![Page 1: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/1.jpg)
Integrated Healthcare Facilities Infrastructure
Warren Rosebraugh MSAWarren Rosebraugh, MSA
Director, Healthcare Solution Architect
![Page 2: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/2.jpg)
Solution-BasedSolution BasedDesign ProcessDesign Process
2
![Page 3: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/3.jpg)
Schneider Electric Brands
3
![Page 4: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/4.jpg)
Solutions-based design process
Mi i
Operational Level(WHY)
What are the servicesprovided by the systems toits environment? Mission
of theSystem Identify the NeedsIdentify the Stakeholders
Function 1
Function 2Functional Level
(WHAT)What are the functionsthat the systems shall
Function 3 Function 4
(WHAT)perform?
Construction Level(HOW)
What are the resources thatform the systems?
4
People Technical ComponentsSoftware Hardware
y
![Page 5: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/5.jpg)
Health system prioritiesImprove Financial
Performance
Improve Safetyand Securityand Security
Simplify Regulatory Priorities Compliance
Increase Patientand Needs
Increase Patient Satisfaction
5
Improve Staff Productivity
![Page 6: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/6.jpg)
Patient room of the future - Needs
PatientSimple WorkflowVisitor Experience
SatisfactionIndoor EnvironmentalStaff Productivity
pFlexible Configuration
ALOSQuality
Light Level
Reduces HumanError
EEntertainment Options
Quiet EnvironmentLight Level
Control
Modern GUI
EnergyEfficiency
Automated ComplianceReporting
Reduced Liability
6
Patient Securityy
Simple PatientInterface
Reduced LiabilityRisk
Creates Positive PR
![Page 7: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/7.jpg)
LifecycleLifecycle ConsiderationsConsiderations
7
![Page 8: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/8.jpg)
Lifecycle cost considerationInfrastructure investment criteria
● Clinical technologies have an 18 month to 3 year life cycle● Clinical technologies have an 18-month to 3-year life-cycle● Infrastructure technologies have a 15 to 30-year life-cycle
Facility lifecycleFacility lifecycle
8
![Page 9: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/9.jpg)
Energy use in hospitals
9
![Page 10: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/10.jpg)
Energy management lifecycle
10
![Page 11: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/11.jpg)
IntelligentIntelligentInfrastructuresInfrastructures
11
![Page 12: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/12.jpg)
Intelligent Infrastructures
12
![Page 13: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/13.jpg)
Functional Areas Impacted
13
![Page 14: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/14.jpg)
Energy Management Lifecycle
14
![Page 15: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/15.jpg)
Impact on Business Priorities
15
![Page 16: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/16.jpg)
Integrated ControlIntegrated Control PlatformPlatform
16
![Page 17: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/17.jpg)
Traditional facilities design
• Multiple networks from differentvendors
Critical PowerManagement
Clinical &Administrative
RTLS PatientInfant Staff
RegulatoryCompliance
Biometrics Elevator Intercom VisitorManagement
• Too many systems to learn• Complex troubleshooting• Higher capital and operational
expenditures
17
White SpaceManagement
g
IntrusionDetection
BuildingManagement
LightingVideo AccessControl
Fire Safety EnergyManagement
Administrative Infant Staff Compliance Management expenditures• Obstacles to achieving energy
efficiency
![Page 18: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/18.jpg)
Integrated Control PlatformReduce CapEx • Lowered equipment,
software &
Lower OpEx
software & installation costs
• Common footprint
p• Maintain design KPI’s• Faster training deployment• Minimized maintenance cost• Continuous commissioning
Delivers• Improved patient care• Improved patient / staff safety• Increase staff efficiency• Increase staff efficiency• Low energy cost• Improve financial performance
18
![Page 19: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/19.jpg)
Enterprise-level monitoring and reporting
19
![Page 20: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/20.jpg)
Making sense of big dataFacility
Benchmarking
BehaviorEmpoweringDashboards
ProactiveFault
Detection
CarbonFootprintA l i
IncidentForensics AnalysisForensics
PredictiveModeling
InformedEnergy
StandardizedCompliance
20
ModelinggyProcurement
pReporting
![Page 21: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/21.jpg)
UseUseCasesCases
21
![Page 22: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/22.jpg)
Value of a use case (Why, What, How) Improve Financial
Performance Translates
Improve Safetyand Security
Business Value
and Security
Simplify Regulatory Priorities Defines actualCompliance
Increase Patientand Needsfunctionality
Increase Patient Satisfaction
Part ofConstruction
22
Improve Staff Productivity
Construction Documents
![Page 23: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/23.jpg)
Integration with Clinical Systems – Use Case
ADTsystems
HL7
SurgicalNurse call & Bed Transaction
data
Meditech, Healthslide, EPIC, Rhapsody, Cloverleaf
Clinical
Facilities
gschedulingmanagement
AS sync
Transactioncoordinator
Facilities
SE HL7 Middleware
bridgeHL7listener
Eneergy strategy
23
Hospitalcampus
Singlebuilding
Buildingautomation
![Page 24: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/24.jpg)
Mechanical
24
![Page 25: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/25.jpg)
Security
25
![Page 26: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/26.jpg)
IHFI DesignIHFI Design DrawingsDrawings
26
![Page 27: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/27.jpg)
Implementation
27
![Page 28: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/28.jpg)
Traditional project approach
28
![Page 29: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/29.jpg)
Solution-based approach
29
![Page 30: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/30.jpg)
IPD – Integrated Project Deliveryffe
ctAbility to impact cost and functional capabilities
fort
/ Ef
Cost of design changes
IPD process
ign
Eff
Traditional process
Des
S h ti D i C t ti A it/P d i C t tiSchematic designCriteria design
Designdevelopment
Detaileddesign
Constructiondocuments
Implementationdocuments
Agency permit/biddingAgency
coordination/final buyout
Pre-design
Conceptualization
Construction
Construction
30
Engage a specialist early to reduce waste and risk!
