Item No. 5-353.00 | February 2019 Project Status Update Widen English Station Road from West Aiken Road to Avoca Road Jefferson County PHASE 1A and PHASE 1B PHASE 1A and PHASE 1B LEGEND PHASE 1A Construction PHASE 1B Construction MAINTENANCE OF TRAFFIC PLAN PHASE 1 - Temporary Pavement and North English Station Road Construction PHASE 1A PHASE 1B No change in the normal trafc patterns required. All utility and ofine drainage along the west of North English Station Road. Shared entrance on west side of North English Station Road. Temporary pavement on west side of North English Station Road, just south of Old Henry Road. Temporary pavement on the north side of Old Henry Road. No change in the normal trafc patterns required. Temporary pavement on the east side of North English Station Road from West Aiken Road to East Aiken Road. Proposed North English Station Road from East Aiken Road to Avoca Road. The east portion of the proposed Chenoweth Run Culvert. PHASE 2 – North English Station Road and Old Henry Road Construction No change in the normal trafc patterns other than trafc between West Aiken Road and East Aiken Road will be restricted to one lane trafc in the SB direction only. The west portion of proposed North English Station Road from West Aiken Road to just north of East Aiken Road. The west portion of proposed North English Station Road from just south of Chenoweth Run to Old Henry Road. The west portion of the proposed Chenoweth Run Culvert The south portion of Old Henry Road. PHASE 3 – North English Station Road, East Aiken Road, and Old Henry Road Construction PHASE 3A PHASE 3B Normal trafc patterns will resume, except trafc along East Aiken Road will be detoured to the Bush Farm Road and East Aiken Road intersection. Proposed East Aiken Road The west portion of North English Station Road north of Old Henry Road. The north portion of Old Henry Road. Normal trafc patterns will resume for all locations. The east portion of North English Station Road from West Aiken Road to East Aiken Road. Remaining curb and gutter and Shared Use Path on the east side of North English Station Road. PHASE 2 PHASE 2 LEGEND PHASE 2 Construction Temporary Completed PHASE 3A and 3B PHASE 3A and 3B LEGEND PHASE 3A Construction PHASE 3B Construction Completed AVOCA ROAD AVOCA ROAD OLD HENRY OLD HENRY ROAD ROAD EAST AIKEN EAST AIKEN ROAD ROAD WEST AIKEN WEST AIKEN ROAD ROAD NORTH ENGLISH STATION ROAD NORTH ENGLISH STATION ROAD AVOCA ROAD AVOCA ROAD OLD HENRY OLD HENRY ROAD ROAD EAST AIKEN EAST AIKEN ROAD ROAD WEST AIKEN WEST AIKEN ROAD ROAD NORTH ENGLISH STATION ROAD NORTH ENGLISH STATION ROAD AVOCA ROAD AVOCA ROAD OLD HENRY OLD HENRY ROAD ROAD EAST AIKEN EAST AIKEN ROAD ROAD WEST AIKEN WEST AIKEN ROAD ROAD NORTH ENGLISH STATION ROAD NORTH ENGLISH STATION ROAD

Upload: others

Post on 01-Aug-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NNORTH ENGLISH STATION ROADORTH ENGLISH STATION …transportation.ky.gov/DistrictFive/Supporting Documents/5-353.00 Project status...PROJECT OVERVIEW English Station Road between West

Item No. 5-353.00 | February 2019

Project Status Update

Widen English Station Road from West Aiken Road to Avoca Road

Jefferson County

PHASE 1A and PHASE 1BPHASE 1A and PHASE 1B LEGEND PHASE 1A Construction PHASE 1B Construction

MAINTENANCE OF TRAFFIC PLANPHASE 1 - Temporary Pavement and North English Station Road Construction

PHASE 1A PHASE 1B

No change in the normal traffi c patterns required. • All utility and offl ine drainage along the west of North English

Station Road.• Shared entrance on west side of North English Station Road.• Temporary pavement on west side of North English Station

Road, just south of Old Henry Road.• Temporary pavement on the north side of Old Henry Road.

No change in the normal traffi c patterns required.• Temporary pavement on the east side of North English

Station Road from West Aiken Road to East Aiken Road. • Proposed North English Station Road from East Aiken Road

to Avoca Road.• The east portion of the proposed Chenoweth Run Culvert.

PHASE 2 – North English Station Road and Old Henry Road Construction

No change in the normal traffi c patterns other than traffi c between West Aiken Road and East Aiken Road will be restricted to one lane traffi c in the SB direction only. • The west portion of proposed North English Station Road from West Aiken Road to just north of East Aiken Road.• The west portion of proposed North English Station Road from just south of Chenoweth Run to Old Henry Road.• The west portion of the proposed Chenoweth Run Culvert• The south portion of Old Henry Road.

