Public Consultation Boards24.11.2020
NEW RICKSTONES ACADEMYNEW TEACHING BLOCKThe New Rickstones academy who currently occupy the site will be expanded as part of this project giving space for an additional 300 pupils.
The New building will be set close to the existing New Rickstones Academy and will be a 2 storey building providing additional classrooms. The new building has been designed to fit in with the existing building on the site.
This project is two separate new buildings, being provided for two separate schools but constructed adjacent to each other on the same site.
Currently the works are programmed to start in July 2021 with completion anticipated in the August of 2022. Our Logistics plan demonstrates our proposed logistics for the project and our on site Kier team will be on hand to address any issues throughout the project.
NEW RICKSTONES ACADEMY+ SOUTHVIEW SCHOOL
STATEMENT OF EDUCATIONAL NEEDAs demonstrated in the ECC 10 Year Plan, there is a forecast permanent deficit of Year 7 places in the Witham area from 2021/22 onwards. The most recent forecast data (May 2020) has confirmed the need for expansion, showing a 1 form of entry (150 places) need in 21/22 and then 2 form of entry (300 places) need in all subsequent years.
An in-depth review of forecast data has confirmed that the requirement to expand New Rickstones Academy by 2 forms of entry is in response to local demand. It is not driven by plans for the nearby garden community, or by new housing in other areas of the District where parents may seek to send their children to a Witham school rather than their local school.
Geographically, New Rickstones Academy is in the correct place to cater for the extra demand and is the only secondary school that could be expanded at a reasonable cost. Expansion at the other secondary school in Witham, Maltings Academy, was considered but, due to site constraints, the cost was estimated to be significantly higher and the option was therefore discounted. Expanding New Rickstones Academy will help to ensure that local parents will be able to access a good school, and a school of preference for their child.
The school are able to admit the predicted small deficit of places for September 2021 within their existing accommodation but would be unable to repeat this for further intakes without the proposed expansion taking place.
Public Consultation Boards24.11.2020SOUTHVIEW SCHOOL
NEW SEN SCHOOLAll Southview pupils have a predominant need that is identified as physical and neurological impairment (PNI). Children with PNI are likely to have severe and complex learning difficulties as well as a physical disability or sensory impairment. Pupils may have additional needs, which could include visual impairment, learning difficulties, complex & diverse medical needs, and speech & language difficulties.
The aim is to create permanent SEN sixth form and residential places, designed for pupils with severe neurological and physical impairments. This project will create spaces for 24no. sixth form pupils, apartments for 10no. pupils which will be temporary overnight accommodation and a hydrotherapy pool. The new building will be set around sensory gardens and outdoor learning spaces.
Externally, 29no. car parking spaces will be provided including a drop off and turning area suitable for mini-buses.
NEW RICKSTONES ACADEMY+ SOUTHVIEW SCHOOL
Southview School is the only special school in Essex which is specific to the needs of children and young people who are identified as having a severe physical difficulty combined with a neurological impairment. Children and young people at the school may have additional needs, which could include learning difficulties, medical needs and speech and language difficulties.
Essex County Council (ECC) has a statutory responsibility to maintain Education Health Care Plans for some young people beyond the statutory school age into post-16 provision; other young people may require the plan to be maintained until the age of 25. Provision for young people with the most severe needs is limited particularly at post-16. The intention to develop post-16 provision at Southview is to enable ECC to support young people to continue their education at the school until year 14 and to better prepare them for a transition into adulthood.
Some children with special educational needs require very specialist boarding provision. Some children are placed in the independent sector at considerable cost to the public purse. As part of the County wide programme of expansion, Essex County Council has included the provision of boarding accommodation in maintained special schools. The new boarding provision at Southview School will enable more children to have their needs met in the local community thus reducing stress on families who may have to travel long distances to visit their child.
It is proposed that Southview School will have 10 Monday to Thursday boarding places for those children assessed by the Local Authority as requiring this type of provisionRecent Essex schemes to rebuild schools for children and young people with severe learning difficulties have included the provision of a hydrotherapy pool. This is a much-needed facility which will provide significant benefits to the health and wellbeing of pupils with a range of disabilities, particularly those in the Southview cohort.
