Public Consultation Boards 24.11.2020 NEW RICKSTONES ACADEMY NEW TEACHING BLOCK The New Rickstones academy who currently occupy the site will be expanded as part of this project giving space for an additional 300 pupils. The New building will be set close to the existing New Rickstones Academy and will be a 2 storey building providing additional classrooms. The new building has been designed to fit in with the existing building on the site. This project is two separate new buildings, being provided for two separate schools but constructed adjacent to each other on the same site. Currently the works are programmed to start in July 2021 with completion anticipated in the August of 2022. Our Logistics plan demonstrates our proposed logistics for the project and our on site Kier team will be on hand to address any issues throughout the project. NEW RICKSTONES ACADEMY + SOUTHVIEW SCHOOL STATEMENT OF EDUCATIONAL NEED As demonstrated in the ECC 10 Year Plan, there is a forecast permanent deficit of Year 7 places in the Witham area from 2021/22 onwards. The most recent forecast data (May 2020) has confirmed the need for expansion, showing a 1 form of entry (150 places) need in 21/22 and then 2 form of entry (300 places) need in all subsequent years. An in-depth review of forecast data has confirmed that the requirement to expand New Rickstones Academy by 2 forms of entry is in response to local demand. It is not driven by plans for the nearby garden community, or by new housing in other areas of the District where parents may seek to send their children to a Witham school rather than their local school. Geographically, New Rickstones Academy is in the correct place to cater for the extra demand and is the only secondary school that could be expanded at a reasonable cost. Expansion at the other secondary school in Witham, Maltings Academy, was considered but, due to site constraints, the cost was estimated to be significantly higher and the option was therefore discounted. Expanding New Rickstones Academy will help to ensure that local parents will be able to access a good school, and a school of preference for their child. The school are able to admit the predicted small deficit of places for September 2021 within their existing accommodation but would be unable to repeat this for further intakes without the proposed expansion taking place.

Upload: others

Post on 20-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NEW TEACHING BLOCK · 2020. 11. 26. · NEW RICKSTONES ACADEMY NEW TEACHING BLOCK The New Rickstones academy who currently occupy the site will be expanded as part of this project

Public Consultation Boards24.11.2020

NEW RICKSTONES ACADEMYNEW TEACHING BLOCKThe New Rickstones academy who currently occupy the site will be expanded as part of this project giving space for an additional 300 pupils.

The New building will be set close to the existing New Rickstones Academy and will be a 2 storey building providing additional classrooms. The new building has been designed to fit in with the existing building on the site.

This project is two separate new buildings, being provided for two separate schools but constructed adjacent to each other on the same site.

Currently the works are programmed to start in July 2021 with completion anticipated in the August of 2022. Our Logistics plan demonstrates our proposed logistics for the project and our on site Kier team will be on hand to address any issues throughout the project.

NEW RICKSTONES ACADEMY+ SOUTHVIEW SCHOOL

STATEMENT OF EDUCATIONAL NEEDAs demonstrated in the ECC 10 Year Plan, there is a forecast permanent deficit of Year 7 places in the Witham area from 2021/22 onwards. The most recent forecast data (May 2020) has confirmed the need for expansion, showing a 1 form of entry (150 places) need in 21/22 and then 2 form of entry (300 places) need in all subsequent years.

An in-depth review of forecast data has confirmed that the requirement to expand New Rickstones Academy by 2 forms of entry is in response to local demand. It is not driven by plans for the nearby garden community, or by new housing in other areas of the District where parents may seek to send their children to a Witham school rather than their local school.

Geographically, New Rickstones Academy is in the correct place to cater for the extra demand and is the only secondary school that could be expanded at a reasonable cost. Expansion at the other secondary school in Witham, Maltings Academy, was considered but, due to site constraints, the cost was estimated to be significantly higher and the option was therefore discounted. Expanding New Rickstones Academy will help to ensure that local parents will be able to access a good school, and a school of preference for their child.

The school are able to admit the predicted small deficit of places for September 2021 within their existing accommodation but would be unable to repeat this for further intakes without the proposed expansion taking place.

