nidec asi corporate energy efficient power solutions

23
www.nideasi.com Efficient Power Solutions Efficient Power Solutions Energy PPT2013.01.01.03EN

Upload: nidec-corporation

Post on 14-Jun-2015

399 views

Category:

Technology


3 download

DESCRIPTION

Corporate Energy - Efficient Power Solutions

TRANSCRIPT

Page 1: Nidec asi corporate energy   efficient power solutions

www.nideasi.com

Efficient Power SolutionsEfficient Power Solutions

Energy

PPT2013.01.01.03EN

Page 2: Nidec asi corporate energy   efficient power solutions

2www.nidec-asi.com

Energy experience

NIDEC ASI has over 40 years of experience in variable speed drive systems,generators, static excitation systems and soft starters for auxiliary equipment in all typesof power stations, including nuclear.

Our product basket includes turn-key substations for Transmission and Distribution andFACTS (Flexible AC Transmission Systems).

As a leading expert in Power Quality, we can assist customers in the rapid deploymentof renewable energy fields with robust systems that integrate seamlessly into the existingenergy network.

PPT2013.01.01.03EN

Page 3: Nidec asi corporate energy   efficient power solutions

3www.nidec-asi.com

Efficient energy produtionOur experience in thermal power plants

NIDEC ASI offers a wide range of components for:

Fossil and fuel power plants

Gas and combined cycle power plants

Geothermal power plants

Waste-to-energy plants, cogeneration, biomass, district heating

PPT2013.01.01.03EN

Page 4: Nidec asi corporate energy   efficient power solutions

4www.nidec-asi.com

• Fossil and fuel power plants - gas and combined cycle powerplants:Energy demand is rising: revamping your plant to increase efficient,reliable power generation is one of our primary focuses.

Our scope of supply includes:

•Waste-to-energy plants, cogeneration, biomass, district heating:We are able to provide proven equipment for different types ofincineration and combustion: fixed and moving grate, rotary kiln,fluidized bed.Our solutions enable municipalities, utilities and waste managementcompanies to optimize energy generation.

- Softstarter for gas turbine

- T&D- MV induction motors

- LV/MV VFD• SFC and excitation systems

Efficient Energy produtionOur experience in thermal power plants

PPT2013.01.01.03EN

Page 5: Nidec asi corporate energy   efficient power solutions

5www.nidec-asi.com

NIDEC ASI has the right solution foryour hydro power plant needs:

•For Mini-Hydro Power Plants:- Synchronous generators- Permanent Magnet (PM) generators-Inverters

•For Hydro Power Plants:pumped-storage plant: SFC andexcitation systemsRun-of-the-river plant: excitationsystems

Micro – Hydro Power Plants:P < 100 kW

Mini – Hydro Power Plants:up to 15 MW

Hydro Power Plants: P > 15MW

Efficient Energy produtionOur experience in Hydropower

PPT2013.01.01.03EN

Page 6: Nidec asi corporate energy   efficient power solutions

6www.nidec-asi.com

NIDEC ASI is one of the few Italian companies qualified to supply electric motors andgenerators to nuclear power stations. Our electric motors and generators are widely used on auxiliaries in the non nuclear island. Our products are manufactured in accordance with the main international standards

(IEEE, ASME III, V, IX, IEC, NEMA, US NRC…).We are now certifying our components for the nuclear island.

Efficient Energy produtionOur experience in Nuclear Energy

PPT2013.01.01.03EN

Page 7: Nidec asi corporate energy   efficient power solutions

7www.nidec-asi.com

Through our subsidiary Answer Drives, in 2009 NIDEC ASI launched the SolarGate5000,specifically designed for large scale commercial solar power plants.

The SolarGate5000 is available in two versions: air cooled and water cooled.

Efficient Energy produtionOur experience in Solar Energy

• Power range: 20-1000 kW• Performance at the top end of the market• Minimized power loss thanks to our Miro function• Plug & Play container solutions up to 2 MW• Multi MPPT modular solutions available

PPT2013.01.01.03EN

Page 8: Nidec asi corporate energy   efficient power solutions

8www.nidec-asi.com

Our 1 MW containerized solution includes:

• MV input line switchboard• MV/LV transformer• N° 2 Inverter PVPP8M580NP• services panel• UPS• remote control by web• subsidized energy meter

Efficient Energy produtionOur experience in Solar Energy

PPT2013.01.01.03EN

Page 9: Nidec asi corporate energy   efficient power solutions

9www.nidec-asi.com

The right partner for innovationDesigning the next generation of Wind Generators

Our extertise:

- PM generators

- AFE inverter for MVsolutions

- GT5000 LV high-powerinverter solutions

- Substation design

- Smart grid connection

Nidec ASI can assist customers with the design anddevelopment of their next generation wind towers.Our segmented PM generator was specifically designed for faroff-shore applications.