Such facilities were not provided at the nearby Edith Borthwick School which means many children and young people who require the provision have no local access. The provision of a hydrotherapy pool at Southview would therefore also support Edith Borthwick school’s pupil population.
STATEMENT OF EDUCATIONAL NEED
Public Consultation Boards24.11.2020LOCATION PLAN
NEW RICKSTONES ACADEMY+ SOUTHVIEW SCHOOL
Public Consultation Boards24.11.2020SITE LAYOUT
© Copyright
tel: 01376 573050
web: w-wa.co.uk
Client
Job Title
Drawing Title
Date
Scale
Project ID Date
Drawn Checked
Drg Rev
Scale/North Point
2029-WWA-00-XX-DR-L-0101
2029 19/11/2020
AH KL
1:200
Landscape Masterplan
Southview and Rickstones
Kier EasternClient Address
Planning
No. Revision NotesAppr
P01
Note: All Dimensions must be checked on site and not scaled from this drawing.
All cross references are to the latest revision of the relevant drawing or specification being referenced
Issue
F1
Item - 05
Item - 04
Item - 03
Item - 02
Item - 01
Item - 01
Item - 01
Item - 06
Item - 01
Item - 08
Item - 08
Item - 01
Item - 01
Item - 10
Item - 07
Item - 09
New Rickstones
Academy
New School Block
Southview School
New College Facility &
Hydrotherapy Pool
Life Skills
Garden
Hard Play
Area
Habitat
Garden
Outdoor
Classbase
Outdoor
Classbase
Outdoor
Dining
Minibus
Drop Off
New Rickstones Academy
Informal Soft Play
New Rickstones Academy
Informal Hard Play
New Rickstones Academy
Informal Soft Play
New Rickstones
Academy Car Park
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F1
F1
F1
F1
F2
F2
F2
F2
F2F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2F2
F2
F2
F2
F2
F2
F2F2
F2
F1
F1
F2
F2
F2
F2
F2
F2
F2
F2
Item - 01
Item - 02
Item - 03
Item - 04
Item - 05
Item - 06
Item - 07
Item - 08
Item - 09
Item - 10
Proposed pedestrian asphalt paving
Proposed permeable slab / block paving
Proposed vehicular asphalt
Proposed rubber crumb surfacing
Proposed amenity lawn
Proposed wildflower meadow with log piles
Proposed ornamental planting
Proposed hedge planting
Existing hedge/planting retained
Proposed tree planting
2.4m high weldesh fencing with associated gates
Existing 1.8m high palisade fencing retained
F1
F2
Bench seating
Washing line
Potting shed
Compost bins
Raised growing beds
Staff cycle shelter
Gazebo for outdoor teaching
External canopy
Oxygen storage
Proposed 1.5m high vertical bar railings F3
Bin storage
Existing tree retained
Existing asphalt retained
Existing asphalt retained and resurfaced
Permeable vehicular asphalt
NEW RICKSTONES ACADEMY+ SOUTHVIEW SCHOOL
Public Consultation Boards24.11.2020CAR PARKING
2029-WWA-00-XX-DR-L-0102
Southview and Rickstones
P01Planning
© Copyright
web: w-wa.co.uk tel: 01376 573050
Client
Job Title Drawing Title
Date
Scale
Project ID Date
Drawn Checked
Drg Rev
Scale/North Point
2029 19/11/2020
AH KL
1:200 Proposed Car Park
Kier Eastern
No. Revision NotesAppr
IssueNote: All Dimensions must be checked on site and not scaled from this drawing.
