OFFICE OF THE EXECUTIVE ENGINEERCONTROL & INSTRU. DIVISION.,III
2X210MW, PARICHHA THERMAL POWER PROJECTPARICHHA (JHANSI)- 284305
No.\ '3 ~ ..IC&ID-III/PTPPIc..,,--
i~'~
\~ J.NL ,
Date- Aug.. S17- " . . . 2008
ToMis. Forbes Marshall Ltd.
llnd floor Anupama ArcadeOpp. Smanchar Apartment,Mayur Vihar, Phase-I Extn.Delhi-ll0091.
Kind Attn. :- Mr. Nitin Kaushal- Product Manager.
Sub :-CODEL Insitu Sox, Nox & Insitu Co Analyser, SWAS system installed in unit 3&4,2x210MW.
Dear Sir,With reference to above we wish to state your FM CODEL make insitu type
Sox, Nox, Analyser & insitu type Co Analyser of CEMS system as well as FM make SWAS
'Psystem installed in unit 3&4 2x210MW, for past Two Years are working satisfactory till
now however we request you to kindly depute your Engineer for training of our Engineers
once again and for checking of calibration of Ph, conductivity, Silica, Hydrazine &
Dissolved oxygen Analyser etc. of the. above SWAS system. Above mentioned work will be
no charges basis.
Thanking you,
EXECUTIVE ENGINEER------
No... / C&IMD-III/PTPPI Date 2008Copy forwarded to the following for information and necessary action:-
1. SuperintendingEngineer, O&M-Vll, PTPP, Parichha.
(
EXECUTIVE ENGINEER
47
~
To
M/s. Forbes Marshall Date : 26/3/2005
NAGPUR
Kind Attention : Mr. Anant Hingwe ji, Product Manager - CSD.
Dear Sir,
This has reference to one no. Codel make Opacity Monitoring System
that has been supplied and commissioned by you for Stack connected
to one no. 63TPH BFG fired cum FBC Boiler. The Boiler is located
in our Power Plant Unit No.1.
We are extremely pleased to inform you that the Performance of the
Instrument is excellent and till date i.e. around one year from date of
commissioning, we haven’t experienced even a single problem.
Thanking you,
Yours truly,
For Jindal Steel and Power Limited
( B. Srinivas )
Sr.D.G.M.(Instrumentation – P.P.)
Post Box No. 16, Kharsia Road, Raigarh – 496 001 (C.G.) Phone: (07762) 227001, 227002, 227003, 227004, 227005
Fax: (07762) 227021, 227022
Gram: PIG IRON, E-mail: [email protected]
From: Kulkarni Sharad
Sent: Tuesday, July 08, 2008 8:46 PM
To: Moholkar Satish
Cc: Bhandarkar Sameer; Pathak Niraj; Sowani Jayant
Subject: FW: Performance Communication GCEM 4000 analyser
FYI & hope this helps as performance certificate.Sharad
From: [email protected] [mailto:[email protected]]
Sent: Tuesday, July 08, 2008 2:36 PM
To: Kulkarni Sharad
Subject: Performance Communication-GCEM 4000 analyser
Dear Sir, The GCEM 4000 SOx/NOx/CO analyser supplied by M/s Codel ; installed & commissioned by M/s Forbes Marshal, Pune in our Calciner-A at Damanjodi during Jan-07 is working satisfactorily with out any problem till
date.
Thanks.
R N Tripathy DGM (E&I), NALCO M&R Complex, Damanjodi Ph. 06853-254382 (O)
Mob: 9437095544
Dear Sir,
Request you to provide a Performance Certificate for smooth working of GCEM 4000 installed in your Calciner.
Regards,
Sharad
Kulkarni Sharad <[email protected]>
Sent by: [email protected]
07/05/2008 04:23 PM
cc
Subject Performance
Adjudged one of India's top "25 Best Places to work - 2008" by Economic Times and the Great Places to Work Institute******************************************" Call 92256 37451 - Your helpline for everything in Steam " DISCLAIMER:This e-mail message is proprietary to Forbes Marshall and is intended solely for the use of the entity to whom it is addressed. It may contain privileged or confidential information exempt from disclosure as per applicable law. If you are not the intended recipient or
Page 1 of 2
2/15/2009file://E:\CODEL details\codel details\TCE folder\Per Cert MOM\NALCO Performance Co...