NGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Upload: lamnhu

Post on 13-Mar-2018

226 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

NGA Fall ConferencePHMSA’s New Construction Inspection Requirements

Thursday, October 8 3:30-4:30

Mel Ciulla, Unitil

Page 2: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Amendment to 49 CFR 192.305

• PHMSA has delayed, indefinitely, the effective date of the amendment to 49 CFR 192.305 (pertaining to construction inspection). PHMSA will publish a document in the Federal Register announcing a new effective date. The rule as it was written requires an independent inspection of construction tasks (no self‐inspection). Since the issuance of the final rule, AGA has lobbied PHMSA to delay the rule, create a task group to address the concerns voiced by industry and state regulators, and move construction inspection oversight 

forward in a reasonable fashion. 

Page 3: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

# of Gas Metered Customers = 77,000# of Electric Customers = 100,500Miles of Main = 1,350Number of Services = 54,259Miles of Transmission = 85Number of Employees = 122 (gas)400 total (gas, electric, central services

Company Profile

Page 4: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Agenda

Challenges

Highlights in Todays PresentationElectronic O&MContractor Oversight/TrainingInspector TrainingInspection ProcessAudits

Quality Management

Page 5: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

• In December 2008 Unitil acquired Northern Utilities. Customer base went from 15,000 to 77,000 overnight.

• Unitil began an accelerated main replacement program in both Northern Utility states.

• The amount of contractor crews performing work for Unitil doubled

• Unitil required a robust QA/QC program for contractor/company oversight

• Unitil required a new O&M in a short amount of time to incorporate all of the changes resulting from the acquisition.

Challenges

Page 6: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Highlights

Unitil electronic O&M procedures

Contractor Oversight/TrainingOperation Qualification ManagementExpectationsGPS Mapping 

Overview of Inspector TrainingConstruction / Welding / System MAOP

Construction Inspection ProcessForms / 2015 Results / Remediation's

Construction AuditsForms / Audit Process / Results

Page 7: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Quality Management – Contractor Oversight

Quality Management

Quality Assurance

Procedural Manuals

Training & Contractor Orientation

Quality Control

Construction Inspections

Construction Audits

Page 8: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

• Quality Management Starts with Quality Assurance

Procedural Manuals – Electronic field access, tied to OQ & AOC’s

Training & OQ – Contractors are Required OQ through the NGA Regional Plan, (3) Day Contractor Orientation.

Daily Tailboards – Includes an O&M Procedure review and OQ Covered task and AOC Review. 

Page 9: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

• Unitil O & M Manual

Page 10: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

• Contractor Training 2015

Page 11: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Operator Qualification Management

Page 12: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Unitil Operator Qualification Covered Tasks Tip Card

Page 13: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Unitil Operator Qualification Covered Tasks AOC's Tip Card

Page 14: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Tailboard Conference Plan – Gas Daily

Page 15: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Tailboard Conference Plan – Gas Weekly

Page 16: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Unitil/ Contractor Expectations GPS Mapping

Unitil requires GPS observations to be captured at approximately 50 foot intervals along the main and at strategic locations. 

These strategic locations include tie‐ins, endpoints, service tees, all valves, butt fusion joints, welds, active and repaired leaks, test stations, points of inflection, and mechanical fittings. 

GPS data collection shall be recorded while any existing facility is exposed and visible to the GPS collector.

GPS data collections equipment requires sub‐foot accuracy to ensure professional ‐ grade precision

Page 17: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

INSPECTOR TRAINING 2015

Unitil ‐MA / ME / NH

Page 18: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Quality Control – Construction Inspectors

Construction Inspectors – Part of the construction group, Fully Operator Qualified, Mandatory Annual Training, Field Experience.

Span of Control – 1 to 4 Ratio (maximum), Included in project planning, also provides oversight and direction.

Daily Inspections – Electronic and tied to a daily work sheet, required remediation, monthly roll‐up reports to key Contractor & Company personnel .

Page 19: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Expectations System MAOP Validation

Page 20: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

QA-QC UPC Construction Inspections (Deficiencies Found – Remediated) 2015

Page 21: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Quality Control – Welding Inspectors

Page 22: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Validate Welder Certifications

Page 23: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Welder Qualification Reports

Page 24: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Weld Map

Page 25: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Weld Map

Page 26: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

NDT Report

Page 27: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Quality Control Compliance Audits

Construction Auditors – Part of the compliance group (independent), Fully Operator Qualified, Mandatory Annual Training, Field Experience.

Span of Control – (2) full time auditors cover (35) contractor crews & 6 to 10 Company crews. Also audit other O&M activities.

Inspections – Target goal of (2) audits per month for each contractor crew.

Audit Checklist & Reporting – Includes O&M Procedures, OQ Covered Tasks, Associated AOC’s, Construction Activity, Safety (i.e. PPE, Traffic etc.)

Page 28: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

2013/2014 Compliance Audits – All Areas

Page 29: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

2013/2014 Compliance Audits – All Areas

Page 30: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

New/Renewal Main Work Audit

Page 31: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

New/Renewal Service Work Audit

Page 32: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Completed Service Inspections Audit

Page 33: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

All Compliance Audits Are Forwarded To The Area Manager, Construction Supervisor, Distribution Supervisor, Director of Gas

Operations and the Contractor Management Staff

Page 34: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

Root Cause To Remediation Report Compliance Inspections All Areas

Page 35: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

“We Do Realize That We Will Never Be Perfect, But

The Real Measure Is In How We Address

Situations When They Arise” - Unitil

Page 36: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil

• Ed Connors• Manager, Gas 

Compliance• [email protected]

Find Us Online

www.aga.org

www.truebluenaturalgas.org

http://twitter.com/naturalgasflk

www.facebook.com/naturalgas

www.linkedin.com/company/50905?trk=tyah 

AGA Contractor Oversight Round Table Minneapolis Minnesota

Page 37: NGA Fall Conference - Northeast  · PDF fileNGA Fall Conference PHMSA’s New Construction Inspection Requirements Thursday, October 8 3:30-4:30 Mel Ciulla, Unitil