Page 2: NEW TEACHING BLOCK · 2020. 11. 26. · NEW RICKSTONES ACADEMY NEW TEACHING BLOCK The New Rickstones academy who currently occupy the site will be expanded as part of this project

Public Consultation Boards24.11.2020SOUTHVIEW SCHOOL

NEW SEN SCHOOLAll Southview pupils have a predominant need that is identified as physical and neurological impairment (PNI). Children with PNI are likely to have severe and complex learning difficulties as well as a physical disability or sensory impairment. Pupils may have additional needs, which could include visual impairment, learning difficulties, complex & diverse medical needs, and speech & language difficulties.

The aim is to create permanent SEN sixth form and residential places, designed for pupils with severe neurological and physical impairments. This project will create spaces for 24no. sixth form pupils, apartments for 10no. pupils which will be temporary overnight accommodation and a hydrotherapy pool. The new building will be set around sensory gardens and outdoor learning spaces.

Externally, 29no. car parking spaces will be provided including a drop off and turning area suitable for mini-buses.

NEW RICKSTONES ACADEMY+ SOUTHVIEW SCHOOL

Southview School is the only special school in Essex which is specific to the needs of children and young people who are identified as having a severe physical difficulty combined with a neurological impairment. Children and young people at the school may have additional needs, which could include learning difficulties, medical needs and speech and language difficulties.

Essex County Council (ECC) has a statutory responsibility to maintain Education Health Care Plans for some young people beyond the statutory school age into post-16 provision; other young people may require the plan to be maintained until the age of 25. Provision for young people with the most severe needs is limited particularly at post-16. The intention to develop post-16 provision at Southview is to enable ECC to support young people to continue their education at the school until year 14 and to better prepare them for a transition into adulthood.

Some children with special educational needs require very specialist boarding provision. Some children are placed in the independent sector at considerable cost to the public purse. As part of the County wide programme of expansion, Essex County Council has included the provision of boarding accommodation in maintained special schools. The new boarding provision at Southview School will enable more children to have their needs met in the local community thus reducing stress on families who may have to travel long distances to visit their child.

It is proposed that Southview School will have 10 Monday to Thursday boarding places for those children assessed by the Local Authority as requiring this type of provisionRecent Essex schemes to rebuild schools for children and young people with severe learning difficulties have included the provision of a hydrotherapy pool. This is a much-needed facility which will provide significant benefits to the health and wellbeing of pupils with a range of disabilities, particularly those in the Southview cohort.

Such facilities were not provided at the nearby Edith Borthwick School which means many children and young people who require the provision have no local access. The provision of a hydrotherapy pool at Southview would therefore also support Edith Borthwick school’s pupil population.

STATEMENT OF EDUCATIONAL NEED

Page 3: NEW TEACHING BLOCK · 2020. 11. 26. · NEW RICKSTONES ACADEMY NEW TEACHING BLOCK The New Rickstones academy who currently occupy the site will be expanded as part of this project

Public Consultation Boards24.11.2020LOCATION PLAN

NEW RICKSTONES ACADEMY+ SOUTHVIEW SCHOOL

Page 4: NEW TEACHING BLOCK · 2020. 11. 26. · NEW RICKSTONES ACADEMY NEW TEACHING BLOCK The New Rickstones academy who currently occupy the site will be expanded as part of this project

Public Consultation Boards24.11.2020SITE LAYOUT

© Copyright

tel: 01376 573050

web: w-wa.co.uk

Client

Job Title

Drawing Title

Date

Scale

Project ID Date

Drawn Checked

Drg Rev

Scale/North Point

2029-WWA-00-XX-DR-L-0101

2029 19/11/2020

AH KL

1:200

Landscape Masterplan

Southview and Rickstones

Kier EasternClient Address

Planning

No. Revision NotesAppr

P01

Note: All Dimensions must be checked on site and not scaled from this drawing.

