nine project (8-19-15)

30
WIRELINE OPERATIONS Mario Castillo Marshall Baker August 19, 2015

Upload: mario-castillo

Post on 08-Jan-2017

615 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Nine Project (8-19-15)

WIRELINE

OPERATIONS

Mario Castillo

Marshall Baker

August 19, 2015

Page 2: Nine Project (8-19-15)

Job: Powers Device

• Cable connects

device to power

source

• Cable powers at

specified location

LAPTOP CHARGER

Page 3: Nine Project (8-19-15)

COMPARISON

Page 4: Nine Project (8-19-15)

Armored conductive line that lowers/actuates equipment

• Exterior: Multi-strand wire armor cable

• Interior: Insulated electrical conductor wire

WIRELINE (ELECTRIC LINE)

Page 5: Nine Project (8-19-15)

• Slickline

Single strand

• Braided Line

Multi strand

• Specialty Cable

COUNTERS PARTS

Page 6: Nine Project (8-19-15)

WIRELINE TRUCK (PERFORATOR)

Page 7: Nine Project (8-19-15)

EXTERIOR

Drum

Horsehead

Motor

Tool Cavity

Grounding

Cable

Page 8: Nine Project (8-19-15)

INTERIOR

Fire Ups

Shooting Panel

Warrior Interface

Panel

Hoistman’s

Controls

Page 9: Nine Project (8-19-15)

Wellbore – reservoir conduit

Common Methods

1. Wireline Perforating

2. TCP (Tubing Conveyed

Perforating)

COMPLETION PERFORATION

Page 10: Nine Project (8-19-15)

Electrically activated gun string run on wireline

• Alternating polarity sequencing

• Depth control: CCL

• Pump-down required for horizontal section

WIRELINE PERFORATING

Page 11: Nine Project (8-19-15)

Mechanically/pressure activated gun string

• Primarily used in horizontal

• No pump-down needed

• Less accurate than wireline perforating

TUBING CONVEYED PERFORATING (TCP)

Page 12: Nine Project (8-19-15)

APPROACHES

Coil Tubing Unit Workover Rig

Units

Methods

Depth Control

Time Delay Use

Coil Tubing Workover Rig

Time Delays Between Joints

Mechanical

CounterTubing Tally

Necessity Assurance

Page 13: Nine Project (8-19-15)

GUN CARRIER

Shaped ChargesPrimer Cord

Examples

Page 14: Nine Project (8-19-15)

Casing-conveyed perforating

• Eliminates need for wireline

• Primarily used for toe

• Process incorporates balls/seats after toe

FLOWGUNTM

Page 15: Nine Project (8-19-15)

FLOWGUNTM

Page 16: Nine Project (8-19-15)

Completion tool used to isolate zones

TypesBall Drop

Caged Ball

• Allows flow uphole

Casing

4.5” (B10, 3.5)

5.5” (B10, B20, 3.5)

• Millable/Drillable

FRAC PLUGS

Page 17: Nine Project (8-19-15)

Completion tool used to isolate zones

• Incorporates bridging pin

• No communication between zones

Casing4.5” (B10, 3.5)

5.5” (B10, B20, 3.5)

• Millable/Drillable

BRIDGE PLUGS

Page 18: Nine Project (8-19-15)

Retrievable isolation tool

Tasks

Fracturing Squeeze Job

Acidizing Wellhead Servicing

Wireline – Set with B10

Tubing – Set with hydraulic setting tool

RETRIEVABLE BRIDGE PLUG (RBP)

Page 19: Nine Project (8-19-15)

Frac plug replacement

• Largest ID

• Dissolvable ball

• Eliminates intervention

FRACDOCKTM

Page 20: Nine Project (8-19-15)

• Cement Bond Logs

(CBLs)

Inspect cement job

• Caliper Logs

Inspect casing integrity

• Tools run with

centralizers

LOGGING

Page 21: Nine Project (8-19-15)

CBL INSIGHT

Casing Collar Locator

(Depth Control)

Variable Density Log

(Arrival Identifier)

Gamma Ray

(Formation Type)

Amplitude

(Signal Loudness)

Transit Time*

(Quality Control)

* not pictured here

Cement Map*

(Visual Representation)

Page 22: Nine Project (8-19-15)

GOOD CEMENT

LOW Amplitude

Page 23: Nine Project (8-19-15)

NO CEMENT

HIGH Amplitude

Page 24: Nine Project (8-19-15)

PARTIAL CEMENT

MIXED Amplitude

Page 25: Nine Project (8-19-15)

CASED HOLE CALIPER

• Up to 80 fingers

Findings− Wear

− Corrosion

− Deformation

• Produce 3D image

Page 26: Nine Project (8-19-15)

PRESSURE CONTROL

Page 27: Nine Project (8-19-15)

1. Grease Head− Holds pressure

2. Lubricator− Gun string housing

3. Pump in Tee− Equalizes pressure

4. Blowout Preventer (BOP)− Security measure

5. Grease Unit− Supplies honey-oil to grease head

6. Tool trap− Prevents tools from entering the well

7. Line wiper− Cleans wireline

PRESSURE CONTROL 7

5

4

2

1

6

3

Page 28: Nine Project (8-19-15)

US Rig Counts

Currently: 884

Last Year: 1913

All-time High: 2031

WTI Crude Oil: $41.87/bbl

Brent Crude Oil: $49.03/bbl

MARKET

Baker Hughes 8/17/2015

Page 29: Nine Project (8-19-15)

EBITA: ~ 30%

Reasons

− Strong Team

− Innovative

− Add-on Tools

− Close to Perfection

− Far from Ordinary

− Driven to Succeed

NINE SUCCESS

Page 30: Nine Project (8-19-15)

WIRELINE

OPERATIONS

Mario Castillo

Marshall Baker

August 19, 2015