![Page 31: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/31.jpg)
Integrated approach costs 12-15% less!
Less hardware Project managementLess hardware
Less installation
Project management efficiencies
Contract al efficienciesLess installation Contractual efficiencies
Less structured cabling
Site efficiencies
31
![Page 32: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/32.jpg)
Contracting methodology?
H d IH d I How do I guarantee
fair pricing?
How do I know what I
want? g
●Typically:●Individual systems are bid and bundled ●Provide deduct for advanced integration based on savings,
if awarded all systems●You’ve already missed the savings in your Power package for the
32
Integrated Control Platform and the efficiencies it can deliver
![Page 33: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/33.jpg)
Contracting methodology?Contracting methodology?● Instead, do this
● Bring Schneider Electric in as your Technology Integration Partner at the g y gy gconceptual design phase
● Use the Division 25 Specification to define integration via Use Cases● Procure your Power package to include the specific equipment and
installation efficiencies designed into Integrated Control Platform detailed by the Division 25 Specification
● Procure Fire package with BACnet option P ONE k ith l lt ifi ti (BMS● Procure ONE package with low voltage as one specification (BMS, security, CCTV, nurse call, lighting control, power metering, networking)
● Consider multi year multi discipline maintenance agreement● Consider multi-year, multi-discipline maintenance agreement● Evaluate true cost of ownership● Bundled service agreements for multiple systems to gain cost savings
33
● Cost plus / guaranteed maximum price
![Page 34: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/34.jpg)
Healthcare Expertise!Healthcare Expertise!● Dedicated Resources ● Continued investments in R&D● EcoStruxure for Healthcare● Single point of contact● End to end project delivery● End to end project delivery● Interoperability and open solutions● Best in class integration to 3rd party products● Understanding of healthcare customer needs and valueg● Off-site prefabrication● Cost certainty early in the project lifecycle● Improved program delivery● Reduced project risk● Reduced health and safety risk ● Improved Hospital margins
34
![Page 35: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/35.jpg)
Questions?Q
Thank You
35
![Page 36: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/36.jpg)
Elmhurst Memorial HealthcareElmhurst, IL
Project Featuresj● 260-bed acute care replacement hospital● 970,000 sf● New facility that ties to existing campus and a second
Energy Center
Construction Manager: Gilbane
Energy Center● Scheduled Completion Fall 2011● SE Project Value = $8.9M
Construction Manager: GilbaneMEP Engineer: Korda
LV Engineer: EDIIntegrated Technologies● Andover Continuum Building Management System● Andover Continuum Security Access System
P l IP C d ONSSI IP Vid M t● Pelco IP Cameras and ONSSI IP Video Management● Square D Electrical Distribution System● Square D PowerLogic Utility Metering
36
![Page 37: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/37.jpg)
Texas Health Presbyterian Hospital Flower MoundFlower Mound, TX
Project Features● 120-bed Acute Care Facility● Certified LEED Silver● 185,000 Square Feet● Project Completion Summer 2010● SE Project Value = $3.6M
Integrated Technologies● Andover Continuum Building Management System● Andover Continuum Security Management System
Architect: HKS, Inc.Construction Manager: Balfour Beatty
MEP Engineer: ccrd Partners● Andover Continuum Security Management System− Key Interfaces:
● Nurse Call● Intercom● Infant Protection
● Pelco IP Cameras and Video Management
gMedical Communications Planner: HKS, Inc.