All cross references are to the latest revision of the relevant drawing or specification being referenced

Issue

F1

Item - 05

Item - 04

Item - 03

Item - 02

Item - 01

Item - 01

Item - 01

Item - 06

Item - 01

Item - 08

Item - 08

Item - 01

Item - 01

Item - 10

Item - 07

Item - 09

New Rickstones

Academy

New School Block

Southview School

New College Facility &

Hydrotherapy Pool

Life Skills

Garden

Hard Play

Area

Habitat

Garden

Outdoor

Classbase

Outdoor

Classbase

Outdoor

Dining

Minibus

Drop Off

New Rickstones Academy

Informal Soft Play

New Rickstones Academy

Informal Hard Play

New Rickstones Academy

Informal Soft Play

New Rickstones

Academy Car Park

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F1

F1

F1

F1

F2

F2

F2

F2

F2F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2F2

F2

F2

F2

F2

F2

F2F2

F2

F1

F1

F2

F2

F2

F2

F2

F2

F2

F2

Item - 01

Item - 02

Item - 03

Item - 04

Item - 05

Item - 06

Item - 07

Item - 08

Item - 09

Item - 10

Proposed pedestrian asphalt paving

Proposed permeable slab / block paving

Proposed vehicular asphalt

Proposed rubber crumb surfacing

Proposed amenity lawn

Proposed wildflower meadow with log piles

Proposed ornamental planting

Proposed hedge planting

Existing hedge/planting retained

Proposed tree planting

2.4m high weldesh fencing with associated gates

Existing 1.8m high palisade fencing retained

F1

F2

Bench seating

Washing line

Potting shed

Compost bins

Raised growing beds

Staff cycle shelter

Gazebo for outdoor teaching

External canopy

Oxygen storage

Proposed 1.5m high vertical bar railings F3

Bin storage

Existing tree retained

Existing asphalt retained

Existing asphalt retained and resurfaced

Permeable vehicular asphalt

NEW RICKSTONES ACADEMY+ SOUTHVIEW SCHOOL

Page 5: NEW TEACHING BLOCK · 2020. 11. 26. · NEW RICKSTONES ACADEMY NEW TEACHING BLOCK The New Rickstones academy who currently occupy the site will be expanded as part of this project

Public Consultation Boards24.11.2020CAR PARKING

2029-WWA-00-XX-DR-L-0102

Southview and Rickstones

P01Planning

© Copyright

web: w-wa.co.uk tel: 01376 573050

Client

Job Title Drawing Title

Date

Scale

Project ID Date

Drawn Checked

Drg Rev

Scale/North Point

2029 19/11/2020

AH KL

1:200 Proposed Car Park

Kier Eastern

No. Revision NotesAppr

IssueNote: All Dimensions must be checked on site and not scaled from this drawing.

All cross references are to the latest revision of the relevant drawing or specification