PHASE 3 – North English Station Road, East Aiken Road, and Old Henry Road Construction

PHASE 3A PHASE 3B

Normal traffi c patterns will resume, except traffi c along East Aiken Road will be detoured to the Bush Farm Road and East Aiken Road intersection. • Proposed East Aiken Road• The west portion of North English Station Road north of Old

Henry Road.• The north portion of Old Henry Road.

Normal traffi c patterns will resume for all locations. • The east portion of North English Station Road from West

Aiken Road to East Aiken Road.• Remaining curb and gutter and Shared Use Path on the east

side of North English Station Road.

PHASE 2PHASE 2 LEGEND PHASE 2 Construction Temporary Completed

PHASE 3A and 3BPHASE 3A and 3B LEGEND PHASE 3A Construction PHASE 3B Construction Completed

AVOC

A RO

AD

AVOC

A RO

AD

OLD

HEN

RY

OLD

HEN

RY

RO

AD

RO

AD

EAST

AIK

ENEA

ST A

IKEN

RO

AD

RO

AD

WEST A

IKEN

WEST A

IKEN

RO

AD

RO

AD

NORTH ENGLISH STATION ROADNORTH ENGLISH STATION ROAD

AVOC

A RO

AD

AVOC

A RO

AD

OLD

HEN

RY

OLD

HEN

RY

RO

AD

RO

AD

EAST

AIK

ENEA

ST A

IKEN

RO

AD

RO

AD

WEST A

IKEN

WEST A

IKEN

RO

AD

RO

AD

NORTH ENGLISH STATION ROADNORTH ENGLISH STATION ROAD

AVOC

A RO

AD

AVOC

A RO

AD

OLD

HEN

RY

OLD

HEN

RY

RO

AD

RO

AD

EAST

AIK

ENEA

ST A

IKEN

RO

AD

RO

AD

WEST A

IKEN

WEST A

IKEN

RO

AD

RO

AD

NORTH ENGLISH STATION ROADNORTH ENGLISH STATION ROAD

Page 2: NNORTH ENGLISH STATION ROADORTH ENGLISH STATION …transportation.ky.gov/DistrictFive/Supporting Documents/5-353.00 Project status...PROJECT OVERVIEW English Station Road between West

INTRODUCTIONThe information contained in this handout describes the current design, impacts and status for a project to improve English Station Road between West Aiken Road and Avoca Road. This informational handout depicts the design changes implemented since the project was last presented to the public in 2001. The original project proposed widening the existing 2-lane roadway to 5-lanes to increase capacity, mobility and safety. The increased roadway width along this highly developed corridor generated excessive right-of-way and utility impacts, including the potential relocation of a 60” water main running parallel to the existing roadway. The costs and impacts associated with the proposed widening were not feasible. Design changes have been implemented to reduce the overall impacts, including coordination efforts with the Louisville Water Company to avoid relocation of the 60” water main. Two signifi cant design changes have enabled the project to move forward: 1) reduction in the proposed roadway width from the original 5-lane to a 3-lane roadway facility and 2) an alignment shift between East Aiken Road and Chenoweth Run to minimize impacts to the 60” water line. These changes and others are identifi ed in EXHIBIT 1 at the bottom of the page.

PURPOSE AND NEEDThe proposed project is to improve traffi c operations and safety by providing a wider roadway confi guration to increase capacity and improve the roadway’s level of service. Reconstruction of English Station Road will create safer turning movements and eliminate sight distance defi ciencies.

PROJECT OVERVIEWEnglish Station Road between West Aiken Road and Avoca Road varies in width from 21 to 24 feet with minimal shoulders and a posted speed limit of 35 MPH. The proposed project will provide an improved link between the existing 3-lane segments immediately north and south of the project. The project includes the installation of new traffi c signals at the East Aiken Road and Old Henry Road intersections and incorporates shared-use facilities for pedestrian and bicycle use. The proposed roadway section is depicted in EXHIBIT 2 at the top of the next page. After construction is completed, the roadway will be incorporated into the state highway system as KY 3084. KY 3084 will begin at the intersection with US 60 (Shelbyville Road), continuing along North English Station Road and Old Henry Road to the Oldham County Line. There is a future project to continue the route, KY 3084, with its eventual termination at KY 362 in Oldham County.