All cross references are to the latest revision of the relevant drawing or specification
being referenced
F3
F3
15 m²PLANT
8 m²ST_CHEM
93 m²HYDROTHERAPY POOL
35 m²PLANT
15 m
²
MA
IN O
FF
ICE
30 m²HYGIENE_TRI
CA
NO
PY
SIX
TH
FO
RM
E
NT
RA
NC
E
HY
DR
OT
HE
RA
PY
EN
TR
AN
CE
10 m²SHOWERS
10 m
²
CH
AN
GIN
G
10 m
²
CH
AN
GIN
G
4 m²CH_S
4 m²AWC
4 m²AWC
POOL
AC
CE
SS
22 m
²
LO
BB
Y
6 m
²
LO
BB
Y
4 m²AWC
BU
ILD
ING
CA
NO
PY
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F1
F3
F3
F3
F3
F3
F3
F3
F3
F1
F1
Item - 10
Item - 08
Item - 06
Item - 05
Item - 04
Item - 07
Item - 02
Item - 01
Item - 03
Item - 09
Item - 01
New Rickstones
Academy
New School Block
Southview
School
New College
Facility &
Hydrotherapy
Pool
New Rickstones Academy
Informal Soft Play
New Rickstones Academy
Informal Hard Play
New Rickstones Academy
Main Pupil Entrance
Conrad Road
New Rickstones
Academy
6th Form Block Southview
Car Park
New Rickstones
Academy Car Park
Minibus
Drop Off
F2
F2
F2
F2
F2F2
F2
F2F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
Proposed pedestrian asphalt paving
Proposed vehicular asphalt
Permeable vehicular asphalt
Proposed amenity lawn
Proposed ornamental planting
Proposed hedge planting
Existing hedge/planting retained
Proposed tree planting
2.4m high weldesh fencing with associated gatesF1
F2
Additional pupil cycle storage
Existing asphalt retained
Item - 01
Existing asphalt retained and resurfaced
Existing pupil cycle storage Item - 02
F3
Existing 1.8m high palisade fencing retained
Proposed 1.5m high vertical bar railings
Existing accessible parking baysItem - 03
New car park entrance gates into New
Rickstones Academy car park
Item - 04
Road markings for pupil crossing point to 6th
Form block.
Item - 05
New pedestrian footpath Item - 06
Pedestrian entrance into Southview School
Existing tree retained
Road markings for pupil crossing point to 6th
Form block.
Item - 05
New pedestrian footpath Item - 06
Pedestrian entrance into Southview SchoolItem - 07
Vehicle entrance gate into Southview SchoolItem - 08
Grounds maintenance gatesItem - 09
Southview School Bin Storage Item - 10
2029-WWA-00-XX-DR-L-0102
Southview and Rickstones
P01Planning
© Copyright
web: w-wa.co.uk tel: 01376 573050
Client
Job Title Drawing Title
Date
Scale
Project ID Date
Drawn Checked
Drg Rev
Scale/North Point
2029 19/11/2020
AH KL
1:200 Proposed Car Park
Kier Eastern
No. Revision NotesAppr
IssueNote: All Dimensions must be checked on site and not scaled from this drawing.
All cross references are to the latest revision of the relevant drawing or specification
being referenced
F3
F3
15 m²PLANT
8 m²ST_CHEM
93 m²HYDROTHERAPY POOL
35 m²PLANT
15 m
²
MA
IN O
FF
ICE
30 m²HYGIENE_TRI
CA
NO
PY
SIX
TH
FO
RM
E
NT
RA
NC
E
HY
DR
OT
HE
RA
PY
EN
TR
AN
CE
10 m²SHOWERS
10 m
²
CH
AN
GIN
G
10 m
²
CH
AN
GIN
G
4 m²CH_S
4 m²AWC
4 m²AWC
POOL
AC
CE
SS
22 m
²
LO
BB
Y
6 m
²
LO
BB
Y
4 m²AWC
BU
ILD
ING
CA
NO
PY
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F1
F3
F3
F3
F3
F3
F3
F3
F3
F1
F1
Item - 10
Item - 08
Item - 06
Item - 05
Item - 04
Item - 07
Item - 02
Item - 01
Item - 03
Item - 09
Item - 01
New Rickstones
Academy
New School Block
Southview
School
New College
Facility &
Hydrotherapy
Pool
New Rickstones Academy
Informal Soft Play
New Rickstones Academy
Informal Hard Play
New Rickstones Academy
Main Pupil Entrance
Conrad Road
New Rickstones
Academy
6th Form Block Southview
Car Park
New Rickstones
Academy Car Park
Minibus
Drop Off
F2
F2
F2
F2
F2F2
F2
F2F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
Proposed pedestrian asphalt paving
Proposed vehicular asphalt
Permeable vehicular asphalt
Proposed amenity lawn
Proposed ornamental planting
Proposed hedge planting
Existing hedge/planting retained
Proposed tree planting
2.4m high weldesh fencing with associated gatesF1
F2
Additional pupil cycle storage
Existing asphalt retained
Item - 01
Existing asphalt retained and resurfaced
Existing pupil cycle storage Item - 02
F3
Existing 1.8m high palisade fencing retained
Proposed 1.5m high vertical bar railings
Existing accessible parking baysItem - 03
New car park entrance gates into New
Rickstones Academy car park
Item - 04
Road markings for pupil crossing point to 6th
Form block.