PPT2013.01.01.03EN

Page 10: Nidec asi corporate energy   efficient power solutions

10www.nidec-asi.com

RECTIFIER MODULETYPE P2T50(75) Fair forced cooled

RECTIFIER MODULE TYPEP2T75(100) Wwater cooled

RECTIFIER MODULETYPE P2T50(75) NAir natural cooled

Static Excitation Systems

ONE BRIDGE MAX (*) RATED CURRENT (A)

With following cooling system

(*) The real rated current for each type of Module is a function of the Ambient Temperature (or the External Water) of supplyVoltage and of the Requested Dimensioning.

4890 – 9920 A(3150 – 4630 A)--------PET100 Size 3 Module

2450 – 6235 A2325 – 3640 A1000 – 1440 APET75 Size 2 Module

1395 – 3530 A1420 – 2200 A620 – 930 APET50 Size 1 Module

----------------(475 – 665 A)PET40 Size 0 Module

--------305 – 520 A35 – 215 ACompact Modules (6 sizes)

Deionized WATER

In closed cycle W

Forced AIR

in open cycle F

Natural AIR

Convection N

EAA SILIBLOC

Converter Type

PPT2013.01.01.03EN

Page 11: Nidec asi corporate energy   efficient power solutions

11www.nidec-asi.com

Variable Speed Drives & Softstarters

Silcovert SThyristor based LCI

for synchronousmotors providesspeed regularity,monitoring andbraking torque

regulation

GT 3000 / GT 5000IGBT based

variable frequencydrive with

unmatched levelsof adaptability

Series HAir cooling: up to 8100 KVAWater cooling: up to 18700

KVA (higher power onrequest)

Voltage: up to 7200 V(12000 V on request)

Series NAir cooling: up to 10400

KVAWater cooling: up to24000 KVA (higherpower on request)

Voltage: up to 3300 V

PPT2013.01.01.03EN

Page 12: Nidec asi corporate energy   efficient power solutions

12www.nidec-asi.com

Our Stengths

Custom Engineered Solutions

2 poles shaft design

Wide range of Power Ratings

Our Stengths

Custom Engineered Solutions

2 poles shaft design

Wide range of Power Ratings

Electric Motors & Generators

Induction machines

Power rating:

− 150 ÷ 25,000 kW

− 200 ÷ 33,000 HP

Voltage:

− up to 15 kV

Mass:

− 1,500 ÷ 120,000 kg

Number of poles:

− 2 ÷ 36

Frame size:

− 315 mm through 1120, 10, 11, 12, 13

Synchronous machines

Power rating:

− 150 ÷ 45,000 kW

− 200 ÷ 60,000 HP

Voltage:

− up to 15 kV

Mass:

− 1,500 ÷ 160,000 kg

Number of poles:

− 2 ÷ 36

Frame size:

− 450 mm through 1120, 10, 11, 12, 13

PPT2013.01.01.03EN

Page 13: Nidec asi corporate energy   efficient power solutions

13www.nidec-asi.com

Lavera Energies, Power Station UpgradeLavera Energies provides vapor, electricity

and compressed air to BP’s LaveraRefineries.

Built in the 1930’s and expanded in the1950’s, Lavera is one of the largest refinery

complexes in France.

As part of a modernization project to improvethe Health and Safety standards at the facility,

the Power Station decided to replace its GasTurbine starter system.

Nidec ASI designed and delivered acontainerized solution which fit into the

existing structure.

This plug-and-play solution reducedinstallation time and costs by eliminating the

need to modify plant layout.

Our added value

1650kW Starter for Gas Turbine GE-6FA

PPT2013.01.01.03EN

Page 14: Nidec asi corporate energy   efficient power solutions

14www.nidec-asi.com

Kemalpasa Power Station, TurkeyStarter 1650kW for Gas Turbine 6C 57 MVA

Similar Projects

KARAMAY Power Station, ChinaStarters (1550 V 2250 kW) for Gas Turbine GE-

6FA+e83.6 MVA

PPT2013.01.01.03EN

Page 15: Nidec asi corporate energy   efficient power solutions

15www.nidec-asi.com

Gas-fired combined cycle powerstation Bayet, France

(Ansaldo Energia for Alpiq)This was Alpiq’s first power generation

project in France so the choice ofsuppliers focused on on-time delivery

and reliability.

Our scope of supply included:SFC & SES

(for 470 MVA Gas Turbine )

AC motors(Type CT 500 Y 2 2210 kW, 3500 rpm)

VFDs(Type SVTN3K6W3312P )

for feed water pumps

Our added value

PPT2013.01.01.03EN

Page 16: Nidec asi corporate energy   efficient power solutions

16www.nidec-asi.com

Edipower Hydroelectric Power Station -Monfalcone (GO)

The need to increase energy productionand reduce environmental impact were

the driving forces behind the decision torevamp and reactivate the small

Hydropower station at the end of thecanal.

