nitrate initial assessment - fresno

15
Nitrate Initial Assessment Fresno-Clovis Regional Wastewater Reclamation Facility Community Meeting April 15, 2021

Upload: others

Post on 01-Jul-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Nitrate Initial Assessment - Fresno

Nitrate Initial AssessmentFresno-Clovis Regional Wastewater Reclamation Facility

Community MeetingApril 15, 2021

Page 2: Nitrate Initial Assessment - Fresno

Introductions

City of Fresno

• Michael Carbajal, Director of Public Utilities

• Rosa Lau-Staggs, Wastewater Manager

Carollo Engineers

• Jeff Stovall, PhD, PE, Principal Technologist, Water Resources Modeling

Page 3: Nitrate Initial Assessment - Fresno

• Translation

• Information is available in

Spanish and Hmong

• Questions

• Please ask questions via Q&A

feature

• Press *9 to “raise hand” if you

are participating by phone

• Press *6 to unmute your phone

• Recording

• We are recording this meeting.

The recording will be available

on the City of Fresno website

We reserve the right to monitor, filter, and

remove any content (text, links, video, etc.)

that is deemed inappropriate

Page 4: Nitrate Initial Assessment - Fresno

Discussion Topics• Nitrate in Drinking Water

• Central Valley Nitrate Control Program

• City of Fresno Nitrate Initial Assessment

• Analyzing Groundwater Conditions

• Alternative Water Supplies

• Working with Neighbors and Stakeholders

• Alternative Compliance Plan

• Next Steps

• Q&A

• Information Resources

Page 5: Nitrate Initial Assessment - Fresno

• Naturally occurring in soils

• Increased levels can enter groundwater from multiple sources

• CCR Title 22 limit: 10 milligrams per liter

• Above CCR Title 22 limit is unsafe to drink, especially for infants and pregnant women

• Elevated nitrate levels in private wells can only be detected through testing

Nitrate in Drinking Water

Nitrate Sources:

• Naturally in soils

• Increased levels from:

• Chemical runoff from most fertilizers

• Water from industrial facilities

• Agricultural/farming operations

runoff

• Wastewater treatment facility

discharge

Page 6: Nitrate Initial Assessment - Fresno

Central Valley Nitrate Control Program

• Extensive program to control nitrate levels in Central Valley drinking water supplies

• Coordinated by the Central Valley Salinity Alternatives for Long- Term Sustainability (CV-SALTS) and Central Valley Regional Water Resources Control Board

• CV-SALTS: Growers, dairies, local industries, communities, environmental organizations, and the State of California working together

Focus: To develop sustainable salinity and

nitrate management planning for the Central

Valley and provide safe drinking water supplies.

Page 7: Nitrate Initial Assessment - Fresno

• Wastewater treatment facilities can be a source of nitrate

• The City of Fresno operates the Fresno-Clovis Regional Wastewater Reclamation Facility (RWRF)

• The City of Fresno is doing its part to assess potential impacts of RWRF on private drinking water wells and to take action if needed

Water provided through the City’s public drinking water system is already regularly tested for nitrate

and other contaminants

City of Fresno – Nitrate Initial Assessment

Nitrate Sources:

• Naturally in soils

• Increased levels from:

• Chemical runoff from most fertilizers

• Water from industrial facilities

• Agricultural/farming operations

runoff

• Wastewater treatment facility

discharge

Page 8: Nitrate Initial Assessment - Fresno

• Located at Jensen and Cornelia

• Treating at a secondary level since 1975

• Receiving 59 million gallons per day

• Treated water:

• Disinfected Tertiary level (5 millions) is used for landscape and crop irrigation

• Undisinfected Secondary level

• Small portion goes to direct irrigation of non-food crops

• The rest goes to percolation ponds

• Reclamation wells pump water from beneath ponds

Fresno-Clovis Regional Wastewater Reclamation Facility

Page 9: Nitrate Initial Assessment - Fresno

Analyzing Groundwater ConditionsPurpose: Determine if RWRF is impacting nitrate levels on local domestic drinking water wells

Water Quality Analysis:

• City of Fresno groundwater monitoring wells

• Domestic and agricultural wells near the RWRF

• Measured constituents and compiled data to determine “Area of Nitrate Contribution” of RWRF

Area of Nitrate Contribution

• Approximately 34 private domestic wells identified in

that area.

• Others should be within Kings Water Alliance area

Page 10: Nitrate Initial Assessment - Fresno

Monitoring for Nitrates & Alternative Water Supplies

The City will coordinate directly with property owners to test domestic wells• Determine if nitrate concentration is greater than (>) 10 mg/L • Results will take a few business days to complete

Process• If nitrate levels > 10 mg/L , City will coordinate bottled water deliveries • City will coordinate other alternative water supply after bottle water deliveries begin• City will follow up with property owners within:

• 1 month of initiation of alternative water supply service• 6 months after initiation alternative water supply service• Annually

Property owners will have the option to have domestic wells re-tested annually

Page 11: Nitrate Initial Assessment - Fresno

Alternative Water Supply• Alternative water supply will be made

available if nitrate levels are >10 mg/L in wells within “Area of Nitrate Contribution”

• Important property owner input on interim

drinking water solutions will be included in

the City’s “Early Action Plan” due May 2021

• Options include:• Coordinating bottle water delivery

• Installing point-of-use treatment systems at individual homes

• Establishing drinking water fill stations

Kings Water Alliance

Page 12: Nitrate Initial Assessment - Fresno

Alternative Water Supply Implementation

• The City will contract with a third-party

vendor

• Vendor will coordinate directly with

property owners to implement and

maintain the alternative water supply

• The City will cover associated costs

• The City will only visit properties to test

domestic wells and will not visit during

implementation and maintenance efforts

Page 13: Nitrate Initial Assessment - Fresno

Alternative Compliance Plan (ACP)

• Purpose: Describe near- and long-term

projects to improve water quality in the

City’s discharge to the aquifer

• The City is preparing ACP to be

submitted along with the Early Action

Plan in May 2021

Page 14: Nitrate Initial Assessment - Fresno

Next Steps

• Continued property owner discussions and coordination

• Submit Early Action Plan - May 2021

• Begin Plan implementation no later than 60 days after EAP submittal

• Share test results promptly with property owners

• Provide interim water supply if nitrate levels above limit

• Continue coordination with property owners toward long-term solution

• Always maintain open lines of communication

Page 15: Nitrate Initial Assessment - Fresno

How to Get Information

• Contact: Rosa Staggs, [email protected]

• Website: https://www.fresno.gov/publicutilities/sewer-wastewater/salinity-and-nitrate-control-program/

• Informational Materials (English, Spanish, Hmong)