Item No. 5-353.00 | February 2019
Project Status Update
Widen English Station Road from West Aiken Road to Avoca Road
Jefferson County
PHASE 1A and PHASE 1BPHASE 1A and PHASE 1B LEGEND PHASE 1A Construction PHASE 1B Construction
MAINTENANCE OF TRAFFIC PLANPHASE 1 - Temporary Pavement and North English Station Road Construction
PHASE 1A PHASE 1B
No change in the normal traffi c patterns required. • All utility and offl ine drainage along the west of North English
Station Road.• Shared entrance on west side of North English Station Road.• Temporary pavement on west side of North English Station
Road, just south of Old Henry Road.• Temporary pavement on the north side of Old Henry Road.
No change in the normal traffi c patterns required.• Temporary pavement on the east side of North English
Station Road from West Aiken Road to East Aiken Road. • Proposed North English Station Road from East Aiken Road
to Avoca Road.• The east portion of the proposed Chenoweth Run Culvert.
PHASE 2 – North English Station Road and Old Henry Road Construction
No change in the normal traffi c patterns other than traffi c between West Aiken Road and East Aiken Road will be restricted to one lane traffi c in the SB direction only. • The west portion of proposed North English Station Road from West Aiken Road to just north of East Aiken Road.• The west portion of proposed North English Station Road from just south of Chenoweth Run to Old Henry Road.• The west portion of the proposed Chenoweth Run Culvert• The south portion of Old Henry Road.
PHASE 3 – North English Station Road, East Aiken Road, and Old Henry Road Construction
PHASE 3A PHASE 3B
Normal traffi c patterns will resume, except traffi c along East Aiken Road will be detoured to the Bush Farm Road and East Aiken Road intersection. • Proposed East Aiken Road• The west portion of North English Station Road north of Old
Henry Road.• The north portion of Old Henry Road.
Normal traffi c patterns will resume for all locations. • The east portion of North English Station Road from West
Aiken Road to East Aiken Road.• Remaining curb and gutter and Shared Use Path on the east
side of North English Station Road.
PHASE 2PHASE 2 LEGEND PHASE 2 Construction Temporary Completed
PHASE 3A and 3BPHASE 3A and 3B LEGEND PHASE 3A Construction PHASE 3B Construction Completed
AVOC
A RO
AD
AVOC
A RO
AD
OLD
HEN
RY
OLD
HEN
RY
RO
AD
RO
AD
EAST
AIK
ENEA
ST A
IKEN
RO
AD
RO
AD
WEST A
IKEN
WEST A
IKEN
RO
AD
RO
AD
NORTH ENGLISH STATION ROADNORTH ENGLISH STATION ROAD
AVOC
A RO
AD
AVOC
A RO
AD
OLD
HEN
RY
OLD
HEN
RY
RO
AD
RO
AD
EAST
AIK
ENEA
ST A
IKEN
RO
AD
RO
AD
WEST A
IKEN
WEST A
IKEN
RO
AD
RO
AD
NORTH ENGLISH STATION ROADNORTH ENGLISH STATION ROAD
AVOC
A RO
AD
AVOC
A RO
AD
OLD
HEN
RY
OLD
HEN
RY
RO
AD
RO
AD
EAST
AIK
ENEA
ST A
IKEN
RO
AD
RO
AD
WEST A
IKEN
WEST A
IKEN
RO
AD
RO
AD
NORTH ENGLISH STATION ROADNORTH ENGLISH STATION ROAD
INTRODUCTIONThe information contained in this handout describes the current design, impacts and status for a project to improve English Station Road between West Aiken Road and Avoca Road. This informational handout depicts the design changes implemented since the project was last presented to the public in 2001. The original project proposed widening the existing 2-lane roadway to 5-lanes to increase capacity, mobility and safety. The increased roadway width along this highly developed corridor generated excessive right-of-way and utility impacts, including the potential relocation of a 60” water main running parallel to the existing roadway. The costs and impacts associated with the proposed widening were not feasible. Design changes have been implemented to reduce the overall impacts, including coordination efforts with the Louisville Water Company to avoid relocation of the 60” water main. Two signifi cant design changes have enabled the project to move forward: 1) reduction in the proposed roadway width from the original 5-lane to a 3-lane roadway facility and 2) an alignment shift between East Aiken Road and Chenoweth Run to minimize impacts to the 60” water line. These changes and others are identifi ed in EXHIBIT 1 at the bottom of the page.
PURPOSE AND NEEDThe proposed project is to improve traffi c operations and safety by providing a wider roadway confi guration to increase capacity and improve the roadway’s level of service. Reconstruction of English Station Road will create safer turning movements and eliminate sight distance defi ciencies.