being referenced

F3

F3

15 m²PLANT

8 m²ST_CHEM

93 m²HYDROTHERAPY POOL

35 m²PLANT

15 m

²

MA

IN O

FF

ICE

30 m²HYGIENE_TRI

CA

NO

PY

SIX

TH

FO

RM

E

NT

RA

NC

E

HY

DR

OT

HE

RA

PY

EN

TR

AN

CE

10 m²SHOWERS

10 m

²

CH

AN

GIN

G

10 m

²

CH

AN

GIN

G

4 m²CH_S

4 m²AWC

4 m²AWC

POOL

AC

CE

SS

22 m

²

LO

BB

Y

6 m

²

LO

BB

Y

4 m²AWC

BU

ILD

ING

CA

NO

PY

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F1

F3

F3

F3

F3

F3

F3

F3

F3

F1

F1

Item - 10

Item - 08

Item - 06

Item - 05

Item - 04

Item - 07

Item - 02

Item - 01

Item - 03

Item - 09

Item - 01

New Rickstones

Academy

New School Block

Southview

School

New College

Facility &

Hydrotherapy

Pool

New Rickstones Academy

Informal Soft Play

New Rickstones Academy

Informal Hard Play

New Rickstones Academy

Main Pupil Entrance

Conrad Road

New Rickstones

Academy

6th Form Block Southview

Car Park

New Rickstones

Academy Car Park

Minibus

Drop Off

F2

F2

F2

F2

F2F2

F2

F2F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

Proposed pedestrian asphalt paving

Proposed vehicular asphalt

Permeable vehicular asphalt

Proposed amenity lawn

Proposed ornamental planting

Proposed hedge planting

Existing hedge/planting retained

Proposed tree planting

2.4m high weldesh fencing with associated gatesF1

F2

Additional pupil cycle storage

Existing asphalt retained

Item - 01

Existing asphalt retained and resurfaced

Existing pupil cycle storage Item - 02

F3

Existing 1.8m high palisade fencing retained

Proposed 1.5m high vertical bar railings

Existing accessible parking baysItem - 03

New car park entrance gates into New

Rickstones Academy car park

Item - 04

Road markings for pupil crossing point to 6th

Form block.

Item - 05

New pedestrian footpath Item - 06

Pedestrian entrance into Southview School

Existing tree retained

Road markings for pupil crossing point to 6th

Form block.

Item - 05

New pedestrian footpath Item - 06

Pedestrian entrance into Southview SchoolItem - 07

Vehicle entrance gate into Southview SchoolItem - 08

Grounds maintenance gatesItem - 09

Southview School Bin Storage Item - 10

2029-WWA-00-XX-DR-L-0102

Southview and Rickstones

P01Planning

© Copyright

web: w-wa.co.uk tel: 01376 573050

Client

Job Title Drawing Title

Date

Scale

Project ID Date

Drawn Checked

Drg Rev

Scale/North Point

2029 19/11/2020

AH KL

1:200 Proposed Car Park

Kier Eastern

No. Revision NotesAppr

IssueNote: All Dimensions must be checked on site and not scaled from this drawing.

All cross references are to the latest revision of the relevant drawing or specification

being referenced

F3

F3

15 m²PLANT

8 m²ST_CHEM

93 m²HYDROTHERAPY POOL

35 m²PLANT

15 m

²

MA

IN O

FF

ICE

30 m²HYGIENE_TRI

CA

NO

PY

SIX

TH

FO

RM

E

NT

RA

NC

E

HY

DR

OT

HE

RA

PY

EN

TR

AN

CE

10 m²SHOWERS

10 m

²

CH

AN

GIN

G

10 m

²

CH

AN

GIN

G

4 m²CH_S

4 m²AWC

4 m²AWC

POOL

AC

CE

SS

22 m

²

LO

BB

Y

6 m

²

LO

BB

Y

4 m²AWC

BU

ILD

ING

CA

NO

PY

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F1

F3

F3

F3

F3

F3

F3

F3

F3

F1

F1

Item - 10

Item - 08

Item - 06

Item - 05

Item - 04

Item - 07

Item - 02

Item - 01

Item - 03

Item - 09

Item - 01

New Rickstones

Academy

New School Block

Southview

School

New College

Facility &

Hydrotherapy

Pool

New Rickstones Academy

Informal Soft Play

New Rickstones Academy

Informal Hard Play

New Rickstones Academy

Main Pupil Entrance

Conrad Road

New Rickstones

Academy

6th Form Block Southview

Car Park

New Rickstones

Academy Car Park

Minibus

Drop Off

F2

F2

F2

F2

F2F2

F2

F2F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

Proposed pedestrian asphalt paving

Proposed vehicular asphalt

Permeable vehicular asphalt

Proposed amenity lawn

Proposed ornamental planting

Proposed hedge planting

Existing hedge/planting retained

Proposed tree planting

2.4m high weldesh fencing with associated gatesF1

F2

Additional pupil cycle storage

Existing asphalt retained

Item - 01

Existing asphalt retained and resurfaced

Existing pupil cycle storage Item - 02

F3

Existing 1.8m high palisade fencing retained

Proposed 1.5m high vertical bar railings

Existing accessible parking baysItem - 03

New car park entrance gates into New

Rickstones Academy car park

Item - 04

Road markings for pupil crossing point to 6th

Form block.

Item - 05

New pedestrian footpath Item - 06

Pedestrian entrance into Southview School

Existing tree retained

Road markings for pupil crossing point to 6th

Form block.

