DRAFT NIT SDE(EP) Page 1 EE(E-P) NIT NO. : ……/CEEPTN / BSNL / 2015-16 DIVN NIT NO : 34/EEE/BSNL/PTN/2015-16 NAME OF WORK : SITC of 5 x 7 TR Microprocessor controlled High Precision capacity package AC units for MSC Exchange Patliputra under GM-NOW(CM) Patna.( PART- A: Supply, PART-B: Installation, Testing & Commissioning, PART-C: Annual Maintenance Contract.) I N D E X SR. NO. CONTENTS PAGE NO 1 Index 01 2 General guideline 02 3 Undertaking 03 4 Redressal of contractors 04 5 Press Notification 05 6 Notice Inviting Tenders 6-11 7 Tender Application Checklist 12 8 Undertaking-―A‖,‖B‖&‘C‖ 13 9 Item Rate Format (EW-6) 22-23 10 Proforma of Schedules 24-25 11 Important note for contractors 26-35 12 Schedule ―D‖ 36-39 13 Schedule of Quantities 39-42 14 General description of works 43-47 15 Specifications for Precision PAC Units 48-57 16 Electrical work 58-60 17 COMPREHENSIVE AMC PORTION AGREEMENT 61 to 66

Upload: others

Post on 23-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

DRAFT NIT

SDE(EP) Page 1 EE(E-P)

NIT NO. : ……/CEEPTN / BSNL / 2015-16 DIVN NIT NO : 34/EEE/BSNL/PTN/2015-16 NAME OF WORK :

SITC of 5 x 7 TR Microprocessor controlled High Precision capacity package AC units for MSC Exchange Patliputra under GM-NOW(CM) Patna.( PART- A: Supply, PART-B: Installation, Testing & Commissioning, PART-C: Annual Maintenance Contract.)

I N D E X

SR. NO. CONTENTS PAGE

NO

1 Index 01

2 General guideline 02

3 Undertaking 03

4 Redressal of contractors 04

5 Press Notification 05

6 Notice Inviting Tenders 6-11

7 Tender Application Checklist 12

8 Undertaking-―A‖,‖B‖&‘C‖ 13

9 Item Rate Format (EW-6) 22-23

10 Proforma of Schedules 24-25

11 Important note for contractors 26-35

12 Schedule ―D‖ 36-39

13 Schedule of Quantities 39-42

14 General description of works 43-47

15 Specifications for Precision PAC Units 48-57

16 Electrical work 58-60

17 COMPREHENSIVE AMC PORTION AGREEMENT 61 to 66

DRAFT NIT

SDE(EP) Page 2 EE(E-P)

GENERAL GUIDELINES

1. BSNL EW-6, Form BSNL EW 8, Schedules, special conditions / specifications and

drawings will be issued to intending tenderers only. The Standard Form will not be issued along with the Tender Documents but the same shall form part of the agreement to be drawn and signed by the both parties after acceptance of tender. The standard Forms shall be available in downloadable manner from website http://www.tenders.bsnl.co.in All blanks are confined to Notice Inviting Tender (BSNL EW-6) and Schedules A to F. Authority approving the Notice Inviting Tenders (NIT) shall fill up all the blanks in BSNL EW-6, and in Schedules B & F before issue of Tender Papers.

2. The intending tenderers shall quote their rates in Schedule A only.

3. The proforma for registers and Schedules are only for information and guidance. These

are not to be filled in the Standard Form. The Schedules with all blanks, duly filled, shall be separately issued to all intending tenderers for filling and returning the same in the manner prescribed. The Schedules can also be downloaded from website http://www.tender.bsnl.co.in.

DRAFT NIT

SDE(EP) Page 3 EE(E-P)

1. Name of Work: -

SITC of 5 x 7 TR Microprocessor controlled High Precision capacity package AC units for MSC Exchange Patliputra under GM-NOW(CM) Patna.( PART- A: Supply, PART-B: Installation, Testing & Commissioning, PART-C: Annual Maintenance Contract.) PART-A: Supply Portion PART-B: Installation, Testing & Commissioning Portion PART-C: Annual Maintenance Contract

2. Estimated cost :- Rs. 29,05,975/-

3. EMD :- Rs. 58,120/- 4. Last date of sale of Tender:- 26.05.2015 5. Last Date & time of receipt of Tenders:- 28.05.2015

6. Date & time of Opening of Tenders:- 28.05.2015 7. To whom issued:-

Signature of the Tender issuing officer. Designation……………. (For & On behalf of BSNL)

UNDERTAKING (To be furnished by the firm before quoting)

1. I/We do hereby undertake to have gone through the terms & conditions/Clauses of all the Tender

documents including Form EW6, EW8 being adopted by the BHARAT SANCHAR NIGAM LIMITED

(Electrical Wing) & agree to abide by the same.

(Signature of the contractor with seal)

DRAFT NIT

SDE(EP) Page 4 EE(E-P)

FOLLOWING OFFICERS MAY BE CONTACTED FOR REDRESSAL OF COMPLAINTS:

No.

NAME OF OFFICE

POSTAL ADDRESS Telephone Numbers

Fax Number

1 CGMT, BSNL, PTN Circle

CGMT, BSNL, 2nd floor, Sanchar Sadan Budh Marg, Patna 800001

0612-2223034 0612-2220100

2 Chief Engineer (E), BSNL Electrical Zone, PATNA

3rd floor CTO, bldg, Sanchar Parisar, Patna -800001

0612-2200679 0612- 2200829

3 DGM (Vig.), BSNL, PTN Circle

D.G.M. (Vig.) – O/o CGMT, BSNL, Sanchar sadan, PATNA – 800001

0612-2225447 0612-2236881

DRAFT NIT

SDE(EP) Page 5 EE(E-P)

BHARAT SANCHAR NIGAM LIMITED (Electrical Wing)

PRESS NOTIFICATION

NIT No. (OF ISSUING OFFICE): 34/EEE/BSNL/PTN/2015-16. Date 08/05/2015

Sealed tenders are invited from firms satisfying eligibility conditions for the work of ―SITC of 5 x 7 TR Microprocessor controlled High Precision capacity package AC units for MSC Exchange Patliputra under GM-NOW(CM) Patna.( PART- A: Supply, PART-B: Installation, Testing & Commissioning, PART-C: Annual Maintenance Contract.) ”

The tender documents can be downloaded from our website at http://www.tender.bsnl.co.in or can be obtained from the O/o The Executive Engineer (E), BSNL Electrical Division, 4th floor, Telephone Bhawan, R. Block, Patna -800001 on all working days.

DRAFT NIT

SDE(EP) Page 6 EE(E-P)

BHARAT SANCHAR NIGAM LIMITED. (A GOVERNMENT OF INDIA ENTERPRISE)

Electrical Wing State : Bihar Zone : Bihar Branch : Electrical Circle : PATNA Division: Patna

NOTICE INVITING TENDER (As per Tendering Procedure in BSNL revised up to date)

N.I.T. NO. : 34/EEE/BSNL/PTN/2015-16

1) The Executive Engineer (E), BSNL Electrical Division, Patna, invites on behalf of Bharat Sanchar Nigam Limited sealed item rate tenders for the following works from the contractor(s) satisfying the under mentioned eligibility conditions.

a)

b )

c )

d)

e)

f)

g)

h)

Name of Work: - SITC of 5 x 7 TR Microprocessor controlled High Precision capacity package AC units for MSC Exchange Patliputra under GM-NOW(CM) Patna.( PART- A: Supply, PART-B: Installation, Testing & Commissioning, PART-C: Annual Maintenance Contract.) Division: - BSNL Electrical Division, Patna. Estimated cost: - Rs. 29,05,975/- E.M.D.: - Rs. 58,120/- Performance Guarantee: i) For Part A & B: 5 % of the contract value of the work. ii) For Part C: 10 % of the 48 Months‘ contract value of Part C Security Deposit: - i) For Part A & B: 5% of the tendered value of work. ii) For Part C: Nil Time: - Part A & B:- 3 (Three) Months Part C:- 48 (Forty-eight) Months COST OF TENDER DOCUMENT: - Rs. 1000 /- + VAT as applicable i.e. Rs. 1135/- Tenders will be issued to eligible contractors satisfying eligibility condition.

2) (a) Printed forms of tenders consisting of the detailed plans, complete specifications, the schedule of quantities of the various classes of works to be done and the set of conditions to be complied and with by the persons whose tender may be accepted, can be purchased, at the Divisional Office between the hours of 11:00 hrs and 16:00 hours every day except on Sundays and public holidays on payment of Rs. 1135/- (Not Refundable) in cash / Demand draft.

(b) The site for the work is available / or site for the works shall be made available in parts. (c) The tender forms can also be downloaded from the web site. (d) Before tendering, the contractor shall inspect site and fully acquaint himself about the

condition with regard to accessibility of site and site nature and the extend of grounds, working conditions, including stocking of materials, installation of T & P etc., and conditions affecting accommodation and movement of labour etc., required for satisfactory execution of contract. No claim whatsoever on such account shall be entertained by BSNL in any circumstances.

3) Tenders which should always be placed in sealed covers with the name of work written on the

DRAFT NIT

SDE(EP) Page 7 EE(E-P)

envelope will be received by the The Executive Engineer (E), BSNL Electrical Division, 4th floor, Telephone Bhawan, R. Block, Patna -800001 up to 15.00 hours on and will be opened by him in his office on the same day at 15:30 hours. 4) The time allowed for carrying out the work will be 03 months from the date of issue of LOI for

Part A & B and 48 Months for Part C (after 12 months from date of Completion of work) 5) Issue of tender form will be stopped four days before the date fixed for opening of tenders.

Tenders will be sold on working days; no tender will be sold after 1600 hours.

Last date of receipt of application for tender forms 23.05.2015

Last date of issue of tender 26.05.2015

Last date of Submission of tender 28.05.2015

Date of opening of tender 28.05.2015

6) (a) Earnest Money amounting to Rs. 58,120/- in the form of demand draft / FDR / BG/ CDR of nationalized / scheduled bank guaranteed by the Reserved Bank of India, drawn in favor of Accounts Officer (Cash), O/o PGMTD, BSNL, Patna, must accompany each tender and each tender should be in two sealed covers, one cover containing the EMD in proper form (if tender document issued by Division Office) and other cover containing tender, super-scribed as ― Tender for the work: ―SITC of 5 x 7 TR Microprocessor controlled High Precision capacity package AC units for MSC Exchange Patliputra under GM-NOW(CM) Patna.( PART- A: Supply, PART-B: Installation, Testing & Commissioning, PART-C: Annual Maintenance Contract.)

The Validity period of EMD is 120 days, from the date of opening of tender. In case of down loaded tender, each tender should be in two sealed covers, first containing credentials for meeting the eligibility condition along with the cost of tenders and EMD in proper form, second cover containing tender documents. The credentials shall be self attested and certified by any BSNL / MTNL Executive or Gazetted Officer of GOI. If not certified by BSNL Executive then original documents shall be produced at the time of tender opening. After verification of contents of this envelop then second envelope containing the bid document shall be opened. (b) The EMD of all the unsuccessful tenders shall be released on issue of award letter to the successful tenderer. This shall be done within one week of award letter. (c) Exemption from payment of earnest money and security deposit by any other unit/ department shall not hold good for BSNL.

7) (a) The contractor should submit & confirm Chartered Accountant Certificate in respect of turnover / Audited balance sheet & other registration certificate with attested copies (self-attested & counter attested by any BSNL / MTNL Executive or Gazetted Officer of GOI) as applicable along with the application on printed letter head for purchase of tender.

(b) The contractor shall submit and confirm his Permanent Account Number (PAN) issued by the Income-tax department.

(c) The tenderer should submit the valid WCT,Sales tax/VAT as well as EPF, ESI registration certificate.

8) i) Performance Guarantee For PART A & B (Supply & ITC Portion):- The contractor is required to furnish performance guarantee for an amount equal to 5% of the contract value of part A&B in the form of Bank Guarantee/CDR/FDR/DD (of Nationalized /Scheduled Bank in a standard format) within two weeks from the date of issue of award letter. This period can be further extended by the Engineer-in-Charge up to maximum period of two weeks on return request of contractor. The validity period of performance security in the form of performance Bank Guarantee shall be one year from the date of stipulated completion of work. For Part C: Firm has to submit Performance guarantee before 15 days of expiry of warranty period (i.e. 12 months from date of completion of work) for 10 % of the 48 Months‘ contract value of Part “C” in the form of Bank Guarantee/CDR/ FDR/DD (of Nationalized /Scheduled Bank in a standard format). The validity period of performance security in the form of

DRAFT NIT

SDE(EP) Page 8 EE(E-P)

performance Bank Guarantee shall be four years from the date of completion of work. PG & SD for Part - A & B shall be released only after receipt of PG for Part-C.

ii) Security Deposit : For PART A & B (Supply & ITC Portion) - In addition to the performance guarantee stated above, a sum @ 5% of the gross amount of the bill shall be deducted from each running bill of the contractor till the sum be deducted with the sum already deposited as earnest money, will amount to security deposit of 5% of the tender value of the work.

9) The acceptance of tender will rest with the Chief Engineer (E), who does not bind himself to accept the lowest tender or any other tender and reserve to himself the authority to reject lowest or all the tenders received without assigning any reason. All tenders in whom any of the prescribed conditions are not fulfilled or incomplete in any respect are liable to be rejected. Tenders with any condition including that of conditional rebate shall be rejected forthwith summarily.

10) Canvassing in connection with tender is strictly prohibited and the tenders submitted by the contractors who resort to canvassing will be liable for rejection.

11) The BSNL reserves itself the right of accepting the whole or any part of the tender and the tenderer shall be bound to perform the same at the rates quoted.

12) (i) The tenderer should give a certificate that none of his/her relative is employed in BSNL units. In case of proprietorship firm, certificate will be given by the proprietor and for partnership firm certificate will be given by all the Directors of the company.

(ii) Near relatives of all BSNL employees either directly recruited or on deputation are prohibited from participation in tenders and execution of works in the different units of BSNL. The near relatives for this purpose are defined as:

(a) Members of a Hindu Undivided family. (b) They are husband & wife. (c) The one is related to the other in the manner as father, mother, son(s), and son‘s wife

(daughter-in-law), daughter(s) and daughter‘s husband (Son-in-law), brother(s) and brother‘s wife, sister(s) and sister‘s husband (Brother-in-law). (iii) The company or firm or any other person is not permitted to tender for works in BSNL unit

in which his near relative(s) is (are), posted. The unit is defined as SSA /Circle/Chief Engineer/Chief Architect/Corporate office for non-executive employees and all SSA in a circle including Circle office/Chief Engineer/Chief Architect/Corporate office for executive employees (including those called as Gazetted officers as present). The tenderer should give a certificate that none of his /her such near relative is working in the units as defined above where he is going to apply for tender /work, for proprietorship, partnership firms and limited company certificate shall be given by the authorized signatory of the firm. At breach of the conditions by the company or firm or any other person, the tender /work will be cancelled and earnest money/performance guarantee will be forfeited at any stage whenever it is so noticed. BSNL will not pay any damages to the company or firm or the concerned person. The company or firm or the person will also be debarred for further participation in the concerned unit.

The format of the certificate to be given is ―I …………………………………….…

………………………………………………… Son of Sh. …………………………………… ………………………………………………… Resident of ……………………………………… ………………………………………………….. hereby certify that none of my relative (s) as defined in the tender document is /are employed in BSNL unit as per details given in tender document. In case at any stage, it is found that the information given by me is false /incorrect, BSNL shall have the absolute right to take any action as deemed fit /without any prior intimation to me‖.

