no activity c63.2-2009 sc1 - oct 2011 pins inactive published 15 december 2009 (reaffirmation of...
DESCRIPTION
C63.4- highlights Remove measurement methods for intentional radiators (clause 13) Revise the measurement method for emissions above 1 GHz Revisit site validation methods above 1 GHz Expand antenna list Revise scrolling H pattern requirements for large screen TV as well as those used as computer monitors Add information on average detectors and review average measurement method using a reduced VBW SC1 - Oct 2011TRANSCRIPT
![Page 1: NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)](https://reader036.vdocuments.site/reader036/viewer/2022082600/5a4d1af27f8b9ab05997ef75/html5/thumbnails/1.jpg)
NO ACTIVITY
C63.2-2009
SC1
- Oct
201
1
• PINS inactive
• Published 15 December 2009
(Reaffirmation of 1996 edition)
![Page 2: NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)](https://reader036.vdocuments.site/reader036/viewer/2022082600/5a4d1af27f8b9ab05997ef75/html5/thumbnails/2.jpg)
C63.4-2009
SC1
- Oct
201
1
• PINS approved by C63® on 10/22/2010
• WG working on revision
• Expected draft by early 2012
HOT TOPIC
![Page 3: NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)](https://reader036.vdocuments.site/reader036/viewer/2022082600/5a4d1af27f8b9ab05997ef75/html5/thumbnails/3.jpg)
C63.4- highlights
• Remove measurement methods for intentional radiators (clause 13)
• Revise the measurement method for emissions above 1 GHz• Revisit site validation methods above 1 GHz• Expand antenna list• Revise scrolling H pattern requirements for large screen TV
• as well as those used as computer monitors• Add information on average detectors and review average
measurement method using a reduced VBW
SC1
- Oct
201
1
![Page 4: NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)](https://reader036.vdocuments.site/reader036/viewer/2022082600/5a4d1af27f8b9ab05997ef75/html5/thumbnails/4.jpg)
C63.5-2006
SC1
- Oct
201
1
• PINS on file and approved by C63® on 10/2009
• WG working on revision
• Target Date –draft by early 2012
MAJOR
CHANGES
![Page 5: NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)](https://reader036.vdocuments.site/reader036/viewer/2022082600/5a4d1af27f8b9ab05997ef75/html5/thumbnails/5.jpg)
C63.5- highlights• Expand scope to cover new items; including the time domain
gating.• Mention of ‘reference site’ needs to be clarified that it is the
SACS.• The uncertainty section on RAM section.• Allow calculable dipoles in RAM section.• Time domain gating for above 1 GHz.• GSCF = RSM.• Dipole corrections to free space (50 ohms).• Standard gain horns can use measured dimensions for AF.• define that the same test site cannot be used for calibrations
and product testing. However, at the same site, different areas can be used for either.