Item - 05
New pedestrian footpath Item - 06
Pedestrian entrance into Southview School
Existing tree retained
Road markings for pupil crossing point to 6th
Form block.
Item - 05
New pedestrian footpath Item - 06
Pedestrian entrance into Southview SchoolItem - 07
Vehicle entrance gate into Southview SchoolItem - 08
Grounds maintenance gatesItem - 09
Southview School Bin Storage Item - 10
2029-WWA-00-XX-DR-L-0102
Southview and Rickstones
P01Planning
© Copyright
web: w-wa.co.uk tel: 01376 573050
Client
Job Title Drawing Title
Date
Scale
Project ID Date
Drawn Checked
Drg Rev
Scale/North Point
2029 19/11/2020
AH KL
1:200 Proposed Car Park
Kier Eastern
No. Revision NotesAppr
IssueNote: All Dimensions must be checked on site and not scaled from this drawing.
All cross references are to the latest revision of the relevant drawing or specification
being referenced
F3
F3
15 m²PLANT
8 m²ST_CHEM
93 m²HYDROTHERAPY POOL
35 m²PLANT
15 m
²
MA
IN O
FF
ICE
30 m²HYGIENE_TRI
CA
NO
PY
SIX
TH
FO
RM
E
NT
RA
NC
E
HY
DR
OT
HE
RA
PY
EN
TR
AN
CE
10 m²SHOWERS
10 m
²
CH
AN
GIN
G
10 m
²
CH
AN
GIN
G
4 m²CH_S
4 m²AWC
4 m²AWC
POOL
AC
CE
SS
22 m
²
LO
BB
Y
6 m
²
LO
BB
Y
4 m²AWC
BU
ILD
ING
CA
NO
PY
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F1
F3
F3
F3
F3
F3
F3
F3
F3
F1
F1
Item - 10
Item - 08
Item - 06
Item - 05
Item - 04
Item - 07
Item - 02
Item - 01
Item - 03
Item - 09
Item - 01
New Rickstones
Academy
New School Block
Southview
School
New College
Facility &
Hydrotherapy
Pool
New Rickstones Academy
Informal Soft Play
New Rickstones Academy
Informal Hard Play
New Rickstones Academy
Main Pupil Entrance
Conrad Road
New Rickstones
Academy
6th Form Block Southview
Car Park
New Rickstones
Academy Car Park
Minibus
Drop Off
F2
F2
F2
F2
F2F2
F2
F2F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
Proposed pedestrian asphalt paving
Proposed vehicular asphalt
Permeable vehicular asphalt
Proposed amenity lawn
Proposed ornamental planting
Proposed hedge planting
Existing hedge/planting retained
Proposed tree planting
2.4m high weldesh fencing with associated gatesF1
F2
Additional pupil cycle storage
Existing asphalt retained
Item - 01
Existing asphalt retained and resurfaced
Existing pupil cycle storage Item - 02
F3
Existing 1.8m high palisade fencing retained
Proposed 1.5m high vertical bar railings
Existing accessible parking baysItem - 03
New car park entrance gates into New
Rickstones Academy car park
Item - 04
Road markings for pupil crossing point to 6th
Form block.