PROJECT SCHEDULEThe project is currently in the Final Design phase with Right-of-Way Plans being fi nalized. Based on schedule and available funding, Right-of Way acquisition and Utility relocations may begin as early as Spring 2019 at which time the property owners will be contacted by the Kentucky Transportation Cabinet (KYTC) to begin negotiation.Current Transportation Budget for Item No. 5-353.00

Contact Person:Keith Downs, Project Manager

Kentucky Transportation Cabinet District 5 Offi ce Telephone: (502)-210-54008310 Westport Road Fax: (502)-210-5494P.O. Box 22129 E-mail: [email protected], KY 40242-3042

Authorized Authorized Authorized Estimated

Phase FY 2013 FY 2014 FY 2017 FY 2020 Total

Right-of-Way $1,000,000 $1,200,000 $2,200,000

Utility $1,365,000 $450,000 $1,815,000

Construction $6,400,000 $6,400,000

11’Drive Lane

13’Two Way Left Turn Lane

11’Drive Lane

2’ 2’2’ 5’ 5’ 5’10’3’

English Station RoadNormal Section with Shared Use Path

Standard Curb & GutterStandard Curb

& Gutter

-Use PathSidewalk Grade Point

EXHIBIT 2

#Y

#Y

#Y

#Y

#Y

Floyds Fork

Floyd

s Fork

AIKEN

RD

ARNO

LD P

ALME

R BL

VD

AS LN

ST CLAIR DR

OLD HENRY RD

NGE R

D

JOHN

SON

RD

URTON LN

AVOCA RD

N BE

CKLE

Y ST

ATIO

N RD

ROC

KCRESTW

AY

TROON DR

PIERCY MILL RD

N ENGLISH STATION RD

GREEN CRE S TLN

ROCKCREST VIEWLN

BROO

KFIELD

HILL

S

CT

S

ENGL

ISH

STAT

IONR

DOLD

HENRY TRL

STANLEYGAULT

PKY

APPLE HILL RD

BOONE TRL

HEAFER RD

EQUITY PL

EAST POINTCENTREDR

NBECKLEY

STATIONRD

ELITE DR

N BE

CKLE

Y ST

ATIO

N RD

ENGLISH S

FOREST OAKS DR

OAKHU R S T RD

SKYWATCHLN

RIDG E BROOK CIR

RIDG

E BR

OOK

PL

CRESS

I N G T ON C IR

R IDGE BROOK CIR

FO X B ENDCT

HA WL

BUSH FARM RD

EN DR

BECKLE YCROSSING DR

WOODED

FAL LSRD

I SLEWORTH DR

TRAD

ITIO

NDR

LANDMARK DR

VALE RD

LANA

I CT

BERRYTOWN RD

GLENLAKE W AY

MAGISTERIAL DR

LAK

E BL UFF CIR

MARCUS AVE

CHAMPION LAKE

S PL

BECK

LEY WOODS DR

TOWNEPARK WAY

JOHNSON FARM RD

OLD STATION RD

ABINGTON RIDGE PL

LAKE FORES

T DR

AY

DATA VAULT DR

CLUB VISTA PL

LILLYLN

MACKI NAW

DR

EASTBRIDGE CT

BARC

ELON

A DR

WO

ODLAND RIDGE DR

MIDDLETOWN INDUSTRIAL BLVD

FAIRWAY VIST ADR

COLLINS LN

FORE

STPO

INTE

LN

AIKEN RD

WELKER WAY

WOODLAKE

DR

LAKEFO

REST

PK

WY

RD

FENWICK CENTER DR

GARD

ENHI

LLPL

MEADOW FARMS CT

CHES

TNUT

RIDG

ECI

R

LONG

CR

EEK WAY

HILLSLANE

LAKE FORESTLN

EASTGATE VILLAGE

DR

EAST COVE

RD

ANCHOR WAY

OAK BRANC HRD

D EERCROSS

ENGLISH VILLA DR

WILLIAM

SON

CT

PL

E

FOREST

CENTRE CT

COMMERCIAL

DR

WOODED FOR E S TRD

FACTORYLANE

SUNN YGATE

PL

FLAT ROCK RD

TIMBERLAKETRL

L AKEFO

REST

P KW

Y

WILL

OWGROV E CIR

BECKLEY

VILL

A G E L AKEDR

G OL DEN LEAF WAY

HIAWATHA AVE

C LAYM O RECI

R

TRCE

RING

DR

AIKEN RD

N ENGLISH STATION RD

VENDETTA

WAY

SAMPLE W AY

SPRINGS S TA TI ON RD

ROCK BAY CT

VILL

AGE

GRE

BLVDCE

DARFO REST SPRINGS DR

N WINCHESTER ACRES RD

OLD

LAGR

FAC TORY LANE

SERV

ICE

PLACE

OLD

LAGR

ANG

ERO

AD

RD

LA G