PROJECT OVERVIEWEnglish Station Road between West Aiken Road and Avoca Road varies in width from 21 to 24 feet with minimal shoulders and a posted speed limit of 35 MPH. The proposed project will provide an improved link between the existing 3-lane segments immediately north and south of the project. The project includes the installation of new traffi c signals at the East Aiken Road and Old Henry Road intersections and incorporates shared-use facilities for pedestrian and bicycle use. The proposed roadway section is depicted in EXHIBIT 2 at the top of the next page. After construction is completed, the roadway will be incorporated into the state highway system as KY 3084. KY 3084 will begin at the intersection with US 60 (Shelbyville Road), continuing along North English Station Road and Old Henry Road to the Oldham County Line. There is a future project to continue the route, KY 3084, with its eventual termination at KY 362 in Oldham County.
PROJECT SCHEDULEThe project is currently in the Final Design phase with Right-of-Way Plans being fi nalized. Based on schedule and available funding, Right-of Way acquisition and Utility relocations may begin as early as Spring 2019 at which time the property owners will be contacted by the Kentucky Transportation Cabinet (KYTC) to begin negotiation.Current Transportation Budget for Item No. 5-353.00
Contact Person:Keith Downs, Project Manager
Kentucky Transportation Cabinet District 5 Offi ce Telephone: (502)-210-54008310 Westport Road Fax: (502)-210-5494P.O. Box 22129 E-mail: [email protected], KY 40242-3042
Authorized Authorized Authorized Estimated
Phase FY 2013 FY 2014 FY 2017 FY 2020 Total
Right-of-Way $1,000,000 $1,200,000 $2,200,000
Utility $1,365,000 $450,000 $1,815,000
Construction $6,400,000 $6,400,000
11’Drive Lane
13’Two Way Left Turn Lane
11’Drive Lane
2’ 2’2’ 5’ 5’ 5’10’3’
English Station RoadNormal Section with Shared Use Path
Standard Curb & GutterStandard Curb
& Gutter
-Use PathSidewalk Grade Point
EXHIBIT 2
#Y
#Y
#Y
#Y
#Y
Floyds Fork
Floyd
s Fork
AIKEN
RD
ARNO
LD P
ALME
R BL
VD
AS LN
ST CLAIR DR
OLD HENRY RD
NGE R
D
JOHN
SON
RD
URTON LN
AVOCA RD
N BE
CKLE
Y ST
ATIO
N RD
ROC
KCRESTW
AY
TROON DR
PIERCY MILL RD
N ENGLISH STATION RD
GREEN CRE S TLN
ROCKCREST VIEWLN
BROO
KFIELD
HILL
S
CT
S
ENGL
ISH
STAT
IONR
DOLD
HENRY TRL
STANLEYGAULT
PKY
APPLE HILL RD
BOONE TRL
HEAFER RD
EQUITY PL
EAST POINTCENTREDR
NBECKLEY
STATIONRD
ELITE DR
N BE
CKLE
Y ST
ATIO
N RD
ENGLISH S
FOREST OAKS DR
OAKHU R S T RD
SKYWATCHLN
RIDG E BROOK CIR
RIDG
E BR
OOK
PL
CRESS
I N G T ON C IR
R IDGE BROOK CIR
FO X B ENDCT
HA WL
BUSH FARM RD
EN DR
BECKLE YCROSSING DR
WOODED
FAL LSRD
I SLEWORTH DR
TRAD
ITIO
NDR
LANDMARK DR
VALE RD
LANA
I CT
BERRYTOWN RD
GLENLAKE W AY
MAGISTERIAL DR
LAK
E BL UFF CIR
MARCUS AVE
CHAMPION LAKE
S PL
BECK
LEY WOODS DR
TOWNEPARK WAY
JOHNSON FARM RD
OLD STATION RD
ABINGTON RIDGE PL
LAKE FORES
T DR
AY
DATA VAULT DR
CLUB VISTA PL
LILLYLN
MACKI NAW
DR
EASTBRIDGE CT
BARC
ELON
A DR
WO
ODLAND RIDGE DR
MIDDLETOWN INDUSTRIAL BLVD
FAIRWAY VIST ADR
COLLINS LN
FORE
STPO
INTE
LN
AIKEN RD
WELKER WAY
WOODLAKE
DR
LAKEFO
REST
PK
WY
RD
FENWICK CENTER DR
GARD
ENHI
LLPL
MEADOW FARMS CT
CHES
TNUT
RIDG
ECI
R
LONG
CR
EEK WAY
HILLSLANE
LAKE FORESTLN
EASTGATE VILLAGE
DR
EAST COVE
RD
ANCHOR WAY
OAK BRANC HRD
D EERCROSS
ENGLISH VILLA DR
WILLIAM
SON