Item - 05

New pedestrian footpath Item - 06

Pedestrian entrance into Southview SchoolItem - 07

Vehicle entrance gate into Southview SchoolItem - 08

Grounds maintenance gatesItem - 09

Southview School Bin Storage Item - 10

2029-WWA-00-XX-DR-L-0102

Southview and Rickstones

P01Planning

© Copyright

web: w-wa.co.uk tel: 01376 573050

Client

Job Title Drawing Title

Date

Scale

Project ID Date

Drawn Checked

Drg Rev

Scale/North Point

2029 19/11/2020

AH KL

1:200 Proposed Car Park

Kier Eastern

No. Revision NotesAppr

IssueNote: All Dimensions must be checked on site and not scaled from this drawing.

All cross references are to the latest revision of the relevant drawing or specification

being referenced

F3

F3

15 m²PLANT

8 m²ST_CHEM

93 m²HYDROTHERAPY POOL

35 m²PLANT

15 m

²

MA

IN O

FF

ICE

30 m²HYGIENE_TRI

CA

NO

PY

SIX

TH

FO

RM

E

NT

RA

NC

E

HY

DR

OT

HE

RA

PY

EN

TR

AN

CE

10 m²SHOWERS

10 m

²

CH

AN

GIN

G

10 m

²

CH

AN

GIN

G

4 m²CH_S

4 m²AWC

4 m²AWC

POOL

AC

CE

SS

22 m

²

LO

BB

Y

6 m

²

LO

BB

Y

4 m²AWC

BU

ILD

ING

CA

NO

PY

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F3

F1

F3

F3

F3

F3

F3

F3

F3

F3

F1

F1

Item - 10

Item - 08

Item - 06

Item - 05

Item - 04

Item - 07

Item - 02

Item - 01

Item - 03

Item - 09

Item - 01

New Rickstones

Academy

New School Block

Southview

School

New College

Facility &

Hydrotherapy

Pool

New Rickstones Academy

Informal Soft Play

New Rickstones Academy

Informal Hard Play

New Rickstones Academy

Main Pupil Entrance

Conrad Road

New Rickstones

Academy

6th Form Block Southview

Car Park

New Rickstones

Academy Car Park

Minibus

Drop Off

F2

F2

F2

F2

F2F2

F2

F2F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

Proposed pedestrian asphalt paving

Proposed vehicular asphalt

Permeable vehicular asphalt

Proposed amenity lawn

Proposed ornamental planting

Proposed hedge planting

Existing hedge/planting retained

Proposed tree planting

2.4m high weldesh fencing with associated gatesF1

F2

Additional pupil cycle storage

Existing asphalt retained

Item - 01

Existing asphalt retained and resurfaced

Existing pupil cycle storage Item - 02

F3

Existing 1.8m high palisade fencing retained

Proposed 1.5m high vertical bar railings

Existing accessible parking baysItem - 03

New car park entrance gates into New

Rickstones Academy car park

Item - 04

Road markings for pupil crossing point to 6th

Form block.

Item - 05

New pedestrian footpath Item - 06

Pedestrian entrance into Southview School

Existing tree retained

Road markings for pupil crossing point to 6th

Form block.

Item - 05

New pedestrian footpath Item - 06

Pedestrian entrance into Southview SchoolItem - 07

Vehicle entrance gate into Southview SchoolItem - 08

Grounds maintenance gatesItem - 09

Southview School Bin Storage Item - 10

NEW RICKSTONES ACADEMY+ SOUTHVIEW SCHOOL

Page 6: NEW TEACHING BLOCK · 2020. 11. 26. · NEW RICKSTONES ACADEMY NEW TEACHING BLOCK The New Rickstones academy who currently occupy the site will be expanded as part of this project

Public Consultation Boards24.11.2020FLOOR PLANS

GROUND FLOOR PLAN FIRST FLOOR PLAN

NEW RICKSTONES ACADEMY

Page 7: NEW TEACHING BLOCK · 2020. 11. 26. · NEW RICKSTONES ACADEMY NEW TEACHING BLOCK The New Rickstones academy who currently occupy the site will be expanded as part of this project