Nidec ASI handled the completerevamping, providing

2 x 300 kW (180…235 rpm)permanent magnet generatorsconnected to Kaplan turbines

and controlled by LV inverters.

This solution allows the plant to produceenergy even at reduced water flows,

optimizing power generation.

Our added value

PPT2013.01.01.03EN

Page 17: Nidec asi corporate energy   efficient power solutions

17www.nidec-asi.com

Energy and maintenance costs consume a large portion of your resources.

Our commitment is to work closely to our customers in order to find the best way for a cost-effectively upgrade and the best solution to achieve the desired level of production flexibility.

Flexibility is a key point for those plants that want to remain competitive in today’s marketenvironment.

RevampingImproving Flexibility

PPT2013.01.01.03EN

Page 18: Nidec asi corporate energy   efficient power solutions

18www.nidec-asi.com

Brindisi Coal Power Station, ItalyThe power station was built by Ansaldo

Energia for ENEL in the late 1980s.Nidec ASI supplied all of the auxiliarymotors and excitation system for the

plant

Original Scope of Supply:•244 MV motors (330 MW), for conveyors,coal mill, main pumps, and fans;• 2 water-cooled Static exciters (5000 A)for steam turbogenerators 750 MVA;

In 2008, the plant underwent a majorrevamping to improve efficiency. Inaddition to Service on the installed

equipment, Nidec ASI installed:

• 4 VFDs for the Exhaust Fan (CR900X8,7300 kW + SVTN 24P, 10800 KVA)

RevampingImproving Flexibility

PPT2013.01.01.03EN

Page 19: Nidec asi corporate energy   efficient power solutions

19www.nidec-asi.com

Dewa JEBEL ALI Power Station, Dubai UAERevamping of 3 Gas Turbines unitsG 9151 E - 140MVA – 10.5kVOur scope of supply:2 starters (1300 V 2900kW)3 excitation systems and changeover

RevampingImproving Flexibility

Steag Bergkamen Power Plant, Germany - Hardcoal-fired power plant 750 MWOur scope of supply:1 VFD for feed water pump, induction motor15MW/5100rpm to replace existing Siemens®drive

PPT2013.01.01.03EN

Page 20: Nidec asi corporate energy   efficient power solutions

20www.nidec-asi.com

Antwerpen, Belgium - Cogeneration PlantOur scope of supply:1 synchronous generatorType: GSCR 900 Z4Power: 12350 KVA @ 1500 r/min

Decentralized Power GenerationProviding energy where it’s needed

Combined cycle power plant (Imola, Italy) 80 MWOur scope of supply:1 Synchronous generatorType: GSCR 1250 Z4Power: 33100 KVA @ 1500 rpm (15kV)

Nidec ASI has developed a complete line of Generators in the range from 1 MVA upto 60 MVA for Steam Turbines and Diesel Engines for small to mid-sized powerstations – ideal for co-generation and rural energy needs.

PPT2013.01.01.03EN

Page 21: Nidec asi corporate energy   efficient power solutions

21www.nidec-asi.com

NIDEC ASI has a long term commitment to the reduction of industry’s impact on the environment.In 2009 our company launched project ZEUS – Zero Emissions Urban Solutions – to promoteawareness of how our technologies can contribute to a greener tomorrow.

The 4 key points of ZEUS:

1) Energy efficiency: plant modernization and optimization of energy consumption2) Electric transportation: implementation of Electric Urban Transit systems to reduce harmful

CO2 and NOX emissions.3) Renewable energy: integration of renewable energy sources into local infrastructure4) Public awareness and education: We must all learn to lead a different lifestyle to save

energy.

Energy efficiency

PPT2013.01.01.03EN

Page 22: Nidec asi corporate energy   efficient power solutions

22www.nidec-asi.com

NIDEC ASI provides reliable, safe and tested solutions for energy applications. Our qualityassurance program covers all aspect of design, material procurement, manufacturing andtesting. This program meets the requirement of international standards such as ISO 9001.

All the machines manufactured in our plants undergo individual and complete routine tests.If needed, we can provide special and system tests.

Quality is one of our customer’s rightsDrive & System Testing Capabilities

PPT2013.01.01.03EN

Page 23: Nidec asi corporate energy   efficient power solutions

23www.nidec-asi.com

NIDEC ASI provides a number of services that allow existing equipment to be improved with thelatest technical updates to add functionality and flexibility to existing performance.

In addtion to spare parts and replacements, our services include:• Revampings and Plant Modernization• Maintenance (predictive analysis, partial discharge basic diagnostics, infrared termography…)• Personnel training• Long Term Service Agreements (LTSA)

With you for the entire lifetime of your plantCommissioning & Service

PPT2013.01.01.03EN