(Seal of the firm) (Signature of the contractor)

DRAFT NIT

SDE(EP) Page 9 EE(E-P)

13) No employee in BSNL/Government of India is allowed to work as a contractor for a period of two years of his retirement from service without the prior permission. The Contract is liable to be cancelled if either the contractor or any of his employees is found at any time to be such a person who had not obtained the permission as aforesaid before submission of tender and engagement in the contractor‘s service.

14) The tender for works shall not be witnessed by the contractor who himself /themselves has /have tendered or who may and has/have tender for the same work. Failure to observe this condition would rendered tenders of the contractors tendering as witnessing the tender is/are liable for summarily rejection.

15) It will be obligatory on the part of the tenderer to sign each page of the schedule of work and the tender documents for all the component parts and after the work is awarded he will have to enter into a separate agreement for each component with the officer concerned.

16) Any tender not submitted in proper manner or if it contains too may corrections, overwriting of absurd rates, and absurd amount will be liable to be rejected and the BSNL will be at liberty to take such action as it may deem fit without any reference to the tenderer.

17) The tenders for the work shall remain open for acceptance for a period of 90 days from the date of opening of tenders.

If any tenderer withdraws his tender before the said period or makes any modification in the terms and conditions of the tender which is not acceptable to the BSNL shall, without prejudice or to any other right of remedy be at liberty to forfeit 50% ( Fifty percent only) of the said earnest money absolutely. Further tenderer shall not be allowed to participate in the tendering process of the work.

18) Extension of validity: In case, where the letter of award of work cannot be placed within the validity of the period of the tender, the BSNL can request all tenderers to extend the validity of their respective tenders and the earnest money deposit by a reasonable period. In such cases, extension of validity of earnest money deposit by 30 days beyond the extended validity date of tender should also be asked for. While BSNL can make the request of extension, the tenderer is free to either extend the validity or refuse the request to extend the validity.

19) Unsealed tenders will be summarily rejected. 20) The contractor should read the tender documents carefully before submitting the tender. 21) Agreement shall be drawn with the successful tenderer on prescribed form. Tenderer shall

quote his rates as per various terms and conditions of the said form, which will form part of agreement.

22) The tenderer shall furnish a declaration to this effect ( In case downloaded tender) that no addition /deletion/correction have been made in the tender document submitted and is identical to the tender document appearing in website. Every page of downloaded tender shall be signed by the tenderer with stamp (Seal) of his firm /organization.

23) This Notice Inviting Tender shall form part of the contract document. The successful tenderer/contractor on acceptance of his tender by the Accepting authority, shall, within 15 days from the stipulated date of start of the work, sign the contract consisting of:- a) The Notice Inviting Tender all the documents including additional conditions specifications

and drawings if any forming the tender as issued at the time invitation of tender and acceptance thereof together with any correspondence leading thereto.

b) Standard form, BSNL EW-8.

24) Eligibility Criteria: - 1.1. Average annual turnover during the last 3 years, ending 31st March of the previous financial year, should be at least 30% of the estimated cost put to tender.

AND 1.2. BSNL CO (Electrical) approved Package AC Manufacturer.

OR 1.3. The dealer authorized by BSNL CO (Electrical) approved Package AC Manufacturers. The letter of Authorization in Original from manufacturer will have to be produced by the dealers.

DRAFT NIT

SDE(EP) Page 10 EE(E-P)

OR 1.4. Experience of having successfully completed similar works in Central Government / State Government / Central Autonomous Body / Central Public sector undertaking during last 7 years ending last day of month previous to the one in which applications are invited should be either of the following :- Three similar successfully completed works costing not less than the amount equal to 40% of the estimated cost put to tender with Central / Package AC Plant with equipment Module not less than 80% of individual capacity of the Central / Package AC Plant proposed in the NIT.

OR Two similar successfully completed works costing not less than the amount equal to 60% of the estimated cost put to tender with Central / Package AC Plant with equipment Module not less than 80% of individual capacity of the Central / Package AC Plant proposed in the NIT.

OR One similar successfully completed work costing not less than the amount equal to 80% of the estimated cost put to tender with Central / Package AC Plant with equipment Module not less than 80% of individual capacity of the Central / Package AC Plant proposed in the NIT. Note: Only BSNL Corporate Office (EW) approved make HPAC units shall be provided. Apart from the approved makes available on website www.electrical.bsnl.co.in, any other make approved by BSNL CO (EW) till the last date of opening of tender shall also be accepted.

Documentary proof of satisfying above conditions and valid Chartered Accountant certificate towards deposit of income tax, valid Bihar Sales Tax / VAT, registration for execution of works contract tax , Service Tax Registration, valid EPF Registration & ESI Registration to be furnished along with application; Agency should also submit the attested copy of PAN card.

Validity of tender shall be for 90 days from the date of opening of tender. The tenders of contractors who do not deposit earnest money in the prescribed manner (in separate cover) are liable to be rejected and will not be opened. NOTE: Tender document can also be downloaded from the website - http://www.tender.bsnl.co.in >>> Tenders >>> Current Tenders >>> Electrical Wing >>> PATNA Division. The firm who quotes on the tender issued by the BSNL/ downloaded from web-site shall strictly follow the following procedure:- 25. The tenderer shall submit the tenders in two sealed covers marked as 1st and 2nd with name of work. In case bidders, not mentioning name of work on both the envelopes, bids shall be disqualified. Both the envelopes should be separate and they should not be enclosed in a common 3rd cover.

a. If the tenderer quotes on the tender issued by the BSNL: (i) 1st cover shall contain Earnest Money Deposit in the prescribed form. (ii) 2nd envelope shall contain duly filled tender document. The first envelope shall be opened first. The second envelope shall not be opened at

all in case:- (i) EMD is not in proper form.

If during the process of tender finalization, if it is detected that the tenderer has submitted tender documents after making any change /additions/deletions in the tender documents issued by the department, the offer shall summarily rejected and the EMD deposited by the tenderer shall be forfeited in addition to any other action as per prevalent rules.

DRAFT NIT

SDE(EP) Page 11 EE(E-P)

b. If the tenderer quotes on the tender downloaded from the website: (i) 1st cover shall contain tender application, tender cost in prescribed form, the attested

credentials of the firm fulfilling eligibility criteria and the Earnest Money Deposit in the prescribed form. EMD and tender cost should be separate. The credentials shall be self attested and counter attested by any executive of BSNL/MTNL or Gazetted officer of GOI as applicable along with the application on printed letter head for purchase of tender. If not counter attested then original documents shall be produced at the time of tender opening.

(ii) 2nd envelope shall contain duly filled tender document. The tenderer shall submit only the downloaded original computer print out of the document from Web site. The photo copy shall not be accepted. The first envelope shall be opened first. The second envelope shall not be opened at all in case:-

i) Tender fee is not submitted in proper form. ii) EMD is not in proper form. iii) Firm fails to fulfill eligibility criteria on the basis of document submitted in the

first envelope. If during the process of tender finalization, if it is detected that the tenderer has submitted tender documents after making any change /additions/deletions in the tender documents downloaded from the website, the offer shall summarily rejected and the EMD deposited by the tenderer shall be forfeited in addition to any other action as per prevalent rules.

2. If any difference / discrepancies found between the tender form issued by the Division

office and the NIT, the contents in NIT issued from C.E. (E)‘s office will be final & binding.

EXECUTIVE ENGINEER (ELECT) BSNL ELECTRICAL DIVISION, Patna

Signature of Divisional Officer / Sub-Divisional Officer

For and on behalf of BSNL

DRAFT NIT

SDE(EP) Page 12 EE(E-P)

CHECK LIST FOR THE TENDERER IMPORTANT NOTE: before submitting the tender document, contractor may verify the check list properly.

S.No Check Yes / No

FIR

ST

EN

VE

LO

PE

1 Whether the demand draft for ` ______/- drawn in favor of Accounts officer (Cash), O/o PGMTD, BSNL Patna, towards the tender fee is placed in the First envelope. (In case of downloaded Tenders)

2 Whether EMD amounting to ` ____________/- in the form of Demand draft/FDR/Bank guarantee/CDR of a nationalized bank or Scheduled bank guaranteed by the RBI, drawn in favor of Accounts officer (Cash), O/o PGMTD BSNL Patna, is placed in the First Envelope.

3 Whether attested copies of valid chartered accountant certificate towards deposition of Income Tax and Turnover

4

Whether attested copies of Sales Tax / VAT, EPF,ESI, Service Tax registration & PAN No. as per tender Document is placed in the first envelope.

5 Whether Power of attorney in favor of the signatory signing the tender and documents is placed in the first envelope.(Not applicable, in case of the tenders signed by the proprietor himself)

6 Whether the credentials fulfilling the Eligibility criteria are submitted.

7 Check ―Letter of PAC Approval from BSNL‖ OR ―List of 3 similar works carried out along with SATISFACTORY Completion Certificate‖

SE

CO

ND

EN

VO

LO

PE

8 Whether the bid document is placed in the second envelope and super scribed on top as Second envelope.

9 Whether Under taking and declaration of the tender document is signed and seal affixed

10 Whether the tenderer has signed all the pages. a) Bottom left side of all the pages of the tender document with seal of the firm.

11 Whether rates are quoted in words & figures for each of the items in schedule of work inclusive of all taxes & duties.

12 Check ―Certificate regarding NO RELATIVE IN BSNL‖

I/we hereby declare that no addition /deletion/correction have been made in the tender document submitted and are identical to the tender document appearing on website. (In case of downloaded tender) (Seal of the firm) (Signature of the contractor)

DRAFT NIT

SDE(EP) Page 13 EE(E-P)

1. UNDERTAKING - A "I ……… …………… ………… ………… …… ………… ……. Son of …… ……… ……… ………

……… ……… ……… …… ……… ……… ….... Resident of……… …… ………… ……… ………

……… …… …… …… ………… ……. hereby give an undertaking that none of my relative(s) as

defined in the tender document is/are employed in BSNL unit as per details given in tender

document. In case at any stage, it is found that the information given by me is false / incorrect,

BSNL shall have the absolute right to take any action as deemed fit/without any prior intimation to

me".

(Seal of the firm) (Dated Signature of Contractor)

2. UNDERTAKING REGARDING PROVISIONS-B "I ……… …………… ………… ………… …… ………… ……. Son of. ……… ………………… ………… …………… …………….. …………….Resident of …… …………… ………… …………… …………… …………… …………. hereby give an undertaking that * I/ We have registered as per the EPF and ESI and Miscellaneous provisions Act, 1952 and our registration no is ____________________ . We undertake to keep it valid during the currency of contract. Any consequence arising due to non-complying of EPF & ESI Act provision shall be sole liability of the undersigned contractor. In case at any stage, it is found that the information given by me is false / incorrect, BSNL shall have the absolute right to take any action as deemed fit/without any prior intimation to me". * Strike out whichever is not applicable

(Seal of the firm) (Dated Signature of Contractor) 3. UNDERTAKING „C‟ PAN No.: ……………………….

Service Tax Registration No.: ………………………..

CST Registration No.: ……………………………

TIN Number: … … … … … … … … … … … …

The Agency shall fill up the above data

(Seal of the firm) (Dated Signature of Contractor)

DRAFT NIT

SDE(EP) Page 14 EE(E-P)

BSNL EW B 6

Bharat Sanchar Nigam Limited (A Government of India Enterprise)

OFFICE OF THE EXECUTIVE ENGINEER (ELECTRICAL) BSNL Electrical Division, Patna

4th floor, Telephone Bhawan, R. Block, Patna -800001 Telephone & Fax No: 0641-2302800

E-mail ID: [email protected] NIT No. : 34/EEE/BSNL/PTN/2015-16 Date : 08/05/ 2015

Notice Inviting Tender 01. The Executive Engineer (E), BSNL, Electrical Division, Patna invites on behalf of

Bharat Sanchar Nigam Limited, Sealed item rate tenders for the under mentioned work(s) from the approved and eligible contractors satisfying the eligibility criteria as per Para no. 21 below :-

(i)

Name of work(s) SITC of 5 x 7 TR Microprocessor controlled High Precision capacity package AC units for MSC Exchange Patliputra under GM-NOW(CM) Patna.(PART- A: Supply, PART-B: Installation, Testing & Commissioning, PART-C: Annual Maintenance Contract.)

(ii) Estimated Cost (Rs) Rs. 29,05,975.00

(iii) Earnest Money Deposit (EMD) (Rs)

Rs. 58,120.00

(iv) Tender cost (Non refundable) Rs.

Rs. 1135.00

(v)

Last Date & Time of receipt of Application

23.05.2015 (16: 00Hrs.)

(vi) Last Date & Time of issue of tenders

26.05.2015 (16: 00Hrs.)

(vii) Last Date & Time of receipt of tenders

28.05.2015 (15: 00Hrs.)

(viii) Last Date & Time of opening of tenders

28.05.2015 (15: 30Hrs.)

(ix) Time allowed for completion of individual work.

Three months from the date of issue of award of work.

(a) Printed forms of tenders consisting of the detailed plans, complete specifications, the schedule of quantities of the various classes of works to be done and the set of conditions of contract to be complied with by the persons whose tender may be accepted, can be purchased, at the Divisional office between the hours of 1100 hrs and 1600 hrs. every day except on Sundays and public Holidays on payment of Rs. 1135.00 in cash.

(b) The site for the work is available/ or the site for the works shall be made available in parts.

(c) The tender forms can also be downloaded from the website : www.tendres.bsnl.co.in.

DRAFT NIT

SDE(EP) Page 15 EE(E-P)

BSNL EW 6

NOTE: In case the tenderer is not able to download the tender document from the web site (www.tenders.bsnl.co.in) due to server/payment gateway problem etc. then the tenderer should immediately contact the EE(E) BSNL, Electrical Division, Patna on his mobile no 9471005874 and send a communication by E-mail indicating the problem along with the print of the computer screen indicating the error(error report) and his E-mail ID at least two days before opening of tender document. Then the EE (E) will E-mail the tender document at the E-mail ID of prospective tenderer after examining the request /complaint. This E-mailed tender document can be downloaded by the tenderer and shall now be treated as same as internet downloaded tender document. The cost of the tender document shall be deposited in the First cover along with EMD & credential etc. failing which the second cover containing tender document shall not be opened. (d) Before tendering, the contractor shall inspect the site and fully acquaint himself about the condition with regard to accessibility of site and site nature and the extend of grounds, working condition, including stocking of materials, installation of T&P etc., and conditions affecting accommodation and movement of labour etc., required for the satisfactory execution of the contract. No claim whatsoever on such account shall be entertained by the BSNL in any circumstances. 03. SUBMISSION OF TENDERS : 3.1 The bidder shall submit the tender in two sealed envelopes marked as

envelope 1st and 2nd. The 1st envelope should contain the Earnest Money in the form of DD/CDR/BG and all other credentials. The 2nd envelope should contain the Techno-commercial Bid (Tender document). In case the 1st envelope is not annexed or Earnest Money & other credentials is not in proper form, then the 2nd cover containing tender documents will not be opened and the offer will be rejected.

3.2 The envelope-1st ( EMD & Credentials) shall contain the following: 3.2.1 Necessary Earnest money Deposit (EMD) may be submitted in the form of

CDR / FDR / DD / BG of a scheduled Bank or Nationalized Bank /State Bank guaranteed by Reserve Bank of India drawn in favour of A.O, O/o the PGMTD, BSNL, Patna ( BG should be submitted as per MODEL FORM OF BID SECURITY FORM). The Bank Guarantee shall be valid for a period of 120 days from date of opening of tender.

3.2.2 Cost of tender documents/ proof of payment of cost of tender document. 3.2.3 Chartered Accountant Certificate for turnover.

3.2.4 Copy of PAN card issued by Income Tax department.

3.2.5 Authority letter from approved Precision Package AC manufacturer.

DRAFT NIT

SDE(EP) Page 16 EE(E-P)

E BSNL EW B 6

3.2.6 EPF Registration certificate.

3.2.7 Service tax registration certificate.

3.2.8 Documents in support of fulfilling the eligibility criteria.

3.2.9 Certificate regarding relative not working in BSNL unit.

3.2.10 The credentials shall be self attested as well as certified by any BSNL Executive. If the credentials are not certified by BSNL Executive, then original documents shall be produced at the time of tenders opening.