Public Consultation Boards24.11.2020ELEVATIONS & 3D VIEWS

NEW RICKSTONES ACADEMY

EAST ELEVATION

B. BRICK : WHITE

A. R

AIN

SCR

EEN

CLA

DDIN

G GR

EY /

BLA

CK

C/D/

E. F

LASH

ING

& F

RAM

ES

MATERIALS

SOUTH ELEVATION

NORTH ELEVATION

WEST ELEVATION

FRONT VIEW

REAR VIEW

Page 8: NEW TEACHING BLOCK · 2020. 11. 26. · NEW RICKSTONES ACADEMY NEW TEACHING BLOCK The New Rickstones academy who currently occupy the site will be expanded as part of this project

Public Consultation Boards24.11.2020FLOOR PLANS

GROUND FLOOR PLAN FIRST FLOOR PLAN

SOUTHVIEWSCHOOL

Page 9: NEW TEACHING BLOCK · 2020. 11. 26. · NEW RICKSTONES ACADEMY NEW TEACHING BLOCK The New Rickstones academy who currently occupy the site will be expanded as part of this project

Public Consultation Boards24.11.2020

SOUTHVIEWSCHOOL

ENTRANCE

GARDEN

MATERIALS

2. BRICK : BUFF MULTI

1. R

AIN

SCR

EEN

CLA

DDIN

G _

NAT

URA

L BR

OW

N

3/4/

5. F

LASH

ING

& F

RAM

ES

EAST ELEVATION

SOUTH ELEVATION

NORTH ELEVATION

WEST ELEVATION

ELEVATIONS & 3D VIEWS

Page 10: NEW TEACHING BLOCK · 2020. 11. 26. · NEW RICKSTONES ACADEMY NEW TEACHING BLOCK The New Rickstones academy who currently occupy the site will be expanded as part of this project

Public Consultation Boards24.11.2020

NEW RICKSTONES ACADEMY+ SOUTHVIEW SCHOOL

12

6

11

2442

35

15

F1

BIN

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1F1

F1

F1

100 m²CLASSROOM_LRG

15 m²HYGIENE 2

20 m²HYGIENE 1

13 m²GR RM

5 m²ST_GT

50 m²CLASSROOM

80 m²DINING & COM RM

20 m²KITCHEN

2 m

²

ST

_C

L

31 m²STAFF PREP

11 m²SWR

7 m²ST_MOB

30 m²SENSORY RM

16 m²PLANT

9 m²

96 m²HYDROTHERAPY POOL

34 m²PLANT

7 m²ST_MOB

15 m

²

MA

IN O

FF

ICE

30 m²HYGIENE_TRI

8 m²S_WC

12 m²GR RM

10 m²SERVER

14 m²LIFT CORE_1.0 29 m

²STAIRCORE_1.0

27 m

²

LO

BB

Y_R

ES

IDE

NT

IAL

87 m²CIRCULATION

CA

NO

PY

CANOPY

FE

RESIDENTIAL

ENTRANCE

SIX

TH

FO

RM

E

NT

RA

NC

E

HY

DR

OT

HE

RA

PY

EN

TR

AN

CE

11 m²SHOWERS

10 m

²

CH

AN

GIN

G

10 m

²

CH

AN

GIN

G

4 m²CH_S

4 m²AWC

4 m²AWC

POOL

AC

CE

SS

23 m

²

LO

BB

Y

11 m²LOBBY

27 m

²

CIR

CU

LA

TIO

N

4 m²ST_GT

4 m²AWC

4 m²ST_GT

BU

ILD

ING

CA

NO

PY

CANOPY

CANOPY

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2 New Ri

Permanent Fencing

Solid Hoarding

Heras Fencing

Pedestrian Barrier

Site Accommodation

Car Park Extension WorkingArea

Contractors Car Parking

Vehicle Flow

Data PodTurnstile

Gatemans Hutlocated outsideboundary tohelp managetraffic

PHASE 2 LOGISTICS PLAN

Managedpedestrian linkto 6th formblock

Material Store

ContractorsOverflow CarPark if required

PermanentFence netteddue toproximity toother buildings

Car Park handed overto school