RANGE R

D

LAGR

ANG

ERD

OBA

NNON

ST

ATION WAY

ROCKBAY

DR

BROKEN

BRANCH WAY

RING

M I LL R O A D

CYPRESS SPRINGSPL

BROK

ENBR

PL

TERR

AC

E CRE EK DR

TE

R R ACE HILLDR

ESTCRE ST

WAY

FOREST TRACECT

EASTPOINTPARKW

AY

MEADOWFIELD DRIVE

FAIRFIELD GARDENS CO

WO ODMONT PARKLANE REAMERS RD

WOODMO N

TPARK

LANE

OLD

HENRY ROADOAKVISTA

WAY

WHITESTONE LN

WOODGROVE PL

HE DGEW

ICK

PL

HED GE WICK

WAY

C R YST

ALSP

RINGS WAY

HI G H L AND

SPRI

NGS

PL

BROOKFIELD VIEWD R

MO NT E VISTA DR

GABL

EWOOD

CIR

FI ELD

DR

ACADEM

Y RIDG E BLVD

VICTORY RIDGE DR

OLD

HENR

Y RD

SASSE WAY

SASSEW

AY

N LN

LAND

MAR

KDR

IVE

AIKEN RD

DAVEN

TRI COUNTY CT

NELSONMILLER

PKY

EAST

POIN

T

PARKWAY

CHA MBERLAINCROSSING

D R

MEAD OW

F ARM

SPL

FORB

ES

CIR

PIERCY MILL

TR

CE

PIERCY MILL RD

W O O DLAKE TRACE

L

SHELBY

STA TION DR

FORE

ST P

LACE

CT TRES

LYN

WAY

VALH

ALLA

VIEW

DR

EIGH CT

GREY

LEDGE CIR

WOODLAND H E IG

HTS

DR

BROA

DOA

K PL

HICKO RY RIDGE RD

GLE N

SFO

RDDR

TRUMAN P A RK DR

WIN

DINGC

REE

KPL

CL EARM EAD OW CT

TO WNE CREEK RD

LEDGES DR

WINTE

RBRA

NCH

WAY

TERRA

CR O SS ING

BLVD

ARNOL D PALMER

BLVD

HIGH WICKHAM PL

TERRA VIEW TRL

FAIRFIELD M

ENG LIS H STATI O NW

AY

T IM

MONS

CT

OLD HENRY TRL

ASHLAND CT

SHELBY COUNTY

JEFFERSON COUNTY

Avoca

Beckley

Berrytown

O'Bannon

ST3084

ST6332

!"#265

0160

0160

0160

01600160

ST

ST3084

ST3084

ST1531

ST153

ST1531

ST3084

!"#265

ST362ST146

ST146

!"#265

!"#265

Cow Lake

TOWN

Middletown

30ST84

CUNTY

JEF

OUNTY

Site Map

265INTERSTATE

3084

3084

3084

3084

362OLDHAM COUNTY

JEFFERSON COUNTY

ITEM NO. 5-353.00Widen English Station Road

Project Length 0.8 mile

IIIIIIIIIIIIIIIIIIIIIIII

IIIIIIIIII

IIIIIIIIIIIIIIIIIII

III

LEGENDSHARED - USE PATH will be on east side of English Station Road, while the SIDEWALK will be on the west side of roadway.

WARNING SIGNALS will be updated at RJ Corman railroad crossing.

SUMMARY OF PROJECT CHANGES

Design Elements Previous Project Current Project

Design Speed 45 MPH 35 MPH

Number of Lanes

Initial 3-lane build along existing alignment with 5-lane ultimate R/W.

3 lanes (2-11 ft. driving lanes and 13 ft. two way left turn lane).

Roadway Surface Asphalt Concrete

Mulitmodal Accommodations

Purchase for potential future capacity.

5’ Sidewalk on west, 10’ Shared Use Path on east.

AlignmentFollowed existing centerline entire length.

Alignment shift to the east from East Aiken Rd for approximately 1000’ then back to existing.

Signals NoneTwo new signals (at E Aiken Rd. and Old Henry Rd).

Right-of-WaySubstantial acquisition, S&S Tool was impacted.

Reduced impacts with a 3-lane roadway and 35 MPH design.

UtilitiesSubstantial relocations (expensive and time consuming).

Minimized relocations, especially the 60” water main under the roadway.

Railroad CrossingProject terminated just south of railroad crossing.

Warning devices are not consistent with current standards and will be replaced.

Proposed Roadway Section