BSNL 3.3 The envelope-2nd shall contain the following :-

3.3.1 Techno-commercial Bid (Tender document) duly filled up.

3.3.2 The second cover ( Envelop 2nd) containing the Techno- commercial Bid ( tender

document) shall be opened only if the conditions regarding eligibility, tender cost , EMD etc is furnished fully as per the NIT.

3.4. The time allowed for carrying out the work will be three Months from the date of L.O.I.

3.5. Issue of tender form will be stopped two days before the date fixed for opening of tenders. Tenders will be sold on working days; no tenders will be sold after 1600 hours.

3.6 a) Earnest Money amounting to Rs.58,120.00 in the form of demand draft/ FDR/ BG/

CDR of a nationalized/scheduled bank guaranteed by the Reserve Bank of India, drawn in favors of Accounts Officer (Cash), O/o the PGMTD, BSNL, Patna must accompany each tender. The Validity period of EMD is 120 days (validity period of tender + 30 days), from the date of opening of tender.

b) The EMD of all the unsuccessful tenderers shall be released on issue of award letter to the successful tenderer. This shall be done within one week of award letter.

c) Exemption from payment of earnest money and security deposit by any other unit/ department shall not hold good for BSNL.

DRAFT NIT

SDE(EP) Page 17 EE(E-P)

66 6

4. TENDER OPENING:-

Tenders, which should always be placed in sealed envelope, in the manner detailed at Para no. 3.0 above, will be received and opened on the due dates in BSNL, Electrical division, Patna up to 15:00 Hrs & 15:30 Hrs. respectively by Executive Engineer (E) or his authorized representative in his office. 4.1 Envelope-1st containing the EMD & Credentials shall be opened on the due date. 4.2 Envelope-2nd containing the credentials, Techno-commercial bid etc shall be

opened on the same date. 4.3 After the opening of Envelope-1st & 2nd, Techno-commercial bid shall be evaluated

by BSNL. 4.4 Deviation, objectionable stipulations and discrepancies, if any, shall be brought to

the notice of eligible bidders by BSNL for clarification, giving a minimum 7 days notice.

4.5 All communication with the bidders shall be in writing. FAX / E-Mail shall be covered under this category and considered as adequate means of communication.

4.6 If a holiday is declared on the tender opening day, the tenders will be opened on the next working day.

5 i) Performance Guarantee: The contractor is required to furnish performance guarantee

for an amount equal to 5% of the contract value of SH-I and SH-II only in the form of bank guarantee / CDR/FDR/DD (of a nationalized / Scheduled Bank in a standard format) within two weeks from the date of issue of award letter. This period can be further extended by the Engineer-in-charge upto a maximum period of 2 weeks on written request of Contractor. The validity period of the performance security in the form of performance bank guarantee shall be one year from the date of actual completion of work .For maintenance contract the firm is required to furnish performance guarantee of 5% of contract value of SH-III only before start of AMC .Validity of this PG will be up to actual completion of maintenance period.

ii) Security deposit: In addition to performance guarantee stated above, a sum @ 10% of

the gross amount of the bill shall be deducted from each running bill of the contractor till the sum be deducted with the sum already deposited as earnest money, will amount to security deposit of 5% of the contract value of the work of SH-I and SH-II only. This security deposit will be released after completion of warranty period .For maintenance contract in addition to PG stated above, a sum@10% of the gross amount of the bill of maintenance work shall be deducted from each running bill of that contractor till the sum to be deducted will amount to 5%of contract value of work of SH-III. This security deposit will be released after actual completion of maintenance period.

6 The acceptance of a tender will rest with the Chief Engineer (E), BSNL Electrical Bihar Zone,

Patna, who does not bind himself to accept the lowest tender or any other tender and reserves to himself the Authority to reject lowest or all the tenders received without assigning any reason. All tenders in which any of the prescribed conditions are not fulfilled or incomplete in any respect are liable to be rejected. Tenders with any condition including that of conditional rebates shall be rejected forthwith summarily.

DRAFT NIT

SDE(EP) Page 18 EE(E-P)

BSNL EW BSBS 6

7 Canvassing in connection with tender is strictly prohibited and the tenders submitted by the contractors who resort to canvassing will be liable for rejection.

8 The BSNL reserves itself the right of accepting the whole or any part of the tender and the

tenderer shall be bound to perform the same at the rates quoted.

9 i) The tenderer should give a certificate that none of his/her relative is employed in BSNL units In case of proprietorship firm, certificate will be given by the proprietor and for partnership firm certificate will be given by all the Directors of the company.

ii) Near relatives of all BSNL employees either directly recruited or on deputation are prohibited from participation in tenders and execution of works in the different units of BSNL. The near relatives for this purpose are defined as:

a) Members of a Hindu Undivided family. b) They are husband and wife. c) The one is related to the other in the manner as father, mother, son(s) & son's wife

(daughter-in-law), Daughter(s) & daughter's husband(son-in-law), brother(s) & brother's wife, sister(s) & sister's husband(brother -in-law).

iii) The company or firm or any other person is not permitted to tender for works in BSNL Unit in which his near relative(s) is (are) posted. The unit is defined as SSA/Circle/Chief Engineer/Chief Archt./Corporate office for non executive employees and all SSA in a circle including circle office/Chief Eng./Chief Archt./Corporate office for executive employees (including those called as Gazetted officers at present). The tenderer should give a certificate that none of his/her such near relative is working in the units as defined above where he is going to apply for tender/work, for proprietorship, parternership firms and limited company certificate shall be given by the authorized signatory of the firm. Any breach of these conditions by the company or firm or any other person, the tender/work will be cancelled and earnest money/performance guarantee will be forfeited at any stage whenever it is so noticed. BSNL will not pay any damages to the company or firm or the concerned person. The company or firm or the person will also be debarred for further participation in the concerned unit. The format of the certificate to be given is—

"I ……………………………………….Son of Sh …………… ……………………… Resident of …………hereby certify that none of my relative(s) as defined in the tender document is/ are employed in BSNL unit as per details given in tender document. In case at any stage, it is found that the information given by me is false / incorrect, BSNL shall have the absolute right to take any action as deemed fit/without any prior intimation to me".

(Seal of the firm) (Signature of Contractor)

DRAFT NIT

SDE(EP) Page 19 EE(E-P)

BSNL EW BSBS 6

10 No employee in BSNL/ Govt. of India is allowed to work as a contractor for a period of two years of his retirement from service without the prior permission. The contract is liable to be cancelled if either the contractor or any of his employees is found at any time to be such a person who had not obtained the permission as aforesaid before submission of tender and engagement in the contractors‘ service.

11 The tender for the works shall not be witnessed by the contractor who himself/themselves has/ have tendered or who may and has/have tender for the same work. Failure to observe this condition would render tenders of the contractors tendering as witnessing the tender is/are liable for summarily rejection.

12 It will be obligatory on the part of the tenderer to sign each page of the Schedule of work and

the tender documents for all the component parts and after the work is awarded he will have to enter into a separate agreement for each component with the officer concerned.

13 Any tender not submitted in proper manner or if it contains too many corrections, over writings

of absurd rates, and absurd amount will be liable to be rejected and the BSNL will be at liberty to take such action as it may deem fit without any reference to the tenderer.

14 The tenders for the work shall remain open for acceptance for a period of 90 days from the

date of opening of the tenders. If any tenderer withdraws his tender before the said period or makes any modification in the terms and conditions of the tender which is not acceptable to the BSNL shall, without prejudice to any other right of remedy be at liberty to forfeit 50% (fifty percent only) of the said earnest money absolutely.

15 Extension of validity: In case, where the letter of award of work cannot be placed within the

validity period of the tender, the BSNL can request all tenderers to extend the validity of their respective tenders and the Earnest Money deposit by a reasonable period. In such cases, extension of validity of Earnest Money deposit by 30 days beyond the extended validity date of tender should also be asked for. While BSNL can make the request for extension, the tenderer is free to either extend the validity or refuse the request to extend the validity.

12121 1212

DRAFT NIT

SDE(EP) Page 20 EE(E-P)

BSNL EW B 6

16 Unsealed tenders will be summarily rejected.

17 The contractor should read the tender documents carefully before submitting the tender.

18 Agreement shall be drawn with the successful tenderer on prescribed form. Tenderer shall quote his rates as per various terms and conditions of the said form, which will form part of the agreement.

19 The tenderer shall furnish a declaration to this effect (incase downloaded tender) that no

addition/deletion/correction have been made in the tender document submitted and is identical to the tender document appearing on website as per ANNEXURE-A. Every page of downloaded tender shall be signed by the tenderer with stamp (seal) of his firm /organization.

20. This Notice Inviting Tender shall form part of the Contract document. The successful tenderer/contractor on acceptance of his tender by the Accepting authority, shall, within 15 days from the stipulated date of start of the work, sign the contract consisting of :-

a) The Notice Inviting Tender, all the documents including additional conditions, specifications and drawings, if any forming the tender as issued at the time of invitation of tender and acceptance thereof together with any correspondence leading thereto.

b) Standard Tender Form BSNL EW-8 as available on the web site www.bsnl.co.in.

BNL c) EPF Provisions :

The agency has to comply with the provision of EPF and miscellaneous provisions Act - 1952 and employees Provident Fund scheme-1952 as amended up to date in respect of labours / employees engaged by them for this work. Any consequences arising due to non-complying of provisions as specified above shall be of the sole responsibility of the firm only.

DRAFT NIT

SDE(EP) Page 21 EE(E-P)

BSNL EW B 6

21 Eligibility Conditions: FOR HVAC AND PACKAGE ( HIGH SENSIBLE / PRECISION) AC

UNITS :

The Contractors satisfying the following conditions:

1.1. Average annual turnover during the last 3 years, ending 31st March of the previous financial year, should be at least 30% of the estimated cost put to tender.

AND 1.2. BSNL CO (Electrical) approved Package AC Manufacturer.

OR 1.3. The dealer authorized by BSNL CO (Electrical) approved Package AC

Manufacturers. The letter of Authorization in Original from manufacturer will have to be produced by the dealers.

OR 1.4. Experience of having successfully completed similar works in Central Government

/ State Government / Central Autonomous Body / Central Public sector undertaking during last 7 years ending last day of month previous to the one in which applications are invited should be either of the following :-

Three similar successfully completed works costing not less than the amount equal to

40% of the estimated cost put to tender with Central / Package AC Plant with equipment Module not less than 80% of individual capacity of the Central / Package AC Plant proposed in the NIT.

OR Two similar successfully completed works costing not less than the amount equal to

60% of the estimated cost put to tender with Central / Package AC Plant with equipment Module not less than 80% of individual capacity of the Central / Package AC Plant proposed in the NIT.

OR One similar successfully completed work costing not less than the amount equal to

80% of the estimated cost put to tender with Central / Package AC Plant with equipment Module not less than 80% of individual capacity of the Central / Package AC Plant proposed in the NIT.

.

Note: Similar work means SITC of Precision Package AC Plant.

Executive Engineer (E) BSNL Electrical Division, Patna

For and on behalf of Bharat Sanchar Nigam Limited.

DRAFT NIT

SDE(EP) Page 22 EE(E-P)

BHARAT SANCHAR NIGAM LIMITED (A Government of India Undertaking)

State : Bihar Zone : PATNA Brach : Electrical Circle : PATNA Division : Patna Percentage Rate Tender / Item Rate Tender & Contract for Works Tender for the work of: - SITC of 5 x 7 TR Microprocessor controlled High Precision capacity package AC units for MSC Exchange Patliputra under GM-NOW(CM) Patna.( PART- A: Supply, PART-B: Installation, Testing & Commissioning, PART-C: Annual Maintenance Contract.) To be submitted by 15:00 hours on 28.05/2015 to the Executive Engineer (Elect), (Time) (Date) BSNL Electrical Division, Patna. To be opened in presence of tenderers who may be present at 15:30 hours on 28.05/2015 in the office of Executive Engineer (Elect) BSNL Electrical Division, Patna. Issued to _________________________________________ (Contractor) Signature of officer issuing the documents _______________ Designation _______________________________________ Date of Issue ______________________________________

TENDER I / We have read and examined the notice inviting tender, schedule, A, B, C, D, E F. Specifications applicable, Drawings & Designs, General Rules and Directions, Conditions of Contract, clauses of contract, Special conditions, Schedule of Rate & other documents and Rules referred to in the conditions of contract and all other contents in the tender document for the work. I/We hereby tender for the execution of the work specified for the President of India within the time specified in Schedule ‗F‘, viz., schedule of quantities and in accordance in all respects with the specifications, design, drawings and instructions in writing referred to in Rule-1 of General Rules and Directions and in Clause 11 of the Conditions of contract and with such materials as are provided for, by, and in respects in accordance with, such conditions so far as applicable. We agree to keep the tender open for Ninety (90) days from the due date of submission thereof and not to make any modifications in its terms and conditions. A sum of Rs. 58,120/- has been deposited in cash/receipt treasury Challan / deposit at call receipt of a scheduled bank/fixed deposit receipt of scheduled bank/demand draft of a scheduled bank,/ bank guarantee issued by a schedule bank as earnest money. If I/ We fail to furnish the prescribed performance guarantee within prescribed period, I/We, agree that the said President of India or his successors in office shall without prejudice to any other right or remedy, be at liberty to forfeit the said earnest money absolutely. Further, if I/We fail to commence work as specified, I/We agree that President of India or his successors in office shall without prejudice to any other right or remedy available in law, be at liberty to forfeit the said earnest money and the performance

DRAFT NIT

SDE(EP) Page 23 EE(E-P)

guarantee absolutely, otherwise the said earnest money shall be retained by him towards security deposit to execute all the works referred to in the tender documents upon the terms and conditions contained or referred to therein and to carry out such deviations as may be ordered, up to maximum of the percentage mentioned in Schedule ‗F‘ and those in excess of that limit at the rates to be determined in accordance with the provision contained in Clause 12.2 and 12.3 of the tender form. Further, I/We agree that in case of forfeiture of earnest money or both Earnest Money & Performance Guarantee as aforesaid, I/We shall be debarred for participation in the re-tendering process of the work. I/We hereby declare that I/We hereby declare that I/We shall treat the tender documents drawings and other records connected with the work as secret/confidential documents and shall not communicate information derived there from to any person other than a person to whom I/We am/are authorized to communicate the same or use the information in any manner prejudicial to the safety of the State. Dated ……………………. Signature of Contractor Postal Address Witness: Address: Occupation:

A C C E P T A N C E The above tender (as modified by you as provided in the letters mentioned hereunder) is accepted by me for and on behalf of the President of India for a sum of Rs. _________________________________________________________________________ _______________ ) The letters referred to below shall be form part of this contract Agreement:- a) b) c) For & on behalf of the President of India Signature _________________________ Date ……………….. Designation ________________________

For and on behalf of BSNL

DRAFT NIT

SDE(EP) Page 24 EE(E-P)

PROFORMA OF SCHEDULES SCHEDULE (A):- Schedule of quantities: Appended from page 39-43. SCHEDULE (B):- Schedule of materials to be issued to the contractor.

Sr. No.

Description of item Quantity

Rates in figures and words at which the material will be charged to the contractor

Place of Issue

1 2 3 4 5

NIL

SCHEDULE (D):- Schedule Appended from page 18-32.

SCHEDULE (F):-Reference to General Conditions of contract.

Name of work:

SITC of 5 x 7 TR Microprocessor controlled High Precision capacity package AC units for MSC Exchange Patliputra under GM-NOW(CM) Patna.( PART- A: Supply, PART-B: Installation, Testing & Commissioning, PART-C: Annual Maintenance Contract.)