● Pelco IP Cameras and Video Management● Square D Electrical Distribution System● Square D Powerlink Lighting Control System● Square D PowerLogic Utility Metering System● Intego Nurse Call
37
● Intego Nurse Call● Bogen Overhead Sound
![Page 38: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/38.jpg)
The Methodist Hospital Outpatient Care CenterHouston, TX,
Project FeaturesConsolidated comprehensive state of art facility● Consolidated, comprehensive state-of-art facility
● Dedicated to Outpatient Services and Procedures● 1.6M sf● 26 floors● Project Completion Summer 2010● SE Project Value = $8.5M
Integrated Technologies● Andover Continuum Building Management System● TAC/ I NET Security Access System Architect: WHR Architects
P M B dd & A i t● Pelco IP Cameras and Video Management● Square D Electrical Distribution System● Square D PowerLink Lighting Control● Square D PowerLogic Utility Metering
Program Manager: Broaddus & AssociatesConstruction Manager: Hensel Phelps
MEP Engineer: Smith Seckman Reid, Inc.LV Engineer: Datacom Design Group
38
q g y g
![Page 39: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/39.jpg)
Massachusetts General Hospital Lunder BuildingBoston, MA
Project Featuresj● 150-bed Patient Tower Addition● 530,000 sf● 14 floors● Project Completion Summer 2011
Architect: NBBJ Architects
● Project Completion Summer 2011● SE Project Value = $6.5M
Integrated Technologies Architect: NBBJ ArchitectsConstruction Manager: Turner ConstructionMEP Engineer: Thompson Consultants, Inc.
LV Engineer: Thompson Consultants, Inc.
Integrated Technologies● Andover Continuum Building Management System● Andover Continuum Security Access System● Pelco IP Cameras and Video Management● Square D Electrical Distribution System● Square D PowerLogic Utility Metering
39
![Page 40: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/40.jpg)
UCSF Neuroscience Laboratory and Clinical Research Building
Project Features● Clinical translation and basic research facility
gSan Francisco, CA
● Clinical, translation and basic research facility● Housing the Institute for Neurodegenerative Disease, the
Department of Neurology and the Keck Foundation for Integrative Neuroscience
● 237 000 sf● 237,000 sf● 5 Floors● Seeking LEED Silver Certification● Scheduled Completion Spring 2012
$● SE Project Value = $5.8M
Integrated Technologies
Architect: Skidmore, Owens and MerrillConstruction Manager: McCarthy Cook / Clark
MEP Engineer: WSP Flack & KurtzElectrical Contractor: Cupertino Electric
Integrated Technologies● TAC I/A Building Management System● Square D Electrical Distribution System● Square D PowerLogic Utility Metering
S D IP CS I t t d E i t
40
● Square D IPaCS Integrated Equipment
![Page 41: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/41.jpg)
University of Chicago New Hospital PavilionChicago, IL
Project Featuresj● 240-bed Adult Hospital ● Focused on cancer, advanced surgery, high tech
imaging, the neurosciences and gastrointestinal procedures
Architect: Rafeal Vinoly Architects
● 1.2M sf● 10 floors● Scheduled Completion Fall 2012
Architect: Rafeal Vinoly ArchitectsConstruction Manager: Gilbane / W.E. O’NeilMEP Engineer: Affiliated Engineers / Primera
LV Engineer: RTKLIntegrated Technologies● Andover Continuum Security Access System● Pelco IP Cameras and Video Management● Pelco IP Cameras and Video Management● Square D Electrical Distribution System● Square D PowerLogic Utility Metering
41
![Page 42: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/42.jpg)
Inova Fairfax Hospital South Patient Tower Falls Church, VA
Project Featuresj● 174-bed Patient Tower for Surgical and Intensive Care
Treatment● Seeking LEED Silver Certification● 216,000 sf
A hit t Wil t S I
216,000 sf● 11 floors● Scheduled Completion Fall 2012● SE Project Value = $4M
Architect: Wilmot Sanz, Inc.Construction Manager: Turner Construction
MEP Engineer: RMF EngineeringIntegrated Technologies● Andover Continuum Building Management System
S D El t i l Di t ib ti S t● Square D Electrical Distribution System● Square D PowerLogic Utility Metering
42
![Page 43: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/43.jpg)
Santa Clara Valley Medical CenterSan Jose, CA
Project Featuresj● 168-bed Rehabilitation Center for traumatic brain injury
and spinal cord injury● Seeking LEED Certification● 375,000 sf375,000 sf● Scheduled Completion Spring 2012● SE Project Value = $4M
Architect: Anshen + AllenConstruction Manager: Turner Construction
MEP Engineer: ARUP Engineering Integrated Technologies● TAC I/A Building Management System
● Advanced patient room control interface through Nurse Call pillow speakerCall pillow speaker
● Square D Electrical Distribution System● Square D PowerLogic Utility Metering
43
![Page 44: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/44.jpg)
Oklahoma Medical Research Foundation TowerOklahoma City, OKy,
Project Features● Oklahoma Medical Research Foundation● Oklahoma Medical Research Foundation
● investigative research entity focused at the molecular level
● 186,000 sf● 2010 Renewable Energy World North America Awardgy● Seeking LEED Gold Certification● Project Completion Spring 2011● SE Project Value = $4M
Integrated Technologies● TAC I/A Building Management System Architect: Perkins + Willg g y
● Phoenix Laboratory Airflow Control System● Wind turbine and Photovoltaic power monitoring● Lighting control system● Vivarium backup water control system
Construction Manager: Flintco, Inc.MEP Engineer: Phoenix Design Group
44
● Heating, Process and Chilled Water system controls● Square D Variable Frequency Drives
![Page 45: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/45.jpg)
Nemours/Alfred I. duPont Hospital for ChildrenWilmington, DE
Project Features● 180-bed Pediatric Hospital● 4 Building Hospital Campus● 4 Building Hospital Campus● 855,000 sf● Project Completion Summer 2007● SE Project Value = $4M
Integrated Technologies● Andover Continuum Building Management System
Construction Manager: SkanskaMEP Engineer: Affiliated Engineers, Inc.
