion 4, 1671 Kråkerøy web www.ostfoldforskning.no

www.norgips.no

[email protected]

[email protected]

7/7 NEPD-109-177-EN, updated, Norgips Windliner-X/Utvendig-X type EH2 (GU-X)