Estimated cost of work: Rs. 29,05,975/-

i) Earnest money : Rs. 58,120/-

ii) Performance Guarantee : iii) Security Deposit :

For Part A & B: 5% of contract value of work. For Part C: 10 % of the 48 Months‘

contract value of Part C For Part A & B: 5% of contract value of work. For Part C (AMC): NIL

GENERAL RULES and DIRECTIONS: Officer inviting tender: EE (E), BSNL Electrical Division, Patna.

Definitions: See below

2(v) Engineer-in-Charge Executive Engineer (E), BSNL Electrical Division, Patna.

2(viii) Accepting Authority SE (E), PATNA

2(x) Percentage on cost of materials and labour to cover all overheads and profits.

10%

Standard contract Form BSNL EW Form 8

Clause 1 Time allowed for submission of Performance Guarantee from the date of issue of letter of acceptance, in days

15 Days

DRAFT NIT

SDE(EP) Page 25 EE(E-P)

Clause 2 Authority for fixing compensation under Clause 2.

SE (E)

Clause 5 Number of days from the date of issue of letter

of acceptance for reckoning date of start

10 days

Time allowed for execution of work. Authority to give fair and reasonable extension of time for completion of work.

Part A & B:- 3 (Three) Months Part C:- 48 (Forty-eight) Months SE (E)

Clause 10CC Clause 10CC to be applicable in contracts with stipulated period of completion exceeding the period shown in next column.

NA

Clause 11 Specifications to be followed for execution of work

Specifications as attached.

Clause 12 12.2(iii) Schedule of rates for determining the rates for additional, altered or substituted items that can not be determined under 12.2.(i) & (ii)

NIL

Clause 12 12.2(iii), plus/minus ± the % over the rate entered in the schedule of rates

NA

Clause 12 Deviation Limit beyond which clauses 12.3 shall apply

25%

Clause 25 Competent Authority for Conciliation

SE (E) not in charge of work

Clause 30.2 Minimum Qualifications and experience required for Principal Technical Representative.

i For works with estimated cost put to tender more than ( Rs. 2 lakh but less than Rs.5 Lakhs for Elect/ Mech. Works)

Recognized diploma holder

ii For works with estimated cost put to tender more than Rs. 5 lakh for Elect / Mech. Works

Graduate or recognized diploma holder with 3 years experience

SCHEDULE ―D‖

“IMPORTANT NOTE FOR CONTRACTORS‖

DRAFT NIT

SDE(EP) Page 26 EE(E-P)

The firm shall read carefully the following conditions and shall quote accordingly confirming all the points in their offer.

A) GENERAL TERMS AND CONDITIONS;_ 1. SUBMISSION AND OPENING OF TENDERS:-

i. The tender shall be submitted as prescribed in clause 6 of BSNL EW 6. ii. The tenderer are advised not to deviate from the technical specifications / items,

commercial terms and conditions of NIT.

2. EVALUATION OF TENDERS:- The evaluation and comparison of responsive bids shall be done on the basis of Net cost to BSNL. Net cost to BSNL= [(Quoted amt. for Part-A + Part-B + Part-C) - (Cenvatable amount i.e. Excise Duty + Service Tax for Part-A + Part-B + Part-C)]. If Cenvatable amount break up is not given then same shall be treated as zero & evaluation shall be done accordingly.

3. Operation of Individual agreements shall be governed as follows: i) The agreement (Separate for A. Supply Portion, B. Installation, Testing & Commissioning Portion and C. Comprehensive Maintenance) shall be framed in the O/o EE (Elect.), Patna.

ii) For A] Supply Portion , B] Installation, Testing & Commissioning Portion and C ] COMPREHENSIVE MAINTENANCE Portion:- Individual award Letter for the work shall be issued by EE (Elect.), Patna to the firm and will made separate agreement for ―Supply‖, ―Installation Testing Commissioning‖ and ―comprehensive maintenance. iii] a) Date of start of A. Supply Portion, and B. Installation, Testing & Commissioning Portion agreements shall be the date of issue of award letter and time allowed to carry out the work shall be counted thereafter as per terms of this NIT.

b) Date of start of COMPREHENSIVE MAINTENANCE portion agreement will be after one year of successful initial acceptance testing and time allowed to carry out the work shall be counted thereafter as per terms of this NIT. iv] Individual agreement shall be operated independently without co-relation with the other individual agreements for the purpose of payment, deduction/release of Security Deposit, extension of time, closing of contract etc. as per terms and conditions of individual agreement. If the firm fails to commence any work, the PG of the individual work shall be forfeited. v] S. D. and other deposits as per terms and conditions of individual agreement shall be kept with the concern EE (E) and refunded / adjusted as per relevant clause of individual agreement. 4. DECLARATION BY TENDERER To be signed by Proprietor in case of proprietorship firm. To be signed by all partners in case of partnership firm. To be signed by all the directors / authorized person in case of the company. M/s……………………………………………………………………S/o …………………………………………………………………..R/o ………………………………..

DRAFT NIT

SDE(EP) Page 27 EE(E-P)

Hereby certify that none of my relatives (*) as defined below is/are employed in BSNL units (**) as defined below. In case at any stage it is found that information given by me is false/incorrect, BSNL shall have absolute right to take any action as deemed fit, without any prior intimation to me. (*) Definition of Relatives - a) Member of Undivided family. b) They are husband and wife. c) They are related to the other in the manner as Father, Son(s), Son‘s wife (Daughter-in-law,

Daughter(s) & Daughter‘s husband (Son-in-law), Brother & Brother‘s wife, Sister(s) & Sister‘s husband (Brother–in–law).

(**) The company or firm or any person is not permitted to tender for the work in BSNL unit in which his near relative(s) is (are) posted. The unit is defined as

a) For Non Executive Employees: SSA / Circle / Chief Engineer / Chief Architect / Corporate Office.

b) For Executive Employees (including those called as gazetted officer at present): All SSA in Circle office / Chief Engineer / Chief Architect / Corporate Office.

Place: ____________ Date: _____________ Signature of tenderer 5. CO-ORDINATION AT SITE:- At the site of work more than one agency may be working full cooperation shall be extended to other agencies during progress of work. Further, work shall be carried out in such a way so that it may not cause abnormal noise and hindrance to the officers of the department engaged in erection as well to the normal routine work. 6. PACKING, FORWARDING AND STORAGE AT SITE:- Before dispatch to site, the equipment / component / materials shall be properly packed so as to afford protection against transit damages and damages against storage in open areas either at transporter's premises or at work site. When storage in open area is inevitable proper waterproof covering shall be provided to protect damages on account of rainwater etc. However, damaged items shall be replaced as per the direction of Engineer-in-Charge. All the stores and materials required for satisfactory completion of the work shall be arranged at work site by the contractor from his own sources. However, safe custody of the material stored at site will be the responsibility of the contractor. 7. TRAINING OF BSNL PERSONNEL:- The contractor shall arrange to impart the training to the BSNL Personnel on the following aspects prior to provisional takeover of the plant:

a) Operation of plant b) Gas charging and pumping down of the system. c) Adjustments of settings for microprocessor controls and protective devices. d) Preventive maintenance.

DRAFT NIT

SDE(EP) Page 28 EE(E-P)

8. INSPECTION AT CONTRACTOR‟S PREMISES:- The BSNL's authorized representative shall have full powers to inspect drawings of any portion of the work or examine the materials and workmanship of the plant at the contractor's work or at any other place from where the material or equipment is obtained. Acceptance of any material or equipment shall in no way, relieve the contractor of his responsibility for meeting the requirement of the specifications but shall have to be replaced free of cost by contractor in case equipment of work is found defective or of inferior quality. 9. GUARANTEE AND DEFECT LIABILITY: - The guarantee shall be valid for twelve (12) months after Commissioning of the system and initial acceptance testing thereof by BSNL Inspection Circle Team. The contractor shall guarantee that system shall be free from any defect due to the defective material and / or bad workmanship and also the equipments shall work satisfactorily with performance and efficiencies not less than the guaranteed values. The firm shall visit quarterly during guarantee period and ensure the healthiness of system. a) Any part found defective during this period shall be replaced free of cost by the contractor. The

service of the contractor's personnel if required during this period shall be made available free of cost to the department.

b) The contractor shall depute his representative within 36 hours of notification of the defect by

the department. c) A joint report shall be prepared by the representative of department and firm regarding nature

of defects and remedial action required. Time schedule for such action shall be also finalized. d) In case the contractor fails to depute his representative within 36 hours of notification of the

defect or fails to cause remedial measure within reasonable time as decided during joint inspection, the department may proceed to do so at the contractor‘s risk and expenses and without prejudice to any other right.

10. MISCELLANEOUS a) The workers engaged by firm should maintain proper discipline and good behavior with occupants. The firm shall not depute such workers at the site, whose behavior is found improper. Executive Engineer‘s decision shall be final. b) The agency will provide the workers with necessary Tools & Plant, Testing and safety equipments. c) Agency has to observe all the labour rules and regulations in force and indemnify BSNL against any claims whatsoever, either from this clause or any other clause in the contract. d) Firm shall issue ID card to their workforce whenever they enter premises for bonafide work. Nobody shall be allowed entry without work and nobody will be allowed overnight stay without work. The workers should wear proper uniform with detachable badge indicating the name of person & firm. 11. BYE-LAWS INDEMNITY AGAINST LIABILITIES a) The contractor shall comply with all bye-laws and regulations of local and statutory authorities having jurisdiction over the works and shall be responsible for payment of all fees and other

DRAFT NIT

SDE(EP) Page 29 EE(E-P)

charges and giving/receiving all necessary notices and keep the Engineer-in-Charge informed about the notices issued and received. b) The contractor shall indemnify BSNL against all claims in respect of patent rights, design, trade mark or name of other protected rights in respect of any plant, machine, work or materials used for or in connection with the works or temporary works and from and against all claims, demands, proceedings, costs, charges and expenses whatsoever in respect of or in relation thereon. The contractor shall defend all actions arising from such claims and shall him-self pay all royalties. c) License fees, damages, cost and charges of all and every sort that may be legally incurred in respect thereof shall be borne by the contractor. d) All liabilities / penal recoveries on matters arising out of tax/excise/levies such as incorrect deductions, discrepancies in the filling up returns, revised assessments by the concerned authorities etc. shall be borne by the contractor. e) It is contractor's liability to follow all safety procedures in accordance with relevant I.S. amended up to date during execution of work at site. 12. COMPENSATION FOR DEFAULTS a) Any damage to the installation(s)/building due to the carelessness on the part of firm‘s staff shall be the responsibility of firm and shall be replaced/rectified without any extra cost. b) Any accident or damage will be the responsibility of agency and the Department will not entertain any claim, compensation, penalty etc on this account or on account of non-observance of any other requirement of law relevant to his work. c) All breakdown calls / complaints have to be attended by the firm with utmost promptness. If the agency fails to rectify any fault within reasonable time, the department reserves the right to carry out the work at the risk and cost of the agency. In case the fault is of emergency nature, which may affect the normal functioning of the services and the firm fails to take immediate necessary action the work shall be carried out at the risk and cost of the firm without giving any notice. The decision of the EE (E) shall be final. 13. REJECTION OF DEFECTIVE UNITS a) If the completed plant or any portion thereof, before it is taken over, be found defective or fails

to fulfill the intent of the specifications, the contractor shall on receipt of a written notice from the Engineer-in-Charge, forthwith make good the defective plant.

b) If the contractor fail to rectify the defects and or make good the defective plant within a

stipulated time mentioned in the written notice or replace the plant at no extra cost, BSNL may make good, reject and or replace at the risk and expanses of the contractor, the whole or any portion of the plant which is defective or fails to fulfill the requirements of the contract.

c) All the equipments shall be tested as per tender specifications. Where test results indicate

capacity less than specified in the equipment schedule, the contractor shall pay to the BSNL prorata compensation against each item. No compensation shall be payable, if the short fall is 3% or less.

14. Display Board;-

One display board should be provided in the Package AC plant room showing all details of the Package AC units plant i.e no of units, capacity of each unit, date of installation, date of commissioning (Date of Pre A/T and Date of final A/T), type & quanitity of refrigerant charged and HP/LP cut off etc.)

B. COMMERCIAL CONDITIONS OF CONTRACT

DRAFT NIT

SDE(EP) Page 30 EE(E-P)

1. a. The bidder shall give the total composite price inclusive of all Central & state‘s levies and taxes i.e. Sales-tax, purchase tax, turnover tax, Service tax works contract tax etc. or any other taxes or duties etc. except octroi / L.B.T. etc. However the evaluation and comparison of shall be done on the basis of Net cost to BSNL. Net cost to BSNL=[(Quoted amt. i.e. total cost offered inclusive of duties and all taxes such as sales tax, service tax packing, forwarding ,freight and insurance charges etc. for Part-A + Part-B + Part-C) - (Cenvatable amount i.e. Excise Duty + Service Tax for Part-A + Part-B + Part-C)]. If Cenvatable amount break up is not given then same shall be treated as zero & evaluation shall be done accordingly. b. The total composite price shall comprise of unit price and all other components of price need to be individually indicated quoted against the goods/material/service, it proposes to supply under the contract in the following manner:- i) The Basic Unit Price (Ex-Factory Price) of the goods /services/ materials, Excise Duty, Sales Tax, Freight, Forwarding, Packing, service tax, insurance and any other levies /charges already paid or payable by the contractor/ supplier shall be quoted separately. ii) The liability to pay all taxes, levies, etc shall be of contractor and BSNL will not entertain any claim whatsoever in this respect. c. No concessional form except Sales Tax form ‗C‘ for the items as specified in the schedule of works and meant for use in BSNL shall be provided by BSNL. Form ‗C‘ shall be provided by the BSNL only on the specific request of the contractor.‖ • The unit wise cost / break up is necessary for the purposes of information and verification of composite price so quoted by the contractor/supplier. • The contractor/supplier shall submit to BSNL documents /proof of payment of all taxes / levies along with exemption certificate if any, to avail CENVAT benefits by BSNL • However the evaluation and comparison of respective bids shall be done on the basis of net cost to BSNL on the total cost offered inclusive of duties and taxes (but –excluding CENVAT-able duties and taxes) sales tax, packing, forwarding, freight and insurance charges etc. 2. The contractor shall, keep necessary books of account and other documents for the purpose of this condition as may be necessary and shall allow inspection of the same by a duly authorised representative of BSNL and further shall furnish such other information/ document as engineer-in-charge may require. 3. The Contractor shall, within a period of 30 days of imposition of any further tax or levy in pursuant to the constitution of (forty sixth amendment) act 1982 give a written notice thereof to the Engineer-in-charge that the same is given pursuant to this condition, together with all necessary information relating thereto. 4. TAX DEDUCTED AT SOURCE: - BSNL shall deduct work contract tax, income tax and other statutory deductions from payments due to the firm as per rules of the State/Central Government. The Accounts Officer of the concerned Division shall issue certificates for such deductions to the firm. The rates offered by the firm shall be inclusive of VAT as applicable in the state. The BSNL shall deduct TDS (e.g. work contract tax, income tax and other statutory deductions) from payments due to the firm as per rules of the State / Central Government. Certificate for such deductions shall be issued to the firm by the Accounts officers of the concern division. 5. PAYMENT TERM: - A. SUPPLY ITEMS [ITEM NO-1] - No advance payment will be made. The payment terms for all items shall be governed as under. Stipulations like levy of interest if payment is not made in specified time are not acceptable to the BSNL.