LV Engineer: Affiliated Engineers Inc● Andover Continuum Security Access System● Pelco IP Cameras and Video Management● Square D Electrical Distribution System● Square D PowerLogic Utility Metering
LV Engineer: Affiliated Engineers, Inc.
q g y g
45
![Page 46: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/46.jpg)
TCMC Commonwealth Medical CollegeScranton, PA
Project Features● Education & Research Building
180 000 f● 180,000 sf● Scheduled Completion Summer 2011● SE Project Value = $3.2M
Integrated Technologies● TAC I/A Building Management System
− Key Interfaces:
Program Manager:Construction Manager: The Quandel Group
MEP Engineer: ● Phoenix Lab Control System● Aircuity Monitoring System
● Andover Continuum Security Access System● Pelco IP Cameras and Video Management
gLV Engineer:
● Square D Clipsal Low Voltage Lighting System● Square D Variable Frequency Drives● Square D Electrical Distribution System● Square D Powerlink Lighting Control System
46
q g g y● Square D Powerlogic Utility Metering System
![Page 47: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/47.jpg)
Springfield Regional Medical CenterSpringfield, OH
Project Features● 254-bed Acute Care Hospital● 475,000 sf● Project Completion Summer 2011● SE Project Value = $3.2M
Integrated Technologies● Andover Continuum Building Management System
● Advanced patient room control interface through Nurse● Advanced patient room control interface through Nurse Call pillow speaker
● Square D Electrical Distribution System● Square D PowerLink Lighting Control● Square D PowerLogic Utility Metering
Architect: Champlin ArchitectureConstruction Manager: Danis Construction
MEP Engineer: Dynamix Engineering
● Square D PowerLogic Utility Metering
47
![Page 48: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/48.jpg)
St.Lukes Episcopal Hospital – Sugar LandSugar Land, TXg ,
Project Features● 106-bed Acute Care Hospitalp● 335,000 sf● Project Completion Fall 2008● SE Project Value = $3M
Integrated Technologies● TAC I/A Building Management Systemg g y● Andover Continuum Security Access System● Pelco IP Cameras and Video Management● Square D Variable Frequency Drives● Square D Electrical Distribution System
Architect: Page Southerland PageConstruction Manager: Linbeck
MEP Engineer: Smith Seckman Reid, Inc.
● Square D Electrical Distribution System● Square D Powerlogic Utility Metering System
48
![Page 49: New Integrated Healthcare Facilities Infrastructuresamekittyhawkpost.org/wp-content/uploads/2016/07/... · 2016. 5. 20. · Phoenix Lab Control System Aircuity Monitoring System Andover](https://reader034.vdocuments.site/reader034/viewer/2022051907/5ffaaf337b907e28fa5dff2c/html5/thumbnails/49.jpg)
Texas Department of Health – Texas Center for Infectious DiseaseSan Antonio, TX
Project FeaturesProject Features● 75-bed tertiary care hospital
● Medical care and research facility for patients with tuberculosis and other related infectious, contagious diseases
● 60,000 sf● Project Completion Summer 2010● SE Project Value = $1.5M Construction Manager: JE Dunn Construction
MEP Engineer: O’Connell Robertson
Integrated Technologies● TAC/ I NET Building Management System
● Complex integration to laboratory airflow and pressurization systems
MEP Engineer: O Connell RobertsonSecurity Engineer: Kroll Security Group
pressurization systems● TAC/I NET Security Access System● Pelco Cameras and Video Management● Square D Electrical Distribution System
49
● Square D PowerLogic Utility Metering