SC1
- Oct
201
1
![Page 6: NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)](https://reader036.vdocuments.site/reader036/viewer/2022082600/5a4d1af27f8b9ab05997ef75/html5/thumbnails/6.jpg)
C63.10-2009
SC1
- Oct
201
1
• PINS on file and approved by C63® on
04/20/09
• Work is ongoing for next draft
• Target Date – draft by December 2011
GOOD
PROGRESS
![Page 7: NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)](https://reader036.vdocuments.site/reader036/viewer/2022082600/5a4d1af27f8b9ab05997ef75/html5/thumbnails/7.jpg)
C63.10- highlights1. Maintenance items – editorial corrections to C63.10 (2009)2. 4.2.2, 4.2.3.2.3 - 4.2.3.2.5 – average measurements using
Spectrum Analyzers 3. 5.2 – clarification of test sites >1 GHz – site must conform to
CISPR 16-1-4 (2010) – 1-18 GHz4. 5.3.1 – Clarification of test distance for devices operation 18-
40 GHz5. 6.3 - 6.6 -- to reduce redundancy, clarify maximization of
emissions and introduced new alternative procedure for measurement of small transmitters operating above 1 GHz
6. 6.4 – new extrapolation factor for emissions below 30 MHz based on frequency and size of EUT
7. NEW 6.10 – Occupied Bandwidth Measurements – Relative bandwidth testing and 99% power bandwidth testing
SC1
- Oct
201
1
![Page 8: NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)](https://reader036.vdocuments.site/reader036/viewer/2022082600/5a4d1af27f8b9ab05997ef75/html5/thumbnails/8.jpg)
C63.10- highlights8. New 6.11 – Bandedge Measurements – a number of
new procedures depending on regulatory requirement – See Annex L for bandedge requirements
• Authorized bandedge procedure• Relative bandedge procedure• Restricted bandedge testing• Marker-Delta method
9. New 7.11 – DTS device testing10. New 7.12 – UNII device testing10. New 7.13 – Antenna array testing11. New 7.14 – Procedures for combining emissions from
multiple outputs
SC1
- Oct
201
1
![Page 9: NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)](https://reader036.vdocuments.site/reader036/viewer/2022082600/5a4d1af27f8b9ab05997ef75/html5/thumbnails/9.jpg)
C63.10- highlights12. New 7.15 – FM transmitter in-vehicle testing (4 configurations)
• Wireless transmission between the FM source and the vehicle antenna.• Injection into a vehicle’s wiring system via the cigarette lighter adapter (CLA) socket.• Capacitive coupling to a vehicle FM whip antenna, roof top antenna, or embedded glass antenna.• Direct connection to a vehicle FM radio antenna input.
13. New 7.16 – Inductive Loop Devices – procedures for testing inductive loop devices operating on frequencies below 100 kHz.
14. 8.0 – Revised test report requirements – deleted reference to 17025 and regulatory reporting requirements – retained only those items needed for documenting compliance test results.
15. New Annex G – guidelines for measurements above 1 GHz16. New Annex H – guidelines for measurements of broadband
emissions17. New Annex I – ERP/EIRP guidelines18. New Annex J – Rationale for alternative emission measurements19. New Annex K – Site considerations for inductive loop devices20. New Annex L – Bandedge requirements for unlicensed transmitters
SC1
- Oct
201
1
![Page 10: NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)](https://reader036.vdocuments.site/reader036/viewer/2022082600/5a4d1af27f8b9ab05997ef75/html5/thumbnails/10.jpg)
C63.22-2004
SC1
- Oct
201
1
• PINS inactive
• Published 2004
• need ballot process for re-affirmation
NO ACTIVITY
![Page 11: NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)](https://reader036.vdocuments.site/reader036/viewer/2022082600/5a4d1af27f8b9ab05997ef75/html5/thumbnails/11.jpg)
C63.23- draft
SC1
- Oct
201
1
• PINS on file and approved by C63® on
04/26/05
• WG finalized draft
• Target Date – draft out of SC1 by November
2011 GOOD
PROGRESS
![Page 12: NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)](https://reader036.vdocuments.site/reader036/viewer/2022082600/5a4d1af27f8b9ab05997ef75/html5/thumbnails/12.jpg)
C63.25- draft
SC1
- Oct
201
1
• PINS on file approved by C63® on 10/09/07
• WG preparing a draft
• Additional measurements on TDR done
• Target Date – draft to SC1 by January 2012
RE-STARTED
![Page 13: NO ACTIVITY C63.2-2009 SC1 - Oct 2011 PINS inactive Published 15 December 2009 (Reaffirmation of 1996 edition)](https://reader036.vdocuments.site/reader036/viewer/2022082600/5a4d1af27f8b9ab05997ef75/html5/thumbnails/13.jpg)
C63.26- draft
SC1
- Oct
201
1
• PINS on file and approved by C63® on
05/27/09
• Work is just beginning for this standard
• Target Date – draft to SC1 by early 2013
MAKING
HEADWAY