DRAFT NIT

SDE(EP) Page 31 EE(E-P)

a) For supply of items 95% of the price shall be paid on receipt of goods at site by the consignee. For claiming this payment the following documents are to be supplied to the paying authority:-

i. Excise gate pass / Invoice or equivalent document favoring BSNL shall be supplied by the supplier.

ii. Delivery challan. iii. Consignee receipt. iv. Proof of payment of octroi / L.B.T. / entry tax, if any

NOTE: 100% Payment (in place of 95 %) may be made on delivery , provided that an additional bank guaranty for an amount equivalent to 5 % of the value of supplies valid for a minimum period of one year is furnished by the supplier along with an undertaking that the shortages / damages are intimated to the supplier in writing shall be made good.

b) The balance 5 % payment shall be released after satisfactory commissioning of equipment or 6

months from the date of supply of the equipment whichever is earlier. c) In cases where shortages / damages are intimated to the supplier in writing, the balance

payment shall be released only after the cases are settled in accordance with the provision of the P.O.

d) No payment will be made for goods rejected at the site on testing. Payment, if made for such items shall be recovered from subsequent bills or other bills.

e) No concessional form will be issued by BSNL.

B. ITC & MISC. ITEMS – 70% of prorata of approved price breakup of contract on successful physical installation, trial run and successful initial Acceptance Testing of AC system. 30% of prorata of approved price breakup of contract on successful Final performance cum Seasonal Test of AC system. C. COMPREHENSIVE MAINTENANCE ITEMS - The payment shall be made quarterly. 6. FORFEITURE OF EMD – a] If any tenderer withdraws his tender before the expiry of the validity period or before the issue of letter of acceptance whichever is earlier or makes any modifications in the terms and conditions of the tender which are not acceptable to the department, then the BSNL shall without prejudice to any other right or remedy, be at liberty to forfeit 50% of earnest money absolutely.

b] If contractor fails to furnish the prescribed performance guaranty within the prescribed period the amount of EMD with reference to estimated amount will be forfeited without any notice. c] If only a part of work as shown in the tender is awarded and the contractor does not commence the work , the amount of EMD with reference to estimated amount will be forfeited. e] In case of forfeiture of EMD as prescribed in a to c above, the tenderer shall not be allowed to participate in the retendering process of the work.

7. COMPLIANCE OF EPF ACT: The firm has to fulfill / compliance of the provisions of EPF & Misc. Provisions Act 1952 & Employees‘ Provident Fund Scheme 1952.The each claim bill of contractors must accompany the 1) List showing the details of laborers / employees engaged. 2) Duration of their engagement. 3) The amount of wages paid to such laborers / employees for the duration in question. 4) Amount of EPF contributions (both employers and employee‘s contribution) for the duration of engagement in question paid to the EPF authorities. 5) Copies of authenticated documents of payments of such

DRAFT NIT

SDE(EP) Page 32 EE(E-P)

contribution to EPF authorities and 6) A declaration from the contractors regarding compliance of the conditions of EPF Act, 1952. 8. SERVICE TAX : Invoice indicating the quantum of Service tax paid on Installation, Testing, Commissioning Portion and Comprehensive Maintenance Portion. Invoice should indicate the name of the consignee with relevant Service tax registration no. as intimated by Executive Engineer (E) concerned The Rates quoted by the contractor shall be inclusive of his service tax liability as service provider in works contracts as per the service tax rules applicable as on date. At present, the service tax is to be norm in the ratio of 50:50 by the service provider (contractor) & by the service receiver (BSNL) in respect of work contacts. The Contractor, as a service provider, shall be fully responsible for the payment of his service tax liability to the service tax department & BSNL will not be responsible for any default on the part of the contractor. BSNL as service receiver shall directly pay its liability to service tax department & no reimbursement shall be made to the contractor. Any further amendment notified by the government in service tax rules during the currency of agreement shall also be applicable without any separate notice. NOTE: No additional condition whatsoever will be accepted for turnover tax/sales tax on works contract. In case of additional conditions for the payment of such taxes by the contractor the tender may be liable to be summarily rejected by the accepting authority. No conditional offer shall be entertained and rejected. (Standing order No.258) C) SUPPLY PORTION AGREEMENT (PART-A) - 1. VARIATION IN EXCISE DUTY:- In case of any statutory variation in regard to excise duty only in respect of AC Package Units, within the stipulated date of completion of individual agreement, the same shall be paid or recovered as per the actual against valid documentary proof. However, beyond this period dept. will take advantage of any reduction in excise duty but will not pay extra on account of increase in excise duty. 2. OCTROI / L.B.T.: - The rate quoted by the firm shall be exclusive of octroi / L.B.T.only for Package units. For other materials octroi / L.B.T. shall be inclusive. No octroi / L.B.T. exemption certificate shall be issued. The octroi / L.B.T.actually paid only for Package units shall be refunded as per actual on production of valid documentary proof / original receipt and other concerned original documents of the octroi / L.B.T. levying authority specifying the materials. 3. STORES AND SAFETY: - Before dispatch to site, the equipment / component / materials shall be properly packed so as to afford protection against transit damages and damages against storage in open areas either at transporter's premises or at work site. Special care shall be taken in respect of sensitive items like heat transfer surface of cooling coils, air-cooled condenser etc. When storage in open area is inevitable proper waterproof covering shall be provided to protect damages on account of rainwater etc. However, damaged items shall be replaced as per the direction of Engineer-in-Charge. 4. DATE OF COMPLETION: - The work shall be deemed to have been completed after the fulfillment of the following: a) Physical completion of installation of A.C system including balancing of air and water circuits (wherever applicable) and successful trial run of the A.C system by the contractor for a period of 7 days subject to a minimum of 120 hours of running during that period in the presence of representative of the Engineer-in-Charge. b) Successful completion of the initial acceptance testing as per the BSNL standards in the presence of representative of Engineer-in-Charge and Inspection Circle of BSNL.

DRAFT NIT

SDE(EP) Page 33 EE(E-P)

5. GUARANTEE AND DEFECT LIABILITY: - The guarantee shall be valid for a period of 12 months after initial acceptance test. However, the microprocessor shall be having a warranty period for three years. The contractor shall guarantee that all equipments shall be free from any defect due to the defective materials and bad workmanship and that the equipment shall work satisfactorily and that the performance and efficiencies of the equipments shall be not less than the guaranteed values. Any part(s) found defective during the guarantee period shall be replaced or made good by the contractor without any charge whatsoever. The services of the contractor's personnel, if requisition during this period for such work, shall be made available free of any cost to the dept. a) The contractor shall depute his representative within 36 hours of notification of the defect by the department. b) A joint report shall be prepared by the representative of department and firm regarding nature of defects and remedial action required. Time schedule for such action shall be also finalized. c) In case the contractor fails to depute his representative within 36 hours of notification of the defect or fails to cause remedial measure within reasonable time as decided during joint inspection, the department may proceed to do so at the contractor‘s risk and expenses and without prejudice to any other right. d) Agency shall provide Quarterly free servicing up to guarantee period. If the firm fails to carry out the same, the department may proceed to do so at the contractor‘s risk and expenses and without prejudice to any other right. D) ITC Potion of AGREEMENT:- 1. DRAWINGS TO BE SUBMITTED FOR APPROVAL The contractor shall get the following drawings approved before the start of the work: a) A dimensional drawing giving complete details of the erection of the equipment in plant room

(including condensers, refrigerant piping and details of foundations). While deciding layout future expansion, if any, has to be taken into consideration.

b) Electric wiring diagrams for all Electrical equipments including controls showing cable sizes and equipment capacities.

2. TESTING AT SITE: - a) TRIAL RUN After installation is complete physically and all adjustments as listed above are carried out, the plant shall be subjected to trial run. The trial run is to be conducted for a period or 7 days subject to minimum running of 120 hours in the presence of representative of the BSNL. During this test performance of all the equipments and control systems shall be checked. Inside conditions shall also be recorded on this trial run. A record of this test shall be submitted to the Engineer-in-Charge who shall arrange for initial acceptance testing thereafter. b) INITIAL ACCEPTANCE TESTING After completion of trial run the plant shall be subjected to initial acceptance testing as per standards of the BSNL. This testing shall be conducted jointly by the representative or the Engineer-in-Charge, Inspection circle and user. A list of all defects and discrepancies shall be prepared during the test, which shall be rectified by the agency within a period of 15 days. c) FINAL PERFORMANCE CUM SEASONAL TEST. This test shall be conducted jointly by the representative of the Engineer-in-Charge, and Inspection Circle of BSNL and user as per standards of the BSNL. The test shall be conducted between 1st April to 30th September.

DRAFT NIT

SDE(EP) Page 34 EE(E-P)

d) The BSNL shall have the right to operate all equipments if in operating conditions, whether or not such equipment, have been accepted as complete and satisfactory. Repairs and alternations shall be made at such times as directed by Engineer-in-Charge.

e) In special circumstances the BSNL may have to use the plant to air condition some areas even before the completion of whole work. The firm shall co-operate fully under such circumstances.

f) Wherever relaxations are required, these should be obtained from the Superintending Engineer (Electrical) well before the final performance cum seasonal test.

g) All test equipments, the operating personnel, oil and refrigerant required for testing shall be supplied by the contractor.

3. OPERATION: - The contractor will provide staff for operation up to initial acceptance

testing (Initial AT) clearance. No extra payment for this operation will be reimbursed to firm by the BSNL except under exceptional circumstances. Staff will work under the supervision of the BSNL officers for proper operation.

4. DATE OF COMPLETION : - The work shall be deemed to have been completed after the

fulfillment of the following: a) Physical completion of installation of A.C system including balancing of air and water

circuits (wherever applicable) and successful trial run of the A.C system by the contractor for a period of 7 days subject to a minimum of 120 hours of running during that period in the presence of representative of the Engineer-in-Charge.

b) Successful completion of the initial acceptance testing as per the BSNL standards in the presence of representative of Engineer-in-Charge and Inspection Circle of BSNL.

5. COMPLETION DRAWINGS : - (I) Following drawings shall be submitted by the contractor after physical completion of the

work but before the proposed date of initial acceptance testing.

(a) Plant installation drawing giving complete details of the entire equipment including foundations.

(b) Electrical drawings showing cable sizes, equipment capacity, control components and control wiring.

(c) Schematic control drawings giving detailed sequence or operation and notes to explain the operation or the control circuit.

(d) Piping drawings showing all pipe sizes, valves and fittings. (II) One set of service manuals of air conditioning plant including salient features of the plant. 6. PAYMENT TERM: - No advance payment will be made. The payment terms for all items

shall be governed as under. Stipulations like levy of interest if payment is not made in specified time are not acceptable to the BSNL. i) 70% of prorata of approved price breakup of contract on successful physical installation,

trial run and successful initial Acceptance Testing of AC system. ii) 30% of prorata of approved price breakup of contract on successful Final performance

cum Seasonal Test of AC system. COMPREHENSIVE AMC PORTION AGREEMENT For details refer relevant Section, Specifications etc. at the end.

DRAFT NIT

SDE(EP) Page 35 EE(E-P)

SCHEDULE ―D‖

(II) ―Copy of Memorandum No.5-1-12/EW/94 dated 26th Sept. 96‖

Subject: Option for Deposit of Earnest Money in the form of Bank Guarantee for Air-conditioning,

Engine Alternator sets, Lifts and Sub-Station Works (Also applicable for this IBMS Work).

1.0 In modification of the existing procedure of Deposit of Earnest Money with each Tender in the shape of Cash/Demand Draft/Pay Order, it has been decided by the Telecom Commission to provide for an option to the Contractor(s) for depositing Bank Guarantee along with the Tenders for Air-conditioning, Diesel Engine Alternator, Lifts and Sub-station works wherever the amount of EMD is more than Rs.20, 000/- 2.0 The Bank Guarantee shall be from a Scheduled Bank or from a Nationalized Bank/State Bank guaranteed by Reserve Bank of India. 3.0 The Bank Guarantee shall remain in force for 30 days after the period for which the tenders are valid. 4.0 The value of the Bank Guarantee to be deposited along with each Tender shall be at the rates of Earnest Money prescribed by the Government from time to time. The Bank Guarantee Bond for EMD Deposit shall be as per the Model form at Annexure-1. 5.0 The Bank Guarantee Deposit by the Contractors shall be entered in a register to be maintained by the Divisional Officer/Accounts Officer of the concerned Electrical Division and the register shall be reviewed periodically and appropriate action to be taken for extending / encashing or release of these Bank Guarantee. 6.0 This is issued with the concurrence of Telecom Finance vide their U.O.No.274/FA-V dated 26th Sept.1996 and shall come into force with immediate effect. Encl.: Annexure-I

DRAFT NIT

SDE(EP) Page 36 EE(E-P)

Annexure-I

MODEL FORM OF BANK GUARANTEE (EMD)

BANK GUARANTEE BOND FOR EMD FOR AIR CONDITIONING, DIESEL ENGINE ALTERNATOR, LIFTS AND SUB STATION WORKS WHEREVER THE AMOUNT OF EMD IS MORE THAN RS.20, 000/- Whereas__________________(hereinafter called "The Contractor(s)") has submitted its Tender dated ________ for_______________ (Name of work) _____________________ KNOW ALL MEN by these presents that we______________________ OF ______________________ having our registered office at ____________________ (hereinafter called "The Bank") are bound unto ________________ (hereinafter called "The BSNL") in the sum of __________________ for which payment will and truly to be made of the said Government, the Bank binds itself, its successors and assigns by these presents. THE CONDITIONS of the obligation are: 1. If the Contractor(s) withdraws its Tender during the period of Tender validity specified on the Tender Form: or 2. If the Contractor(s) having been notified of the acceptance of its Tender by the BSNL during the period of Tender validity. (a) Fails or refuses to execute the Contract. (b) Fails or refuses to furnish Security Deposit in accordance with the conditions of Tender document. WE undertake to pay to the BSNL upto the above amount upon receipt of its first written demand, without the BSNL having to substantiate its demand, provided that in its demand, the BSNL will note that the amount claimed by it is due to it owing to the occurrence of one or both of the two conditions, specifying the occurred condition or conditions. This guarantee will remain in force as specified in the Tender Document upto and including thirty (30) days after the period of the Tender validity, and any demand in respect thereof should reach the Bank not later than the specified date/dates. Signature of the Bank Signature of the Witness Name of Witness Address of Witness

DRAFT NIT

SDE(EP) Page 37 EE(E-P)

ANNEXURE- II PERFORMANCE SECURITY GUARANTEE BOND

In consideration of the CMD, BSNL (hereinafter called ‗BSNL‘) having offered to accept the terms and conditions of the proposed agreement between ________________ and ______________(hereinafter called the said contractor(s)‘) for the work___________________ (hereinafter called ―the said agreement‖),having agreed to production of a irrevocable Bank Guarantee for Rs. _________ (Rupees _____________________________________________only) as a security / Guarantee from the contractor(s) for compliance of his obligations in accordance with the terms and conditions in the said agreement . 1. We, (name of the bank) ______________________ (hereinafter referred to as ―the bank‖) hereby undertake to pay to the BSNL an amount not exceeding Rs.__________ (Rupees_____________________________________________ only) on demand by the BSNL. 2. We (name of the bank)__________________ do hereby undertake to pay the amounts due and payable under this guarantee without any demure, merely on a demand from the BSNL stating that the amount claimed as required to meet the recoveries due or likely to be due from the said contractor(s). Any such demand made on the bank shall be conclusive as regards the amount due and payable by the Bank under this guarantee. However, our liability under this guarantee shall be restricted to an amount not exceeding Rs.________________ (Rupees __________________ only) 3. We, the said bank further undertake to pay to the BSNL any money so demanded notwithstanding any dispute or disputes raised by the contractor(s) in any suit or proceeding pending before any court or tribunal relating thereto, our liability under this present being absolute and unequivocal. The payment so made by us under this bond shall be a valid discharge of our liability for payment there under and the contractor(s) shall have no claim against us for making such payment. 4. We, (name of the bank) ___________________________ further agree that the guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance of the said agreement and that it shall continue to be enforceable till all the dues of BSNL under or by virtue of the said Agreement have been fully paid and its claims satisfied of discharged or till Engineer-in-Charge on behalf of the BSNL certified that the terms and conditions of the said Agreement have been fully and properly carried out by the said contractor(s) and accordingly discharges this guarantee. 5. We, (name of the bank)___________________ further agree with the BSNL that the BSNL shall have fullest liberty without our consent and without affecting in any manner our obligations hereunder to vary any of the terms and conditions of the said Agreement or to extend time of performance by the said contractor(s) from time to time or to postpone for any time from time to time any of the powers exercisable by the BSNL against the said Contractor(s) and to forbear or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said Contractor(s) or for any forbearance, act of omission on the part of the BSNL or any indulgence by the BSNL to the said contractor(s) or by any such matter or thing whatsoever which under the law relating to sureties would, but for this provision, have effect of so relieving us. 6. This guarantee will not be discharged due to the change in the constitution of the Bank or the Contractor(s). 7. We, (name of the bank)_____________________lastly undertake not to revoke this guarantee except with the previous consent of the BSNL in writing. 8. This guarantee shall be valid up to ______________ unless extended on demand by the Government. Notwithstanding anything mentioned above, our liability against this guarantee is restricted to Rs. _____________ (Rupees _______________ only) and unless a claim in writing is lodged with us within six months of the date of expiry or the extended date of expiry of this guarantee all our liabilities under this guarantee shall stand discharged. Dated the ______________ day of _________ for_____________________________ (Indicate the name of bank)

DRAFT NIT

SDE(EP) Page 38 EE(E-P)

SCHEDULE ―A‖

Name of work :-SITC of 5 x 7 TR Microprocessor controlled High Precision capacity package AC units

for MSC Exchange Patliputra under GM-NOW(CM) Patna.

