Sustainability as an operational and strategic tool
Klaus Kellermann Roskilde Municipality
NEW DEMANDSNEW POSSIBILITIES
![Page 2: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/2.jpg)
![Page 3: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/3.jpg)
![Page 4: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/4.jpg)
Emissions Gap Report
November 2019
"Our collective lack of early and effective action against climate change means that we now have to reduce emissions by more than seven per cent every year."
Inger Andersen, Executive Director of UNEP
Shutterstock
![Page 5: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/5.jpg)
The building and construction sector accounts for 39 % of all energy‐ and process‐related global CO2 emissions.
Production of building materials: The production and transport of building materials, such as concrete and metals, as well as demolition and waste treatment in the building sector
accounts for 11 % og the global CO2 emissions.
Global Status Report 2018: Towards a Zero-emission, Efficient and Resilient Buildings and Construction Sector, UN
![Page 6: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/6.jpg)
Bringing Embodied Carbon UpfrontWorld Green Building Council
![Page 7: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/7.jpg)
LCA LCC Circular Economy
![Page 8: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/8.jpg)
Ragnarock
8.4.
Improve progressively, through 2030, global resource efficiency in consumption and production and endeavour to decouple economic growth from environmental degradation, in accordance with the 10‑Year Framework of Programmes on Sustainable Consumption and Production, with developed countries taking the lead
![Page 9: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/9.jpg)
Directive 2014/24/EU of the European Parliament
§40 Technical specifications
“A contracting authority shall stipulate the characteristics required by the works, services or supplies in the technical specifications.
The contracting authority may impose requirements for the specific processor method of production or supply of the proposed works, supplies or services and requirements concerning intellectual property rights including transfer of intellectual property rights.”
![Page 10: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/10.jpg)
Directive 2014/24/EU of the European Parliament
§46 Labels
“In the technical specifications, the award criteria or the terms of performance of the contract, a contracting authority may require that a purchase shall carry a particular label as documentation of specific qualities”
![Page 11: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/11.jpg)
Spraglehøj
![Page 12: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/12.jpg)
![Page 13: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/13.jpg)
- Incentives
- Terms of performance
- Award criterias
PROCUREMENT STRATEGY
Experiences from development projects migrates into larger scale commercial projects.
![Page 14: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/14.jpg)
- Explicit demands for LCA calculations
- Explicit demands for LCC calculations
- All larger project are certified DGNB
- Explicit demands for reuse and recycling
- Explicit demands for design for disassembly
PROCUREMENT STRATEGY
![Page 15: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/15.jpg)
MUSI
CON
![Page 16: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/16.jpg)
MUSI
CON
![Page 17: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/17.jpg)
MUSI
CON
DEVELOPMENT
PROJECT
The municipality received funding for our first
experiments with recycled concrete.
![Page 18: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/18.jpg)
MUSI
CON
PRACTICAL LEARNING PROCESS
The results of the project has been transformed into a
practical builders manual, that is distributed to other
municipalities
![Page 19: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/19.jpg)
MUSI
CON
PRACTICAL LEARNING PROCESS
Often very simple building methods does not compile with traditional risk handling and therefore needs a shift in responsibility.
By insisting on a more simplistic approach general risk profile can be minimized.
In practical situations this means that the builder must accept a responsibility normally placed by contractors or advisors.
![Page 20: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/20.jpg)
P-house Indfaldet
“In connection with tenders, an LCA statement must be submitted, which in prose explains the design choices made in connection with the project offered. The statement must include sufficiently detailed information about design considerations and documentation for implementation in the actual building design, to make it probable that the chosen solution is environmentally optimized.
The focus should be exclusively on CO2 (Global Warming Potential) in the statement.
Alternatively, LCA estimates can be prepared in LCAbyg.dk”
![Page 21: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/21.jpg)
GOALS
Focus on CO2 emissions are kept by
builder and realized by contractor
Recycling and design for
disassembly is implemented througout the
process.
CIRC
ECO
MTHøjgaard A/S
![Page 22: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/22.jpg)
MUSI
CON
![Page 23: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/23.jpg)
• Process Quality 12,5%
• Environmental Quality 22,5%• Economical Quality 22,5%
• Social Quality 27,5%
• Teqnical Quality 15,0%
Institution Ringparken
![Page 24: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/24.jpg)
Environmental Quality
- The consumption of resources is minimized and there is a focus on the possibility of separating building components after use.
- The project's expected climate impact is as small as possible.
Institution Ringparken
![Page 25: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/25.jpg)
New road Søndermarksvej
CO2 emissions reductions are incorporated in the project with the focus on minimizing soil excavations and transport.
![Page 26: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/26.jpg)
LIPASTO - calculation system for traffic exhaust emissionsEN 16258:2012
![Page 27: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/27.jpg)
![Page 28: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/28.jpg)
MUSI
CON
MATERIAL BANK
![Page 29: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/29.jpg)
MUSI
CON
RESSOURCE SHEDS
![Page 30: NEW POSSIBILITIES - Procura](https://reader034.vdocuments.site/reader034/viewer/2022042412/625ef448e8e6c8320a1db3ab/html5/thumbnails/30.jpg)
MUSI
CON
ENVIRONMENTAL QUALITY
55% lower CO2 emmissions
ECONOMICAL QUALITY
20% lower constructions costs
SOCIAL QUALITY
75% of the costs are used for local salaries