new microsoft office word document

2
CONSENT OF THE APPLICANT Dt. TO: The Deputy Engineer, UCVCL: Sub –Dii!i"n , #ANDHINA#A$ Sub : App%i&'ti"n ("r e%e&tri&'% In(r'!tru&ture )ee%"p*ent + ith !eri&e &"nne&ti"n- ith un)ergr"un) )i!tributi"n !y!te* &"n ne) t" "ur pre*i!e! ("r "bt'ining p" er !upp%y &"nne&ti"n De'r Sir , A re!i)enti'%/ C"**er&i'% !&he*e n'*e) '! $')he #reene!e) 't Vi%%'ge : 0u)'!'n ,T' #'n)hin'g'r i! "rg'ni1e)/)ee%"pe) by u! 'n) '! ' "rg'ni1er /)ee%"per 'n 'pp%i&'ti"n ("r in(r'!tru&ture )ee%"p*ent + ith !eri&e &"nne&ti"n / ith"ut !eri&e &"nne&ti"n -i! !ub*itte) 'n) in the !ub2e&t *'tter e un)ert'3e '! per ("%%" ing ("r un)ergr"un) )i!tributi"n !y!te* &"n ne) t" "ur pre*i!e!.

Upload: dhwani

Post on 05-Nov-2015

212 views

Category:

Documents


0 download

DESCRIPTION

New Microsoft Office Word Document

TRANSCRIPT

CONSENT OF THE APPLICANT

Dt. TO: The Deputy Engineer, UCVCL: Sub Division , GANDHINAGAR Sub : Application for electrical Infrastructure development (with service connection) with underground distribution system confined to our premises for obtaining power supply connection

Dear Sir ,A residential/ Commercial scheme named as Radhe Greenesed at Village : Kudasan ,Ta Gandhinagar is organized/developed by us and as a organizer /developer an application for infrastructure development (with service connection / without service connection )is submitted and in the subject matter we undertake as per following for underground distribution system confined to our premises.

1. We will use only ISI marked electrical goods for underground distribution system conned to our premises.2. We are submitted all Plans /drawings for the said schedule duly signed by Electrical Engineering and we ensure that we will carry out underground cabling work through the License electrical contractor . After completion of underground cabling work we will produce work completion certificate duly sign by license electrical contractor.3. We will arrange to lay entire underground network as per drawing submitted and upon work completion get in inspected by government Electrical Inspector before release of power .4. We will obey all rules and regulations prescribed by UGVCL for underground distribution system confined to scheme to be laid by us.5. We ensure that , no permanent RCC work/paving on cable trench, will be developed at any point of time we also ensure to arrange to make this adhere to by final occupant of premises.6. As per directives of Electrical inspectors latter No.14526 dtd :11/6/08 and as per rules , we will provide proper earthling at both ends i.e. at MSP, FSP and consumer metering end .7. Power failure due to any fault in underground network laid down y organizer / developer /society will have to be attended by organizer/developer/ society at our risk and cost .UGVCL is not liable for such kind of power interruption due to fault in underground network which is laid by us. It will be liability of organizer /developer /society to arrange to restore under ground network to healthy stat.Thanking You