SUB-HEAD-I (SUPPLY of HPAC UNIT) PART-A

Sl

No

DESCRIPTION OF ITEM

Q

T

Y

UNI

T

Ex

-Fac

tory

Pri

ce (

Bas

ic

un

it p

rice

ex

clu

siv

e o

f

all

lev

ies

& c

har

ges

Ex

cise

Du

ty/

Cu

sto

m

Du

ty

Sal

es T

ax

(CS

T/V

AT

)

Fre

igth

, F

orw

ard

ing

,

Pac

kin

g &

In

sura

nce

Oth

er L

evie

s &

char

ges

,

if

any

Un

it P

rice

(A

ll

incl

usi

ve)

Tax

es &

Du

ties

CE

NV

AT

-ab

le o

n u

nit

pri

ce

To

tal

Am

ou

nt

incl

usi

ve

of

all

lev

ies

& c

har

ges

,

incl

ud

ing

CE

NV

AT

-

able

Du

ties

& T

axes

U

nit

s P

rice

ex

clu

din

g

CE

NV

AT

ab

le D

uti

es

& T

axes

T

ota

l E

xcl

ud

ing

CE

NV

AT

-ab

le D

uti

es

& T

axes

. (N

ET

CO

ST

to B

SN

L)

(%) Amount (%) Amount ( % ) Amount

(5+7+9

+11+12

)

{3x13} { 13-

14}

{

3x16)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

PART-A: Supply

1 Supply of factory tested 7 TR

(sensible cooling capacity)

Microprocessor based air-cooled

High Precision AC package

units complete with Upward /

downward flow with suitable

mesh in the return air path

having energy efficient high

technology, along with scroll

compressor, comprising of

indoor & outdoor units with all

components including providing

suitable floor stand for indoor

unit to match false flooring

height, supply of suitable size of

copper refrigerant piping,

controls, interlocking, electrical

accessories, SPP [for all three

phase motors], voltage & current

indications & sequential

5 nos

DRAFT NIT

SDE(EP) Page 39 EE(E-P)

controls, communication port

with suitable protocol to suit

BMS compatibility but without

software, air cooled condenser,

MCBs, safety valve, pressure

release valve, data /

communication cable between

units etc. complete as required

and as per specifications

attached.

Note 1. The length of refrigerant

copper pipes for hot & liquid

lines, condenser cable shall be

included up to 12 Mtr. in Part-A

/ Item 1. Additional extra length

shall be paid, as per Part-B /

Item- 2 & 3 respectively.

Total for SUB-HEAD-1

SUB-HEAD-II (INSTALLATION, TESTING AND COMMISSIONING) PART-B

Sl

No

DESCRIPTION OF ITEM QT

Y

UNI

T

Unit price i/c

of all taxes

and duties but

exclusive of

CENVAT-

able taxes and

duties

CENVAT-able

taxes and duties

(Service Tax) on

unit price

UNIT

PRICE (All

inclusive)

Total

Net cost

to

BSNL

Total Amount

inclusive of

all taxes and

duties

Qty Unit ( % ) Amount (5 + 7) ( 3 x 5) ( 3 x 8)

1 2 3 4 5 6 7 8 9 10

1 Installation, testing and commissioning of above 7 TR air-cooled High Precision AC

package units complete with all components, air cooled condenser, including laying of

refrigerant piping, cable, charging of required quantity of refrigerant, condenser/data

communication cable between units etc. as required on existing framework for item at

Sr. No. 1 of Part-A.

5 job

DRAFT NIT

SDE(EP) Page 40 EE(E-P)

2 Supplying and fixing of copper refrigerant piping of minimum 18 G (1.2 mm)

thickness of following sizes with all accessories including cutting, bending, jointing,

brazing etc. for hot gas and liquid lines of a single circuit, on existing MS angle tray

including insulating the refrigerant lines inside AC area with suitable fire retardant

polythene foam complete as per specifications attached.

a). Hot Gas Line, 7/8" nominal dia. 50 mtr

b). Liquid Line, 5/8" nominal dia. 50 mtr

Note for Item no 2 :-

1. The length of refrigerant pipes for hot and cold lines shall be included up to 12 mtrs

in Part-A/ Item No-1. Circuit lengths (for liquid line/ hot gas line) falling in the range

of 10 to 14 mtrs. will be measured as 12 mtrs. and are not subjected to price

adjustment. Where site conditions warrant provision of liquid refrigerant and hot gas

refrigerant pipe of lengths which are more than 14 mtrs & less than 10 mtrs suitable

price adjustment shall be made for additional/ reduced length.

Sl

No

DESCRIPTION OF ITEM

QU

AN

TIT

Y

Unit price i/c

of all taxes and

duties but

exclusive of

CENVAT-able

taxes and

duties

CENVAT-able

taxes and

duties (Service

Tax) on unit

price

UNIT

PRICE (All

inclusive)

Total

Net cost

to BSNL

Total Amount

inclusive of all

taxes and duties

Qty Unit ( %

) Amount (5 + 7) ( 3 x 5) ( 3 x 8)

1 2 3 4 5 6 7 8 9 10

3 Supply and fixing of PVC insulated PVC sheathed copper conductor armored

cable of the following size on the existing MS angle tray (with saddles) along

with 2 x 2.24 mm dia. bare copper wire for loop earthing & end termination of

cable with glands etc. as required.

a). 3 x 2.5 sq. Mm (for condensers) 75 mtr

Note :- 1. The length of armoured copper cable & 2 nos 2.24 mm dia copper wire

for condenser shall be included up to 12 mtrs. with suitable lugs & glands for

each condenser in Part-a/Item No-1. Circuit lengths falling in the range of 10 to

14 mtrs. will be measured as 12 mtrs. and are not subjected to price adjustment.

For circuit length which are more than 14 mtrs & less than 10 mtrs suitable price

adjustment shall be made for additional/ reduced length.

4 Providing plumbing work for humidification circuits and drainage requirements

including supply of GI pipes, pipe fittings such as bends, reducers, elbows, tees,

unions, flanges etc. for water connection of various components of the system.

DRAFT NIT

SDE(EP) Page 41 EE(E-P)

a) 25 mm ( Medium class ) GI pipe insulated with 6-mm thick superior insulation

(for condensate drain) 25 mtr

b) 25 mm GI pipe (Medium Class) 25 mtr

c) 40 mm GI pipe (Medium Class) 25 mtr

Sl

No

DESCRIPTION OF ITEM

QU

AN

TIT

Y

Unit price i/c

of all taxes and

duties but

exclusive of

CENVAT-able

taxes and

duties

CENVAT-able

taxes and

duties (Service

Tax) on unit

price

UNIT

PRICE (All

inclusive)

Total

Net cost

to BSNL

Total Amount

inclusive of all

taxes and duties

Qty Unit ( % )

Amou

nt (5 + 7)

1 2 3 4 5 6 7 8 9 10

5 Supplying and installing following size of perforated pre-painted M.S. cable trays

with perforation not more than 17.5%, in convenient sections, joined with

connectors, suspended from the ceiling with M.S. suspenders including bolts &

nuts, painting suspenders etc as required.

(a) 150mm width x 50mm depth x 1.6mm thickness. 50 mtr

Total for SUB-HEAD - II

SUB-HEAD-III ( COMPREHENSIVE MAINTENANCE) PART-C

Sl

No

DESCRIPTION OF ITEM Qty Unit

Basic

Rate/PAC/Year

(inclusive of all

levies & charges

excluding Service

Tax)

Service

Tax/PAC/Year

Rate/PAC/year

(Inclusive of

all levies &

charges i/c

service Tax)

Total Amount

(Inclusive of all

Taxes & Duties

i/c Service Tax

Total Net

Cost to

BSNL

1

Comprehensive maintenance of the 7TR microprocessor based air-cooled

Precision package AC unit (after the warrantee period) including all items

covered under Part-A & Part–B as per the specifications/conditions of

contract & as per the details given in relevant sections by deploying the

required staff including specialized man power and by arranging required

spares, refrigerant gas, tools and plant etc., to keep the AC unit & connected

equipments operational up to the required standards complete as required.

Note: 1) Operation of package AC unit is not included in this item.

DRAFT NIT

SDE(EP) Page 42 EE(E-P)

2) First year (i.e. 12 months defects liability period) covered under guarantee

AND (Three years for Microprocessor)

A) Second Year 5 Jobs

B) Third Year 5 Jobs

C) Fourth Year 5 Jobs

D) Fifth Year 5 Jobs

Total for Sub-head-III Rs

ABSTRACT OF COST:

Total of Sub-head-I (Part-A) : Rs.

Total of Sub-head-II (Part-B) : Rs.

Total of Sub-head-III (Part-C) : Rs.

Total of Sub-heads : Rs.

DRAFT NIT

SDE(EP) Page 43 EE(E-P)

Note (for Part A, B, C): - 1) Rates quoted shall be inclusive of all taxes & duties. For determining L-1 Cenvatable credit items i.e. Excise duty & Service tax shall not be considered. Cenvatable credit items i.e. excise duty service tax must be mentioned in the table provided below the Price Break up without which the Cenvatable taxes & duties shall be treated as NIL and tender will be decided accordingly. 2) In case of ambiguity, between schedule and specifications, schedule shall prevail. If there is ambiguity between ―schedule and specification‖ verses IS / BS standards, ―schedule and specification‖ shall prevail. 3) No concessional form other than Form ―C‖ shall be issued by the BSNL. Form ―C‖ shall be issued on specific request of the Agency for supply portion only (i.e. SH-I Item No. 1).

CENVAT CREDIT: In order to avail CENVAT credit as per CENVAT Credit rules 2004 & amendment

thereof BSNL, who is an output service provider, is entitled for duty credit. In order to avail the

CENVAT credit, the contractor has to furnish an invoice favoring BSNL indicating quantum of

Service tax paid as of preceding Quarter. The components of Material & Labour in obtaining

CENVAT CREDIT shall be Minimum labour cost 40% on Part B items no 2,3,4 &5 .

QUOTING OF RATES:

The rates quoted shall be inclusive of levies and taxes, packing, forwarding, freight and insurance as

mentioned

Executive Engineer (E)

BSNL Electrical Division, Patna

DRAFT NIT

SDE(EP) Page 44 EE(E-P)

SCHEDULE ―D‖

SECTION - I

GENERAL DESCRIPTION OF WORK

1. Station : Under BSNL Electrical Circle PATNA. 2. Name of Building : Various sites under BSNL Elect Circle. PATNA. 3. Drawings: TO BE SUPPLIED BY concerned EE (E).

The following drawings give the necessary details regarding the areas to be air conditioned, location of air-conditioning plant, cooling tower, proposed routes for condenser water pipes and air ducts, location of fire dampers and other relevant particulars. Any other information can be had from the concerned Executive Engineer (E).

4. Design Data:

The salient design and other relevant data is given below: 1. Particulars of temperature and relative humidity. i) Outside design conditions: D.B.°C (° F) W.B.°C (° F) R.H. (%) Summer: ….............. .........………. .………… Monsoon: ..........……. …..........……. .....……… Winter: ..........……. .........………… .....……… ii) Inside design conditions: Summer: ..........……. .....………….. Monsoon: ..........…….. .....…………… Winter: ..........…….. .....…………… 2. Fresh Air requirements: One air change per hour. 3. Areas to be air-conditioned: As per Annexure 'A'. 4. Plant operation: 24 hours continuously. 5. Peak heat load: ------kcal/Hr (----TR) 6. Features of A/C Plant: As per schedule of work attached 7. Roof Insulation :

NOTE: Safety standards as per Annexure on "B". Makes of various items as per Annexure ―C‖

DRAFT NIT

SDE(EP) Page 45 EE(E-P)

ANNEXURE "A"

NOTE: It will be supplied when Job Agreement is drawn.

PARTICULARS OF SPACE TO BE AIR CONDITIONED

SR.NO.

FLOOR NAME

OF ROOM

AREA (Sq Mtr) /(Sq ft)

EQPT. HEAT LOAD (KW)

LIGHT LOAD (KW)

OCCUPANCY

FLOOR HEIGHT (MTRS) /(FEET)

TOTAL

ANNEXURE "B"

LIST OF SAFETY STANDARDS

I.S. 618 - Code of practice for safety and health requirement in Electrical and Gas

welding and cutting operations.

I.S. 659 - Safety code for Air Conditioning. I.S. 660 - Safety code for Mechanical Refrigeration. I.S. 3016 - Code of practice for fire precautions in welding and cutting operations. I.S. 3210 - Code for safety procedures and practices in Electrical works. I.S. 3696 - Safety for Scaffolds and Ladders. - INDIAN ELECTRICITY RULES 1956.

DRAFT NIT

SDE(EP) Page 46 EE(E-P)

ANNEXURE "C”

LIST OF APPROVED MAKES

LIST OF APPROVED MAKES- BSNL ELECTRICAL WING

S.

No.

Item Makes

1 MCCB(Ics=Icu) L&T/ Schneider Electric / Siemens

2 SDF units L&T/ Schneider Electric / Siemens/

HPL/Havells

3 Power Contactors L&T/ Schneider Electric / Siemens/ Lakshmi(LECS)

4 Change Over Switch HPL / Havells / H-H Elcon

5 Digital/ KWHr meter Schneider Electric/ AE/ Digitron /

IMP/ Meco / Rishabh / Universal/HPL/L&T/ABB

6 Rubber Matting ISI mark

7 MCB/ lsolator

/ELCB/RCCB/ Distribution Board

Crompton / Havells / lndokopp / MDS

Legrand/ L&T / Schneider Electric/ Siemens / Standard/ C&S/ABB/HPL

8 MS/ PVC Conduit ISI mark

9 Cable Tray MEM/Bharti/Ratan/Slotco/Profab

10 HT/LT Cables ISI mark

11 PVC insulated

copper conductor wire

ISI mark

12 Motors ABB/ Bharat Bijlee / Crompton Greaves / Schneider Electric / HBB /

KEC / Siemens/Jyoti Ltd

13 Fresh Air Fans GE / Khaitan/Almonard/Crompton

14 Starter ABB / BCH / Schneider Electric / L&T /

Siemens /

15 Single Phase Preventer

L&T / Minilec / Siemens / Zerotrip

16 GI/MS Pipe ATC / ATL / BST / GSI / ITC / ITS /

IIA / JST / Jindal /TTA / Tata/Zenith

17 Gate Valve Advance/Audco/Johnson Controls/Zoloto/Annapurna / Fountain

/ Kirloskar / Leader / Sant / Trishul

18 Compressors Carrier/Emerson copeland/York/Danfoss (for chillers

only)

19 Resin Bonded Glass

wool

Fibre Glass / Pilkingston / UP Twiga

20 Expanded Polystyrene

BASF(India) Ltd.

