New Jersey Avenue, NWDesign of Safety Improvements
Public Meeting
July 25, 2012
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
2/44
Project Status
Alternatives
Traffic Anal sis
Screening
Recommended Alternative
Obtain Feedback
Finalize
Project Schedule
Next Steps
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
3/44
New Jersey Avenue
New York AvenueN Street
H Street
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
4/44
Multi-modal considerations
Recommendation presented toDDOT in May 2012
Public update tonight
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
5/44
1. Mount Vernon Triangle Study
.
Comments Modifications to ca acit
Increased turning radii
3. Combined or NewAlternative with provisions
for multi-modal opportunities
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
6/44
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
7/44
-
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
8/44
-
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
9/44
- -
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
10/44
Used turning movement
Obtained Wal Mart TrafficImpact Study from August
2011
Applied MWCOG model toaccount or ot er growt
Developed 2022 No Build
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
11/44
Conducted traffic analysis
Forecasted two-wayoperation
Evaluated crash information
Evaluated multi-modalcharacteristics including
pedestrian, cyclist and
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
12/44
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
13/44
Weighted scoring system of:
Parking Impacts
Bicycle/Pedestrian Aspects
Curb Impacts/Construction
Cost eaut cat on
Alternative 3 provides best
Could impact parking
Likel is the hi hest cost
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
14/44
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
15/44
On-road bicycle facility
throughout limit of project 3 travel lanes 11-10-11 feet
2 NB and 1 SB
2 bike lanes (10 feet) 1 parking lane (8 feet)
Increased landscaping
e estrian upgra es No major change to traffic
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
16/44
Bike lanes right side
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
17/44
Floating bike lanes
parking Provide guidance for
cyclists and vehicles
during different
eaks
Could provide 40
additional parking
spaces off peak
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
18/44
Alternatives Analysis May 2012
30% Submittal August 2012
90% Submittal January 2013
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
19/44
Public Input
Geotechnical Analysis
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
20/44
Thank you for your time
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
21/44
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
22/44
Bike lanes stay right at intersection; cyclists navigate like
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
23/44
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
24/44
Bike lanes initiate/terminate
intersection
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
25/44
Bike lanes initiate/terminate
intersection
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
26/44
Pedestrian crossings
NYA Leading pedestrian interval
not considered
Unique Dutch treatmentcons ere or cyc st tra c
along NJA
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
27/44
Add U Tube Video
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
28/44
Bike lanes initiate/terminate
intersection
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
29/44
Bike lanes initiate/terminate
intersection
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
30/44
Bike lanes initiate/terminate
intersection
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
31/44
Bike lanes initiate/terminate
intersection
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
32/44
Bike lanes initiate/terminate
intersection
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
33/44
Bike lanes initiate/terminate
intersection
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
34/44
Bike lanes initiate/terminate
intersection
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
35/44
Conduct a traffic analysis to
construct based on previousalternatives
Coordinate with community to
achieve consensus on alternative
65% contract documents
Provide construction phase
services as necessar
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
36/44
1. Mount Vernon Triangle Study
.
3. Combined or New Alternative withrovisions for multi-modal
opportunities
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
37/44
Roadway Design
Maintenance of Traffic
New York Avenue
M Street if re uired K Street
2nd Street/I(Eye) Street
Signing and Pavement Marking Street Lighting
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
38/44
Horizontal/Vertical Alignment
Maintenance of Traffic (includingc clists & edestrians
Signing & Pavement Marking
Li htin Landscaping
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
39/44
- As-built utility information at
DDOT public involvementcoordination
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
40/44
Deliver the best project to Districts residents
B/C near 2.0 at NYA/NJA alone
improvements along NYA and M Street
Ex anded multi-modal connections directl to rowinareas of the City
Safer pedestrian crossings
Replacement of aging infrastructure
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
41/44
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
42/44
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
43/44
Options eliminated from consideration:
-
a cycle track (Based on the Kick Off meeting in January 2012) Options considered, but eliminated from consideration:
Off road trail parallel to NJA eliminated due to landscaping
and property impacts
yc e trac n t e m e o roppe ue to trans t on
requirements on either end of corridor
eliminated: Traffic signal-specific phasing at NYA/NJA
-
7/31/2019 New Jersey Avenue -- DDOT 07-25 Presentation
44/44
Bulb outs considered in all areas where dedicated parking is
7
M Street in vicinity of NYA/NJA to calm traffic intocommunity
Along NJA in front of Bible Way Temple south to L Street
Geometric revisions considered to account for Design
e c es an pe es r ans
Revised Eye Street design to accommodate truck traffic to
Wal Mart
Median extensions at NYA considered for refuge andadditional crossings