CT
PL
E
FOREST
CENTRE CT
COMMERCIAL
DR
WOODED FOR E S TRD
FACTORYLANE
SUNN YGATE
PL
FLAT ROCK RD
TIMBERLAKETRL
L AKEFO
REST
P KW
Y
WILL
OWGROV E CIR
BECKLEY
VILL
A G E L AKEDR
G OL DEN LEAF WAY
HIAWATHA AVE
C LAYM O RECI
R
TRCE
RING
DR
AIKEN RD
N ENGLISH STATION RD
VENDETTA
WAY
SAMPLE W AY
SPRINGS S TA TI ON RD
ROCK BAY CT
VILL
AGE
GRE
BLVDCE
DARFO REST SPRINGS DR
N WINCHESTER ACRES RD
OLD
LAGR
FAC TORY LANE
SERV
ICE
PLACE
OLD
LAGR
ANG
ERO
AD
RD
LA G
RANGE R
D
LAGR
ANG
ERD
OBA
NNON
ST
ATION WAY
ROCKBAY
DR
BROKEN
BRANCH WAY
RING
M I LL R O A D
CYPRESS SPRINGSPL
BROK
ENBR
PL
TERR
AC
E CRE EK DR
TE
R R ACE HILLDR
ESTCRE ST
WAY
FOREST TRACECT
EASTPOINTPARKW
AY
MEADOWFIELD DRIVE
FAIRFIELD GARDENS CO
WO ODMONT PARKLANE REAMERS RD
WOODMO N
TPARK
LANE
OLD
HENRY ROADOAKVISTA
WAY
WHITESTONE LN
WOODGROVE PL
HE DGEW
ICK
PL
HED GE WICK
WAY
C R YST
ALSP
RINGS WAY
HI G H L AND
SPRI
NGS
PL
BROOKFIELD VIEWD R
MO NT E VISTA DR
GABL
EWOOD
CIR
FI ELD
DR
ACADEM
Y RIDG E BLVD
VICTORY RIDGE DR
OLD
HENR
Y RD
SASSE WAY
SASSEW
AY
N LN
LAND
MAR
KDR
IVE
AIKEN RD
DAVEN
TRI COUNTY CT
NELSONMILLER
PKY
EAST
POIN
T
PARKWAY
CHA MBERLAINCROSSING
D R
MEAD OW
F ARM
SPL
FORB
ES
CIR
PIERCY MILL
TR
CE
PIERCY MILL RD
W O O DLAKE TRACE
L
SHELBY
STA TION DR
FORE
ST P
LACE
CT TRES
LYN
WAY
VALH
ALLA
VIEW
DR
EIGH CT
GREY
LEDGE CIR
WOODLAND H E IG
HTS
DR
BROA
DOA
K PL
HICKO RY RIDGE RD
GLE N
SFO
RDDR
TRUMAN P A RK DR
WIN
DINGC
REE
KPL
CL EARM EAD OW CT
TO WNE CREEK RD
LEDGES DR
WINTE
RBRA
NCH
WAY
TERRA
CR O SS ING
BLVD
ARNOL D PALMER
BLVD
HIGH WICKHAM PL
TERRA VIEW TRL
FAIRFIELD M
ENG LIS H STATI O NW
AY
T IM
MONS
CT
OLD HENRY TRL
ASHLAND CT
SHELBY COUNTY
JEFFERSON COUNTY
Avoca
Beckley
Berrytown
O'Bannon
ST3084
ST6332
!"#265
0160
0160
0160
01600160
ST
ST3084
ST3084
ST1531
ST153
ST1531
ST3084
!"#265
ST362ST146
ST146
!"#265
!"#265
Cow Lake
TOWN
Middletown
30ST84
CUNTY
JEF
OUNTY
Site Map
265INTERSTATE
3084
3084
3084
3084
362OLDHAM COUNTY
JEFFERSON COUNTY
ITEM NO. 5-353.00Widen English Station Road
Project Length 0.8 mile
IIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIII
IIIIIIIIIIIIIIIIIII
III
LEGENDSHARED - USE PATH will be on east side of English Station Road, while the SIDEWALK will be on the west side of roadway.
WARNING SIGNALS will be updated at RJ Corman railroad crossing.
SUMMARY OF PROJECT CHANGES
Design Elements Previous Project Current Project
Design Speed 45 MPH 35 MPH
Number of Lanes
Initial 3-lane build along existing alignment with 5-lane ultimate R/W.
3 lanes (2-11 ft. driving lanes and 13 ft. two way left turn lane).
Roadway Surface Asphalt Concrete
Mulitmodal Accommodations
Purchase for potential future capacity.
5’ Sidewalk on west, 10’ Shared Use Path on east.
AlignmentFollowed existing centerline entire length.
Alignment shift to the east from East Aiken Rd for approximately 1000’ then back to existing.
Signals NoneTwo new signals (at E Aiken Rd. and Old Henry Rd).
Right-of-WaySubstantial acquisition, S&S Tool was impacted.
Reduced impacts with a 3-lane roadway and 35 MPH design.
UtilitiesSubstantial relocations (expensive and time consuming).
Minimized relocations, especially the 60” water main under the roadway.
Railroad CrossingProject terminated just south of railroad crossing.
Warning devices are not consistent with current standards and will be replaced.
Proposed Roadway Section