DRAFT NIT

SDE(EP) Page 47 EE(E-P)

21 Gauge Feibig / H.Guru / Pricol

22 Controls FLICA / Honeywell / Indfoss / Penn-Danfoss / Ranco / Ranutrol / Sporland

23 Fine Filters Anfiltra Effluent / ARW / Athlete/

Airtake/ Dyna / Kirsloskar/ Puromatic/ Purafill/ Purolator /

Tenacity

24 GI Sheet HSU Jindal / National / Nippon Denro /

Sail / Tata

25 Fire Extinguisher ISI mark

NOTE:

1. The accessories such as CT/PT/measuring instrument/relays provided by approved make in respect of Transformer/HT Panel/DG /AC Package

Units as supplied by approved manufacturer along with the equipments are also acceptable in addition.

DRAFT NIT

SDE(EP) Page 48 EE(E-P)

SECTION - II

SPECIFICATIONS FOR 7/14 TR CAPACITY HIGH PRECISION AIR

CONDITIONERS (HPACs) 1.0 SCOPE :

1.1 These specifications describe the specific requirements of microprocessor

based High Precision Air conditioners (HPACs). The HPAC unit shall consist of indoor and outdoor unit.

1.2 The indoor unit shall be floor mounted type comprising of hermetic

sealed scroll compressor(s), filter section, controller, electrical power system , multi-rows deep copper cooling coil with aluminium fins,

dehumidification cycle, modular panel cabinet construction, cabinet insulation, statically & dynamically balanced blower section, humidifier,

refrigeration controls etc. The unit shall be suitable for Top/Bottom

discharge.

1.3 The outdoor unit shall comprise of air-cooled condenser with fans.

1.4 These specifications set out the basis of design of self contained HPACs to meet the environmental needs of telecom equipments.

1.5 The firms will have to supply such units, approved from BSNLCO.

2.0 DESIGN :

The unit shall be designed to meet the following conditions:

1 Rated capacity 7TR TR (sensible cooling capacity)

2 Flow direction Upward / Downward flow

3 Return Air inlet Temp. 25 ºC (DB) & 50% RH.

4 Saturated Suction

Temp.

Between 9 ºC and 10 ºC

5 Minimum Super heat 2 ºC

6 Saturated Discharge

Temperature

Maximum 53 ºC (at 43 ºC ambient)

7 Ambient air design

temperature (Entering condenser)

43 ºC. However, the unit shall be able to

work for ambient up to 50 ºC)

8 Air Quantity Not less than 550 CFM/TR

9 Filters Having 95% efficiency down to 5 microns.

10 Face velocity across the cooling coil.

Not exceeding 2.5m/sec

11 Type of load The load shall be High sensible type having Sensible Heat factor not less than 0.90

12 EER of the unit Not less than 2.90 Watt/watt

3.0 CABINET :

DRAFT NIT

SDE(EP) Page 49 EE(E-P)

3.1 The Cabinet shall be constructed from best quality GI sheet steel of thickness not less than 1.6mm for top, bottom and side panels & 0.9mm for front and

back panels suitably treated for weather protection, corrosion and shall be powder coated.

3.2 Coil and blower sections shall be insulated internally for both acoustics and

thermal purposes. The insulation material shall be polyurethane foam of thickness not less than 15 mm complying to the class-B according to DIN

4102 with self extinguishing and sound absorbing properties.

4.0 COMPRESSOR :

4.1 The compressor(s) shall be of scroll hermetic sealed type of COPELAND–

ZR108C/DANFOSS make having independent refrigerant circuit.

4.2 Compressor(s) shall be suitable for R22/R407C/R410A refrigerants.

4.3 Compressor(s) shall be suitable for operation on 3-phase, 415± 10% volts, 50 Hz, AC supply.

4.4 The compressors shall be located in such a way that removal of one

compressor shall not affect the operation of the other compressor.

4.5 Compressors shall be mounted on vibration isolation pads or any other mounting approved by manufacturer.

4.6 The compressor(s) shall be provided with built in overload protection.

4.7 The Compressor(s) shall be fitted with electrically operated oil heaters. The heaters shall be “ON” when compressor is in “OFF” position and vice-versa.

It shall be possible to disconnect power supply to the heater during extended periods of shut down.

5.0 EVAPORATOR SECTION :

5.1 The Evaporator Coil shall be provided separately for each refrigerant

circuit.

5.2 Evaporator coil shall be constructed out of copper tubes not less than 0.28 mm thickness with expanded aluminium fins to give a good mechanical bond

for maximum heat transfer. The number of fins shall not be less than 12 fins per inch. Fins thickness shall not be less than 0.1 mm and provided with

hydrophilic treatment.

5.3 Face area of coil shall be selected corresponding to air velocity not exceeding

2.5 m/sec.

DRAFT NIT

SDE(EP) Page 50 EE(E-P)

5.4 The condensate drain tray shall be of stainless steel of thickness not less

than 1.2mm shall be provided to cover full projected area of cooling coil to collect all the condensed water. The PVC threaded water pipe shall be

provided to drain the condensed water.

5.5 The Blower fans shall be statically and dynamically balanced.

5.6 Backward curved fan directly driven by electronically Commutated (EC) motor with integrated electronics suitable for operation on 3-phase AC

supply. The fan speed shall be controlled by sensing return air temperature/pressure/controller logic for energy saving.

5.7 Energy efficient motors of EBMPAPST/ROSSENBERG/ZEIHLABEGG make

shall be used.

5.8 Infrared /Immersed electrode humidifier shall be provided.

6.0 REFRIGERANT PIPING :

6.1 Separate piping shall be provided for each refrigerant circuit.

6.2 Each refrigerant circuit shall be suitable for operation on R22/R-407C/R

410A and shall consist of the following items:- i) Electronic Expansion Valve (EEV) controlled by the microprocessor with

special software to enable the adjustment of flow of refrigerant fluid through the evaporator. At the same time, it should not allow liquid flood

back into compressor. ii) Removable liquid line filter drier with hand shut off valves.

iii) Liquid Line sight Glass with Moisture indicator.

iv) Charging valves. v) Liquid receiver with safety plug.

6.3 Serviceable/removable components for easy removal & assembling.

6.4 The piping shall be carried with refrigerant quality copper tubes of thickness

not less than 18 SWG (1.2mm). The proper bending tool shall be used for bending of the pipes. Heavy gauge radius fittings shall be provided

wherever, bending of pipes is not feasible.

7.0 ELECTRICAL SYSTEM :

The electrical system shall confirm to relevant I.S. standard. The panel shall be accessible from front. The main incomer MCCB of suitable rating and

having a rupturing capacity of not less than 25 kA shall be provided along with

Single Phasing Preventer (SPP), Electronic overload protection, phase loss and reverse phase sequence and sensing negative sequence current to meet the

total power requirements.

DRAFT NIT

SDE(EP) Page 51 EE(E-P)

7.1 The load shall be distributed equally on 3-phase, 4-wire supply.

7.2 All control wires shall be provided with not less than 1.5 sq. mm. Multi-

strand copper conductor. The control wiring shall be properly colour coded and shall be numbered/ ferruled at their point of termination to facilitate

servicing/identification.

7.3 The power and control wiring shall be provided in separate casing capping/conduit.

7.4 Heaters shall be provided with insulators, with safety thermostats,

humidistats and contactors of suitable ratings.

7.5 Isolator of suitable rating having rupturing capacity of not less than 10 kA

shall be provided for each equipment/ motor/ heater etc. However, the isolation arrangement for condenser fan motor shall be achieved through

suitable rating MCB mounted on condenser unit.

7.6 Contactor of suitable rating shall be provided with over load protection for motors and compressors.

7.7 The laminated power and control wiring diagram shall be provided on HPAC

unit.

8.0 AIR COOLED CONDENSER :

8.1 Separate condenser unit shall be provided for each refrigerant circuit.

8.2 A heat rejecting coil block shall be constructed out of copper tubes not less

than 0.28 mm thickness with expanded aluminium fins to give a good mechanical bond for maximum heat transfer. The number of fins shall not be

less than 12 fins per inch.

8.3 Fins thickness shall not be less than 0.1 mm and shall be provided with epoxy /suitable weather proof coating.

8.4 A minimum of two numbers axial flow fan directly driven by variable speed

drive shall be provided for each condenser unit.

8.5 The condenser unit shall suitably design for noise level ≤ 75 dB at a distance of 1 meter away from outdoor unit.

8.6 The Condenser unit shall be suitable for round-the-clock operation.

8.7 The body of the condenser unit shall be made out of 16 SWG (1.6 mm) corrosion resistant G.I. Sheet. The entire assembly shall be supported by

epoxy coated frame.

DRAFT NIT

SDE(EP) Page 52 EE(E-P)

9.0 CONTROLS :

9.1 High pressure trip – Manual reset (for each compressor)

9.2 Low pressure trip – Auto reset (for each compressor)

The unit shall trip in the event of for three consecutive LP trip.

10.0 SAFETY INTERLOCKS :

10.1 The compressor shall start with condenser fan in “ON" condition only. However, the compressor may run without condenser fan in operation.

10.2 Provision shall also be made to operate the evaporator fan without operation

of condenser and compressor.

11.0 CONTROLLER :

11.1 SCOPE :

Each unit shall have individual controller as per the manufacturer’s design

to maintain the desired temperature and humidity. The controller shall be intelligent type with microprocessor capable of communicating with other units

in same room and control the desired condition with group action. The controller shall operate the units in Master-Slave configuration; however, each

controller shall act as Master, if required, in emergency situations.

The controller shall be provided with a backlit LCD/LED screen and control keys for user inputs mounted in an ergonomic, aesthetically pleasing housing.

The controls shall be menu driven. The display & housing shall be viewable

while the unit panels are open or closed.

The controller shall fully compliant with EEC directives for electromagnetic compatibility possessing following broad features:

i) Operates and monitors so that the temperature and humidity in the

conditioned area are kept at 23 +3 0C & 40 + 20% RH respectively. However, the parameters shall be site settable.

ii) The controller shall be password protected for preventing un-authorized access.

iii) The display shall be organized into following three main sections:

User Menu Service Menu Advanced Menu

Active alarms, event

log, numeric/ graphic data, unit

view/ status

Set points, standby

settings (lead/lag), timers/ sleep mode, alarm setup,

sensor calibration,

Factory Settings,

Configuration settings shall be

factory-set based

DRAFT NIT

SDE(EP) Page 53 EE(E-P)

overview (including

the monitoring of room conditions,

operational status in % of each function,

date and time) , total run hours,

various sensors etc.

maintenance/ wellness

settings, and repair /service mode etc.

on the pre-defined

component operation etc.

11.2 USER MENU :

The user menu shall be defined as follows:

i) Active Alarms :

Unit memory shall hold the 100 most recent alarms with time and date stamp for each alarm.

ii) Event Log :

Unit memory shall hold minimum of 100 most recent events with id number, time and date stamp for each event. The conditioned area temperature,

humidity etc. are saved at regular intervals.

iii) Numeric/Graphic Data View : The numeric/ graphic records shall be available for supply air temperature,

return air temperature, return air humidity and outdoor ambient temperature.

iv) Unit View - Status Overview : Numeric or Graphical unit view summary displays shall include temperature,

humidity, active functions and any alarms of the units.

v) Total Run Hours : Menu shall display accumulative component operating hours for Unit and

compressors.

11.3 SERVICE MENU:

The service menu shall be defined as follows: -

i) Set Points :

The controller shall allow programming of the following conditions:

a) Temperature Set Point - 18-29ºC

b) Adjustable Temperature Hysteresis - 0.5-5ºC c) Humidity Set Point - 20-80% RH

d) Adjustable Humidity Hysteresis - 1-10% RH

DRAFT NIT

SDE(EP) Page 54 EE(E-P)

e) Low/High Temperature Alarm - 2-32ºC

f) Low/High Humidity Alarm - 15-85% RH g) High Pressure Alarm - 320-340 psi

The controller may be set within these ranges, however, the unit may not

be able to control to extreme combinations of temperature and humidity.

The controller shall include the following settable features: a) Unit identification number.

b) Startup delay, cold start delay and Fan run on timers c) Remote shutdown & general alarm management

d) Compressor sequencing. e) Return temperature control.

ii) Repair/Service Mode : Control input and output values and status shall be displayed to aid in

unit diagnostics and troubleshooting. Control inputs shall indicate on or off at the front display and shall be able to turn on or off from the front display

without using jumpers or a service terminal. Each control output shall be indicated by an LED on a circuit board.

11.4 ADVANCED MENU:

Factory Settings:

Configuration settings shall be factory-set based on the pre-defined component operation.

11.5 The Controller shall also have following features :

i) Allow adjustment of temperature, humidity set points, range of control,

alarm set points etc.

ii) Arrow/control buttons for navigation and value adjustment.

iii) Status indicators like Power, Cool, humidity etc.

iv) The controller shall be provided with power backup unit to operate during mains

power failure.

v) Programming of unit shall be based on :

(a) Equal run hours per 24 hours in a day and

(b) Turn on next unit in case the designated unit is unhealthy.

11.6 GROUP OPERATION: The optimum number of units shall be made operational in order to maintain

the necessary temperature and humidity in the conditioned area. All units can work as a single system and shall communicate with each other to maintain desired values in the conditioned area.

DRAFT NIT

SDE(EP) Page 55 EE(E-P)

11.7 CASCADING EFFECTS:

If the values exceeds beyond the set points, the standby units will operate to

maintain the desired condition and after maintaining the set points, unit will return back to standby mode. In case, the standby unit(s) are not in a position

to maintain the set values, all the units shall operate collectively to maintain the desired condition.

The Controller shall have the feature of grouping/ zoning of units, if required.

11.8 SYSTEM AUTO RESTART:

The controller shall have auto restart facility to start unit sequentially after

restoration of power supply with suitable programmable time delay to minimize

total inrush current.

11.9 PREDICTIVE HUMIDITY CONTROL :

The controller shall calculate the moisture content in the room and prevents

unnecessary humidification and dehumidification cycles by responding to changes in dew point temperature.

11.10 ALARM MANAGEMENT :

i) Display Status Indication : The unit shall display the following:

a. Temperature and humidity.

b. Blower fan-working status.

c. Compressor working status.

d. Electric heaters working status.

e. Temperature set point.

f. Humidity set point.

g. Working hours of main component i.e. Compressor, fan, heater,

humidifier.

h. Unit working hours.

i. Real time and date.

j. Type of alarm.

ii) Audio-Visual alarms:

a. High Temperature

b. Low Temperature

c. High Humidity

d. Low Humidity

DRAFT NIT

SDE(EP) Page 56 EE(E-P)

e. Compressor Overload

f. Evaporator Fan Overload.

g. Humidifier Faulty.

h. High Pressure

i. Low Pressure

j. Clogged Filter

k. Condenser Fan overload

l. Unit OFF

11.11 The controller shall be suitable to be integrated with fire system and should switch off the unit in event of receiving signal from the fire panel.

11.12 The Controller shall be equipped with Modbus/BACnet/LonWorks/open protocols

connectivity facility for enabling data transfer to an IBMS system, wherever IBMS is available.