Item - 05
New pedestrian footpath Item - 06
Pedestrian entrance into Southview School
Existing tree retained
Road markings for pupil crossing point to 6th
Form block.
Item - 05
New pedestrian footpath Item - 06
Pedestrian entrance into Southview SchoolItem - 07
Vehicle entrance gate into Southview SchoolItem - 08
Grounds maintenance gatesItem - 09
Southview School Bin Storage Item - 10
NEW RICKSTONES ACADEMY+ SOUTHVIEW SCHOOL
Public Consultation Boards24.11.2020FLOOR PLANS
GROUND FLOOR PLAN FIRST FLOOR PLAN
NEW RICKSTONES ACADEMY
Public Consultation Boards24.11.2020ELEVATIONS & 3D VIEWS
NEW RICKSTONES ACADEMY
EAST ELEVATION
B. BRICK : WHITE
A. R
AIN
SCR
EEN
CLA
DDIN
G GR
EY /
BLA
CK
C/D/
E. F
LASH
ING
& F
RAM
ES
MATERIALS
SOUTH ELEVATION
NORTH ELEVATION
WEST ELEVATION
FRONT VIEW
REAR VIEW
Public Consultation Boards24.11.2020FLOOR PLANS
GROUND FLOOR PLAN FIRST FLOOR PLAN
SOUTHVIEWSCHOOL
Public Consultation Boards24.11.2020
SOUTHVIEWSCHOOL
ENTRANCE
GARDEN
MATERIALS
2. BRICK : BUFF MULTI
1. R
AIN
SCR
EEN
CLA
DDIN
G _
NAT
URA
L BR
OW
N
3/4/
5. F
LASH
ING
& F
RAM
ES
EAST ELEVATION
SOUTH ELEVATION
NORTH ELEVATION
WEST ELEVATION
ELEVATIONS & 3D VIEWS
Public Consultation Boards24.11.2020
NEW RICKSTONES ACADEMY+ SOUTHVIEW SCHOOL
12
6
11
2442
35
15
F1
BIN
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1F1
F1
F1
100 m²CLASSROOM_LRG
15 m²HYGIENE 2
20 m²HYGIENE 1
13 m²GR RM
5 m²ST_GT
50 m²CLASSROOM
80 m²DINING & COM RM
20 m²KITCHEN
2 m
²
ST
_C
L
31 m²STAFF PREP
11 m²SWR
7 m²ST_MOB
30 m²SENSORY RM
16 m²PLANT
9 m²
96 m²HYDROTHERAPY POOL
34 m²PLANT
7 m²ST_MOB
15 m
²
MA
IN O
FF
ICE
30 m²HYGIENE_TRI
8 m²S_WC
12 m²GR RM
10 m²SERVER
14 m²LIFT CORE_1.0 29 m
²STAIRCORE_1.0
27 m
²
LO
BB
Y_R
ES
IDE
NT
IAL
87 m²CIRCULATION
CA
NO
PY
CANOPY
FE
RESIDENTIAL
ENTRANCE
SIX
TH
FO
RM
E
NT
RA
NC
E
HY
DR
OT
HE
RA
PY
EN
TR
AN
CE
11 m²SHOWERS
10 m
²
CH
AN
GIN
G
10 m
²
CH
AN
GIN
G
4 m²CH_S
4 m²AWC
4 m²AWC
POOL
AC
CE
SS
23 m
²
LO
BB
Y
11 m²LOBBY
27 m
²
CIR
CU
LA
TIO
N
4 m²ST_GT
4 m²AWC
4 m²ST_GT
BU
ILD
ING
CA
NO
PY
CANOPY
CANOPY
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2 New Ri
Permanent Fencing
Solid Hoarding
Heras Fencing
Pedestrian Barrier
Site Accommodation
Car Park Extension WorkingArea
Contractors Car Parking
Vehicle Flow
Data PodTurnstile
Gatemans Hutlocated outsideboundary tohelp managetraffic
PHASE 2 LOGISTICS PLAN
Managedpedestrian linkto 6th formblock
Material Store
ContractorsOverflow CarPark if required
PermanentFence netteddue toproximity toother buildings
Car Park handed overto school