11.13 The log data shall be downloadable printable in sequence of date & time. The

necessary provision shall be available to connect the laptop /flash drive through TCP/IP protocols, wherever IBMS is not available.

11.14 The firm shall provide one software free of cost.

DRAFT NIT

SDE(EP) Page 57 EE(E-P)

12.0 MICRO INVENTORY :

Sl.

No. Description of Items 7 TR HPAC 14 TR HPAC

1.0 COMPRESSOR:

1.1 Make COPELAND–ZR108C/DANFOSS

COPELAND–ZR108C/DANFOSS

1.2 Type Hermetic scroll Hermetic scroll

1.3 No of Compressor 1 2

1.4 Power supply V / Ph / Hz 415±10%/3/50 415±10%/3/50

1.5 Oil Heater Yes Yes

2.0 EVAPORATOR COIL:

2.1 Tube not less than 0.28 mm Cu

not less than 0.28 mm Cu

2.2 Fins not less than 0.1 mm Al.

not less than 0.1 mm Al.

2.3 Fins per Inch nos. not less than 12 not less than 12

2.4 Coating Hydrophilic Hydrophilic

3.0 EVAPORATOR FAN:

3.1 Make EBMPAPST/ROSSENBERG/ZEIHLABEGG

EBMPAPST/ROSSENBERG/ZEIHLABEGG

3.2 Type of Fan Electronically Commutated with

backward Curved

Electronically Commutated with

backward Curved

3.3 Type of Drive Direct driven Direct driven

3.4 Speed control Variable Variable

3.5 No of Fan 1 2

3.6 Power supply V / Ph / Hz 415±10%/3/50 415±10%/3/50

4.0 EXPANSION VALVE:

4.1 Type Electronic Electronic

4.2 Number 1 2

5.0 FILTERS:

5.1 efficiency 95% down to 5 microns

95% down to 5 microns

6.0 HUMIDIFIER:

6.1 Type Immersed electrode/

Infra Red

Immersed electrode/

Infra Red

DRAFT NIT

SDE(EP) Page 58 EE(E-P)

6.2 Power supply V / Ph / Hz 415±10%/3/50 415±10%/3/50

7.0 ELECTRICAL HEATER:

7.1 Type steel fin tubular steel fin tubular

7.2 ON/OFF/ Safety arrangement

Contactor, Thermostat

Contactor, Thermostat

7.3 KW 6 KW 9 KW

7.4 Power supply V / Ph / Hz 415±10%/3/50 415±10%/3/50

8.0 CONDENSER:

8.1 Type Air cooled Air cooled

8.2 Number of Units 1 2

8.3 Tube not less than 0.28 mm Cu

not less than 0.28 mm Cu

8.4 Fins not less than 0.1

mm Al.

not less than 0.1

mm Al.

8.5 Fins per Inch nos. not less than 12 not less than 12

8.6 Number of fans not less than 2 not less than 4

9.0 CONDENSER FAN:

9.1 Type of Fan Axial Flow Axial Flow

9.2 Type of Drive Direct driven Direct driven

9.3 Power supply V / Ph / Hz 230±10%/1/50 230±10%/1/50

9.4 Speed control Variable Variable

10.0 NUMBER OF CIRCUITS 1 2

11.0 ELECTRICAL SYSTEM:

11.1 MAIN INCOMER: 1 1

i) Type 4-pole MCCB 4-pole MCCB

ii) Rating 63A 80A

iii) Breaking Capacity not less than 25 kA not less than 25 kA

iv) SPP 1 No. 1 No.

11.2 ISOLATOR 5 Nos. 8 Nos.

11.3 MCB 1 No. 2 Nos.

11.3 CONTROL WIRING 1.5 Sq. mm. multi

strand Cu. Wire

1.5 Sq. mm. multi

strand Cu. Wire

DRAFT NIT

SDE(EP) Page 59 EE(E-P)

PROFORMA FOR TEST RESULT

___________________________________________________________________ S.No. Items Test Result ___________________________________________________________________ 1. Ambient Conditions D.B. Temp. _______ C W.B Temp. _______ C R.H _______ % 2. Compressors R.P.M _______

Refrigerant Gas suction pressure _______ kgs/Sq.cm Refrigerant Gas discharge pressure _______ kgs/Sq.cm

Oil Pressure _______ Kgs/Sq.cm 3. Compressor Motors R.P.M. _______ Voltage _______ Volts Currents

(I) at 10% load ________ Amps. (ii) at Partial load (a). _______ Amps. (b). _______ Amps. (c). _______ Amps. 4. Condensers Air flow rate _______ C.F.M. Air Temp. (i) Entering _______ C (ii). Leaving _______ C 5. Cooling Coil Total air quantity across the coil _______ C.M.H. Coil Face Area _______ Sq.M Air Temperature Entering (D.B) _______ C Entering (W.B) _______ C Leaving (D.B) _______ C Leaving (W.B) _______ C 6. Fresh Air Intake Face Area _______ Sq.M Air Quantity _______ C.M.H. 7. Room condition at the Temperature working place ( No. of (D.B) _______ C

readings shall be taken (W.B) _______ C and average taken out). 8. Controls Functions of each control shall be tested and report furnished.

DRAFT NIT

SDE(EP) Page 60 EE(E-P)

SCHEDULE ―D‖

Section-III

ELECTRICAL WORK

1. Scope

This section sets out the basic requirement for switchboards, electrical power wiring to individual motors and other equipments, control circuit wiring and earthing etc.

1. General

1. Unless otherwise specified particularly the entire equipment shall be suitable for operation

on 415 volts/240 volts, 50Hz earthed neutral, 3/single-phase alternating current system as may be required.

2. All components, accessories, raw materials and finished parts used in manufacture and

assembly of switch boards, power and control circuit wiring and earthing system shall comply with the relevant Indian Standards amended up to date. Where Indian Standards do not exist British Standards shall apply.

3. The entire work shall comply with Indian Electricity rules and C.P.W.D general

specifications for electrical work. Particular care shall be taken to ensure compliance to I. E. rules 41, 45, 51 and 61.

4. When cables pass through pipes, wooden bushes shall be provided at both the ends. When

cables are required to pass through floors or walls, pipe inserts shall be provided and openings sealed in approved manner.

2. Control Wiring

1. Control circuit wiring shall be carried out with 250 volts grade PVC insulated armored multi

core copper conductor cables. 2. Control cables shall be of adequate cross sections to restrict the voltage drop but each

conductor shall be not less than 1.5 sq. mm. 3. Runs of control wires within the switchboard shall be neatly bunched and suitably supported

/ clamped. Means shall be provided for easy identification of the control wires by means of labeled ferrules.

4. The control wiring shall correspond to the circuit / sequence of operations and inter locks as

required for satisfactory performance of the plant.

4. Earthing

1. In accordance with Rule 61 of IE Rules, metallic frame of all medium voltage equipments / supporting frames, shall in all cases be connected to 2 separate and distinct earths. The size of such earth wires shall be not less than 4-mm dia. GI wire.

DRAFT NIT

SDE(EP) Page 61 EE(E-P)

PART C

GENERAL CONDITIONS

COMPREHENSIVE AMC PORTION AGREEMENT

1. Scope of Maintenance :

a. The maintenance of HPAC units as included in the schedule of work is to be carried out on comprehensive basis. No material / spares will be supplied by BSNL. The firm has to adhere to maintenance schedule attached with this document.

b. The firm has to repair / replace defective parts / spares at no extra cost. The faulty compressor will be replaced from the original manufacturers / authorized dealer and documentary proof for the same will be given.

c. The contractor shall depute his service representative – (I) within 4 to 6 Hours in case 50% or more PAC units trip or goes faulty (emergency condition), (II) within 24 hours in case 1/2 units trip or goes faulty (in normal working condition), of notification of breakdown calls made by the department / BSNL.

d. In case the contractor fails to depute his representative within (I) 4 to 6 hours (emergency condition) or (II) 24 hours of notification of the defect or fails to cause remedial measure within reasonable time as decided during joint inspection, the department may proceed to do so at the contractor‘s risk and expenses and without prejudice to any other right.

e. The AMC period shall be started immediately after the expiry of warrantee period & will be treated as taken over for comprehensive contract from the next calendar date. The units being in warrantee period, there will not be any kind of defect list etc during handing over.

f. After the completion of maintenance contract, the Agency will hand over the installation in a healthy and free from defects condition.

2. METHODOLOGY

a. Before starting the work the agency has to supply the details as per Annexure I. A complaint book as per Annexure-II shall be kept at sub-division office by the firm and the firm shall update the same by submission of service reports. Necessary complaints will be registered by JTO (E) / SDE (E) concerned and entries will be made by him according to the service reports with due verification.

b. At the start of each quarter, the firm in consultation with SDE (E) concerned shall prepare a

tentative program for preventive maintenance to be carried out during the period by listing name of stations and date on which he may carry out the maintenance.

c. The firm shall depute only those persons who are trained in handling the unit to the

satisfaction of maintenance in charge. 3. COMMERCIAL

a. The tenderer must obtain himself at his own expenses, all the information necessary for the purpose of tendering, Inspect the site and acquaint himself with all the local conditions, means of access to work and nature of work etc. No claim shall be entertained on this account.

DRAFT NIT

SDE(EP) Page 62 EE(E-P)

b. Payments shall be made on quarterly basis. It is mandatory to attach Annexure III & IV (Containing details of periodical maintenance done) with the bill. This certificate has to be signed by the S.D.E. (E).

4. SERVICE TAX: - Refer conditions mentioned earlier. 5. COMPENSATION FOR DEFAULTS

a. Any damage to the installation(s)/building due to the carelessness on the part of firm‘s staff shall be the responsibility of firm and shall be replaced/rectified without any extra cost.

b. Any accident or damage will be the responsibility of agency and the Department will not

entertain any claim, compensation, penalty etc on this account or on account of non-observance of any other requirement of law relevant to his work.

c. All breakdown calls / complaints have to be attended by the firm with utmost promptness. If

the agency fails to rectify any fault within reasonable time, the department reserves the right to carry out the work at the risk and cost of the agency. In case the fault is of emergency nature, which may affect the normal functioning of the services, and the firm fails to take immediate necessary action, the work shall be carried out at the risk and cost of the firm without giving any notice. The decision of the EE (E) shall be final.

d. Compensation for delay in removal of defects:

Sr. No. Grounds of compensation Quantum

1 Non functioning of equipments but overall performance parameters i.e. temp,

0.5 % (half percent) per week subject to maximum of 10% of the agreement amount (one year). a) Within Limits.

b) Beyond Limits.

Note: 1. This is without prejudice to BSNL‘s right to take action under clause 3 of EW-8. 2. The period after which compensation shall be applicable will be governed as Follows : 1(a) shall be applicable after a period of two weeks or immediately if the

ground changes from 1(a) to 1 (b). 1(b) shall be applicable immediately. 3. The period of 2 weeks shall be suitably extended, if required, in case of major

defects (replacement/ repair) by the Superintending Engineer (E).

6. CURRENCY OF CONTRACT

a. The currency of contract shall be 48 months (4 years).

b. The Department reserves the right to terminate the contract by giving show cause notice of one-month duration at any time during the currency of the contract.

c. The Department reserves the right to extend the contract for a maximum period of 12

months (6 months at a time) at the same rates & conditions without consent of the firm.

DRAFT NIT

SDE(EP) Page 63 EE(E-P)

7. MISCELLANEOUS

a. The workers engaged by firm should maintain proper discipline and good behavior with occupants. The firm shall not depute such workers at the site, whose behavior is found improper. Executive Engineer‘s decision shall be final.

b. The agency will provide the workers with necessary Tools & Plant, Testing and safety equipments.

c. Agency has to observe all the labour rules and regulations in force and indemnify BSNL against any claims whatsoever, either from this clause or any other clause in the contract.

d. Firm shall issue ID card to their workforce whenever they enter premises for bonafide work. Nobody shall be allowed entry without work and nobody will be allowed overnight stay without work. The workers should wear proper uniform with detachable badge indicating the name of person & firm.

e. Dismantled materials shall be returned to the BSNL except those items for which the replacement is supplied by the agency.

f. The contractor has to keep all the units, neat and clean to avoid any accident and / or fire hazards.

g. Firm should have round the clock contact telephone number. In case of Emergency, contractor and authorized engineer supervisor shall be available at site on short notice from engineer-in-charge and make all efforts to make the situation normal at the earliest.

h. Firm is responsible to keep workable spares and consumables for due performance of the contract. For critical spare parts, firm shall have arrangement with dealers for prompt supply.

i. Any material used/replaced by the Firm for the work shall have same specification. Alternate Make shall be allowed, only after prior approval of the Engineer in charge.

8. MAINTENANCE SCHEDULE TO BE FOLLOWED

QUARTERLY

1. Checking and tightening of electrical connections. 2. Check compressor mounts for any undue vibrations or cracks, replace mounts, if

necessary. 3. Checks air leakage around the A/C unit and rectify. 4. Cleaning of cooling and condensing coil with air pressure (including chemical cleaning, if

required). 5. Clean internal parts of A/C units. 6. Open fan section cover. Check belts for wear & tear. Replace, if necessary. Check bearings

& alignment of belt drive and take corrective action. 7. Check operating pressures of compressors. Take corrective action for deviations. 8. Checking of Micro controller settings 9. Checking of sequential operational settings of programmer. 10. Checking all safety controls like overload, HP/LP cutouts & thermostats. Take corrective

action, wherever required. 11. Checking current drawn by blower fan motor, condenser fan motor & compressor. 12. Ensure proper operation of motorized dampers. 13. Checking all indicating lamps, protective fuses etc. 14. Checking of refrigerant leakages & topping up if required. 15. Checking of supply air flow rate & air leakages if any.

DRAFT NIT

SDE(EP) Page 64 EE(E-P)

16. Checking all safety interlocks

YEARLY

1. Complete servicing of the units. 2. Carry out leak test for refrigeration circuit and plug the leaks, if any. 3. Check current of all motors and take corrective action for major deviations. 4. Check for any rust spots. Dry, emery such spots, patch up with red oxide and paint. 5. Performance cum trial run test including capacity calculation by enthalpy & HR method as

per proforma Test report.

SPECIAL CONDITION

1. All breakdown calls / complaints have to be attended by the firm with utmost promptness. 2. The replacement of Microvee filters will be the responsibility of BSNL. [Replacement of

Microvee filter shall be done with the prior written approval of Superintending Engineer (E)]. 3. Burnt out motors shall not be repaired but replaced with higher efficiency motors of reputed

make.

DRAFT NIT

SDE(EP) Page 65 EE(E-P)

Annexure – I

Details to be supplied before starting the work

1 Name of the Agency

(with Office address)

:

2 Name of Proprietor / partners

:

3 Telephone No.(s) of the firm

:

4 Name & address of the Supervisor

:

5 24 Hours contact No. :

ANNEXURE - II

COMPLAINT REGISTER / LOG BOOK

Sr. No.

Date & time of

complaint

Nature of complaint

Location Date & time of attending complaint

Cause of fault

Material used

Remarks / Signature of SDE/ JTO

DRAFT NIT

SDE(EP) Page 66 EE(E-P)

ANNEXURE – III

Programme for Periodical Maintenance for the month of __________ Name of Contractor: __________________ Agreement No.: _____________________ Location: __________________

Sr. No.

Name of Service Maintenance Activity with requirements of materials

Remark

(Contractor) Engineer – in – Charge

ANNEXURE – IV

Actual Periodical Maintenance carried out in the month of __________ Name of Contractor: __________________ Agreement No.: _____________________ Location: __________________

Sr. No.

Name of Service

Periodical Maintenance Actually carried out

Results Satisfactory/ Unsatisfactory

Remarks

(Contractor) Engineer – in – Charge